SRP Electricity Demand and Generation Mix
SRP demand was 2,505 MW in the hour starting 5 Nov 2026, 06:00 MST (UTC-07:00). Nuclear was the largest source in the hour starting 4 Nov 2026, 22:00 MST (UTC-07:00), at 44% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- SRP is a balancing authority in the United States, part of the EIA Southwest region.
- In the hour starting 5 Nov 2026, 06:00 MST (UTC-07:00), demand in SRP was 2,505 MW, against a day-ahead forecast of 3,487 MW.
- Nuclear supplied 44.1% of SRP's generation in the hour starting 4 Nov 2026, 22:00 MST (UTC-07:00).
- Demand in SRP totalled 36.4 TWh in 2025.
- Nuclear supplied 52.1% of SRP's generation in 2025.
- The highest daily demand in SRP from 2019 onward was 163 GWh, on 2026-07-24 (24 July 2026).
- The highest hourly demand in SRP since 2026-06-16 (16 June 2026) was 8,987 MW, in the hour starting 24 Jul 2026, 18:00 MST (UTC-07:00).
- Solar's highest share of SRP's daily generation from 2019 onward was 14.3%, on 2025-04-26 (26 April 2025).
- Wind's highest share of SRP's daily generation from 2019 onward was 5.2%, on 2026-04-26 (26 April 2026).
Latest Demand
Hourly operator dataLatest hour known when this page was built: 5 Nov 2026, 06:00 MST (UTC-07:00).
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05T13:00:00Z.
Generation by Source
Latest hour with generation by source: 4 Nov 2026, 22:00 MST (UTC-07:00)| Source | Output | Share |
|---|---|---|
| Nuclear | 3,113 MW | 44.1% |
| Gas | 2,678 MW | 37.9% |
| Coal | 1,118 MW | 15.8% |
| Storage | 114 MW | 1.6% |
| Solar | 29 MW | 0.4% |
| Wind | 8 MW | 0.1% |
| Hydro | 5 MW | 0.1% |
| Total from these sources | 7,065 MW | |
| Net interchange | 4,254 MW | net exports |
EIA publishes generation by source 10 or more hours after demand, so this hour can be earlier than the latest demand hour. Net interchange is positive when SRP exports.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05T05:00:00Z.
Last 30 Days, Hourly
Times in UTCShow the data table (720 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-10-06T15:00Z | 3,094 MW |
| 2026-10-06T16:00Z | 3,533 MW |
| 2026-10-06T17:00Z | 4,396 MW |
| 2026-10-06T18:00Z | 5,033 MW |
| 2026-10-06T19:00Z | 5,608 MW |
| 2026-10-06T20:00Z | 6,020 MW |
| 2026-10-06T21:00Z | 6,266 MW |
| 2026-10-06T22:00Z | 6,373 MW |
| 2026-10-06T23:00Z | 6,398 MW |
| 2026-10-07T00:00Z | 6,212 MW |
| 2026-10-07T01:00Z | 5,822 MW |
| 2026-10-07T02:00Z | 5,581 MW |
| 2026-10-07T03:00Z | 5,296 MW |
| 2026-10-07T04:00Z | 4,946 MW |
| 2026-10-07T05:00Z | 4,477 MW |
| 2026-10-07T06:00Z | 4,183 MW |
| 2026-10-07T07:00Z | 3,992 MW |
| 2026-10-07T08:00Z | 3,811 MW |
| 2026-10-07T09:00Z | 3,652 MW |
| 2026-10-07T10:00Z | 3,647 MW |
| 2026-10-07T11:00Z | 3,655 MW |
| 2026-10-07T12:00Z | 3,798 MW |
| 2026-10-07T13:00Z | 3,899 MW |
| 2026-10-07T14:00Z | 4,140 MW |
| 2026-10-07T15:00Z | 4,478 MW |
| 2026-10-07T16:00Z | 4,749 MW |
| 2026-10-07T17:00Z | 5,035 MW |
| 2026-10-07T18:00Z | 5,343 MW |
| 2026-10-07T19:00Z | 5,525 MW |
| 2026-10-07T20:00Z | 5,715 MW |
| 2026-10-07T21:00Z | 5,858 MW |
| 2026-10-07T22:00Z | 6,025 MW |
| 2026-10-07T23:00Z | 6,265 MW |
| 2026-10-08T00:00Z | 5,985 MW |
| 2026-10-08T01:00Z | 5,639 MW |
| 2026-10-08T02:00Z | 5,478 MW |
| 2026-10-08T03:00Z | 5,491 MW |
| 2026-10-08T04:00Z | 5,288 MW |
| 2026-10-08T05:00Z | 4,994 MW |
| 2026-10-08T06:00Z | 4,708 MW |
| 2026-10-08T07:00Z | 4,422 MW |
| 2026-10-08T08:00Z | 4,202 MW |
| 2026-10-08T09:00Z | 4,044 MW |
| 2026-10-08T10:00Z | 3,899 MW |
| 2026-10-08T11:00Z | 3,857 MW |
| 2026-10-08T12:00Z | 3,831 MW |
| 2026-10-08T13:00Z | 4,077 MW |
| 2026-10-08T14:00Z | 4,244 MW |
| 2026-10-08T15:00Z | 4,500 MW |
| 2026-10-08T16:00Z | 4,726 MW |
| 2026-10-08T17:00Z | 5,072 MW |
| 2026-10-08T18:00Z | 5,498 MW |
| 2026-10-08T19:00Z | 5,989 MW |
| 2026-10-08T20:00Z | 6,330 MW |
| 2026-10-08T21:00Z | 6,507 MW |
| 2026-10-08T22:00Z | 6,539 MW |
| 2026-10-08T23:00Z | 6,341 MW |
| 2026-10-09T00:00Z | 5,862 MW |
| 2026-10-09T01:00Z | 5,636 MW |
| 2026-10-09T02:00Z | 5,172 MW |
| 2026-10-09T03:00Z | 5,001 MW |
| 2026-10-09T04:00Z | 4,833 MW |
| 2026-10-09T05:00Z | 4,501 MW |
| 2026-10-09T06:00Z | 4,295 MW |
| 2026-10-09T07:00Z | 4,188 MW |
| 2026-10-09T08:00Z | 3,990 MW |
| 2026-10-09T09:00Z | 3,954 MW |
| 2026-10-09T10:00Z | 3,917 MW |
| 2026-10-09T11:00Z | 3,970 MW |
| 2026-10-09T12:00Z | 4,065 MW |
| 2026-10-09T13:00Z | 4,103 MW |
| 2026-10-09T14:00Z | 4,208 MW |
| 2026-10-09T15:00Z | 4,521 MW |
| 2026-10-09T16:00Z | 4,880 MW |
| 2026-10-09T17:00Z | 5,121 MW |
| 2026-10-09T18:00Z | 5,679 MW |
| 2026-10-09T19:00Z | 6,047 MW |
| 2026-10-09T20:00Z | 6,292 MW |
| 2026-10-09T21:00Z | 6,417 MW |
| 2026-10-09T22:00Z | 6,474 MW |
| 2026-10-09T23:00Z | 6,230 MW |
| 2026-10-10T00:00Z | 5,803 MW |
| 2026-10-10T01:00Z | 5,630 MW |
| 2026-10-10T02:00Z | 5,398 MW |
| 2026-10-10T03:00Z | 5,186 MW |
| 2026-10-10T04:00Z | 4,986 MW |
| 2026-10-10T05:00Z | 4,543 MW |
| 2026-10-10T06:00Z | 4,140 MW |
| 2026-10-10T07:00Z | 3,973 MW |
| 2026-10-10T08:00Z | 3,727 MW |
| 2026-10-10T09:00Z | 3,474 MW |
| 2026-10-10T10:00Z | 3,292 MW |
| 2026-10-10T11:00Z | 3,146 MW |
| 2026-10-10T12:00Z | 3,019 MW |
| 2026-10-10T13:00Z | 2,974 MW |
| 2026-10-10T14:00Z | 3,152 MW |
| 2026-10-10T15:00Z | 3,408 MW |
| 2026-10-10T16:00Z | 3,507 MW |
| 2026-10-10T17:00Z | 3,604 MW |
| 2026-10-10T18:00Z | 3,811 MW |
| 2026-10-10T19:00Z | 4,275 MW |
| 2026-10-10T20:00Z | 4,155 MW |
| 2026-10-10T21:00Z | 3,866 MW |
| 2026-10-10T22:00Z | 3,611 MW |
| 2026-10-10T23:00Z | 3,739 MW |
| 2026-10-11T00:00Z | 3,748 MW |
| 2026-10-11T01:00Z | 3,790 MW |
| 2026-10-11T02:00Z | 3,748 MW |
| 2026-10-11T03:00Z | 3,598 MW |
| 2026-10-11T04:00Z | 3,241 MW |
| 2026-10-11T05:00Z | 2,960 MW |
| 2026-10-11T06:00Z | 3,169 MW |
| 2026-10-11T07:00Z | 3,014 MW |
| 2026-10-11T08:00Z | 2,678 MW |
| 2026-10-11T09:00Z | 2,508 MW |
| 2026-10-11T10:00Z | 2,495 MW |
| 2026-10-11T11:00Z | 2,954 MW |
| 2026-10-11T12:00Z | 3,195 MW |
| 2026-10-11T13:00Z | 3,102 MW |
| 2026-10-11T14:00Z | 2,832 MW |
| 2026-10-11T15:00Z | 2,697 MW |
| 2026-10-11T16:00Z | 2,557 MW |
| 2026-10-11T17:00Z | 2,569 MW |
| 2026-10-11T18:00Z | 2,811 MW |
| 2026-10-11T19:00Z | 2,986 MW |
| 2026-10-11T20:00Z | 3,140 MW |
| 2026-10-11T21:00Z | 3,094 MW |
| 2026-10-11T22:00Z | 3,071 MW |
| 2026-10-11T23:00Z | 3,066 MW |
| 2026-10-12T00:00Z | 3,086 MW |
| 2026-10-12T01:00Z | 2,997 MW |
| 2026-10-12T02:00Z | 2,962 MW |
| 2026-10-12T03:00Z | 3,232 MW |
| 2026-10-12T04:00Z | 2,927 MW |
| 2026-10-12T05:00Z | 2,874 MW |
| 2026-10-12T06:00Z | 2,881 MW |
| 2026-10-12T07:00Z | 3,041 MW |
| 2026-10-12T08:00Z | 2,926 MW |
| 2026-10-12T09:00Z | 2,703 MW |
| 2026-10-12T10:00Z | 2,567 MW |
| 2026-10-12T11:00Z | 2,432 MW |
| 2026-10-12T12:00Z | 2,242 MW |
| 2026-10-12T13:00Z | 2,340 MW |
| 2026-10-12T14:00Z | 2,764 MW |
| 2026-10-12T15:00Z | 2,959 MW |
| 2026-10-12T16:00Z | 3,062 MW |
| 2026-10-12T17:00Z | 3,294 MW |
| 2026-10-12T18:00Z | 3,407 MW |
| 2026-10-12T19:00Z | 3,588 MW |
| 2026-10-12T20:00Z | 3,616 MW |
| 2026-10-12T21:00Z | 3,571 MW |
| 2026-10-12T22:00Z | 3,525 MW |
| 2026-10-12T23:00Z | 3,489 MW |
| 2026-10-13T00:00Z | 3,404 MW |
| 2026-10-13T01:00Z | 3,447 MW |
| 2026-10-13T02:00Z | 3,343 MW |
| 2026-10-13T03:00Z | 3,439 MW |
| 2026-10-13T04:00Z | 3,493 MW |
| 2026-10-13T05:00Z | 3,352 MW |
| 2026-10-13T06:00Z | 3,006 MW |
| 2026-10-13T07:00Z | 2,598 MW |
| 2026-10-13T08:00Z | 2,387 MW |
| 2026-10-13T09:00Z | 2,271 MW |
| 2026-10-13T10:00Z | 2,206 MW |
| 2026-10-13T11:00Z | 2,300 MW |
| 2026-10-13T12:00Z | 2,515 MW |
| 2026-10-13T13:00Z | 2,693 MW |
| 2026-10-13T14:00Z | 2,771 MW |
| 2026-10-13T15:00Z | 2,841 MW |
| 2026-10-13T16:00Z | 2,994 MW |
| 2026-10-13T17:00Z | 3,080 MW |
| 2026-10-13T18:00Z | 3,032 MW |
| 2026-10-13T19:00Z | 3,014 MW |
| 2026-10-13T20:00Z | 3,216 MW |
| 2026-10-13T21:00Z | 3,224 MW |
| 2026-10-13T22:00Z | 3,259 MW |
| 2026-10-13T23:00Z | 3,326 MW |
| 2026-10-14T00:00Z | 3,323 MW |
| 2026-10-14T01:00Z | 3,357 MW |
| 2026-10-14T02:00Z | 3,239 MW |
| 2026-10-14T03:00Z | 3,326 MW |
| 2026-10-14T04:00Z | 3,398 MW |
| 2026-10-14T05:00Z | 3,445 MW |
| 2026-10-14T06:00Z | 3,379 MW |
| 2026-10-14T07:00Z | 3,125 MW |
| 2026-10-14T08:00Z | 2,855 MW |
| 2026-10-14T09:00Z | 2,589 MW |
| 2026-10-14T10:00Z | 2,246 MW |
| 2026-10-14T11:00Z | 2,132 MW |
| 2026-10-14T12:00Z | 2,229 MW |
| 2026-10-14T13:00Z | 2,334 MW |
| 2026-10-14T14:00Z | 2,323 MW |
| 2026-10-14T15:00Z | 2,279 MW |
| 2026-10-14T16:00Z | 2,275 MW |
| 2026-10-14T17:00Z | 2,305 MW |
| 2026-10-14T18:00Z | 2,375 MW |
| 2026-10-14T19:00Z | 2,428 MW |
| 2026-10-14T20:00Z | 2,555 MW |
| 2026-10-14T21:00Z | 2,688 MW |
| 2026-10-14T22:00Z | 2,718 MW |
| 2026-10-14T23:00Z | 2,766 MW |
| 2026-10-15T00:00Z | 2,839 MW |
| 2026-10-15T01:00Z | 2,874 MW |
| 2026-10-15T02:00Z | 2,739 MW |
| 2026-10-15T03:00Z | 2,652 MW |
| 2026-10-15T04:00Z | 2,477 MW |
| 2026-10-15T05:00Z | 2,374 MW |
| 2026-10-15T06:00Z | 2,340 MW |
| 2026-10-15T07:00Z | 2,297 MW |
| 2026-10-15T08:00Z | 2,137 MW |
| 2026-10-15T09:00Z | 2,062 MW |
| 2026-10-15T10:00Z | 2,013 MW |
| 2026-10-15T11:00Z | 2,092 MW |
| 2026-10-15T12:00Z | 2,210 MW |
| 2026-10-15T13:00Z | 2,330 MW |
| 2026-10-15T14:00Z | 2,401 MW |
| 2026-10-15T15:00Z | 2,529 MW |
| 2026-10-15T16:00Z | 2,655 MW |
| 2026-10-15T17:00Z | 2,596 MW |
| 2026-10-15T18:00Z | 2,619 MW |
| 2026-10-15T19:00Z | 2,778 MW |
| 2026-10-15T20:00Z | 2,994 MW |
| 2026-10-15T21:00Z | 3,182 MW |
| 2026-10-15T22:00Z | 3,352 MW |
| 2026-10-15T23:00Z | 3,535 MW |
| 2026-10-16T00:00Z | 3,556 MW |
| 2026-10-16T01:00Z | 3,590 MW |
| 2026-10-16T02:00Z | 3,487 MW |
| 2026-10-16T03:00Z | 3,367 MW |
| 2026-10-16T04:00Z | 3,209 MW |
| 2026-10-16T05:00Z | 3,003 MW |
| 2026-10-16T06:00Z | 2,790 MW |
| 2026-10-16T07:00Z | 2,637 MW |
| 2026-10-16T08:00Z | 2,517 MW |
| 2026-10-16T09:00Z | 2,393 MW |
| 2026-10-16T10:00Z | 2,321 MW |
| 2026-10-16T11:00Z | 2,351 MW |
| 2026-10-16T12:00Z | 2,513 MW |
| 2026-10-16T13:00Z | 2,668 MW |
| 2026-10-16T14:00Z | 2,717 MW |
| 2026-10-16T15:00Z | 2,812 MW |
| 2026-10-16T16:00Z | 2,895 MW |
| 2026-10-16T17:00Z | 2,977 MW |
| 2026-10-16T18:00Z | 3,093 MW |
| 2026-10-16T19:00Z | 3,176 MW |
| 2026-10-16T20:00Z | 3,313 MW |
| 2026-10-16T21:00Z | 3,419 MW |
| 2026-10-16T22:00Z | 3,497 MW |
| 2026-10-16T23:00Z | 3,528 MW |
| 2026-10-17T00:00Z | 3,002 MW |
| 2026-10-17T01:00Z | 2,793 MW |
| 2026-10-17T02:00Z | 2,703 MW |
| 2026-10-17T03:00Z | 2,795 MW |
| 2026-10-17T04:00Z | 2,856 MW |
| 2026-10-17T05:00Z | 2,920 MW |
| 2026-10-17T06:00Z | 2,783 MW |
| 2026-10-17T07:00Z | 2,693 MW |
| 2026-10-17T08:00Z | 2,675 MW |
| 2026-10-17T09:00Z | 2,887 MW |
| 2026-10-17T10:00Z | 3,180 MW |
| 2026-10-17T11:00Z | 3,266 MW |
| 2026-10-17T12:00Z | 3,254 MW |
| 2026-10-17T13:00Z | 3,327 MW |
| 2026-10-17T14:00Z | 3,457 MW |
| 2026-10-17T15:00Z | 3,578 MW |
| 2026-10-17T16:00Z | 3,600 MW |
| 2026-10-17T17:00Z | 3,724 MW |
| 2026-10-17T18:00Z | 3,767 MW |
| 2026-10-17T19:00Z | 3,786 MW |
| 2026-10-17T20:00Z | 3,869 MW |
