CAISO Electricity Demand and Generation Mix
CAISO demand was 21,548 MW in the hour starting 30 Oct 2026, 04:00 PDT (UTC-07:00). Gas was the largest source in the hour starting 29 Oct 2026, 22:00 PDT (UTC-07:00), at 60% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- CAISO is a regional transmission organization and balancing authority in the United States, part of the EIA California region.
- In the hour starting 30 Oct 2026, 04:00 PDT (UTC-07:00), demand in CAISO was 21,548 MW, against a day-ahead forecast of 20,111 MW.
- Gas supplied 60.1% of CAISO's generation in the hour starting 29 Oct 2026, 22:00 PDT (UTC-07:00).
- Demand in CAISO totalled 224 TWh in 2025.
- Gas supplied 42.0% of CAISO's generation in 2025.
- The highest daily demand in CAISO from 2019 onward was 965 GWh, on 2026-09-09 (9 September 2026).
- The highest hourly demand in CAISO since 2026-06-16 (16 June 2026) was 49,959 MW, in the hour starting 9 Sept 2026, 17:00 PDT (UTC-07:00).
- Solar's highest share of CAISO's daily generation from 2019 onward was 48.2%, on 2026-06-29 (29 June 2026).
- Wind's highest share of CAISO's daily generation from 2019 onward was 34.2%, on 2026-05-17 (17 May 2026).
Latest Demand
Hourly operator dataLatest hour known when this page was built: 30 Oct 2026, 04:00 PDT (UTC-07:00).
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-10-30T11:00:00Z.
Generation by Source
Latest hour with generation by source: 29 Oct 2026, 22:00 PDT (UTC-07:00)| Source | Output | Share |
|---|---|---|
| Gas | 13,091 MW | 60.1% |
| Wind | 2,932 MW | 13.5% |
| Other | 2,162 MW | 9.9% |
| Hydro | 1,736 MW | 8.0% |
| Nuclear | 1,100 MW | 5.1% |
| Geothermal | 707 MW | 3.2% |
| Oil | 46 MW | 0.2% |
| Coal | 2 MW | 0.0% |
| Solar | -61 MW | own use |
| Total from these sources | 21,776 MW | |
| Net interchange | -3,487 MW | net imports |
EIA publishes generation by source 10 or more hours after demand, so this hour can be earlier than the latest demand hour. Net interchange is positive when CAISO exports.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-10-30T05:00:00Z.
Last 30 Days, Hourly
Times in UTCShow the data table (720 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-09-30T13:00Z | 25,774 MW |
| 2026-09-30T14:00Z | 27,104 MW |
| 2026-09-30T15:00Z | 30,227 MW |
| 2026-09-30T16:00Z | 32,448 MW |
| 2026-09-30T17:00Z | 33,288 MW |
| 2026-09-30T18:00Z | 33,463 MW |
| 2026-09-30T19:00Z | 33,309 MW |
| 2026-09-30T20:00Z | 33,000 MW |
| 2026-09-30T21:00Z | 33,821 MW |
| 2026-09-30T22:00Z | 34,773 MW |
| 2026-09-30T23:00Z | 36,278 MW |
| 2026-10-01T00:00Z | 36,636 MW |
| 2026-10-01T01:00Z | 36,219 MW |
| 2026-10-01T02:00Z | 34,742 MW |
| 2026-10-01T03:00Z | 33,641 MW |
| 2026-10-01T04:00Z | 32,248 MW |
| 2026-10-01T05:00Z | 30,233 MW |
| 2026-10-01T06:00Z | 28,543 MW |
| 2026-10-01T07:00Z | 27,174 MW |
| 2026-10-01T08:00Z | 25,408 MW |
| 2026-10-01T09:00Z | 24,652 MW |
| 2026-10-01T10:00Z | 24,364 MW |
| 2026-10-01T11:00Z | 24,187 MW |
| 2026-10-01T12:00Z | 24,572 MW |
| 2026-10-01T13:00Z | 26,392 MW |
| 2026-10-01T14:00Z | 27,702 MW |
| 2026-10-01T15:00Z | 31,361 MW |
| 2026-10-01T16:00Z | 34,241 MW |
| 2026-10-01T17:00Z | 34,449 MW |
| 2026-10-01T18:00Z | 34,256 MW |
| 2026-10-01T19:00Z | 34,519 MW |
| 2026-10-01T20:00Z | 34,781 MW |
| 2026-10-01T21:00Z | 35,656 MW |
| 2026-10-01T22:00Z | 37,329 MW |
| 2026-10-01T23:00Z | 38,708 MW |
| 2026-10-02T00:00Z | 38,754 MW |
| 2026-10-02T01:00Z | 38,062 MW |
| 2026-10-02T02:00Z | 36,787 MW |
| 2026-10-02T03:00Z | 34,844 MW |
| 2026-10-02T04:00Z | 33,222 MW |
| 2026-10-02T05:00Z | 31,157 MW |
| 2026-10-02T06:00Z | 28,908 MW |
| 2026-10-02T07:00Z | 28,261 MW |
| 2026-10-02T08:00Z | 27,084 MW |
| 2026-10-02T09:00Z | 26,306 MW |
| 2026-10-02T10:00Z | 26,045 MW |
| 2026-10-02T11:00Z | 25,517 MW |
| 2026-10-02T12:00Z | 25,323 MW |
| 2026-10-02T13:00Z | 26,322 MW |
| 2026-10-02T14:00Z | 28,818 MW |
| 2026-10-02T15:00Z | 34,240 MW |
| 2026-10-02T16:00Z | 35,820 MW |
| 2026-10-02T17:00Z | 35,639 MW |
| 2026-10-02T18:00Z | 35,691 MW |
| 2026-10-02T19:00Z | 36,596 MW |
| 2026-10-02T20:00Z | 38,303 MW |
| 2026-10-02T21:00Z | 39,809 MW |
| 2026-10-02T22:00Z | 40,946 MW |
| 2026-10-02T23:00Z | 42,152 MW |
| 2026-10-03T00:00Z | 41,866 MW |
| 2026-10-03T01:00Z | 40,661 MW |
| 2026-10-03T02:00Z | 39,115 MW |
| 2026-10-03T03:00Z | 37,175 MW |
| 2026-10-03T04:00Z | 35,611 MW |
| 2026-10-03T05:00Z | 33,328 MW |
| 2026-10-03T06:00Z | 30,837 MW |
| 2026-10-03T07:00Z | 29,351 MW |
| 2026-10-03T08:00Z | 27,619 MW |
| 2026-10-03T09:00Z | 26,148 MW |
| 2026-10-03T10:00Z | 25,050 MW |
| 2026-10-03T11:00Z | 24,716 MW |
| 2026-10-03T12:00Z | 24,807 MW |
| 2026-10-03T13:00Z | 25,149 MW |
| 2026-10-03T14:00Z | 26,785 MW |
| 2026-10-03T15:00Z | 32,171 MW |
| 2026-10-03T16:00Z | 35,130 MW |
| 2026-10-03T17:00Z | 35,415 MW |
| 2026-10-03T18:00Z | 36,644 MW |
| 2026-10-03T19:00Z | 37,305 MW |
| 2026-10-03T20:00Z | 37,983 MW |
| 2026-10-03T21:00Z | 39,193 MW |
| 2026-10-03T22:00Z | 40,599 MW |
| 2026-10-03T23:00Z | 41,782 MW |
| 2026-10-04T00:00Z | 42,616 MW |
| 2026-10-04T01:00Z | 42,186 MW |
| 2026-10-04T02:00Z | 40,497 MW |
| 2026-10-04T03:00Z | 38,177 MW |
| 2026-10-04T04:00Z | 36,125 MW |
| 2026-10-04T05:00Z | 33,834 MW |
| 2026-10-04T06:00Z | 31,464 MW |
| 2026-10-04T07:00Z | 29,745 MW |
| 2026-10-04T08:00Z | 28,007 MW |
| 2026-10-04T09:00Z | 26,471 MW |
| 2026-10-04T10:00Z | 25,454 MW |
| 2026-10-04T11:00Z | 25,084 MW |
| 2026-10-04T12:00Z | 24,897 MW |
| 2026-10-04T13:00Z | 24,923 MW |
| 2026-10-04T14:00Z | 26,744 MW |
| 2026-10-04T15:00Z | 32,150 MW |
| 2026-10-04T16:00Z | 35,046 MW |
| 2026-10-04T17:00Z | 35,442 MW |
| 2026-10-04T18:00Z | 37,155 MW |
| 2026-10-04T19:00Z | 37,189 MW |
| 2026-10-04T20:00Z | 38,236 MW |
| 2026-10-04T21:00Z | 39,803 MW |
| 2026-10-04T22:00Z | 41,006 MW |
| 2026-10-04T23:00Z | 41,862 MW |
| 2026-10-05T00:00Z | 42,601 MW |
| 2026-10-05T01:00Z | 42,428 MW |
| 2026-10-05T02:00Z | 41,350 MW |
| 2026-10-05T03:00Z | 39,130 MW |
| 2026-10-05T04:00Z | 36,830 MW |
| 2026-10-05T05:00Z | 34,195 MW |
| 2026-10-05T06:00Z | 31,904 MW |
| 2026-10-05T07:00Z | 29,870 MW |
| 2026-10-05T08:00Z | 28,106 MW |
| 2026-10-05T09:00Z | 27,753 MW |
| 2026-10-05T10:00Z | 26,971 MW |
| 2026-10-05T11:00Z | 26,641 MW |
| 2026-10-05T12:00Z | 27,072 MW |
| 2026-10-05T13:00Z | 28,302 MW |
| 2026-10-05T14:00Z | 30,875 MW |
| 2026-10-05T15:00Z | 37,562 MW |
| 2026-10-05T16:00Z | 40,142 MW |
| 2026-10-05T17:00Z | 41,062 MW |
| 2026-10-05T18:00Z | 41,731 MW |
| 2026-10-05T19:00Z | 41,448 MW |
| 2026-10-05T20:00Z | 42,295 MW |
| 2026-10-05T21:00Z | 43,837 MW |
| 2026-10-05T22:00Z | 45,673 MW |
| 2026-10-05T23:00Z | 46,213 MW |
| 2026-10-06T00:00Z | 45,878 MW |
| 2026-10-06T01:00Z | 44,471 MW |
| 2026-10-06T02:00Z | 42,558 MW |
| 2026-10-06T03:00Z | 40,970 MW |
| 2026-10-06T04:00Z | 38,938 MW |
| 2026-10-06T05:00Z | 35,873 MW |
| 2026-10-06T06:00Z | 32,924 MW |
| 2026-10-06T07:00Z | 31,094 MW |
| 2026-10-06T08:00Z | 29,354 MW |
| 2026-10-06T09:00Z | 28,226 MW |
| 2026-10-06T10:00Z | 27,794 MW |
| 2026-10-06T11:00Z | 27,732 MW |
| 2026-10-06T12:00Z | 27,698 MW |
| 2026-10-06T13:00Z | 28,984 MW |
| 2026-10-06T14:00Z | 30,601 MW |
| 2026-10-06T15:00Z | 37,560 MW |
| 2026-10-06T16:00Z | 40,957 MW |
| 2026-10-06T17:00Z | 41,100 MW |
| 2026-10-06T18:00Z | 41,129 MW |
| 2026-10-06T19:00Z | 40,893 MW |
| 2026-10-06T20:00Z | 41,778 MW |
| 2026-10-06T21:00Z | 42,629 MW |
| 2026-10-06T22:00Z | 43,968 MW |
| 2026-10-06T23:00Z | 45,150 MW |
| 2026-10-07T00:00Z | 45,505 MW |
| 2026-10-07T01:00Z | 43,900 MW |
| 2026-10-07T02:00Z | 42,461 MW |
| 2026-10-07T03:00Z | 40,484 MW |
| 2026-10-07T04:00Z | 38,371 MW |
| 2026-10-07T05:00Z | 35,288 MW |
| 2026-10-07T06:00Z | 32,382 MW |
| 2026-10-07T07:00Z | 30,680 MW |
| 2026-10-07T08:00Z | 28,879 MW |
| 2026-10-07T09:00Z | 27,788 MW |
| 2026-10-07T10:00Z | 27,281 MW |
| 2026-10-07T11:00Z | 27,456 MW |
| 2026-10-07T12:00Z | 27,154 MW |
| 2026-10-07T13:00Z | 28,660 MW |
| 2026-10-07T14:00Z | 30,032 MW |
| 2026-10-07T15:00Z | 35,622 MW |
| 2026-10-07T16:00Z | 38,581 MW |
| 2026-10-07T17:00Z | 39,791 MW |
| 2026-10-07T18:00Z | 40,491 MW |
| 2026-10-07T19:00Z | 41,102 MW |
| 2026-10-07T20:00Z | 41,399 MW |
| 2026-10-07T21:00Z | 42,091 MW |
| 2026-10-07T22:00Z | 43,566 MW |
| 2026-10-07T23:00Z | 44,018 MW |
| 2026-10-08T00:00Z | 44,030 MW |
| 2026-10-08T01:00Z | 42,823 MW |
| 2026-10-08T02:00Z | 40,890 MW |
| 2026-10-08T03:00Z | 38,755 MW |
| 2026-10-08T04:00Z | 36,845 MW |
| 2026-10-08T05:00Z | 34,063 MW |
| 2026-10-08T06:00Z | 31,238 MW |
| 2026-10-08T07:00Z | 29,754 MW |
| 2026-10-08T08:00Z | 27,877 MW |
| 2026-10-08T09:00Z | 26,767 MW |
| 2026-10-08T10:00Z | 26,429 MW |
| 2026-10-08T11:00Z | 26,395 MW |
| 2026-10-08T12:00Z | 26,402 MW |
| 2026-10-08T13:00Z | 27,965 MW |
| 2026-10-08T14:00Z | 29,606 MW |
| 2026-10-08T15:00Z | 34,892 MW |
| 2026-10-08T16:00Z | 38,360 MW |
| 2026-10-08T17:00Z | 38,797 MW |
| 2026-10-08T18:00Z | 39,297 MW |
| 2026-10-08T19:00Z | 38,729 MW |
| 2026-10-08T20:00Z | 39,073 MW |
| 2026-10-08T21:00Z | 40,556 MW |
| 2026-10-08T22:00Z | 42,306 MW |
| 2026-10-08T23:00Z | 42,502 MW |
| 2026-10-09T00:00Z | 41,714 MW |
| 2026-10-09T01:00Z | 40,626 MW |
| 2026-10-09T02:00Z | 38,942 MW |
| 2026-10-09T03:00Z | 37,095 MW |
| 2026-10-09T04:00Z | 35,499 MW |
| 2026-10-09T05:00Z | 33,274 MW |
| 2026-10-09T06:00Z | 30,681 MW |
| 2026-10-09T07:00Z | 29,474 MW |
| 2026-10-09T08:00Z | 27,581 MW |
| 2026-10-09T09:00Z | 26,560 MW |
| 2026-10-09T10:00Z | 25,676 MW |
| 2026-10-09T11:00Z | 25,702 MW |
| 2026-10-09T12:00Z | 26,229 MW |
| 2026-10-09T13:00Z | 27,273 MW |
| 2026-10-09T14:00Z | 28,221 MW |
| 2026-10-09T15:00Z | 31,926 MW |
| 2026-10-09T16:00Z | 35,809 MW |
| 2026-10-09T17:00Z | 36,198 MW |
| 2026-10-09T18:00Z | 36,087 MW |
| 2026-10-09T19:00Z | 36,331 MW |
| 2026-10-09T20:00Z | 36,174 MW |
| 2026-10-09T21:00Z | 37,486 MW |
| 2026-10-09T22:00Z | 37,958 MW |
| 2026-10-09T23:00Z | 37,979 MW |
| 2026-10-10T00:00Z | 37,417 MW |
| 2026-10-10T01:00Z | 36,492 MW |
| 2026-10-10T02:00Z | 34,916 MW |
| 2026-10-10T03:00Z | 33,352 MW |
| 2026-10-10T04:00Z | 32,284 MW |
| 2026-10-10T05:00Z | 30,197 MW |
| 2026-10-10T06:00Z | 28,401 MW |
| 2026-10-10T07:00Z | 27,224 MW |
| 2026-10-10T08:00Z | 25,587 MW |
| 2026-10-10T09:00Z | 24,467 MW |
| 2026-10-10T10:00Z | 23,665 MW |
| 2026-10-10T11:00Z | 23,247 MW |
| 2026-10-10T12:00Z | 23,313 MW |
| 2026-10-10T13:00Z | 23,828 MW |
| 2026-10-10T14:00Z | 24,557 MW |
| 2026-10-10T15:00Z | 26,361 MW |
| 2026-10-10T16:00Z | 28,502 MW |
| 2026-10-10T17:00Z | 28,689 MW |
| 2026-10-10T18:00Z | 29,294 MW |
| 2026-10-10T19:00Z | 28,509 MW |
| 2026-10-10T20:00Z | 28,308 MW |
| 2026-10-10T21:00Z | 28,001 MW |
| 2026-10-10T22:00Z | 27,091 MW |
| 2026-10-10T23:00Z | 27,311 MW |
| 2026-10-11T00:00Z | 28,091 MW |
| 2026-10-11T01:00Z | 28,456 MW |
| 2026-10-11T02:00Z | 28,293 MW |
| 2026-10-11T03:00Z | 27,728 MW |
| 2026-10-11T04:00Z | 27,178 MW |
| 2026-10-11T05:00Z | 26,120 MW |
| 2026-10-11T06:00Z | 25,048 MW |
| 2026-10-11T07:00Z | 24,200 MW |
| 2026-10-11T08:00Z | 23,298 MW |
| 2026-10-11T09:00Z | 22,038 MW |
| 2026-10-11T10:00Z | 21,392 MW |
| 2026-10-11T11:00Z | 21,272 MW |
| 2026-10-11T12:00Z | 21,222 MW |
| 2026-10-11T13:00Z | 21,804 MW |
| 2026-10-11T14:00Z | 22,189 MW |
| 2026-10-11T15:00Z | 22,923 MW |
| 2026-10-11T16:00Z | 24,410 MW |
| 2026-10-11T17:00Z | 24,964 MW |
| 2026-10-11T18:00Z | 25,736 MW |
| 2026-10-11T19:00Z | 26,609 MW |
| 2026-10-11T20:00Z | 27,082 MW |
| 2026-10-11T21:00Z | 26,821 MW |
| 2026-10-11T22:00Z | 26,129 MW |
| 2026-10-11T23:00Z | 25,638 MW |
| 2026-10-12T00:00Z | 24,908 MW |
