TVA Electricity Demand and Generation Mix
TVA demand was 23,406 MW in the hour starting 15 Sept 2026, 10:00 CDT (UTC-05:00). Gas was the largest source in the hour starting 14 Sept 2026, 22:00 CDT (UTC-05:00), at 40% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- TVA is a balancing authority in the United States, part of the EIA Tennessee region.
- In the hour starting 15 Sept 2026, 10:00 CDT (UTC-05:00), demand in TVA was 23,406 MW, against a day-ahead forecast of 26,165 MW.
- Gas supplied 40.4% of TVA's generation in the hour starting 14 Sept 2026, 22:00 CDT (UTC-05:00).
- Demand in TVA totalled 171 TWh in 2025.
- Nuclear supplied 36.3% of TVA's generation in 2025.
- The highest daily demand in TVA from 2019 onward was 736 GWh, on 2022-12-23 (23 December 2022).
- The highest hourly demand in TVA since 2026-06-16 (16 June 2026) was 33,092 MW, in the hour starting 3 Sept 2026, 15:00 CDT (UTC-05:00).
- Solar's highest share of TVA's daily generation from 2019 onward was 7.5%, on 2019-01-29 (29 January 2019).
Latest Demand
Hourly operator dataLatest hour known when this page was built: 15 Sept 2026, 10:00 CDT (UTC-05:00).
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T15:00:00Z.
Generation by Source
Latest hour with generation by source: 14 Sept 2026, 22:00 CDT (UTC-05:00)| Source | Output | Share |
|---|---|---|
| Gas | 8,509 MW | 40.4% |
| Nuclear | 6,889 MW | 32.7% |
| Coal | 4,338 MW | 20.6% |
| Hydro | 1,273 MW | 6.0% |
| Other | 39 MW | 0.2% |
| Geothermal | 0 MW | 0.0% |
| Oil | 0 MW | 0.0% |
| Wind | 0 MW | 0.0% |
| Solar | -4 MW | own use |
| Storage | -103 MW | charging |
| Total from these sources | 21,048 MW | |
| Net interchange | -1,532 MW | net imports |
EIA publishes generation by source 10 or more hours after demand, so this hour can be earlier than the latest demand hour. Net interchange is positive when TVA exports.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T03:00:00Z.
Last 30 Days, Hourly
Times in UTC| Hour starting (UTC) | Demand |
|---|---|
| 2026-08-16T17:00Z | 30,069 MW |
| 2026-08-16T18:00Z | 31,138 MW |
| 2026-08-16T19:00Z | 31,669 MW |
| 2026-08-16T20:00Z | 32,330 MW |
| 2026-08-16T21:00Z | 31,935 MW |
| 2026-08-16T22:00Z | 31,268 MW |
| 2026-08-16T23:00Z | 30,374 MW |
| 2026-08-17T00:00Z | 29,489 MW |
| 2026-08-17T01:00Z | 28,631 MW |
| 2026-08-17T02:00Z | 27,177 MW |
| 2026-08-17T03:00Z | 25,218 MW |
| 2026-08-17T04:00Z | 23,624 MW |
| 2026-08-17T05:00Z | 22,272 MW |
| 2026-08-17T06:00Z | 21,164 MW |
| 2026-08-17T07:00Z | 20,309 MW |
| 2026-08-17T08:00Z | 19,921 MW |
| 2026-08-17T09:00Z | 20,055 MW |
| 2026-08-17T10:00Z | 20,709 MW |
| 2026-08-17T11:00Z | 21,392 MW |
| 2026-08-17T12:00Z | 22,256 MW |
| 2026-08-17T13:00Z | 23,912 MW |
| 2026-08-17T14:00Z | 25,958 MW |
| 2026-08-17T15:00Z | 28,223 MW |
| 2026-08-17T16:00Z | 30,176 MW |
| 2026-08-17T17:00Z | 31,597 MW |
| 2026-08-17T18:00Z | 32,355 MW |
| 2026-08-17T19:00Z | 32,756 MW |
| 2026-08-17T20:00Z | 32,595 MW |
| 2026-08-17T21:00Z | 31,692 MW |
| 2026-08-17T22:00Z | 30,243 MW |
| 2026-08-17T23:00Z | 28,850 MW |
| 2026-08-18T00:00Z | 27,812 MW |
| 2026-08-18T01:00Z | 26,663 MW |
| 2026-08-18T02:00Z | 24,986 MW |
| 2026-08-18T03:00Z | 23,296 MW |
| 2026-08-18T04:00Z | 21,758 MW |
| 2026-08-18T05:00Z | 20,581 MW |
| 2026-08-18T06:00Z | 19,636 MW |
| 2026-08-18T07:00Z | 18,977 MW |
| 2026-08-18T08:00Z | 18,528 MW |
| 2026-08-18T09:00Z | 18,552 MW |
| 2026-08-18T10:00Z | 19,216 MW |
| 2026-08-18T11:00Z | 19,960 MW |
| 2026-08-18T12:00Z | 20,653 MW |
| 2026-08-18T13:00Z | 21,575 MW |
| 2026-08-18T14:00Z | 22,943 MW |
| 2026-08-18T15:00Z | 24,457 MW |
| 2026-08-18T16:00Z | 26,022 MW |
| 2026-08-18T17:00Z | 27,331 MW |
| 2026-08-18T18:00Z | 28,283 MW |
| 2026-08-18T19:00Z | 29,027 MW |
| 2026-08-18T20:00Z | 29,680 MW |
| 2026-08-18T21:00Z | 29,971 MW |
| 2026-08-18T22:00Z | 29,688 MW |
| 2026-08-18T23:00Z | 28,686 MW |
| 2026-08-19T00:00Z | 27,400 MW |
| 2026-08-19T01:00Z | 26,218 MW |
| 2026-08-19T02:00Z | 24,378 MW |
| 2026-08-19T03:00Z | 22,501 MW |
| 2026-08-19T04:00Z | 20,729 MW |
| 2026-08-19T05:00Z | 19,472 MW |
| 2026-08-19T06:00Z | 18,454 MW |
| 2026-08-19T07:00Z | 17,869 MW |
| 2026-08-19T08:00Z | 17,383 MW |
| 2026-08-19T09:00Z | 17,505 MW |
| 2026-08-19T10:00Z | 18,038 MW |
| 2026-08-19T11:00Z | 19,105 MW |
| 2026-08-19T12:00Z | 19,520 MW |
| 2026-08-19T13:00Z | 20,592 MW |
| 2026-08-19T14:00Z | 22,287 MW |
| 2026-08-19T15:00Z | 24,320 MW |
| 2026-08-19T16:00Z | 25,806 MW |
| 2026-08-19T17:00Z | 27,319 MW |
| 2026-08-19T18:00Z | 28,173 MW |
| 2026-08-19T19:00Z | 28,692 MW |
| 2026-08-19T20:00Z | 28,944 MW |
| 2026-08-19T21:00Z | 29,053 MW |
| 2026-08-19T22:00Z | 28,998 MW |
| 2026-08-19T23:00Z | 28,085 MW |
| 2026-08-20T00:00Z | 27,267 MW |
| 2026-08-20T01:00Z | 26,356 MW |
| 2026-08-20T02:00Z | 24,853 MW |
| 2026-08-20T03:00Z | 23,167 MW |
| 2026-08-20T04:00Z | 21,592 MW |
| 2026-08-20T05:00Z | 20,441 MW |
| 2026-08-20T06:00Z | 19,438 MW |
| 2026-08-20T07:00Z | 18,806 MW |
| 2026-08-20T08:00Z | 18,516 MW |
| 2026-08-20T09:00Z | 18,547 MW |
| 2026-08-20T10:00Z | 19,307 MW |
| 2026-08-20T11:00Z | 20,091 MW |
| 2026-08-20T12:00Z | 20,429 MW |
| 2026-08-20T13:00Z | 20,935 MW |
| 2026-08-20T14:00Z | 21,955 MW |
| 2026-08-20T15:00Z | 23,547 MW |
| 2026-08-20T16:00Z | 25,386 MW |
| 2026-08-20T17:00Z | 26,916 MW |
| 2026-08-20T18:00Z | 28,332 MW |
| 2026-08-20T19:00Z | 29,474 MW |
| 2026-08-20T20:00Z | 30,066 MW |
| 2026-08-20T21:00Z | 30,201 MW |
| 2026-08-20T22:00Z | 29,799 MW |
| 2026-08-20T23:00Z | 29,010 MW |
| 2026-08-21T00:00Z | 28,209 MW |
| 2026-08-21T01:00Z | 27,243 MW |
| 2026-08-21T02:00Z | 25,408 MW |
| 2026-08-21T03:00Z | 23,222 MW |
| 2026-08-21T04:00Z | 21,566 MW |
| 2026-08-21T05:00Z | 20,297 MW |
| 2026-08-21T06:00Z | 19,371 MW |
| 2026-08-21T07:00Z | 18,675 MW |
| 2026-08-21T08:00Z | 18,305 MW |
| 2026-08-21T09:00Z | 18,325 MW |
| 2026-08-21T10:00Z | 18,899 MW |
| 2026-08-21T11:00Z | 19,601 MW |
| 2026-08-21T12:00Z | 20,162 MW |
| 2026-08-21T13:00Z | 21,224 MW |
| 2026-08-21T14:00Z | 22,783 MW |
| 2026-08-21T15:00Z | 24,523 MW |
| 2026-08-21T16:00Z | 26,044 MW |
| 2026-08-21T17:00Z | 27,502 MW |
| 2026-08-21T18:00Z | 28,140 MW |
| 2026-08-21T19:00Z | 28,994 MW |
| 2026-08-21T20:00Z | 29,400 MW |
| 2026-08-21T21:00Z | 29,523 MW |
| 2026-08-21T22:00Z | 28,950 MW |
| 2026-08-21T23:00Z | 27,706 MW |
| 2026-08-22T00:00Z | 26,504 MW |
| 2026-08-22T01:00Z | 25,216 MW |
| 2026-08-22T02:00Z | 23,484 MW |
| 2026-08-22T03:00Z | 21,897 MW |
| 2026-08-22T04:00Z | 20,365 MW |
| 2026-08-22T05:00Z | 19,049 MW |
| 2026-08-22T06:00Z | 17,995 MW |
| 2026-08-22T07:00Z | 17,331 MW |
| 2026-08-22T08:00Z | 16,816 MW |
| 2026-08-22T09:00Z | 16,461 MW |
| 2026-08-22T10:00Z | 16,592 MW |
| 2026-08-22T11:00Z | 16,582 MW |
| 2026-08-22T12:00Z | 17,410 MW |
| 2026-08-22T13:00Z | 19,155 MW |
| 2026-08-22T14:00Z | 21,255 MW |
| 2026-08-22T15:00Z | 23,406 MW |
| 2026-08-22T16:00Z | 25,150 MW |
| 2026-08-22T17:00Z | 26,663 MW |
| 2026-08-22T18:00Z | 27,874 MW |
| 2026-08-22T19:00Z | 28,856 MW |
| 2026-08-22T20:00Z | 29,347 MW |
| 2026-08-22T21:00Z | 29,213 MW |
| 2026-08-22T22:00Z | 27,663 MW |
| 2026-08-22T23:00Z | 26,171 MW |
| 2026-08-23T00:00Z | 24,624 MW |
| 2026-08-23T01:00Z | 23,597 MW |
| 2026-08-23T02:00Z | 22,129 MW |
| 2026-08-23T03:00Z | 20,631 MW |
| 2026-08-23T04:00Z | 18,951 MW |
| 2026-08-23T05:00Z | 17,847 MW |
| 2026-08-23T06:00Z | 16,830 MW |
| 2026-08-23T07:00Z | 16,277 MW |
| 2026-08-23T08:00Z | 15,906 MW |
| 2026-08-23T09:00Z | 15,584 MW |
| 2026-08-23T10:00Z | 15,599 MW |
| 2026-08-23T11:00Z | 15,545 MW |
| 2026-08-23T12:00Z | 16,494 MW |
| 2026-08-23T13:00Z | 18,081 MW |
| 2026-08-23T14:00Z | 19,638 MW |
| 2026-08-23T15:00Z | 21,163 MW |
| 2026-08-23T16:00Z | 22,863 MW |
| 2026-08-23T17:00Z | 24,100 MW |
| 2026-08-23T18:00Z | 25,274 MW |
| 2026-08-23T19:00Z | 26,043 MW |
| 2026-08-23T20:00Z | 26,681 MW |
| 2026-08-23T21:00Z | 26,939 MW |
| 2026-08-23T22:00Z | 26,617 MW |
| 2026-08-23T23:00Z | 25,450 MW |
| 2026-08-24T00:00Z | 24,144 MW |
| 2026-08-24T01:00Z | 23,008 MW |
| 2026-08-24T02:00Z | 21,303 MW |
| 2026-08-24T03:00Z | 19,543 MW |
| 2026-08-24T04:00Z | 18,099 MW |
| 2026-08-24T05:00Z | 16,681 MW |
| 2026-08-24T06:00Z | 16,118 MW |
| 2026-08-24T07:00Z | 15,757 MW |
| 2026-08-24T08:00Z | 15,466 MW |
| 2026-08-24T09:00Z | 15,827 MW |
| 2026-08-24T10:00Z | 16,667 MW |
| 2026-08-24T11:00Z | 17,502 MW |
| 2026-08-24T12:00Z | 17,825 MW |
| 2026-08-24T13:00Z | 19,138 MW |
| 2026-08-24T14:00Z | 20,540 MW |
| 2026-08-24T15:00Z | 22,396 MW |
| 2026-08-24T16:00Z | 23,649 MW |
| 2026-08-24T17:00Z | 24,981 MW |
| 2026-08-24T18:00Z | 26,097 MW |
| 2026-08-24T19:00Z | 26,810 MW |
| 2026-08-24T20:00Z | 27,520 MW |
| 2026-08-24T21:00Z | 27,803 MW |
| 2026-08-24T22:00Z | 27,380 MW |
| 2026-08-24T23:00Z | 26,324 MW |
| 2026-08-25T00:00Z | 25,258 MW |
| 2026-08-25T01:00Z | 23,832 MW |
| 2026-08-25T02:00Z | 21,972 MW |
| 2026-08-25T03:00Z | 20,241 MW |
| 2026-08-25T04:00Z | 18,824 MW |
| 2026-08-25T05:00Z | 17,694 MW |
| 2026-08-25T06:00Z | 16,893 MW |
| 2026-08-25T07:00Z | 16,249 MW |
| 2026-08-25T08:00Z | 16,335 MW |
| 2026-08-25T09:00Z | 16,289 MW |
| 2026-08-25T10:00Z | 17,082 MW |
| 2026-08-25T11:00Z | 17,820 MW |
| 2026-08-25T12:00Z | 18,503 MW |
| 2026-08-25T13:00Z | 19,309 MW |
| 2026-08-25T14:00Z | 20,571 MW |
| 2026-08-25T15:00Z | 22,480 MW |
| 2026-08-25T16:00Z | 23,858 MW |
| 2026-08-25T17:00Z | 25,298 MW |
| 2026-08-25T18:00Z | 26,216 MW |
| 2026-08-25T19:00Z | 27,352 MW |
| 2026-08-25T20:00Z | 28,131 MW |
| 2026-08-25T21:00Z | 28,318 MW |
| 2026-08-25T22:00Z | 28,136 MW |
| 2026-08-25T23:00Z | 27,096 MW |
| 2026-08-26T00:00Z | 25,998 MW |
| 2026-08-26T01:00Z | 25,009 MW |
| 2026-08-26T02:00Z | 23,177 MW |
| 2026-08-26T03:00Z | 21,219 MW |
| 2026-08-26T04:00Z | 19,721 MW |
| 2026-08-26T05:00Z | 18,561 MW |
| 2026-08-26T06:00Z | 17,759 MW |
| 2026-08-26T07:00Z | 17,170 MW |
| 2026-08-26T08:00Z | 16,914 MW |
| 2026-08-26T09:00Z | 16,929 MW |
| 2026-08-26T10:00Z | 17,563 MW |
| 2026-08-26T11:00Z | 18,340 MW |
| 2026-08-26T12:00Z | 19,055 MW |
| 2026-08-26T13:00Z | 20,215 MW |
| 2026-08-26T14:00Z | 21,582 MW |
| 2026-08-26T15:00Z | 23,001 MW |
| 2026-08-26T16:00Z | 24,301 MW |
| 2026-08-26T17:00Z | 25,143 MW |
| 2026-08-26T18:00Z | 25,365 MW |
| 2026-08-26T19:00Z | 25,339 MW |
| 2026-08-26T20:00Z | 25,249 MW |
| 2026-08-26T21:00Z | 25,166 MW |
| 2026-08-26T22:00Z | 24,986 MW |
| 2026-08-26T23:00Z | 24,331 MW |
| 2026-08-27T00:00Z | 23,928 MW |
| 2026-08-27T01:00Z | 23,276 MW |
| 2026-08-27T02:00Z | 21,854 MW |
| 2026-08-27T03:00Z | 20,379 MW |
| 2026-08-27T04:00Z | 18,903 MW |
| 2026-08-27T05:00Z | 17,825 MW |
| 2026-08-27T06:00Z | 17,079 MW |
| 2026-08-27T07:00Z | 16,621 MW |
| 2026-08-27T08:00Z | 16,475 MW |
| 2026-08-27T09:00Z | 16,594 MW |
| 2026-08-27T10:00Z | 17,352 MW |
| 2026-08-27T11:00Z | 18,032 MW |
| 2026-08-27T12:00Z | 18,755 MW |
| 2026-08-27T13:00Z | 19,762 MW |
| 2026-08-27T14:00Z | 21,043 MW |
| 2026-08-27T15:00Z | 22,833 MW |
| 2026-08-27T16:00Z | 24,674 MW |
| 2026-08-27T17:00Z | 26,202 MW |
| 2026-08-27T18:00Z | 27,141 MW |
| 2026-08-27T19:00Z | 28,162 MW |
| 2026-08-27T20:00Z | 28,695 MW |
| 2026-08-27T21:00Z | 28,693 MW |
| 2026-08-27T22:00Z | 28,503 MW |
| 2026-08-27T23:00Z | 27,375 MW |
| 2026-08-28T00:00Z | 26,385 MW |
| 2026-08-28T01:00Z | 25,249 MW |
| 2026-08-28T02:00Z | 23,415 MW |
| 2026-08-28T03:00Z | 21,576 MW |
| 2026-08-28T04:00Z | 19,992 MW |
| 2026-08-28T05:00Z | 18,751 MW |