| 2026-10-17T21:00Z | 3,844 MW |
| 2026-10-17T22:00Z | 3,858 MW |
| 2026-10-17T23:00Z | 3,880 MW |
| 2026-10-18T00:00Z | 3,730 MW |
| 2026-10-18T01:00Z | 3,802 MW |
| 2026-10-18T02:00Z | 3,784 MW |
| 2026-10-18T03:00Z | 3,778 MW |
| 2026-10-18T04:00Z | 3,755 MW |
| 2026-10-18T05:00Z | 3,639 MW |
| 2026-10-18T06:00Z | 3,173 MW |
| 2026-10-18T07:00Z | 2,492 MW |
| 2026-10-18T08:00Z | 2,020 MW |
| 2026-10-18T09:00Z | 1,717 MW |
| 2026-10-18T10:00Z | 1,506 MW |
| 2026-10-18T11:00Z | 1,445 MW |
| 2026-10-18T12:00Z | 1,409 MW |
| 2026-10-18T13:00Z | 1,703 MW |
| 2026-10-18T14:00Z | 2,114 MW |
| 2026-10-18T15:00Z | 2,084 MW |
| 2026-10-18T16:00Z | 2,477 MW |
| 2026-10-18T17:00Z | 2,592 MW |
| 2026-10-18T18:00Z | 2,808 MW |
| 2026-10-18T19:00Z | 3,043 MW |
| 2026-10-18T20:00Z | 3,241 MW |
| 2026-10-18T21:00Z | 3,359 MW |
| 2026-10-18T22:00Z | 3,786 MW |
| 2026-10-18T23:00Z | 3,883 MW |
| 2026-10-19T00:00Z | 4,031 MW |
| 2026-10-19T01:00Z | 3,841 MW |
| 2026-10-19T02:00Z | 3,230 MW |
| 2026-10-19T03:00Z | 3,174 MW |
| 2026-10-19T04:00Z | 3,008 MW |
| 2026-10-19T05:00Z | 2,538 MW |
| 2026-10-19T06:00Z | 2,132 MW |
| 2026-10-19T07:00Z | 1,899 MW |
| 2026-10-19T08:00Z | 1,733 MW |
| 2026-10-19T09:00Z | 1,461 MW |
| 2026-10-19T10:00Z | 1,487 MW |
| 2026-10-19T11:00Z | 1,609 MW |
| 2026-10-19T12:00Z | 1,859 MW |
| 2026-10-19T13:00Z | 2,034 MW |
| 2026-10-19T14:00Z | 2,203 MW |
| 2026-10-19T15:00Z | 3,125 MW |
| 2026-10-19T16:00Z | 3,395 MW |
| 2026-10-19T17:00Z | 3,712 MW |
| 2026-10-19T18:00Z | 4,120 MW |
| 2026-10-19T19:00Z | 4,477 MW |
| 2026-10-19T20:00Z | 4,114 MW |
| 2026-10-19T21:00Z | 3,775 MW |
| 2026-10-19T22:00Z | 3,546 MW |
| 2026-10-19T23:00Z | 4,167 MW |
| 2026-10-20T00:00Z | 4,512 MW |
| 2026-10-20T01:00Z | 4,641 MW |
| 2026-10-20T02:00Z | 4,681 MW |
| 2026-10-20T03:00Z | 4,621 MW |
| 2026-10-20T04:00Z | 3,624 MW |
| 2026-10-20T05:00Z | 3,886 MW |
| 2026-10-20T06:00Z | 3,749 MW |
| 2026-10-20T07:00Z | 3,529 MW |
| 2026-10-20T08:00Z | 3,074 MW |
| 2026-10-20T09:00Z | 2,530 MW |
| 2026-10-20T10:00Z | 2,125 MW |
| 2026-10-20T11:00Z | 2,476 MW |
| 2026-10-20T12:00Z | 2,399 MW |
| 2026-10-20T13:00Z | 2,396 MW |
| 2026-10-20T14:00Z | 3,267 MW |
| 2026-10-20T15:00Z | 3,510 MW |
| 2026-10-20T16:00Z | 3,723 MW |
| 2026-10-20T17:00Z | 3,583 MW |
| 2026-10-20T18:00Z | 3,225 MW |
| 2026-10-20T19:00Z | 3,883 MW |
| 2026-10-20T20:00Z | 3,962 MW |
| 2026-10-20T21:00Z | 3,954 MW |
| 2026-10-20T22:00Z | 4,445 MW |
| 2026-10-20T23:00Z | 4,971 MW |
| 2026-10-21T00:00Z | 4,919 MW |
| 2026-10-21T01:00Z | 4,858 MW |
| 2026-10-21T02:00Z | 5,002 MW |
| 2026-10-21T03:00Z | 4,972 MW |
| 2026-10-21T04:00Z | 4,653 MW |
| 2026-10-21T05:00Z | 4,300 MW |
| 2026-10-21T06:00Z | 4,048 MW |
| 2026-10-21T07:00Z | 3,736 MW |
| 2026-10-21T08:00Z | 3,692 MW |
| 2026-10-21T09:00Z | 3,534 MW |
| 2026-10-21T10:00Z | 3,530 MW |
| 2026-10-21T11:00Z | 3,587 MW |
| 2026-10-21T12:00Z | 3,709 MW |
| 2026-10-21T13:00Z | 3,679 MW |
| 2026-10-21T14:00Z | 3,755 MW |
| 2026-10-21T15:00Z | 3,923 MW |
| 2026-10-21T16:00Z | 4,075 MW |
| 2026-10-21T17:00Z | 4,261 MW |
| 2026-10-21T18:00Z | 4,499 MW |
| 2026-10-21T19:00Z | 4,531 MW |
| 2026-10-21T20:00Z | 4,589 MW |
| 2026-10-21T21:00Z | 4,675 MW |
| 2026-10-21T22:00Z | 4,341 MW |
| 2026-10-21T23:00Z | 4,174 MW |
| 2026-10-22T00:00Z | 4,288 MW |
| 2026-10-22T01:00Z | 4,108 MW |
| 2026-10-22T02:00Z | 3,950 MW |
| 2026-10-22T03:00Z | 3,958 MW |
| 2026-10-22T04:00Z | 3,893 MW |
| 2026-10-22T05:00Z | 3,541 MW |
| 2026-10-22T06:00Z | 3,205 MW |
| 2026-10-22T07:00Z | 2,869 MW |
| 2026-10-22T08:00Z | 3,039 MW |
| 2026-10-22T09:00Z | 3,262 MW |
| 2026-10-22T10:00Z | 3,270 MW |
| 2026-10-22T11:00Z | 3,388 MW |
| 2026-10-22T12:00Z | 3,649 MW |
| 2026-10-22T13:00Z | 3,917 MW |
| 2026-10-22T14:00Z | 4,005 MW |
| 2026-10-22T15:00Z | 4,105 MW |
| 2026-10-22T16:00Z | 3,880 MW |
| 2026-10-22T17:00Z | 3,618 MW |
| 2026-10-22T18:00Z | 3,702 MW |
| 2026-10-22T19:00Z | 3,829 MW |
| 2026-10-22T20:00Z | 3,797 MW |
| 2026-10-22T21:00Z | 3,821 MW |
| 2026-10-22T22:00Z | 3,723 MW |
| 2026-10-22T23:00Z | 3,383 MW |
| 2026-10-23T00:00Z | 3,269 MW |
| 2026-10-23T01:00Z | 3,271 MW |
| 2026-10-23T02:00Z | 3,279 MW |
| 2026-10-23T03:00Z | 3,318 MW |
| 2026-10-23T04:00Z | 3,140 MW |
| 2026-10-23T05:00Z | 3,118 MW |
| 2026-10-23T06:00Z | 3,389 MW |
| 2026-10-23T07:00Z | 3,523 MW |
| 2026-10-23T08:00Z | 3,302 MW |
| 2026-10-23T09:00Z | 3,117 MW |
| 2026-10-23T10:00Z | 3,231 MW |
| 2026-10-23T11:00Z | 3,208 MW |
| 2026-10-23T12:00Z | 3,304 MW |
| 2026-10-23T13:00Z | 3,425 MW |
| 2026-10-23T14:00Z | 3,380 MW |
| 2026-10-23T15:00Z | 3,204 MW |
| 2026-10-23T16:00Z | 3,052 MW |
| 2026-10-23T17:00Z | 3,070 MW |
| 2026-10-23T18:00Z | 3,116 MW |
| 2026-10-23T19:00Z | 2,924 MW |
| 2026-10-23T20:00Z | 2,811 MW |
| 2026-10-23T21:00Z | 2,979 MW |
| 2026-10-23T22:00Z | 2,823 MW |
| 2026-10-23T23:00Z | 3,116 MW |
| 2026-10-24T00:00Z | 3,156 MW |
| 2026-10-24T01:00Z | 3,121 MW |
| 2026-10-24T02:00Z | 2,371 MW |
| 2026-10-24T03:00Z | 3,507 MW |
| 2026-10-24T04:00Z | 3,342 MW |
| 2026-10-24T05:00Z | 2,996 MW |
| 2026-10-24T06:00Z | 2,834 MW |
| 2026-10-24T07:00Z | 2,863 MW |
| 2026-10-24T08:00Z | 2,201 MW |
| 2026-10-24T09:00Z | 1,868 MW |
| 2026-10-24T10:00Z | 1,991 MW |
| 2026-10-24T11:00Z | 2,089 MW |
| 2026-10-24T12:00Z | 2,118 MW |
| 2026-10-24T13:00Z | 2,308 MW |
| 2026-10-24T14:00Z | 2,317 MW |
| 2026-10-24T15:00Z | 1,800 MW |
| 2026-10-24T16:00Z | 1,668 MW |
| 2026-10-24T17:00Z | 1,499 MW |
| 2026-10-24T18:00Z | 1,495 MW |
| 2026-10-24T19:00Z | 1,642 MW |
| 2026-10-24T20:00Z | 1,724 MW |
| 2026-10-24T21:00Z | 1,779 MW |
| 2026-10-24T22:00Z | 1,768 MW |
| 2026-10-24T23:00Z | 1,934 MW |
| 2026-10-25T00:00Z | 2,023 MW |
| 2026-10-25T01:00Z | 2,024 MW |
| 2026-10-25T02:00Z | 2,309 MW |
| 2026-10-25T03:00Z | 2,777 MW |
| 2026-10-25T04:00Z | 2,817 MW |
| 2026-10-25T05:00Z | 3,068 MW |
| 2026-10-25T06:00Z | 3,255 MW |
| 2026-10-25T07:00Z | 2,974 MW |
| 2026-10-25T08:00Z | 2,656 MW |
| 2026-10-25T09:00Z | 2,694 MW |
| 2026-10-25T10:00Z | 2,801 MW |
| 2026-10-25T11:00Z | 2,804 MW |
| 2026-10-25T12:00Z | 2,733 MW |
| 2026-10-25T13:00Z | 2,798 MW |
| 2026-10-25T14:00Z | 2,764 MW |
| 2026-10-25T15:00Z | 2,822 MW |
| 2026-10-25T16:00Z | 2,685 MW |
| 2026-10-25T17:00Z | 3,073 MW |
| 2026-10-25T18:00Z | 3,093 MW |
| 2026-10-25T19:00Z | 3,135 MW |
| 2026-10-25T20:00Z | 3,423 MW |
| 2026-10-25T21:00Z | 3,693 MW |
| 2026-10-25T22:00Z | 3,591 MW |
| 2026-10-25T23:00Z | 3,541 MW |
| 2026-10-26T00:00Z | 3,691 MW |
| 2026-10-26T01:00Z | 3,585 MW |
| 2026-10-26T02:00Z | 3,591 MW |
| 2026-10-26T03:00Z | 3,612 MW |
| 2026-10-26T04:00Z | 3,278 MW |
| 2026-10-26T05:00Z | 3,197 MW |
| 2026-10-26T06:00Z | 3,131 MW |
| 2026-10-26T07:00Z | 3,092 MW |
| 2026-10-26T08:00Z | 3,072 MW |
| 2026-10-26T09:00Z | 3,076 MW |
| 2026-10-26T10:00Z | 3,101 MW |
| 2026-10-26T11:00Z | 3,107 MW |
| 2026-10-26T12:00Z | 3,161 MW |
| 2026-10-26T13:00Z | 3,205 MW |
| 2026-10-26T14:00Z | 3,289 MW |
| 2026-10-26T15:00Z | 3,273 MW |
| 2026-10-26T16:00Z | 3,302 MW |
| 2026-10-26T17:00Z | 3,344 MW |
| 2026-10-26T18:00Z | 3,437 MW |
| 2026-10-26T19:00Z | 3,411 MW |
| 2026-10-26T20:00Z | 3,263 MW |
| 2026-10-26T21:00Z | 3,386 MW |
| 2026-10-26T22:00Z | 3,609 MW |
| 2026-10-26T23:00Z | 3,901 MW |
| 2026-10-27T00:00Z | 4,276 MW |
| 2026-10-27T01:00Z | 4,461 MW |
| 2026-10-27T02:00Z | 4,337 MW |
| 2026-10-27T03:00Z | 4,254 MW |
| 2026-10-27T04:00Z | 4,041 MW |
| 2026-10-27T05:00Z | 3,734 MW |
| 2026-10-27T06:00Z | 3,441 MW |
| 2026-10-27T07:00Z | 3,245 MW |
| 2026-10-27T08:00Z | 3,094 MW |
| 2026-10-27T09:00Z | 2,840 MW |
| 2026-10-27T10:00Z | 2,724 MW |
| 2026-10-27T11:00Z | 2,637 MW |
| 2026-10-27T12:00Z | 2,671 MW |
| 2026-10-27T13:00Z | 2,725 MW |
| 2026-10-27T14:00Z | 2,578 MW |
| 2026-10-27T15:00Z | 2,330 MW |
| 2026-10-27T16:00Z | 1,908 MW |
| 2026-10-27T17:00Z | 1,685 MW |
| 2026-10-27T18:00Z | 1,708 MW |
| 2026-10-27T19:00Z | 1,814 MW |
| 2026-10-27T20:00Z | 2,014 MW |
| 2026-10-27T21:00Z | 2,263 MW |
| 2026-10-27T22:00Z | 2,538 MW |
| 2026-10-27T23:00Z | 3,223 MW |
| 2026-10-28T00:00Z | 3,835 MW |
| 2026-10-28T01:00Z | 3,938 MW |
| 2026-10-28T02:00Z | 3,795 MW |
| 2026-10-28T03:00Z | 3,487 MW |
| 2026-10-28T04:00Z | 3,028 MW |
| 2026-10-28T05:00Z | 2,559 MW |
| 2026-10-28T06:00Z | 2,306 MW |
| 2026-10-28T07:00Z | 2,257 MW |
| 2026-10-28T08:00Z | 2,177 MW |
| 2026-10-28T09:00Z | 2,006 MW |
| 2026-10-28T10:00Z | 1,671 MW |
| 2026-10-28T11:00Z | 1,759 MW |
| 2026-10-28T12:00Z | 2,089 MW |
| 2026-10-28T13:00Z | 2,370 MW |
| 2026-10-28T14:00Z | 2,261 MW |
| 2026-10-28T15:00Z | 1,815 MW |
| 2026-10-28T16:00Z | 1,565 MW |
| 2026-10-28T17:00Z | 1,540 MW |
| 2026-10-28T18:00Z | 1,632 MW |
| 2026-10-28T19:00Z | 1,850 MW |
| 2026-10-28T20:00Z | 2,075 MW |
| 2026-10-28T21:00Z | 2,452 MW |
| 2026-10-28T22:00Z | 3,058 MW |
| 2026-10-28T23:00Z | 3,750 MW |
| 2026-10-29T00:00Z | 4,109 MW |
| 2026-10-29T01:00Z | 4,283 MW |
| 2026-10-29T02:00Z | 4,236 MW |
| 2026-10-29T03:00Z | 3,967 MW |
| 2026-10-29T04:00Z | 3,514 MW |
| 2026-10-29T05:00Z | 3,223 MW |
| 2026-10-29T06:00Z | 3,071 MW |
| 2026-10-29T07:00Z | 2,841 MW |
| 2026-10-29T08:00Z | 2,415 MW |
| 2026-10-29T09:00Z | 2,100 MW |
| 2026-10-29T10:00Z | 1,988 MW |
| 2026-10-29T11:00Z | 2,123 MW |
| 2026-10-29T12:00Z | 2,384 MW |
| 2026-10-29T13:00Z | 2,709 MW |
| 2026-10-29T14:00Z | 3,104 MW |
| 2026-10-29T15:00Z | 3,234 MW |
| 2026-10-29T16:00Z | 3,305 MW |
| 2026-10-29T17:00Z | 3,323 MW |
| 2026-10-29T18:00Z | 3,532 MW |
| 2026-10-29T19:00Z | 3,627 MW |
| 2026-10-29T20:00Z | 3,630 MW |
| 2026-10-29T21:00Z | 3,676 MW |
| 2026-10-29T22:00Z | 3,667 MW |
| 2026-10-29T23:00Z | 3,398 MW |
| 2026-10-30T00:00Z | 3,314 MW |
| 2026-10-30T01:00Z | 3,595 MW |
| 2026-10-30T02:00Z | 3,576 MW |
| 2026-10-30T03:00Z | 3,413 MW |
| 2026-10-30T04:00Z | 2,804 MW |
| 2026-10-30T05:00Z | 2,617 MW |
| 2026-10-30T06:00Z | 1,962 MW |
| 2026-10-30T07:00Z | 2,306 MW |
| 2026-10-30T08:00Z | 2,765 MW |
| 2026-10-30T09:00Z | 3,018 MW |
| 2026-10-30T10:00Z | 3,012 MW |
| 2026-10-30T11:00Z | 3,058 MW |
| 2026-10-30T12:00Z | 3,332 MW |
| 2026-10-30T13:00Z | 3,581 MW |
| 2026-10-30T14:00Z | 3,672 MW |
| 2026-10-30T15:00Z | 3,713 MW |
| 2026-10-30T16:00Z | 3,736 MW |
| 2026-10-30T17:00Z | 3,640 MW |
| 2026-10-30T18:00Z | 3,711 MW |
| 2026-10-30T19:00Z | 3,827 MW |
| 2026-10-30T20:00Z | 3,676 MW |
| 2026-10-30T21:00Z | 3,519 MW |
| 2026-10-30T22:00Z | 3,465 MW |
| 2026-10-30T23:00Z | 3,628 MW |
| 2026-10-31T00:00Z | 3,728 MW |
| 2026-10-31T01:00Z | 3,666 MW |
| 2026-10-31T02:00Z | 3,615 MW |
| 2026-10-31T03:00Z | 3,699 MW |
| 2026-10-31T04:00Z | 3,624 MW |
| 2026-10-31T05:00Z | 3,598 MW |
| 2026-10-31T06:00Z | 3,196 MW |
| 2026-10-31T07:00Z | 3,093 MW |
| 2026-10-31T08:00Z | 2,567 MW |
| 2026-10-31T09:00Z | 2,132 MW |
| 2026-10-31T10:00Z | 1,980 MW |
| 2026-10-31T11:00Z | 1,910 MW |
| 2026-10-31T12:00Z | 1,961 MW |
| 2026-10-31T13:00Z | 2,016 MW |
| 2026-10-31T14:00Z | 2,133 MW |
| 2026-10-31T15:00Z | 2,356 MW |