| 2026-10-12T01:00Z | 26,021 MW |
| 2026-10-12T02:00Z | 26,248 MW |
| 2026-10-12T03:00Z | 25,557 MW |
| 2026-10-12T04:00Z | 25,187 MW |
| 2026-10-12T05:00Z | 24,044 MW |
| 2026-10-12T06:00Z | 22,869 MW |
| 2026-10-12T07:00Z | 22,301 MW |
| 2026-10-12T08:00Z | 21,225 MW |
| 2026-10-12T09:00Z | 21,571 MW |
| 2026-10-12T10:00Z | 21,441 MW |
| 2026-10-12T11:00Z | 21,550 MW |
| 2026-10-12T12:00Z | 22,176 MW |
| 2026-10-12T13:00Z | 23,588 MW |
| 2026-10-12T14:00Z | 24,855 MW |
| 2026-10-12T15:00Z | 25,318 MW |
| 2026-10-12T16:00Z | 26,513 MW |
| 2026-10-12T17:00Z | 27,248 MW |
| 2026-10-12T18:00Z | 28,301 MW |
| 2026-10-12T19:00Z | 29,295 MW |
| 2026-10-12T20:00Z | 28,894 MW |
| 2026-10-12T21:00Z | 29,724 MW |
| 2026-10-12T22:00Z | 28,498 MW |
| 2026-10-12T23:00Z | 27,380 MW |
| 2026-10-13T00:00Z | 26,551 MW |
| 2026-10-13T01:00Z | 27,510 MW |
| 2026-10-13T02:00Z | 27,723 MW |
| 2026-10-13T03:00Z | 26,696 MW |
| 2026-10-13T04:00Z | 25,973 MW |
| 2026-10-13T05:00Z | 24,652 MW |
| 2026-10-13T06:00Z | 23,600 MW |
| 2026-10-13T07:00Z | 22,757 MW |
| 2026-10-13T08:00Z | 21,650 MW |
| 2026-10-13T09:00Z | 20,948 MW |
| 2026-10-13T10:00Z | 20,671 MW |
| 2026-10-13T11:00Z | 21,044 MW |
| 2026-10-13T12:00Z | 22,233 MW |
| 2026-10-13T13:00Z | 24,021 MW |
| 2026-10-13T14:00Z | 25,173 MW |
| 2026-10-13T15:00Z | 26,398 MW |
| 2026-10-13T16:00Z | 27,277 MW |
| 2026-10-13T17:00Z | 27,519 MW |
| 2026-10-13T18:00Z | 27,412 MW |
| 2026-10-13T19:00Z | 27,240 MW |
| 2026-10-13T20:00Z | 27,645 MW |
| 2026-10-13T21:00Z | 27,394 MW |
| 2026-10-13T22:00Z | 27,755 MW |
| 2026-10-13T23:00Z | 26,633 MW |
| 2026-10-14T00:00Z | 26,498 MW |
| 2026-10-14T01:00Z | 27,668 MW |
| 2026-10-14T02:00Z | 27,709 MW |
| 2026-10-14T03:00Z | 26,847 MW |
| 2026-10-14T04:00Z | 26,207 MW |
| 2026-10-14T05:00Z | 24,747 MW |
| 2026-10-14T06:00Z | 23,466 MW |
| 2026-10-14T07:00Z | 22,811 MW |
| 2026-10-14T08:00Z | 21,998 MW |
| 2026-10-14T09:00Z | 21,109 MW |
| 2026-10-14T10:00Z | 20,986 MW |
| 2026-10-14T11:00Z | 20,988 MW |
| 2026-10-14T12:00Z | 22,015 MW |
| 2026-10-14T13:00Z | 23,701 MW |
| 2026-10-14T14:00Z | 24,906 MW |
| 2026-10-14T15:00Z | 27,217 MW |
| 2026-10-14T16:00Z | 29,145 MW |
| 2026-10-14T17:00Z | 28,896 MW |
| 2026-10-14T18:00Z | 29,144 MW |
| 2026-10-14T19:00Z | 27,636 MW |
| 2026-10-14T20:00Z | 26,276 MW |
| 2026-10-14T21:00Z | 25,158 MW |
| 2026-10-14T22:00Z | 25,687 MW |
| 2026-10-14T23:00Z | 25,561 MW |
| 2026-10-15T00:00Z | 27,289 MW |
| 2026-10-15T01:00Z | 28,276 MW |
| 2026-10-15T02:00Z | 28,134 MW |
| 2026-10-15T03:00Z | 27,203 MW |
| 2026-10-15T04:00Z | 26,623 MW |
| 2026-10-15T05:00Z | 25,200 MW |
| 2026-10-15T06:00Z | 23,706 MW |
| 2026-10-15T07:00Z | 23,459 MW |
| 2026-10-15T08:00Z | 22,329 MW |
| 2026-10-15T09:00Z | 21,459 MW |
| 2026-10-15T10:00Z | 21,931 MW |
| 2026-10-15T11:00Z | 21,808 MW |
| 2026-10-15T12:00Z | 21,859 MW |
| 2026-10-15T13:00Z | 23,419 MW |
| 2026-10-15T14:00Z | 24,953 MW |
| 2026-10-15T15:00Z | 27,692 MW |
| 2026-10-15T16:00Z | 29,853 MW |
| 2026-10-15T17:00Z | 30,107 MW |
| 2026-10-15T18:00Z | 30,424 MW |
| 2026-10-15T19:00Z | 29,498 MW |
| 2026-10-15T20:00Z | 28,482 MW |
| 2026-10-15T21:00Z | 27,737 MW |
| 2026-10-15T22:00Z | 28,248 MW |
| 2026-10-15T23:00Z | 29,601 MW |
| 2026-10-16T00:00Z | 30,607 MW |
| 2026-10-16T01:00Z | 31,331 MW |
| 2026-10-16T02:00Z | 30,561 MW |
| 2026-10-16T03:00Z | 29,584 MW |
| 2026-10-16T04:00Z | 28,911 MW |
| 2026-10-16T05:00Z | 27,370 MW |
| 2026-10-16T06:00Z | 25,565 MW |
| 2026-10-16T07:00Z | 24,934 MW |
| 2026-10-16T08:00Z | 23,712 MW |
| 2026-10-16T09:00Z | 22,895 MW |
| 2026-10-16T10:00Z | 22,791 MW |
| 2026-10-16T11:00Z | 22,692 MW |
| 2026-10-16T12:00Z | 23,440 MW |
| 2026-10-16T13:00Z | 24,857 MW |
| 2026-10-16T14:00Z | 26,386 MW |
| 2026-10-16T15:00Z | 29,262 MW |
| 2026-10-16T16:00Z | 31,770 MW |
| 2026-10-16T17:00Z | 31,666 MW |
| 2026-10-16T18:00Z | 31,357 MW |
| 2026-10-16T19:00Z | 32,243 MW |
| 2026-10-16T20:00Z | 32,193 MW |
| 2026-10-16T21:00Z | 33,437 MW |
| 2026-10-16T22:00Z | 33,921 MW |
| 2026-10-16T23:00Z | 34,236 MW |
| 2026-10-17T00:00Z | 34,916 MW |
| 2026-10-17T01:00Z | 34,535 MW |
| 2026-10-17T02:00Z | 33,235 MW |
| 2026-10-17T03:00Z | 31,789 MW |
| 2026-10-17T04:00Z | 30,941 MW |
| 2026-10-17T05:00Z | 29,421 MW |
| 2026-10-17T06:00Z | 27,752 MW |
| 2026-10-17T07:00Z | 26,496 MW |
| 2026-10-17T08:00Z | 25,054 MW |
| 2026-10-17T09:00Z | 23,793 MW |
| 2026-10-17T10:00Z | 23,179 MW |
| 2026-10-17T11:00Z | 22,582 MW |
| 2026-10-17T12:00Z | 23,163 MW |
| 2026-10-17T13:00Z | 23,376 MW |
| 2026-10-17T14:00Z | 23,743 MW |
| 2026-10-17T15:00Z | 25,276 MW |
| 2026-10-17T16:00Z | 29,205 MW |
| 2026-10-17T17:00Z | 30,280 MW |
| 2026-10-17T18:00Z | 30,054 MW |
| 2026-10-17T19:00Z | 30,139 MW |
| 2026-10-17T20:00Z | 29,244 MW |
| 2026-10-17T21:00Z | 28,967 MW |
| 2026-10-17T22:00Z | 29,107 MW |
| 2026-10-17T23:00Z | 29,722 MW |
| 2026-10-18T00:00Z | 30,681 MW |
| 2026-10-18T01:00Z | 30,946 MW |
| 2026-10-18T02:00Z | 30,096 MW |
| 2026-10-18T03:00Z | 28,843 MW |
| 2026-10-18T04:00Z | 27,983 MW |
| 2026-10-18T05:00Z | 26,537 MW |
| 2026-10-18T06:00Z | 24,972 MW |
| 2026-10-18T07:00Z | 24,210 MW |
| 2026-10-18T08:00Z | 22,822 MW |
| 2026-10-18T09:00Z | 21,805 MW |
| 2026-10-18T10:00Z | 21,408 MW |
| 2026-10-18T11:00Z | 20,758 MW |
| 2026-10-18T12:00Z | 20,580 MW |
| 2026-10-18T13:00Z | 20,945 MW |
| 2026-10-18T14:00Z | 21,239 MW |
| 2026-10-18T15:00Z | 21,923 MW |
| 2026-10-18T16:00Z | 24,288 MW |
| 2026-10-18T17:00Z | 26,521 MW |
| 2026-10-18T18:00Z | 27,011 MW |
| 2026-10-18T19:00Z | 27,578 MW |
| 2026-10-18T20:00Z | 27,913 MW |
| 2026-10-18T21:00Z | 27,777 MW |
| 2026-10-18T22:00Z | 28,355 MW |
| 2026-10-18T23:00Z | 28,691 MW |
| 2026-10-19T00:00Z | 29,554 MW |
| 2026-10-19T01:00Z | 29,932 MW |
| 2026-10-19T02:00Z | 29,447 MW |
| 2026-10-19T03:00Z | 28,233 MW |
| 2026-10-19T04:00Z | 27,303 MW |
| 2026-10-19T05:00Z | 25,909 MW |
| 2026-10-19T06:00Z | 24,164 MW |
| 2026-10-19T07:00Z | 23,442 MW |
| 2026-10-19T08:00Z | 22,362 MW |
| 2026-10-19T09:00Z | 22,229 MW |
| 2026-10-19T10:00Z | 21,933 MW |
| 2026-10-19T11:00Z | 21,703 MW |
| 2026-10-19T12:00Z | 22,083 MW |
| 2026-10-19T13:00Z | 24,213 MW |
| 2026-10-19T14:00Z | 25,347 MW |
| 2026-10-19T15:00Z | 27,695 MW |
| 2026-10-19T16:00Z | 30,485 MW |
| 2026-10-19T17:00Z | 30,172 MW |
| 2026-10-19T18:00Z | 29,727 MW |
| 2026-10-19T19:00Z | 28,512 MW |
| 2026-10-19T20:00Z | 29,777 MW |
| 2026-10-19T21:00Z | 30,021 MW |
| 2026-10-19T22:00Z | 30,165 MW |
| 2026-10-19T23:00Z | 30,197 MW |
| 2026-10-20T00:00Z | 30,854 MW |
| 2026-10-20T01:00Z | 31,255 MW |
| 2026-10-20T02:00Z | 30,445 MW |
| 2026-10-20T03:00Z | 29,162 MW |
| 2026-10-20T04:00Z | 28,261 MW |
| 2026-10-20T05:00Z | 26,585 MW |
| 2026-10-20T06:00Z | 25,190 MW |
| 2026-10-20T07:00Z | 25,202 MW |
| 2026-10-20T08:00Z | 23,432 MW |
| 2026-10-20T09:00Z | 22,487 MW |
| 2026-10-20T10:00Z | 22,712 MW |
| 2026-10-20T11:00Z | 22,557 MW |
| 2026-10-20T12:00Z | 23,332 MW |
| 2026-10-20T13:00Z | 24,633 MW |
| 2026-10-20T14:00Z | 25,657 MW |
| 2026-10-20T15:00Z | 26,943 MW |
| 2026-10-20T16:00Z | 28,792 MW |
| 2026-10-20T17:00Z | 30,468 MW |
| 2026-10-20T18:00Z | 30,537 MW |
| 2026-10-20T19:00Z | 31,351 MW |
| 2026-10-20T20:00Z | 30,303 MW |
| 2026-10-20T21:00Z | 29,886 MW |
| 2026-10-20T22:00Z | 29,536 MW |
| 2026-10-20T23:00Z | 28,654 MW |
| 2026-10-21T00:00Z | 29,183 MW |
| 2026-10-21T01:00Z | 29,716 MW |
| 2026-10-21T02:00Z | 29,312 MW |
| 2026-10-21T03:00Z | 28,625 MW |
| 2026-10-21T04:00Z | 27,583 MW |
| 2026-10-21T05:00Z | 26,342 MW |
| 2026-10-21T06:00Z | 24,709 MW |
| 2026-10-21T07:00Z | 24,052 MW |
| 2026-10-21T08:00Z | 22,814 MW |
| 2026-10-21T09:00Z | 22,207 MW |
| 2026-10-21T10:00Z | 21,935 MW |
| 2026-10-21T11:00Z | 21,765 MW |
| 2026-10-21T12:00Z | 22,680 MW |
| 2026-10-21T13:00Z | 24,119 MW |
| 2026-10-21T14:00Z | 25,463 MW |
| 2026-10-21T15:00Z | 26,689 MW |
| 2026-10-21T16:00Z | 27,223 MW |
| 2026-10-21T17:00Z | 28,054 MW |
| 2026-10-21T18:00Z | 28,100 MW |
| 2026-10-21T19:00Z | 27,970 MW |
| 2026-10-21T20:00Z | 29,135 MW |
| 2026-10-21T21:00Z | 30,668 MW |
| 2026-10-21T22:00Z | 30,353 MW |
| 2026-10-21T23:00Z | 29,340 MW |
| 2026-10-22T00:00Z | 28,719 MW |
| 2026-10-22T01:00Z | 28,426 MW |
| 2026-10-22T02:00Z | 27,990 MW |
| 2026-10-22T03:00Z | 27,279 MW |
| 2026-10-22T04:00Z | 26,360 MW |
| 2026-10-22T05:00Z | 25,050 MW |
| 2026-10-22T06:00Z | 24,081 MW |
| 2026-10-22T07:00Z | 23,599 MW |
| 2026-10-22T08:00Z | 22,730 MW |
| 2026-10-22T09:00Z | 22,219 MW |
| 2026-10-22T10:00Z | 21,912 MW |
| 2026-10-22T11:00Z | 21,362 MW |
| 2026-10-22T12:00Z | 22,295 MW |
| 2026-10-22T13:00Z | 23,817 MW |
| 2026-10-22T14:00Z | 24,902 MW |
| 2026-10-22T15:00Z | 26,012 MW |
| 2026-10-22T16:00Z | 26,097 MW |
| 2026-10-22T17:00Z | 27,044 MW |
| 2026-10-22T18:00Z | 26,888 MW |
| 2026-10-22T19:00Z | 27,941 MW |
| 2026-10-22T20:00Z | 29,146 MW |
| 2026-10-22T21:00Z | 29,313 MW |
| 2026-10-22T22:00Z | 28,721 MW |
| 2026-10-22T23:00Z | 27,035 MW |
| 2026-10-23T00:00Z | 26,698 MW |
| 2026-10-23T01:00Z | 27,207 MW |
| 2026-10-23T02:00Z | 27,071 MW |
| 2026-10-23T03:00Z | 26,261 MW |
| 2026-10-23T04:00Z | 25,554 MW |
| 2026-10-23T05:00Z | 24,358 MW |
| 2026-10-23T06:00Z | 23,265 MW |
| 2026-10-23T07:00Z | 22,779 MW |
| 2026-10-23T08:00Z | 21,371 MW |
| 2026-10-23T09:00Z | 20,870 MW |
| 2026-10-23T10:00Z | 21,144 MW |
| 2026-10-23T11:00Z | 20,942 MW |
| 2026-10-23T12:00Z | 22,193 MW |
| 2026-10-23T13:00Z | 23,689 MW |
| 2026-10-23T14:00Z | 24,991 MW |
| 2026-10-23T15:00Z | 26,845 MW |
| 2026-10-23T16:00Z | 28,665 MW |
| 2026-10-23T17:00Z | 29,256 MW |
| 2026-10-23T18:00Z | 28,740 MW |
| 2026-10-23T19:00Z | 28,837 MW |
| 2026-10-23T20:00Z | 28,517 MW |
| 2026-10-23T21:00Z | 27,656 MW |
| 2026-10-23T22:00Z | 26,858 MW |
| 2026-10-23T23:00Z | 24,821 MW |
| 2026-10-24T00:00Z | 25,091 MW |
| 2026-10-24T01:00Z | 26,015 MW |
| 2026-10-24T02:00Z | 25,889 MW |
| 2026-10-24T03:00Z | 25,045 MW |
| 2026-10-24T04:00Z | 24,678 MW |
| 2026-10-24T05:00Z | 23,797 MW |
| 2026-10-24T06:00Z | 22,426 MW |
| 2026-10-24T07:00Z | 22,194 MW |
| 2026-10-24T08:00Z | 21,226 MW |
| 2026-10-24T09:00Z | 20,490 MW |
| 2026-10-24T10:00Z | 20,217 MW |
| 2026-10-24T11:00Z | 19,983 MW |
| 2026-10-24T12:00Z | 20,415 MW |
| 2026-10-24T13:00Z | 20,688 MW |
| 2026-10-24T14:00Z | 21,116 MW |
| 2026-10-24T15:00Z | 22,895 MW |
| 2026-10-24T16:00Z | 24,814 MW |
| 2026-10-24T17:00Z | 24,996 MW |
| 2026-10-24T18:00Z | 24,807 MW |
| 2026-10-24T19:00Z | 24,509 MW |
| 2026-10-24T20:00Z | 24,666 MW |
| 2026-10-24T21:00Z | 24,632 MW |
| 2026-10-24T22:00Z | 24,163 MW |
| 2026-10-24T23:00Z | 22,914 MW |
| 2026-10-25T00:00Z | 24,231 MW |
| 2026-10-25T01:00Z | 25,362 MW |
| 2026-10-25T02:00Z | 25,177 MW |
| 2026-10-25T03:00Z | 24,537 MW |
| 2026-10-25T04:00Z | 24,003 MW |
| 2026-10-25T05:00Z | 23,112 MW |
| 2026-10-25T06:00Z | 21,904 MW |
| 2026-10-25T07:00Z | 21,399 MW |
| 2026-10-25T08:00Z | 20,463 MW |
| 2026-10-25T09:00Z | 19,788 MW |
| 2026-10-25T10:00Z | 19,336 MW |
| 2026-10-25T11:00Z | 19,196 MW |
| 2026-10-25T12:00Z | 19,287 MW |
| 2026-10-25T13:00Z | 19,765 MW |
| 2026-10-25T14:00Z | 20,287 MW |
| 2026-10-25T15:00Z | 22,668 MW |
| 2026-10-25T16:00Z | 25,143 MW |
| 2026-10-25T17:00Z | 24,461 MW |
| 2026-10-25T18:00Z | 24,359 MW |
| 2026-10-25T19:00Z | 23,947 MW |
| 2026-10-25T20:00Z | 23,476 MW |
| 2026-10-25T21:00Z | 24,877 MW |
| 2026-10-25T22:00Z | 24,505 MW |
| 2026-10-25T23:00Z | 24,036 MW |
| 2026-10-26T00:00Z | 25,135 MW |
| 2026-10-26T01:00Z | 26,419 MW |
| 2026-10-26T02:00Z | 26,110 MW |
| 2026-10-26T03:00Z | 25,296 MW |
| 2026-10-26T04:00Z | 24,637 MW |