| 2026-08-28T06:00Z | 17,804 MW |
| 2026-08-28T07:00Z | 17,169 MW |
| 2026-08-28T08:00Z | 16,818 MW |
| 2026-08-28T09:00Z | 16,922 MW |
| 2026-08-28T10:00Z | 17,498 MW |
| 2026-08-28T11:00Z | 18,291 MW |
| 2026-08-28T12:00Z | 18,875 MW |
| 2026-08-28T13:00Z | 20,161 MW |
| 2026-08-28T14:00Z | 21,716 MW |
| 2026-08-28T15:00Z | 23,814 MW |
| 2026-08-28T16:00Z | 25,346 MW |
| 2026-08-28T17:00Z | 26,571 MW |
| 2026-08-28T18:00Z | 27,254 MW |
| 2026-08-28T19:00Z | 27,895 MW |
| 2026-08-28T20:00Z | 28,387 MW |
| 2026-08-28T21:00Z | 28,399 MW |
| 2026-08-28T22:00Z | 27,903 MW |
| 2026-08-28T23:00Z | 26,519 MW |
| 2026-08-29T00:00Z | 25,290 MW |
| 2026-08-29T01:00Z | 23,960 MW |
| 2026-08-29T02:00Z | 22,479 MW |
| 2026-08-29T03:00Z | 20,904 MW |
| 2026-08-29T04:00Z | 19,229 MW |
| 2026-08-29T05:00Z | 17,958 MW |
| 2026-08-29T06:00Z | 17,062 MW |
| 2026-08-29T07:00Z | 16,261 MW |
| 2026-08-29T08:00Z | 16,056 MW |
| 2026-08-29T09:00Z | 15,859 MW |
| 2026-08-29T10:00Z | 15,561 MW |
| 2026-08-29T11:00Z | 15,916 MW |
| 2026-08-29T12:00Z | 16,541 MW |
| 2026-08-29T13:00Z | 18,339 MW |
| 2026-08-29T14:00Z | 20,459 MW |
| 2026-08-29T15:00Z | 22,529 MW |
| 2026-08-29T16:00Z | 24,546 MW |
| 2026-08-29T17:00Z | 26,190 MW |
| 2026-08-29T18:00Z | 27,416 MW |
| 2026-08-29T19:00Z | 28,349 MW |
| 2026-08-29T20:00Z | 28,858 MW |
| 2026-08-29T21:00Z | 29,060 MW |
| 2026-08-29T22:00Z | 28,584 MW |
| 2026-08-29T23:00Z | 27,387 MW |
| 2026-08-30T00:00Z | 25,796 MW |
| 2026-08-30T01:00Z | 24,273 MW |
| 2026-08-30T02:00Z | 22,733 MW |
| 2026-08-30T03:00Z | 21,226 MW |
| 2026-08-30T04:00Z | 19,123 MW |
| 2026-08-30T05:00Z | 18,446 MW |
| 2026-08-30T06:00Z | 17,460 MW |
| 2026-08-30T07:00Z | 16,797 MW |
| 2026-08-30T08:00Z | 16,425 MW |
| 2026-08-30T09:00Z | 16,137 MW |
| 2026-08-30T10:00Z | 16,097 MW |
| 2026-08-30T11:00Z | 16,169 MW |
| 2026-08-30T12:00Z | 17,047 MW |
| 2026-08-30T13:00Z | 19,321 MW |
| 2026-08-30T14:00Z | 21,436 MW |
| 2026-08-30T15:00Z | 23,618 MW |
| 2026-08-30T16:00Z | 25,570 MW |
| 2026-08-30T17:00Z | 27,061 MW |
| 2026-08-30T18:00Z | 28,206 MW |
| 2026-08-30T19:00Z | 29,008 MW |
| 2026-08-30T20:00Z | 29,685 MW |
| 2026-08-30T21:00Z | 30,030 MW |
| 2026-08-30T22:00Z | 29,831 MW |
| 2026-08-30T23:00Z | 28,684 MW |
| 2026-08-31T00:00Z | 27,406 MW |
| 2026-08-31T01:00Z | 26,074 MW |
| 2026-08-31T02:00Z | 24,560 MW |
| 2026-08-31T03:00Z | 22,604 MW |
| 2026-08-31T04:00Z | 21,056 MW |
| 2026-08-31T05:00Z | 19,765 MW |
| 2026-08-31T06:00Z | 18,680 MW |
| 2026-08-31T07:00Z | 17,934 MW |
| 2026-08-31T08:00Z | 17,654 MW |
| 2026-08-31T09:00Z | 17,693 MW |
| 2026-08-31T10:00Z | 18,505 MW |
| 2026-08-31T11:00Z | 19,384 MW |
| 2026-08-31T12:00Z | 20,263 MW |
| 2026-08-31T13:00Z | 21,736 MW |
| 2026-08-31T14:00Z | 23,892 MW |
| 2026-08-31T15:00Z | 26,108 MW |
| 2026-08-31T16:00Z | 27,982 MW |
| 2026-08-31T17:00Z | 29,359 MW |
| 2026-08-31T18:00Z | 30,160 MW |
| 2026-08-31T19:00Z | 30,827 MW |
| 2026-08-31T20:00Z | 31,186 MW |
| 2026-08-31T21:00Z | 31,358 MW |
| 2026-08-31T22:00Z | 31,035 MW |
| 2026-08-31T23:00Z | 29,856 MW |
| 2026-09-01T00:00Z | 28,478 MW |
| 2026-09-01T01:00Z | 27,224 MW |
| 2026-09-01T02:00Z | 25,395 MW |
| 2026-09-01T03:00Z | 23,556 MW |
| 2026-09-01T04:00Z | 21,926 MW |
| 2026-09-01T05:00Z | 20,423 MW |
| 2026-09-01T06:00Z | 19,507 MW |
| 2026-09-01T07:00Z | 18,818 MW |
| 2026-09-01T08:00Z | 18,469 MW |
| 2026-09-01T09:00Z | 18,502 MW |
| 2026-09-01T10:00Z | 19,191 MW |
| 2026-09-01T11:00Z | 19,855 MW |
| 2026-09-01T12:00Z | 20,669 MW |
| 2026-09-01T13:00Z | 22,158 MW |
| 2026-09-01T14:00Z | 24,388 MW |
| 2026-09-01T15:00Z | 26,643 MW |
| 2026-09-01T16:00Z | 28,758 MW |
| 2026-09-01T17:00Z | 30,164 MW |
| 2026-09-01T18:00Z | 30,886 MW |
| 2026-09-01T19:00Z | 31,457 MW |
| 2026-09-01T20:00Z | 31,928 MW |
| 2026-09-01T21:00Z | 32,013 MW |
| 2026-09-01T22:00Z | 31,652 MW |
| 2026-09-01T23:00Z | 30,597 MW |
| 2026-09-02T00:00Z | 29,565 MW |
| 2026-09-02T01:00Z | 28,181 MW |
| 2026-09-02T02:00Z | 26,324 MW |
| 2026-09-02T03:00Z | 24,289 MW |
| 2026-09-02T04:00Z | 22,494 MW |
| 2026-09-02T05:00Z | 21,164 MW |
| 2026-09-02T06:00Z | 20,105 MW |
| 2026-09-02T07:00Z | 19,266 MW |
| 2026-09-02T08:00Z | 18,846 MW |
| 2026-09-02T09:00Z | 18,794 MW |
| 2026-09-02T10:00Z | 19,301 MW |
| 2026-09-02T11:00Z | 20,150 MW |
| 2026-09-02T12:00Z | 20,914 MW |
| 2026-09-02T13:00Z | 22,520 MW |
| 2026-09-02T14:00Z | 24,736 MW |
| 2026-09-02T15:00Z | 27,221 MW |
| 2026-09-02T16:00Z | 29,407 MW |
| 2026-09-02T17:00Z | 30,931 MW |
| 2026-09-02T18:00Z | 31,629 MW |
| 2026-09-02T19:00Z | 32,296 MW |
| 2026-09-02T20:00Z | 32,456 MW |
| 2026-09-02T21:00Z | 32,193 MW |
| 2026-09-02T22:00Z | 31,855 MW |
| 2026-09-02T23:00Z | 30,707 MW |
| 2026-09-03T00:00Z | 29,651 MW |
| 2026-09-03T01:00Z | 28,608 MW |
| 2026-09-03T02:00Z | 26,836 MW |
| 2026-09-03T03:00Z | 24,682 MW |
| 2026-09-03T04:00Z | 23,091 MW |
| 2026-09-03T05:00Z | 21,657 MW |
| 2026-09-03T06:00Z | 20,671 MW |
| 2026-09-03T07:00Z | 19,882 MW |
| 2026-09-03T08:00Z | 19,389 MW |
| 2026-09-03T09:00Z | 19,353 MW |
| 2026-09-03T10:00Z | 19,741 MW |
| 2026-09-03T11:00Z | 20,500 MW |
| 2026-09-03T12:00Z | 21,366 MW |
| 2026-09-03T13:00Z | 22,979 MW |
| 2026-09-03T14:00Z | 25,327 MW |
| 2026-09-03T15:00Z | 27,898 MW |
| 2026-09-03T16:00Z | 30,029 MW |
| 2026-09-03T17:00Z | 31,582 MW |
| 2026-09-03T18:00Z | 32,300 MW |
| 2026-09-03T19:00Z | 32,807 MW |
| 2026-09-03T20:00Z | 33,092 MW |
| 2026-09-03T21:00Z | 32,740 MW |
| 2026-09-03T22:00Z | 31,956 MW |
| 2026-09-03T23:00Z | 30,943 MW |
| 2026-09-04T00:00Z | 29,933 MW |
| 2026-09-04T01:00Z | 28,882 MW |
| 2026-09-04T02:00Z | 27,317 MW |
| 2026-09-04T03:00Z | 25,390 MW |
| 2026-09-04T04:00Z | 23,409 MW |
| 2026-09-04T05:00Z | 22,302 MW |
| 2026-09-04T06:00Z | 20,998 MW |
| 2026-09-04T07:00Z | 20,245 MW |
| 2026-09-04T08:00Z | 19,608 MW |
| 2026-09-04T09:00Z | 19,548 MW |
| 2026-09-04T10:00Z | 19,953 MW |
| 2026-09-04T11:00Z | 20,666 MW |
| 2026-09-04T12:00Z | 21,412 MW |
| 2026-09-04T13:00Z | 23,148 MW |
| 2026-09-04T14:00Z | 25,504 MW |
| 2026-09-04T15:00Z | 27,889 MW |
| 2026-09-04T16:00Z | 30,150 MW |
| 2026-09-04T17:00Z | 31,431 MW |
| 2026-09-04T18:00Z | 31,995 MW |
| 2026-09-04T19:00Z | 32,342 MW |
| 2026-09-04T20:00Z | 32,441 MW |
| 2026-09-04T21:00Z | 32,172 MW |
| 2026-09-04T22:00Z | 31,265 MW |
| 2026-09-04T23:00Z | 29,732 MW |
| 2026-09-05T00:00Z | 28,674 MW |
| 2026-09-05T01:00Z | 27,617 MW |
| 2026-09-05T02:00Z | 26,162 MW |
| 2026-09-05T03:00Z | 24,565 MW |
| 2026-09-05T04:00Z | 22,815 MW |
| 2026-09-05T05:00Z | 21,486 MW |
| 2026-09-05T06:00Z | 20,343 MW |
| 2026-09-05T07:00Z | 19,418 MW |
| 2026-09-05T08:00Z | 18,835 MW |
| 2026-09-05T09:00Z | 18,423 MW |
| 2026-09-05T10:00Z | 18,406 MW |
| 2026-09-05T11:00Z | 18,266 MW |
| 2026-09-05T12:00Z | 19,121 MW |
| 2026-09-05T13:00Z | 20,810 MW |
| 2026-09-05T14:00Z | 23,072 MW |
| 2026-09-05T15:00Z | 25,603 MW |
| 2026-09-05T16:00Z | 27,950 MW |
| 2026-09-05T17:00Z | 29,480 MW |
| 2026-09-05T18:00Z | 30,224 MW |
| 2026-09-05T19:00Z | 30,590 MW |
| 2026-09-05T20:00Z | 30,950 MW |
| 2026-09-05T21:00Z | 30,919 MW |
| 2026-09-05T22:00Z | 30,482 MW |
| 2026-09-05T23:00Z | 29,306 MW |
| 2026-09-06T00:00Z | 27,941 MW |
| 2026-09-06T01:00Z | 26,560 MW |
| 2026-09-06T02:00Z | 24,684 MW |
| 2026-09-06T03:00Z | 23,222 MW |
| 2026-09-06T04:00Z | 21,926 MW |
| 2026-09-06T05:00Z | 20,691 MW |
| 2026-09-06T06:00Z | 19,611 MW |
| 2026-09-06T07:00Z | 18,880 MW |
| 2026-09-06T08:00Z | 18,301 MW |
| 2026-09-06T09:00Z | 17,988 MW |
| 2026-09-06T10:00Z | 17,775 MW |
| 2026-09-06T11:00Z | 17,832 MW |
| 2026-09-06T12:00Z | 18,480 MW |
| 2026-09-06T13:00Z | 20,370 MW |
| 2026-09-06T14:00Z | 22,525 MW |
| 2026-09-06T15:00Z | 24,768 MW |
| 2026-09-06T16:00Z | 26,992 MW |
| 2026-09-06T17:00Z | 28,732 MW |
| 2026-09-06T18:00Z | 29,831 MW |
| 2026-09-06T19:00Z | 30,256 MW |
| 2026-09-06T20:00Z | 30,403 MW |
| 2026-09-06T21:00Z | 30,211 MW |
| 2026-09-06T22:00Z | 29,504 MW |
| 2026-09-06T23:00Z | 27,985 MW |
| 2026-09-07T00:00Z | 26,755 MW |
| 2026-09-07T01:00Z | 25,434 MW |
| 2026-09-07T02:00Z | 23,929 MW |
| 2026-09-07T03:00Z | 22,303 MW |
| 2026-09-07T04:00Z | 20,809 MW |
| 2026-09-07T05:00Z | 19,455 MW |
| 2026-09-07T06:00Z | 18,612 MW |
| 2026-09-07T07:00Z | 17,729 MW |
| 2026-09-07T08:00Z | 17,277 MW |
| 2026-09-07T09:00Z | 17,028 MW |
| 2026-09-07T10:00Z | 16,915 MW |
| 2026-09-07T11:00Z | 16,800 MW |
| 2026-09-07T12:00Z | 17,229 MW |
| 2026-09-07T13:00Z | 18,524 MW |
| 2026-09-07T14:00Z | 20,286 MW |
| 2026-09-07T15:00Z | 22,369 MW |
| 2026-09-07T16:00Z | 24,254 MW |
| 2026-09-07T17:00Z | 25,600 MW |
| 2026-09-07T18:00Z | 26,678 MW |
| 2026-09-07T19:00Z | 27,484 MW |
| 2026-09-07T20:00Z | 28,093 MW |
| 2026-09-07T21:00Z | 28,268 MW |
| 2026-09-07T22:00Z | 27,990 MW |
| 2026-09-07T23:00Z | 26,803 MW |
| 2026-09-08T00:00Z | 25,890 MW |
| 2026-09-08T01:00Z | 24,563 MW |
| 2026-09-08T02:00Z | 22,971 MW |
| 2026-09-08T03:00Z | 21,464 MW |
| 2026-09-08T04:00Z | 19,864 MW |
| 2026-09-08T05:00Z | 18,686 MW |
| 2026-09-08T06:00Z | 17,968 MW |
| 2026-09-08T07:00Z | 17,330 MW |
| 2026-09-08T08:00Z | 17,265 MW |
| 2026-09-08T09:00Z | 17,437 MW |
| 2026-09-08T10:00Z | 18,389 MW |
| 2026-09-08T11:00Z | 19,143 MW |
| 2026-09-08T12:00Z | 19,804 MW |
| 2026-09-08T13:00Z | 21,030 MW |
| 2026-09-08T14:00Z | 22,491 MW |
| 2026-09-08T15:00Z | 24,288 MW |
| 2026-09-08T16:00Z | 26,057 MW |
| 2026-09-08T17:00Z | 27,553 MW |
| 2026-09-08T18:00Z | 28,680 MW |
| 2026-09-08T19:00Z | 29,210 MW |
| 2026-09-08T20:00Z | 30,021 MW |
| 2026-09-08T21:00Z | 30,117 MW |
| 2026-09-08T22:00Z | 29,631 MW |
| 2026-09-08T23:00Z | 28,169 MW |
| 2026-09-09T00:00Z | 27,496 MW |
| 2026-09-09T01:00Z | 26,491 MW |
| 2026-09-09T02:00Z | 24,844 MW |
| 2026-09-09T03:00Z | 23,056 MW |
| 2026-09-09T04:00Z | 21,497 MW |
| 2026-09-09T05:00Z | 20,138 MW |
| 2026-09-09T06:00Z | 19,191 MW |
| 2026-09-09T07:00Z | 18,566 MW |
| 2026-09-09T08:00Z | 18,186 MW |
| 2026-09-09T09:00Z | 18,263 MW |
| 2026-09-09T10:00Z | 18,941 MW |
| 2026-09-09T11:00Z | 19,655 MW |
| 2026-09-09T12:00Z | 20,329 MW |
| 2026-09-09T13:00Z | 21,432 MW |
| 2026-09-09T14:00Z | 23,107 MW |
| 2026-09-09T15:00Z | 25,170 MW |
| 2026-09-09T16:00Z | 26,979 MW |
| 2026-09-09T17:00Z | 28,565 MW |
| 2026-09-09T18:00Z | 29,022 MW |
| 2026-09-09T19:00Z | 30,378 MW |
| 2026-09-09T20:00Z | 30,897 MW |
| 2026-09-09T21:00Z | 30,898 MW |
| 2026-09-09T22:00Z | 30,163 MW |
| 2026-09-09T23:00Z | 28,876 MW |
| 2026-09-10T00:00Z | 27,845 MW |
| 2026-09-10T01:00Z | 26,628 MW |
| 2026-09-10T02:00Z | 25,029 MW |
| 2026-09-10T03:00Z | 23,063 MW |
| 2026-09-10T04:00Z | 21,595 MW |
| 2026-09-10T05:00Z | 20,504 MW |
| 2026-09-10T06:00Z | 19,577 MW |
| 2026-09-10T07:00Z | 18,953 MW |
| 2026-09-10T08:00Z | 18,485 MW |
| 2026-09-10T09:00Z | 18,597 MW |
| 2026-09-10T10:00Z | 19,200 MW |
| 2026-09-10T11:00Z | 19,987 MW |
| 2026-09-10T12:00Z | 20,398 MW |
| 2026-09-10T13:00Z | 21,639 MW |
| 2026-09-10T14:00Z | 23,158 MW |
| 2026-09-10T15:00Z | 24,913 MW |
| 2026-09-10T16:00Z | 26,803 MW |
| 2026-09-10T17:00Z | 28,095 MW |
| 2026-09-10T18:00Z | 28,932 MW |
| 2026-09-10T19:00Z | 29,670 MW |
| 2026-09-10T20:00Z | 30,213 MW |
| 2026-09-10T21:00Z | 30,059 MW |
| 2026-09-10T22:00Z | 29,088 MW |
| 2026-09-10T23:00Z | 27,867 MW |
| 2026-09-11T00:00Z | 26,881 MW |
| 2026-09-11T01:00Z | 25,687 MW |
| 2026-09-11T02:00Z | 24,311 MW |
| 2026-09-11T03:00Z | 22,690 MW |
| 2026-09-11T04:00Z | 21,140 MW |
| 2026-09-11T05:00Z | 19,912 MW |