| 2026-10-31T16:00Z | 2,439 MW |
| 2026-10-31T17:00Z | 2,583 MW |
| 2026-10-31T18:00Z | 2,590 MW |
| 2026-10-31T19:00Z | 2,890 MW |
| 2026-10-31T20:00Z | 3,095 MW |
| 2026-10-31T21:00Z | 3,380 MW |
| 2026-10-31T22:00Z | 3,541 MW |
| 2026-10-31T23:00Z | 3,676 MW |
| 2026-11-01T00:00Z | 3,673 MW |
| 2026-11-01T01:00Z | 3,749 MW |
| 2026-11-01T02:00Z | 3,717 MW |
| 2026-11-01T03:00Z | 3,753 MW |
| 2026-11-01T04:00Z | 3,572 MW |
| 2026-11-01T05:00Z | 3,262 MW |
| 2026-11-01T06:00Z | 2,914 MW |
| 2026-11-01T07:00Z | 2,877 MW |
| 2026-11-01T08:00Z | 2,732 MW |
| 2026-11-01T09:00Z | 2,769 MW |
| 2026-11-01T10:00Z | 2,660 MW |
| 2026-11-01T11:00Z | 2,578 MW |
| 2026-11-01T12:00Z | 2,463 MW |
| 2026-11-01T13:00Z | 2,302 MW |
| 2026-11-01T14:00Z | 2,198 MW |
| 2026-11-01T15:00Z | 2,361 MW |
| 2026-11-01T16:00Z | 2,278 MW |
| 2026-11-01T17:00Z | 2,133 MW |
| 2026-11-01T18:00Z | 2,013 MW |
| 2026-11-01T19:00Z | 1,965 MW |
| 2026-11-01T20:00Z | 1,892 MW |
| 2026-11-01T21:00Z | 1,927 MW |
| 2026-11-01T22:00Z | 2,053 MW |
| 2026-11-01T23:00Z | 2,171 MW |
| 2026-11-02T00:00Z | 2,312 MW |
| 2026-11-02T01:00Z | 2,335 MW |
| 2026-11-02T02:00Z | 2,304 MW |
| 2026-11-02T03:00Z | 2,182 MW |
| 2026-11-02T04:00Z | 1,998 MW |
| 2026-11-02T05:00Z | 1,742 MW |
| 2026-11-02T06:00Z | 1,608 MW |
| 2026-11-02T07:00Z | 1,528 MW |
| 2026-11-02T08:00Z | 1,409 MW |
| 2026-11-02T09:00Z | 1,301 MW |
| 2026-11-02T10:00Z | 1,292 MW |
| 2026-11-02T11:00Z | 1,288 MW |
| 2026-11-02T12:00Z | 1,389 MW |
| 2026-11-02T13:00Z | 1,601 MW |
| 2026-11-02T14:00Z | 2,237 MW |
| 2026-11-02T15:00Z | 2,121 MW |
| 2026-11-02T16:00Z | 2,075 MW |
| 2026-11-02T17:00Z | 2,040 MW |
| 2026-11-02T18:00Z | 2,042 MW |
| 2026-11-02T19:00Z | 2,098 MW |
| 2026-11-02T20:00Z | 2,181 MW |
| 2026-11-02T21:00Z | 2,276 MW |
| 2026-11-02T22:00Z | 2,389 MW |
| 2026-11-02T23:00Z | 2,575 MW |
| 2026-11-03T00:00Z | 2,771 MW |
| 2026-11-03T01:00Z | 2,813 MW |
| 2026-11-03T02:00Z | 2,725 MW |
| 2026-11-03T03:00Z | 2,633 MW |
| 2026-11-03T04:00Z | 2,502 MW |
| 2026-11-03T05:00Z | 2,301 MW |
| 2026-11-03T06:00Z | 2,118 MW |
| 2026-11-03T07:00Z | 1,937 MW |
| 2026-11-03T08:00Z | 1,816 MW |
| 2026-11-03T09:00Z | 1,765 MW |
| 2026-11-03T10:00Z | 1,754 MW |
| 2026-11-03T11:00Z | 1,867 MW |
| 2026-11-03T12:00Z | 2,009 MW |
| 2026-11-03T13:00Z | 2,061 MW |
| 2026-11-03T14:00Z | 2,308 MW |
| 2026-11-03T15:00Z | 2,665 MW |
| 2026-11-03T16:00Z | 2,988 MW |
| 2026-11-03T17:00Z | 3,208 MW |
| 2026-11-03T18:00Z | 3,292 MW |
| 2026-11-03T19:00Z | 3,351 MW |
| 2026-11-03T20:00Z | 3,421 MW |
| 2026-11-03T21:00Z | 3,498 MW |
| 2026-11-03T22:00Z | 3,604 MW |
| 2026-11-03T23:00Z | 3,729 MW |
| 2026-11-04T00:00Z | 3,856 MW |
| 2026-11-04T01:00Z | 3,985 MW |
| 2026-11-04T02:00Z | 3,902 MW |
| 2026-11-04T03:00Z | 3,671 MW |
| 2026-11-04T04:00Z | 3,568 MW |
| 2026-11-04T05:00Z | 3,238 MW |
| 2026-11-04T06:00Z | 2,990 MW |
| 2026-11-04T07:00Z | 2,767 MW |
| 2026-11-04T08:00Z | 2,837 MW |
| 2026-11-04T09:00Z | 2,639 MW |
| 2026-11-04T10:00Z | 2,453 MW |
| 2026-11-04T11:00Z | 2,556 MW |
| 2026-11-04T12:00Z | 2,915 MW |
| 2026-11-04T13:00Z | 2,884 MW |
| 2026-11-04T14:00Z | 2,945 MW |
| 2026-11-04T15:00Z | 2,909 MW |
| 2026-11-04T16:00Z | 2,577 MW |
| 2026-11-04T17:00Z | 2,559 MW |
| 2026-11-04T18:00Z | 2,646 MW |
| 2026-11-04T19:00Z | 2,736 MW |
| 2026-11-04T20:00Z | 2,808 MW |
| 2026-11-04T21:00Z | 2,883 MW |
| 2026-11-04T22:00Z | 2,996 MW |
| 2026-11-04T23:00Z | 3,058 MW |
| 2026-11-05T00:00Z | 3,118 MW |
| 2026-11-05T01:00Z | 3,133 MW |
| 2026-11-05T02:00Z | 3,073 MW |
| 2026-11-05T03:00Z | 2,949 MW |
| 2026-11-05T04:00Z | 2,845 MW |
| 2026-11-05T05:00Z | 2,811 MW |
| 2026-11-05T06:00Z | 2,650 MW |
| 2026-11-05T07:00Z | 2,476 MW |
| 2026-11-05T08:00Z | 2,365 MW |
| 2026-11-05T09:00Z | 2,280 MW |
| 2026-11-05T10:00Z | 2,272 MW |
| 2026-11-05T11:00Z | 2,326 MW |
| 2026-11-05T12:00Z | 2,360 MW |
| 2026-11-05T13:00Z | 2,505 MW |
| 2026-11-05T14:00Z | n/a |
Show the data table (720 rows)
| Hour starting (UTC) | Gas | Nuclear | Coal | Solar | Storage |
|---|---|---|---|---|---|
| 2026-10-06T15:00Z | 2,954 MW | 2,632 MW | 777 MW | 706 MW | -713 MW |
| 2026-10-06T16:00Z | 2,878 MW | 2,624 MW | 693 MW | 759 MW | -566 MW |
| 2026-10-06T17:00Z | 2,843 MW | 2,617 MW | 672 MW | 894 MW | -531 MW |
| 2026-10-06T18:00Z | 2,922 MW | 2,617 MW | 805 MW | 902 MW | -501 MW |
| 2026-10-06T19:00Z | 2,903 MW | 2,616 MW | 813 MW | 1,030 MW | -250 MW |
| 2026-10-06T20:00Z | 2,743 MW | 2,615 MW | 775 MW | 1,164 MW | 65 MW |
| 2026-10-06T21:00Z | 2,814 MW | 2,621 MW | 836 MW | 1,127 MW | 159 MW |
| 2026-10-06T22:00Z | 2,579 MW | 2,622 MW | 759 MW | 1,015 MW | 417 MW |
| 2026-10-06T23:00Z | 2,968 MW | 2,625 MW | 771 MW | 896 MW | 554 MW |
| 2026-10-07T00:00Z | 3,828 MW | 2,627 MW | 884 MW | 687 MW | 583 MW |
| 2026-10-07T01:00Z | 4,300 MW | 2,622 MW | 885 MW | 479 MW | 201 MW |
| 2026-10-07T02:00Z | 3,926 MW | 2,621 MW | 884 MW | 644 MW | 317 MW |
| 2026-10-07T03:00Z | 3,884 MW | 2,625 MW | 884 MW | 513 MW | 275 MW |
| 2026-10-07T04:00Z | 3,897 MW | 2,628 MW | 883 MW | 194 MW | 224 MW |
| 2026-10-07T05:00Z | 3,751 MW | 2,629 MW | 879 MW | 116 MW | 111 MW |
| 2026-10-07T06:00Z | 3,568 MW | 2,630 MW | 870 MW | 28 MW | 20 MW |
| 2026-10-07T07:00Z | 3,338 MW | 2,629 MW | 826 MW | -6 MW | 1 MW |
| 2026-10-07T08:00Z | 3,308 MW | 2,630 MW | 811 MW | -13 MW | -12 MW |
| 2026-10-07T09:00Z | 3,137 MW | 2,633 MW | 809 MW | 7 MW | -3 MW |
| 2026-10-07T10:00Z | 3,012 MW | 2,631 MW | 810 MW | -10 MW | -5 MW |
| 2026-10-07T11:00Z | 3,085 MW | 2,631 MW | 833 MW | -6 MW | -10 MW |
| 2026-10-07T12:00Z | 3,193 MW | 2,637 MW | 874 MW | -10 MW | -186 MW |
| 2026-10-07T13:00Z | 3,125 MW | 2,640 MW | 862 MW | 14 MW | -474 MW |
| 2026-10-07T14:00Z | 3,079 MW | 2,639 MW | 811 MW | 363 MW | -430 MW |
| 2026-10-07T15:00Z | 2,386 MW | 2,640 MW | 579 MW | 733 MW | -761 MW |
| 2026-10-07T16:00Z | 2,056 MW | 2,633 MW | 561 MW | 831 MW | -628 MW |
| 2026-10-07T17:00Z | 2,211 MW | 2,630 MW | 607 MW | 787 MW | -507 MW |
| 2026-10-07T18:00Z | 2,986 MW | 2,627 MW | 588 MW | 926 MW | -219 MW |
| 2026-10-07T19:00Z | 3,184 MW | 2,625 MW | 560 MW | 1,029 MW | 83 MW |
| 2026-10-07T20:00Z | 3,386 MW | 2,628 MW | 571 MW | 1,086 MW | 210 MW |
| 2026-10-07T21:00Z | 3,166 MW | 2,626 MW | 590 MW | 1,075 MW | 482 MW |
| 2026-10-07T22:00Z | 3,010 MW | 2,627 MW | 612 MW | 1,159 MW | 368 MW |
| 2026-10-07T23:00Z | 3,577 MW | 2,625 MW | 631 MW | 797 MW | 268 MW |
| 2026-10-08T00:00Z | 4,125 MW | 2,624 MW | 824 MW | 673 MW | 489 MW |
| 2026-10-08T01:00Z | 4,227 MW | 2,626 MW | 883 MW | 451 MW | 285 MW |
| 2026-10-08T02:00Z | 4,059 MW | 2,625 MW | 871 MW | 687 MW | 240 MW |
| 2026-10-08T03:00Z | 3,677 MW | 2,626 MW | 846 MW | 492 MW | 233 MW |
| 2026-10-08T04:00Z | 3,665 MW | 2,627 MW | 876 MW | 226 MW | 123 MW |
| 2026-10-08T05:00Z | 3,672 MW | 2,629 MW | 883 MW | 350 MW | 39 MW |
| 2026-10-08T06:00Z | 3,664 MW | 2,633 MW | 815 MW | 103 MW | 14 MW |
| 2026-10-08T07:00Z | 3,573 MW | 2,630 MW | 737 MW | -20 MW | -6 MW |
| 2026-10-08T08:00Z | 3,340 MW | 2,628 MW | 729 MW | -7 MW | 1 MW |
| 2026-10-08T09:00Z | 3,124 MW | 2,634 MW | 734 MW | -10 MW | -6 MW |
| 2026-10-08T10:00Z | 3,066 MW | 2,635 MW | 734 MW | -7 MW | -35 MW |
| 2026-10-08T11:00Z | 3,097 MW | 2,637 MW | 737 MW | -8 MW | -26 MW |
| 2026-10-08T12:00Z | 3,262 MW | 2,640 MW | 823 MW | -5 MW | -461 MW |
| 2026-10-08T13:00Z | 3,223 MW | 2,637 MW | 839 MW | 15 MW | -263 MW |
| 2026-10-08T14:00Z | 3,031 MW | 2,638 MW | 764 MW | 529 MW | -484 MW |
| 2026-10-08T15:00Z | 2,570 MW | 2,637 MW | 578 MW | 817 MW | -722 MW |
| 2026-10-08T16:00Z | 2,656 MW | 2,626 MW | 498 MW | 991 MW | -640 MW |
| 2026-10-08T17:00Z | 2,665 MW | 2,622 MW | 451 MW | 996 MW | -241 MW |
| 2026-10-08T18:00Z | 3,199 MW | 2,618 MW | 603 MW | 934 MW | -207 MW |
| 2026-10-08T19:00Z | 3,287 MW | 2,619 MW | 740 MW | 1,051 MW | 17 MW |
| 2026-10-08T20:00Z | 3,392 MW | 2,622 MW | 857 MW | 1,107 MW | 177 MW |
| 2026-10-08T21:00Z | 3,658 MW | 2,625 MW | 883 MW | 1,185 MW | 231 MW |
| 2026-10-08T22:00Z | 3,927 MW | 2,626 MW | 912 MW | 1,014 MW | 234 MW |
| 2026-10-08T23:00Z | 3,944 MW | 2,626 MW | 978 MW | 947 MW | 415 MW |
| 2026-10-09T00:00Z | 4,051 MW | 2,624 MW | 1,024 MW | 675 MW | 384 MW |
| 2026-10-09T01:00Z | 4,051 MW | 2,627 MW | 1,026 MW | 507 MW | 264 MW |
| 2026-10-09T02:00Z | 4,122 MW | 2,626 MW | 818 MW | 305 MW | 182 MW |
| 2026-10-09T03:00Z | 4,093 MW | 2,629 MW | 801 MW | 177 MW | 168 MW |
| 2026-10-09T04:00Z | 3,891 MW | 2,629 MW | 820 MW | 137 MW | 85 MW |
| 2026-10-09T05:00Z | 3,585 MW | 2,631 MW | 865 MW | 371 MW | 42 MW |
| 2026-10-09T06:00Z | 3,373 MW | 2,628 MW | 902 MW | 317 MW | 30 MW |
| 2026-10-09T07:00Z | 3,350 MW | 2,633 MW | 953 MW | 101 MW | 8 MW |
| 2026-10-09T08:00Z | 3,233 MW | 2,633 MW | 961 MW | -12 MW | -28 MW |
| 2026-10-09T09:00Z | 2,940 MW | 2,637 MW | 788 MW | -9 MW | -30 MW |
| 2026-10-09T10:00Z | 2,938 MW | 2,634 MW | 769 MW | -8 MW | -12 MW |
| 2026-10-09T11:00Z | 2,943 MW | 2,639 MW | 772 MW | -7 MW | -36 MW |
| 2026-10-09T12:00Z | 3,006 MW | 2,637 MW | 1,011 MW | -9 MW | -485 MW |
| 2026-10-09T13:00Z | 3,033 MW | 2,640 MW | 1,160 MW | -32 MW | -206 MW |
| 2026-10-09T14:00Z | 3,091 MW | 2,638 MW | 1,093 MW | 370 MW | -449 MW |
| 2026-10-09T15:00Z | 3,062 MW | 2,636 MW | 824 MW | 817 MW | -707 MW |
| 2026-10-09T16:00Z | 3,130 MW | 2,627 MW | 747 MW | 924 MW | -627 MW |
| 2026-10-09T17:00Z | 3,149 MW | 2,623 MW | 669 MW | 864 MW | -196 MW |
| 2026-10-09T18:00Z | 3,150 MW | 2,624 MW | 632 MW | 909 MW | -75 MW |
| 2026-10-09T19:00Z | 3,198 MW | 2,621 MW | 673 MW | 835 MW | 302 MW |
| 2026-10-09T20:00Z | 3,407 MW | 2,624 MW | 775 MW | 1,014 MW | 375 MW |
| 2026-10-09T21:00Z | 3,610 MW | 2,624 MW | 927 MW | 1,078 MW | 383 MW |
| 2026-10-09T22:00Z | 3,689 MW | 2,630 MW | 873 MW | 1,159 MW | 392 MW |
| 2026-10-09T23:00Z | 3,688 MW | 2,628 MW | 906 MW | 860 MW | 432 MW |
| 2026-10-10T00:00Z | 3,722 MW | 2,629 MW | 1,082 MW | 507 MW | 108 MW |
| 2026-10-10T01:00Z | 3,769 MW | 2,630 MW | 1,074 MW | 286 MW | -98 MW |
| 2026-10-10T02:00Z | 3,701 MW | 2,625 MW | 869 MW | 501 MW | 260 MW |
| 2026-10-10T03:00Z | 3,521 MW | 2,630 MW | 927 MW | 504 MW | 325 MW |
| 2026-10-10T04:00Z | 3,347 MW | 2,631 MW | 762 MW | 228 MW | 180 MW |
| 2026-10-10T05:00Z | 3,183 MW | 2,635 MW | 828 MW | 158 MW | 190 MW |
| 2026-10-10T06:00Z | 3,184 MW | 2,635 MW | 714 MW | 72 MW | 103 MW |
| 2026-10-10T07:00Z | 3,220 MW | 2,632 MW | 739 MW | 14 MW | 27 MW |
| 2026-10-10T08:00Z | 3,151 MW | 2,634 MW | 620 MW | -107 MW | -267 MW |
| 2026-10-10T09:00Z | 3,144 MW | 2,635 MW | 607 MW | -166 MW | -354 MW |
| 2026-10-10T10:00Z | 3,145 MW | 2,634 MW | 566 MW | -186 MW | -340 MW |
| 2026-10-10T11:00Z | 3,152 MW | 2,634 MW | 480 MW | -208 MW | -502 MW |
| 2026-10-10T12:00Z | 3,150 MW | 2,636 MW | 479 MW | -228 MW | -179 MW |
| 2026-10-10T13:00Z | 3,149 MW | 2,633 MW | 612 MW | -126 MW | -115 MW |
| 2026-10-10T14:00Z | 3,228 MW | 2,638 MW | 732 MW | 10 MW | -310 MW |
| 2026-10-10T15:00Z | 3,117 MW | 2,630 MW | 644 MW | 407 MW | -545 MW |