| 2026-10-26T05:00Z | 23,376 MW |
| 2026-10-26T06:00Z | 22,478 MW |
| 2026-10-26T07:00Z | 21,638 MW |
| 2026-10-26T08:00Z | 20,896 MW |
| 2026-10-26T09:00Z | 20,676 MW |
| 2026-10-26T10:00Z | 20,488 MW |
| 2026-10-26T11:00Z | 20,971 MW |
| 2026-10-26T12:00Z | 21,472 MW |
| 2026-10-26T13:00Z | 23,067 MW |
| 2026-10-26T14:00Z | 24,488 MW |
| 2026-10-26T15:00Z | 26,770 MW |
| 2026-10-26T16:00Z | 28,846 MW |
| 2026-10-26T17:00Z | 27,632 MW |
| 2026-10-26T18:00Z | 27,502 MW |
| 2026-10-26T19:00Z | 27,428 MW |
| 2026-10-26T20:00Z | 28,432 MW |
| 2026-10-26T21:00Z | 28,288 MW |
| 2026-10-26T22:00Z | 27,748 MW |
| 2026-10-26T23:00Z | 26,423 MW |
| 2026-10-27T00:00Z | 26,788 MW |
| 2026-10-27T01:00Z | 27,827 MW |
| 2026-10-27T02:00Z | 27,274 MW |
| 2026-10-27T03:00Z | 26,375 MW |
| 2026-10-27T04:00Z | 25,604 MW |
| 2026-10-27T05:00Z | 24,292 MW |
| 2026-10-27T06:00Z | 22,862 MW |
| 2026-10-27T07:00Z | 22,220 MW |
| 2026-10-27T08:00Z | 21,206 MW |
| 2026-10-27T09:00Z | 20,385 MW |
| 2026-10-27T10:00Z | 20,548 MW |
| 2026-10-27T11:00Z | 21,071 MW |
| 2026-10-27T12:00Z | 21,748 MW |
| 2026-10-27T13:00Z | 22,280 MW |
| 2026-10-27T14:00Z | 24,589 MW |
| 2026-10-27T15:00Z | 25,895 MW |
| 2026-10-27T16:00Z | 28,681 MW |
| 2026-10-27T17:00Z | 28,268 MW |
| 2026-10-27T18:00Z | 27,805 MW |
| 2026-10-27T19:00Z | 27,481 MW |
| 2026-10-27T20:00Z | 27,720 MW |
| 2026-10-27T21:00Z | 28,504 MW |
| 2026-10-27T22:00Z | 27,569 MW |
| 2026-10-27T23:00Z | 25,821 MW |
| 2026-10-28T00:00Z | 26,128 MW |
| 2026-10-28T01:00Z | 27,248 MW |
| 2026-10-28T02:00Z | 26,841 MW |
| 2026-10-28T03:00Z | 26,118 MW |
| 2026-10-28T04:00Z | 25,583 MW |
| 2026-10-28T05:00Z | 24,167 MW |
| 2026-10-28T06:00Z | 22,926 MW |
| 2026-10-28T07:00Z | 22,754 MW |
| 2026-10-28T08:00Z | 21,921 MW |
| 2026-10-28T09:00Z | 21,091 MW |
| 2026-10-28T10:00Z | 20,561 MW |
| 2026-10-28T11:00Z | 20,678 MW |
| 2026-10-28T12:00Z | 21,538 MW |
| 2026-10-28T13:00Z | 23,394 MW |
| 2026-10-28T14:00Z | 24,921 MW |
| 2026-10-28T15:00Z | 26,554 MW |
| 2026-10-28T16:00Z | 29,015 MW |
| 2026-10-28T17:00Z | 29,899 MW |
| 2026-10-28T18:00Z | 29,369 MW |
| 2026-10-28T19:00Z | 28,429 MW |
| 2026-10-28T20:00Z | 28,025 MW |
| 2026-10-28T21:00Z | 26,360 MW |
| 2026-10-28T22:00Z | 25,620 MW |
| 2026-10-28T23:00Z | 24,986 MW |
| 2026-10-29T00:00Z | 26,007 MW |
| 2026-10-29T01:00Z | 27,014 MW |
| 2026-10-29T02:00Z | 26,750 MW |
| 2026-10-29T03:00Z | 26,102 MW |
| 2026-10-29T04:00Z | 25,595 MW |
| 2026-10-29T05:00Z | 24,367 MW |
| 2026-10-29T06:00Z | 22,949 MW |
| 2026-10-29T07:00Z | 22,397 MW |
| 2026-10-29T08:00Z | 21,794 MW |
| 2026-10-29T09:00Z | 21,564 MW |
| 2026-10-29T10:00Z | 21,803 MW |
| 2026-10-29T11:00Z | 21,498 MW |
| 2026-10-29T12:00Z | 22,041 MW |
| 2026-10-29T13:00Z | 23,842 MW |
| 2026-10-29T14:00Z | 25,220 MW |
| 2026-10-29T15:00Z | 26,515 MW |
| 2026-10-29T16:00Z | 29,278 MW |
| 2026-10-29T17:00Z | 28,976 MW |
| 2026-10-29T18:00Z | 29,237 MW |
| 2026-10-29T19:00Z | 29,919 MW |
| 2026-10-29T20:00Z | 29,320 MW |
| 2026-10-29T21:00Z | 29,312 MW |
| 2026-10-29T22:00Z | 27,939 MW |
| 2026-10-29T23:00Z | 25,960 MW |
| 2026-10-30T00:00Z | 26,546 MW |
| 2026-10-30T01:00Z | 26,921 MW |
| 2026-10-30T02:00Z | 26,618 MW |
| 2026-10-30T03:00Z | 26,235 MW |
| 2026-10-30T04:00Z | 25,874 MW |
| 2026-10-30T05:00Z | 24,798 MW |
| 2026-10-30T06:00Z | 23,671 MW |
| 2026-10-30T07:00Z | 23,461 MW |
| 2026-10-30T08:00Z | 22,285 MW |
| 2026-10-30T09:00Z | 21,943 MW |
| 2026-10-30T10:00Z | 21,728 MW |
| 2026-10-30T11:00Z | 21,548 MW |
| 2026-10-30T12:00Z | n/a |
Show the data table (720 rows)
| Hour starting (UTC) | Gas | Solar | Wind | Other | Hydro |
|---|---|---|---|---|---|
| 2026-09-30T13:00Z | 8,737 MW | 58 MW | 865 MW | 2,439 MW | 2,835 MW |
| 2026-09-30T14:00Z | 7,528 MW | 5,009 MW | 1,231 MW | 230 MW | 2,106 MW |
| 2026-09-30T15:00Z | 4,698 MW | 14,430 MW | 1,675 MW | -3,501 MW | 879 MW |
| 2026-09-30T16:00Z | 3,979 MW | 17,577 MW | 1,912 MW | -6,249 MW | 327 MW |
| 2026-09-30T17:00Z | 3,983 MW | 19,086 MW | 2,043 MW | -7,963 MW | 212 MW |
| 2026-09-30T18:00Z | 3,921 MW | 19,104 MW | 2,112 MW | -7,953 MW | 221 MW |
| 2026-09-30T19:00Z | 3,729 MW | 18,631 MW | 2,167 MW | -6,901 MW | 218 MW |
| 2026-09-30T20:00Z | 4,466 MW | 18,532 MW | 1,679 MW | -5,377 MW | 541 MW |
| 2026-09-30T21:00Z | 4,672 MW | 18,463 MW | 1,468 MW | -3,831 MW | 693 MW |
| 2026-09-30T22:00Z | 5,515 MW | 17,616 MW | 1,595 MW | -1,932 MW | 1,116 MW |
| 2026-09-30T23:00Z | 7,095 MW | 15,578 MW | 1,780 MW | -804 MW | 1,471 MW |
| 2026-10-01T00:00Z | 8,946 MW | 8,228 MW | 2,458 MW | 3,518 MW | 2,606 MW |
| 2026-10-01T01:00Z | 10,405 MW | 733 MW | 3,216 MW | 8,724 MW | 2,850 MW |
| 2026-10-01T02:00Z | 10,444 MW | -7 MW | 3,171 MW | 7,694 MW | 2,868 MW |
| 2026-10-01T03:00Z | 10,395 MW | -52 MW | 3,028 MW | 6,449 MW | 2,905 MW |
| 2026-10-01T04:00Z | 10,643 MW | -48 MW | 2,896 MW | 5,691 MW | 2,955 MW |
| 2026-10-01T05:00Z | 10,833 MW | -46 MW | 2,812 MW | 3,402 MW | 2,856 MW |
| 2026-10-01T06:00Z | 10,727 MW | -46 MW | 2,617 MW | 1,036 MW | 2,803 MW |
| 2026-10-01T07:00Z | 11,179 MW | -46 MW | 2,210 MW | 596 MW | 2,559 MW |
| 2026-10-01T08:00Z | 11,512 MW | -46 MW | 1,635 MW | 37 MW | 2,192 MW |
| 2026-10-01T09:00Z | 11,822 MW | -45 MW | 1,085 MW | -542 MW | 2,028 MW |
| 2026-10-01T10:00Z | 11,625 MW | -45 MW | 1,023 MW | -996 MW | 1,931 MW |
| 2026-10-01T11:00Z | 11,699 MW | -45 MW | 1,203 MW | -702 MW | 1,983 MW |
| 2026-10-01T12:00Z | 12,024 MW | -45 MW | 1,198 MW | 312 MW | 2,194 MW |
| 2026-10-01T13:00Z | 12,233 MW | 45 MW | 1,364 MW | 2,905 MW | 1,996 MW |
| 2026-10-01T14:00Z | 11,412 MW | 4,707 MW | 862 MW | 434 MW | 1,788 MW |
| 2026-10-01T15:00Z | 8,844 MW | 14,180 MW | 772 MW | -4,676 MW | 894 MW |
| 2026-10-01T16:00Z | 8,089 MW | 18,029 MW | 674 MW | -8,210 MW | 574 MW |
| 2026-10-01T17:00Z | 7,636 MW | 18,792 MW | 996 MW | -9,174 MW | 574 MW |
| 2026-10-01T18:00Z | 7,822 MW | 18,850 MW | 1,583 MW | -8,670 MW | 568 MW |
| 2026-10-01T19:00Z | 7,985 MW | 18,540 MW | 2,155 MW | -7,308 MW | 552 MW |
| 2026-10-01T20:00Z | 7,362 MW | 18,996 MW | 2,257 MW | -5,427 MW | 602 MW |
| 2026-10-01T21:00Z | 8,243 MW | 18,818 MW | 2,278 MW | -3,670 MW | 702 MW |
| 2026-10-01T22:00Z | 9,870 MW | 17,379 MW | 2,290 MW | -2,366 MW | 1,218 MW |
| 2026-10-01T23:00Z | 11,202 MW | 15,915 MW | 2,291 MW | -1,324 MW | 1,712 MW |
| 2026-10-02T00:00Z | 12,806 MW | 7,843 MW | 2,251 MW | 3,551 MW | 2,930 MW |
| 2026-10-02T01:00Z | 13,802 MW | 767 MW | 2,247 MW | 9,322 MW | 3,157 MW |
| 2026-10-02T02:00Z | 13,878 MW | 80 MW | 2,348 MW | 9,152 MW | 3,074 MW |
| 2026-10-02T03:00Z | 13,604 MW | -48 MW | 2,569 MW | 7,095 MW | 3,139 MW |
| 2026-10-02T04:00Z | 13,627 MW | -46 MW | 2,602 MW | 5,977 MW | 3,096 MW |
| 2026-10-02T05:00Z | 13,481 MW | -45 MW | 2,678 MW | 3,725 MW | 2,681 MW |
| 2026-10-02T06:00Z | 13,132 MW | -44 MW | 2,858 MW | 1,282 MW | 2,616 MW |
| 2026-10-02T07:00Z | 12,909 MW | -44 MW | 2,955 MW | -93 MW | 2,421 MW |
| 2026-10-02T08:00Z | 12,254 MW | -44 MW | 2,986 MW | -1,099 MW | 2,261 MW |
| 2026-10-02T09:00Z | 11,711 MW | -44 MW | 3,022 MW | -1,660 MW | 2,117 MW |
| 2026-10-02T10:00Z | 11,730 MW | -44 MW | 3,030 MW | -2,222 MW | 2,134 MW |
| 2026-10-02T11:00Z | 11,602 MW | -44 MW | 2,889 MW | -1,622 MW | 1,960 MW |
| 2026-10-02T12:00Z | 11,597 MW | -44 MW | 2,672 MW | -119 MW | 2,017 MW |
| 2026-10-02T13:00Z | 12,706 MW | 35 MW | 2,147 MW | 1,761 MW | 1,894 MW |
| 2026-10-02T14:00Z | 11,422 MW | 4,531 MW | 2,309 MW | -1,410 MW | 1,618 MW |
| 2026-10-02T15:00Z | 9,757 MW | 14,116 MW | 2,426 MW | -6,769 MW | 673 MW |
| 2026-10-02T16:00Z | 9,766 MW | 17,561 MW | 2,531 MW | -8,404 MW | 532 MW |
| 2026-10-02T17:00Z | 9,406 MW | 18,503 MW | 2,146 MW | -7,853 MW | 525 MW |
| 2026-10-02T18:00Z | 9,088 MW | 18,111 MW | 1,469 MW | -6,672 MW | 547 MW |
| 2026-10-02T19:00Z | 9,218 MW | 18,545 MW | 1,434 MW | -4,860 MW | 575 MW |
| 2026-10-02T20:00Z | 11,548 MW | 17,724 MW | 1,321 MW | -3,857 MW | 654 MW |
| 2026-10-02T21:00Z | 13,190 MW | 17,360 MW | 1,236 MW | -2,604 MW | 836 MW |
| 2026-10-02T22:00Z | 14,105 MW | 16,758 MW | 1,426 MW | -1,430 MW | 1,925 MW |
| 2026-10-02T23:00Z | 14,908 MW | 14,522 MW | 1,503 MW | 71 MW | 2,366 MW |
| 2026-10-03T00:00Z | 15,878 MW | 6,849 MW | 1,201 MW | 5,248 MW | 3,160 MW |
| 2026-10-03T01:00Z | 16,383 MW | 394 MW | 929 MW | 9,395 MW | 3,458 MW |
| 2026-10-03T02:00Z | 16,462 MW | -54 MW | 1,008 MW | 7,902 MW | 3,494 MW |
| 2026-10-03T03:00Z | 15,396 MW | -46 MW | 1,030 MW | 6,550 MW | 3,535 MW |
| 2026-10-03T04:00Z | 14,812 MW | -42 MW | 927 MW | 5,855 MW | 3,512 MW |
| 2026-10-03T05:00Z | 15,008 MW | -42 MW | 855 MW | 3,964 MW | 3,300 MW |
| 2026-10-03T06:00Z | 14,788 MW | -41 MW | 824 MW | 2,298 MW | 2,898 MW |
| 2026-10-03T07:00Z | 14,474 MW | -41 MW | 695 MW | 1,914 MW | 2,589 MW |
| 2026-10-03T08:00Z | 13,807 MW | -41 MW | 670 MW | 957 MW | 2,311 MW |
| 2026-10-03T09:00Z | 13,396 MW | -41 MW | 727 MW | 80 MW | 2,162 MW |
| 2026-10-03T10:00Z | 13,337 MW | -41 MW | 692 MW | -87 MW | 2,171 MW |
| 2026-10-03T11:00Z | 13,250 MW | -40 MW | 671 MW | -236 MW | 2,137 MW |
| 2026-10-03T12:00Z | 13,238 MW | -41 MW | 664 MW | -233 MW | 2,072 MW |
| 2026-10-03T13:00Z | 12,814 MW | 40 MW | 684 MW | 397 MW | 1,915 MW |
| 2026-10-03T14:00Z | 11,396 MW | 4,667 MW | 620 MW | -1,593 MW | 1,647 MW |
| 2026-10-03T15:00Z | 8,921 MW | 14,515 MW | 154 MW | -6,723 MW | 927 MW |
| 2026-10-03T16:00Z | 8,688 MW | 18,421 MW | 304 MW | -9,509 MW | 818 MW |
| 2026-10-03T17:00Z | 8,990 MW | 19,001 MW | 450 MW | -8,768 MW | 850 MW |
| 2026-10-03T18:00Z | 10,026 MW | 19,017 MW | 402 MW | -8,296 MW | 922 MW |
| 2026-10-03T19:00Z | 10,144 MW | 18,901 MW | 683 MW | -6,789 MW | 958 MW |
| 2026-10-03T20:00Z | 10,419 MW | 18,799 MW | 1,231 MW | -4,716 MW | 945 MW |
| 2026-10-03T21:00Z | 11,526 MW | 18,612 MW | 1,452 MW | -3,014 MW | 1,101 MW |
| 2026-10-03T22:00Z | 13,470 MW | 17,665 MW | 1,317 MW | -1,471 MW | 1,815 MW |
| 2026-10-03T23:00Z | 14,994 MW | 15,528 MW | 1,269 MW | 336 MW | 2,707 MW |
| 2026-10-04T00:00Z | 17,580 MW | 7,282 MW | 1,253 MW | 5,630 MW | 3,201 MW |
| 2026-10-04T01:00Z | 18,578 MW | 542 MW | 988 MW | 9,303 MW | 3,154 MW |
| 2026-10-04T02:00Z | 18,247 MW | -42 MW | 673 MW | 7,815 MW | 3,382 MW |
| 2026-10-04T03:00Z | 17,199 MW | -61 MW | 501 MW | 6,954 MW | 3,454 MW |
| 2026-10-04T04:00Z | 17,131 MW | -55 MW | 481 MW | 5,629 MW | 3,373 MW |
| 2026-10-04T05:00Z | 17,075 MW | -57 MW | 520 MW | 4,277 MW | 3,174 MW |
| 2026-10-04T06:00Z | 16,072 MW | -56 MW | 578 MW | 2,575 MW | 2,927 MW |
| 2026-10-04T07:00Z | 15,519 MW | -54 MW | 575 MW | 1,830 MW | 2,821 MW |
| 2026-10-04T08:00Z | 14,893 MW | -54 MW | 778 MW | 479 MW | 2,625 MW |
| 2026-10-04T09:00Z | 14,254 MW | -54 MW | 915 MW | 208 MW | 2,262 MW |
| 2026-10-04T10:00Z | 13,564 MW | -54 MW | 1,004 MW | -306 MW | 2,204 MW |
| 2026-10-04T11:00Z | 13,007 MW | -53 MW | 938 MW | -740 MW | 2,168 MW |
| 2026-10-04T12:00Z | 12,452 MW | -54 MW | 928 MW | -489 MW | 2,059 MW |
| 2026-10-04T13:00Z | 12,046 MW | 17 MW | 1,087 MW | -177 MW | 1,907 MW |
| 2026-10-04T14:00Z | 10,215 MW | 4,314 MW | 1,336 MW | -2,386 MW | 1,622 MW |
| 2026-10-04T15:00Z | 8,032 MW | 13,611 MW | 1,545 MW | -7,722 MW | 992 MW |
| 2026-10-04T16:00Z | 7,766 MW | 17,496 MW | 2,272 MW | -9,931 MW | 937 MW |
| 2026-10-04T17:00Z | 7,798 MW | 18,279 MW | 2,604 MW | -8,839 MW | 968 MW |
| 2026-10-04T18:00Z | 8,299 MW | 18,377 MW | 2,735 MW | -8,196 MW | 999 MW |
| 2026-10-04T19:00Z | 8,854 MW | 18,021 MW | 2,682 MW | -5,628 MW | 1,002 MW |
| 2026-10-04T20:00Z | 9,851 MW | 17,961 MW | 2,311 MW | -3,690 MW | 1,060 MW |
