North America Electricity Flows Map

Between 6 October 2026 and 4 November 2026 the largest net flow of electricity between two US grid operators was 2.18 TWh, from SRP into AZPS. The Lower 48 states imported a net 2.09 TWh from Canada. The map shows the net flow on the 45 largest of 159 borders between balancing authorities, summed over 30 complete days: a wider line is a larger net flow and the arrowhead points to the operator that received it. These are EIA interchange figures for that window, not live readings.

Skip the map and go to the tables

The map draws the 45 largest of 159 borders by net flow over the 30 days 6 October to 4 November 2026, from 223 GWh (thinnest) to 2.18 TWh (widest). The arrowhead points to the operator that received the net flow. Node positions are approximate, and lines join those points: they are not cable routes.

Select a border on the map, or a row in the table, to see its detail. The tables below list every border.

Every Border, Net Flow and Direction

30 days, 6 October to 4 November 2026
Every Border, Net Flow and Direction, 6 October to 4 November 2026. Select a column heading to sort.
Border Net direction Net flow Average net power First operator's report (first to second) Second operator's report (first to second)
AZPS and SRP SRP to AZPS 2.18 TWh 3,021 MW -2.25 TWh -2.10 TWh
MISO and TVA MISO to TVA 1.47 TWh 2,041 MW +1.46 TWh +1.48 TWh
BPA and PSEI BPA to PSEI 1.35 TWh 1,877 MW +1.19 TWh +1.51 TWh
NYISO and PJM PJM to NYISO 1.07 TWh 1,481 MW -1.18 TWh -952 GWh
MISO and SPP MISO to SPP (reports disagree) 1.00 TWh 1,392 MW -77.2 GWh +2.08 TWh
MISO and PJM PJM to MISO 962 GWh 1,336 MW -1.28 TWh -644 GWh
SCEG and SOCO SOCO to SCEG 893 GWh 1,240 MW -876 GWh -909 GWh
AZPS and CAISO AZPS to CAISO 875 GWh 1,215 MW +740 GWh +1.01 TWh
SC and SCEG SCEG to SC 864 GWh 1,200 MW -868 GWh -860 GWh
CAISO and NEVP NEVP to CAISO 860 GWh 1,194 MW -858 GWh -861 GWh
BPA and PGE BPA to PGE 836 GWh 1,161 MW +560 GWh +1.11 TWh
CPLE and PJM CPLE to PJM 807 GWh 1,120 MW +792 GWh +821 GWh
PJM and TVA TVA to PJM 745 GWh 1,035 MW -646 GWh -844 GWh
BCHA and BPA BCHA to BPA 741 GWh 1,029 MW not reported +741 GWh
IPCO and PACE PACE to IPCO 739 GWh 1,026 MW -725 GWh -753 GWh
LDWP and WALC WALC to LDWP 712 GWh 990 MW -713 GWh -712 GWh
BPA and NWMT NWMT to BPA 696 GWh 966 MW -696 GWh -696 GWh
MHEB and MISO MHEB to MISO 685 GWh 951 MW not reported +685 GWh
CAISO and SRP SRP to CAISO 673 GWh 935 MW -683 GWh -663 GWh
LDWP and NEVP LDWP to NEVP 627 GWh 871 MW +638 GWh +616 GWh
FPL and SEC SEC to FPL 555 GWh 770 MW -576 GWh -533 GWh
CPLE and DUK DUK to CPLE 541 GWh 751 MW -541 GWh -541 GWh
FPC and FPL FPL to FPC 521 GWh 723 MW -521 GWh -521 GWh
BPA and GRID GRID to BPA 472 GWh 656 MW -472 GWh -472 GWh
FPL and JEA FPL to JEA 452 GWh 628 MW +445 GWh +459 GWh
AECI and MISO AECI to MISO 440 GWh 611 MW +440 GWh +440 GWh
IESO and MISO IESO to MISO 438 GWh 608 MW not reported +438 GWh
SC and SOCO SOCO to SC 385 GWh 534 MW -380 GWh -390 GWh
GRID and SRP GRID to SRP 371 GWh 515 MW +363 GWh +378 GWh