| 2026-10-10T16:00Z | 3,172 MW | 2,626 MW | 633 MW | 352 MW | -643 MW |
| 2026-10-10T17:00Z | 3,124 MW | 2,624 MW | 634 MW | 453 MW | -176 MW |
| 2026-10-10T18:00Z | 3,243 MW | 2,624 MW | 645 MW | 580 MW | -16 MW |
| 2026-10-10T19:00Z | 3,293 MW | 2,616 MW | 643 MW | 807 MW | 192 MW |
| 2026-10-10T20:00Z | 3,337 MW | 2,619 MW | 644 MW | 523 MW | 143 MW |
| 2026-10-10T21:00Z | 3,398 MW | 2,621 MW | 644 MW | 304 MW | 197 MW |
| 2026-10-10T22:00Z | 3,478 MW | 2,614 MW | 643 MW | 259 MW | 62 MW |
| 2026-10-10T23:00Z | 3,520 MW | 2,615 MW | 664 MW | 338 MW | 147 MW |
| 2026-10-11T00:00Z | 3,546 MW | 2,620 MW | 656 MW | 28 MW | -99 MW |
| 2026-10-11T01:00Z | 3,221 MW | 2,626 MW | 732 MW | 53 MW | -3 MW |
| 2026-10-11T02:00Z | 3,167 MW | 2,628 MW | 721 MW | 254 MW | 609 MW |
| 2026-10-11T03:00Z | 3,099 MW | 2,628 MW | 696 MW | 537 MW | 548 MW |
| 2026-10-11T04:00Z | 3,116 MW | 2,621 MW | 720 MW | 581 MW | 604 MW |
| 2026-10-11T05:00Z | 3,062 MW | 2,619 MW | 755 MW | 380 MW | 328 MW |
| 2026-10-11T06:00Z | 3,066 MW | 2,616 MW | 734 MW | 124 MW | 104 MW |
| 2026-10-11T07:00Z | 3,006 MW | 2,618 MW | 812 MW | 53 MW | -63 MW |
| 2026-10-11T08:00Z | 3,005 MW | 2,620 MW | 789 MW | -21 MW | -66 MW |
| 2026-10-11T09:00Z | 3,014 MW | 2,619 MW | 709 MW | -12 MW | -7 MW |
| 2026-10-11T10:00Z | 3,019 MW | 2,617 MW | 799 MW | -1 MW | -87 MW |
| 2026-10-11T11:00Z | 2,933 MW | 2,616 MW | 859 MW | -7 MW | -215 MW |
| 2026-10-11T12:00Z | 2,951 MW | 2,615 MW | 828 MW | -4 MW | 2 MW |
| 2026-10-11T13:00Z | 2,973 MW | 2,621 MW | 927 MW | 2 MW | -19 MW |
| 2026-10-11T14:00Z | 3,017 MW | 2,620 MW | 932 MW | 294 MW | -346 MW |
| 2026-10-11T15:00Z | 2,891 MW | 2,618 MW | 932 MW | 643 MW | -641 MW |
| 2026-10-11T16:00Z | 2,849 MW | 2,617 MW | 889 MW | 668 MW | -584 MW |
| 2026-10-11T17:00Z | 2,886 MW | 2,615 MW | 704 MW | 815 MW | -536 MW |
| 2026-10-11T18:00Z | 2,907 MW | 2,617 MW | 546 MW | 843 MW | -330 MW |
| 2026-10-11T19:00Z | 3,064 MW | 2,622 MW | 450 MW | 834 MW | -33 MW |
| 2026-10-11T20:00Z | 3,144 MW | 2,626 MW | 449 MW | 1,099 MW | 154 MW |
| 2026-10-11T21:00Z | 2,971 MW | 2,634 MW | 449 MW | 1,200 MW | 311 MW |
| 2026-10-11T22:00Z | 2,914 MW | 2,633 MW | 459 MW | 1,162 MW | 343 MW |
| 2026-10-11T23:00Z | 3,066 MW | 2,632 MW | 507 MW | 829 MW | 403 MW |
| 2026-10-12T00:00Z | 3,224 MW | 2,632 MW | 571 MW | 353 MW | 196 MW |
| 2026-10-12T01:00Z | 3,123 MW | 2,630 MW | 681 MW | 318 MW | 24 MW |
| 2026-10-12T02:00Z | 2,959 MW | 2,633 MW | 684 MW | 406 MW | 474 MW |
| 2026-10-12T03:00Z | 2,929 MW | 2,632 MW | 716 MW | 407 MW | 317 MW |
| 2026-10-12T04:00Z | 2,931 MW | 2,631 MW | 701 MW | 405 MW | 315 MW |
| 2026-10-12T05:00Z | 2,929 MW | 2,629 MW | 744 MW | 270 MW | 206 MW |
| 2026-10-12T06:00Z | 2,929 MW | 2,632 MW | 744 MW | 76 MW | 62 MW |
| 2026-10-12T07:00Z | 2,937 MW | 2,633 MW | 745 MW | -13 MW | 21 MW |
| 2026-10-12T08:00Z | 2,945 MW | 2,630 MW | 741 MW | -3 MW | -4 MW |
| 2026-10-12T09:00Z | 2,939 MW | 2,631 MW | 743 MW | -8 MW | -1 MW |
| 2026-10-12T10:00Z | 2,939 MW | 2,628 MW | 742 MW | -30 MW | -4 MW |
| 2026-10-12T11:00Z | 2,944 MW | 2,634 MW | 747 MW | -13 MW | -15 MW |
| 2026-10-12T12:00Z | 2,933 MW | 2,631 MW | 737 MW | -9 MW | -119 MW |
| 2026-10-12T13:00Z | 2,943 MW | 2,635 MW | 752 MW | 5 MW | -40 MW |
| 2026-10-12T14:00Z | 2,948 MW | 2,637 MW | 753 MW | 130 MW | -145 MW |
| 2026-10-12T15:00Z | 2,969 MW | 2,633 MW | 753 MW | 566 MW | -381 MW |
| 2026-10-12T16:00Z | 2,930 MW | 2,620 MW | 633 MW | 846 MW | -754 MW |
| 2026-10-12T17:00Z | 2,959 MW | 2,626 MW | 557 MW | 573 MW | -725 MW |
| 2026-10-12T18:00Z | 3,021 MW | 2,627 MW | 706 MW | 497 MW | -391 MW |
| 2026-10-12T19:00Z | 3,126 MW | 2,631 MW | 749 MW | 457 MW | -187 MW |
| 2026-10-12T20:00Z | 3,174 MW | 2,628 MW | 641 MW | 400 MW | -140 MW |
| 2026-10-12T21:00Z | 3,356 MW | 2,637 MW | 549 MW | 902 MW | -5 MW |
| 2026-10-12T22:00Z | 3,403 MW | 2,633 MW | 588 MW | 408 MW | 127 MW |
| 2026-10-12T23:00Z | 3,408 MW | 2,635 MW | 634 MW | 641 MW | 303 MW |
| 2026-10-13T00:00Z | 3,354 MW | 2,636 MW | 740 MW | 536 MW | 254 MW |
| 2026-10-13T01:00Z | 3,366 MW | 2,638 MW | 751 MW | 405 MW | 355 MW |
| 2026-10-13T02:00Z | 3,285 MW | 2,633 MW | 631 MW | 572 MW | 574 MW |
| 2026-10-13T03:00Z | 3,145 MW | 2,632 MW | 672 MW | 294 MW | 534 MW |
| 2026-10-13T04:00Z | 2,986 MW | 2,637 MW | 686 MW | 132 MW | 306 MW |
| 2026-10-13T05:00Z | 2,960 MW | 2,640 MW | 680 MW | 38 MW | 74 MW |
| 2026-10-13T06:00Z | 2,969 MW | 2,640 MW | 627 MW | -5 MW | 12 MW |
| 2026-10-13T07:00Z | 3,013 MW | 2,643 MW | 580 MW | -11 MW | 5 MW |
| 2026-10-13T08:00Z | 3,000 MW | 2,642 MW | 525 MW | -12 MW | 0 MW |
| 2026-10-13T09:00Z | 3,004 MW | 2,640 MW | 518 MW | -14 MW | -3 MW |
| 2026-10-13T10:00Z | 3,000 MW | 2,641 MW | 513 MW | -13 MW | 0 MW |
| 2026-10-13T11:00Z | 2,980 MW | 2,638 MW | 517 MW | -8 MW | -2 MW |
| 2026-10-13T12:00Z | 3,010 MW | 2,639 MW | 544 MW | -9 MW | -2 MW |
| 2026-10-13T13:00Z | 3,405 MW | 2,639 MW | 644 MW | -9 MW | -9 MW |
| 2026-10-13T14:00Z | 3,372 MW | 2,639 MW | 655 MW | 106 MW | -137 MW |
| 2026-10-13T15:00Z | 2,974 MW | 2,645 MW | 659 MW | 63 MW | -415 MW |
| 2026-10-13T16:00Z | 2,934 MW | 2,645 MW | 610 MW | 251 MW | -556 MW |
| 2026-10-13T17:00Z | 2,911 MW | 2,643 MW | 505 MW | 388 MW | -687 MW |
| 2026-10-13T18:00Z | 2,928 MW | 2,643 MW | 475 MW | 401 MW | -655 MW |
| 2026-10-13T19:00Z | 2,937 MW | 2,641 MW | 369 MW | 626 MW | -328 MW |
| 2026-10-13T20:00Z | 2,642 MW | 2,643 MW | 314 MW | 793 MW | -127 MW |
| 2026-10-13T21:00Z | 1,925 MW | 2,644 MW | 327 MW | 1,021 MW | 106 MW |
| 2026-10-13T22:00Z | 1,751 MW | 2,644 MW | 372 MW | 972 MW | 199 MW |
| 2026-10-13T23:00Z | 2,228 MW | 2,643 MW | 318 MW | 478 MW | 256 MW |
| 2026-10-14T00:00Z | 3,118 MW | 2,642 MW | 458 MW | 552 MW | 345 MW |
| 2026-10-14T01:00Z | 3,186 MW | 2,644 MW | 516 MW | 311 MW | 526 MW |
| 2026-10-14T02:00Z | 3,201 MW | 2,644 MW | 461 MW | 355 MW | 534 MW |
| 2026-10-14T03:00Z | 3,195 MW | 2,648 MW | 470 MW | 517 MW | 398 MW |
| 2026-10-14T04:00Z | 2,978 MW | 2,650 MW | 531 MW | 286 MW | 194 MW |
| 2026-10-14T05:00Z | 3,002 MW | 2,655 MW | 592 MW | 93 MW | -10 MW |
| 2026-10-14T06:00Z | 3,089 MW | 2,657 MW | 592 MW | 36 MW | 2 MW |
| 2026-10-14T07:00Z | 3,399 MW | 2,658 MW | 598 MW | 21 MW | 3 MW |
| 2026-10-14T08:00Z | 3,225 MW | 2,661 MW | 593 MW | 14 MW | -5 MW |
| 2026-10-14T09:00Z | 2,928 MW | 2,659 MW | 594 MW | -8 MW | -249 MW |
| 2026-10-14T10:00Z | 2,975 MW | 2,660 MW | 484 MW | -8 MW | -261 MW |
| 2026-10-14T11:00Z | 2,975 MW | 2,663 MW | 459 MW | -17 MW | -260 MW |
| 2026-10-14T12:00Z | 2,946 MW | 2,665 MW | 509 MW | 1 MW | -187 MW |
| 2026-10-14T13:00Z | 3,063 MW | 2,663 MW | 598 MW | 10 MW | -68 MW |
| 2026-10-14T14:00Z | 2,974 MW | 2,667 MW | 562 MW | 511 MW | -80 MW |
| 2026-10-14T15:00Z | 2,460 MW | 2,661 MW | 452 MW | 775 MW | -355 MW |
| 2026-10-14T16:00Z | 1,663 MW | 2,648 MW | 354 MW | 900 MW | -333 MW |
| 2026-10-14T17:00Z | 1,613 MW | 2,658 MW | 319 MW | 924 MW | -295 MW |
| 2026-10-14T18:00Z | 1,552 MW | 2,656 MW | 351 MW | 900 MW | -304 MW |
| 2026-10-14T19:00Z | 1,540 MW | 2,650 MW | 355 MW | 1,068 MW | -4 MW |
| 2026-10-14T20:00Z | 1,539 MW | 2,653 MW | 335 MW | 704 MW | 144 MW |
| 2026-10-14T21:00Z | 1,608 MW | 2,653 MW | 319 MW | 743 MW | 147 MW |
| 2026-10-14T22:00Z | 1,625 MW | 2,653 MW | 314 MW | 676 MW | 172 MW |
| 2026-10-14T23:00Z | 2,082 MW | 2,654 MW | 313 MW | 720 MW | 170 MW |
| 2026-10-15T00:00Z | 3,223 MW | 2,650 MW | 397 MW | 405 MW | 151 MW |
| 2026-10-15T01:00Z | 3,249 MW | 2,652 MW | 461 MW | 521 MW | 310 MW |
| 2026-10-15T02:00Z | 3,329 MW | 2,648 MW | 459 MW | 496 MW | 353 MW |
| 2026-10-15T03:00Z | 3,275 MW | 2,648 MW | 513 MW | 515 MW | 291 MW |
| 2026-10-15T04:00Z | 3,333 MW | 2,648 MW | 497 MW | 265 MW | 98 MW |
| 2026-10-15T05:00Z | 3,155 MW | 2,649 MW | 518 MW | 380 MW | 41 MW |
| 2026-10-15T06:00Z | 3,033 MW | 2,651 MW | 500 MW | 278 MW | -6 MW |
| 2026-10-15T07:00Z | 3,022 MW | 2,651 MW | 474 MW | 17 MW | -10 MW |
| 2026-10-15T08:00Z | 2,940 MW | 2,652 MW | 472 MW | -10 MW | -13 MW |
| 2026-10-15T09:00Z | 2,863 MW | 2,654 MW | 447 MW | -13 MW | -204 MW |
| 2026-10-15T10:00Z | 2,817 MW | 2,660 MW | 454 MW | -55 MW | -214 MW |
| 2026-10-15T11:00Z | 2,805 MW | 2,660 MW | 455 MW | -25 MW | -213 MW |
| 2026-10-15T12:00Z | 2,860 MW | 2,661 MW | 479 MW | 34 MW | -163 MW |
| 2026-10-15T13:00Z | 2,887 MW | 2,663 MW | 523 MW | 25 MW | -157 MW |
| 2026-10-15T14:00Z | 2,603 MW | 2,662 MW | 547 MW | 536 MW | -228 MW |
| 2026-10-15T15:00Z | 1,612 MW | 2,655 MW | 448 MW | 812 MW | -130 MW |
| 2026-10-15T16:00Z | 1,467 MW | 2,652 MW | 396 MW | 863 MW | -286 MW |
| 2026-10-15T17:00Z | 1,385 MW | 2,647 MW | 327 MW | 904 MW | -289 MW |
| 2026-10-15T18:00Z | 1,394 MW | 2,649 MW | 315 MW | 816 MW | -216 MW |
| 2026-10-15T19:00Z | 1,489 MW | 2,648 MW | 314 MW | 921 MW | -205 MW |
| 2026-10-15T20:00Z | 1,579 MW | 2,646 MW | 313 MW | 702 MW | -106 MW |
| 2026-10-15T21:00Z | 1,644 MW | 2,648 MW | 314 MW | 554 MW | -87 MW |
| 2026-10-15T22:00Z | 1,695 MW | 2,647 MW | 314 MW | 519 MW | 6 MW |
| 2026-10-15T23:00Z | 1,736 MW | 2,644 MW | 314 MW | 727 MW | 164 MW |
| 2026-10-16T00:00Z | 2,540 MW | 2,645 MW | 371 MW | 491 MW | 153 MW |
| 2026-10-16T01:00Z | 3,105 MW | 2,644 MW | 491 MW | 132 MW | 3 MW |
| 2026-10-16T02:00Z | 3,192 MW | 2,641 MW | 422 MW | 296 MW | 451 MW |
| 2026-10-16T03:00Z | 2,946 MW | 2,638 MW | 404 MW | 627 MW | 392 MW |
| 2026-10-16T04:00Z | 3,091 MW | 2,638 MW | 429 MW | 696 MW | 515 MW |
| 2026-10-16T05:00Z | 3,115 MW | 2,641 MW | 455 MW | 354 MW | 456 MW |
| 2026-10-16T06:00Z | 3,140 MW | 2,643 MW | 454 MW | 143 MW | 135 MW |
| 2026-10-16T07:00Z | 3,148 MW | 2,641 MW | 454 MW | 46 MW | 66 MW |
| 2026-10-16T08:00Z | 3,134 MW | 2,644 MW | 455 MW | -9 MW | -9 MW |
| 2026-10-16T09:00Z | 3,048 MW | 2,649 MW | 453 MW | 1 MW | -2 MW |
| 2026-10-16T10:00Z | 2,934 MW | 2,644 MW | 455 MW | -21 MW | -16 MW |
| 2026-10-16T11:00Z | 2,937 MW | 2,646 MW | 456 MW | -10 MW | -58 MW |
| 2026-10-16T12:00Z | 2,937 MW | 2,647 MW | 472 MW | 4 MW | -21 MW |
| 2026-10-16T13:00Z | 2,982 MW | 2,647 MW | 457 MW | -7 MW | 2 MW |
| 2026-10-16T14:00Z | 2,902 MW | 2,646 MW | 406 MW | 381 MW | -99 MW |
| 2026-10-16T15:00Z | 2,362 MW | 2,645 MW | 317 MW | 796 MW | -596 MW |
| 2026-10-16T16:00Z | 2,097 MW | 2,635 MW | 316 MW | 839 MW | -744 MW |
| 2026-10-16T17:00Z | 2,173 MW | 2,639 MW | 314 MW | 906 MW | -660 MW |
| 2026-10-16T18:00Z | 2,198 MW | 2,641 MW | 314 MW | 770 MW | -633 MW |
| 2026-10-16T19:00Z | 1,983 MW | 2,637 MW | 314 MW | 752 MW | -234 MW |
| 2026-10-16T20:00Z | 2,036 MW | 2,642 MW | 313 MW | 847 MW | 95 MW |
| 2026-10-16T21:00Z | 1,810 MW | 2,639 MW | 314 MW | 768 MW | 145 MW |
| 2026-10-16T22:00Z | 1,807 MW | 2,640 MW | 312 MW | 702 MW | 180 MW |
| 2026-10-16T23:00Z | 2,337 MW | 2,640 MW | 330 MW | 562 MW | 280 MW |
| 2026-10-17T00:00Z | 3,196 MW | 2,642 MW | 483 MW | 478 MW | 281 MW |
| 2026-10-17T01:00Z | 3,251 MW | 2,644 MW | 496 MW | 458 MW | 184 MW |