| 2026-10-04T21:00Z | 11,581 MW | 17,490 MW | 2,139 MW | -2,606 MW | 1,173 MW |
| 2026-10-04T22:00Z | 13,569 MW | 16,923 MW | 1,913 MW | -1,383 MW | 2,060 MW |
| 2026-10-04T23:00Z | 15,254 MW | 14,842 MW | 1,571 MW | -40 MW | 2,749 MW |
| 2026-10-05T00:00Z | 17,119 MW | 6,715 MW | 1,142 MW | 6,176 MW | 3,230 MW |
| 2026-10-05T01:00Z | 18,073 MW | 482 MW | 930 MW | 9,622 MW | 3,536 MW |
| 2026-10-05T02:00Z | 18,332 MW | -66 MW | 941 MW | 8,276 MW | 3,578 MW |
| 2026-10-05T03:00Z | 17,398 MW | -61 MW | 708 MW | 6,899 MW | 3,721 MW |
| 2026-10-05T04:00Z | 17,334 MW | -55 MW | 463 MW | 5,617 MW | 3,678 MW |
| 2026-10-05T05:00Z | 16,981 MW | -55 MW | 363 MW | 3,529 MW | 3,608 MW |
| 2026-10-05T06:00Z | 16,117 MW | -55 MW | 334 MW | 2,641 MW | 3,039 MW |
| 2026-10-05T07:00Z | 15,658 MW | -54 MW | 338 MW | 1,446 MW | 3,047 MW |
| 2026-10-05T08:00Z | 15,290 MW | -54 MW | 374 MW | 338 MW | 2,780 MW |
| 2026-10-05T09:00Z | 14,850 MW | -53 MW | 355 MW | -1,423 MW | 2,546 MW |
| 2026-10-05T10:00Z | 14,703 MW | -53 MW | 278 MW | -1,636 MW | 2,525 MW |
| 2026-10-05T11:00Z | 14,807 MW | -53 MW | 180 MW | -1,363 MW | 2,476 MW |
| 2026-10-05T12:00Z | 14,922 MW | -53 MW | 179 MW | -642 MW | 2,656 MW |
| 2026-10-05T13:00Z | 15,053 MW | 6 MW | 228 MW | 839 MW | 2,796 MW |
| 2026-10-05T14:00Z | 13,862 MW | 4,304 MW | 239 MW | -1,276 MW | 2,642 MW |
| 2026-10-05T15:00Z | 11,755 MW | 14,181 MW | 218 MW | -7,756 MW | 2,055 MW |
| 2026-10-05T16:00Z | 10,460 MW | 18,125 MW | 292 MW | -9,868 MW | 1,962 MW |
| 2026-10-05T17:00Z | 10,769 MW | 18,762 MW | 353 MW | -9,362 MW | 2,020 MW |
| 2026-10-05T18:00Z | 11,607 MW | 18,701 MW | 438 MW | -7,889 MW | 1,881 MW |
| 2026-10-05T19:00Z | 12,107 MW | 18,714 MW | 421 MW | -5,434 MW | 2,125 MW |
| 2026-10-05T20:00Z | 13,172 MW | 18,448 MW | 457 MW | -3,851 MW | 2,569 MW |
| 2026-10-05T21:00Z | 15,694 MW | 18,110 MW | 385 MW | -2,550 MW | 2,645 MW |
| 2026-10-05T22:00Z | 16,804 MW | 17,786 MW | 372 MW | -1,665 MW | 3,073 MW |
| 2026-10-05T23:00Z | 18,265 MW | 15,403 MW | 385 MW | 154 MW | 3,312 MW |
| 2026-10-06T00:00Z | 20,608 MW | 6,727 MW | 493 MW | 5,696 MW | 3,375 MW |
| 2026-10-06T01:00Z | 21,203 MW | 535 MW | 551 MW | 10,383 MW | 3,300 MW |
| 2026-10-06T02:00Z | 20,793 MW | 112 MW | 663 MW | 8,982 MW | 3,596 MW |
| 2026-10-06T03:00Z | 20,191 MW | 14 MW | 972 MW | 7,204 MW | 3,629 MW |
| 2026-10-06T04:00Z | 19,881 MW | 17 MW | 1,393 MW | 5,673 MW | 3,465 MW |
| 2026-10-06T05:00Z | 19,142 MW | 18 MW | 1,573 MW | 2,586 MW | 3,540 MW |
| 2026-10-06T06:00Z | 17,427 MW | 18 MW | 1,879 MW | 1,521 MW | 3,387 MW |
| 2026-10-06T07:00Z | 15,651 MW | 19 MW | 2,346 MW | 1,379 MW | 2,816 MW |
| 2026-10-06T08:00Z | 14,893 MW | 20 MW | 2,668 MW | 626 MW | 2,518 MW |
| 2026-10-06T09:00Z | 14,283 MW | 21 MW | 3,089 MW | -473 MW | 2,228 MW |
| 2026-10-06T10:00Z | 14,046 MW | 20 MW | 3,071 MW | -1,322 MW | 2,169 MW |
| 2026-10-06T11:00Z | 13,653 MW | 20 MW | 3,092 MW | -1,188 MW | 2,143 MW |
| 2026-10-06T12:00Z | 13,791 MW | 20 MW | 2,972 MW | -136 MW | 2,362 MW |
| 2026-10-06T13:00Z | 13,880 MW | 29 MW | 2,796 MW | 1,421 MW | 2,476 MW |
| 2026-10-06T14:00Z | 13,127 MW | 3,706 MW | 2,088 MW | -483 MW | 2,336 MW |
| 2026-10-06T15:00Z | 11,903 MW | 13,436 MW | 1,792 MW | -7,782 MW | 2,115 MW |
| 2026-10-06T16:00Z | 11,499 MW | 18,015 MW | 1,530 MW | -10,928 MW | 1,802 MW |
| 2026-10-06T17:00Z | 11,956 MW | 18,755 MW | 939 MW | -10,278 MW | 1,872 MW |
| 2026-10-06T18:00Z | 13,401 MW | 18,650 MW | 610 MW | -8,817 MW | 1,934 MW |
| 2026-10-06T19:00Z | 14,098 MW | 18,387 MW | 472 MW | -6,146 MW | 2,007 MW |
| 2026-10-06T20:00Z | 15,219 MW | 18,110 MW | 423 MW | -4,092 MW | 2,025 MW |
| 2026-10-06T21:00Z | 16,683 MW | 17,438 MW | 439 MW | -1,875 MW | 2,466 MW |
| 2026-10-06T22:00Z | 18,309 MW | 16,821 MW | 436 MW | -718 MW | 3,035 MW |
| 2026-10-06T23:00Z | 19,562 MW | 14,576 MW | 371 MW | 1,026 MW | 3,291 MW |
| 2026-10-07T00:00Z | 21,415 MW | 6,411 MW | 407 MW | 5,573 MW | 3,395 MW |
| 2026-10-07T01:00Z | 21,704 MW | 369 MW | 776 MW | 8,704 MW | 3,614 MW |
| 2026-10-07T02:00Z | 20,996 MW | -59 MW | 901 MW | 7,947 MW | 3,654 MW |
| 2026-10-07T03:00Z | 20,357 MW | -54 MW | 877 MW | 6,822 MW | 3,592 MW |
| 2026-10-07T04:00Z | 20,127 MW | -51 MW | 1,014 MW | 5,993 MW | 3,389 MW |
| 2026-10-07T05:00Z | 18,881 MW | -51 MW | 1,117 MW | 3,644 MW | 3,580 MW |
| 2026-10-07T06:00Z | 17,525 MW | -51 MW | 1,123 MW | 2,804 MW | 3,116 MW |
| 2026-10-07T07:00Z | 17,198 MW | -50 MW | 1,221 MW | 2,329 MW | 2,777 MW |
| 2026-10-07T08:00Z | 16,828 MW | -50 MW | 1,339 MW | 492 MW | 2,792 MW |
| 2026-10-07T09:00Z | 16,097 MW | -51 MW | 1,487 MW | -606 MW | 2,653 MW |
| 2026-10-07T10:00Z | 15,986 MW | -51 MW | 1,363 MW | -1,312 MW | 2,438 MW |
| 2026-10-07T11:00Z | 15,840 MW | -51 MW | 1,096 MW | -1,525 MW | 2,446 MW |
| 2026-10-07T12:00Z | 15,887 MW | -50 MW | 742 MW | -21 MW | 2,506 MW |
| 2026-10-07T13:00Z | 15,618 MW | -6 MW | 451 MW | 2,090 MW | 2,634 MW |
| 2026-10-07T14:00Z | 15,066 MW | 3,960 MW | 259 MW | -95 MW | 2,436 MW |
| 2026-10-07T15:00Z | 13,305 MW | 13,684 MW | 71 MW | -6,202 MW | 2,197 MW |
| 2026-10-07T16:00Z | 12,930 MW | 17,654 MW | 103 MW | -9,124 MW | 1,769 MW |
| 2026-10-07T17:00Z | 13,326 MW | 18,522 MW | 186 MW | -9,858 MW | 1,914 MW |
| 2026-10-07T18:00Z | 13,254 MW | 18,784 MW | 335 MW | -9,065 MW | 1,933 MW |
| 2026-10-07T19:00Z | 13,725 MW | 18,642 MW | 644 MW | -7,183 MW | 1,974 MW |
| 2026-10-07T20:00Z | 13,925 MW | 18,611 MW | 857 MW | -4,530 MW | 1,977 MW |
| 2026-10-07T21:00Z | 14,762 MW | 18,540 MW | 914 MW | -2,275 MW | 2,165 MW |
| 2026-10-07T22:00Z | 16,747 MW | 17,670 MW | 876 MW | -947 MW | 2,822 MW |
| 2026-10-07T23:00Z | 18,004 MW | 15,107 MW | 751 MW | 1,032 MW | 3,413 MW |
| 2026-10-08T00:00Z | 20,450 MW | 6,192 MW | 672 MW | 6,118 MW | 3,678 MW |
| 2026-10-08T01:00Z | 21,586 MW | 341 MW | 874 MW | 8,634 MW | 3,480 MW |
| 2026-10-08T02:00Z | 20,053 MW | -67 MW | 1,175 MW | 8,103 MW | 3,656 MW |
| 2026-10-08T03:00Z | 19,234 MW | -57 MW | 1,282 MW | 7,243 MW | 3,684 MW |
| 2026-10-08T04:00Z | 18,893 MW | -54 MW | 1,143 MW | 6,100 MW | 3,530 MW |
| 2026-10-08T05:00Z | 17,938 MW | -51 MW | 1,105 MW | 3,899 MW | 3,598 MW |
| 2026-10-08T06:00Z | 16,936 MW | -51 MW | 1,091 MW | 2,874 MW | 3,013 MW |
| 2026-10-08T07:00Z | 16,118 MW | -51 MW | 1,172 MW | 1,936 MW | 2,921 MW |
| 2026-10-08T08:00Z | 15,649 MW | -50 MW | 1,283 MW | 580 MW | 2,714 MW |
| 2026-10-08T09:00Z | 15,424 MW | -50 MW | 1,331 MW | -411 MW | 2,367 MW |
| 2026-10-08T10:00Z | 15,141 MW | -50 MW | 1,229 MW | -1,100 MW | 2,331 MW |
| 2026-10-08T11:00Z | 15,224 MW | -51 MW | 1,083 MW | -1,088 MW | 2,366 MW |
| 2026-10-08T12:00Z | 15,313 MW | -51 MW | 747 MW | 47 MW | 2,348 MW |
| 2026-10-08T13:00Z | 15,559 MW | -10 MW | 353 MW | 1,737 MW | 2,886 MW |
| 2026-10-08T14:00Z | 14,647 MW | 3,884 MW | 152 MW | -226 MW | 2,749 MW |
| 2026-10-08T15:00Z | 11,976 MW | 13,624 MW | 104 MW | -6,094 MW | 2,150 MW |
| 2026-10-08T16:00Z | 11,197 MW | 17,983 MW | 215 MW | -9,732 MW | 1,978 MW |
| 2026-10-08T17:00Z | 11,685 MW | 18,765 MW | 286 MW | -9,774 MW | 2,014 MW |
| 2026-10-08T18:00Z | 12,283 MW | 18,751 MW | 291 MW | -9,088 MW | 2,051 MW |
| 2026-10-08T19:00Z | 12,332 MW | 18,651 MW | 279 MW | -6,735 MW | 2,135 MW |
| 2026-10-08T20:00Z | 12,509 MW | 18,725 MW | 406 MW | -4,574 MW | 2,226 MW |
| 2026-10-08T21:00Z | 13,234 MW | 18,819 MW | 499 MW | -3,475 MW | 2,331 MW |
| 2026-10-08T22:00Z | 14,050 MW | 18,279 MW | 702 MW | -2,228 MW | 2,745 MW |
| 2026-10-08T23:00Z | 15,122 MW | 15,264 MW | 1,074 MW | -585 MW | 3,367 MW |
| 2026-10-09T00:00Z | 17,265 MW | 6,000 MW | 1,726 MW | 6,516 MW | 3,410 MW |
| 2026-10-09T01:00Z | 18,232 MW | 212 MW | 1,884 MW | 8,773 MW | 3,413 MW |
| 2026-10-09T02:00Z | 17,620 MW | -67 MW | 2,071 MW | 7,907 MW | 3,592 MW |
| 2026-10-09T03:00Z | 16,485 MW | -56 MW | 2,047 MW | 7,287 MW | 3,649 MW |
| 2026-10-09T04:00Z | 15,911 MW | -51 MW | 1,961 MW | 6,385 MW | 3,561 MW |
| 2026-10-09T05:00Z | 15,348 MW | -51 MW | 2,057 MW | 4,496 MW | 3,380 MW |
| 2026-10-09T06:00Z | 14,951 MW | -51 MW | 1,884 MW | 2,593 MW | 3,000 MW |
| 2026-10-09T07:00Z | 14,387 MW | -49 MW | 1,777 MW | 2,030 MW | 2,440 MW |
| 2026-10-09T08:00Z | 13,945 MW | -50 MW | 1,869 MW | 389 MW | 2,058 MW |
| 2026-10-09T09:00Z | 13,054 MW | -51 MW | 1,746 MW | -282 MW | 1,944 MW |
| 2026-10-09T10:00Z | 12,284 MW | -50 MW | 1,618 MW | -351 MW | 1,802 MW |
| 2026-10-09T11:00Z | 12,104 MW | -49 MW | 1,434 MW | -272 MW | 1,895 MW |
| 2026-10-09T12:00Z | 12,561 MW | -50 MW | 1,455 MW | 121 MW | 1,975 MW |
| 2026-10-09T13:00Z | 12,501 MW | -17 MW | 1,320 MW | 1,557 MW | 2,119 MW |
| 2026-10-09T14:00Z | 11,256 MW | 3,533 MW | 1,301 MW | 605 MW | 2,015 MW |
| 2026-10-09T15:00Z | 8,037 MW | 12,737 MW | 1,214 MW | -3,631 MW | 1,672 MW |
| 2026-10-09T16:00Z | 7,286 MW | 17,421 MW | 1,533 MW | -8,197 MW | 1,573 MW |
| 2026-10-09T17:00Z | 6,654 MW | 18,685 MW | 1,778 MW | -8,692 MW | 1,530 MW |
| 2026-10-09T18:00Z | 6,885 MW | 18,778 MW | 1,799 MW | -8,255 MW | 1,471 MW |
| 2026-10-09T19:00Z | 7,333 MW | 18,348 MW | 2,170 MW | -7,605 MW | 1,536 MW |
| 2026-10-09T20:00Z | 7,494 MW | 18,002 MW | 2,756 MW | -5,586 MW | 1,371 MW |
| 2026-10-09T21:00Z | 7,842 MW | 17,629 MW | 3,135 MW | -4,701 MW | 1,436 MW |
| 2026-10-09T22:00Z | 8,894 MW | 16,291 MW | 3,198 MW | -2,920 MW | 1,683 MW |
| 2026-10-09T23:00Z | 10,070 MW | 14,097 MW | 3,416 MW | -777 MW | 2,094 MW |
| 2026-10-10T00:00Z | 11,078 MW | 5,606 MW | 3,696 MW | 5,301 MW | 3,094 MW |
| 2026-10-10T01:00Z | 11,122 MW | 304 MW | 3,458 MW | 8,870 MW | 3,236 MW |
| 2026-10-10T02:00Z | 10,940 MW | -58 MW | 3,229 MW | 7,894 MW | 3,215 MW |
| 2026-10-10T03:00Z | 11,500 MW | -59 MW | 3,120 MW | 6,565 MW | 3,211 MW |
| 2026-10-10T04:00Z | 11,689 MW | -56 MW | 3,002 MW | 5,788 MW | 2,904 MW |
| 2026-10-10T05:00Z | 11,657 MW | -55 MW | 3,129 MW | 4,108 MW | 2,440 MW |
| 2026-10-10T06:00Z | 10,926 MW | -54 MW | 3,396 MW | 1,938 MW | 2,408 MW |
| 2026-10-10T07:00Z | 10,632 MW | -54 MW | 3,559 MW | 1,121 MW | 2,583 MW |
| 2026-10-10T08:00Z | 10,344 MW | -54 MW | 3,637 MW | 234 MW | 2,543 MW |
| 2026-10-10T09:00Z | 9,676 MW | -54 MW | 3,653 MW | -119 MW | 2,438 MW |
| 2026-10-10T10:00Z | 8,995 MW | -55 MW | 3,595 MW | -221 MW | 2,138 MW |
| 2026-10-10T11:00Z | 8,355 MW | -54 MW | 3,389 MW | -84 MW | 2,159 MW |
| 2026-10-10T12:00Z | 8,272 MW | -53 MW | 3,145 MW | 94 MW | 2,182 MW |
| 2026-10-10T13:00Z | 8,418 MW | -31 MW | 3,016 MW | 855 MW | 2,293 MW |
| 2026-10-10T14:00Z | 8,367 MW | 1,116 MW | 2,905 MW | 539 MW | 2,228 MW |
| 2026-10-10T15:00Z | 8,329 MW | 4,539 MW | 2,709 MW | -1,699 MW | 1,734 MW |
| 2026-10-10T16:00Z | 7,804 MW | 7,920 MW | 3,014 MW | -4,791 MW | 1,453 MW |
| 2026-10-10T17:00Z | 6,734 MW | 10,177 MW | 3,068 MW | -6,235 MW | 1,407 MW |
| 2026-10-10T18:00Z | 6,807 MW | 10,180 MW | 3,347 MW | -6,133 MW | 1,408 MW |
| 2026-10-10T19:00Z | 6,953 MW | 9,556 MW | 3,192 MW | -4,867 MW | 1,388 MW |
| 2026-10-10T20:00Z | 6,825 MW | 8,997 MW | 3,699 MW | -4,837 MW | 1,373 MW |
| 2026-10-10T21:00Z | 7,049 MW | 8,064 MW | 3,409 MW | -3,502 MW | 1,451 MW |
| 2026-10-10T22:00Z | 7,570 MW | 6,326 MW | 3,207 MW | -1,955 MW | 1,746 MW |
| 2026-10-10T23:00Z | 8,116 MW | 4,804 MW | 3,008 MW | -1,032 MW | 2,059 MW |
| 2026-10-11T00:00Z | 8,389 MW | 1,914 MW | 2,700 MW | 1,013 MW | 2,702 MW |
| 2026-10-11T01:00Z | 8,690 MW | 88 MW | 2,357 MW | 3,762 MW | 2,797 MW |
| 2026-10-11T02:00Z | 8,885 MW | 6 MW | 2,412 MW | 3,294 MW | 2,944 MW |
| 2026-10-11T03:00Z | 8,694 MW | -2 MW | 2,517 MW | 3,099 MW | 2,894 MW |
| 2026-10-11T04:00Z | 8,616 MW | -24 MW | 3,000 MW | 3,518 MW | 2,891 MW |