AVRN and PACW AVRN to PACW 357 GWh 496 MW +357 GWh +357 GWh
AZPS and WALC AZPS to WALC 356 GWh 495 MW +356 GWh +356 GWh
AZPS and LDWP AZPS to LDWP 347 GWh 481 MW +346 GWh +347 GWh
IPCO and PACW IPCO to PACW 345 GWh 480 MW +341 GWh +350 GWh
FPL and SOCO SOCO to FPL 306 GWh 425 MW -300 GWh -312 GWh
DUK and SC SC to DUK 278 GWh 386 MW -279 GWh -277 GWh
SRP and WALC SRP to WALC 273 GWh 379 MW +273 GWh +273 GWh
FPC and SEC SEC to FPC 263 GWh 366 MW -293 GWh -234 GWh
LGEE and MISO MISO to LGEE 261 GWh 362 MW -260 GWh -261 GWh
BPA and PACW BPA to PACW 257 GWh 357 MW +257 GWh +257 GWh
DEAA and SRP DEAA to SRP 251 GWh 348 MW +251 GWh +251 GWh
GRID and WALC GRID to WALC 241 GWh 334 MW +239 GWh +243 GWh
BPA and CHPD CHPD to BPA 232 GWh 323 MW -233 GWh -232 GWh
BPA and SCL BPA to SCL 227 GWh 315 MW +227 GWh +227 GWh
BPA and TPWR BPA to TPWR 226 GWh 314 MW +226 GWh +226 GWh
CAISO and TIDC CAISO to TIDC 223 GWh 310 MW +219 GWh +227 GWh
FMPP and FPC (not drawn) FMPP to FPC 214 GWh 297 MW +220 GWh +209 GWh
AVRN and BPA (not drawn) AVRN to BPA 211 GWh 293 MW +211 GWh +211 GWh
PSCO and SWPW (not drawn) PSCO to SWPW 204 GWh 284 MW +127 GWh +282 GWh
CAISO and IID (not drawn) IID to CAISO 196 GWh 272 MW -192 GWh -200 GWh
FPC and TEC (not drawn) FPC to TEC 188 GWh 261 MW +186 GWh +191 GWh
CPLE and SCEG (not drawn) SCEG to CPLE 188 GWh 261 MW -188 GWh -188 GWh
BANC and TIDC (not drawn) TIDC to BANC 186 GWh 259 MW -178 GWh -194 GWh
EPE and PNM (not drawn) PNM to EPE 185 GWh 257 MW -184 GWh -187 GWh
FMPP and FPL (not drawn) FPL to FMPP 185 GWh 257 MW -188 GWh -182 GWh
LGEE and PJM (not drawn) LGEE to PJM 183 GWh 255 MW +193 GWh +174 GWh
AVA and BPA (not drawn) BPA to AVA 182 GWh 253 MW -263 GWh -101 GWh
TEPC and WALC (not drawn) WALC to TEPC 169 GWh 235 MW -169 GWh -169 GWh
DUK and PJM (not drawn) DUK to PJM 168 GWh 233 MW +196 GWh +140 GWh
LGEE and TVA (not drawn) TVA to LGEE 161 GWh 224 MW -164 GWh -158 GWh
IESO and NYISO (not drawn) IESO to NYISO 160 GWh 222 MW not reported +160 GWh
GRID and PNM (not drawn) GRID to PNM 151 GWh 209 MW +146 GWh +156 GWh
AECI and TVA (not drawn) AECI to TVA 139 GWh 193 MW +143 GWh +135 GWh
AECI and SPP (not drawn) SPP to AECI 130 GWh 181 MW -130 GWh -130 GWh
SEPA and SOCO (not drawn) SEPA to SOCO 129 GWh 179 MW +126 GWh +132 GWh
ERCOT and SPP (not drawn) SPP to ERCOT 124 GWh 173 MW -80.1 GWh -169 GWh
LDWP and PACE (not drawn) PACE to LDWP 122 GWh 169 MW -122 GWh -121 GWh
CPLE and SC (not drawn) SC to CPLE 118 GWh 164 MW -117 GWh -119 GWh
NEVP and PACE (not drawn) PACE to NEVP 116 GWh 161 MW -113 GWh -118 GWh
NEVP and WALC (not drawn) WALC to NEVP 113 GWh 158 MW -110 GWh -117 GWh
AZPS and TEPC (not drawn) TEPC to AZPS 106 GWh 147 MW -106 GWh -106 GWh
ISO-NE and NYISO (not drawn) NYISO to ISO-NE 101 GWh 141 MW -102 GWh -101 GWh
SRP and TEPC (not drawn) TEPC to SRP 100 GWh 139 MW -100 GWh -100 GWh
NWMT and SWPW (not drawn) SWPW to NWMT 100 GWh 139 MW -101 GWh -99.5 GWh
FMPP and TEC (not drawn) TEC to FMPP 96.3 GWh 134 MW -96.3 GWh -96.4 GWh
BHBA and SWPW (not drawn) SWPW to BHBA 95.9 GWh 133 MW -97.7 GWh -94.2 GWh