| 2026-09-11T06:00Z | 19,030 MW |
| 2026-09-11T07:00Z | 18,384 MW |
| 2026-09-11T08:00Z | 18,049 MW |
| 2026-09-11T09:00Z | 18,105 MW |
| 2026-09-11T10:00Z | 18,816 MW |
| 2026-09-11T11:00Z | 19,466 MW |
| 2026-09-11T12:00Z | 20,086 MW |
| 2026-09-11T13:00Z | 21,459 MW |
| 2026-09-11T14:00Z | 23,031 MW |
| 2026-09-11T15:00Z | 24,974 MW |
| 2026-09-11T16:00Z | 26,726 MW |
| 2026-09-11T17:00Z | 28,254 MW |
| 2026-09-11T18:00Z | 28,958 MW |
| 2026-09-11T19:00Z | 29,446 MW |
| 2026-09-11T20:00Z | 29,501 MW |
| 2026-09-11T21:00Z | 28,509 MW |
| 2026-09-11T22:00Z | 27,419 MW |
| 2026-09-11T23:00Z | 25,477 MW |
| 2026-09-12T00:00Z | 24,946 MW |
| 2026-09-12T01:00Z | 25,059 MW |
| 2026-09-12T02:00Z | 25,922 MW |
| 2026-09-12T03:00Z | 26,032 MW |
| 2026-09-12T04:00Z | 20,386 MW |
| 2026-09-12T05:00Z | 19,293 MW |
| 2026-09-12T06:00Z | 18,504 MW |
| 2026-09-12T07:00Z | 17,967 MW |
| 2026-09-12T08:00Z | 17,666 MW |
| 2026-09-12T09:00Z | 17,527 MW |
| 2026-09-12T10:00Z | 17,710 MW |
| 2026-09-12T11:00Z | 18,005 MW |
| 2026-09-12T12:00Z | 18,465 MW |
| 2026-09-12T13:00Z | 19,409 MW |
| 2026-09-12T14:00Z | 20,676 MW |
| 2026-09-12T15:00Z | 21,831 MW |
| 2026-09-12T16:00Z | 23,326 MW |
| 2026-09-12T17:00Z | 24,748 MW |
| 2026-09-12T18:00Z | 26,077 MW |
| 2026-09-12T19:00Z | 26,481 MW |
| 2026-09-12T20:00Z | 26,820 MW |
| 2026-09-12T21:00Z | 26,859 MW |
| 2026-09-12T22:00Z | 26,465 MW |
| 2026-09-12T23:00Z | 25,378 MW |
| 2026-09-13T00:00Z | 24,330 MW |
| 2026-09-13T01:00Z | 23,238 MW |
| 2026-09-13T02:00Z | 21,800 MW |
| 2026-09-13T03:00Z | 20,520 MW |
| 2026-09-13T04:00Z | 19,258 MW |
| 2026-09-13T05:00Z | 18,160 MW |
| 2026-09-13T06:00Z | 17,263 MW |
| 2026-09-13T07:00Z | 16,739 MW |
| 2026-09-13T08:00Z | 16,397 MW |
| 2026-09-13T09:00Z | 16,190 MW |
| 2026-09-13T10:00Z | 16,148 MW |
| 2026-09-13T11:00Z | 16,393 MW |
| 2026-09-13T12:00Z | 17,155 MW |
| 2026-09-13T13:00Z | 18,657 MW |
| 2026-09-13T14:00Z | 20,286 MW |
| 2026-09-13T15:00Z | 22,350 MW |
| 2026-09-13T16:00Z | 24,593 MW |
| 2026-09-13T17:00Z | 26,428 MW |
| 2026-09-13T18:00Z | 27,893 MW |
| 2026-09-13T19:00Z | 28,819 MW |
| 2026-09-13T20:00Z | 29,431 MW |
| 2026-09-13T21:00Z | 29,622 MW |
| 2026-09-13T22:00Z | 29,368 MW |
| 2026-09-13T23:00Z | 27,941 MW |
| 2026-09-14T00:00Z | 26,856 MW |
| 2026-09-14T01:00Z | 25,456 MW |
| 2026-09-14T02:00Z | 23,775 MW |
| 2026-09-14T03:00Z | 21,987 MW |
| 2026-09-14T04:00Z | 20,525 MW |
| 2026-09-14T05:00Z | 19,245 MW |
| 2026-09-14T06:00Z | 18,296 MW |
| 2026-09-14T07:00Z | 17,757 MW |
| 2026-09-14T08:00Z | 17,371 MW |
| 2026-09-14T09:00Z | 17,587 MW |
| 2026-09-14T10:00Z | 18,501 MW |
| 2026-09-14T11:00Z | 19,236 MW |
| 2026-09-14T12:00Z | 19,963 MW |
| 2026-09-14T13:00Z | 21,218 MW |
| 2026-09-14T14:00Z | 22,974 MW |
| 2026-09-14T15:00Z | 24,994 MW |
| 2026-09-14T16:00Z | 26,949 MW |
| 2026-09-14T17:00Z | 28,719 MW |
| 2026-09-14T18:00Z | 29,624 MW |
| 2026-09-14T19:00Z | 30,047 MW |
| 2026-09-14T20:00Z | 30,100 MW |
| 2026-09-14T21:00Z | 30,047 MW |
| 2026-09-14T22:00Z | 29,493 MW |
| 2026-09-14T23:00Z | 28,191 MW |
| 2026-09-15T00:00Z | 27,465 MW |
| 2026-09-15T01:00Z | 26,151 MW |
| 2026-09-15T02:00Z | 24,335 MW |
| 2026-09-15T03:00Z | 22,476 MW |
| 2026-09-15T04:00Z | 20,874 MW |
| 2026-09-15T05:00Z | 19,688 MW |
| 2026-09-15T06:00Z | 18,596 MW |
| 2026-09-15T07:00Z | 18,050 MW |
| 2026-09-15T08:00Z | 17,404 MW |
| 2026-09-15T09:00Z | 17,727 MW |
| 2026-09-15T10:00Z | 18,428 MW |
| 2026-09-15T11:00Z | 19,107 MW |
| 2026-09-15T12:00Z | 20,610 MW |
| 2026-09-15T13:00Z | 21,356 MW |
| 2026-09-15T14:00Z | 23,406 MW |
| 2026-09-15T15:00Z | 23,406 MW |
| 2026-09-15T16:00Z | n/a |
| Hour starting (UTC) | Gas | Nuclear | Coal | Hydro | Solar |
|---|---|---|---|---|---|
| 2026-08-16T17:00Z | 9,538 MW | 8,052 MW | 4,549 MW | 2,831 MW | 1,588 MW |
| 2026-08-16T18:00Z | 9,827 MW | 8,054 MW | 4,585 MW | 3,168 MW | 1,571 MW |
| 2026-08-16T19:00Z | 9,704 MW | 8,049 MW | 4,616 MW | 3,260 MW | 1,552 MW |
| 2026-08-16T20:00Z | 9,587 MW | 8,055 MW | 4,626 MW | 3,273 MW | 1,514 MW |
| 2026-08-16T21:00Z | 9,320 MW | 8,049 MW | 4,647 MW | 3,284 MW | 1,498 MW |
| 2026-08-16T22:00Z | 9,587 MW | 8,050 MW | 4,658 MW | 3,193 MW | 1,314 MW |
| 2026-08-16T23:00Z | 9,293 MW | 8,035 MW | 4,644 MW | 2,794 MW | 601 MW |
| 2026-08-17T00:00Z | 9,228 MW | 8,043 MW | 4,642 MW | 2,463 MW | 34 MW |
| 2026-08-17T01:00Z | 9,240 MW | 8,042 MW | 4,632 MW | 2,087 MW | 17 MW |
| 2026-08-17T02:00Z | 9,395 MW | 8,045 MW | 4,626 MW | 1,666 MW | 11 MW |
| 2026-08-17T03:00Z | 8,793 MW | 8,066 MW | 4,583 MW | 1,322 MW | -10 MW |
| 2026-08-17T04:00Z | 8,088 MW | 8,056 MW | 4,507 MW | 1,153 MW | -6 MW |
| 2026-08-17T05:00Z | 7,658 MW | 8,064 MW | 4,520 MW | 1,073 MW | -34 MW |
| 2026-08-17T06:00Z | 7,740 MW | 8,062 MW | 4,466 MW | 1,040 MW | -50 MW |
| 2026-08-17T07:00Z | 7,207 MW | 8,067 MW | 4,381 MW | 971 MW | -62 MW |
| 2026-08-17T08:00Z | 6,842 MW | 8,065 MW | 4,317 MW | 1,014 MW | -55 MW |
| 2026-08-17T09:00Z | 6,943 MW | 8,066 MW | 4,307 MW | 1,060 MW | -52 MW |
| 2026-08-17T10:00Z | 7,511 MW | 8,086 MW | 4,320 MW | 1,112 MW | -50 MW |
| 2026-08-17T11:00Z | 7,828 MW | 8,072 MW | 4,428 MW | 1,184 MW | -11 MW |
| 2026-08-17T12:00Z | 7,752 MW | 8,070 MW | 4,526 MW | 1,234 MW | 461 MW |
| 2026-08-17T13:00Z | 7,779 MW | 8,069 MW | 4,536 MW | 1,411 MW | 1,221 MW |
| 2026-08-17T14:00Z | 7,821 MW | 8,062 MW | 4,530 MW | 1,564 MW | 1,533 MW |
| 2026-08-17T15:00Z | 8,852 MW | 8,054 MW | 4,549 MW | 1,823 MW | 1,629 MW |
| 2026-08-17T16:00Z | 9,198 MW | 8,048 MW | 4,551 MW | 2,279 MW | 1,598 MW |
| 2026-08-17T17:00Z | 9,076 MW | 8,033 MW | 4,548 MW | 2,933 MW | 1,546 MW |
| 2026-08-17T18:00Z | 9,554 MW | 8,022 MW | 4,538 MW | 3,133 MW | 1,558 MW |
| 2026-08-17T19:00Z | 9,791 MW | 8,019 MW | 4,537 MW | 3,274 MW | 1,486 MW |
| 2026-08-17T20:00Z | 9,589 MW | 8,020 MW | 4,681 MW | 3,290 MW | 1,380 MW |
| 2026-08-17T21:00Z | 9,016 MW | 8,038 MW | 4,670 MW | 3,280 MW | 1,139 MW |
| 2026-08-17T22:00Z | 8,966 MW | 8,049 MW | 4,665 MW | 3,197 MW | 729 MW |
| 2026-08-17T23:00Z | 8,848 MW | 8,045 MW | 4,672 MW | 3,006 MW | 248 MW |
| 2026-08-18T00:00Z | 8,684 MW | 8,056 MW | 4,675 MW | 2,744 MW | 28 MW |
| 2026-08-18T01:00Z | 8,962 MW | 8,070 MW | 4,596 MW | 2,309 MW | -5 MW |
| 2026-08-18T02:00Z | 8,169 MW | 8,066 MW | 4,501 MW | 1,895 MW | 0 MW |
| 2026-08-18T03:00Z | 7,804 MW | 8,069 MW | 4,518 MW | 1,443 MW | -2 MW |
| 2026-08-18T04:00Z | 7,499 MW | 8,069 MW | 4,518 MW | 1,367 MW | -6 MW |
| 2026-08-18T05:00Z | 7,162 MW | 8,077 MW | 4,396 MW | 1,257 MW | -43 MW |
| 2026-08-18T06:00Z | 6,932 MW | 8,070 MW | 4,028 MW | 1,154 MW | -3 MW |
| 2026-08-18T07:00Z | 6,359 MW | 8,073 MW | 3,887 MW | 1,092 MW | -3 MW |
| 2026-08-18T08:00Z | 5,865 MW | 8,074 MW | 3,866 MW | 1,067 MW | -6 MW |
| 2026-08-18T09:00Z | 5,836 MW | 8,077 MW | 3,863 MW | 1,122 MW | -8 MW |
| 2026-08-18T10:00Z | 6,404 MW | 8,075 MW | 3,983 MW | 1,106 MW | -5 MW |
| 2026-08-18T11:00Z | 6,688 MW | 8,090 MW | 4,220 MW | 1,188 MW | 55 MW |
| 2026-08-18T12:00Z | 6,541 MW | 8,076 MW | 4,263 MW | 1,212 MW | 510 MW |
| 2026-08-18T13:00Z | 6,791 MW | 8,069 MW | 4,039 MW | 1,379 MW | 898 MW |
| 2026-08-18T14:00Z | 7,034 MW | 8,077 MW | 3,909 MW | 1,563 MW | 1,101 MW |
| 2026-08-18T15:00Z | 7,215 MW | 8,066 MW | 4,033 MW | 1,983 MW | 1,401 MW |
| 2026-08-18T16:00Z | 7,424 MW | 8,069 MW | 4,217 MW | 2,373 MW | 1,478 MW |
| 2026-08-18T17:00Z | 7,874 MW | 8,069 MW | 4,338 MW | 2,668 MW | 1,625 MW |
| 2026-08-18T18:00Z | 8,672 MW | 8,072 MW | 4,361 MW | 2,937 MW | 1,592 MW |
| 2026-08-18T19:00Z | 8,978 MW | 8,063 MW | 4,351 MW | 3,119 MW | 1,518 MW |
| 2026-08-18T20:00Z | 8,881 MW | 8,063 MW | 4,347 MW | 3,252 MW | 1,549 MW |
| 2026-08-18T21:00Z | 8,864 MW | 8,065 MW | 4,347 MW | 3,270 MW | 1,525 MW |
| 2026-08-18T22:00Z | 8,797 MW | 8,064 MW | 4,349 MW | 3,269 MW | 1,120 MW |
| 2026-08-18T23:00Z | 8,461 MW | 8,066 MW | 4,368 MW | 3,122 MW | 540 MW |
| 2026-08-19T00:00Z | 8,298 MW | 8,079 MW | 4,355 MW | 2,852 MW | 69 MW |
| 2026-08-19T01:00Z | 7,963 MW | 8,080 MW | 4,361 MW | 2,387 MW | -4 MW |
| 2026-08-19T02:00Z | 7,357 MW | 8,078 MW | 4,253 MW | 1,790 MW | -4 MW |
| 2026-08-19T03:00Z | 6,847 MW | 8,080 MW | 4,268 MW | 1,446 MW | -9 MW |
| 2026-08-19T04:00Z | 6,103 MW | 8,083 MW | 4,272 MW | 1,287 MW | -7 MW |
| 2026-08-19T05:00Z | 5,638 MW | 8,085 MW | 4,263 MW | 1,095 MW | -12 MW |
| 2026-08-19T06:00Z | 5,359 MW | 8,093 MW | 4,266 MW | 992 MW | -79 MW |
| 2026-08-19T07:00Z | 5,397 MW | 8,095 MW | 4,267 MW | 1,063 MW | -64 MW |
| 2026-08-19T08:00Z | 5,152 MW | 8,093 MW | 4,272 MW | 1,034 MW | -100 MW |
| 2026-08-19T09:00Z | 5,049 MW | 8,093 MW | 4,266 MW | 1,106 MW | -121 MW |
| 2026-08-19T10:00Z | 5,434 MW | 8,096 MW | 4,275 MW | 1,199 MW | -76 MW |
| 2026-08-19T11:00Z | 6,056 MW | 8,098 MW | 4,311 MW | 1,186 MW | 44 MW |
| 2026-08-19T12:00Z | 5,820 MW | 8,101 MW | 4,414 MW | 1,278 MW | 521 MW |
| 2026-08-19T13:00Z | 5,811 MW | 8,098 MW | 4,409 MW | 1,386 MW | 984 MW |
| 2026-08-19T14:00Z | 6,408 MW | 8,086 MW | 4,410 MW | 1,520 MW | 1,209 MW |
| 2026-08-19T15:00Z | 6,840 MW | 8,075 MW | 4,410 MW | 1,646 MW | 1,236 MW |
| 2026-08-19T16:00Z | 7,388 MW | 8,075 MW | 4,418 MW | 2,077 MW | 1,397 MW |
| 2026-08-19T17:00Z | 7,826 MW | 8,068 MW | 4,425 MW | 2,576 MW | 1,361 MW |
| 2026-08-19T18:00Z | 8,439 MW | 8,063 MW | 4,388 MW | 2,934 MW | 1,274 MW |
| 2026-08-19T19:00Z | 8,817 MW | 8,054 MW | 4,291 MW | 3,201 MW | 1,258 MW |
| 2026-08-19T20:00Z | 8,784 MW | 8,058 MW | 4,294 MW | 3,301 MW | 998 MW |
| 2026-08-19T21:00Z | 8,763 MW | 8,052 MW | 4,299 MW | 3,286 MW | 968 MW |
| 2026-08-19T22:00Z | 8,465 MW | 8,059 MW | 4,292 MW | 3,287 MW | 838 MW |
| 2026-08-19T23:00Z | 8,507 MW | 8,057 MW | 4,287 MW | 3,136 MW | 457 MW |
| 2026-08-20T00:00Z | 8,605 MW | 8,060 MW | 4,294 MW | 2,673 MW | 122 MW |
| 2026-08-20T01:00Z | 8,262 MW | 8,063 MW | 4,305 MW | 2,113 MW | 63 MW |
| 2026-08-20T02:00Z | 7,341 MW | 8,072 MW | 4,299 MW | 1,619 MW | -8 MW |
| 2026-08-20T03:00Z | 6,962 MW | 8,061 MW | 4,096 MW | 1,365 MW | 2 MW |
| 2026-08-20T04:00Z | 6,992 MW | 8,063 MW | 3,951 MW | 1,285 MW | 2 MW |
| 2026-08-20T05:00Z | 6,449 MW | 8,071 MW | 3,599 MW | 1,070 MW | -23 MW |
| 2026-08-20T06:00Z | 5,823 MW | 8,070 MW | 3,536 MW | 922 MW | -95 MW |
| 2026-08-20T07:00Z | 5,788 MW | 8,074 MW | 3,534 MW | 847 MW | -88 MW |
| 2026-08-20T08:00Z | 6,015 MW | 8,075 MW | 3,549 MW | 912 MW | -68 MW |
| 2026-08-20T09:00Z | 6,424 MW | 8,080 MW | 3,654 MW | 961 MW | -72 MW |
| 2026-08-20T10:00Z | 6,934 MW | 8,081 MW | 3,873 MW | 1,039 MW | -79 MW |
| 2026-08-20T11:00Z | 7,231 MW | 8,080 MW | 4,229 MW | 1,156 MW | -27 MW |
| 2026-08-20T12:00Z | 6,896 MW | 8,093 MW | 4,250 MW | 1,158 MW | 213 MW |
| 2026-08-20T13:00Z | 6,298 MW | 8,088 MW | 4,267 MW | 1,296 MW | 731 MW |
| 2026-08-20T14:00Z | 6,503 MW | 8,091 MW | 4,283 MW | 1,451 MW | 1,183 MW |
| 2026-08-20T15:00Z | 7,090 MW | 8,093 MW | 4,293 MW | 1,768 MW | 1,496 MW |
| 2026-08-20T16:00Z | 6,986 MW | 8,088 MW | 4,286 MW | 2,122 MW | 1,515 MW |
| 2026-08-20T17:00Z | 8,090 MW | 8,076 MW | 4,246 MW | 2,583 MW | 1,522 MW |
| 2026-08-20T18:00Z | 8,750 MW | 8,070 MW | 4,236 MW | 2,988 MW | 1,554 MW |
| 2026-08-20T19:00Z | 9,202 MW | 8,062 MW | 4,249 MW | 3,156 MW | 1,358 MW |
| 2026-08-20T20:00Z | 9,523 MW | 8,051 MW | 4,318 MW | 3,264 MW | 1,148 MW |
| 2026-08-20T21:00Z | 9,985 MW | 8,045 MW | 4,382 MW | 3,260 MW | 989 MW |
| 2026-08-20T22:00Z | 10,086 MW | 8,048 MW | 4,378 MW | 3,240 MW | 687 MW |