| 2026-10-11T05:00Z | 8,726 MW | -24 MW | 3,279 MW | 3,363 MW | 2,849 MW |
| 2026-10-11T06:00Z | 8,692 MW | -24 MW | 2,771 MW | 2,284 MW | 2,777 MW |
| 2026-10-11T07:00Z | 8,653 MW | -24 MW | 2,828 MW | 3,102 MW | 2,612 MW |
| 2026-10-11T08:00Z | 8,588 MW | -25 MW | 3,049 MW | 1,940 MW | 2,571 MW |
| 2026-10-11T09:00Z | 8,220 MW | -28 MW | 3,502 MW | 1,159 MW | 2,270 MW |
| 2026-10-11T10:00Z | 8,255 MW | -29 MW | 3,598 MW | 274 MW | 2,144 MW |
| 2026-10-11T11:00Z | 8,363 MW | -13 MW | 3,149 MW | 259 MW | 2,019 MW |
| 2026-10-11T12:00Z | 8,069 MW | -6 MW | 2,967 MW | 694 MW | 2,007 MW |
| 2026-10-11T13:00Z | 7,806 MW | 6 MW | 3,399 MW | 622 MW | 2,066 MW |
| 2026-10-11T14:00Z | 7,451 MW | 1,734 MW | 3,635 MW | 134 MW | 2,022 MW |
| 2026-10-11T15:00Z | 5,725 MW | 6,901 MW | 3,605 MW | -858 MW | 1,636 MW |
| 2026-10-11T16:00Z | 4,682 MW | 10,189 MW | 3,797 MW | -3,363 MW | 1,333 MW |
| 2026-10-11T17:00Z | 4,074 MW | 11,417 MW | 4,212 MW | -4,765 MW | 988 MW |
| 2026-10-11T18:00Z | 3,758 MW | 11,628 MW | 4,610 MW | -6,601 MW | 987 MW |
| 2026-10-11T19:00Z | 3,485 MW | 12,104 MW | 4,908 MW | -8,358 MW | 1,018 MW |
| 2026-10-11T20:00Z | 3,224 MW | 11,889 MW | 5,124 MW | -8,702 MW | 800 MW |
| 2026-10-11T21:00Z | 2,794 MW | 12,668 MW | 5,391 MW | -7,651 MW | 820 MW |
| 2026-10-11T22:00Z | 2,852 MW | 11,801 MW | 5,219 MW | -5,598 MW | 916 MW |
| 2026-10-11T23:00Z | 3,176 MW | 9,708 MW | 5,190 MW | -3,110 MW | 1,077 MW |
| 2026-10-12T00:00Z | 4,033 MW | 4,039 MW | 5,050 MW | 1,096 MW | 1,939 MW |
| 2026-10-12T01:00Z | 4,870 MW | 52 MW | 4,792 MW | 5,732 MW | 2,374 MW |
| 2026-10-12T02:00Z | 5,016 MW | -51 MW | 4,620 MW | 5,401 MW | 2,612 MW |
| 2026-10-12T03:00Z | 5,020 MW | -47 MW | 4,292 MW | 4,710 MW | 2,631 MW |
| 2026-10-12T04:00Z | 5,055 MW | -47 MW | 4,481 MW | 5,138 MW | 2,582 MW |
| 2026-10-12T05:00Z | 5,170 MW | -48 MW | 4,289 MW | 4,297 MW | 2,502 MW |
| 2026-10-12T06:00Z | 5,480 MW | -48 MW | 3,788 MW | 2,989 MW | 2,603 MW |
| 2026-10-12T07:00Z | 6,293 MW | -47 MW | 3,337 MW | 2,404 MW | 2,374 MW |
| 2026-10-12T08:00Z | 6,290 MW | -47 MW | 3,213 MW | 1,544 MW | 2,139 MW |
| 2026-10-12T09:00Z | 6,584 MW | -47 MW | 2,829 MW | 583 MW | 1,802 MW |
| 2026-10-12T10:00Z | 6,663 MW | -47 MW | 2,738 MW | 317 MW | 1,770 MW |
| 2026-10-12T11:00Z | 7,169 MW | -47 MW | 2,946 MW | 350 MW | 1,769 MW |
| 2026-10-12T12:00Z | 7,557 MW | -46 MW | 3,370 MW | 1,877 MW | 1,840 MW |
| 2026-10-12T13:00Z | 7,531 MW | -35 MW | 3,351 MW | 3,830 MW | 2,208 MW |
| 2026-10-12T14:00Z | 7,800 MW | 1,889 MW | 3,058 MW | 3,358 MW | 2,650 MW |
| 2026-10-12T15:00Z | 7,294 MW | 6,786 MW | 2,791 MW | 334 MW | 1,750 MW |
| 2026-10-12T16:00Z | 6,778 MW | 11,170 MW | 2,977 MW | -2,245 MW | 1,023 MW |
| 2026-10-12T17:00Z | 6,320 MW | 13,183 MW | 3,073 MW | -4,289 MW | 851 MW |
| 2026-10-12T18:00Z | 6,434 MW | 13,064 MW | 3,129 MW | -6,389 MW | 804 MW |
| 2026-10-12T19:00Z | 6,068 MW | 14,644 MW | 3,230 MW | -7,906 MW | 789 MW |
| 2026-10-12T20:00Z | 5,952 MW | 14,389 MW | 3,223 MW | -7,743 MW | 788 MW |
| 2026-10-12T21:00Z | 5,817 MW | 13,864 MW | 3,460 MW | -8,136 MW | 891 MW |
| 2026-10-12T22:00Z | 6,006 MW | 11,854 MW | 3,580 MW | -6,078 MW | 1,008 MW |
| 2026-10-12T23:00Z | 6,177 MW | 10,218 MW | 3,580 MW | -3,374 MW | 1,254 MW |
| 2026-10-13T00:00Z | 6,924 MW | 3,535 MW | 3,578 MW | 2,240 MW | 1,878 MW |
| 2026-10-13T01:00Z | 7,265 MW | 216 MW | 3,618 MW | 6,799 MW | 1,936 MW |
| 2026-10-13T02:00Z | 7,278 MW | 14 MW | 3,711 MW | 7,149 MW | 2,093 MW |
| 2026-10-13T03:00Z | 7,574 MW | -44 MW | 3,703 MW | 6,404 MW | 2,054 MW |
| 2026-10-13T04:00Z | 7,758 MW | -43 MW | 3,483 MW | 6,437 MW | 2,018 MW |
| 2026-10-13T05:00Z | 7,911 MW | -44 MW | 3,592 MW | 4,213 MW | 1,951 MW |
| 2026-10-13T06:00Z | 7,989 MW | -44 MW | 4,181 MW | 2,295 MW | 1,956 MW |
| 2026-10-13T07:00Z | 7,898 MW | -43 MW | 4,777 MW | 2,081 MW | 1,581 MW |
| 2026-10-13T08:00Z | 7,874 MW | -43 MW | 5,095 MW | 621 MW | 1,543 MW |
| 2026-10-13T09:00Z | 7,878 MW | -43 MW | 5,183 MW | 16 MW | 1,508 MW |
| 2026-10-13T10:00Z | 7,910 MW | -43 MW | 4,924 MW | 58 MW | 1,523 MW |
| 2026-10-13T11:00Z | 7,921 MW | -43 MW | 4,702 MW | 449 MW | 1,497 MW |
| 2026-10-13T12:00Z | 8,115 MW | -43 MW | 5,072 MW | 1,155 MW | 1,620 MW |
| 2026-10-13T13:00Z | 8,712 MW | -30 MW | 5,088 MW | 1,868 MW | 1,860 MW |
| 2026-10-13T14:00Z | 8,579 MW | 2,924 MW | 5,050 MW | 936 MW | 1,819 MW |
| 2026-10-13T15:00Z | 6,075 MW | 11,602 MW | 4,467 MW | -2,464 MW | 900 MW |
| 2026-10-13T16:00Z | 4,054 MW | 16,024 MW | 3,920 MW | -5,221 MW | 824 MW |
| 2026-10-13T17:00Z | 3,028 MW | 16,814 MW | 3,217 MW | -7,026 MW | 725 MW |
| 2026-10-13T18:00Z | 2,846 MW | 16,865 MW | 2,795 MW | -8,203 MW | 689 MW |
| 2026-10-13T19:00Z | 2,969 MW | 16,867 MW | 2,488 MW | -8,524 MW | 683 MW |
| 2026-10-13T20:00Z | 2,944 MW | 17,736 MW | 2,274 MW | -8,999 MW | 699 MW |
| 2026-10-13T21:00Z | 2,941 MW | 17,626 MW | 2,068 MW | -7,880 MW | 747 MW |
| 2026-10-13T22:00Z | 3,236 MW | 17,152 MW | 2,069 MW | -6,422 MW | 786 MW |
| 2026-10-13T23:00Z | 4,203 MW | 14,321 MW | 2,012 MW | -2,468 MW | 993 MW |
| 2026-10-14T00:00Z | 6,078 MW | 5,090 MW | 1,952 MW | 4,220 MW | 1,755 MW |
| 2026-10-14T01:00Z | 7,022 MW | 73 MW | 1,973 MW | 8,863 MW | 2,136 MW |
| 2026-10-14T02:00Z | 7,365 MW | -50 MW | 2,038 MW | 9,079 MW | 2,300 MW |
| 2026-10-14T03:00Z | 7,633 MW | -46 MW | 1,945 MW | 7,491 MW | 2,363 MW |
| 2026-10-14T04:00Z | 7,977 MW | -46 MW | 1,762 MW | 7,021 MW | 2,210 MW |
| 2026-10-14T05:00Z | 8,240 MW | -46 MW | 1,500 MW | 5,756 MW | 2,108 MW |
| 2026-10-14T06:00Z | 8,892 MW | -47 MW | 1,391 MW | 3,323 MW | 1,943 MW |
| 2026-10-14T07:00Z | 9,347 MW | -47 MW | 1,691 MW | 1,327 MW | 1,969 MW |
| 2026-10-14T08:00Z | 9,473 MW | -47 MW | 1,979 MW | 95 MW | 1,886 MW |
| 2026-10-14T09:00Z | 9,154 MW | -47 MW | 2,004 MW | -27 MW | 1,696 MW |
| 2026-10-14T10:00Z | 9,144 MW | -47 MW | 2,217 MW | -374 MW | 1,711 MW |
| 2026-10-14T11:00Z | 9,133 MW | -47 MW | 2,125 MW | -111 MW | 1,831 MW |
| 2026-10-14T12:00Z | 9,627 MW | -47 MW | 1,959 MW | 460 MW | 1,971 MW |
| 2026-10-14T13:00Z | 10,361 MW | -22 MW | 1,902 MW | 1,477 MW | 2,076 MW |
| 2026-10-14T14:00Z | 9,338 MW | 3,598 MW | 1,872 MW | 575 MW | 1,981 MW |
| 2026-10-14T15:00Z | 5,622 MW | 13,398 MW | 1,950 MW | -3,679 MW | 1,018 MW |
| 2026-10-14T16:00Z | 4,121 MW | 17,357 MW | 1,964 MW | -7,318 MW | 831 MW |
| 2026-10-14T17:00Z | 3,652 MW | 17,581 MW | 1,951 MW | -8,730 MW | 729 MW |
| 2026-10-14T18:00Z | 3,667 MW | 18,065 MW | 1,901 MW | -9,790 MW | 564 MW |
| 2026-10-14T19:00Z | 3,674 MW | 17,233 MW | 1,834 MW | -8,579 MW | 556 MW |
| 2026-10-14T20:00Z | 3,743 MW | 15,998 MW | 1,706 MW | -6,991 MW | 566 MW |
| 2026-10-14T21:00Z | 3,905 MW | 14,667 MW | 1,632 MW | -4,219 MW | 562 MW |
| 2026-10-14T22:00Z | 4,318 MW | 14,843 MW | 1,636 MW | -2,991 MW | 583 MW |
| 2026-10-14T23:00Z | 5,516 MW | 12,590 MW | 1,630 MW | -143 MW | 739 MW |
| 2026-10-15T00:00Z | 7,962 MW | 5,205 MW | 1,649 MW | 4,728 MW | 1,622 MW |
| 2026-10-15T01:00Z | 9,502 MW | 189 MW | 1,717 MW | 8,679 MW | 1,974 MW |
| 2026-10-15T02:00Z | 10,039 MW | -34 MW | 1,833 MW | 7,327 MW | 2,065 MW |
| 2026-10-15T03:00Z | 9,792 MW | -38 MW | 2,045 MW | 6,973 MW | 2,140 MW |
| 2026-10-15T04:00Z | 9,490 MW | -37 MW | 2,125 MW | 6,962 MW | 1,906 MW |
| 2026-10-15T05:00Z | 9,583 MW | -37 MW | 2,109 MW | 4,970 MW | 1,834 MW |
| 2026-10-15T06:00Z | 9,682 MW | -36 MW | 2,075 MW | 3,002 MW | 1,744 MW |
| 2026-10-15T07:00Z | 9,632 MW | -36 MW | 1,871 MW | 1,722 MW | 1,556 MW |
| 2026-10-15T08:00Z | 9,780 MW | -37 MW | 1,881 MW | 434 MW | 1,455 MW |
| 2026-10-15T09:00Z | 9,859 MW | -36 MW | 1,941 MW | -85 MW | 1,407 MW |
| 2026-10-15T10:00Z | 9,830 MW | -36 MW | 1,986 MW | -1,203 MW | 1,441 MW |
| 2026-10-15T11:00Z | 9,870 MW | -36 MW | 2,068 MW | -838 MW | 1,456 MW |
| 2026-10-15T12:00Z | 9,878 MW | -36 MW | 2,257 MW | 206 MW | 1,387 MW |
| 2026-10-15T13:00Z | 10,146 MW | -14 MW | 2,421 MW | 1,798 MW | 1,568 MW |
| 2026-10-15T14:00Z | 9,569 MW | 3,351 MW | 2,521 MW | 461 MW | 1,469 MW |
| 2026-10-15T15:00Z | 6,012 MW | 12,591 MW | 2,383 MW | -4,022 MW | 745 MW |
| 2026-10-15T16:00Z | 4,512 MW | 16,802 MW | 2,443 MW | -7,721 MW | 635 MW |
| 2026-10-15T17:00Z | 3,840 MW | 16,831 MW | 3,119 MW | -9,131 MW | 612 MW |
| 2026-10-15T18:00Z | 4,036 MW | 17,195 MW | 3,598 MW | -10,031 MW | 615 MW |
| 2026-10-15T19:00Z | 4,191 MW | 16,273 MW | 3,850 MW | -8,729 MW | 636 MW |
| 2026-10-15T20:00Z | 4,008 MW | 15,388 MW | 3,277 MW | -7,003 MW | 653 MW |
| 2026-10-15T21:00Z | 4,029 MW | 14,015 MW | 3,259 MW | -4,127 MW | 671 MW |
| 2026-10-15T22:00Z | 4,324 MW | 13,531 MW | 3,310 MW | -1,910 MW | 695 MW |
| 2026-10-15T23:00Z | 5,568 MW | 11,852 MW | 3,543 MW | 43 MW | 1,020 MW |
| 2026-10-16T00:00Z | 9,184 MW | 4,656 MW | 3,673 MW | 3,766 MW | 1,936 MW |
| 2026-10-16T01:00Z | 10,890 MW | 114 MW | 3,168 MW | 6,929 MW | 2,200 MW |
| 2026-10-16T02:00Z | 11,183 MW | -50 MW | 2,801 MW | 6,688 MW | 1,909 MW |
| 2026-10-16T03:00Z | 11,327 MW | -44 MW | 2,816 MW | 5,892 MW | 1,891 MW |
| 2026-10-16T04:00Z | 11,292 MW | -42 MW | 2,794 MW | 5,265 MW | 2,049 MW |
| 2026-10-16T05:00Z | 11,043 MW | -42 MW | 2,856 MW | 3,647 MW | 1,983 MW |
| 2026-10-16T06:00Z | 11,083 MW | -43 MW | 3,094 MW | 2,813 MW | 1,524 MW |
| 2026-10-16T07:00Z | 11,206 MW | -42 MW | 3,380 MW | 1,342 MW | 1,273 MW |
| 2026-10-16T08:00Z | 11,095 MW | -42 MW | 3,380 MW | 982 MW | 1,210 MW |
| 2026-10-16T09:00Z | 10,709 MW | -42 MW | 3,298 MW | 497 MW | 1,188 MW |
| 2026-10-16T10:00Z | 10,719 MW | -43 MW | 3,305 MW | -91 MW | 1,042 MW |
| 2026-10-16T11:00Z | 10,350 MW | -44 MW | 3,607 MW | -60 MW | 1,100 MW |
| 2026-10-16T12:00Z | 9,742 MW | -44 MW | 4,107 MW | 750 MW | 1,520 MW |
| 2026-10-16T13:00Z | 10,343 MW | -29 MW | 4,290 MW | 2,559 MW | 1,684 MW |
| 2026-10-16T14:00Z | 10,197 MW | 2,679 MW | 4,246 MW | 667 MW | 1,724 MW |
| 2026-10-16T15:00Z | 7,564 MW | 11,209 MW | 4,367 MW | -3,722 MW | 959 MW |
| 2026-10-16T16:00Z | 6,491 MW | 15,927 MW | 4,166 MW | -7,298 MW | 731 MW |
| 2026-10-16T17:00Z | 5,963 MW | 16,687 MW | 4,502 MW | -7,926 MW | 730 MW |
| 2026-10-16T18:00Z | 6,435 MW | 16,603 MW | 4,608 MW | -7,717 MW | 753 MW |
| 2026-10-16T19:00Z | 6,399 MW | 16,597 MW | 4,635 MW | -7,978 MW | 764 MW |
| 2026-10-16T20:00Z | 6,787 MW | 16,342 MW | 4,239 MW | -6,044 MW | 764 MW |
| 2026-10-16T21:00Z | 7,402 MW | 16,251 MW | 4,326 MW | -5,030 MW | 824 MW |
| 2026-10-16T22:00Z | 8,017 MW | 15,301 MW | 4,366 MW | -2,749 MW | 844 MW |
| 2026-10-16T23:00Z | 10,219 MW | 12,011 MW | 4,112 MW | -487 MW | 1,172 MW |
| 2026-10-17T00:00Z | 12,154 MW | 3,867 MW | 4,071 MW | 6,029 MW | 2,170 MW |
| 2026-10-17T01:00Z | 12,982 MW | 88 MW | 3,860 MW | 8,129 MW | 2,299 MW |
| 2026-10-17T02:00Z | 12,741 MW | -60 MW | 3,634 MW | 7,619 MW | 2,133 MW |
| 2026-10-17T03:00Z | 12,625 MW | -56 MW | 3,286 MW | 6,599 MW | 2,286 MW |
| 2026-10-17T04:00Z | 12,955 MW | -55 MW | 2,768 MW | 5,654 MW | 2,191 MW |
| 2026-10-17T05:00Z | 13,441 MW | -56 MW | 2,558 MW | 3,674 MW | 2,174 MW |
| 2026-10-17T06:00Z | 13,850 MW | -55 MW | 2,361 MW | 2,027 MW | 2,036 MW |
| 2026-10-17T07:00Z | 13,180 MW | -55 MW | 2,004 MW | 2,150 MW | 1,696 MW |
| 2026-10-17T08:00Z | 12,625 MW | -55 MW | 1,949 MW | 1,119 MW | 1,570 MW |
| 2026-10-17T09:00Z | 12,270 MW | -54 MW | 1,630 MW | 551 MW | 1,496 MW |
| 2026-10-17T10:00Z | 12,212 MW | -54 MW | 1,083 MW | 36 MW | 1,352 MW |
| 2026-10-17T11:00Z | 11,881 MW | -54 MW | 928 MW | 241 MW | 1,487 MW |
| 2026-10-17T12:00Z | 11,781 MW | -54 MW | 1,128 MW | -380 MW | 1,765 MW |
| 2026-10-17T13:00Z | 11,625 MW | -54 MW | 1,017 MW | 740 MW | 2,000 MW |