BANC and CAISO (not drawn) CAISO to BANC 92.5 GWh 128 MW -98.3 GWh -86.6 GWh
SPA and SPP (not drawn) SPA to SPP 91.9 GWh 128 MW +92.7 GWh +91.2 GWh
PSCO and SPP (not drawn) SPP to PSCO 90.7 GWh 126 MW -45.3 GWh -136 GWh
PNM and SWPW (not drawn) PNM to SWPW 88.0 GWh 122 MW +87.7 GWh +88.3 GWh
PACE and SWPW (not drawn) SWPW to PACE 85.7 GWh 119 MW -84.9 GWh -86.5 GWh
BHBA and SPP (not drawn) SPP to BHBA 80.9 GWh 112 MW -80.9 GWh not reported
CHPD and PSEI (not drawn) CHPD to PSEI 78.3 GWh 109 MW +78.3 GWh +78.3 GWh
FPL and TEC (not drawn) TEC to FPL 74.9 GWh 104 MW -74.1 GWh -75.7 GWh
FPC and TAL (not drawn) TAL to FPC 66.9 GWh 93 MW -66.0 GWh -67.7 GWh
EPE and TEPC (not drawn) EPE to TEPC 65.3 GWh 91 MW +67.2 GWh +63.3 GWh
SOCO and TAL (not drawn) SOCO to TAL 63.6 GWh 88 MW +63.7 GWh +63.6 GWh
BPA and IPCO (not drawn) IPCO to BPA 63.6 GWh 88 MW -64.2 GWh -63.0 GWh
SWPW and WALC (not drawn) SWPW to WALC 63.3 GWh 88 MW +62.6 GWh +64.0 GWh
BPA and CAISO (not drawn) BPA to CAISO 62.7 GWh 87 MW +50.5 GWh +74.9 GWh
AVA and NWMT (not drawn) NWMT to AVA 60.1 GWh 83 MW -60.0 GWh -60.1 GWh
SIKE and SPP (not drawn) SPP to SIKE 59.1 GWh 82 MW -58.9 GWh -59.3 GWh
DUK and SCEG (not drawn) SCEG to DUK 58.9 GWh 82 MW -58.2 GWh -59.7 GWh
SC and SEPA (not drawn) SC to SEPA 58.9 GWh 82 MW +58.9 GWh +58.8 GWh
DUK and TVA (not drawn) TVA to DUK 57.5 GWh 80 MW -57.5 GWh -57.4 GWh
PNM and PSCO (not drawn) PSCO to PNM 57.4 GWh 80 MW -63.8 GWh -50.9 GWh
DUK and SOCO (not drawn) DUK to SOCO 55.5 GWh 77 MW +55.4 GWh +55.7 GWh
SOCO and TVA (not drawn) TVA to SOCO 55.2 GWh 77 MW -56.5 GWh -53.9 GWh
FPL and HST (not drawn) FPL to HST 54.9 GWh 76 MW +54.0 GWh +55.8 GWh
CAISO and WALC (not drawn) WALC to CAISO 53.5 GWh 74 MW -52.7 GWh -54.2 GWh
SIKE and SPA (not drawn) SIKE to SPA 53.1 GWh 74 MW +52.3 GWh +53.9 GWh
GCPD and PACW (not drawn) GCPD to PACW 51.1 GWh 71 MW +51.1 GWh +51.1 GWh
AECI and SPA (not drawn) SPA to AECI 47.7 GWh 66 MW -47.7 GWh -47.7 GWh
MISO and SOCO (not drawn) MISO to SOCO 45.6 GWh 63 MW +6.95 GWh +84.2 GWh
FPC and SOCO (not drawn) FPC to SOCO 43.8 GWh 61 MW +43.4 GWh +44.2 GWh
BANC and BPA (not drawn) BANC to BPA 41.8 GWh 58 MW +35.3 GWh +48.4 GWh
GWA and NWMT (not drawn) GWA to NWMT 41.6 GWh 58 MW +42.7 GWh +40.5 GWh
SPC and SPP (not drawn) SPC to SPP 41.6 GWh 58 MW not reported +41.6 GWh
GCPD and PSEI (not drawn) PSEI to GCPD 38.9 GWh 54 MW -38.9 GWh -38.9 GWh
DUK and YAD (not drawn) YAD to DUK 36.5 GWh 51 MW -36.4 GWh -36.5 GWh
AZPS and SWPW (not drawn) SWPW to AZPS 33.0 GWh 46 MW -34.6 GWh -31.4 GWh
PSEI and TPWR (not drawn) TPWR to PSEI 32.1 GWh 45 MW -32.1 GWh -32.1 GWh
PSEI and SCL (not drawn) PSEI to SCL 30.9 GWh 43 MW +30.9 GWh +30.9 GWh
MISO and SPA (not drawn) SPA to MISO 30.5 GWh 42 MW -30.7 GWh -30.3 GWh
AZPS and PNM (not drawn) PNM to AZPS 28.6 GWh 40 MW -28.6 GWh -28.6 GWh
MISO and SIKE (not drawn) SIKE to MISO 28.2 GWh 39 MW -28.9 GWh -27.5 GWh
CAISO and CEN (not drawn) CAISO to CEN 28.2 GWh 39 MW +28.2 GWh not reported
SEC and TEC (not drawn) SEC to TEC 27.1 GWh 38 MW +27.6 GWh +26.7 GWh