| 2026-10-17T02:00Z | 3,146 MW | 2,646 MW | 362 MW | 506 MW | 481 MW |
| 2026-10-17T03:00Z | 3,077 MW | 2,648 MW | 315 MW | 362 MW | 480 MW |
| 2026-10-17T04:00Z | 3,182 MW | 2,650 MW | 314 MW | 437 MW | 381 MW |
| 2026-10-17T05:00Z | 3,154 MW | 2,650 MW | 313 MW | 132 MW | 137 MW |
| 2026-10-17T06:00Z | 3,158 MW | 2,650 MW | 323 MW | 117 MW | 49 MW |
| 2026-10-17T07:00Z | 3,164 MW | 2,648 MW | 445 MW | 7 MW | 0 MW |
| 2026-10-17T08:00Z | 3,215 MW | 2,651 MW | 441 MW | -10 MW | -3 MW |
| 2026-10-17T09:00Z | 3,079 MW | 2,652 MW | 454 MW | -7 MW | -237 MW |
| 2026-10-17T10:00Z | 3,002 MW | 2,650 MW | 346 MW | -6 MW | -250 MW |
| 2026-10-17T11:00Z | 3,016 MW | 2,652 MW | 314 MW | -48 MW | -251 MW |
| 2026-10-17T12:00Z | 2,953 MW | 2,656 MW | 313 MW | -17 MW | -206 MW |
| 2026-10-17T13:00Z | 2,913 MW | 2,656 MW | 316 MW | 0 MW | -44 MW |
| 2026-10-17T14:00Z | 3,027 MW | 2,659 MW | 367 MW | 82 MW | -104 MW |
| 2026-10-17T15:00Z | 2,993 MW | 2,657 MW | 364 MW | 123 MW | -202 MW |
| 2026-10-17T16:00Z | 2,861 MW | 2,654 MW | 350 MW | 511 MW | -216 MW |
| 2026-10-17T17:00Z | 2,873 MW | 2,654 MW | 315 MW | 357 MW | -218 MW |
| 2026-10-17T18:00Z | 2,938 MW | 2,651 MW | 314 MW | 340 MW | -292 MW |
| 2026-10-17T19:00Z | 2,850 MW | 2,652 MW | 314 MW | 400 MW | -245 MW |
| 2026-10-17T20:00Z | 2,860 MW | 2,656 MW | 329 MW | 521 MW | -107 MW |
| 2026-10-17T21:00Z | 3,030 MW | 2,655 MW | 319 MW | 804 MW | 67 MW |
| 2026-10-17T22:00Z | 3,084 MW | 2,655 MW | 325 MW | 258 MW | 76 MW |
| 2026-10-17T23:00Z | 3,102 MW | 2,655 MW | 402 MW | 209 MW | 215 MW |
| 2026-10-18T00:00Z | 3,119 MW | 2,661 MW | 471 MW | 153 MW | -6 MW |
| 2026-10-18T01:00Z | 3,135 MW | 2,659 MW | 474 MW | 20 MW | -78 MW |
| 2026-10-18T02:00Z | 3,120 MW | 2,660 MW | 638 MW | 316 MW | 239 MW |
| 2026-10-18T03:00Z | 3,227 MW | 2,660 MW | 524 MW | 168 MW | 363 MW |
| 2026-10-18T04:00Z | 3,223 MW | 2,656 MW | 410 MW | 171 MW | 388 MW |
| 2026-10-18T05:00Z | 3,231 MW | 2,654 MW | 363 MW | 175 MW | 369 MW |
| 2026-10-18T06:00Z | 3,230 MW | 2,652 MW | 314 MW | 278 MW | 161 MW |
| 2026-10-18T07:00Z | 3,213 MW | 2,650 MW | 313 MW | 385 MW | 179 MW |
| 2026-10-18T08:00Z | 3,197 MW | 2,652 MW | 315 MW | 210 MW | 87 MW |
| 2026-10-18T09:00Z | 3,101 MW | 2,652 MW | 314 MW | 52 MW | 3 MW |
| 2026-10-18T10:00Z | 2,951 MW | 2,653 MW | 322 MW | 89 MW | -1 MW |
| 2026-10-18T11:00Z | 2,952 MW | 2,654 MW | 381 MW | -5 MW | -247 MW |
| 2026-10-18T12:00Z | 2,976 MW | 2,655 MW | 366 MW | -12 MW | -253 MW |
| 2026-10-18T13:00Z | 2,982 MW | 2,656 MW | 484 MW | -34 MW | -251 MW |
| 2026-10-18T14:00Z | 3,052 MW | 2,656 MW | 494 MW | 226 MW | -152 MW |
| 2026-10-18T15:00Z | 3,011 MW | 2,654 MW | 472 MW | 671 MW | -96 MW |
| 2026-10-18T16:00Z | 2,996 MW | 2,655 MW | 357 MW | 774 MW | -67 MW |
| 2026-10-18T17:00Z | 3,048 MW | 2,649 MW | 321 MW | 840 MW | -6 MW |
| 2026-10-18T18:00Z | 3,089 MW | 2,649 MW | 318 MW | 738 MW | -304 MW |
| 2026-10-18T19:00Z | 3,121 MW | 2,651 MW | 313 MW | 468 MW | -340 MW |
| 2026-10-18T20:00Z | 3,180 MW | 2,652 MW | 320 MW | 565 MW | -314 MW |
| 2026-10-18T21:00Z | 2,755 MW | 2,652 MW | 319 MW | 520 MW | -443 MW |
| 2026-10-18T22:00Z | 2,849 MW | 2,650 MW | 315 MW | 1,009 MW | -89 MW |
| 2026-10-18T23:00Z | 2,957 MW | 2,648 MW | 362 MW | 889 MW | 238 MW |
| 2026-10-19T00:00Z | 3,156 MW | 2,648 MW | 485 MW | 682 MW | 555 MW |
| 2026-10-19T01:00Z | 3,206 MW | 2,648 MW | 517 MW | 346 MW | 223 MW |
| 2026-10-19T02:00Z | 3,191 MW | 2,647 MW | 519 MW | 255 MW | 326 MW |
| 2026-10-19T03:00Z | 3,187 MW | 2,645 MW | 518 MW | 527 MW | 487 MW |
| 2026-10-19T04:00Z | 3,209 MW | 2,646 MW | 516 MW | 363 MW | 311 MW |
| 2026-10-19T05:00Z | 3,209 MW | 2,649 MW | 515 MW | 167 MW | 89 MW |
| 2026-10-19T06:00Z | 3,188 MW | 2,652 MW | 510 MW | 147 MW | 16 MW |
| 2026-10-19T07:00Z | 3,043 MW | 2,652 MW | 477 MW | 24 MW | -3 MW |
| 2026-10-19T08:00Z | 2,915 MW | 2,655 MW | 512 MW | -4 MW | -1 MW |
| 2026-10-19T09:00Z | 2,937 MW | 2,654 MW | 477 MW | -10 MW | -1 MW |
| 2026-10-19T10:00Z | 2,905 MW | 2,652 MW | 384 MW | -28 MW | -13 MW |
| 2026-10-19T11:00Z | 2,889 MW | 2,655 MW | 362 MW | -7 MW | -292 MW |
| 2026-10-19T12:00Z | 2,902 MW | 2,655 MW | 401 MW | -7 MW | -254 MW |
| 2026-10-19T13:00Z | 2,935 MW | 2,658 MW | 513 MW | -4 MW | -157 MW |
| 2026-10-19T14:00Z | 3,017 MW | 2,654 MW | 450 MW | 331 MW | -84 MW |
| 2026-10-19T15:00Z | 2,729 MW | 2,654 MW | 368 MW | 511 MW | -183 MW |
| 2026-10-19T16:00Z | 2,573 MW | 2,652 MW | 314 MW | 659 MW | -170 MW |
| 2026-10-19T17:00Z | 2,958 MW | 2,648 MW | 446 MW | 493 MW | -96 MW |
| 2026-10-19T18:00Z | 3,051 MW | 2,644 MW | 516 MW | 452 MW | -228 MW |
| 2026-10-19T19:00Z | 3,127 MW | 2,640 MW | 519 MW | 543 MW | -394 MW |
| 2026-10-19T20:00Z | 3,081 MW | 2,643 MW | 532 MW | 713 MW | -283 MW |
| 2026-10-19T21:00Z | 2,833 MW | 2,641 MW | 538 MW | 701 MW | -115 MW |
| 2026-10-19T22:00Z | 2,566 MW | 2,640 MW | 483 MW | 746 MW | 29 MW |
| 2026-10-19T23:00Z | 3,116 MW | 2,640 MW | 431 MW | 771 MW | 171 MW |
| 2026-10-20T00:00Z | 3,574 MW | 2,641 MW | 498 MW | 684 MW | 416 MW |
| 2026-10-20T01:00Z | 3,574 MW | 2,631 MW | 567 MW | 617 MW | 361 MW |
| 2026-10-20T02:00Z | 3,546 MW | 2,640 MW | 650 MW | 363 MW | 366 MW |
| 2026-10-20T03:00Z | 3,637 MW | 2,639 MW | 665 MW | 426 MW | 296 MW |
| 2026-10-20T04:00Z | 3,561 MW | 2,641 MW | 712 MW | 202 MW | 197 MW |
| 2026-10-20T05:00Z | 3,581 MW | 2,642 MW | 734 MW | 39 MW | 66 MW |
| 2026-10-20T06:00Z | 3,329 MW | 2,644 MW | 735 MW | -8 MW | -4 MW |
| 2026-10-20T07:00Z | 3,111 MW | 2,644 MW | 720 MW | -9 MW | -6 MW |
| 2026-10-20T08:00Z | 3,107 MW | 2,649 MW | 677 MW | -4 MW | -4 MW |
| 2026-10-20T09:00Z | 3,108 MW | 2,646 MW | 659 MW | -8 MW | -3 MW |
| 2026-10-20T10:00Z | 3,115 MW | 2,650 MW | 660 MW | -11 MW | -6 MW |
| 2026-10-20T11:00Z | 3,109 MW | 2,648 MW | 666 MW | -13 MW | -140 MW |
| 2026-10-20T12:00Z | 3,105 MW | 2,651 MW | 776 MW | 4 MW | -53 MW |
| 2026-10-20T13:00Z | 3,113 MW | 2,649 MW | 788 MW | -30 MW | -73 MW |
| 2026-10-20T14:00Z | 3,158 MW | 2,651 MW | 880 MW | 294 MW | -44 MW |
| 2026-10-20T15:00Z | 2,841 MW | 2,648 MW | 797 MW | 548 MW | -497 MW |
| 2026-10-20T16:00Z | 2,729 MW | 2,639 MW | 798 MW | 622 MW | -580 MW |
| 2026-10-20T17:00Z | 2,857 MW | 2,635 MW | 769 MW | 785 MW | -424 MW |
| 2026-10-20T18:00Z | 3,100 MW | 2,633 MW | 759 MW | 929 MW | -136 MW |
| 2026-10-20T19:00Z | 3,406 MW | 2,633 MW | 777 MW | 850 MW | -268 MW |
| 2026-10-20T20:00Z | 2,939 MW | 2,635 MW | 770 MW | 988 MW | -185 MW |
| 2026-10-20T21:00Z | 2,518 MW | 2,636 MW | 667 MW | 777 MW | 128 MW |
| 2026-10-20T22:00Z | 3,061 MW | 2,636 MW | 742 MW | 922 MW | 29 MW |
| 2026-10-20T23:00Z | 3,490 MW | 2,633 MW | 868 MW | 699 MW | 301 MW |
| 2026-10-21T00:00Z | 3,660 MW | 2,632 MW | 948 MW | 597 MW | 472 MW |
| 2026-10-21T01:00Z | 3,547 MW | 2,631 MW | 939 MW | 611 MW | 324 MW |
| 2026-10-21T02:00Z | 3,534 MW | 2,635 MW | 963 MW | 182 MW | 352 MW |
| 2026-10-21T03:00Z | 3,304 MW | 2,634 MW | 986 MW | 472 MW | 281 MW |
| 2026-10-21T04:00Z | 3,473 MW | 2,638 MW | 1,065 MW | 154 MW | 141 MW |
| 2026-10-21T05:00Z | 3,485 MW | 2,639 MW | 1,059 MW | 57 MW | 28 MW |
| 2026-10-21T06:00Z | 3,444 MW | 2,636 MW | 1,050 MW | 23 MW | -2 MW |
| 2026-10-21T07:00Z | 3,328 MW | 2,637 MW | 1,027 MW | -13 MW | 0 MW |
| 2026-10-21T08:00Z | 3,159 MW | 2,638 MW | 999 MW | -10 MW | -3 MW |
| 2026-10-21T09:00Z | 3,192 MW | 2,634 MW | 994 MW | -27 MW | -10 MW |
| 2026-10-21T10:00Z | 3,279 MW | 2,639 MW | 996 MW | -36 MW | -1 MW |
| 2026-10-21T11:00Z | 3,463 MW | 2,636 MW | 1,000 MW | -15 MW | -5 MW |
| 2026-10-21T12:00Z | 3,630 MW | 2,640 MW | 1,008 MW | -11 MW | -6 MW |
| 2026-10-21T13:00Z | 3,462 MW | 2,640 MW | 1,033 MW | -12 MW | -22 MW |
| 2026-10-21T14:00Z | 3,406 MW | 2,635 MW | 1,030 MW | 168 MW | -70 MW |
| 2026-10-21T15:00Z | 3,474 MW | 2,633 MW | 1,034 MW | 172 MW | -106 MW |
| 2026-10-21T16:00Z | 3,487 MW | 2,634 MW | 1,057 MW | 272 MW | 81 MW |
| 2026-10-21T17:00Z | 3,569 MW | 2,629 MW | 1,076 MW | 379 MW | 9 MW |
| 2026-10-21T18:00Z | 3,598 MW | 2,629 MW | 1,073 MW | 607 MW | -525 MW |
| 2026-10-21T19:00Z | 3,651 MW | 2,628 MW | 1,072 MW | 760 MW | -439 MW |
| 2026-10-21T20:00Z | 3,765 MW | 2,627 MW | 1,038 MW | 630 MW | -521 MW |
| 2026-10-21T21:00Z | 3,757 MW | 2,629 MW | 1,034 MW | 506 MW | -539 MW |
| 2026-10-21T22:00Z | 3,767 MW | 2,629 MW | 1,034 MW | 171 MW | -242 MW |
| 2026-10-21T23:00Z | 3,767 MW | 2,630 MW | 1,029 MW | 123 MW | 93 MW |
| 2026-10-22T00:00Z | 3,774 MW | 2,629 MW | 1,034 MW | 284 MW | 513 MW |
| 2026-10-22T01:00Z | 3,818 MW | 2,628 MW | 1,033 MW | 155 MW | 328 MW |
| 2026-10-22T02:00Z | 3,826 MW | 2,620 MW | 1,035 MW | 152 MW | 295 MW |
| 2026-10-22T03:00Z | 3,585 MW | 2,625 MW | 1,025 MW | 247 MW | 501 MW |
| 2026-10-22T04:00Z | 3,649 MW | 2,624 MW | 922 MW | 69 MW | 229 MW |
| 2026-10-22T05:00Z | 3,585 MW | 2,623 MW | 870 MW | 34 MW | 97 MW |
| 2026-10-22T06:00Z | 3,533 MW | 2,628 MW | 806 MW | -5 MW | 0 MW |
| 2026-10-22T07:00Z | 3,275 MW | 2,629 MW | 789 MW | 9 MW | -4 MW |
| 2026-10-22T08:00Z | 3,262 MW | 2,627 MW | 785 MW | -21 MW | -3 MW |
| 2026-10-22T09:00Z | 3,170 MW | 2,628 MW | 786 MW | -131 MW | -241 MW |
| 2026-10-22T10:00Z | 3,062 MW | 2,632 MW | 781 MW | -108 MW | -232 MW |
| 2026-10-22T11:00Z | 3,097 MW | 2,630 MW | 776 MW | -135 MW | -248 MW |
| 2026-10-22T12:00Z | 3,137 MW | 2,634 MW | 789 MW | -33 MW | -205 MW |
| 2026-10-22T13:00Z | 3,235 MW | 2,634 MW | 765 MW | -2 MW | -178 MW |
| 2026-10-22T14:00Z | 3,371 MW | 2,630 MW | 747 MW | 53 MW | -199 MW |
| 2026-10-22T15:00Z | 3,173 MW | 2,634 MW | 782 MW | 292 MW | -482 MW |
| 2026-10-22T16:00Z | 3,145 MW | 2,633 MW | 787 MW | 373 MW | -319 MW |
| 2026-10-22T17:00Z | 2,945 MW | 2,628 MW | 791 MW | 520 MW | -543 MW |
| 2026-10-22T18:00Z | 3,052 MW | 2,627 MW | 799 MW | 668 MW | -366 MW |
| 2026-10-22T19:00Z | 3,106 MW | 2,625 MW | 806 MW | 749 MW | -69 MW |
| 2026-10-22T20:00Z | 3,091 MW | 2,625 MW | 799 MW | 662 MW | 97 MW |
| 2026-10-22T21:00Z | 2,938 MW | 2,627 MW | 652 MW | 750 MW | 136 MW |
| 2026-10-22T22:00Z | 2,524 MW | 2,631 MW | 542 MW | 1,024 MW | 155 MW |
| 2026-10-22T23:00Z | 3,156 MW | 2,633 MW | 618 MW | 771 MW | 130 MW |
| 2026-10-23T00:00Z | 3,277 MW | 2,639 MW | 762 MW | 141 MW | -1 MW |
| 2026-10-23T01:00Z | 3,278 MW | 2,640 MW | 807 MW | 101 MW | -3 MW |
| 2026-10-23T02:00Z | 3,093 MW | 2,642 MW | 752 MW | 11 MW | 4 MW |
| 2026-10-23T03:00Z | 3,068 MW | 2,647 MW | 619 MW | 328 MW | 426 MW |
| 2026-10-23T04:00Z | 3,043 MW | 2,648 MW | 543 MW | 213 MW | 271 MW |
| 2026-10-23T05:00Z | 2,898 MW | 2,650 MW | 504 MW | 400 MW | 371 MW |
| 2026-10-23T06:00Z | 2,857 MW | 2,650 MW | 352 MW | 439 MW | 532 MW |
| 2026-10-23T07:00Z | 2,951 MW | 2,652 MW | 459 MW | 211 MW | 437 MW |
| 2026-10-23T08:00Z | 2,969 MW | 2,655 MW | 521 MW | 29 MW | 84 MW |
| 2026-10-23T09:00Z | 2,952 MW | 2,655 MW | 558 MW | -10 MW | -3 MW |
| 2026-10-23T10:00Z | 2,936 MW | 2,655 MW | 574 MW | -72 MW | -162 MW |
| 2026-10-23T11:00Z | 2,953 MW | 2,658 MW | 488 MW | -104 MW | -262 MW |