| 2026-10-17T14:00Z | 11,424 MW | 1,008 MW | 777 MW | 657 MW | 1,577 MW |
| 2026-10-17T15:00Z | 11,077 MW | 3,713 MW | 663 MW | -988 MW | 1,315 MW |
| 2026-10-17T16:00Z | 9,306 MW | 9,961 MW | 766 MW | -6,625 MW | 852 MW |
| 2026-10-17T17:00Z | 8,826 MW | 11,615 MW | 868 MW | -8,044 MW | 820 MW |
| 2026-10-17T18:00Z | 8,365 MW | 12,444 MW | 868 MW | -8,423 MW | 820 MW |
| 2026-10-17T19:00Z | 8,277 MW | 12,958 MW | 939 MW | -8,195 MW | 836 MW |
| 2026-10-17T20:00Z | 8,235 MW | 12,194 MW | 825 MW | -6,310 MW | 1,021 MW |
| 2026-10-17T21:00Z | 8,455 MW | 11,119 MW | 840 MW | -4,187 MW | 1,273 MW |
| 2026-10-17T22:00Z | 9,090 MW | 11,040 MW | 827 MW | -2,506 MW | 1,343 MW |
| 2026-10-17T23:00Z | 10,839 MW | 8,837 MW | 770 MW | -768 MW | 1,835 MW |
| 2026-10-18T00:00Z | 12,053 MW | 2,961 MW | 949 MW | 4,252 MW | 2,644 MW |
| 2026-10-18T01:00Z | 12,467 MW | 112 MW | 730 MW | 6,624 MW | 2,837 MW |
| 2026-10-18T02:00Z | 12,268 MW | -56 MW | 705 MW | 5,835 MW | 2,795 MW |
| 2026-10-18T03:00Z | 12,125 MW | -51 MW | 657 MW | 5,011 MW | 2,642 MW |
| 2026-10-18T04:00Z | 12,303 MW | -50 MW | 655 MW | 4,581 MW | 2,573 MW |
| 2026-10-18T05:00Z | 11,941 MW | -50 MW | 772 MW | 3,920 MW | 2,494 MW |
| 2026-10-18T06:00Z | 11,333 MW | -52 MW | 1,108 MW | 2,738 MW | 2,010 MW |
| 2026-10-18T07:00Z | 11,571 MW | -50 MW | 1,599 MW | 1,498 MW | 2,092 MW |
| 2026-10-18T08:00Z | 10,925 MW | -50 MW | 1,940 MW | 497 MW | 2,093 MW |
| 2026-10-18T09:00Z | 10,013 MW | -51 MW | 2,108 MW | 331 MW | 2,017 MW |
| 2026-10-18T10:00Z | 9,789 MW | -51 MW | 2,103 MW | 83 MW | 1,944 MW |
| 2026-10-18T11:00Z | 10,017 MW | -52 MW | 2,174 MW | 172 MW | 1,954 MW |
| 2026-10-18T12:00Z | 9,012 MW | -51 MW | 2,276 MW | 1,241 MW | 1,978 MW |
| 2026-10-18T13:00Z | 9,096 MW | -50 MW | 2,030 MW | 2,096 MW | 2,366 MW |
| 2026-10-18T14:00Z | 9,308 MW | 1,326 MW | 1,666 MW | 773 MW | 2,122 MW |
| 2026-10-18T15:00Z | 6,008 MW | 8,313 MW | 1,762 MW | -1,408 MW | 1,158 MW |
| 2026-10-18T16:00Z | 4,289 MW | 13,310 MW | 1,441 MW | -5,060 MW | 796 MW |
| 2026-10-18T17:00Z | 3,921 MW | 14,766 MW | 1,455 MW | -7,889 MW | 757 MW |
| 2026-10-18T18:00Z | 3,956 MW | 15,656 MW | 1,360 MW | -8,770 MW | 757 MW |
| 2026-10-18T19:00Z | 4,071 MW | 16,200 MW | 1,296 MW | -9,381 MW | 760 MW |
| 2026-10-18T20:00Z | 4,145 MW | 16,836 MW | 1,288 MW | -8,435 MW | 770 MW |
| 2026-10-18T21:00Z | 4,228 MW | 17,188 MW | 1,371 MW | -6,173 MW | 869 MW |
| 2026-10-18T22:00Z | 4,785 MW | 16,475 MW | 1,273 MW | -4,012 MW | 927 MW |
| 2026-10-18T23:00Z | 6,754 MW | 12,784 MW | 1,380 MW | -1,303 MW | 1,577 MW |
| 2026-10-19T00:00Z | 12,358 MW | 3,758 MW | 1,299 MW | 4,318 MW | 2,357 MW |
| 2026-10-19T01:00Z | 12,421 MW | -1 MW | 1,583 MW | 7,198 MW | 2,666 MW |
| 2026-10-19T02:00Z | 11,435 MW | -55 MW | 2,427 MW | 5,903 MW | 2,737 MW |
| 2026-10-19T03:00Z | 10,571 MW | -50 MW | 2,442 MW | 6,047 MW | 2,684 MW |
| 2026-10-19T04:00Z | 10,811 MW | -49 MW | 2,473 MW | 5,319 MW | 2,707 MW |
| 2026-10-19T05:00Z | 10,423 MW | -50 MW | 2,679 MW | 3,879 MW | 2,537 MW |
| 2026-10-19T06:00Z | 10,150 MW | -50 MW | 2,870 MW | 2,439 MW | 2,103 MW |
| 2026-10-19T07:00Z | 10,332 MW | -49 MW | 2,883 MW | 1,120 MW | 1,952 MW |
| 2026-10-19T08:00Z | 10,306 MW | -49 MW | 2,717 MW | 451 MW | 1,781 MW |
| 2026-10-19T09:00Z | 10,257 MW | -49 MW | 2,853 MW | -577 MW | 1,865 MW |
| 2026-10-19T10:00Z | 10,160 MW | -49 MW | 2,892 MW | -793 MW | 1,863 MW |
| 2026-10-19T11:00Z | 9,658 MW | -49 MW | 2,923 MW | 320 MW | 1,707 MW |
| 2026-10-19T12:00Z | 9,276 MW | -48 MW | 2,957 MW | 1,331 MW | 1,853 MW |
| 2026-10-19T13:00Z | 9,995 MW | -40 MW | 2,916 MW | 3,479 MW | 1,977 MW |
| 2026-10-19T14:00Z | 9,970 MW | 2,596 MW | 2,548 MW | 2,702 MW | 1,504 MW |
| 2026-10-19T15:00Z | 8,906 MW | 11,448 MW | 1,408 MW | -2,954 MW | 975 MW |
| 2026-10-19T16:00Z | 7,690 MW | 16,066 MW | 1,204 MW | -7,017 MW | 759 MW |
| 2026-10-19T17:00Z | 7,776 MW | 16,289 MW | 1,005 MW | -7,953 MW | 729 MW |
| 2026-10-19T18:00Z | 7,711 MW | 16,839 MW | 816 MW | -7,776 MW | 401 MW |
| 2026-10-19T19:00Z | 7,989 MW | 16,250 MW | 756 MW | -6,478 MW | 609 MW |
| 2026-10-19T20:00Z | 8,558 MW | 16,423 MW | 1,230 MW | -7,112 MW | 478 MW |
| 2026-10-19T21:00Z | 8,324 MW | 16,401 MW | 1,634 MW | -5,458 MW | 516 MW |
| 2026-10-19T22:00Z | 8,845 MW | 15,577 MW | 2,227 MW | -3,423 MW | 768 MW |
| 2026-10-19T23:00Z | 10,243 MW | 12,301 MW | 1,979 MW | -605 MW | 1,116 MW |
| 2026-10-20T00:00Z | 12,219 MW | 3,387 MW | 1,912 MW | 6,146 MW | 1,892 MW |
| 2026-10-20T01:00Z | 12,662 MW | 96 MW | 1,828 MW | 8,619 MW | 2,013 MW |
| 2026-10-20T02:00Z | 12,648 MW | 34 MW | 1,700 MW | 7,679 MW | 2,084 MW |
| 2026-10-20T03:00Z | 12,780 MW | 0 MW | 1,527 MW | 6,826 MW | 2,023 MW |
| 2026-10-20T04:00Z | 12,815 MW | -44 MW | 2,114 MW | 5,664 MW | 1,880 MW |
| 2026-10-20T05:00Z | 12,640 MW | -44 MW | 1,373 MW | 3,863 MW | 1,806 MW |
| 2026-10-20T06:00Z | 12,643 MW | -45 MW | 1,204 MW | 2,165 MW | 1,495 MW |
| 2026-10-20T07:00Z | 12,741 MW | -43 MW | 1,072 MW | 1,887 MW | 1,492 MW |
| 2026-10-20T08:00Z | 12,956 MW | -46 MW | 1,153 MW | 428 MW | 1,183 MW |
| 2026-10-20T09:00Z | 12,143 MW | -46 MW | 1,435 MW | 32 MW | 1,110 MW |
| 2026-10-20T10:00Z | 12,292 MW | -46 MW | 1,657 MW | -694 MW | 1,125 MW |
| 2026-10-20T11:00Z | 12,772 MW | -46 MW | 1,143 MW | -151 MW | 1,132 MW |
| 2026-10-20T12:00Z | 13,237 MW | -45 MW | 1,379 MW | 324 MW | 1,174 MW |
| 2026-10-20T13:00Z | 13,836 MW | -39 MW | 1,578 MW | 1,335 MW | 1,747 MW |
| 2026-10-20T14:00Z | 14,271 MW | 2,110 MW | 551 MW | 1,238 MW | 1,594 MW |
| 2026-10-20T15:00Z | 11,536 MW | 9,942 MW | 316 MW | -1,787 MW | 1,051 MW |
| 2026-10-20T16:00Z | 10,251 MW | 14,482 MW | 219 MW | -4,896 MW | 799 MW |
| 2026-10-20T17:00Z | 9,137 MW | 15,450 MW | 745 MW | -7,686 MW | 712 MW |
| 2026-10-20T18:00Z | 8,855 MW | 15,495 MW | 1,615 MW | -8,510 MW | 654 MW |
| 2026-10-20T19:00Z | 9,765 MW | 15,136 MW | 1,558 MW | -8,928 MW | 689 MW |
| 2026-10-20T20:00Z | 10,180 MW | 14,480 MW | 1,848 MW | -6,859 MW | 707 MW |
| 2026-10-20T21:00Z | 10,903 MW | 13,577 MW | 2,226 MW | -5,091 MW | 778 MW |
| 2026-10-20T22:00Z | 11,325 MW | 12,380 MW | 1,801 MW | -2,886 MW | 906 MW |
| 2026-10-20T23:00Z | 12,150 MW | 8,457 MW | 1,234 MW | 1,041 MW | 1,203 MW |
| 2026-10-21T00:00Z | 13,224 MW | 2,231 MW | 1,285 MW | 6,945 MW | 1,879 MW |
| 2026-10-21T01:00Z | 13,443 MW | -9 MW | 1,047 MW | 8,311 MW | 2,206 MW |
| 2026-10-21T02:00Z | 13,702 MW | -54 MW | 628 MW | 7,123 MW | 2,142 MW |
| 2026-10-21T03:00Z | 14,598 MW | -58 MW | 443 MW | 6,283 MW | 2,306 MW |
| 2026-10-21T04:00Z | 14,757 MW | -60 MW | 635 MW | 4,874 MW | 2,260 MW |
| 2026-10-21T05:00Z | 13,849 MW | -62 MW | 825 MW | 3,051 MW | 2,093 MW |
| 2026-10-21T06:00Z | 13,889 MW | -55 MW | 991 MW | 1,902 MW | 1,777 MW |
| 2026-10-21T07:00Z | 13,912 MW | -66 MW | 1,034 MW | 1,214 MW | 1,636 MW |
| 2026-10-21T08:00Z | 13,790 MW | -57 MW | 797 MW | 470 MW | 1,425 MW |
| 2026-10-21T09:00Z | 13,640 MW | -57 MW | 786 MW | -326 MW | 1,377 MW |
| 2026-10-21T10:00Z | 13,644 MW | -58 MW | 770 MW | -760 MW | 1,355 MW |
| 2026-10-21T11:00Z | 13,701 MW | -57 MW | 694 MW | -342 MW | 1,316 MW |
| 2026-10-21T12:00Z | 14,196 MW | -55 MW | 779 MW | 26 MW | 1,522 MW |
| 2026-10-21T13:00Z | 15,579 MW | -50 MW | 878 MW | 1,118 MW | 2,044 MW |
| 2026-10-21T14:00Z | 15,857 MW | 1,350 MW | 807 MW | 677 MW | 1,863 MW |
| 2026-10-21T15:00Z | 14,379 MW | 6,196 MW | 594 MW | -893 MW | 1,000 MW |
| 2026-10-21T16:00Z | 13,678 MW | 7,908 MW | 455 MW | -1,596 MW | 961 MW |
| 2026-10-21T17:00Z | 13,711 MW | 8,781 MW | 571 MW | -2,953 MW | 912 MW |
| 2026-10-21T18:00Z | 13,875 MW | 9,309 MW | 627 MW | -2,667 MW | 658 MW |
| 2026-10-21T19:00Z | 14,052 MW | 8,772 MW | 854 MW | -1,742 MW | 788 MW |
| 2026-10-21T20:00Z | 14,112 MW | 8,604 MW | 1,341 MW | -2,690 MW | 1,012 MW |
| 2026-10-21T21:00Z | 15,868 MW | 8,515 MW | 1,561 MW | -3,758 MW | 868 MW |
| 2026-10-21T22:00Z | 16,124 MW | 8,023 MW | 1,826 MW | -3,727 MW | 1,019 MW |
| 2026-10-21T23:00Z | 16,147 MW | 6,050 MW | 1,682 MW | -2,841 MW | 1,382 MW |
| 2026-10-22T00:00Z | 15,433 MW | 1,528 MW | 1,572 MW | 2,077 MW | 1,777 MW |
| 2026-10-22T01:00Z | 15,437 MW | -37 MW | 1,916 MW | 2,841 MW | 1,941 MW |
| 2026-10-22T02:00Z | 15,476 MW | -46 MW | 2,048 MW | 2,174 MW | 1,859 MW |
| 2026-10-22T03:00Z | 14,925 MW | -46 MW | 2,124 MW | 2,049 MW | 1,864 MW |
| 2026-10-22T04:00Z | 13,849 MW | -49 MW | 1,882 MW | 2,830 MW | 1,850 MW |
| 2026-10-22T05:00Z | 13,550 MW | -50 MW | 2,126 MW | 1,668 MW | 1,693 MW |
| 2026-10-22T06:00Z | 13,293 MW | -49 MW | 2,378 MW | 725 MW | 1,591 MW |
| 2026-10-22T07:00Z | 13,187 MW | -50 MW | 2,629 MW | 113 MW | 1,511 MW |
| 2026-10-22T08:00Z | 12,882 MW | -51 MW | 2,349 MW | -714 MW | 1,319 MW |
| 2026-10-22T09:00Z | 12,780 MW | -51 MW | 2,277 MW | -1,269 MW | 1,262 MW |
| 2026-10-22T10:00Z | 12,799 MW | -51 MW | 1,945 MW | -1,508 MW | 1,248 MW |
| 2026-10-22T11:00Z | 12,843 MW | -50 MW | 1,888 MW | -719 MW | 1,259 MW |
| 2026-10-22T12:00Z | 13,086 MW | -50 MW | 1,569 MW | 465 MW | 1,499 MW |
| 2026-10-22T13:00Z | 13,706 MW | -48 MW | 1,279 MW | 2,592 MW | 1,833 MW |
| 2026-10-22T14:00Z | 14,339 MW | 937 MW | 1,300 MW | 2,340 MW | 1,892 MW |
| 2026-10-22T15:00Z | 12,516 MW | 6,421 MW | 1,282 MW | -903 MW | 1,448 MW |
| 2026-10-22T16:00Z | 10,557 MW | 9,083 MW | 1,512 MW | -1,649 MW | 1,192 MW |
| 2026-10-22T17:00Z | 9,543 MW | 10,367 MW | 2,105 MW | -3,364 MW | 917 MW |
| 2026-10-22T18:00Z | 9,747 MW | 10,408 MW | 2,088 MW | -4,064 MW | 785 MW |
| 2026-10-22T19:00Z | 9,589 MW | 11,561 MW | 2,247 MW | -5,246 MW | 775 MW |
| 2026-10-22T20:00Z | 9,251 MW | 11,924 MW | 2,783 MW | -6,181 MW | 983 MW |
| 2026-10-22T21:00Z | 9,514 MW | 11,716 MW | 3,054 MW | -5,886 MW | 917 MW |
| 2026-10-22T22:00Z | 9,845 MW | 10,133 MW | 3,189 MW | -3,837 MW | 1,084 MW |
| 2026-10-22T23:00Z | 10,302 MW | 6,346 MW | 3,662 MW | -280 MW | 1,200 MW |
| 2026-10-23T00:00Z | 10,833 MW | 1,694 MW | 3,430 MW | 2,880 MW | 1,645 MW |
| 2026-10-23T01:00Z | 11,013 MW | 20 MW | 3,238 MW | 5,096 MW | 1,755 MW |
| 2026-10-23T02:00Z | 11,240 MW | -50 MW | 3,060 MW | 4,296 MW | 1,727 MW |
| 2026-10-23T03:00Z | 10,968 MW | -47 MW | 2,873 MW | 3,170 MW | 1,694 MW |
| 2026-10-23T04:00Z | 10,359 MW | -47 MW | 2,688 MW | 3,262 MW | 1,626 MW |
| 2026-10-23T05:00Z | 10,111 MW | -47 MW | 2,528 MW | 2,381 MW | 1,373 MW |
| 2026-10-23T06:00Z | 9,848 MW | -47 MW | 2,046 MW | 1,540 MW | 1,040 MW |
| 2026-10-23T07:00Z | 10,091 MW | -47 MW | 1,849 MW | 819 MW | 1,125 MW |
| 2026-10-23T08:00Z | 10,104 MW | -48 MW | 1,995 MW | 1,564 MW | 1,304 MW |
| 2026-10-23T09:00Z | 10,156 MW | -48 MW | 2,138 MW | 58 MW | 1,197 MW |
| 2026-10-23T10:00Z | 9,997 MW | -48 MW | 1,942 MW | -613 MW | 806 MW |
| 2026-10-23T11:00Z | 10,194 MW | -48 MW | 1,720 MW | -4 MW | 822 MW |
| 2026-10-23T12:00Z | 10,377 MW | -47 MW | 1,925 MW | 150 MW | 1,035 MW |
| 2026-10-23T13:00Z | 10,560 MW | -42 MW | 2,141 MW | 1,806 MW | 1,387 MW |
| 2026-10-23T14:00Z | 10,464 MW | 2,293 MW | 1,947 MW | 799 MW | 1,716 MW |
| 2026-10-23T15:00Z | 7,580 MW | 9,888 MW | 1,850 MW | -2,289 MW | 1,190 MW |
| 2026-10-23T16:00Z | 5,952 MW | 13,775 MW | 2,075 MW | -5,032 MW | 1,029 MW |
| 2026-10-23T17:00Z | 5,463 MW | 14,520 MW | 2,184 MW | -6,721 MW | 1,008 MW |
| 2026-10-23T18:00Z | 5,017 MW | 14,463 MW | 2,306 MW | -7,280 MW | 830 MW |
| 2026-10-23T19:00Z | 5,123 MW | 13,696 MW | 2,970 MW | -7,627 MW | 954 MW |
| 2026-10-23T20:00Z | 4,849 MW | 13,159 MW | 3,666 MW | -7,563 MW | 909 MW |
| 2026-10-23T21:00Z | 4,866 MW | 11,895 MW | 3,941 MW | -6,097 MW | 822 MW |
| 2026-10-23T22:00Z | 5,782 MW | 10,466 MW | 4,293 MW | -4,494 MW | 492 MW |