HQT and NYISO (not drawn) HQT to NYISO 26.7 GWh 37 MW not reported +26.7 GWh
BHBA and PACE (not drawn) BHBA to PACE 24.2 GWh 34 MW +23.1 GWh +25.2 GWh
IPCO and NEVP (not drawn) IPCO to NEVP (reports disagree) 23.3 GWh 32 MW -25.3 GWh +71.9 GWh
PACW and PGE (not drawn) PACW to PGE 21.8 GWh 30 MW +21.8 GWh +21.8 GWh
AVA and GCPD (not drawn) AVA to GCPD 20.2 GWh 28 MW +20.2 GWh +20.2 GWh
AZPS and PACE (not drawn) AZPS to PACE 18.2 GWh 25 MW +18.2 GWh +18.1 GWh
FPC and GVL (not drawn) FPC to GVL 16.9 GWh 23 MW +16.9 GWh not reported
ISO-NE and NBSO (not drawn) ISO-NE to NBSO 16.8 GWh 23 MW +16.8 GWh not reported
CPLW and TVA (not drawn) TVA to CPLW 14.5 GWh 20 MW -14.5 GWh -14.5 GWh
CHPD and DOPD (not drawn) DOPD to CHPD 14.3 GWh 20 MW -14.3 GWh -14.3 GWh
HQT and ISO-NE (not drawn) HQT to ISO-NE 13.4 GWh 19 MW not reported +13.4 GWh
JEA and SEC (not drawn) SEC to JEA 13.3 GWh 18 MW -14.6 GWh -12.0 GWh
CEN and ERCOT (not drawn) ERCOT to CEN 13.1 GWh 18 MW not reported -13.1 GWh
CPLW and PJM (not drawn) CPLW to PJM 12.6 GWh 17 MW +15.2 GWh +9.94 GWh
PNM and TEPC (not drawn) PNM to TEPC 11.5 GWh 16 MW +11.5 GWh +11.5 GWh
AZPS and IID (not drawn) AZPS to IID 10.2 GWh 14 MW +10.1 GWh +10.2 GWh
AVA and CHPD (not drawn) CHPD to AVA 9.56 GWh 13 MW -9.65 GWh -9.46 GWh
SPP and WAUW (not drawn) SPP to WAUW 9.11 GWh 13 MW +9.11 GWh not reported
PACE and SRP (not drawn) SRP to PACE 8.30 GWh 12 MW -7.77 GWh -8.84 GWh
CAISO and LDWP (not drawn) CAISO to LDWP (reports disagree) 7.68 GWh 11 MW -2.04 GWh +17.4 GWh
IPCO and NWMT (not drawn) NWMT to IPCO 7.30 GWh 10 MW -7.16 GWh -7.45 GWh
AVA and PACW (not drawn) AVA to PACW 6.13 GWh 9 MW +6.13 GWh +6.13 GWh
CPLE and YAD (not drawn) YAD to CPLE 5.98 GWh 8 MW -5.98 GWh -5.98 GWh
SCEG and SEPA (not drawn) SCEG to SEPA 4.64 GWh 6 MW +4.53 GWh +4.75 GWh
AVA and IPCO (not drawn) IPCO to AVA 4.21 GWh 6 MW -4.21 GWh -4.21 GWh
IID and WALC (not drawn) IID to WALC 3.84 GWh 5 MW +3.86 GWh +3.82 GWh
DUK and SEPA (not drawn) DUK to SEPA 3.13 GWh 4 MW +2.56 GWh +3.71 GWh
BPA and NEVP (not drawn) BPA to NEVP 2.65 GWh 4 MW +3.33 GWh +1.98 GWh
FMPP and JEA (not drawn) JEA to FMPP 2.11 GWh 3 MW -2.11 GWh -2.11 GWh
CAISO and PACW (not drawn) PACW to CAISO 1.63 GWh 2 MW -1.68 GWh -1.57 GWh
CPLW and DUK (not drawn) DUK to CPLW 1.34 GWh 2 MW -1.34 GWh -1.34 GWh
FPL and GVL (not drawn) GVL to FPL 1.12 GWh 2 MW -1.12 GWh not reported
BPA and DOPD (not drawn) BPA to DOPD (reports disagree) 941 MWh 1 MW -439 MWh +2.32 GWh
BPA and GCPD (not drawn) GCPD to BPA 745 MWh 1 MW -1.40 GWh -95 MWh
AECI and SIKE (not drawn) AECI to SIKE (reports disagree) 382 MWh 1 MW +2.35 GWh -1.59 GWh
NWMT and PACE (not drawn) NWMT to PACE 178 MWh 0 MW +175 MWh +180 MWh
BPA and LDWP (not drawn) LDWP to BPA 7 MWh 0 MW 0 MWh -14 MWh
AESO and NWMT (not drawn) No net flow 0 MWh 0 MW not reported 0 MWh
EPE and SPP (not drawn) No net flow 0 MWh 0 MW 0 MWh 0 MWh
NWMT and WAUW (not drawn) No net flow 0 MWh 0 MW 0 MWh not reported
NWMT and WWA (not drawn) No net flow 0 MWh 0 MW 0 MWh not reported
PNM and SPP (not drawn) No net flow 0 MWh 0 MW 0 MWh 0 MWh

