Grid Stress Alerts for 13 September 2026
2 notable grid events on 13 September 2026 in ENTSO-E and EIA operator data: 2 net imports. Records are judged against the days loaded for each zone, and each sentence says how many.
Key Facts
- Net imports into Albania reached 4.25 GWh on 13 September 2026 (22% of demand), the 2nd highest daily net imports in 377 days of loaded history.
- Net imports into Austria reached 46.1 GWh on 13 September 2026 (38% of demand), the 3rd highest daily net imports in 393 days of loaded history.
All Alerts, 13 September 2026
2 events- Net imports Net imports into Albania reached 4.25 GWh on 13 September 2026 (22% of demand), the 2nd highest daily net imports in 377 days of loaded history. Albania grid
- Net imports Net imports into Austria reached 46.1 GWh on 13 September 2026 (38% of demand), the 3rd highest daily net imports in 393 days of loaded history. Austria grid
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-13. Operator data only, kept apart from annual statistics.