| 2026-10-23T23:00Z | 6,391 MW | 8,136 MW | 4,123 MW | -1,116 MW | 976 MW |
| 2026-10-24T00:00Z | 7,784 MW | 2,063 MW | 3,552 MW | 2,667 MW | 1,691 MW |
| 2026-10-24T01:00Z | 8,095 MW | 13 MW | 3,008 MW | 6,229 MW | 1,833 MW |
| 2026-10-24T02:00Z | 8,081 MW | -18 MW | 3,467 MW | 5,393 MW | 1,708 MW |
| 2026-10-24T03:00Z | 8,282 MW | -50 MW | 2,041 MW | 6,125 MW | 1,550 MW |
| 2026-10-24T04:00Z | 8,373 MW | -52 MW | 1,865 MW | 6,056 MW | 1,721 MW |
| 2026-10-24T05:00Z | 8,442 MW | -52 MW | 2,162 MW | 4,897 MW | 1,770 MW |
| 2026-10-24T06:00Z | 8,865 MW | -52 MW | 2,199 MW | 3,252 MW | 1,465 MW |
| 2026-10-24T07:00Z | 9,509 MW | -51 MW | 2,315 MW | 2,307 MW | 1,030 MW |
| 2026-10-24T08:00Z | 9,920 MW | -51 MW | 2,292 MW | 1,339 MW | 934 MW |
| 2026-10-24T09:00Z | 9,894 MW | -51 MW | 2,328 MW | 821 MW | 919 MW |
| 2026-10-24T10:00Z | 10,024 MW | -51 MW | 2,399 MW | 217 MW | 912 MW |
| 2026-10-24T11:00Z | 9,602 MW | -51 MW | 2,267 MW | 1,029 MW | 957 MW |
| 2026-10-24T12:00Z | 9,767 MW | -51 MW | 1,957 MW | 1,101 MW | 1,003 MW |
| 2026-10-24T13:00Z | 10,009 MW | -47 MW | 1,698 MW | 2,029 MW | 1,377 MW |
| 2026-10-24T14:00Z | 9,529 MW | 2,171 MW | 1,606 MW | 942 MW | 1,380 MW |
| 2026-10-24T15:00Z | 6,126 MW | 10,841 MW | 1,970 MW | -2,168 MW | 708 MW |
| 2026-10-24T16:00Z | 3,738 MW | 16,595 MW | 1,981 MW | -5,787 MW | 418 MW |
| 2026-10-24T17:00Z | 3,155 MW | 17,720 MW | 2,264 MW | -7,842 MW | 434 MW |
| 2026-10-24T18:00Z | 3,063 MW | 17,662 MW | 2,363 MW | -9,027 MW | 417 MW |
| 2026-10-24T19:00Z | 3,083 MW | 17,341 MW | 2,352 MW | -9,003 MW | 417 MW |
| 2026-10-24T20:00Z | 2,868 MW | 16,975 MW | 2,417 MW | -9,002 MW | 450 MW |
| 2026-10-24T21:00Z | 2,916 MW | 16,384 MW | 2,402 MW | -7,756 MW | 398 MW |
| 2026-10-24T22:00Z | 3,180 MW | 14,939 MW | 2,324 MW | -5,088 MW | 436 MW |
| 2026-10-24T23:00Z | 4,267 MW | 12,067 MW | 2,274 MW | -767 MW | 788 MW |
| 2026-10-25T00:00Z | 6,969 MW | 3,225 MW | 2,228 MW | 4,380 MW | 1,518 MW |
| 2026-10-25T01:00Z | 7,885 MW | -16 MW | 2,260 MW | 7,045 MW | 2,006 MW |
| 2026-10-25T02:00Z | 7,999 MW | -55 MW | 2,008 MW | 6,964 MW | 2,119 MW |
| 2026-10-25T03:00Z | 8,051 MW | -50 MW | 1,504 MW | 6,650 MW | 2,079 MW |
| 2026-10-25T04:00Z | 8,133 MW | -51 MW | 1,399 MW | 6,426 MW | 1,760 MW |
| 2026-10-25T05:00Z | 8,172 MW | -52 MW | 995 MW | 6,095 MW | 1,575 MW |
| 2026-10-25T06:00Z | 8,529 MW | -53 MW | 715 MW | 4,684 MW | 1,557 MW |
| 2026-10-25T07:00Z | 9,664 MW | -51 MW | 675 MW | 3,002 MW | 1,618 MW |
| 2026-10-25T08:00Z | 9,815 MW | -51 MW | 800 MW | 1,790 MW | 1,398 MW |
| 2026-10-25T09:00Z | 9,943 MW | -51 MW | 685 MW | 804 MW | 1,492 MW |
| 2026-10-25T10:00Z | 10,184 MW | -50 MW | 479 MW | 304 MW | 1,437 MW |
| 2026-10-25T11:00Z | 10,634 MW | -50 MW | 381 MW | 256 MW | 1,326 MW |
| 2026-10-25T12:00Z | 10,799 MW | -50 MW | 392 MW | 578 MW | 1,439 MW |
| 2026-10-25T13:00Z | 10,881 MW | -46 MW | 281 MW | 910 MW | 1,616 MW |
| 2026-10-25T14:00Z | 10,318 MW | 2,326 MW | 333 MW | 267 MW | 1,320 MW |
| 2026-10-25T15:00Z | 6,463 MW | 11,834 MW | 351 MW | -3,508 MW | 861 MW |
| 2026-10-25T16:00Z | 4,524 MW | 17,069 MW | 566 MW | -7,503 MW | 533 MW |
| 2026-10-25T17:00Z | 3,385 MW | 17,906 MW | 237 MW | -7,992 MW | 302 MW |
| 2026-10-25T18:00Z | 3,382 MW | 17,773 MW | 400 MW | -8,827 MW | 300 MW |
| 2026-10-25T19:00Z | 3,429 MW | 17,432 MW | 559 MW | -8,785 MW | 300 MW |
| 2026-10-25T20:00Z | 3,224 MW | 17,650 MW | 487 MW | -7,485 MW | 306 MW |
| 2026-10-25T21:00Z | 3,512 MW | 17,725 MW | 463 MW | -7,278 MW | 353 MW |
| 2026-10-25T22:00Z | 3,928 MW | 16,733 MW | 828 MW | -4,631 MW | 431 MW |
| 2026-10-25T23:00Z | 5,403 MW | 12,222 MW | 1,258 MW | -576 MW | 926 MW |
| 2026-10-26T00:00Z | 8,535 MW | 2,905 MW | 1,320 MW | 5,904 MW | 1,757 MW |
| 2026-10-26T01:00Z | 9,138 MW | 61 MW | 1,248 MW | 7,981 MW | 2,057 MW |
| 2026-10-26T02:00Z | 9,227 MW | -44 MW | 989 MW | 7,514 MW | 2,131 MW |
| 2026-10-26T03:00Z | 9,462 MW | -39 MW | 985 MW | 7,106 MW | 1,999 MW |
| 2026-10-26T04:00Z | 9,772 MW | -39 MW | 1,311 MW | 5,710 MW | 1,924 MW |
| 2026-10-26T05:00Z | 9,917 MW | -40 MW | 1,369 MW | 4,094 MW | 1,725 MW |
| 2026-10-26T06:00Z | 10,350 MW | -51 MW | 1,403 MW | 2,040 MW | 1,626 MW |
| 2026-10-26T07:00Z | 11,119 MW | -50 MW | 1,230 MW | 1,356 MW | 1,572 MW |
| 2026-10-26T08:00Z | 11,513 MW | -51 MW | 1,202 MW | 144 MW | 1,391 MW |
| 2026-10-26T09:00Z | 11,561 MW | -50 MW | 1,279 MW | -488 MW | 1,399 MW |
| 2026-10-26T10:00Z | 11,778 MW | -50 MW | 1,231 MW | -792 MW | 1,406 MW |
| 2026-10-26T11:00Z | 12,023 MW | -50 MW | 1,469 MW | -575 MW | 1,467 MW |
| 2026-10-26T12:00Z | 12,060 MW | -49 MW | 1,425 MW | 664 MW | 1,645 MW |
| 2026-10-26T13:00Z | 12,321 MW | -46 MW | 1,281 MW | 3,348 MW | 1,742 MW |
| 2026-10-26T14:00Z | 12,250 MW | 2,161 MW | 1,212 MW | 2,581 MW | 1,671 MW |
| 2026-10-26T15:00Z | 9,615 MW | 11,487 MW | 1,072 MW | -2,639 MW | 909 MW |
| 2026-10-26T16:00Z | 8,113 MW | 15,730 MW | 1,189 MW | -6,016 MW | 658 MW |
| 2026-10-26T17:00Z | 6,310 MW | 17,412 MW | 1,203 MW | -6,589 MW | 439 MW |
| 2026-10-26T18:00Z | 5,818 MW | 17,453 MW | 1,157 MW | -8,098 MW | 396 MW |
| 2026-10-26T19:00Z | 5,712 MW | 17,384 MW | 1,250 MW | -8,397 MW | 388 MW |
| 2026-10-26T20:00Z | 5,375 MW | 17,225 MW | 1,943 MW | -9,017 MW | 384 MW |
| 2026-10-26T21:00Z | 5,239 MW | 17,423 MW | 2,367 MW | -7,767 MW | 399 MW |
| 2026-10-26T22:00Z | 5,536 MW | 17,179 MW | 2,570 MW | -5,221 MW | 506 MW |
| 2026-10-26T23:00Z | 7,105 MW | 12,701 MW | 2,901 MW | -1,395 MW | 831 MW |
| 2026-10-27T00:00Z | 10,379 MW | 2,869 MW | 2,646 MW | 5,949 MW | 1,740 MW |
| 2026-10-27T01:00Z | 10,881 MW | -26 MW | 2,602 MW | 8,536 MW | 2,055 MW |
| 2026-10-27T02:00Z | 10,580 MW | -57 MW | 2,560 MW | 8,263 MW | 2,027 MW |
| 2026-10-27T03:00Z | 10,580 MW | -54 MW | 2,231 MW | 7,250 MW | 1,968 MW |
| 2026-10-27T04:00Z | 10,718 MW | -54 MW | 2,574 MW | 6,443 MW | 1,867 MW |
| 2026-10-27T05:00Z | 10,752 MW | -54 MW | 2,921 MW | 4,177 MW | 1,758 MW |
| 2026-10-27T06:00Z | 10,758 MW | -52 MW | 2,977 MW | 2,099 MW | 1,713 MW |
| 2026-10-27T07:00Z | 10,349 MW | -52 MW | 3,212 MW | 1,646 MW | 1,587 MW |
| 2026-10-27T08:00Z | 10,188 MW | -53 MW | 3,171 MW | 421 MW | 1,492 MW |
| 2026-10-27T09:00Z | 9,434 MW | -53 MW | 3,431 MW | -110 MW | 1,457 MW |
| 2026-10-27T10:00Z | 9,540 MW | -53 MW | 3,357 MW | -701 MW | 1,503 MW |
| 2026-10-27T11:00Z | 9,706 MW | -53 MW | 3,581 MW | -792 MW | 1,523 MW |
| 2026-10-27T12:00Z | 9,514 MW | -53 MW | 3,333 MW | 395 MW | 1,673 MW |
| 2026-10-27T13:00Z | 9,044 MW | -53 MW | 2,956 MW | 2,148 MW | 1,973 MW |
| 2026-10-27T14:00Z | 9,420 MW | 2,091 MW | 2,235 MW | 2,758 MW | 1,799 MW |
| 2026-10-27T15:00Z | 6,217 MW | 11,228 MW | 2,237 MW | -1,879 MW | 1,341 MW |
| 2026-10-27T16:00Z | 4,633 MW | 16,774 MW | 2,374 MW | -6,544 MW | 661 MW |
| 2026-10-27T17:00Z | 3,878 MW | 17,623 MW | 2,495 MW | -7,633 MW | 403 MW |
| 2026-10-27T18:00Z | 3,779 MW | 17,474 MW | 2,555 MW | -8,307 MW | 372 MW |
| 2026-10-27T19:00Z | 3,434 MW | 17,297 MW | 2,737 MW | -8,576 MW | 425 MW |
| 2026-10-27T20:00Z | 3,327 MW | 17,275 MW | 3,079 MW | -8,699 MW | 429 MW |
| 2026-10-27T21:00Z | 3,356 MW | 16,997 MW | 3,565 MW | -8,637 MW | 456 MW |
| 2026-10-27T22:00Z | 3,562 MW | 16,353 MW | 3,802 MW | -5,585 MW | 477 MW |
| 2026-10-27T23:00Z | 4,774 MW | 11,765 MW | 3,530 MW | -1,284 MW | 1,119 MW |
| 2026-10-28T00:00Z | 6,811 MW | 2,448 MW | 3,235 MW | 5,209 MW | 1,846 MW |
| 2026-10-28T01:00Z | 7,106 MW | -46 MW | 3,090 MW | 8,013 MW | 2,065 MW |
| 2026-10-28T02:00Z | 7,575 MW | -62 MW | 2,719 MW | 6,988 MW | 1,811 MW |
| 2026-10-28T03:00Z | 7,837 MW | -55 MW | 3,000 MW | 6,046 MW | 1,815 MW |
| 2026-10-28T04:00Z | 7,761 MW | -57 MW | 3,370 MW | 5,454 MW | 1,789 MW |
| 2026-10-28T05:00Z | 7,783 MW | -55 MW | 3,406 MW | 3,229 MW | 1,759 MW |
| 2026-10-28T06:00Z | 7,852 MW | -56 MW | 3,340 MW | 2,257 MW | 1,824 MW |
| 2026-10-28T07:00Z | 8,397 MW | -53 MW | 3,300 MW | 1,780 MW | 1,486 MW |
| 2026-10-28T08:00Z | 8,808 MW | -54 MW | 3,041 MW | 851 MW | 1,395 MW |
| 2026-10-28T09:00Z | 8,956 MW | -54 MW | 2,953 MW | -299 MW | 1,379 MW |
| 2026-10-28T10:00Z | 8,643 MW | -54 MW | 3,207 MW | -121 MW | 1,367 MW |
| 2026-10-28T11:00Z | 8,921 MW | -55 MW | 2,937 MW | 387 MW | 1,419 MW |
| 2026-10-28T12:00Z | 9,106 MW | -55 MW | 2,617 MW | 1,759 MW | 1,525 MW |
| 2026-10-28T13:00Z | 9,597 MW | -52 MW | 2,407 MW | 4,308 MW | 1,659 MW |
| 2026-10-28T14:00Z | 9,718 MW | 1,653 MW | 2,037 MW | 3,397 MW | 1,681 MW |
| 2026-10-28T15:00Z | 7,971 MW | 9,738 MW | 2,085 MW | -2,182 MW | 1,349 MW |
| 2026-10-28T16:00Z | 5,806 MW | 15,442 MW | 2,134 MW | -6,427 MW | 624 MW |
| 2026-10-28T17:00Z | 5,270 MW | 16,766 MW | 2,129 MW | -9,176 MW | 416 MW |
| 2026-10-28T18:00Z | 5,405 MW | 16,822 MW | 2,199 MW | -10,168 MW | 416 MW |
| 2026-10-28T19:00Z | 5,397 MW | 16,755 MW | 2,162 MW | -10,121 MW | 472 MW |
| 2026-10-28T20:00Z | 5,419 MW | 16,434 MW | 2,135 MW | -9,585 MW | 409 MW |
| 2026-10-28T21:00Z | 6,097 MW | 15,112 MW | 1,910 MW | -5,698 MW | 147 MW |
| 2026-10-28T22:00Z | 6,630 MW | 14,461 MW | 1,388 MW | -3,158 MW | 442 MW |
| 2026-10-28T23:00Z | 8,148 MW | 10,579 MW | 853 MW | -256 MW | 1,103 MW |
| 2026-10-29T00:00Z | 10,530 MW | 2,165 MW | 566 MW | 5,378 MW | 1,999 MW |
| 2026-10-29T01:00Z | 10,858 MW | -52 MW | 403 MW | 7,924 MW | 2,251 MW |
| 2026-10-29T02:00Z | 10,886 MW | -61 MW | 407 MW | 7,897 MW | 2,096 MW |
| 2026-10-29T03:00Z | 11,323 MW | -56 MW | 626 MW | 6,495 MW | 2,061 MW |
| 2026-10-29T04:00Z | 11,182 MW | -56 MW | 970 MW | 5,761 MW | 2,062 MW |
| 2026-10-29T05:00Z | 11,339 MW | -56 MW | 1,067 MW | 4,167 MW | 1,843 MW |
| 2026-10-29T06:00Z | 11,667 MW | -56 MW | 1,002 MW | 2,871 MW | 1,563 MW |
| 2026-10-29T07:00Z | 12,900 MW | -55 MW | 996 MW | 960 MW | 1,761 MW |
| 2026-10-29T08:00Z | 12,968 MW | -55 MW | 1,206 MW | -220 MW | 1,538 MW |
| 2026-10-29T09:00Z | 13,123 MW | -55 MW | 1,400 MW | -934 MW | 1,393 MW |
| 2026-10-29T10:00Z | 13,296 MW | -56 MW | 1,432 MW | -1,398 MW | 1,550 MW |
| 2026-10-29T11:00Z | 13,412 MW | -55 MW | 1,330 MW | -604 MW | 1,617 MW |
| 2026-10-29T12:00Z | 13,979 MW | -55 MW | 1,178 MW | 631 MW | 1,666 MW |
| 2026-10-29T13:00Z | 14,601 MW | -54 MW | 952 MW | 3,025 MW | 1,782 MW |
| 2026-10-29T14:00Z | 14,530 MW | 968 MW | 568 MW | 3,194 MW | 1,850 MW |
| 2026-10-29T15:00Z | 13,561 MW | 7,019 MW | 364 MW | -670 MW | 1,455 MW |
| 2026-10-29T16:00Z | 11,124 MW | 12,844 MW | 287 MW | -5,146 MW | 1,211 MW |
| 2026-10-29T17:00Z | 11,118 MW | 13,099 MW | 298 MW | -5,942 MW | 1,053 MW |
| 2026-10-29T18:00Z | 10,892 MW | 14,636 MW | 254 MW | -6,706 MW | 997 MW |
| 2026-10-29T19:00Z | 11,004 MW | 14,822 MW | 302 MW | -8,554 MW | 1,011 MW |
| 2026-10-29T20:00Z | 10,895 MW | 14,489 MW | 511 MW | -8,384 MW | 1,071 MW |
| 2026-10-29T21:00Z | 12,040 MW | 12,999 MW | 689 MW | -7,242 MW | 1,266 MW |
| 2026-10-29T22:00Z | 12,369 MW | 11,291 MW | 858 MW | -4,107 MW | 1,133 MW |
| 2026-10-29T23:00Z | 12,807 MW | 5,296 MW | 1,462 MW | 1,129 MW | 1,310 MW |
| 2026-10-30T00:00Z | 13,077 MW | 702 MW | 1,824 MW | 4,178 MW | 1,985 MW |
| 2026-10-30T01:00Z | 13,064 MW | -62 MW | 1,637 MW | 5,621 MW | 2,068 MW |
| 2026-10-30T02:00Z | 13,333 MW | -58 MW | 1,811 MW | 4,854 MW | 2,011 MW |
| 2026-10-30T03:00Z | 13,196 MW | -53 MW | 2,059 MW | 3,821 MW | 1,914 MW |
| 2026-10-30T04:00Z | 13,055 MW | -55 MW | 2,895 MW | 2,657 MW | 1,816 MW |
| 2026-10-30T05:00Z | 13,091 MW | -61 MW | 2,932 MW | 2,162 MW | 1,736 MW |
| 2026-10-30T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T12:00Z | n/a | n/a | n/a | n/a | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-10-30T12:00Z.