Interchange between each pair of balancing authorities, summed over 30 complete days (6 October to 4 November 2026). Net is the average of the two operators' reports; average net power is the net divided by the 720 hours in the window. Each report is signed from the first operator's side: positive means energy left the first named operator for the second. "First operator" follows the order of the border name. A border with only one report is a Canadian or Mexican operator, or a US operator that does not report the other side.

Between EIA Regions

30 days, 6 October to 4 November 2026
Between EIA Regions, 6 October to 4 November 2026. Select a column heading to sort.
Border Net direction Net flow Average net power First operator's report (first to second) Second operator's report (first to second)
California and Southwest Southwest to California 2.67 TWh 3,703 MW -2.81 TWh -2.52 TWh
Midwest and Tennessee Midwest to Tennessee 1.45 TWh 2,010 MW +1.44 TWh +1.45 TWh
Carolinas and Southeast Southeast to Carolinas 1.16 TWh 1,605 MW -1.13 TWh -1.18 TWh
Canada and Midwest Canada to Midwest 1.12 TWh 1,559 MW not reported +1.12 TWh
Mid-Atlantic and New York Mid-Atlantic to New York 1.07 TWh 1,481 MW +952 GWh +1.18 TWh
Carolinas and Mid-Atlantic Carolinas to Mid-Atlantic 987 GWh 1,371 MW +1.00 TWh +971 GWh
Central and Midwest Midwest to Central (reports disagree) 788 GWh 1,094 MW -1.87 TWh +292 GWh
Mid-Atlantic and Midwest Mid-Atlantic to Midwest 778 GWh 1,081 MW +470 GWh +1.09 TWh
Mid-Atlantic and Tennessee Tennessee to Mid-Atlantic 745 GWh 1,035 MW -646 GWh -844 GWh
Canada and Northwest Canada to Northwest 742 GWh 1,031 MW not reported +742 GWh
Northwest and Southwest Northwest to Southwest 667 GWh 926 MW +626 GWh +708 GWh
California and Northwest Northwest to California 375 GWh 521 MW -384 GWh -366 GWh
Florida and Southeast Southeast to Florida 326 GWh 452 MW -320 GWh -331 GWh
Canada and New York Canada to New York 187 GWh 259 MW not reported +187 GWh
Central and Northwest Central to Northwest 136 GWh 189 MW +145 GWh +126 GWh
Central and Texas Central to Texas 124 GWh 173 MW +169 GWh +80.1 GWh
New England and New York New York to New England 101 GWh 141 MW -102 GWh -101 GWh
Carolinas and Tennessee Tennessee to Carolinas 72.0 GWh 100 MW -72.1 GWh -71.9 GWh
Southeast and Tennessee Tennessee to Southeast 55.2 GWh 77 MW -56.5 GWh -53.9 GWh
Midwest and Southeast Midwest to Southeast 45.6 GWh 63 MW +6.95 GWh +84.2 GWh
Canada and Central Canada to Central 41.6 GWh 58 MW not reported +41.6 GWh
California and Mexico California to Mexico 28.2 GWh 39 MW +28.2 GWh not reported
Texas and Mexico Texas to Mexico 13.1 GWh 18 MW +13.1 GWh not reported
Canada and New England New England to Canada 3.43 GWh 5 MW not reported -3.43 GWh
Central and Southwest No net flow 0 MWh 0 MW 0 MWh 0 MWh

The same interchange grouped into the EIA regions, 6 October to 4 November 2026, with the Canada and Mexico aggregates EIA publishes. Regions are larger than balancing authorities and their borders are not drawn on the map.