| 2026-08-20T23:00Z | 9,814 MW | 8,051 MW | 4,374 MW | 3,116 MW | 368 MW |
| 2026-08-21T00:00Z | 9,860 MW | 8,065 MW | 4,378 MW | 2,784 MW | 154 MW |
| 2026-08-21T01:00Z | 9,961 MW | 8,079 MW | 4,339 MW | 2,420 MW | 32 MW |
| 2026-08-21T02:00Z | 9,295 MW | 8,074 MW | 4,280 MW | 1,889 MW | -5 MW |
| 2026-08-21T03:00Z | 7,969 MW | 8,077 MW | 4,201 MW | 1,421 MW | -2 MW |
| 2026-08-21T04:00Z | 7,292 MW | 8,083 MW | 4,090 MW | 1,185 MW | -6 MW |
| 2026-08-21T05:00Z | 6,573 MW | 8,084 MW | 4,043 MW | 1,112 MW | -31 MW |
| 2026-08-21T06:00Z | 6,372 MW | 8,078 MW | 4,065 MW | 1,034 MW | -6 MW |
| 2026-08-21T07:00Z | 6,301 MW | 8,078 MW | 4,073 MW | 1,082 MW | -12 MW |
| 2026-08-21T08:00Z | 6,450 MW | 8,084 MW | 4,063 MW | 1,032 MW | -39 MW |
| 2026-08-21T09:00Z | 6,543 MW | 8,087 MW | 4,066 MW | 1,133 MW | -52 MW |
| 2026-08-21T10:00Z | 6,836 MW | 8,093 MW | 4,091 MW | 1,245 MW | -43 MW |
| 2026-08-21T11:00Z | 6,994 MW | 8,099 MW | 4,186 MW | 1,156 MW | -32 MW |
| 2026-08-21T12:00Z | 7,145 MW | 8,100 MW | 4,267 MW | 1,030 MW | 306 MW |
| 2026-08-21T13:00Z | 7,007 MW | 8,092 MW | 4,281 MW | 1,159 MW | 1,058 MW |
| 2026-08-21T14:00Z | 7,698 MW | 8,084 MW | 4,292 MW | 1,292 MW | 1,386 MW |
| 2026-08-21T15:00Z | 8,456 MW | 8,089 MW | 4,341 MW | 1,590 MW | 1,469 MW |
| 2026-08-21T16:00Z | 8,957 MW | 8,077 MW | 4,344 MW | 1,696 MW | 1,527 MW |
| 2026-08-21T17:00Z | 9,299 MW | 8,070 MW | 4,393 MW | 2,395 MW | 1,536 MW |
| 2026-08-21T18:00Z | 9,114 MW | 8,074 MW | 4,332 MW | 2,752 MW | 1,538 MW |
| 2026-08-21T19:00Z | 9,849 MW | 8,060 MW | 4,302 MW | 2,935 MW | 1,557 MW |
| 2026-08-21T20:00Z | 10,043 MW | 8,053 MW | 4,331 MW | 3,059 MW | 1,590 MW |
| 2026-08-21T21:00Z | 10,218 MW | 8,056 MW | 4,340 MW | 3,112 MW | 1,509 MW |
| 2026-08-21T22:00Z | 10,020 MW | 8,061 MW | 4,347 MW | 3,039 MW | 1,266 MW |
| 2026-08-21T23:00Z | 9,893 MW | 8,059 MW | 4,353 MW | 2,888 MW | 513 MW |
| 2026-08-22T00:00Z | 10,095 MW | 8,080 MW | 4,326 MW | 2,769 MW | 104 MW |
| 2026-08-22T01:00Z | 9,878 MW | 8,080 MW | 4,333 MW | 2,353 MW | 4 MW |
| 2026-08-22T02:00Z | 8,916 MW | 8,081 MW | 4,463 MW | 1,837 MW | 16 MW |
| 2026-08-22T03:00Z | 7,942 MW | 8,077 MW | 4,495 MW | 1,457 MW | -4 MW |
| 2026-08-22T04:00Z | 7,773 MW | 8,085 MW | 4,354 MW | 1,281 MW | -7 MW |
| 2026-08-22T05:00Z | 6,985 MW | 8,082 MW | 4,188 MW | 1,147 MW | -28 MW |
| 2026-08-22T06:00Z | 6,073 MW | 8,084 MW | 4,084 MW | 1,134 MW | -38 MW |
| 2026-08-22T07:00Z | 5,619 MW | 8,093 MW | 4,014 MW | 1,117 MW | -69 MW |
| 2026-08-22T08:00Z | 5,386 MW | 8,090 MW | 3,786 MW | 1,090 MW | -76 MW |
| 2026-08-22T09:00Z | 5,080 MW | 8,098 MW | 3,665 MW | 1,174 MW | -81 MW |
| 2026-08-22T10:00Z | 4,890 MW | 8,095 MW | 3,738 MW | 1,332 MW | -85 MW |
| 2026-08-22T11:00Z | 4,908 MW | 8,097 MW | 3,737 MW | 1,362 MW | -10 MW |
| 2026-08-22T12:00Z | 5,074 MW | 8,094 MW | 3,683 MW | 1,389 MW | 629 MW |
| 2026-08-22T13:00Z | 5,698 MW | 8,099 MW | 3,871 MW | 1,517 MW | 1,370 MW |
| 2026-08-22T14:00Z | 7,129 MW | 8,082 MW | 4,120 MW | 1,587 MW | 1,537 MW |
| 2026-08-22T15:00Z | 8,002 MW | 8,071 MW | 4,214 MW | 1,769 MW | 1,629 MW |
| 2026-08-22T16:00Z | 8,667 MW | 8,054 MW | 4,317 MW | 2,054 MW | 1,634 MW |
| 2026-08-22T17:00Z | 9,462 MW | 8,044 MW | 4,319 MW | 2,350 MW | 1,646 MW |
| 2026-08-22T18:00Z | 9,998 MW | 8,034 MW | 4,282 MW | 2,939 MW | 1,607 MW |
| 2026-08-22T19:00Z | 10,082 MW | 8,031 MW | 4,295 MW | 3,139 MW | 1,537 MW |
| 2026-08-22T20:00Z | 10,061 MW | 8,042 MW | 4,329 MW | 3,214 MW | 1,349 MW |
| 2026-08-22T21:00Z | 10,254 MW | 8,039 MW | 4,330 MW | 3,216 MW | 969 MW |
| 2026-08-22T22:00Z | 9,593 MW | 8,043 MW | 4,330 MW | 3,211 MW | 543 MW |
| 2026-08-22T23:00Z | 9,165 MW | 8,046 MW | 4,261 MW | 3,039 MW | 150 MW |
| 2026-08-23T00:00Z | 9,129 MW | 8,039 MW | 4,242 MW | 2,803 MW | 7 MW |
| 2026-08-23T01:00Z | 8,957 MW | 8,056 MW | 4,239 MW | 2,370 MW | 0 MW |
| 2026-08-23T02:00Z | 8,076 MW | 8,058 MW | 4,021 MW | 1,988 MW | 49 MW |
| 2026-08-23T03:00Z | 7,125 MW | 8,052 MW | 3,612 MW | 1,659 MW | -2 MW |
| 2026-08-23T04:00Z | 5,714 MW | 8,050 MW | 3,526 MW | 1,416 MW | -8 MW |
| 2026-08-23T05:00Z | 5,198 MW | 8,051 MW | 3,515 MW | 1,069 MW | -17 MW |
| 2026-08-23T06:00Z | 5,269 MW | 8,063 MW | 3,511 MW | 920 MW | -23 MW |
| 2026-08-23T07:00Z | 5,248 MW | 8,062 MW | 3,508 MW | 895 MW | -64 MW |
| 2026-08-23T08:00Z | 4,963 MW | 8,064 MW | 3,488 MW | 846 MW | -67 MW |
| 2026-08-23T09:00Z | 4,753 MW | 8,073 MW | 3,237 MW | 895 MW | -5 MW |
| 2026-08-23T10:00Z | 4,676 MW | 8,078 MW | 3,198 MW | 997 MW | -6 MW |
| 2026-08-23T11:00Z | 4,678 MW | 8,079 MW | 3,206 MW | 955 MW | 44 MW |
| 2026-08-23T12:00Z | 5,023 MW | 8,077 MW | 3,213 MW | 929 MW | 559 MW |
| 2026-08-23T13:00Z | 5,372 MW | 8,080 MW | 3,412 MW | 1,096 MW | 1,370 MW |
| 2026-08-23T14:00Z | 5,680 MW | 8,074 MW | 4,047 MW | 1,114 MW | 1,579 MW |
| 2026-08-23T15:00Z | 5,920 MW | 8,075 MW | 4,264 MW | 1,251 MW | 1,641 MW |
| 2026-08-23T16:00Z | 7,004 MW | 8,061 MW | 4,285 MW | 1,555 MW | 1,650 MW |
| 2026-08-23T17:00Z | 7,871 MW | 8,060 MW | 4,363 MW | 1,833 MW | 1,647 MW |
| 2026-08-23T18:00Z | 8,160 MW | 8,063 MW | 4,364 MW | 2,398 MW | 1,653 MW |
| 2026-08-23T19:00Z | 8,572 MW | 8,057 MW | 4,368 MW | 2,738 MW | 1,582 MW |
| 2026-08-23T20:00Z | 8,384 MW | 8,049 MW | 4,373 MW | 2,976 MW | 1,548 MW |
| 2026-08-23T21:00Z | 8,765 MW | 8,051 MW | 4,368 MW | 3,038 MW | 1,322 MW |
| 2026-08-23T22:00Z | 8,931 MW | 8,055 MW | 4,367 MW | 3,002 MW | 957 MW |
| 2026-08-23T23:00Z | 8,722 MW | 8,055 MW | 4,326 MW | 2,884 MW | 332 MW |
| 2026-08-24T00:00Z | 7,994 MW | 8,058 MW | 4,115 MW | 2,802 MW | 82 MW |
| 2026-08-24T01:00Z | 7,097 MW | 8,057 MW | 4,085 MW | 2,470 MW | 52 MW |
| 2026-08-24T02:00Z | 6,358 MW | 8,057 MW | 4,040 MW | 1,909 MW | -6 MW |
| 2026-08-24T03:00Z | 5,970 MW | 8,062 MW | 3,937 MW | 1,375 MW | 0 MW |
| 2026-08-24T04:00Z | 5,114 MW | 8,072 MW | 3,806 MW | 1,216 MW | -8 MW |
| 2026-08-24T05:00Z | 5,052 MW | 8,065 MW | 3,272 MW | 1,123 MW | -36 MW |
| 2026-08-24T06:00Z | 5,371 MW | 8,070 MW | 3,066 MW | 1,071 MW | -68 MW |
| 2026-08-24T07:00Z | 5,094 MW | 8,080 MW | 3,063 MW | 1,053 MW | -108 MW |
| 2026-08-24T08:00Z | 4,913 MW | 8,082 MW | 3,083 MW | 1,042 MW | -102 MW |
| 2026-08-24T09:00Z | 5,176 MW | 8,086 MW | 3,062 MW | 1,048 MW | -107 MW |
| 2026-08-24T10:00Z | 5,808 MW | 8,086 MW | 3,209 MW | 1,113 MW | -94 MW |
| 2026-08-24T11:00Z | 6,150 MW | 8,090 MW | 3,636 MW | 1,204 MW | -47 MW |
| 2026-08-24T12:00Z | 5,855 MW | 8,092 MW | 3,876 MW | 1,201 MW | 431 MW |
| 2026-08-24T13:00Z | 6,180 MW | 8,087 MW | 3,901 MW | 1,205 MW | 1,049 MW |
| 2026-08-24T14:00Z | 6,431 MW | 8,073 MW | 3,913 MW | 1,346 MW | 1,453 MW |
| 2026-08-24T15:00Z | 6,872 MW | 8,075 MW | 4,023 MW | 1,471 MW | 1,424 MW |
| 2026-08-24T16:00Z | 7,183 MW | 8,067 MW | 4,101 MW | 1,946 MW | 1,519 MW |
| 2026-08-24T17:00Z | 7,854 MW | 8,057 MW | 4,062 MW | 2,453 MW | 1,653 MW |
| 2026-08-24T18:00Z | 8,161 MW | 8,059 MW | 4,004 MW | 2,790 MW | 1,646 MW |
| 2026-08-24T19:00Z | 8,732 MW | 8,053 MW | 4,016 MW | 3,084 MW | 1,606 MW |
| 2026-08-24T20:00Z | 9,426 MW | 8,049 MW | 4,026 MW | 3,104 MW | 1,576 MW |
| 2026-08-24T21:00Z | 9,506 MW | 8,057 MW | 4,020 MW | 3,083 MW | 1,462 MW |
| 2026-08-24T22:00Z | 9,359 MW | 8,054 MW | 4,008 MW | 3,160 MW | 1,198 MW |
| 2026-08-24T23:00Z | 9,300 MW | 8,056 MW | 3,972 MW | 3,116 MW | 523 MW |
| 2026-08-25T00:00Z | 8,969 MW | 8,060 MW | 3,901 MW | 2,985 MW | 88 MW |
| 2026-08-25T01:00Z | 8,395 MW | 8,061 MW | 3,904 MW | 2,467 MW | 31 MW |
| 2026-08-25T02:00Z | 8,049 MW | 8,068 MW | 3,777 MW | 1,908 MW | 47 MW |
| 2026-08-25T03:00Z | 7,212 MW | 8,067 MW | 3,568 MW | 1,406 MW | -2 MW |
| 2026-08-25T04:00Z | 6,401 MW | 8,072 MW | 3,333 MW | 1,253 MW | -5 MW |
| 2026-08-25T05:00Z | 6,418 MW | 8,076 MW | 3,149 MW | 1,189 MW | -62 MW |
| 2026-08-25T06:00Z | 5,912 MW | 8,078 MW | 3,095 MW | 1,154 MW | -79 MW |
| 2026-08-25T07:00Z | 5,542 MW | 8,089 MW | 2,948 MW | 1,198 MW | -108 MW |
| 2026-08-25T08:00Z | 5,598 MW | 8,086 MW | 2,768 MW | 1,121 MW | -101 MW |
| 2026-08-25T09:00Z | 5,709 MW | 8,086 MW | 2,775 MW | 1,152 MW | -95 MW |
| 2026-08-25T10:00Z | 6,267 MW | 8,093 MW | 2,974 MW | 1,181 MW | -89 MW |
| 2026-08-25T11:00Z | 6,620 MW | 8,086 MW | 3,314 MW | 1,318 MW | -26 MW |
| 2026-08-25T12:00Z | 6,743 MW | 8,090 MW | 3,556 MW | 1,220 MW | 270 MW |
| 2026-08-25T13:00Z | 6,491 MW | 8,093 MW | 3,624 MW | 1,315 MW | 876 MW |
| 2026-08-25T14:00Z | 6,522 MW | 8,091 MW | 3,668 MW | 1,376 MW | 1,479 MW |
| 2026-08-25T15:00Z | 6,882 MW | 8,080 MW | 3,768 MW | 1,643 MW | 1,593 MW |
| 2026-08-25T16:00Z | 7,657 MW | 8,072 MW | 3,865 MW | 2,066 MW | 1,647 MW |
| 2026-08-25T17:00Z | 8,570 MW | 8,068 MW | 3,874 MW | 2,328 MW | 1,643 MW |
| 2026-08-25T18:00Z | 8,575 MW | 8,058 MW | 3,879 MW | 2,707 MW | 1,531 MW |
| 2026-08-25T19:00Z | 8,909 MW | 8,059 MW | 3,876 MW | 2,924 MW | 1,598 MW |
| 2026-08-25T20:00Z | 9,440 MW | 8,058 MW | 3,868 MW | 3,043 MW | 1,506 MW |
| 2026-08-25T21:00Z | 9,666 MW | 8,050 MW | 4,038 MW | 3,181 MW | 1,160 MW |
| 2026-08-25T22:00Z | 9,478 MW | 8,051 MW | 4,164 MW | 3,203 MW | 964 MW |
| 2026-08-25T23:00Z | 9,255 MW | 8,050 MW | 4,225 MW | 2,979 MW | 460 MW |
| 2026-08-26T00:00Z | 8,888 MW | 8,062 MW | 4,259 MW | 2,803 MW | 3 MW |
| 2026-08-26T01:00Z | 8,220 MW | 8,063 MW | 4,265 MW | 2,509 MW | -5 MW |
| 2026-08-26T02:00Z | 8,217 MW | 8,075 MW | 4,206 MW | 1,931 MW | -3 MW |
| 2026-08-26T03:00Z | 7,552 MW | 8,081 MW | 3,640 MW | 1,581 MW | -9 MW |
| 2026-08-26T04:00Z | 6,848 MW | 8,092 MW | 3,056 MW | 1,387 MW | -6 MW |
| 2026-08-26T05:00Z | 6,839 MW | 8,089 MW | 2,905 MW | 1,172 MW | -54 MW |
| 2026-08-26T06:00Z | 6,849 MW | 8,089 MW | 2,920 MW | 1,091 MW | -69 MW |
| 2026-08-26T07:00Z | 6,468 MW | 8,093 MW | 2,904 MW | 917 MW | -66 MW |
| 2026-08-26T08:00Z | 6,071 MW | 8,097 MW | 2,900 MW | 1,058 MW | -43 MW |
| 2026-08-26T09:00Z | 5,867 MW | 8,105 MW | 2,902 MW | 1,327 MW | -14 MW |
| 2026-08-26T10:00Z | 6,353 MW | 8,104 MW | 2,902 MW | 1,510 MW | -8 MW |
| 2026-08-26T11:00Z | 6,747 MW | 8,108 MW | 3,186 MW | 1,555 MW | 32 MW |
| 2026-08-26T12:00Z | 6,643 MW | 8,103 MW | 3,610 MW | 1,573 MW | 343 MW |
| 2026-08-26T13:00Z | 6,859 MW | 8,099 MW | 3,846 MW | 1,609 MW | 670 MW |
| 2026-08-26T14:00Z | 7,103 MW | 8,113 MW | 3,905 MW | 1,556 MW | 783 MW |
| 2026-08-26T15:00Z | 8,033 MW | 8,099 MW | 3,958 MW | 1,639 MW | 930 MW |
| 2026-08-26T16:00Z | 8,965 MW | 8,098 MW | 3,967 MW | 1,609 MW | 463 MW |
| 2026-08-26T17:00Z | 9,608 MW | 7,948 MW | 3,984 MW | 1,580 MW | 931 MW |
| 2026-08-26T18:00Z | 8,967 MW | 7,615 MW | 3,987 MW | 1,901 MW | 1,029 MW |
| 2026-08-26T19:00Z | 8,585 MW | 7,324 MW | 3,718 MW | 2,201 MW | 994 MW |
| 2026-08-26T20:00Z | 7,922 MW | 7,277 MW | 3,613 MW | 2,564 MW | 928 MW |
| 2026-08-26T21:00Z | 7,652 MW | 7,285 MW | 3,643 MW | 2,805 MW | 759 MW |
| 2026-08-26T22:00Z | 7,891 MW | 7,276 MW | 3,694 MW | 2,831 MW | 503 MW |
| 2026-08-26T23:00Z | 7,871 MW | 7,216 MW | 3,695 MW | 2,665 MW | 145 MW |
| 2026-08-27T00:00Z | 8,296 MW | 7,039 MW | 3,663 MW | 2,319 MW | -1 MW |
| 2026-08-27T01:00Z | 8,055 MW | 6,992 MW | 3,665 MW | 1,972 MW | -4 MW |
| 2026-08-27T02:00Z | 7,681 MW | 6,860 MW | 3,658 MW | 1,524 MW | -7 MW |
| 2026-08-27T03:00Z | 7,627 MW | 6,861 MW | 3,645 MW | 1,354 MW | -9 MW |
| 2026-08-27T04:00Z | 6,543 MW | 6,874 MW | 3,598 MW | 1,237 MW | -3 MW |
| 2026-08-27T05:00Z | 6,285 MW | 6,868 MW | 3,481 MW | 1,036 MW | -6 MW |
| 2026-08-27T06:00Z | 6,390 MW | 6,868 MW | 3,428 MW | 1,012 MW | -5 MW |