Day by Day
Daily totals, Pacific time dates, through 2026-10-29Show the data table (400 rows)
| Date (Pacific time) | Demand |
|---|---|
| 2025-09-25 | 700 GWh |
| 2025-09-26 | 677 GWh |
| 2025-09-27 | 629 GWh |
| 2025-09-28 | 609 GWh |
| 2025-09-29 | 665 GWh |
| 2025-09-30 | 664 GWh |
| 2025-10-01 | 667 GWh |
| 2025-10-02 | 661 GWh |
| 2025-10-03 | 639 GWh |
| 2025-10-04 | 564 GWh |
| 2025-10-05 | 563 GWh |
| 2025-10-06 | 625 GWh |
| 2025-10-07 | 636 GWh |
| 2025-10-08 | 632 GWh |
| 2025-10-09 | 621 GWh |
| 2025-10-10 | 626 GWh |
| 2025-10-11 | 575 GWh |
| 2025-10-12 | 546 GWh |
| 2025-10-13 | 593 GWh |
| 2025-10-14 | 594 GWh |
| 2025-10-15 | 579 GWh |
| 2025-10-16 | 579 GWh |
| 2025-10-17 | 579 GWh |
| 2025-10-18 | 560 GWh |
| 2025-10-19 | 553 GWh |
| 2025-10-20 | 603 GWh |
| 2025-10-21 | 608 GWh |
| 2025-10-22 | 609 GWh |
| 2025-10-23 | 596 GWh |
| 2025-10-24 | 594 GWh |
| 2025-10-25 | 567 GWh |
| 2025-10-26 | 543 GWh |
| 2025-10-27 | 593 GWh |
| 2025-10-28 | 607 GWh |
| 2025-10-29 | 624 GWh |
| 2025-10-30 | 617 GWh |
| 2025-10-31 | 598 GWh |
| 2025-11-01 | 550 GWh |
| 2025-11-02 | 564 GWh |
| 2025-11-03 | 585 GWh |
| 2025-11-04 | 594 GWh |
| 2025-11-05 | 599 GWh |
| 2025-11-06 | 597 GWh |
| 2025-11-07 | 600 GWh |
| 2025-11-08 | 563 GWh |
| 2025-11-09 | 553 GWh |
| 2025-11-10 | 613 GWh |
| 2025-11-11 | 604 GWh |
| 2025-11-12 | 604 GWh |
| 2025-11-13 | 601 GWh |
| 2025-11-14 | 581 GWh |
| 2025-11-15 | 544 GWh |
| 2025-11-16 | 532 GWh |
| 2025-11-17 | 577 GWh |
| 2025-11-18 | 567 GWh |
| 2025-11-19 | 578 GWh |
| 2025-11-20 | 603 GWh |
| 2025-11-21 | 566 GWh |
| 2025-11-22 | 535 GWh |
| 2025-11-23 | 517 GWh |
| 2025-11-24 | 576 GWh |
| 2025-11-25 | 589 GWh |
| 2025-11-26 | 597 GWh |
| 2025-11-27 | 552 GWh |
| 2025-11-28 | 556 GWh |
| 2025-11-29 | 551 GWh |
| 2025-11-30 | 551 GWh |
| 2025-12-01 | 605 GWh |
| 2025-12-02 | 606 GWh |
| 2025-12-03 | 617 GWh |
| 2025-12-04 | 616 GWh |
| 2025-12-05 | 613 GWh |
| 2025-12-06 | 582 GWh |
| 2025-12-07 | 569 GWh |
| 2025-12-08 | 628 GWh |
| 2025-12-09 | 641 GWh |
| 2025-12-10 | 639 GWh |
| 2025-12-11 | 638 GWh |
| 2025-12-12 | 628 GWh |
| 2025-12-13 | 593 GWh |
| 2025-12-14 | 588 GWh |
| 2025-12-15 | 639 GWh |
| 2025-12-16 | 636 GWh |
| 2025-12-17 | 626 GWh |
| 2025-12-18 | 609 GWh |
| 2025-12-19 | 612 GWh |
| 2025-12-20 | 575 GWh |
| 2025-12-21 | 556 GWh |
| 2025-12-22 | 597 GWh |
| 2025-12-23 | 603 GWh |
| 2025-12-24 | 570 GWh |
| 2025-12-25 | 534 GWh |
| 2025-12-26 | 546 GWh |
| 2025-12-27 | 541 GWh |
| 2025-12-28 | 550 GWh |
| 2025-12-29 | 587 GWh |
| 2025-12-30 | 597 GWh |
| 2025-12-31 | 577 GWh |
| 2026-01-01 | 532 GWh |
| 2026-01-02 | 558 GWh |
| 2026-01-03 | 541 GWh |
| 2026-01-04 | 570 GWh |
| 2026-01-05 | 601 GWh |
| 2026-01-06 | 595 GWh |
| 2026-01-07 | 591 GWh |
| 2026-01-08 | 608 GWh |
| 2026-01-09 | 622 GWh |
| 2026-01-10 | 578 GWh |
| 2026-01-11 | 561 GWh |
| 2026-01-12 | 604 GWh |
| 2026-01-13 | 601 GWh |
| 2026-01-14 | 602 GWh |
| 2026-01-15 | 608 GWh |
| 2026-01-16 | 598 GWh |
| 2026-01-17 | 559 GWh |
| 2026-01-18 | 544 GWh |
| 2026-01-19 | 581 GWh |
| 2026-01-20 | 612 GWh |
| 2026-01-21 | 608 GWh |
| 2026-01-22 | 607 GWh |
| 2026-01-23 | 593 GWh |
| 2026-01-24 | 563 GWh |
| 2026-01-25 | 566 GWh |
| 2026-01-26 | 601 GWh |
| 2026-01-27 | 609 GWh |
| 2026-01-28 | 604 GWh |
| 2026-01-29 | 603 GWh |
| 2026-01-30 | 588 GWh |
| 2026-01-31 | 554 GWh |
| 2026-02-01 | 538 GWh |
| 2026-02-02 | 574 GWh |
| 2026-02-03 | 589 GWh |
| 2026-02-04 | 594 GWh |
| 2026-02-05 | 576 GWh |
| 2026-02-06 | 574 GWh |
| 2026-02-07 | 535 GWh |
| 2026-02-08 | 520 GWh |
| 2026-02-09 | 575 GWh |
| 2026-02-10 | 589 GWh |
| 2026-02-11 | 588 GWh |
| 2026-02-12 | 567 GWh |
| 2026-02-13 | 561 GWh |
| 2026-02-14 | 541 GWh |
| 2026-02-15 | 528 GWh |
| 2026-02-16 | 604 GWh |
| 2026-02-17 | 628 GWh |
| 2026-02-18 | 610 GWh |
| 2026-02-19 | 634 GWh |
| 2026-02-20 | 619 GWh |
| 2026-02-21 | 562 GWh |
| 2026-02-22 | 532 GWh |
| 2026-02-23 | 587 GWh |
| 2026-02-24 | 595 GWh |
| 2026-02-25 | 595 GWh |
| 2026-02-26 | 579 GWh |
| 2026-02-27 | 593 GWh |
| 2026-02-28 | 563 GWh |
| 2026-03-01 | 547 GWh |
| 2026-03-02 | 577 GWh |
| 2026-03-03 | 565 GWh |
| 2026-03-04 | 570 GWh |
| 2026-03-05 | 561 GWh |
| 2026-03-06 | 558 GWh |
| 2026-03-07 | 525 GWh |
| 2026-03-08 | 500 GWh |
| 2026-03-09 | 566 GWh |
| 2026-03-10 | 574 GWh |
| 2026-03-11 | 573 GWh |
| 2026-03-12 | 603 GWh |
| 2026-03-13 | 611 GWh |
| 2026-03-14 | 548 GWh |
| 2026-03-15 | 531 GWh |
| 2026-03-16 | 619 GWh |
| 2026-03-17 | 666 GWh |
| 2026-03-18 | 695 GWh |
| 2026-03-19 | 695 GWh |
| 2026-03-20 | 708 GWh |
| 2026-03-21 | 618 GWh |
| 2026-03-22 | 561 GWh |
| 2026-03-23 | 628 GWh |
| 2026-03-24 | 636 GWh |
| 2026-03-25 | 630 GWh |
| 2026-03-26 | 623 GWh |
| 2026-03-27 | 611 GWh |
| 2026-03-28 | 563 GWh |
| 2026-03-29 | 553 GWh |
| 2026-03-30 | 612 GWh |
| 2026-03-31 | 611 GWh |
| 2026-04-01 | 601 GWh |
| 2026-04-02 | 587 GWh |
| 2026-04-03 | 564 GWh |
| 2026-04-04 | 541 GWh |
| 2026-04-05 | 531 GWh |
| 2026-04-06 | 595 GWh |
| 2026-04-07 | 594 GWh |
| 2026-04-08 | 605 GWh |
| 2026-04-09 | 617 GWh |
| 2026-04-10 | 608 GWh |
| 2026-04-11 | 557 GWh |
| 2026-04-12 | 536 GWh |
| 2026-04-13 | 568 GWh |
| 2026-04-14 | 556 GWh |
| 2026-04-15 | 571 GWh |
| 2026-04-16 | 566 GWh |
| 2026-04-17 | 556 GWh |
| 2026-04-18 | 528 GWh |
| 2026-04-19 | 519 GWh |
| 2026-04-20 | 581 GWh |
| 2026-04-21 | 590 GWh |
| 2026-04-22 | 565 GWh |
| 2026-04-23 | 555 GWh |
| 2026-04-24 | 559 GWh |
| 2026-04-25 | 544 GWh |
| 2026-04-26 | 514 GWh |
| 2026-04-27 | 537 GWh |
| 2026-04-28 | 542 GWh |
| 2026-04-29 | 557 GWh |
| 2026-04-30 | 570 GWh |
| 2026-05-01 | 589 GWh |
| 2026-05-02 | 557 GWh |
| 2026-05-03 | 533 GWh |
| 2026-05-04 | 589 GWh |
| 2026-05-05 | 594 GWh |
| 2026-05-06 | 581 GWh |
| 2026-05-07 | 601 GWh |
| 2026-05-08 | 609 GWh |
| 2026-05-09 | 570 GWh |
| 2026-05-10 | 562 GWh |
| 2026-05-11 | 652 GWh |
| 2026-05-12 | 640 GWh |
| 2026-05-13 | 608 GWh |
| 2026-05-14 | 616 GWh |
| 2026-05-15 | 624 GWh |
| 2026-05-16 | 558 GWh |
| 2026-05-17 | 519 GWh |
| 2026-05-18 | 582 GWh |
| 2026-05-19 | 631 GWh |
| 2026-05-20 | 656 GWh |
| 2026-05-21 | 664 GWh |
| 2026-05-22 | 641 GWh |
| 2026-05-23 | 577 GWh |
| 2026-05-24 | 554 GWh |
| 2026-05-25 | 561 GWh |
| 2026-05-26 | 589 GWh |
| 2026-05-27 | 599 GWh |
| 2026-05-28 | 591 GWh |
| 2026-05-29 | 604 GWh |
| 2026-05-30 | 550 GWh |
| 2026-05-31 | 548 GWh |
| 2026-06-01 | 641 GWh |
| 2026-06-02 | 649 GWh |
| 2026-06-03 | 668 GWh |
| 2026-06-04 | 678 GWh |
| 2026-06-05 | 687 GWh |
| 2026-06-06 | 608 GWh |
| 2026-06-07 | 569 GWh |
| 2026-06-08 | 632 GWh |
| 2026-06-09 | 664 GWh |
| 2026-06-10 | 727 GWh |
| 2026-06-11 | 767 GWh |
| 2026-06-12 | 769 GWh |
| 2026-06-13 | 717 GWh |
| 2026-06-14 | 672 GWh |
| 2026-06-15 | 737 GWh |
| 2026-06-16 | 732 GWh |
| 2026-06-17 | 712 GWh |
| 2026-06-18 | 681 GWh |
| 2026-06-19 | 652 GWh |
| 2026-06-20 | 594 GWh |
| 2026-06-21 | 585 GWh |
| 2026-06-22 | 675 GWh |
| 2026-06-23 | 697 GWh |
| 2026-06-24 | 691 GWh |
| 2026-06-25 | 690 GWh |
| 2026-06-26 | 668 GWh |
| 2026-06-27 | 607 GWh |
| 2026-06-28 | 570 GWh |
| 2026-06-29 | 649 GWh |
| 2026-06-30 | 663 GWh |
| 2026-07-01 | 655 GWh |
| 2026-07-02 | 666 GWh |
| 2026-07-03 | 653 GWh |
| 2026-07-04 | 648 GWh |
| 2026-07-05 | 653 GWh |
| 2026-07-06 | 712 GWh |
| 2026-07-07 | 718 GWh |
| 2026-07-08 | 727 GWh |
| 2026-07-09 | 744 GWh |
| 2026-07-10 | 741 GWh |
| 2026-07-11 | 695 GWh |
| 2026-07-12 | 691 GWh |
| 2026-07-13 | 773 GWh |
| 2026-07-14 | 838 GWh |
| 2026-07-15 | 865 GWh |
| 2026-07-16 | 812 GWh |
| 2026-07-17 | 778 GWh |
| 2026-07-18 | 743 GWh |
| 2026-07-19 | 732 GWh |
| 2026-07-20 | 795 GWh |
| 2026-07-21 | 839 GWh |
| 2026-07-22 | 823 GWh |
| 2026-07-23 | 820 GWh |
| 2026-07-24 | 827 GWh |
| 2026-07-25 | 772 GWh |
| 2026-07-26 | 746 GWh |
| 2026-07-27 | 804 GWh |
| 2026-07-28 | 792 GWh |
| 2026-07-29 | 792 GWh |
| 2026-07-30 | 810 GWh |
| 2026-07-31 | 822 GWh |
| 2026-08-01 | 795 GWh |
| 2026-08-02 | 791 GWh |
| 2026-08-03 | 857 GWh |
| 2026-08-04 | 836 GWh |
| 2026-08-05 | 824 GWh |
| 2026-08-06 | 833 GWh |
| 2026-08-07 | 844 GWh |
| 2026-08-08 | 805 GWh |
| 2026-08-09 | 801 GWh |
| 2026-08-10 | 858 GWh |
| 2026-08-11 | 819 GWh |
| 2026-08-12 | 810 GWh |
| 2026-08-13 | 764 GWh |
| 2026-08-14 | 748 GWh |
| 2026-08-15 | 703 GWh |
| 2026-08-16 | 713 GWh |
| 2026-08-17 | 796 GWh |
| 2026-08-18 | 814 GWh |
| 2026-08-19 | 838 GWh |
| 2026-08-20 | 828 GWh |
| 2026-08-21 | 848 GWh |
| 2026-08-22 | 796 GWh |
| 2026-08-23 | 802 GWh |
| 2026-08-24 | 870 GWh |
| 2026-08-25 | 886 GWh |
| 2026-08-26 | 906 GWh |
| 2026-08-27 | 910 GWh |
| 2026-08-28 | 897 GWh |
| 2026-08-29 | 815 GWh |
| 2026-08-30 | 754 GWh |
| 2026-08-31 | 764 GWh |
| 2026-09-01 | 718 GWh |
| 2026-09-02 | 705 GWh |
| 2026-09-03 | 708 GWh |
| 2026-09-04 | 700 GWh |
| 2026-09-05 | 665 GWh |
| 2026-09-06 | 627 GWh |
| 2026-09-07 | 720 GWh |
| 2026-09-08 | 850 GWh |
| 2026-09-09 | 965 GWh |
| 2026-09-10 | 963 GWh |
| 2026-09-11 | 874 GWh |
| 2026-09-12 | 760 GWh |
| 2026-09-13 | 695 GWh |
| 2026-09-14 | 728 GWh |
| 2026-09-15 | 721 GWh |
| 2026-09-16 | 695 GWh |
| 2026-09-17 | 699 GWh |
| 2026-09-18 | 679 GWh |
| 2026-09-19 | 640 GWh |
| 2026-09-20 | 632 GWh |
| 2026-09-21 | 673 GWh |
| 2026-09-22 | 690 GWh |
| 2026-09-23 | 722 GWh |
| 2026-09-24 | 740 GWh |
| 2026-09-25 | 740 GWh |
| 2026-09-26 | 696 GWh |
| 2026-09-27 | 657 GWh |
| 2026-09-28 | 688 GWh |
| 2026-09-29 | 697 GWh |
| 2026-09-30 | 733 GWh |
| 2026-10-01 | 761 GWh |
| 2026-10-02 | 811 GWh |
| 2026-10-03 | 811 GWh |
| 2026-10-04 | 818 GWh |
| 2026-10-05 | 887 GWh |
| 2026-10-06 | 885 GWh |
| 2026-10-07 | 863 GWh |
| 2026-10-08 | 834 GWh |
| 2026-10-09 | 776 GWh |
| 2026-10-10 | 639 GWh |
| 2026-10-11 | 583 GWh |
| 2026-10-12 | 613 GWh |
| 2026-10-13 | 607 GWh |
| 2026-10-14 | 610 GWh |
| 2026-10-15 | 647 GWh |
| 2026-10-16 | 704 GWh |
| 2026-10-17 | 653 GWh |
| 2026-10-18 | 608 GWh |
| 2026-10-19 | 652 GWh |
| 2026-10-20 | 652 GWh |
| 2026-10-21 | 630 GWh |
| 2026-10-22 | 611 GWh |
| 2026-10-23 | 601 GWh |
| 2026-10-24 | 553 GWh |
| 2026-10-25 | 550 GWh |
| 2026-10-26 | 604 GWh |
| 2026-10-27 | 601 GWh |
| 2026-10-28 | 604 GWh |
| 2026-10-29 | 617 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-10-29. Daily totals are EIA's own daily aggregation in the balancing authority's reporting time zone.
Year by Year
Summed from EIA daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 198 TWh | 142 TWh | Solar 32.5% | 302 |
| 2025 | 224 TWh | 186 TWh | Gas 42.0% | 365 |
| 2024 | 224 TWh | 191 TWh | Gas 44.5% | 366 |
| 2023 | 218 TWh | 184 TWh | Gas 47.7% | 365 |
| 2022 | 224 TWh | 170 TWh | Gas 48.7% | 365 |
| 2021 | 219 TWh | 159 TWh | Gas 49.8% | 365 |
| 2020 | 218 TWh | 139 TWh | Gas 53.1% | 366 |
| 2019 | 214 TWh | 150 TWh | Gas 43.4% | 365 |
A year is partial when EIA has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-10-29.
Records
From EIA operator data held by World Power Monitor| Record | Value | When |
|---|---|---|
| Highest daily demand, 2019 onward | 965 GWh | 2026-09-09 (9 September 2026) |
| Highest hourly demand since 2026-06-16 (16 June 2026) | 49,959 MW | 9 Sept 2026, 17:00 PDT (UTC-07:00) |
| Highest solar share of a day's generation, 2019 onward | 48.2% | 2026-06-29 (29 June 2026) |
| Highest wind share of a day's generation, 2019 onward | 34.2% | 2026-05-17 (17 May 2026) |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-10-29.
Power Flows With Neighbours
Net totals, 2026-09-30 (30 September 2026) to 2026-10-29 (29 October 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| AZPS | CAISO imports | 1.04 TWh |
| NEVP | CAISO imports | 969 GWh |
| SRP | CAISO imports | 725 GWh |
| TIDC | CAISO exports | 225 GWh |
| BPA | CAISO imports | 211 GWh |
| IID | CAISO imports | 186 GWh |
| BANC | CAISO exports | 64.0 GWh |
| WALC | CAISO imports | 53.1 GWh |
| CEN | CAISO exports | 44.3 GWh |
| LDWP | CAISO imports | 42.9 GWh |
| PACW | CAISO imports | 3.55 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-10-29.
Share and Embed
Figures as of 2026-10-30 (30 October 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for CAISO, credited to EIA. The image is rebuilt with the page. More about grid widgets.
Embed this widget
Free to use on your own site. Keep the source line in the frame; it carries the data licence and a link back here.
The frame reports its height to the page with postMessage type wpm-embed-height if you want it to resize.
Related
Cite this page
World Power Monitor. (2026). CAISO Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/caiso/
World Power Monitor. CAISO Electricity Demand and Generation Mix. Data as of 2026-10-30 11:00 UTC. Data from U.S. Energy Information Administration. https://worldpowermonitor.com/zones/caiso/
@misc{wpm_zones_caiso_2026,
title = {{CAISO Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-10-30 11:00 UTC. Data from U.S. Energy Information Administration.},
url = {https://worldpowermonitor.com/zones/caiso/}
} Permalink: https://worldpowermonitor.com/zones/caiso/
The Copy buttons add today's date as the access date.