Net Position of Each Operator

30 days, 6 October to 4 November 2026
Exports, imports and net position of each operator, 6 October to 4 November 2026. Select a column heading to sort.
Operator Exports Imports Net (exports minus imports) Reporting
Alberta Electric System Operator 0 MWh 0 MWh 0 MWh Neighbours only
Alcoa Power Generating, Inc. - Yadkin Division 42.5 GWh 0 MWh +42.5 GWh Own report and neighbours
Arizona Public Service Company 1.61 TWh 2.34 TWh -737 GWh Own report and neighbours
Arlington Valley, LLC 251 GWh 0 MWh +251 GWh Own report and neighbours
Associated Electric Cooperative, Inc. 579 GWh 178 GWh +401 GWh Own report and neighbours
Avangrid Renewables, LLC 568 GWh 0 MWh +568 GWh Own report and neighbours
Avista Corporation 26.3 GWh 256 GWh -229 GWh Own report and neighbours
Balancing Authority of Northern California 41.8 GWh 279 GWh -237 GWh Own report and neighbours
Black Hills Energy 24.2 GWh 177 GWh -153 GWh Own report and neighbours
Bonneville Power Administration 3.15 TWh 2.46 TWh +688 GWh Own report and neighbours
British Columbia Hydro and Power Authority 741 GWh 0 MWh +741 GWh Neighbours only
California Independent System Operator 351 GWh 2.72 TWh -2.37 TWh Own report and neighbours
Centro Nacional de Control de Energia 0 MWh 41.2 GWh -41.2 GWh Neighbours only
City of Homestead 0 MWh 54.9 GWh -54.9 GWh Own report and neighbours
City of Tacoma, Department of Public Utilities, Light Division 32.1 GWh 226 GWh -194 GWh Own report and neighbours
City of Tallahassee 66.9 GWh 63.6 GWh +3.21 GWh Own report and neighbours
Dominion Energy South Carolina, Inc. 1.12 TWh 893 GWh +223 GWh Own report and neighbours
Duke Energy Carolinas 769 GWh 431 GWh +338 GWh Own report and neighbours
Duke Energy Florida, Inc. 249 GWh 1.06 TWh -816 GWh Own report and neighbours
Duke Energy Progress East 807 GWh 853 GWh -46.5 GWh Own report and neighbours
Duke Energy Progress West 12.6 GWh 15.8 GWh -3.28 GWh Own report and neighbours
El Paso Electric Company 65.3 GWh 185 GWh -120 GWh Own report and neighbours
Electric Reliability Council of Texas, Inc. 13.1 GWh 124 GWh -111 GWh Own report and neighbours
Florida Municipal Power Pool 214 GWh 284 GWh -69.5 GWh Own report and neighbours
Florida Power & Light Co. 1.21 TWh 936 GWh +276 GWh Own report and neighbours
Gainesville Regional Utilities 1.12 GWh 16.9 GWh -15.7 GWh Neighbours only
Gridforce Energy Management, LLC 1.23 TWh 0 MWh +1.23 TWh Own report and neighbours
Hydro-Quebec TransEnergie 40.1 GWh 0 MWh +40.1 GWh Neighbours only
Idaho Power Company 437 GWh 746 GWh -310 GWh Own report and neighbours
Imperial Irrigation District 200 GWh 10.2 GWh +189 GWh Own report and neighbours
ISO New England 16.8 GWh 115 GWh -98.1 GWh Own report and neighbours
JEA 2.11 GWh 465 GWh -463 GWh Own report and neighbours
Los Angeles Department of Water and Power 627 GWh 1.19 TWh -561 GWh Own report and neighbours
Louisville Gas and Electric Company and Kentucky Utilities Company 183 GWh 422 GWh -238 GWh Own report and neighbours