| 2026-08-27T07:00Z | 6,515 MW | 6,871 MW | 3,424 MW | 924 MW | -6 MW |
| 2026-08-27T08:00Z | 6,371 MW | 6,876 MW | 3,427 MW | 913 MW | -7 MW |
| 2026-08-27T09:00Z | 6,607 MW | 6,874 MW | 3,428 MW | 915 MW | -4 MW |
| 2026-08-27T10:00Z | 7,245 MW | 6,882 MW | 3,731 MW | 927 MW | -5 MW |
| 2026-08-27T11:00Z | 7,212 MW | 6,889 MW | 4,055 MW | 1,033 MW | 7 MW |
| 2026-08-27T12:00Z | 7,020 MW | 6,884 MW | 4,064 MW | 928 MW | 193 MW |
| 2026-08-27T13:00Z | 6,758 MW | 6,885 MW | 4,048 MW | 1,084 MW | 615 MW |
| 2026-08-27T14:00Z | 7,190 MW | 6,877 MW | 4,024 MW | 1,235 MW | 920 MW |
| 2026-08-27T15:00Z | 8,257 MW | 6,865 MW | 4,041 MW | 1,504 MW | 1,207 MW |
| 2026-08-27T16:00Z | 9,082 MW | 6,867 MW | 4,022 MW | 1,905 MW | 1,337 MW |
| 2026-08-27T17:00Z | 9,487 MW | 6,864 MW | 4,031 MW | 2,319 MW | 1,370 MW |
| 2026-08-27T18:00Z | 9,739 MW | 6,853 MW | 4,022 MW | 2,714 MW | 21,644 MW |
| 2026-08-27T19:00Z | 9,487 MW | 6,853 MW | 4,039 MW | 2,990 MW | 1,371 MW |
| 2026-08-27T20:00Z | 9,789 MW | 6,852 MW | 4,035 MW | 3,141 MW | 1,316 MW |
| 2026-08-27T21:00Z | 9,685 MW | 6,850 MW | 4,041 MW | 3,158 MW | 1,304 MW |
| 2026-08-27T22:00Z | 9,629 MW | 6,853 MW | 4,087 MW | 3,230 MW | 1,188 MW |
| 2026-08-27T23:00Z | 9,748 MW | 6,856 MW | 4,080 MW | 2,952 MW | 375 MW |
| 2026-08-28T00:00Z | 9,672 MW | 6,858 MW | 4,088 MW | 2,575 MW | 95 MW |
| 2026-08-28T01:00Z | 9,068 MW | 6,865 MW | 4,101 MW | 2,263 MW | 45 MW |
| 2026-08-28T02:00Z | 8,439 MW | 6,868 MW | 4,104 MW | 1,824 MW | -6 MW |
| 2026-08-28T03:00Z | 8,450 MW | 6,865 MW | 4,106 MW | 1,398 MW | 4 MW |
| 2026-08-28T04:00Z | 7,443 MW | 6,867 MW | 4,103 MW | 1,187 MW | -7 MW |
| 2026-08-28T05:00Z | 6,745 MW | 6,875 MW | 3,999 MW | 1,004 MW | -60 MW |
| 2026-08-28T06:00Z | 6,300 MW | 6,874 MW | 3,916 MW | 971 MW | -114 MW |
| 2026-08-28T07:00Z | 6,392 MW | 6,874 MW | 3,901 MW | 942 MW | -73 MW |
| 2026-08-28T08:00Z | 6,463 MW | 6,874 MW | 3,893 MW | 944 MW | 777 MW |
| 2026-08-28T09:00Z | 6,653 MW | 6,881 MW | 3,888 MW | 945 MW | -100 MW |
| 2026-08-28T10:00Z | 7,150 MW | 6,875 MW | 3,947 MW | 996 MW | -106 MW |
| 2026-08-28T11:00Z | 7,807 MW | 6,884 MW | 4,039 MW | 938 MW | -31 MW |
| 2026-08-28T12:00Z | 7,853 MW | 6,874 MW | 4,105 MW | 893 MW | 535 MW |
| 2026-08-28T13:00Z | 7,735 MW | 6,872 MW | 4,077 MW | 1,125 MW | 1,331 MW |
| 2026-08-28T14:00Z | 7,850 MW | 6,864 MW | 4,087 MW | 1,290 MW | 1,608 MW |
| 2026-08-28T15:00Z | 8,111 MW | 6,858 MW | 4,080 MW | 1,587 MW | 2,052 MW |
| 2026-08-28T16:00Z | 8,957 MW | 6,856 MW | 4,079 MW | 1,891 MW | 1,561 MW |
| 2026-08-28T17:00Z | 9,076 MW | 6,851 MW | 4,091 MW | 2,512 MW | 1,597 MW |
| 2026-08-28T18:00Z | 9,329 MW | 6,849 MW | 4,101 MW | 2,799 MW | 1,610 MW |
| 2026-08-28T19:00Z | 9,455 MW | 6,853 MW | 4,093 MW | 3,082 MW | 1,584 MW |
| 2026-08-28T20:00Z | 9,494 MW | 6,851 MW | 4,118 MW | 3,138 MW | 1,552 MW |
| 2026-08-28T21:00Z | 9,511 MW | 6,852 MW | 4,161 MW | 3,111 MW | 1,448 MW |
| 2026-08-28T22:00Z | 9,232 MW | 6,853 MW | 4,162 MW | 3,179 MW | 1,338 MW |
| 2026-08-28T23:00Z | 9,280 MW | 6,854 MW | 4,159 MW | 2,908 MW | 514 MW |
| 2026-08-29T00:00Z | 9,445 MW | 6,860 MW | 4,158 MW | 2,547 MW | 83 MW |
| 2026-08-29T01:00Z | 9,223 MW | 6,856 MW | 4,168 MW | 2,006 MW | 0 MW |
| 2026-08-29T02:00Z | 8,813 MW | 6,868 MW | 4,160 MW | 1,623 MW | -7 MW |
| 2026-08-29T03:00Z | 8,264 MW | 6,867 MW | 4,164 MW | 1,153 MW | -7 MW |
| 2026-08-29T04:00Z | 7,165 MW | 6,861 MW | 4,143 MW | 1,009 MW | -8 MW |
| 2026-08-29T05:00Z | 6,623 MW | 6,867 MW | 4,090 MW | 741 MW | -55 MW |
| 2026-08-29T06:00Z | 6,397 MW | 6,869 MW | 3,987 MW | 721 MW | -64 MW |
| 2026-08-29T07:00Z | 6,151 MW | 6,877 MW | 3,826 MW | 686 MW | -58 MW |
| 2026-08-29T08:00Z | 6,023 MW | 6,878 MW | 3,573 MW | 730 MW | -74 MW |
| 2026-08-29T09:00Z | 5,793 MW | 6,875 MW | 3,566 MW | 842 MW | -79 MW |
| 2026-08-29T10:00Z | 5,587 MW | 6,881 MW | 3,550 MW | 833 MW | -56 MW |
| 2026-08-29T11:00Z | 5,844 MW | 6,881 MW | 3,554 MW | 813 MW | -6 MW |
| 2026-08-29T12:00Z | 5,821 MW | 6,884 MW | 3,548 MW | 884 MW | 655 MW |
| 2026-08-29T13:00Z | 6,247 MW | 6,878 MW | 3,669 MW | 964 MW | 1,425 MW |
| 2026-08-29T14:00Z | 7,004 MW | 6,867 MW | 3,981 MW | 1,171 MW | 1,621 MW |
| 2026-08-29T15:00Z | 7,583 MW | 6,865 MW | 4,081 MW | 1,590 MW | 1,665 MW |
| 2026-08-29T16:00Z | 8,619 MW | 6,853 MW | 4,084 MW | 1,978 MW | 1,644 MW |
| 2026-08-29T17:00Z | 9,088 MW | 6,841 MW | 4,110 MW | 2,153 MW | 1,553 MW |
| 2026-08-29T18:00Z | 8,966 MW | 6,834 MW | 4,140 MW | 2,537 MW | 1,554 MW |
| 2026-08-29T19:00Z | 9,226 MW | 6,833 MW | 4,146 MW | 2,844 MW | 1,553 MW |
| 2026-08-29T20:00Z | 9,633 MW | 6,832 MW | 4,148 MW | 3,016 MW | 1,462 MW |
| 2026-08-29T21:00Z | 9,815 MW | 6,835 MW | 4,158 MW | 3,077 MW | 1,399 MW |
| 2026-08-29T22:00Z | 9,712 MW | 6,826 MW | 4,169 MW | 3,117 MW | 1,069 MW |
| 2026-08-29T23:00Z | 9,425 MW | 6,827 MW | 4,175 MW | 3,012 MW | 393 MW |
| 2026-08-30T00:00Z | 9,128 MW | 6,830 MW | 4,152 MW | 2,683 MW | 13 MW |
| 2026-08-30T01:00Z | 9,084 MW | 6,839 MW | 4,102 MW | 2,307 MW | -7 MW |
| 2026-08-30T02:00Z | 8,563 MW | 6,854 MW | 4,107 MW | 1,862 MW | -5 MW |
| 2026-08-30T03:00Z | 8,191 MW | 6,864 MW | 4,094 MW | 1,333 MW | -9 MW |
| 2026-08-30T04:00Z | 7,047 MW | 6,868 MW | 3,963 MW | 1,200 MW | -2 MW |
| 2026-08-30T05:00Z | 6,936 MW | 6,866 MW | 3,851 MW | 763 MW | -54 MW |
| 2026-08-30T06:00Z | 6,792 MW | 6,866 MW | 3,887 MW | 678 MW | -47 MW |
| 2026-08-30T07:00Z | 6,422 MW | 6,869 MW | 3,887 MW | 664 MW | -78 MW |
| 2026-08-30T08:00Z | 6,169 MW | 6,880 MW | 3,752 MW | 645 MW | -84 MW |
| 2026-08-30T09:00Z | 5,973 MW | 6,878 MW | 3,553 MW | 747 MW | -63 MW |
| 2026-08-30T10:00Z | 5,836 MW | 6,883 MW | 3,545 MW | 792 MW | -7 MW |
| 2026-08-30T11:00Z | 5,820 MW | 6,877 MW | 3,548 MW | 811 MW | 29 MW |
| 2026-08-30T12:00Z | 6,155 MW | 6,879 MW | 3,547 MW | 805 MW | 592 MW |
| 2026-08-30T13:00Z | 6,438 MW | 6,871 MW | 3,766 MW | 828 MW | 1,371 MW |
| 2026-08-30T14:00Z | 7,069 MW | 6,863 MW | 3,977 MW | 1,077 MW | 1,578 MW |
| 2026-08-30T15:00Z | 8,075 MW | 6,861 MW | 4,041 MW | 1,314 MW | 1,548 MW |
| 2026-08-30T16:00Z | 8,998 MW | 6,856 MW | 3,982 MW | 1,768 MW | 1,485 MW |
| 2026-08-30T17:00Z | 9,365 MW | 6,855 MW | 4,022 MW | 2,003 MW | 1,439 MW |
| 2026-08-30T18:00Z | 9,582 MW | 6,846 MW | 4,012 MW | 2,497 MW | 1,392 MW |
| 2026-08-30T19:00Z | 9,895 MW | 6,839 MW | 4,033 MW | 2,783 MW | 1,391 MW |
| 2026-08-30T20:00Z | 10,099 MW | 6,836 MW | 4,011 MW | 3,004 MW | 1,433 MW |
| 2026-08-30T21:00Z | 10,343 MW | 6,835 MW | 4,006 MW | 3,068 MW | 1,357 MW |
| 2026-08-30T22:00Z | 10,492 MW | 6,838 MW | 4,027 MW | 3,049 MW | 1,084 MW |
| 2026-08-30T23:00Z | 10,367 MW | 6,842 MW | 4,030 MW | 2,905 MW | 381 MW |
| 2026-08-31T00:00Z | 10,062 MW | 6,837 MW | 4,031 MW | 2,702 MW | 1 MW |
| 2026-08-31T01:00Z | 10,018 MW | 6,841 MW | 4,034 MW | 2,351 MW | -5 MW |
| 2026-08-31T02:00Z | 9,648 MW | 6,841 MW | 4,033 MW | 1,923 MW | -4 MW |
| 2026-08-31T03:00Z | 9,059 MW | 6,846 MW | 3,953 MW | 1,469 MW | -4 MW |
| 2026-08-31T04:00Z | 8,977 MW | 6,851 MW | 3,849 MW | 1,156 MW | -8 MW |
| 2026-08-31T05:00Z | 8,277 MW | 6,850 MW | 3,675 MW | 1,044 MW | -69 MW |
| 2026-08-31T06:00Z | 7,336 MW | 6,861 MW | 3,617 MW | 914 MW | -66 MW |
| 2026-08-31T07:00Z | 6,792 MW | 6,865 MW | 3,463 MW | 830 MW | -50 MW |
| 2026-08-31T08:00Z | 6,818 MW | 6,858 MW | 3,222 MW | 813 MW | -16 MW |
| 2026-08-31T09:00Z | 6,723 MW | 6,863 MW | 3,214 MW | 971 MW | -7 MW |
| 2026-08-31T10:00Z | 7,221 MW | 6,864 MW | 3,406 MW | 1,113 MW | -9 MW |
| 2026-08-31T11:00Z | 7,523 MW | 6,866 MW | 3,836 MW | 1,175 MW | 23 MW |
| 2026-08-31T12:00Z | 7,471 MW | 6,865 MW | 4,071 MW | 1,176 MW | 620 MW |
| 2026-08-31T13:00Z | 7,783 MW | 6,860 MW | 4,077 MW | 1,354 MW | 1,384 MW |
| 2026-08-31T14:00Z | 8,100 MW | 6,849 MW | 4,071 MW | 1,447 MW | 1,602 MW |
| 2026-08-31T15:00Z | 9,514 MW | 6,844 MW | 4,064 MW | 1,883 MW | 1,579 MW |
| 2026-08-31T16:00Z | 10,396 MW | 6,835 MW | 4,082 MW | 2,384 MW | 1,407 MW |
| 2026-08-31T17:00Z | 10,566 MW | 6,829 MW | 4,086 MW | 2,777 MW | 1,426 MW |
| 2026-08-31T18:00Z | 10,507 MW | 6,827 MW | 4,091 MW | 3,120 MW | 1,432 MW |
| 2026-08-31T19:00Z | 10,286 MW | 6,866 MW | 4,094 MW | 3,338 MW | 1,361 MW |
| 2026-08-31T20:00Z | 10,302 MW | 6,977 MW | 4,087 MW | 3,470 MW | 1,252 MW |
| 2026-08-31T21:00Z | 10,487 MW | 7,042 MW | 4,093 MW | 3,518 MW | 1,196 MW |
| 2026-08-31T22:00Z | 10,392 MW | 7,147 MW | 4,111 MW | 3,532 MW | 979 MW |
| 2026-08-31T23:00Z | 10,496 MW | 7,179 MW | 4,183 MW | 3,178 MW | 424 MW |
| 2026-09-01T00:00Z | 10,070 MW | 7,172 MW | 4,211 MW | 2,848 MW | 1 MW |
| 2026-09-01T01:00Z | 9,938 MW | 7,177 MW | 4,212 MW | 2,625 MW | -1 MW |
| 2026-09-01T02:00Z | 9,763 MW | 7,162 MW | 4,209 MW | 2,089 MW | -6 MW |
| 2026-09-01T03:00Z | 8,628 MW | 7,140 MW | 4,113 MW | 1,690 MW | 21 MW |
| 2026-09-01T04:00Z | 8,239 MW | 7,135 MW | 4,005 MW | 1,198 MW | 10 MW |
| 2026-09-01T05:00Z | 7,639 MW | 7,197 MW | 3,821 MW | 978 MW | -5 MW |
| 2026-09-01T06:00Z | 7,430 MW | 7,309 MW | 3,711 MW | 907 MW | -37 MW |
| 2026-09-01T07:00Z | 7,363 MW | 7,275 MW | 3,556 MW | 858 MW | -53 MW |
| 2026-09-01T08:00Z | 7,329 MW | 7,261 MW | 3,425 MW | 841 MW | -87 MW |
| 2026-09-01T09:00Z | 7,014 MW | 7,253 MW | 3,735 MW | 846 MW | -85 MW |
| 2026-09-01T10:00Z | 7,188 MW | 7,413 MW | 3,886 MW | 997 MW | -10 MW |
| 2026-09-01T11:00Z | 7,000 MW | 7,593 MW | 4,245 MW | 1,134 MW | 20 MW |
| 2026-09-01T12:00Z | 6,900 MW | 7,664 MW | 4,347 MW | 1,245 MW | 591 MW |
| 2026-09-01T13:00Z | 7,390 MW | 7,658 MW | 4,390 MW | 1,318 MW | 1,351 MW |
| 2026-09-01T14:00Z | 8,252 MW | 7,726 MW | 4,403 MW | 1,492 MW | 1,568 MW |
| 2026-09-01T15:00Z | 8,957 MW | 7,783 MW | 4,402 MW | 1,781 MW | 1,587 MW |
| 2026-09-01T16:00Z | 9,893 MW | 7,848 MW | 4,402 MW | 2,464 MW | 1,250 MW |
| 2026-09-01T17:00Z | 10,089 MW | 7,921 MW | 4,379 MW | 2,861 MW | 1,394 MW |
| 2026-09-01T18:00Z | 9,417 MW | 7,951 MW | 4,405 MW | 3,199 MW | 1,407 MW |
| 2026-09-01T19:00Z | 8,970 MW | 7,943 MW | 4,470 MW | 3,536 MW | 1,401 MW |
| 2026-09-01T20:00Z | 9,750 MW | 7,924 MW | 4,442 MW | 3,527 MW | 1,300 MW |
| 2026-09-01T21:00Z | 9,985 MW | 7,913 MW | 4,447 MW | 3,536 MW | 1,382 MW |
| 2026-09-01T22:00Z | 10,316 MW | 7,885 MW | 4,464 MW | 3,474 MW | 981 MW |
| 2026-09-01T23:00Z | 9,983 MW | 7,868 MW | 4,454 MW | 3,221 MW | 329 MW |
| 2026-09-02T00:00Z | 9,707 MW | 7,841 MW | 4,472 MW | 2,736 MW | -1 MW |
| 2026-09-02T01:00Z | 9,636 MW | 7,821 MW | 4,466 MW | 2,500 MW | -3 MW |
| 2026-09-02T02:00Z | 8,932 MW | 7,810 MW | 4,212 MW | 2,055 MW | -3 MW |
| 2026-09-02T03:00Z | 8,695 MW | 7,798 MW | 3,926 MW | 1,460 MW | -6 MW |
| 2026-09-02T04:00Z | 7,980 MW | 7,783 MW | 3,961 MW | 1,182 MW | -6 MW |
| 2026-09-02T05:00Z | 7,287 MW | 7,779 MW | 3,947 MW | 923 MW | -6 MW |
| 2026-09-02T06:00Z | 7,107 MW | 7,774 MW | 3,950 MW | 873 MW | -7 MW |
| 2026-09-02T07:00Z | 6,907 MW | 7,764 MW | 3,961 MW | 826 MW | -11 MW |
| 2026-09-02T08:00Z | 6,563 MW | 7,761 MW | 3,945 MW | 846 MW | -3 MW |
| 2026-09-02T09:00Z | 6,464 MW | 7,757 MW | 3,947 MW | 890 MW | -5 MW |
| 2026-09-02T10:00Z | 6,806 MW | 7,754 MW | 4,062 MW | 932 MW | -11 MW |
| 2026-09-02T11:00Z | 7,089 MW | 7,750 MW | 4,249 MW | 1,034 MW | 24 MW |
| 2026-09-02T12:00Z | 7,037 MW | 7,742 MW | 4,426 MW | 1,128 MW | 559 MW |
| 2026-09-02T13:00Z | 7,548 MW | 7,718 MW | 4,453 MW | 1,210 MW | 1,319 MW |
| 2026-09-02T14:00Z | 8,130 MW | 7,536 MW | 4,454 MW | 1,693 MW | 1,538 MW |
| 2026-09-02T15:00Z | 9,266 MW | 7,521 MW | 4,456 MW | 2,076 MW | 1,582 MW |