| 2026-10-23T12:00Z | 2,959 MW | 2,658 MW | 581 MW | -60 MW | -124 MW |
| 2026-10-23T13:00Z | 2,963 MW | 2,660 MW | 485 MW | -161 MW | -457 MW |
| 2026-10-23T14:00Z | 2,789 MW | 2,662 MW | 425 MW | 149 MW | -575 MW |
| 2026-10-23T15:00Z | 2,362 MW | 2,660 MW | 325 MW | 721 MW | -731 MW |
| 2026-10-23T16:00Z | 1,743 MW | 2,656 MW | 315 MW | 865 MW | -663 MW |
| 2026-10-23T17:00Z | 1,658 MW | 2,654 MW | 314 MW | 1,082 MW | -224 MW |
| 2026-10-23T18:00Z | 1,483 MW | 2,657 MW | 314 MW | 1,172 MW | 101 MW |
| 2026-10-23T19:00Z | 1,587 MW | 2,653 MW | 314 MW | 1,105 MW | -87 MW |
| 2026-10-23T20:00Z | 1,321 MW | 2,649 MW | 314 MW | 1,126 MW | -68 MW |
| 2026-10-23T21:00Z | 1,309 MW | 2,651 MW | 314 MW | 1,211 MW | 96 MW |
| 2026-10-23T22:00Z | 1,262 MW | 2,651 MW | 313 MW | 1,111 MW | -54 MW |
| 2026-10-23T23:00Z | 1,831 MW | 2,649 MW | 334 MW | 838 MW | 19 MW |
| 2026-10-24T00:00Z | 2,760 MW | 2,650 MW | 421 MW | 364 MW | 153 MW |
| 2026-10-24T01:00Z | 2,912 MW | 2,650 MW | 514 MW | 149 MW | 337 MW |
| 2026-10-24T02:00Z | 2,906 MW | 2,650 MW | 428 MW | 126 MW | 152 MW |
| 2026-10-24T03:00Z | 2,882 MW | 2,649 MW | 419 MW | 241 MW | 658 MW |
| 2026-10-24T04:00Z | 2,859 MW | 2,653 MW | 439 MW | 179 MW | 524 MW |
| 2026-10-24T05:00Z | 2,873 MW | 2,657 MW | 504 MW | 316 MW | 660 MW |
| 2026-10-24T06:00Z | 2,842 MW | 2,658 MW | 494 MW | 406 MW | 182 MW |
| 2026-10-24T07:00Z | 2,842 MW | 2,658 MW | 560 MW | 201 MW | 243 MW |
| 2026-10-24T08:00Z | 2,789 MW | 2,658 MW | 658 MW | 27 MW | 19 MW |
| 2026-10-24T09:00Z | 2,661 MW | 2,657 MW | 687 MW | -6 MW | -1 MW |
| 2026-10-24T10:00Z | 2,624 MW | 2,658 MW | 685 MW | -8 MW | -1 MW |
| 2026-10-24T11:00Z | 2,622 MW | 2,659 MW | 663 MW | -7 MW | 0 MW |
| 2026-10-24T12:00Z | 2,624 MW | 2,665 MW | 661 MW | -7 MW | -2 MW |
| 2026-10-24T13:00Z | 2,642 MW | 2,659 MW | 660 MW | 3 MW | -2 MW |
| 2026-10-24T14:00Z | 2,692 MW | 2,663 MW | 655 MW | 326 MW | 1 MW |
| 2026-10-24T15:00Z | 2,212 MW | 2,662 MW | 498 MW | 628 MW | -548 MW |
| 2026-10-24T16:00Z | 1,348 MW | 2,658 MW | 425 MW | 739 MW | -801 MW |
| 2026-10-24T17:00Z | 1,117 MW | 2,655 MW | 343 MW | 771 MW | -728 MW |
| 2026-10-24T18:00Z | 1,140 MW | 2,653 MW | 313 MW | 705 MW | -660 MW |
| 2026-10-24T19:00Z | 1,305 MW | 2,653 MW | 314 MW | 680 MW | -597 MW |
| 2026-10-24T20:00Z | 1,292 MW | 2,651 MW | 314 MW | 741 MW | -10 MW |
| 2026-10-24T21:00Z | 1,301 MW | 2,650 MW | 314 MW | 758 MW | -50 MW |
| 2026-10-24T22:00Z | 1,313 MW | 2,654 MW | 314 MW | 746 MW | -28 MW |
| 2026-10-24T23:00Z | 1,691 MW | 2,653 MW | 343 MW | 646 MW | 57 MW |
| 2026-10-25T00:00Z | 2,764 MW | 2,653 MW | 440 MW | 299 MW | 587 MW |
| 2026-10-25T01:00Z | 2,819 MW | 2,655 MW | 455 MW | 161 MW | 509 MW |
| 2026-10-25T02:00Z | 2,892 MW | 2,651 MW | 455 MW | 218 MW | 448 MW |
| 2026-10-25T03:00Z | 2,943 MW | 2,653 MW | 464 MW | 367 MW | 597 MW |
| 2026-10-25T04:00Z | 2,943 MW | 2,658 MW | 474 MW | 217 MW | 540 MW |
| 2026-10-25T05:00Z | 2,913 MW | 2,658 MW | 529 MW | 365 MW | 218 MW |
| 2026-10-25T06:00Z | 2,774 MW | 2,657 MW | 630 MW | 260 MW | 78 MW |
| 2026-10-25T07:00Z | 2,798 MW | 2,658 MW | 640 MW | 110 MW | 12 MW |
| 2026-10-25T08:00Z | 2,945 MW | 2,658 MW | 624 MW | 90 MW | -8 MW |
| 2026-10-25T09:00Z | 2,962 MW | 2,660 MW | 622 MW | 0 MW | 1 MW |
| 2026-10-25T10:00Z | 2,969 MW | 2,658 MW | 622 MW | -5 MW | -7 MW |
| 2026-10-25T11:00Z | 2,723 MW | 2,660 MW | 640 MW | -5 MW | -17 MW |
| 2026-10-25T12:00Z | 2,842 MW | 2,664 MW | 702 MW | -8 MW | -4 MW |
| 2026-10-25T13:00Z | 2,990 MW | 2,663 MW | 772 MW | 4 MW | 11 MW |
| 2026-10-25T14:00Z | 2,896 MW | 2,664 MW | 752 MW | 381 MW | -15 MW |
| 2026-10-25T15:00Z | 2,148 MW | 2,663 MW | 574 MW | 979 MW | -125 MW |
| 2026-10-25T16:00Z | 1,526 MW | 2,661 MW | 436 MW | 1,093 MW | -115 MW |
| 2026-10-25T17:00Z | 1,334 MW | 2,657 MW | 329 MW | 1,142 MW | -38 MW |
| 2026-10-25T18:00Z | 2,235 MW | 2,656 MW | 314 MW | 843 MW | -782 MW |
| 2026-10-25T19:00Z | 2,401 MW | 2,656 MW | 314 MW | 825 MW | -789 MW |
| 2026-10-25T20:00Z | 2,463 MW | 2,654 MW | 314 MW | 845 MW | -757 MW |
| 2026-10-25T21:00Z | 2,453 MW | 2,654 MW | 313 MW | 971 MW | -466 MW |
| 2026-10-25T22:00Z | 2,065 MW | 2,648 MW | 314 MW | 1,074 MW | -304 MW |
| 2026-10-25T23:00Z | 2,580 MW | 2,651 MW | 360 MW | 848 MW | 198 MW |
| 2026-10-26T00:00Z | 3,008 MW | 2,651 MW | 500 MW | 390 MW | 674 MW |
| 2026-10-26T01:00Z | 3,007 MW | 2,651 MW | 620 MW | 307 MW | 691 MW |
| 2026-10-26T02:00Z | 2,996 MW | 2,652 MW | 738 MW | 169 MW | 625 MW |
| 2026-10-26T03:00Z | 2,946 MW | 2,652 MW | 806 MW | 188 MW | 567 MW |
| 2026-10-26T04:00Z | 2,890 MW | 2,656 MW | 808 MW | 164 MW | 225 MW |
| 2026-10-26T05:00Z | 2,868 MW | 2,653 MW | 808 MW | 158 MW | 83 MW |
| 2026-10-26T06:00Z | 2,772 MW | 2,657 MW | 799 MW | 91 MW | 0 MW |
| 2026-10-26T07:00Z | 2,669 MW | 2,660 MW | 685 MW | 113 MW | -2 MW |
| 2026-10-26T08:00Z | 2,638 MW | 2,660 MW | 671 MW | 294 MW | -3 MW |
| 2026-10-26T09:00Z | 2,619 MW | 2,656 MW | 758 MW | 171 MW | -3 MW |
| 2026-10-26T10:00Z | 2,665 MW | 2,660 MW | 808 MW | -4 MW | -3 MW |
| 2026-10-26T11:00Z | 2,679 MW | 2,661 MW | 832 MW | -8 MW | -5 MW |
| 2026-10-26T12:00Z | 2,663 MW | 2,660 MW | 828 MW | -6 MW | -2 MW |
| 2026-10-26T13:00Z | 2,753 MW | 2,663 MW | 840 MW | 2 MW | -1 MW |
| 2026-10-26T14:00Z | 2,766 MW | 2,663 MW | 831 MW | 429 MW | -9 MW |
| 2026-10-26T15:00Z | 2,317 MW | 2,659 MW | 686 MW | 692 MW | -445 MW |
| 2026-10-26T16:00Z | 2,303 MW | 2,657 MW | 532 MW | 897 MW | -489 MW |
| 2026-10-26T17:00Z | 1,937 MW | 2,652 MW | 375 MW | 859 MW | -611 MW |
| 2026-10-26T18:00Z | 2,103 MW | 2,647 MW | 316 MW | 967 MW | -320 MW |
| 2026-10-26T19:00Z | 2,378 MW | 2,648 MW | 315 MW | 831 MW | -775 MW |
| 2026-10-26T20:00Z | 2,618 MW | 2,646 MW | 325 MW | 992 MW | -553 MW |
| 2026-10-26T21:00Z | 2,652 MW | 2,652 MW | 314 MW | 1,164 MW | -119 MW |
| 2026-10-26T22:00Z | 2,323 MW | 2,651 MW | 321 MW | 1,137 MW | -35 MW |
| 2026-10-26T23:00Z | 2,979 MW | 2,652 MW | 403 MW | 941 MW | 116 MW |
| 2026-10-27T00:00Z | 3,215 MW | 2,655 MW | 553 MW | 669 MW | 550 MW |
| 2026-10-27T01:00Z | 3,171 MW | 2,653 MW | 739 MW | 551 MW | 747 MW |
| 2026-10-27T02:00Z | 3,172 MW | 2,653 MW | 807 MW | 301 MW | 525 MW |
| 2026-10-27T03:00Z | 3,273 MW | 2,653 MW | 808 MW | 184 MW | 595 MW |
| 2026-10-27T04:00Z | 3,232 MW | 2,656 MW | 810 MW | 104 MW | 324 MW |
| 2026-10-27T05:00Z | 2,888 MW | 2,658 MW | 809 MW | 27 MW | 109 MW |
| 2026-10-27T06:00Z | 2,944 MW | 2,656 MW | 810 MW | 168 MW | 48 MW |
| 2026-10-27T07:00Z | 2,724 MW | 2,660 MW | 774 MW | 2 MW | 3 MW |
| 2026-10-27T08:00Z | 2,643 MW | 2,659 MW | 787 MW | -7 MW | 0 MW |
| 2026-10-27T09:00Z | 2,445 MW | 2,658 MW | 732 MW | -7 MW | -32 MW |
| 2026-10-27T10:00Z | 2,200 MW | 2,659 MW | 771 MW | -8 MW | -552 MW |
| 2026-10-27T11:00Z | 2,214 MW | 2,660 MW | 758 MW | -8 MW | -572 MW |
| 2026-10-27T12:00Z | 2,357 MW | 2,664 MW | 759 MW | -9 MW | -99 MW |
| 2026-10-27T13:00Z | 2,376 MW | 2,663 MW | 865 MW | -4 MW | -15 MW |
| 2026-10-27T14:00Z | 2,317 MW | 2,663 MW | 799 MW | 411 MW | -25 MW |
| 2026-10-27T15:00Z | 1,773 MW | 2,663 MW | 577 MW | 841 MW | -200 MW |
| 2026-10-27T16:00Z | 1,561 MW | 2,658 MW | 413 MW | 1,085 MW | -218 MW |
| 2026-10-27T17:00Z | 1,843 MW | 2,651 MW | 342 MW | 955 MW | -173 MW |
| 2026-10-27T18:00Z | 1,811 MW | 2,650 MW | 314 MW | 813 MW | -219 MW |
| 2026-10-27T19:00Z | 2,225 MW | 2,647 MW | 313 MW | 864 MW | -577 MW |
| 2026-10-27T20:00Z | 1,922 MW | 2,649 MW | 314 MW | 972 MW | -484 MW |
| 2026-10-27T21:00Z | 1,585 MW | 2,649 MW | 314 MW | 1,102 MW | -73 MW |
| 2026-10-27T22:00Z | 1,509 MW | 2,650 MW | 313 MW | 1,108 MW | -46 MW |
| 2026-10-27T23:00Z | 2,084 MW | 2,649 MW | 395 MW | 776 MW | 1 MW |
| 2026-10-28T00:00Z | 2,409 MW | 2,651 MW | 536 MW | 598 MW | 508 MW |
| 2026-10-28T01:00Z | 2,521 MW | 2,649 MW | 739 MW | 425 MW | 271 MW |
| 2026-10-28T02:00Z | 2,625 MW | 2,652 MW | 765 MW | 230 MW | 269 MW |
| 2026-10-28T03:00Z | 2,540 MW | 2,651 MW | 804 MW | 343 MW | 710 MW |
| 2026-10-28T04:00Z | 2,554 MW | 2,653 MW | 794 MW | 194 MW | 553 MW |
| 2026-10-28T05:00Z | 2,533 MW | 2,652 MW | 797 MW | 95 MW | 414 MW |
| 2026-10-28T06:00Z | 2,543 MW | 2,656 MW | 810 MW | 82 MW | 198 MW |
| 2026-10-28T07:00Z | 2,703 MW | 2,656 MW | 808 MW | -11 MW | 11 MW |
| 2026-10-28T08:00Z | 2,669 MW | 2,663 MW | 809 MW | -9 MW | -10 MW |
| 2026-10-28T09:00Z | 2,595 MW | 2,658 MW | 806 MW | -5 MW | -7 MW |
| 2026-10-28T10:00Z | 2,529 MW | 2,664 MW | 641 MW | -9 MW | -8 MW |
| 2026-10-28T11:00Z | 2,626 MW | 2,669 MW | 587 MW | -6 MW | -2 MW |
| 2026-10-28T12:00Z | 2,682 MW | 2,667 MW | 696 MW | -9 MW | -6 MW |
| 2026-10-28T13:00Z | 2,679 MW | 2,668 MW | 810 MW | -3 MW | -6 MW |
| 2026-10-28T14:00Z | 2,709 MW | 2,668 MW | 767 MW | 307 MW | -78 MW |
| 2026-10-28T15:00Z | 2,554 MW | 2,665 MW | 606 MW | 853 MW | -440 MW |
| 2026-10-28T16:00Z | 2,365 MW | 2,660 MW | 489 MW | 868 MW | -750 MW |
| 2026-10-28T17:00Z | 2,223 MW | 2,654 MW | 354 MW | 862 MW | -782 MW |
| 2026-10-28T18:00Z | 2,574 MW | 2,652 MW | 352 MW | 841 MW | -679 MW |
| 2026-10-28T19:00Z | 2,277 MW | 2,651 MW | 352 MW | 926 MW | -502 MW |
| 2026-10-28T20:00Z | 1,850 MW | 2,654 MW | 352 MW | 1,101 MW | -53 MW |
| 2026-10-28T21:00Z | 1,779 MW | 2,652 MW | 352 MW | 1,006 MW | -87 MW |
| 2026-10-28T22:00Z | 1,863 MW | 2,653 MW | 327 MW | 836 MW | 76 MW |
| 2026-10-28T23:00Z | 2,627 MW | 2,651 MW | 408 MW | 690 MW | 105 MW |
| 2026-10-29T00:00Z | 2,975 MW | 2,649 MW | 530 MW | 592 MW | 640 MW |
| 2026-10-29T01:00Z | 2,995 MW | 2,649 MW | 650 MW | 426 MW | 657 MW |
| 2026-10-29T02:00Z | 2,969 MW | 2,651 MW | 666 MW | 278 MW | 622 MW |
| 2026-10-29T03:00Z | 2,870 MW | 2,652 MW | 687 MW | 206 MW | 600 MW |
| 2026-10-29T04:00Z | 3,025 MW | 2,652 MW | 826 MW | 82 MW | 229 MW |
| 2026-10-29T05:00Z | 2,946 MW | 2,653 MW | 851 MW | 63 MW | 102 MW |
| 2026-10-29T06:00Z | 2,861 MW | 2,654 MW | 852 MW | 43 MW | 6 MW |
| 2026-10-29T07:00Z | 2,861 MW | 2,655 MW | 822 MW | -3 MW | -5 MW |
| 2026-10-29T08:00Z | 2,801 MW | 2,657 MW | 778 MW | -11 MW | -1 MW |
| 2026-10-29T09:00Z | 2,751 MW | 2,658 MW | 800 MW | -39 MW | -1 MW |
| 2026-10-29T10:00Z | 2,629 MW | 2,663 MW | 799 MW | -14 MW | -2 MW |
| 2026-10-29T11:00Z | 2,728 MW | 2,665 MW | 789 MW | -6 MW | -6 MW |
| 2026-10-29T12:00Z | 2,814 MW | 2,666 MW | 784 MW | 19 MW | -7 MW |
| 2026-10-29T13:00Z | 2,912 MW | 2,664 MW | 760 MW | -4 MW | -3 MW |
| 2026-10-29T14:00Z | 2,766 MW | 2,667 MW | 745 MW | 277 MW | -12 MW |
| 2026-10-29T15:00Z | 2,472 MW | 2,661 MW | 778 MW | 556 MW | -12 MW |
| 2026-10-29T16:00Z | 2,432 MW | 2,653 MW | 709 MW | 776 MW | -113 MW |
| 2026-10-29T17:00Z | 2,325 MW | 2,651 MW | 753 MW | 771 MW | -18 MW |
| 2026-10-29T18:00Z | 2,559 MW | 2,648 MW | 792 MW | 474 MW | -730 MW |
| 2026-10-29T19:00Z | 2,705 MW | 2,652 MW | 787 MW | 457 MW | -742 MW |
| 2026-10-29T20:00Z | 2,683 MW | 2,652 MW | 782 MW | 407 MW | -767 MW |
| 2026-10-29T21:00Z | 2,786 MW | 2,646 MW | 787 MW | 445 MW | -623 MW |
| 2026-10-29T22:00Z | 2,921 MW | 2,646 MW | 788 MW | 455 MW | -236 MW |