Manitoba Hydro 685 GWh 0 MWh +685 GWh Neighbours only
Midcontinent Independent System Operator, Inc. 2.78 TWh 2.58 TWh +195 GWh Own report and neighbours
NaturEner Power Watch, LLC 41.6 GWh 0 MWh +41.6 GWh Own report and neighbours
NaturEner Wind Watch, LLC 0 MWh 0 MWh 0 MWh Neighbours only
Nevada Power Company 860 GWh 882 GWh -22.7 GWh Own report and neighbours
New Brunswick System Operator 0 MWh 16.8 GWh -16.8 GWh Neighbours only
New York Independent System Operator 101 GWh 1.25 TWh -1.15 TWh Own report and neighbours
NorthWestern Corporation 763 GWh 142 GWh +621 GWh Own report and neighbours
Ontario IESO 598 GWh 0 MWh +598 GWh Neighbours only
PacifiCorp East 977 GWh 136 GWh +840 GWh Own report and neighbours
PacifiCorp West 23.4 GWh 1.02 TWh -993 GWh Own report and neighbours
PJM Interconnection, LLC 2.03 TWh 1.92 TWh +113 GWh Own report and neighbours
Portland General Electric Company 0 MWh 858 GWh -858 GWh Own report and neighbours
Public Service Company of Colorado 262 GWh 90.7 GWh +171 GWh Own report and neighbours
Public Service Company of New Mexico 313 GWh 208 GWh +105 GWh Own report and neighbours
Public Utility District No. 1 of Chelan County 320 GWh 14.3 GWh +306 GWh Own report and neighbours
Public Utility District No. 2 of Grant County, Washington 51.9 GWh 59.1 GWh -7.17 GWh Own report and neighbours
PUD No. 1 of Douglas County 14.3 GWh 941 MWh +13.4 GWh Own report and neighbours
Puget Sound Energy, Inc. 69.7 GWh 1.46 TWh -1.39 TWh Own report and neighbours
Salt River Project Agricultural Improvement and Power District 3.13 TWh 722 GWh +2.41 TWh Own report and neighbours
Saskatchewan Power Corporation 41.6 GWh 0 MWh +41.6 GWh Neighbours only
Seattle City Light 0 MWh 258 GWh -258 GWh Own report and neighbours
Seminole Electric Cooperative 858 GWh 0 MWh +858 GWh Own report and neighbours
Sikeston Board Of Municipal Utilities 81.4 GWh 59.5 GWh +21.9 GWh Own report and neighbours
South Carolina Public Service Authority 455 GWh 1.25 TWh -793 GWh Own report and neighbours
Southeastern Power Administration 129 GWh 66.6 GWh +62.2 GWh Own report and neighbours
Southern Company Services, Inc. - Trans 1.65 TWh 329 GWh +1.32 TWh Own report and neighbours
Southwest Power Pool 495 GWh 1.14 TWh -641 GWh Own report and neighbours
Southwest Power Pool West Balancing Authority Area 378 GWh 292 GWh +85.8 GWh Own report and neighbours
Southwestern Power Administration 170 GWh 53.1 GWh +117 GWh Own report and neighbours
Tampa Electric Company 171 GWh 215 GWh -44.1 GWh Own report and neighbours
Tennessee Valley Authority 1.03 TWh 1.61 TWh -575 GWh Own report and neighbours
Tucson Electric Power 206 GWh 246 GWh -39.9 GWh Own report and neighbours
Turlock Irrigation District 186 GWh 223 GWh -37.0 GWh Own report and neighbours
Western Area Power Administration - Desert Southwest Region 1.05 TWh 937 GWh +111 GWh Own report and neighbours
Western Area Power Administration - Upper Great Plains West 0 MWh 9.11 GWh -9.11 GWh Neighbours only