| 2026-09-02T16:00Z | 10,097 MW | 7,672 MW | 4,456 MW | 2,502 MW | 1,449 MW |
| 2026-09-02T17:00Z | 10,025 MW | 7,749 MW | 4,460 MW | 2,835 MW | 1,375 MW |
| 2026-09-02T18:00Z | 9,882 MW | 7,877 MW | 4,445 MW | 3,183 MW | 1,290 MW |
| 2026-09-02T19:00Z | 10,291 MW | 7,914 MW | 4,454 MW | 3,410 MW | 1,387 MW |
| 2026-09-02T20:00Z | 10,367 MW | 7,934 MW | 4,448 MW | 3,738 MW | 1,379 MW |
| 2026-09-02T21:00Z | 10,550 MW | 7,951 MW | 4,454 MW | 3,765 MW | 1,267 MW |
| 2026-09-02T22:00Z | 10,226 MW | 7,964 MW | 4,449 MW | 3,814 MW | 1,063 MW |
| 2026-09-02T23:00Z | 10,038 MW | 7,971 MW | 4,448 MW | 3,375 MW | 380 MW |
| 2026-09-03T00:00Z | 9,345 MW | 7,966 MW | 4,446 MW | 2,931 MW | 108 MW |
| 2026-09-03T01:00Z | 9,204 MW | 7,973 MW | 4,447 MW | 2,539 MW | 120 MW |
| 2026-09-03T02:00Z | 8,149 MW | 7,979 MW | 4,434 MW | 2,101 MW | 19 MW |
| 2026-09-03T03:00Z | 8,251 MW | 8,000 MW | 4,431 MW | 1,490 MW | -4 MW |
| 2026-09-03T04:00Z | 8,207 MW | 8,006 MW | 4,390 MW | 1,188 MW | -6 MW |
| 2026-09-03T05:00Z | 8,027 MW | 8,010 MW | 4,168 MW | 1,010 MW | -12 MW |
| 2026-09-03T06:00Z | 7,861 MW | 8,020 MW | 4,162 MW | 887 MW | -6 MW |
| 2026-09-03T07:00Z | 7,693 MW | 8,020 MW | 4,148 MW | 830 MW | -25 MW |
| 2026-09-03T08:00Z | 7,327 MW | 8,024 MW | 4,125 MW | 841 MW | -47 MW |
| 2026-09-03T09:00Z | 7,281 MW | 8,030 MW | 4,125 MW | 946 MW | -79 MW |
| 2026-09-03T10:00Z | 7,698 MW | 8,029 MW | 4,149 MW | 939 MW | -89 MW |
| 2026-09-03T11:00Z | 7,911 MW | 8,037 MW | 4,333 MW | 981 MW | -33 MW |
| 2026-09-03T12:00Z | 8,070 MW | 8,037 MW | 4,448 MW | 1,094 MW | 382 MW |
| 2026-09-03T13:00Z | 7,796 MW | 8,024 MW | 4,356 MW | 1,315 MW | 1,164 MW |
| 2026-09-03T14:00Z | 9,461 MW | 8,013 MW | 4,423 MW | 1,656 MW | 1,485 MW |
| 2026-09-03T15:00Z | 10,104 MW | 8,011 MW | 4,448 MW | 2,129 MW | 1,575 MW |
| 2026-09-03T16:00Z | 10,534 MW | 8,006 MW | 4,443 MW | 2,528 MW | 1,524 MW |
| 2026-09-03T17:00Z | 11,224 MW | 7,999 MW | 4,458 MW | 2,887 MW | 1,353 MW |
| 2026-09-03T18:00Z | 10,896 MW | 7,989 MW | 4,437 MW | 3,177 MW | 1,421 MW |
| 2026-09-03T19:00Z | 10,830 MW | 7,988 MW | 4,441 MW | 3,446 MW | 1,214 MW |
| 2026-09-03T20:00Z | 10,956 MW | 7,985 MW | 4,433 MW | 3,761 MW | 1,271 MW |
| 2026-09-03T21:00Z | 10,667 MW | 7,975 MW | 4,434 MW | 3,913 MW | 1,247 MW |
| 2026-09-03T22:00Z | 10,628 MW | 7,972 MW | 4,437 MW | 3,753 MW | 834 MW |
| 2026-09-03T23:00Z | 10,977 MW | 7,971 MW | 4,395 MW | 3,367 MW | 361 MW |
| 2026-09-04T00:00Z | 10,665 MW | 7,966 MW | 4,386 MW | 2,995 MW | 58 MW |
| 2026-09-04T01:00Z | 10,678 MW | 7,970 MW | 4,441 MW | 2,504 MW | 72 MW |
| 2026-09-04T02:00Z | 10,660 MW | 7,982 MW | 4,440 MW | 1,844 MW | 7 MW |
| 2026-09-04T03:00Z | 10,114 MW | 7,983 MW | 4,446 MW | 1,364 MW | -2 MW |
| 2026-09-04T04:00Z | 9,685 MW | 7,982 MW | 4,451 MW | 1,071 MW | -8 MW |
| 2026-09-04T05:00Z | 9,366 MW | 7,995 MW | 4,448 MW | 851 MW | -37 MW |
| 2026-09-04T06:00Z | 8,542 MW | 7,999 MW | 4,443 MW | 775 MW | -61 MW |
| 2026-09-04T07:00Z | 7,934 MW | 7,996 MW | 4,455 MW | 717 MW | -86 MW |
| 2026-09-04T08:00Z | 7,218 MW | 7,997 MW | 4,455 MW | 717 MW | -66 MW |
| 2026-09-04T09:00Z | 7,222 MW | 8,001 MW | 4,448 MW | 773 MW | -99 MW |
| 2026-09-04T10:00Z | 7,512 MW | 8,008 MW | 4,443 MW | 823 MW | -92 MW |
| 2026-09-04T11:00Z | 7,986 MW | 8,022 MW | 4,442 MW | 786 MW | -19 MW |
| 2026-09-04T12:00Z | 8,209 MW | 8,011 MW | 4,446 MW | 901 MW | 424 MW |
| 2026-09-04T13:00Z | 8,249 MW | 8,005 MW | 4,434 MW | 1,053 MW | 1,167 MW |
| 2026-09-04T14:00Z | 8,524 MW | 8,000 MW | 4,430 MW | 1,337 MW | 1,493 MW |
| 2026-09-04T15:00Z | 9,258 MW | 7,996 MW | 4,429 MW | 1,860 MW | 1,555 MW |
| 2026-09-04T16:00Z | 9,865 MW | 7,991 MW | 4,432 MW | 2,271 MW | 1,568 MW |
| 2026-09-04T17:00Z | 10,012 MW | 7,979 MW | 4,477 MW | 2,900 MW | 1,287 MW |
| 2026-09-04T18:00Z | 9,728 MW | 7,979 MW | 4,463 MW | 3,256 MW | 1,296 MW |
| 2026-09-04T19:00Z | 9,301 MW | 7,975 MW | 4,468 MW | 3,572 MW | 1,314 MW |
| 2026-09-04T20:00Z | 9,711 MW | 7,972 MW | 4,436 MW | 3,655 MW | 1,243 MW |
| 2026-09-04T21:00Z | 9,582 MW | 7,971 MW | 4,446 MW | 3,666 MW | 1,126 MW |
| 2026-09-04T22:00Z | 9,388 MW | 7,977 MW | 4,474 MW | 3,539 MW | 841 MW |
| 2026-09-04T23:00Z | 9,382 MW | 7,977 MW | 4,464 MW | 3,239 MW | 259 MW |
| 2026-09-05T00:00Z | 9,526 MW | 7,974 MW | 4,458 MW | 2,624 MW | 20 MW |
| 2026-09-05T01:00Z | 9,671 MW | 7,976 MW | 4,441 MW | 2,271 MW | 46 MW |
| 2026-09-05T02:00Z | 9,525 MW | 7,978 MW | 4,415 MW | 1,820 MW | 16 MW |
| 2026-09-05T03:00Z | 9,236 MW | 7,981 MW | 4,402 MW | 1,284 MW | -8 MW |
| 2026-09-05T04:00Z | 8,900 MW | 7,988 MW | 4,194 MW | 1,076 MW | -4 MW |
| 2026-09-05T05:00Z | 8,778 MW | 7,994 MW | 4,072 MW | 817 MW | -37 MW |
| 2026-09-05T06:00Z | 8,188 MW | 7,992 MW | 4,059 MW | 709 MW | -58 MW |
| 2026-09-05T07:00Z | 7,847 MW | 7,998 MW | 4,055 MW | 705 MW | -42 MW |
| 2026-09-05T08:00Z | 7,262 MW | 7,995 MW | 4,073 MW | 693 MW | -53 MW |
| 2026-09-05T09:00Z | 6,898 MW | 8,001 MW | 4,058 MW | 680 MW | -72 MW |
| 2026-09-05T10:00Z | 6,836 MW | 8,008 MW | 4,060 MW | 735 MW | -78 MW |
| 2026-09-05T11:00Z | 6,767 MW | 8,011 MW | 4,023 MW | 661 MW | 10 MW |
| 2026-09-05T12:00Z | 7,043 MW | 8,011 MW | 3,847 MW | 868 MW | 467 MW |
| 2026-09-05T13:00Z | 7,636 MW | 8,001 MW | 3,923 MW | 1,011 MW | 1,217 MW |
| 2026-09-05T14:00Z | 8,345 MW | 7,992 MW | 4,006 MW | 1,227 MW | 1,485 MW |
| 2026-09-05T15:00Z | 9,086 MW | 7,986 MW | 3,943 MW | 1,506 MW | 1,558 MW |
| 2026-09-05T16:00Z | 9,568 MW | 7,983 MW | 4,032 MW | 2,153 MW | 1,566 MW |
| 2026-09-05T17:00Z | 9,663 MW | 7,987 MW | 4,238 MW | 2,594 MW | 1,436 MW |
| 2026-09-05T18:00Z | 9,568 MW | 7,978 MW | 4,287 MW | 3,025 MW | 1,417 MW |
| 2026-09-05T19:00Z | 9,449 MW | 8,000 MW | 4,303 MW | 3,192 MW | 1,341 MW |
| 2026-09-05T20:00Z | 9,175 MW | 8,000 MW | 4,308 MW | 3,233 MW | 1,364 MW |
| 2026-09-05T21:00Z | 9,483 MW | 8,001 MW | 4,327 MW | 3,214 MW | 1,336 MW |
| 2026-09-05T22:00Z | 9,600 MW | 7,998 MW | 4,319 MW | 3,063 MW | 958 MW |
| 2026-09-05T23:00Z | 9,711 MW | 7,999 MW | 4,317 MW | 2,919 MW | 320 MW |
| 2026-09-06T00:00Z | 9,653 MW | 8,000 MW | 4,319 MW | 2,355 MW | -6 MW |
| 2026-09-06T01:00Z | 9,660 MW | 8,000 MW | 4,326 MW | 1,938 MW | 26 MW |
| 2026-09-06T02:00Z | 9,035 MW | 7,748 MW | 4,317 MW | 1,765 MW | -2 MW |
| 2026-09-06T03:00Z | 8,885 MW | 7,566 MW | 4,315 MW | 1,227 MW | -10 MW |
| 2026-09-06T04:00Z | 8,492 MW | 7,547 MW | 4,314 MW | 992 MW | -1 MW |
| 2026-09-06T05:00Z | 8,366 MW | 7,549 MW | 4,315 MW | 740 MW | -68 MW |
| 2026-09-06T06:00Z | 8,488 MW | 7,596 MW | 4,157 MW | 700 MW | -62 MW |
| 2026-09-06T07:00Z | 8,001 MW | 7,619 MW | 3,992 MW | 596 MW | -41 MW |
| 2026-09-06T08:00Z | 7,397 MW | 7,618 MW | 3,986 MW | 595 MW | -32 MW |
| 2026-09-06T09:00Z | 7,028 MW | 7,634 MW | 3,987 MW | 595 MW | -2 MW |
| 2026-09-06T10:00Z | 6,808 MW | 7,627 MW | 3,897 MW | 676 MW | -5 MW |
| 2026-09-06T11:00Z | 6,823 MW | 7,641 MW | 3,861 MW | 731 MW | 2 MW |
| 2026-09-06T12:00Z | 6,867 MW | 7,633 MW | 3,843 MW | 940 MW | 417 MW |
| 2026-09-06T13:00Z | 7,553 MW | 7,639 MW | 3,905 MW | 1,088 MW | 1,190 MW |
| 2026-09-06T14:00Z | 8,031 MW | 7,624 MW | 3,916 MW | 1,281 MW | 1,516 MW |
| 2026-09-06T15:00Z | 8,458 MW | 7,617 MW | 4,106 MW | 1,451 MW | 1,586 MW |
| 2026-09-06T16:00Z | 9,258 MW | 7,600 MW | 4,244 MW | 2,063 MW | 1,565 MW |
| 2026-09-06T17:00Z | 9,643 MW | 7,603 MW | 4,283 MW | 2,525 MW | 1,545 MW |
| 2026-09-06T18:00Z | 9,845 MW | 7,590 MW | 4,293 MW | 2,868 MW | 1,450 MW |
| 2026-09-06T19:00Z | 9,625 MW | 7,594 MW | 4,271 MW | 3,018 MW | 1,362 MW |
| 2026-09-06T20:00Z | 9,675 MW | 7,587 MW | 4,274 MW | 3,092 MW | 1,065 MW |
| 2026-09-06T21:00Z | 9,508 MW | 7,589 MW | 4,238 MW | 3,110 MW | 1,008 MW |
| 2026-09-06T22:00Z | 9,570 MW | 7,597 MW | 4,140 MW | 3,126 MW | 815 MW |
| 2026-09-06T23:00Z | 9,616 MW | 7,595 MW | 4,127 MW | 2,996 MW | 177 MW |
| 2026-09-07T00:00Z | 9,517 MW | 7,609 MW | 4,140 MW | 2,671 MW | -1 MW |
| 2026-09-07T01:00Z | 9,399 MW | 7,625 MW | 4,136 MW | 2,015 MW | -5 MW |
| 2026-09-07T02:00Z | 9,388 MW | 7,614 MW | 4,149 MW | 1,669 MW | -6 MW |
| 2026-09-07T03:00Z | 8,295 MW | 7,731 MW | 4,081 MW | 1,310 MW | 1 MW |
| 2026-09-07T04:00Z | 8,053 MW | 7,913 MW | 3,902 MW | 955 MW | -6 MW |
| 2026-09-07T05:00Z | 7,853 MW | 8,008 MW | 3,827 MW | 710 MW | -19 MW |
| 2026-09-07T06:00Z | 7,310 MW | 8,035 MW | 3,825 MW | 639 MW | -14 MW |
| 2026-09-07T07:00Z | 6,380 MW | 8,035 MW | 3,793 MW | 659 MW | -6 MW |
| 2026-09-07T08:00Z | 6,159 MW | 8,033 MW | 3,604 MW | 623 MW | -8 MW |
| 2026-09-07T09:00Z | 5,953 MW | 8,043 MW | 3,505 MW | 640 MW | -1 MW |
| 2026-09-07T10:00Z | 5,781 MW | 8,044 MW | 3,498 MW | 721 MW | -7 MW |
| 2026-09-07T11:00Z | 5,551 MW | 8,047 MW | 3,497 MW | 773 MW | 8 MW |
| 2026-09-07T12:00Z | 5,376 MW | 8,040 MW | 3,487 MW | 849 MW | 498 MW |
| 2026-09-07T13:00Z | 5,717 MW | 8,038 MW | 3,486 MW | 947 MW | 1,277 MW |
| 2026-09-07T14:00Z | 6,321 MW | 8,039 MW | 3,505 MW | 1,145 MW | 1,526 MW |
| 2026-09-07T15:00Z | 7,122 MW | 8,022 MW | 3,750 MW | 1,448 MW | 1,587 MW |
| 2026-09-07T16:00Z | 7,718 MW | 8,024 MW | 4,040 MW | 2,154 MW | 1,553 MW |
| 2026-09-07T17:00Z | 7,969 MW | 8,021 MW | 4,086 MW | 2,482 MW | 1,541 MW |
| 2026-09-07T18:00Z | 8,021 MW | 8,013 MW | 4,096 MW | 2,691 MW | 1,550 MW |
| 2026-09-07T19:00Z | 8,264 MW | 8,005 MW | 4,092 MW | 2,761 MW | 1,464 MW |
| 2026-09-07T20:00Z | 8,256 MW | 8,006 MW | 4,100 MW | 3,130 MW | 1,417 MW |
| 2026-09-07T21:00Z | 8,281 MW | 7,989 MW | 4,118 MW | 3,118 MW | 1,357 MW |
| 2026-09-07T22:00Z | 8,340 MW | 7,996 MW | 4,101 MW | 3,156 MW | 1,130 MW |
| 2026-09-07T23:00Z | 8,457 MW | 8,004 MW | 4,093 MW | 2,947 MW | 393 MW |
| 2026-09-08T00:00Z | 8,637 MW | 8,015 MW | 4,090 MW | 2,606 MW | 53 MW |
| 2026-09-08T01:00Z | 8,600 MW | 8,021 MW | 4,086 MW | 2,070 MW | 38 MW |
| 2026-09-08T02:00Z | 7,901 MW | 8,015 MW | 3,951 MW | 1,720 MW | 9 MW |
| 2026-09-08T03:00Z | 7,267 MW | 8,019 MW | 3,884 MW | 1,421 MW | -2 MW |
| 2026-09-08T04:00Z | 6,691 MW | 8,030 MW | 3,862 MW | 998 MW | -7 MW |
| 2026-09-08T05:00Z | 6,455 MW | 8,021 MW | 3,845 MW | 689 MW | -58 MW |
| 2026-09-08T06:00Z | 6,190 MW | 8,029 MW | 3,825 MW | 626 MW | -64 MW |
| 2026-09-08T07:00Z | 5,991 MW | 8,039 MW | 3,634 MW | 572 MW | -72 MW |
| 2026-09-08T08:00Z | 6,279 MW | 8,029 MW | 3,604 MW | 588 MW | -57 MW |
| 2026-09-08T09:00Z | 6,541 MW | 8,036 MW | 3,661 MW | 561 MW | -75 MW |
| 2026-09-08T10:00Z | 6,900 MW | 8,038 MW | 3,865 MW | 694 MW | -60 MW |
| 2026-09-08T11:00Z | 6,883 MW | 8,038 MW | 3,865 MW | 649 MW | -78 MW |
| 2026-09-08T12:00Z | 6,608 MW | 8,050 MW | 3,914 MW | 731 MW | 360 MW |
| 2026-09-08T13:00Z | 6,632 MW | 8,051 MW | 4,035 MW | 821 MW | 1,203 MW |
| 2026-09-08T14:00Z | 7,114 MW | 8,018 MW | 4,088 MW | 1,015 MW | 1,490 MW |
| 2026-09-08T15:00Z | 7,877 MW | 8,049 MW | 4,082 MW | 1,313 MW | 1,547 MW |
| 2026-09-08T16:00Z | 8,074 MW | 8,035 MW | 4,092 MW | 1,755 MW | 1,481 MW |
| 2026-09-08T17:00Z | 8,630 MW | 8,036 MW | 4,084 MW | 2,395 MW | 1,355 MW |
| 2026-09-08T18:00Z | 8,887 MW | 8,035 MW | 4,091 MW | 2,835 MW | 1,384 MW |
| 2026-09-08T19:00Z | 8,906 MW | 8,030 MW | 4,091 MW | 3,112 MW | 1,312 MW |
| 2026-09-08T20:00Z | 8,965 MW | 8,024 MW | 4,091 MW | 3,201 MW | 1,250 MW |
| 2026-09-08T21:00Z | 8,923 MW | 8,026 MW | 4,087 MW | 3,144 MW | 1,216 MW |
| 2026-09-08T22:00Z | 9,070 MW | 8,019 MW | 4,061 MW | 3,065 MW | 991 MW |
| 2026-09-08T23:00Z | 9,077 MW | 8,032 MW | 4,011 MW | 2,752 MW | 305 MW |