| 2026-10-29T23:00Z | 2,981 MW | 2,645 MW | 780 MW | 437 MW | 268 MW |
| 2026-10-30T00:00Z | 3,021 MW | 2,645 MW | 787 MW | 375 MW | 749 MW |
| 2026-10-30T01:00Z | 2,963 MW | 2,642 MW | 780 MW | 274 MW | 638 MW |
| 2026-10-30T02:00Z | 2,992 MW | 2,642 MW | 787 MW | 115 MW | 130 MW |
| 2026-10-30T03:00Z | 2,974 MW | 2,645 MW | 790 MW | 573 MW | 640 MW |
| 2026-10-30T04:00Z | 2,983 MW | 2,648 MW | 740 MW | 223 MW | 398 MW |
| 2026-10-30T05:00Z | 2,991 MW | 2,648 MW | 774 MW | 138 MW | 85 MW |
| 2026-10-30T06:00Z | 3,064 MW | 2,648 MW | 783 MW | 30 MW | 13 MW |
| 2026-10-30T07:00Z | 3,056 MW | 2,641 MW | 788 MW | -17 MW | -4 MW |
| 2026-10-30T08:00Z | 3,046 MW | 2,646 MW | 780 MW | -13 MW | -6 MW |
| 2026-10-30T09:00Z | 3,118 MW | 2,646 MW | 788 MW | -32 MW | 3 MW |
| 2026-10-30T10:00Z | 3,227 MW | 2,649 MW | 776 MW | -9 MW | -12 MW |
| 2026-10-30T11:00Z | 3,204 MW | 2,648 MW | 779 MW | -9 MW | -1 MW |
| 2026-10-30T12:00Z | 3,291 MW | 2,649 MW | 785 MW | -46 MW | -63 MW |
| 2026-10-30T13:00Z | 3,198 MW | 2,647 MW | 782 MW | 16 MW | 32 MW |
| 2026-10-30T14:00Z | 3,267 MW | 2,643 MW | 752 MW | 71 MW | -57 MW |
| 2026-10-30T15:00Z | 3,338 MW | 2,646 MW | 756 MW | 141 MW | 17 MW |
| 2026-10-30T16:00Z | 3,319 MW | 2,639 MW | 751 MW | 194 MW | -81 MW |
| 2026-10-30T17:00Z | 3,149 MW | 2,639 MW | 771 MW | 483 MW | -34 MW |
| 2026-10-30T18:00Z | 3,203 MW | 2,636 MW | 776 MW | 369 MW | -24 MW |
| 2026-10-30T19:00Z | 3,177 MW | 2,635 MW | 751 MW | 244 MW | -789 MW |
| 2026-10-30T20:00Z | 3,212 MW | 2,632 MW | 774 MW | 251 MW | -743 MW |
| 2026-10-30T21:00Z | 3,096 MW | 2,633 MW | 754 MW | 186 MW | -775 MW |
| 2026-10-30T22:00Z | 3,122 MW | 2,635 MW | 750 MW | 537 MW | -528 MW |
| 2026-10-30T23:00Z | 3,208 MW | 2,637 MW | 751 MW | 115 MW | -366 MW |
| 2026-10-31T00:00Z | 3,194 MW | 2,638 MW | 750 MW | 70 MW | 84 MW |
| 2026-10-31T01:00Z | 3,143 MW | 2,638 MW | 752 MW | 4 MW | 3 MW |
| 2026-10-31T02:00Z | 3,157 MW | 2,636 MW | 750 MW | 106 MW | 367 MW |
| 2026-10-31T03:00Z | 3,158 MW | 2,641 MW | 751 MW | 132 MW | 388 MW |
| 2026-10-31T04:00Z | 3,015 MW | 2,643 MW | 752 MW | 271 MW | 511 MW |
| 2026-10-31T05:00Z | 2,932 MW | 2,644 MW | 751 MW | 243 MW | 415 MW |
| 2026-10-31T06:00Z | 2,736 MW | 2,644 MW | 751 MW | 201 MW | 335 MW |
| 2026-10-31T07:00Z | 2,761 MW | 2,643 MW | 749 MW | 198 MW | 444 MW |
| 2026-10-31T08:00Z | 2,517 MW | 2,645 MW | 752 MW | 105 MW | 306 MW |
| 2026-10-31T09:00Z | 2,574 MW | 2,642 MW | 751 MW | 53 MW | 196 MW |
| 2026-10-31T10:00Z | 2,623 MW | 2,643 MW | 803 MW | -8 MW | 11 MW |
| 2026-10-31T11:00Z | 2,625 MW | 2,646 MW | 762 MW | -24 MW | 1 MW |
| 2026-10-31T12:00Z | 2,617 MW | 2,647 MW | 760 MW | -5 MW | -4 MW |
| 2026-10-31T13:00Z | 2,618 MW | 2,650 MW | 751 MW | 49 MW | -5 MW |
| 2026-10-31T14:00Z | 2,709 MW | 2,647 MW | 750 MW | 57 MW | -35 MW |
| 2026-10-31T15:00Z | 2,688 MW | 2,644 MW | 751 MW | 195 MW | -10 MW |
| 2026-10-31T16:00Z | 2,827 MW | 2,641 MW | 751 MW | 364 MW | -20 MW |
| 2026-10-31T17:00Z | 2,870 MW | 2,636 MW | 710 MW | 413 MW | -5 MW |
| 2026-10-31T18:00Z | 2,862 MW | 2,634 MW | 677 MW | 637 MW | -69 MW |
| 2026-10-31T19:00Z | 2,927 MW | 2,633 MW | 734 MW | 426 MW | -778 MW |
| 2026-10-31T20:00Z | 2,990 MW | 2,633 MW | 689 MW | 236 MW | -761 MW |
| 2026-10-31T21:00Z | 3,250 MW | 2,636 MW | 733 MW | 110 MW | -674 MW |
| 2026-10-31T22:00Z | 3,255 MW | 2,632 MW | 639 MW | 68 MW | -29 MW |
| 2026-10-31T23:00Z | 3,244 MW | 2,633 MW | 647 MW | -22 MW | -153 MW |
| 2026-11-01T00:00Z | 3,216 MW | 2,633 MW | 708 MW | 173 MW | 268 MW |
| 2026-11-01T01:00Z | 3,143 MW | 2,631 MW | 748 MW | 94 MW | 279 MW |
| 2026-11-01T02:00Z | 3,140 MW | 2,633 MW | 750 MW | 95 MW | 272 MW |
| 2026-11-01T03:00Z | 3,132 MW | 2,634 MW | 716 MW | 191 MW | 565 MW |
| 2026-11-01T04:00Z | 3,091 MW | 2,633 MW | 642 MW | 206 MW | 567 MW |
| 2026-11-01T05:00Z | 2,956 MW | 2,637 MW | 677 MW | 174 MW | 299 MW |
| 2026-11-01T06:00Z | 2,702 MW | 2,635 MW | 773 MW | 128 MW | 55 MW |
| 2026-11-01T07:00Z | 2,451 MW | 2,636 MW | 770 MW | -3 MW | -3 MW |
| 2026-11-01T08:00Z | 2,413 MW | 2,635 MW | 745 MW | -10 MW | -1 MW |
| 2026-11-01T09:00Z | 2,372 MW | 2,639 MW | 746 MW | -16 MW | -24 MW |
| 2026-11-01T10:00Z | 2,117 MW | 2,638 MW | 739 MW | 26 MW | 10 MW |
| 2026-11-01T11:00Z | 1,960 MW | 2,642 MW | 739 MW | -24 MW | -16 MW |
| 2026-11-01T12:00Z | 2,181 MW | 2,644 MW | 752 MW | -15 MW | -23 MW |
| 2026-11-01T13:00Z | 2,109 MW | 2,646 MW | 805 MW | 9 MW | -8 MW |
| 2026-11-01T14:00Z | 2,097 MW | 2,643 MW | 811 MW | 12 MW | 3 MW |
| 2026-11-01T15:00Z | 2,099 MW | 2,647 MW | 813 MW | 58 MW | -67 MW |
| 2026-11-01T16:00Z | 2,162 MW | 2,643 MW | 799 MW | 54 MW | -92 MW |
| 2026-11-01T17:00Z | 2,139 MW | 2,641 MW | 642 MW | 86 MW | -39 MW |
| 2026-11-01T18:00Z | 2,137 MW | 2,637 MW | 488 MW | 118 MW | 117 MW |
| 2026-11-01T19:00Z | 2,150 MW | 2,637 MW | 512 MW | -154 MW | -792 MW |
| 2026-11-01T20:00Z | 2,134 MW | 2,631 MW | 558 MW | -109 MW | -794 MW |
| 2026-11-01T21:00Z | 2,194 MW | 2,630 MW | 662 MW | 270 MW | -702 MW |
| 2026-11-01T22:00Z | 1,966 MW | 2,630 MW | 816 MW | 217 MW | -587 MW |
| 2026-11-01T23:00Z | 2,027 MW | 2,628 MW | 865 MW | 289 MW | -384 MW |
| 2026-11-02T00:00Z | 2,082 MW | 2,629 MW | 798 MW | 117 MW | 0 MW |
| 2026-11-02T01:00Z | 2,229 MW | 2,638 MW | 809 MW | 111 MW | 276 MW |
| 2026-11-02T02:00Z | 2,276 MW | 2,640 MW | 880 MW | 94 MW | 275 MW |
| 2026-11-02T03:00Z | 2,237 MW | 2,643 MW | 921 MW | 86 MW | 272 MW |
| 2026-11-02T04:00Z | 2,154 MW | 2,645 MW | 1,000 MW | 150 MW | 485 MW |
| 2026-11-02T05:00Z | 2,070 MW | 2,650 MW | 1,021 MW | 112 MW | 441 MW |
| 2026-11-02T06:00Z | 2,062 MW | 2,654 MW | 1,071 MW | 166 MW | 496 MW |
| 2026-11-02T07:00Z | 2,006 MW | 2,652 MW | 931 MW | 65 MW | 414 MW |
| 2026-11-02T08:00Z | 1,795 MW | 2,654 MW | 956 MW | 174 MW | 314 MW |
| 2026-11-02T09:00Z | 1,798 MW | 2,653 MW | 979 MW | 42 MW | 39 MW |
| 2026-11-02T10:00Z | 1,813 MW | 2,656 MW | 931 MW | -5 MW | -3 MW |
| 2026-11-02T11:00Z | 1,765 MW | 2,658 MW | 1,015 MW | -3 MW | -2 MW |
| 2026-11-02T12:00Z | 1,807 MW | 2,659 MW | 1,029 MW | -8 MW | -8 MW |
| 2026-11-02T13:00Z | 1,887 MW | 2,657 MW | 929 MW | 34 MW | 4 MW |
| 2026-11-02T14:00Z | 1,787 MW | 2,656 MW | 962 MW | 268 MW | -23 MW |
| 2026-11-02T15:00Z | 1,263 MW | 2,657 MW | 731 MW | 676 MW | -672 MW |
| 2026-11-02T16:00Z | 1,124 MW | 2,655 MW | 668 MW | 764 MW | -796 MW |
| 2026-11-02T17:00Z | 1,113 MW | 2,657 MW | 666 MW | 754 MW | -772 MW |
| 2026-11-02T18:00Z | 1,209 MW | 2,654 MW | 666 MW | 912 MW | -590 MW |
| 2026-11-02T19:00Z | 1,165 MW | 2,656 MW | 666 MW | 1,007 MW | -369 MW |
| 2026-11-02T20:00Z | 1,082 MW | 2,655 MW | 624 MW | 1,042 MW | -138 MW |
| 2026-11-02T21:00Z | 1,142 MW | 2,657 MW | 549 MW | 1,064 MW | -17 MW |
| 2026-11-02T22:00Z | 1,134 MW | 2,654 MW | 545 MW | 1,090 MW | 5 MW |
| 2026-11-02T23:00Z | 1,499 MW | 2,654 MW | 635 MW | 737 MW | 28 MW |
| 2026-11-03T00:00Z | 1,976 MW | 2,650 MW | 879 MW | 577 MW | 44 MW |
| 2026-11-03T01:00Z | 2,153 MW | 2,652 MW | 895 MW | 295 MW | 333 MW |
| 2026-11-03T02:00Z | 2,285 MW | 2,650 MW | 896 MW | 23 MW | 14 MW |
| 2026-11-03T03:00Z | 2,195 MW | 2,651 MW | 892 MW | 192 MW | 508 MW |
| 2026-11-03T04:00Z | 2,197 MW | 2,651 MW | 816 MW | 231 MW | 618 MW |
| 2026-11-03T05:00Z | 2,185 MW | 2,654 MW | 828 MW | 313 MW | 739 MW |
| 2026-11-03T06:00Z | 2,137 MW | 2,652 MW | 889 MW | 257 MW | 514 MW |
| 2026-11-03T07:00Z | 2,073 MW | 2,657 MW | 936 MW | 92 MW | 170 MW |
| 2026-11-03T08:00Z | 2,156 MW | 2,654 MW | 1,048 MW | 2 MW | 54 MW |
| 2026-11-03T09:00Z | 2,166 MW | 2,656 MW | 1,084 MW | 3 MW | 2 MW |
| 2026-11-03T10:00Z | 2,108 MW | 2,656 MW | 1,089 MW | -14 MW | -7 MW |
| 2026-11-03T11:00Z | 2,184 MW | 2,659 MW | 1,120 MW | -10 MW | -5 MW |
| 2026-11-03T12:00Z | 2,232 MW | 2,655 MW | 1,085 MW | -7 MW | -4 MW |
| 2026-11-03T13:00Z | 2,391 MW | 2,658 MW | 1,094 MW | 9 MW | -6 MW |
| 2026-11-03T14:00Z | 2,337 MW | 2,657 MW | 1,144 MW | 275 MW | 1 MW |
| 2026-11-03T15:00Z | 2,121 MW | 2,657 MW | 881 MW | 731 MW | -506 MW |
| 2026-11-03T16:00Z | 2,018 MW | 2,655 MW | 740 MW | 932 MW | -282 MW |
| 2026-11-03T17:00Z | 1,966 MW | 2,653 MW | 617 MW | 1,067 MW | -207 MW |
| 2026-11-03T18:00Z | 1,798 MW | 2,651 MW | 617 MW | 1,020 MW | -29 MW |
| 2026-11-03T19:00Z | 1,785 MW | 2,648 MW | 691 MW | 821 MW | -761 MW |
| 2026-11-03T20:00Z | 1,720 MW | 2,646 MW | 730 MW | 845 MW | -758 MW |
| 2026-11-03T21:00Z | 1,778 MW | 2,650 MW | 643 MW | 1,045 MW | -618 MW |
| 2026-11-03T22:00Z | 1,752 MW | 2,651 MW | 566 MW | 1,175 MW | -169 MW |
| 2026-11-03T23:00Z | 1,958 MW | 2,649 MW | 673 MW | 762 MW | 182 MW |
| 2026-11-04T00:00Z | 2,235 MW | 2,651 MW | 825 MW | 559 MW | 449 MW |
| 2026-11-04T01:00Z | 2,295 MW | 2,649 MW | 829 MW | 305 MW | 356 MW |
| 2026-11-04T02:00Z | 2,352 MW | 2,647 MW | 854 MW | 195 MW | 412 MW |
| 2026-11-04T03:00Z | 2,379 MW | 2,650 MW | 994 MW | 172 MW | 390 MW |
| 2026-11-04T04:00Z | 2,478 MW | 2,652 MW | 1,065 MW | 259 MW | 614 MW |
| 2026-11-04T05:00Z | 2,342 MW | 2,652 MW | 981 MW | 128 MW | 503 MW |
| 2026-11-04T06:00Z | 2,279 MW | 2,648 MW | 1,028 MW | 181 MW | 93 MW |
| 2026-11-04T07:00Z | 2,292 MW | 2,655 MW | 1,031 MW | 0 MW | 23 MW |
| 2026-11-04T08:00Z | 2,273 MW | 3,114 MW | 1,041 MW | 10 MW | -77 MW |
| 2026-11-04T09:00Z | 2,288 MW | 3,114 MW | 1,121 MW | -2 MW | 51 MW |
| 2026-11-04T10:00Z | 2,294 MW | 3,114 MW | 1,107 MW | -14 MW | 5 MW |
| 2026-11-04T11:00Z | 2,306 MW | 3,118 MW | 1,106 MW | -12 MW | -4 MW |
| 2026-11-04T12:00Z | 2,305 MW | 3,117 MW | 1,123 MW | -9 MW | -2 MW |
| 2026-11-04T13:00Z | 2,326 MW | 3,120 MW | 1,168 MW | 1 MW | 3 MW |
| 2026-11-04T14:00Z | 1,919 MW | 3,121 MW | 1,176 MW | 162 MW | 29 MW |
| 2026-11-04T15:00Z | 1,486 MW | 3,121 MW | 959 MW | 848 MW | -331 MW |
| 2026-11-04T16:00Z | 1,341 MW | 3,117 MW | 683 MW | 961 MW | -387 MW |
| 2026-11-04T17:00Z | 1,482 MW | 3,113 MW | 524 MW | 1,067 MW | -77 MW |
| 2026-11-04T18:00Z | 1,634 MW | 3,109 MW | 535 MW | 1,056 MW | -1 MW |
| 2026-11-04T19:00Z | 1,464 MW | 3,111 MW | 617 MW | 703 MW | -748 MW |
| 2026-11-04T20:00Z | 1,686 MW | 3,110 MW | 565 MW | 627 MW | -783 MW |
| 2026-11-04T21:00Z | 1,773 MW | 3,110 MW | 529 MW | 770 MW | -694 MW |
| 2026-11-04T22:00Z | 1,633 MW | 3,110 MW | 478 MW | 886 MW | -327 MW |
| 2026-11-04T23:00Z | 2,074 MW | 3,108 MW | 575 MW | 643 MW | 141 MW |
| 2026-11-05T00:00Z | 2,401 MW | 3,107 MW | 729 MW | 555 MW | 366 MW |
| 2026-11-05T01:00Z | 2,410 MW | 3,106 MW | 919 MW | 585 MW | 601 MW |
| 2026-11-05T02:00Z | 2,400 MW | 3,102 MW | 1,063 MW | 616 MW | 628 MW |
| 2026-11-05T03:00Z | 2,320 MW | 3,108 MW | 1,135 MW | 177 MW | 693 MW |
| 2026-11-05T04:00Z | 2,403 MW | 3,110 MW | 1,140 MW | 117 MW | 393 MW |
| 2026-11-05T05:00Z | 2,678 MW | 3,113 MW | 1,118 MW | 29 MW | 114 MW |
| 2026-11-05T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T13:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-05T14:00Z | n/a | n/a | n/a | n/a | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05T14:00Z.