Built from the averaged border figures above. A positive net means the operator sent out more than it received across its borders with the operators listed in the window; a negative net means it was a net importer. Interchange with operators not covered by EIA is not counted, and flows within an operator's own area are not counted.

Key Facts

  • EIA balancing authorities reported interchange on 159 borders between 70 operators in the 30 days 6 October to 4 November 2026.
  • The largest net flow in the 30 days to 4 November 2026 was 2.18 TWh from SRP to AZPS, an average of 3,021 MW.
  • Salt River Project Agricultural Improvement and Power District was the largest net exporter in the 30 days to 4 November 2026, at 2.41 TWh.
  • California Independent System Operator was the largest net importer in the 30 days to 4 November 2026, at 2.37 TWh.
  • The Lower 48 states imported a net 2.09 TWh from Canada in the 30 days to 4 November 2026.
  • The Lower 48 states exported a net 41.9 GWh to Mexico in the 30 days to 4 November 2026.
  • Both operators reported 142 of the borders and agreed on the direction of 137 of them in the 30 days to 4 November 2026.

Reading the Map

  • Sign convention. EIA reports interchange from each balancing authority's own side: a positive figure means energy left that operator for its neighbour, a negative figure means it arrived. The map shows the direction of the net flow, from the operator that sent it to the one that received it, and the table gives the signed reports.
  • Two reports, one border. Both operators on a border report it, and their meters rarely match exactly. The net flow on the map and in the tables is the average of the two reports; each report is in the border table. Both operators reported 142 borders and agreed on the direction of 137.
  • Window totals. Each figure is a sum over 30 complete days, 6 October to 4 November 2026. The export holds one total per border, so the map does not show a single day or an hour by hour picture.
  • Net, not gross. Power can cross a border in both directions within the window. The map shows the difference, so a busy border with balanced traffic can look quiet.
  • Balancing authorities. The 59 operators that report interchange to EIA are electric system operators, not states or countries, and vary from ERCOT and PJM to a single city utility. Nodes sit at hand placed approximate centres, and lines join those points: they show which operators are linked, not where lines run.
  • Canada and Mexico. Canadian and Mexican operators are shown as nodes on their side of the border, from the US side's reports only. The Canada and Mexico totals for the Lower 48 come from EIA's own aggregate.
  • Map and tables. To keep the map readable it draws the 45 largest borders. Every border, including the smallest, is in the table, and so is each operator's net position.

Sources: Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Map outlines: Natural Earth. (Public domain) Data as of 4 November 2026 (30 days from 6 October 2026). Hourly and daily interchange (EIA-930), provisional.

Cite this page
APA 7

World Power Monitor. (2026). North America Electricity Flows Map: US Grid Interchange. https://worldpowermonitor.com/us/flows/

Plain text

World Power Monitor. North America Electricity Flows Map: US Grid Interchange. Data as of 2026-11-04. Data from U.S. Energy Information Administration and Natural Earth. https://worldpowermonitor.com/us/flows/

BibTeX
@misc{wpm_us_flows_2026,
  title = {{North America Electricity Flows Map: US Grid Interchange}},
  author = {{World Power Monitor}},
  year = {2026},
  note = {Data as of 2026-11-04. Data from U.S. Energy Information Administration and Natural Earth.},
  url = {https://worldpowermonitor.com/us/flows/}
}

Permalink: https://worldpowermonitor.com/us/flows/

The Copy buttons add today's date as the access date.