| 2026-09-09T00:00Z | 9,260 MW | 8,032 MW | 3,912 MW | 2,409 MW | -11 MW |
| 2026-09-09T01:00Z | 9,110 MW | 8,030 MW | 3,867 MW | 1,811 MW | -3 MW |
| 2026-09-09T02:00Z | 8,950 MW | 8,052 MW | 3,875 MW | 1,127 MW | -4 MW |
| 2026-09-09T03:00Z | 8,863 MW | 8,048 MW | 3,876 MW | 829 MW | -9 MW |
| 2026-09-09T04:00Z | 7,760 MW | 8,055 MW | 3,853 MW | 740 MW | -10 MW |
| 2026-09-09T05:00Z | 7,453 MW | 8,056 MW | 3,844 MW | 606 MW | -38 MW |
| 2026-09-09T06:00Z | 7,475 MW | 8,060 MW | 3,850 MW | 572 MW | -38 MW |
| 2026-09-09T07:00Z | 7,135 MW | 8,058 MW | 3,864 MW | 549 MW | -76 MW |
| 2026-09-09T08:00Z | 6,877 MW | 8,065 MW | 3,888 MW | 537 MW | -87 MW |
| 2026-09-09T09:00Z | 6,940 MW | 8,068 MW | 3,926 MW | 616 MW | -103 MW |
| 2026-09-09T10:00Z | 7,575 MW | 8,064 MW | 3,939 MW | 624 MW | -91 MW |
| 2026-09-09T11:00Z | 7,970 MW | 8,075 MW | 3,947 MW | 570 MW | -79 MW |
| 2026-09-09T12:00Z | 7,917 MW | 8,065 MW | 3,974 MW | 636 MW | 263 MW |
| 2026-09-09T13:00Z | 7,641 MW | 8,060 MW | 3,982 MW | 669 MW | 1,062 MW |
| 2026-09-09T14:00Z | 8,328 MW | 8,055 MW | 3,976 MW | 897 MW | 1,247 MW |
| 2026-09-09T15:00Z | 8,774 MW | 8,052 MW | 3,974 MW | 1,410 MW | 1,452 MW |
| 2026-09-09T16:00Z | 9,696 MW | 8,028 MW | 3,996 MW | 1,857 MW | 1,492 MW |
| 2026-09-09T17:00Z | 10,099 MW | 8,029 MW | 4,012 MW | 2,380 MW | 1,434 MW |
| 2026-09-09T18:00Z | 9,492 MW | 8,025 MW | 3,975 MW | 2,918 MW | 1,414 MW |
| 2026-09-09T19:00Z | 10,238 MW | 8,027 MW | 3,922 MW | 3,131 MW | 1,432 MW |
| 2026-09-09T20:00Z | 10,355 MW | 8,022 MW | 3,842 MW | 3,131 MW | 1,372 MW |
| 2026-09-09T21:00Z | 10,231 MW | 8,017 MW | 3,796 MW | 3,174 MW | 1,363 MW |
| 2026-09-09T22:00Z | 9,969 MW | 8,021 MW | 3,756 MW | 3,127 MW | 1,020 MW |
| 2026-09-09T23:00Z | 9,661 MW | 8,020 MW | 3,749 MW | 2,878 MW | 247 MW |
| 2026-09-10T00:00Z | 9,722 MW | 8,018 MW | 3,769 MW | 2,318 MW | 9 MW |
| 2026-09-10T01:00Z | 9,985 MW | 8,028 MW | 3,769 MW | 1,883 MW | -5 MW |
| 2026-09-10T02:00Z | 9,780 MW | 8,036 MW | 3,726 MW | 1,398 MW | -7 MW |
| 2026-09-10T03:00Z | 9,314 MW | 8,033 MW | 3,632 MW | 821 MW | -5 MW |
| 2026-09-10T04:00Z | 9,338 MW | 8,041 MW | 3,613 MW | 645 MW | -9 MW |
| 2026-09-10T05:00Z | 9,297 MW | 8,045 MW | 3,616 MW | 594 MW | -47 MW |
| 2026-09-10T06:00Z | 8,625 MW | 8,043 MW | 3,615 MW | 504 MW | -79 MW |
| 2026-09-10T07:00Z | 7,963 MW | 8,044 MW | 3,627 MW | 502 MW | -64 MW |
| 2026-09-10T08:00Z | 7,536 MW | 8,049 MW | 3,620 MW | 524 MW | -50 MW |
| 2026-09-10T09:00Z | 7,614 MW | 8,058 MW | 3,628 MW | 530 MW | -39 MW |
| 2026-09-10T10:00Z | 8,047 MW | 8,061 MW | 3,621 MW | 608 MW | -30 MW |
| 2026-09-10T11:00Z | 8,189 MW | 8,074 MW | 3,618 MW | 518 MW | -29 MW |
| 2026-09-10T12:00Z | 8,033 MW | 8,085 MW | 3,633 MW | 503 MW | 398 MW |
| 2026-09-10T13:00Z | 8,254 MW | 7,606 MW | 3,619 MW | 502 MW | 1,127 MW |
| 2026-09-10T14:00Z | 8,675 MW | 7,243 MW | 3,693 MW | 686 MW | 1,393 MW |
| 2026-09-10T15:00Z | 9,294 MW | 7,213 MW | 3,805 MW | 1,220 MW | 1,545 MW |
| 2026-09-10T16:00Z | 9,524 MW | 7,190 MW | 3,852 MW | 1,714 MW | 1,535 MW |
| 2026-09-10T17:00Z | 9,741 MW | 7,176 MW | 3,861 MW | 2,280 MW | 1,346 MW |
| 2026-09-10T18:00Z | 9,513 MW | 7,167 MW | 3,832 MW | 2,764 MW | 1,317 MW |
| 2026-09-10T19:00Z | 9,513 MW | 7,153 MW | 3,808 MW | 3,069 MW | 1,195 MW |
| 2026-09-10T20:00Z | 9,792 MW | 7,161 MW | 3,818 MW | 3,193 MW | 1,208 MW |
| 2026-09-10T21:00Z | 10,057 MW | 7,173 MW | 3,812 MW | 3,192 MW | 1,224 MW |
| 2026-09-10T22:00Z | 9,980 MW | 7,173 MW | 3,814 MW | 2,980 MW | 962 MW |
| 2026-09-10T23:00Z | 10,119 MW | 7,185 MW | 3,817 MW | 2,600 MW | 243 MW |
| 2026-09-11T00:00Z | 10,019 MW | 7,193 MW | 3,843 MW | 2,069 MW | 46 MW |
| 2026-09-11T01:00Z | 9,750 MW | 7,218 MW | 3,905 MW | 1,627 MW | 39 MW |
| 2026-09-11T02:00Z | 9,858 MW | 7,233 MW | 3,923 MW | 1,033 MW | 58 MW |
| 2026-09-11T03:00Z | 9,531 MW | 7,237 MW | 3,948 MW | 672 MW | -5 MW |
| 2026-09-11T04:00Z | 9,446 MW | 7,254 MW | 3,971 MW | 560 MW | -11 MW |
| 2026-09-11T05:00Z | 8,609 MW | 7,256 MW | 3,939 MW | 567 MW | -23 MW |
| 2026-09-11T06:00Z | 8,091 MW | 7,259 MW | 3,708 MW | 542 MW | -46 MW |
| 2026-09-11T07:00Z | 7,711 MW | 7,273 MW | 3,538 MW | 502 MW | -45 MW |
| 2026-09-11T08:00Z | 7,353 MW | 7,272 MW | 3,527 MW | 507 MW | -58 MW |
| 2026-09-11T09:00Z | 7,365 MW | 7,285 MW | 3,521 MW | 570 MW | -73 MW |
| 2026-09-11T10:00Z | 8,022 MW | 7,285 MW | 3,577 MW | 570 MW | -84 MW |
| 2026-09-11T11:00Z | 8,330 MW | 7,291 MW | 3,682 MW | 521 MW | -99 MW |
| 2026-09-11T12:00Z | 8,449 MW | 7,287 MW | 3,755 MW | 565 MW | 199 MW |
| 2026-09-11T13:00Z | 8,487 MW | 7,286 MW | 3,818 MW | 729 MW | 704 MW |
| 2026-09-11T14:00Z | 8,486 MW | 7,271 MW | 3,843 MW | 1,184 MW | 1,116 MW |
| 2026-09-11T15:00Z | 8,955 MW | 7,131 MW | 3,851 MW | 1,693 MW | 1,208 MW |
| 2026-09-11T16:00Z | 9,712 MW | 6,980 MW | 3,868 MW | 2,121 MW | 1,173 MW |
| 2026-09-11T17:00Z | 9,961 MW | 6,841 MW | 3,861 MW | 2,423 MW | 1,265 MW |
| 2026-09-11T18:00Z | 9,922 MW | 6,532 MW | 3,841 MW | 2,837 MW | 1,296 MW |
| 2026-09-11T19:00Z | 9,820 MW | 6,639 MW | 3,837 MW | 3,265 MW | 1,016 MW |
| 2026-09-11T20:00Z | 9,892 MW | 6,838 MW | 3,847 MW | 3,294 MW | 811 MW |
| 2026-09-11T21:00Z | 9,551 MW | 6,943 MW | 3,845 MW | 3,324 MW | 384 MW |
| 2026-09-11T22:00Z | 8,908 MW | 6,987 MW | 3,837 MW | 3,149 MW | 327 MW |
| 2026-09-11T23:00Z | 8,178 MW | 6,902 MW | 3,825 MW | 2,902 MW | 126 MW |
| 2026-09-12T00:00Z | 9,066 MW | 7,006 MW | 3,839 MW | 2,563 MW | 18 MW |
| 2026-09-12T01:00Z | 9,750 MW | 7,039 MW | 3,838 MW | 2,193 MW | 51 MW |
| 2026-09-12T02:00Z | 8,722 MW | 6,914 MW | 2,923 MW | 1,716 MW | 3,747 MW |
| 2026-09-12T03:00Z | 8,573 MW | 6,912 MW | 3,825 MW | 1,295 MW | -2 MW |
| 2026-09-12T04:00Z | 8,271 MW | 6,919 MW | 3,825 MW | 878 MW | -5 MW |
| 2026-09-12T05:00Z | 8,160 MW | 6,919 MW | 3,817 MW | 564 MW | -45 MW |
| 2026-09-12T06:00Z | 8,231 MW | 6,920 MW | 3,865 MW | 500 MW | -69 MW |
| 2026-09-12T07:00Z | 7,678 MW | 6,923 MW | 3,929 MW | 524 MW | -66 MW |
| 2026-09-12T08:00Z | 7,424 MW | 6,931 MW | 3,941 MW | 484 MW | -49 MW |
| 2026-09-12T09:00Z | 7,401 MW | 6,929 MW | 3,932 MW | 449 MW | -65 MW |
| 2026-09-12T10:00Z | 7,506 MW | 6,925 MW | 3,925 MW | 522 MW | -75 MW |
| 2026-09-12T11:00Z | 7,705 MW | 6,923 MW | 3,927 MW | 542 MW | -49 MW |
| 2026-09-12T12:00Z | 7,595 MW | 6,915 MW | 3,953 MW | 571 MW | 140 MW |
| 2026-09-12T13:00Z | 7,578 MW | 6,910 MW | 4,007 MW | 585 MW | 660 MW |
| 2026-09-12T14:00Z | 8,066 MW | 6,907 MW | 4,053 MW | 883 MW | 775 MW |
| 2026-09-12T15:00Z | 7,744 MW | 6,889 MW | 4,067 MW | 1,146 MW | 1,052 MW |
| 2026-09-12T16:00Z | 8,016 MW | 6,875 MW | 4,065 MW | 1,589 MW | 1,362 MW |
| 2026-09-12T17:00Z | 8,496 MW | 6,850 MW | 4,057 MW | 2,041 MW | 1,445 MW |
| 2026-09-12T18:00Z | 8,806 MW | 6,850 MW | 4,081 MW | 2,447 MW | 1,336 MW |
| 2026-09-12T19:00Z | 8,493 MW | 6,543 MW | 4,119 MW | 2,805 MW | 1,259 MW |
| 2026-09-12T20:00Z | 8,706 MW | 6,454 MW | 4,126 MW | 3,110 MW | 1,196 MW |
| 2026-09-12T21:00Z | 8,840 MW | 6,590 MW | 4,123 MW | 3,141 MW | 1,010 MW |
| 2026-09-12T22:00Z | 8,974 MW | 6,683 MW | 4,121 MW | 3,115 MW | 582 MW |
| 2026-09-12T23:00Z | 8,807 MW | 6,794 MW | 4,117 MW | 2,721 MW | 147 MW |
| 2026-09-13T00:00Z | 8,504 MW | 6,886 MW | 4,097 MW | 2,410 MW | -6 MW |
| 2026-09-13T01:00Z | 8,833 MW | 6,931 MW | 4,011 MW | 2,163 MW | -5 MW |
| 2026-09-13T02:00Z | 7,986 MW | 6,929 MW | 4,016 MW | 1,692 MW | -4 MW |
| 2026-09-13T03:00Z | 7,132 MW | 6,931 MW | 4,008 MW | 1,434 MW | -7 MW |
| 2026-09-13T04:00Z | 6,710 MW | 6,932 MW | 4,009 MW | 1,086 MW | -6 MW |
| 2026-09-13T05:00Z | 6,215 MW | 6,936 MW | 3,989 MW | 690 MW | -11 MW |
| 2026-09-13T06:00Z | 6,174 MW | 6,942 MW | 3,953 MW | 467 MW | -7 MW |
| 2026-09-13T07:00Z | 6,344 MW | 6,942 MW | 3,875 MW | 482 MW | -31 MW |
| 2026-09-13T08:00Z | 6,184 MW | 6,950 MW | 3,870 MW | 385 MW | -49 MW |
| 2026-09-13T09:00Z | 5,928 MW | 6,950 MW | 3,889 MW | 484 MW | -78 MW |
| 2026-09-13T10:00Z | 5,812 MW | 6,955 MW | 3,905 MW | 523 MW | -41 MW |
| 2026-09-13T11:00Z | 5,971 MW | 6,950 MW | 3,932 MW | 452 MW | 0 MW |
| 2026-09-13T12:00Z | 6,340 MW | 6,950 MW | 3,946 MW | 468 MW | 361 MW |
| 2026-09-13T13:00Z | 7,071 MW | 6,948 MW | 3,943 MW | 532 MW | 887 MW |
| 2026-09-13T14:00Z | 7,363 MW | 6,943 MW | 3,947 MW | 742 MW | 1,226 MW |
| 2026-09-13T15:00Z | 7,769 MW | 6,936 MW | 4,006 MW | 1,014 MW | 1,422 MW |
| 2026-09-13T16:00Z | 8,562 MW | 6,926 MW | 4,050 MW | 1,352 MW | 1,511 MW |
| 2026-09-13T17:00Z | 9,292 MW | 6,924 MW | 4,054 MW | 1,842 MW | 1,535 MW |
| 2026-09-13T18:00Z | 9,468 MW | 6,919 MW | 4,050 MW | 2,169 MW | 1,508 MW |
| 2026-09-13T19:00Z | 9,756 MW | 6,912 MW | 4,049 MW | 2,514 MW | 1,277 MW |
| 2026-09-13T20:00Z | 10,121 MW | 6,910 MW | 4,060 MW | 2,733 MW | 1,211 MW |
| 2026-09-13T21:00Z | 10,039 MW | 6,907 MW | 4,056 MW | 2,764 MW | 1,058 MW |
| 2026-09-13T22:00Z | 10,103 MW | 6,913 MW | 4,056 MW | 2,786 MW | 743 MW |
| 2026-09-13T23:00Z | 9,776 MW | 6,909 MW | 4,060 MW | 2,733 MW | 167 MW |
| 2026-09-14T00:00Z | 9,889 MW | 6,909 MW | 4,050 MW | 2,540 MW | 28 MW |
| 2026-09-14T01:00Z | 9,563 MW | 6,912 MW | 4,007 MW | 2,062 MW | -5 MW |
| 2026-09-14T02:00Z | 9,198 MW | 6,916 MW | 4,024 MW | 1,601 MW | -1 MW |
| 2026-09-14T03:00Z | 8,514 MW | 6,921 MW | 4,025 MW | 1,167 MW | -10 MW |
| 2026-09-14T04:00Z | 8,630 MW | 6,929 MW | 4,027 MW | 754 MW | -5 MW |
| 2026-09-14T05:00Z | 8,806 MW | 6,933 MW | 4,002 MW | 537 MW | -55 MW |
| 2026-09-14T06:00Z | 7,884 MW | 6,938 MW | 3,984 MW | 514 MW | -52 MW |
| 2026-09-14T07:00Z | 7,253 MW | 6,939 MW | 4,029 MW | 508 MW | -52 MW |
| 2026-09-14T08:00Z | 6,949 MW | 6,943 MW | 4,045 MW | 453 MW | -61 MW |
| 2026-09-14T09:00Z | 7,042 MW | 6,941 MW | 4,075 MW | 584 MW | -68 MW |
| 2026-09-14T10:00Z | 7,880 MW | 6,944 MW | 4,113 MW | 614 MW | -69 MW |
| 2026-09-14T11:00Z | 8,454 MW | 6,945 MW | 4,138 MW | 651 MW | -75 MW |
| 2026-09-14T12:00Z | 8,603 MW | 6,954 MW | 4,153 MW | 711 MW | 372 MW |
| 2026-09-14T13:00Z | 8,568 MW | 6,944 MW | 4,134 MW | 776 MW | 1,134 MW |
| 2026-09-14T14:00Z | 8,404 MW | 6,933 MW | 4,150 MW | 1,026 MW | 1,452 MW |
| 2026-09-14T15:00Z | 8,715 MW | 6,928 MW | 4,196 MW | 1,415 MW | 1,523 MW |
| 2026-09-14T16:00Z | 9,421 MW | 6,923 MW | 4,361 MW | 1,742 MW | 1,551 MW |
| 2026-09-14T17:00Z | 9,492 MW | 6,915 MW | 4,420 MW | 2,259 MW | 1,458 MW |
| 2026-09-14T18:00Z | 9,267 MW | 6,912 MW | 4,434 MW | 2,758 MW | 1,465 MW |
| 2026-09-14T19:00Z | 8,912 MW | 6,909 MW | 4,426 MW | 3,145 MW | 1,454 MW |
| 2026-09-14T20:00Z | 8,906 MW | 6,905 MW | 4,430 MW | 3,414 MW | 1,351 MW |
| 2026-09-14T21:00Z | 8,953 MW | 6,894 MW | 4,429 MW | 3,500 MW | 1,039 MW |
| 2026-09-14T22:00Z | 9,351 MW | 6,897 MW | 4,418 MW | 3,447 MW | 610 MW |
| 2026-09-14T23:00Z | 9,340 MW | 6,898 MW | 4,429 MW | 3,200 MW | 142 MW |
| 2026-09-15T00:00Z | 9,307 MW | 6,896 MW | 4,388 MW | 2,747 MW | -8 MW |
| 2026-09-15T01:00Z | 9,132 MW | 6,892 MW | 4,366 MW | 2,356 MW | 4 MW |
| 2026-09-15T02:00Z | 9,025 MW | 6,877 MW | 4,369 MW | 1,767 MW | -2 MW |
| 2026-09-15T03:00Z | 8,509 MW | 6,889 MW | 4,338 MW | 1,273 MW | -4 MW |
| 2026-09-15T04:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T05:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T13:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T14:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T15:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T16:00Z | n/a | n/a | n/a | n/a | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T16:00Z.