Day by Day
Daily totals, Arizona time dates, through 2026-11-04Show the data table (400 rows)
| Date (Arizona time) | Demand |
|---|---|
| 2025-10-01 | 110 GWh |
| 2025-10-02 | 110 GWh |
| 2025-10-03 | 113 GWh |
| 2025-10-04 | 96.1 GWh |
| 2025-10-05 | 87.0 GWh |
| 2025-10-06 | 93.3 GWh |
| 2025-10-07 | 98.0 GWh |
| 2025-10-08 | 106 GWh |
| 2025-10-09 | 105 GWh |
| 2025-10-10 | 105 GWh |
| 2025-10-11 | 95.7 GWh |
| 2025-10-12 | 90.6 GWh |
| 2025-10-13 | 98.0 GWh |
| 2025-10-14 | 92.7 GWh |
| 2025-10-15 | 88.8 GWh |
| 2025-10-16 | 82.6 GWh |
| 2025-10-17 | 82.1 GWh |
| 2025-10-18 | 81.9 GWh |
| 2025-10-19 | 86.4 GWh |
| 2025-10-20 | 89.3 GWh |
| 2025-10-21 | 88.7 GWh |
| 2025-10-22 | 92.9 GWh |
| 2025-10-23 | 88.3 GWh |
| 2025-10-24 | 84.8 GWh |
| 2025-10-25 | 84.3 GWh |
| 2025-10-26 | 87.9 GWh |
| 2025-10-27 | 89.8 GWh |
| 2025-10-28 | 91.8 GWh |
| 2025-10-29 | 90.3 GWh |
| 2025-10-30 | 87.7 GWh |
| 2025-10-31 | 85.6 GWh |
| 2025-11-01 | 81.5 GWh |
| 2025-11-02 | 82.4 GWh |
| 2025-11-03 | 88.3 GWh |
| 2025-11-04 | 86.7 GWh |
| 2025-11-05 | 86.8 GWh |
| 2025-11-06 | 86.6 GWh |
| 2025-11-07 | 83.6 GWh |
| 2025-11-08 | 82.5 GWh |
| 2025-11-09 | 86.2 GWh |
| 2025-11-10 | 87.3 GWh |
| 2025-11-11 | 85.2 GWh |
| 2025-11-12 | 85.2 GWh |
| 2025-11-13 | 86.4 GWh |
| 2025-11-14 | 84.7 GWh |
| 2025-11-15 | 80.8 GWh |
| 2025-11-16 | 84.1 GWh |
| 2025-11-17 | 81.9 GWh |
| 2025-11-18 | 81.7 GWh |
| 2025-11-19 | 80.3 GWh |
| 2025-11-20 | 79.8 GWh |
| 2025-11-21 | 79.1 GWh |
| 2025-11-22 | 78.7 GWh |
| 2025-11-23 | 77.6 GWh |
| 2025-11-24 | 79.8 GWh |
| 2025-11-25 | 79.0 GWh |
| 2025-11-26 | 79.3 GWh |
| 2025-11-27 | 78.6 GWh |
| 2025-11-28 | 74.6 GWh |
| 2025-11-29 | 72.5 GWh |
| 2025-11-30 | 77.7 GWh |
| 2025-12-01 | 77.2 GWh |
| 2025-12-02 | 78.2 GWh |
| 2025-12-03 | 80.2 GWh |
| 2025-12-04 | 81.6 GWh |
| 2025-12-05 | 78.9 GWh |
| 2025-12-06 | 78.6 GWh |
| 2025-12-07 | 76.5 GWh |
| 2025-12-08 | 81.3 GWh |
| 2025-12-09 | 82.1 GWh |
| 2025-12-10 | 82.0 GWh |
| 2025-12-11 | 81.3 GWh |
| 2025-12-12 | 81.0 GWh |
| 2025-12-13 | 78.9 GWh |
| 2025-12-14 | 79.9 GWh |
| 2025-12-15 | 81.5 GWh |
| 2025-12-16 | 80.9 GWh |
| 2025-12-17 | 83.7 GWh |
| 2025-12-18 | 83.4 GWh |
| 2025-12-19 | 80.6 GWh |
| 2025-12-20 | 79.0 GWh |
| 2025-12-21 | 77.7 GWh |
| 2025-12-22 | 76.3 GWh |
| 2025-12-23 | 80.5 GWh |
| 2025-12-24 | 77.8 GWh |
| 2025-12-25 | 71.6 GWh |
| 2025-12-26 | 73.9 GWh |
| 2025-12-27 | 74.2 GWh |
| 2025-12-28 | 72.4 GWh |
| 2025-12-29 | 81.3 GWh |
| 2025-12-30 | 78.0 GWh |
| 2025-12-31 | 76.7 GWh |
| 2026-01-01 | 68.2 GWh |
| 2026-01-02 | 70.6 GWh |
| 2026-01-03 | 73.1 GWh |
| 2026-01-04 | 71.7 GWh |
| 2026-01-05 | 73.1 GWh |
| 2026-01-06 | 73.0 GWh |
| 2026-01-07 | 83.6 GWh |
| 2026-01-08 | 88.2 GWh |
| 2026-01-09 | 89.2 GWh |
| 2026-01-10 | 89.5 GWh |
| 2026-01-11 | 85.7 GWh |
| 2026-01-12 | 85.2 GWh |
| 2026-01-13 | 79.7 GWh |
| 2026-01-14 | 83.4 GWh |
| 2026-01-15 | 81.3 GWh |
| 2026-01-16 | 81.0 GWh |
| 2026-01-17 | 79.9 GWh |
| 2026-01-18 | 79.4 GWh |
| 2026-01-19 | 83.0 GWh |
| 2026-01-20 | 82.6 GWh |
| 2026-01-21 | 84.0 GWh |
| 2026-01-22 | 82.9 GWh |
| 2026-01-23 | 82.9 GWh |
| 2026-01-24 | 79.0 GWh |
| 2026-01-25 | 82.4 GWh |
| 2026-01-26 | 87.3 GWh |
| 2026-01-27 | 84.5 GWh |
| 2026-01-28 | 84.0 GWh |
| 2026-01-29 | 85.2 GWh |
| 2026-01-30 | 83.4 GWh |
| 2026-01-31 | 79.5 GWh |
| 2026-02-01 | 79.6 GWh |
| 2026-02-02 | 81.3 GWh |
| 2026-02-03 | 80.6 GWh |
| 2026-02-04 | 82.6 GWh |
| 2026-02-05 | 80.8 GWh |
| 2026-02-06 | 80.2 GWh |
| 2026-02-07 | 78.5 GWh |
| 2026-02-08 | 78.0 GWh |
| 2026-02-09 | 82.8 GWh |
| 2026-02-10 | 83.4 GWh |
| 2026-02-11 | 82.7 GWh |
| 2026-02-12 | 81.5 GWh |
| 2026-02-13 | 80.1 GWh |
| 2026-02-14 | 76.8 GWh |
| 2026-02-15 | 78.1 GWh |
| 2026-02-16 | 85.8 GWh |
| 2026-02-17 | 85.0 GWh |
| 2026-02-18 | 86.7 GWh |
| 2026-02-19 | 85.2 GWh |
| 2026-02-20 | 84.6 GWh |
| 2026-02-21 | 82.3 GWh |
| 2026-02-22 | 80.0 GWh |
| 2026-02-23 | 82.7 GWh |
| 2026-02-24 | 85.4 GWh |
| 2026-02-25 | 85.2 GWh |
| 2026-02-26 | 86.0 GWh |
| 2026-02-27 | 87.8 GWh |
| 2026-02-28 | 87.0 GWh |
| 2026-03-01 | 89.9 GWh |
| 2026-03-02 | 94.2 GWh |
| 2026-03-03 | 87.2 GWh |
| 2026-03-04 | 86.4 GWh |
| 2026-03-05 | 85.7 GWh |
| 2026-03-06 | 77.7 GWh |
| 2026-03-07 | 80.2 GWh |
| 2026-03-08 | 78.0 GWh |
| 2026-03-09 | 78.4 GWh |
| 2026-03-10 | 78.5 GWh |
| 2026-03-11 | 78.5 GWh |
| 2026-03-12 | 78.1 GWh |
| 2026-03-13 | 80.2 GWh |
| 2026-03-14 | 82.0 GWh |
| 2026-03-15 | 79.8 GWh |
| 2026-03-16 | 83.5 GWh |
| 2026-03-17 | 76.6 GWh |
| 2026-03-18 | 96.0 GWh |
| 2026-03-19 | 94.1 GWh |
| 2026-03-20 | 100 GWh |
| 2026-03-21 | 96.3 GWh |
| 2026-03-22 | 87.8 GWh |
| 2026-03-23 | 103 GWh |
| 2026-03-24 | 103 GWh |
| 2026-03-25 | 103 GWh |
| 2026-03-26 | 103 GWh |
| 2026-03-27 | 95.4 GWh |
| 2026-03-28 | 89.7 GWh |
| 2026-03-29 | 89.4 GWh |
| 2026-03-30 | 101 GWh |
| 2026-03-31 | 101 GWh |
| 2026-04-01 | 91.8 GWh |
| 2026-04-02 | 84.1 GWh |
| 2026-04-03 | 73.7 GWh |
| 2026-04-04 | 83.7 GWh |
| 2026-04-05 | 93.2 GWh |
| 2026-04-06 | 89.9 GWh |
| 2026-04-07 | 92.3 GWh |
| 2026-04-08 | 88.0 GWh |
| 2026-04-09 | 86.7 GWh |
| 2026-04-10 | 89.8 GWh |
| 2026-04-11 | 84.6 GWh |
| 2026-04-12 | 65.7 GWh |
| 2026-04-13 | 62.6 GWh |
| 2026-04-14 | 58.7 GWh |
| 2026-04-15 | 80.5 GWh |
| 2026-04-16 | 94.4 GWh |
| 2026-04-17 | 93.5 GWh |
| 2026-04-18 | 92.3 GWh |
| 2026-04-19 | 88.9 GWh |
| 2026-04-20 | 95.4 GWh |
| 2026-04-21 | 86.3 GWh |
| 2026-04-22 | 73.3 GWh |
| 2026-04-23 | 63.9 GWh |
| 2026-04-24 | 73.0 GWh |
| 2026-04-25 | 63.1 GWh |
| 2026-04-26 | 62.2 GWh |
| 2026-04-27 | 60.5 GWh |
| 2026-04-28 | 61.1 GWh |
| 2026-04-29 | 79.9 GWh |
| 2026-04-30 | 83.2 GWh |
| 2026-05-01 | 78.2 GWh |
| 2026-05-02 | 97.4 GWh |
| 2026-05-03 | 77.9 GWh |
| 2026-05-04 | 55.5 GWh |
| 2026-05-05 | 47.2 GWh |
| 2026-05-06 | 59.0 GWh |
| 2026-05-07 | 88.9 GWh |
| 2026-05-08 | 94.9 GWh |
| 2026-05-09 | 94.7 GWh |
| 2026-05-10 | 86.5 GWh |
| 2026-05-11 | 116 GWh |
| 2026-05-12 | 111 GWh |
| 2026-05-13 | 103 GWh |
| 2026-05-14 | 87.8 GWh |
| 2026-05-15 | 75.1 GWh |
| 2026-05-16 | 73.8 GWh |
| 2026-05-17 | 66.1 GWh |
| 2026-05-18 | 69.9 GWh |
| 2026-05-19 | 78.8 GWh |
| 2026-05-20 | 82.0 GWh |
| 2026-05-21 | 87.7 GWh |
| 2026-05-22 | 87.4 GWh |
| 2026-05-23 | 101 GWh |
| 2026-05-24 | 99.2 GWh |
| 2026-05-25 | 95.8 GWh |
| 2026-05-26 | 105 GWh |
| 2026-05-27 | 97.4 GWh |
| 2026-05-28 | 89.0 GWh |
| 2026-05-29 | 80.1 GWh |
| 2026-05-30 | 71.4 GWh |
| 2026-05-31 | 105 GWh |
| 2026-06-01 | 106 GWh |
| 2026-06-02 | 112 GWh |
| 2026-06-03 | 117 GWh |
| 2026-06-04 | 128 GWh |
| 2026-06-05 | 117 GWh |
| 2026-06-06 | 112 GWh |
| 2026-06-07 | 117 GWh |
| 2026-06-08 | 126 GWh |
| 2026-06-09 | 114 GWh |
| 2026-06-10 | 105 GWh |
| 2026-06-11 | 125 GWh |
| 2026-06-12 | 142 GWh |
| 2026-06-13 | 148 GWh |
| 2026-06-14 | 142 GWh |
| 2026-06-15 | 147 GWh |
| 2026-06-16 | 146 GWh |
| 2026-06-17 | 147 GWh |
| 2026-06-18 | 138 GWh |
| 2026-06-19 | 121 GWh |
| 2026-06-20 | 108 GWh |
| 2026-06-21 | 103 GWh |
| 2026-06-22 | 118 GWh |
| 2026-06-23 | 146 GWh |
| 2026-06-24 | 147 GWh |
| 2026-06-25 | 146 GWh |
| 2026-06-26 | 143 GWh |
| 2026-06-27 | 130 GWh |
| 2026-06-28 | 120 GWh |
| 2026-06-29 | 118 GWh |
| 2026-06-30 | 115 GWh |
| 2026-07-01 | 111 GWh |
| 2026-07-02 | 112 GWh |
| 2026-07-03 | 116 GWh |
| 2026-07-04 | 110 GWh |
| 2026-07-05 | 127 GWh |
| 2026-07-06 | 147 GWh |
| 2026-07-07 | 155 GWh |
| 2026-07-08 | 155 GWh |
| 2026-07-09 | 159 GWh |
| 2026-07-10 | 155 GWh |
| 2026-07-11 | 148 GWh |
| 2026-07-12 | 148 GWh |
| 2026-07-13 | 136 GWh |
| 2026-07-14 | 139 GWh |
| 2026-07-15 | 148 GWh |
| 2026-07-16 | 133 GWh |
| 2026-07-17 | 114 GWh |
| 2026-07-18 | 104 GWh |
| 2026-07-19 | 126 GWh |
| 2026-07-20 | 133 GWh |
| 2026-07-21 | 129 GWh |
| 2026-07-22 | 136 GWh |
| 2026-07-23 | 151 GWh |
| 2026-07-24 | 163 GWh |
| 2026-07-25 | 159 GWh |
| 2026-07-26 | 148 GWh |
| 2026-07-27 | 163 GWh |
| 2026-07-28 | 138 GWh |
| 2026-07-29 | 148 GWh |
| 2026-07-30 | 156 GWh |
| 2026-07-31 | 141 GWh |
| 2026-08-01 | 158 GWh |
| 2026-08-02 | 162 GWh |
| 2026-08-03 | 142 GWh |
| 2026-08-04 | 126 GWh |
| 2026-08-05 | 143 GWh |
| 2026-08-06 | 134 GWh |
| 2026-08-07 | 146 GWh |
| 2026-08-08 | 152 GWh |
| 2026-08-09 | 136 GWh |
| 2026-08-10 | 142 GWh |
| 2026-08-11 | 137 GWh |
| 2026-08-12 | 117 GWh |
| 2026-08-13 | 122 GWh |
| 2026-08-14 | 126 GWh |
| 2026-08-15 | 132 GWh |
| 2026-08-16 | 130 GWh |
| 2026-08-17 | 149 GWh |
| 2026-08-18 | 147 GWh |
| 2026-08-19 | 140 GWh |
| 2026-08-20 | 142 GWh |
| 2026-08-21 | 145 GWh |
| 2026-08-22 | 152 GWh |
| 2026-08-23 | 144 GWh |
| 2026-08-24 | 140 GWh |
| 2026-08-25 | 146 GWh |
| 2026-08-26 | 152 GWh |
| 2026-08-27 | 153 GWh |
| 2026-08-28 | 157 GWh |
| 2026-08-29 | 137 GWh |
| 2026-08-30 | 139 GWh |
| 2026-08-31 | 104 GWh |
| 2026-09-01 | 128 GWh |
| 2026-09-02 | 138 GWh |
| 2026-09-03 | 129 GWh |
| 2026-09-04 | 127 GWh |
| 2026-09-05 | 129 GWh |
| 2026-09-06 | 124 GWh |
| 2026-09-07 | 125 GWh |
| 2026-09-08 | 142 GWh |
| 2026-09-09 | 142 GWh |
| 2026-09-10 | 139 GWh |
| 2026-09-11 | 123 GWh |
| 2026-09-12 | 122 GWh |
| 2026-09-13 | 130 GWh |
| 2026-09-14 | 119 GWh |
| 2026-09-15 | 122 GWh |
| 2026-09-16 | 109 GWh |
| 2026-09-17 | 103 GWh |
| 2026-09-18 | 103 GWh |
| 2026-09-19 | 100 GWh |
| 2026-09-20 | 110 GWh |
| 2026-09-21 | 117 GWh |
| 2026-09-22 | 107 GWh |
| 2026-09-23 | 119 GWh |
| 2026-09-24 | 102 GWh |
| 2026-09-25 | 97.5 GWh |
| 2026-09-26 | 97.0 GWh |
| 2026-09-27 | 110 GWh |
| 2026-09-28 | 81.8 GWh |
| 2026-09-29 | 82.6 GWh |
| 2026-09-30 | 71.9 GWh |
| 2026-10-01 | 75.7 GWh |
| 2026-10-02 | 87.6 GWh |
| 2026-10-03 | 113 GWh |
| 2026-10-04 | 98.8 GWh |
| 2026-10-05 | 117 GWh |
| 2026-10-06 | 103 GWh |
| 2026-10-07 | 117 GWh |
| 2026-10-08 | 119 GWh |
| 2026-10-09 | 120 GWh |
| 2026-10-10 | 85.0 GWh |
| 2026-10-11 | 69.7 GWh |
| 2026-10-12 | 75.0 GWh |
| 2026-10-13 | 71.2 GWh |
| 2026-10-14 | 60.5 GWh |
| 2026-10-15 | 66.8 GWh |
| 2026-10-16 | 68.7 GWh |
| 2026-10-17 | 84.3 GWh |
| 2026-10-18 | 63.6 GWh |
| 2026-10-19 | 78.4 GWh |
| 2026-10-20 | 89.8 GWh |
| 2026-10-21 | 95.2 GWh |
| 2026-10-22 | 84.0 GWh |
| 2026-10-23 | 74.9 GWh |
| 2026-10-24 | 51.3 GWh |
| 2026-10-25 | 75.4 GWh |
| 2026-10-26 | 84.6 GWh |
| 2026-10-27 | 64.9 GWh |
| 2026-10-28 | 62.7 GWh |
| 2026-10-29 | 72.3 GWh |
| 2026-10-30 | 82.8 GWh |
| 2026-10-31 | 69.0 GWh |
| 2026-11-01 | 53.9 GWh |
| 2026-11-02 | 49.7 GWh |
| 2026-11-03 | 70.5 GWh |
| 2026-11-04 | 67.7 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04. Daily totals are EIA's own daily aggregation in the balancing authority's reporting time zone.
Year by Year
Summed from EIA daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 31.4 TWh | 52.9 TWh | Nuclear 49.9% | 308 |
| 2025 | 36.4 TWh | 59.7 TWh | Nuclear 52.1% | 365 |
| 2024 | 35.7 TWh | 59.9 TWh | Nuclear 53.9% | 366 |
| 2023 | 33.9 TWh | 59.5 TWh | Nuclear 53.1% | 365 |
| 2022 | 32.5 TWh | 55.5 TWh | Nuclear 57.7% | 365 |
| 2021 | 31.8 TWh | 57.3 TWh | Nuclear 55.3% | 365 |
| 2020 | 32.2 TWh | 67.4 TWh | Nuclear 46.7% | 366 |
| 2019 | 30.3 TWh | 63.8 TWh | Nuclear 50.0% | 365 |
A year is partial when EIA has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04.
Records
From EIA operator data held by World Power Monitor| Record | Value | When |
|---|---|---|
| Highest daily demand, 2019 onward | 163 GWh | 2026-07-24 (24 July 2026) |
| Highest hourly demand since 2026-06-16 (16 June 2026) | 8,987 MW | 24 Jul 2026, 18:00 MST (UTC-07:00) |
| Highest solar share of a day's generation, 2019 onward | 14.3% | 2025-04-26 (26 April 2025) |
| Highest wind share of a day's generation, 2019 onward | 5.2% | 2026-04-26 (26 April 2026) |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04.
Power Flows With Neighbours
Net totals, 2026-10-06 (6 October 2026) to 2026-11-04 (4 November 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| AZPS | SRP exports | 2.10 TWh |
| CAISO | SRP exports | 663 GWh |
| GRID | SRP imports | 378 GWh |
| WALC | SRP exports | 273 GWh |
| DEAA | SRP imports | 251 GWh |
| TEPC | SRP imports | 100 GWh |
| PACE | SRP exports | 8.84 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-04.
Share and Embed
Figures as of 2026-11-05 (5 November 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for SRP, credited to EIA. The image is rebuilt with the page. More about grid widgets.
Embed this widget
Free to use on your own site. Keep the source line in the frame; it carries the data licence and a link back here.
The frame reports its height to the page with postMessage type wpm-embed-height if you want it to resize.
Related
Cite this page
World Power Monitor. (2026). SRP Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/srp/
World Power Monitor. SRP Electricity Demand and Generation Mix. Data as of 2026-11-05 13:00 UTC. Data from U.S. Energy Information Administration. https://worldpowermonitor.com/zones/srp/
@misc{wpm_zones_srp_2026,
title = {{SRP Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-05 13:00 UTC. Data from U.S. Energy Information Administration.},
url = {https://worldpowermonitor.com/zones/srp/}
} Permalink: https://worldpowermonitor.com/zones/srp/
The Copy buttons add today's date as the access date.