Day by Day
Daily totals, Central time dates, through 2026-09-13| Date (Central time) | Demand |
|---|---|
| 2025-08-11 | 562 GWh |
| 2025-08-12 | 561 GWh |
| 2025-08-13 | 535 GWh |
| 2025-08-14 | 559 GWh |
| 2025-08-15 | 572 GWh |
| 2025-08-16 | 569 GWh |
| 2025-08-17 | 567 GWh |
| 2025-08-18 | 602 GWh |
| 2025-08-19 | 609 GWh |
| 2025-08-20 | 568 GWh |
| 2025-08-21 | 531 GWh |
| 2025-08-22 | 530 GWh |
| 2025-08-23 | 507 GWh |
| 2025-08-24 | 494 GWh |
| 2025-08-25 | 456 GWh |
| 2025-08-26 | 445 GWh |
| 2025-08-27 | 435 GWh |
| 2025-08-28 | 430 GWh |
| 2025-08-29 | 451 GWh |
| 2025-08-30 | 447 GWh |
| 2025-08-31 | 432 GWh |
| 2025-09-01 | 442 GWh |
| 2025-09-02 | 456 GWh |
| 2025-09-03 | 479 GWh |
| 2025-09-04 | 486 GWh |
| 2025-09-05 | 510 GWh |
| 2025-09-06 | 401 GWh |
| 2025-09-07 | 387 GWh |
| 2025-09-08 | 416 GWh |
| 2025-09-09 | 437 GWh |
| 2025-09-10 | 460 GWh |
| 2025-09-11 | 484 GWh |
| 2025-09-12 | 481 GWh |
| 2025-09-13 | 458 GWh |
| 2025-09-14 | 464 GWh |
| 2025-09-15 | 502 GWh |
| 2025-09-16 | 488 GWh |
| 2025-09-17 | 498 GWh |
| 2025-09-18 | 493 GWh |
| 2025-09-19 | 480 GWh |
| 2025-09-20 | 468 GWh |
| 2025-09-21 | 463 GWh |
| 2025-09-22 | 467 GWh |
| 2025-09-23 | 480 GWh |
| 2025-09-24 | 463 GWh |
| 2025-09-25 | 459 GWh |
| 2025-09-26 | 446 GWh |
| 2025-09-27 | 423 GWh |
| 2025-09-28 | 429 GWh |
| 2025-09-29 | 463 GWh |
| 2025-09-30 | 469 GWh |
| 2025-10-01 | 478 GWh |
| 2025-10-02 | 460 GWh |
| 2025-10-03 | 430 GWh |
| 2025-10-04 | 401 GWh |
| 2025-10-05 | 414 GWh |
| 2025-10-06 | 440 GWh |
| 2025-10-07 | 442 GWh |
| 2025-10-08 | 423 GWh |
| 2025-10-09 | 388 GWh |
| 2025-10-10 | 389 GWh |
| 2025-10-11 | 375 GWh |
| 2025-10-12 | 374 GWh |
| 2025-10-13 | 402 GWh |
| 2025-10-14 | 407 GWh |
| 2025-10-15 | 410 GWh |
| 2025-10-16 | 415 GWh |
| 2025-10-17 | 406 GWh |
| 2025-10-18 | 414 GWh |
| 2025-10-19 | 367 GWh |
| 2025-10-20 | 378 GWh |
| 2025-10-21 | 384 GWh |
| 2025-10-22 | 385 GWh |
| 2025-10-23 | 389 GWh |
| 2025-10-24 | 387 GWh |
| 2025-10-25 | 366 GWh |
| 2025-10-26 | 361 GWh |
| 2025-10-27 | 393 GWh |
| 2025-10-28 | 390 GWh |
| 2025-10-29 | 401 GWh |
| 2025-10-30 | 414 GWh |
| 2025-10-31 | 409 GWh |
| 2025-11-01 | 399 GWh |
| 2025-11-02 | 412 GWh |
| 2025-11-03 | 429 GWh |
| 2025-11-04 | 418 GWh |
| 2025-11-05 | 401 GWh |
| 2025-11-06 | 398 GWh |
| 2025-11-07 | 391 GWh |
| 2025-11-08 | 367 GWh |
| 2025-11-09 | 398 GWh |
| 2025-11-10 | 540 GWh |
| 2025-11-11 | 529 GWh |
| 2025-11-12 | 442 GWh |
| 2025-11-13 | 426 GWh |
| 2025-11-14 | 413 GWh |
| 2025-11-15 | 377 GWh |
| 2025-11-16 | 366 GWh |
| 2025-11-17 | 425 GWh |
| 2025-11-18 | 416 GWh |
| 2025-11-19 | 400 GWh |
| 2025-11-20 | 395 GWh |
| 2025-11-21 | 390 GWh |
| 2025-11-22 | 374 GWh |
| 2025-11-23 | 371 GWh |
| 2025-11-24 | 409 GWh |
| 2025-11-25 | 395 GWh |
| 2025-11-26 | 409 GWh |
| 2025-11-27 | 438 GWh |
| 2025-11-28 | 484 GWh |
| 2025-11-29 | 477 GWh |
| 2025-11-30 | 464 GWh |
| 2025-12-01 | 532 GWh |
| 2025-12-02 | 547 GWh |
| 2025-12-03 | 553 GWh |
| 2025-12-04 | 555 GWh |
| 2025-12-05 | 526 GWh |
| 2025-12-06 | 498 GWh |
| 2025-12-07 | 480 GWh |
| 2025-12-08 | 381 GWh |
| 2025-12-09 | 453 GWh |
| 2025-12-10 | 501 GWh |
| 2025-12-11 | 519 GWh |
| 2025-12-12 | 485 GWh |
| 2025-12-13 | 473 GWh |
| 2025-12-14 | 606 GWh |
| 2025-12-15 | 656 GWh |
| 2025-12-16 | 564 GWh |
| 2025-12-17 | 492 GWh |
| 2025-12-18 | 447 GWh |
| 2025-12-19 | 488 GWh |
| 2025-12-20 | 482 GWh |
| 2025-12-21 | 433 GWh |
| 2025-12-22 | 467 GWh |
| 2025-12-23 | 401 GWh |
| 2025-12-24 | 360 GWh |
| 2025-12-25 | 336 GWh |
| 2025-12-26 | 351 GWh |
| 2025-12-27 | 356 GWh |
| 2025-12-28 | 358 GWh |
| 2025-12-29 | 473 GWh |
| 2025-12-30 | 562 GWh |
| 2025-12-31 | 519 GWh |
| 2026-01-01 | 448 GWh |
| 2026-01-02 | 439 GWh |
| 2026-01-03 | 424 GWh |
| 2026-01-04 | 460 GWh |
| 2026-01-05 | 462 GWh |
| 2026-01-06 | 421 GWh |
| 2026-01-07 | 399 GWh |
| 2026-01-08 | 413 GWh |
| 2026-01-09 | 389 GWh |
| 2026-01-10 | 387 GWh |
| 2026-01-11 | 484 GWh |
| 2026-01-12 | 551 GWh |
| 2026-01-13 | 504 GWh |
| 2026-01-14 | 492 GWh |
| 2026-01-15 | 606 GWh |
| 2026-01-16 | 556 GWh |
| 2026-01-17 | 492 GWh |
| 2026-01-18 | 562 GWh |
| 2026-01-19 | 583 GWh |
| 2026-01-20 | 615 GWh |
| 2026-01-21 | 548 GWh |
| 2026-01-22 | 494 GWh |
| 2026-01-23 | 553 GWh |
| 2026-01-24 | 638 GWh |
| 2026-01-25 | 564 GWh |
| 2026-01-26 | 677 GWh |
| 2026-01-27 | 676 GWh |
| 2026-01-28 | 618 GWh |
| 2026-01-29 | 608 GWh |
| 2026-01-30 | 618 GWh |
| 2026-01-31 | 717 GWh |
| 2026-02-01 | 677 GWh |
| 2026-02-02 | 622 GWh |
| 2026-02-03 | 565 GWh |
| 2026-02-04 | 568 GWh |
| 2026-02-05 | 619 GWh |
| 2026-02-06 | 539 GWh |
| 2026-02-07 | 516 GWh |
| 2026-02-08 | 524 GWh |
| 2026-02-09 | 471 GWh |
| 2026-02-10 | 428 GWh |
| 2026-02-11 | 415 GWh |
| 2026-02-12 | 484 GWh |
| 2026-02-13 | 474 GWh |
| 2026-02-14 | 445 GWh |
| 2026-02-15 | 417 GWh |
| 2026-02-16 | 432 GWh |
| 2026-02-17 | 427 GWh |
| 2026-02-18 | 407 GWh |
| 2026-02-19 | 398 GWh |
| 2026-02-20 | 387 GWh |
| 2026-02-21 | 396 GWh |
| 2026-02-22 | 503 GWh |
| 2026-02-23 | 611 GWh |
| 2026-02-24 | 570 GWh |
| 2026-02-25 | 456 GWh |
| 2026-02-26 | 416 GWh |
| 2026-02-27 | 409 GWh |
| 2026-02-28 | 394 GWh |
| 2026-03-01 | 374 GWh |
| 2026-03-02 | 407 GWh |
| 2026-03-03 | 395 GWh |
| 2026-03-04 | 392 GWh |
| 2026-03-05 | 400 GWh |
| 2026-03-06 | 402 GWh |
| 2026-03-07 | 375 GWh |
| 2026-03-08 | 340 GWh |
| 2026-03-09 | 388 GWh |
| 2026-03-10 | 399 GWh |
| 2026-03-11 | 402 GWh |
| 2026-03-12 | 410 GWh |
| 2026-03-13 | 424 GWh |
| 2026-03-14 | 380 GWh |
| 2026-03-15 | 365 GWh |
| 2026-03-16 | 474 GWh |
| 2026-03-17 | 540 GWh |
| 2026-03-18 | 482 GWh |
| 2026-03-19 | 428 GWh |
| 2026-03-20 | 401 GWh |
| 2026-03-21 | 392 GWh |
| 2026-03-22 | 411 GWh |
| 2026-03-23 | 392 GWh |
| 2026-03-24 | 395 GWh |
| 2026-03-25 | 396 GWh |
| 2026-03-26 | 412 GWh |
| 2026-03-27 | 392 GWh |
| 2026-03-28 | 382 GWh |
| 2026-03-29 | 388 GWh |
| 2026-03-30 | 401 GWh |
| 2026-03-31 | 429 GWh |
| 2026-04-01 | 429 GWh |
| 2026-04-02 | 430 GWh |
| 2026-04-03 | 426 GWh |
| 2026-04-04 | 392 GWh |
| 2026-04-05 | 346 GWh |
| 2026-04-06 | 383 GWh |
| 2026-04-07 | 391 GWh |
| 2026-04-08 | 397 GWh |
| 2026-04-09 | 396 GWh |
| 2026-04-10 | 396 GWh |
| 2026-04-11 | 388 GWh |
| 2026-04-12 | 387 GWh |
| 2026-04-13 | 409 GWh |
| 2026-04-14 | 432 GWh |
| 2026-04-15 | 436 GWh |
| 2026-04-16 | 438 GWh |
| 2026-04-17 | 437 GWh |
| 2026-04-18 | 388 GWh |
| 2026-04-19 | 350 GWh |
| 2026-04-20 | 390 GWh |
| 2026-04-21 | 399 GWh |
| 2026-04-22 | 411 GWh |
| 2026-04-23 | 418 GWh |
| 2026-04-24 | 415 GWh |
| 2026-04-25 | 397 GWh |
| 2026-04-26 | 407 GWh |
| 2026-04-27 | 446 GWh |
| 2026-04-28 | 435 GWh |
| 2026-04-29 | 415 GWh |
| 2026-04-30 | 385 GWh |
| 2026-05-01 | 377 GWh |
| 2026-05-02 | 358 GWh |
| 2026-05-03 | 366 GWh |
| 2026-05-04 | 409 GWh |
| 2026-05-05 | 402 GWh |
| 2026-05-06 | 398 GWh |
| 2026-05-07 | 387 GWh |
| 2026-05-08 | 389 GWh |
| 2026-05-09 | 385 GWh |
| 2026-05-10 | 401 GWh |
| 2026-05-11 | 409 GWh |
| 2026-05-12 | 415 GWh |
| 2026-05-13 | 421 GWh |
| 2026-05-14 | 399 GWh |
| 2026-05-15 | 409 GWh |
| 2026-05-16 | 430 GWh |
| 2026-05-17 | 463 GWh |
| 2026-05-18 | 517 GWh |
| 2026-05-19 | 533 GWh |
| 2026-05-20 | 486 GWh |
| 2026-05-21 | 445 GWh |
| 2026-05-22 | 433 GWh |
| 2026-05-23 | 433 GWh |
| 2026-05-24 | 414 GWh |
| 2026-05-25 | 421 GWh |
| 2026-05-26 | 468 GWh |
| 2026-05-27 | 496 GWh |
| 2026-05-28 | 518 GWh |
| 2026-05-29 | 478 GWh |
| 2026-05-30 | 469 GWh |
| 2026-05-31 | 469 GWh |
| 2026-06-01 | 480 GWh |
| 2026-06-02 | 470 GWh |
| 2026-06-03 | 454 GWh |
| 2026-06-04 | 461 GWh |
| 2026-06-05 | 465 GWh |
| 2026-06-06 | 469 GWh |
| 2026-06-07 | 454 GWh |
| 2026-06-08 | 500 GWh |
| 2026-06-09 | 536 GWh |
| 2026-06-10 | 565 GWh |
| 2026-06-11 | 578 GWh |
| 2026-06-12 | 525 GWh |
| 2026-06-13 | 520 GWh |
| 2026-06-14 | 484 GWh |
| 2026-06-15 | 469 GWh |
| 2026-06-16 | 472 GWh |
| 2026-06-17 | 513 GWh |
| 2026-06-18 | 522 GWh |
| 2026-06-19 | 497 GWh |
| 2026-06-20 | 471 GWh |
| 2026-06-21 | 488 GWh |
| 2026-06-22 | 494 GWh |
| 2026-06-23 | 467 GWh |
| 2026-06-24 | 475 GWh |
| 2026-06-25 | 516 GWh |
| 2026-06-26 | 535 GWh |
| 2026-06-27 | 533 GWh |
| 2026-06-28 | 549 GWh |
| 2026-06-29 | 598 GWh |
| 2026-06-30 | 615 GWh |
| 2026-07-01 | 618 GWh |
| 2026-07-02 | 606 GWh |
| 2026-07-03 | 552 GWh |
| 2026-07-04 | 522 GWh |
| 2026-07-05 | 506 GWh |
| 2026-07-06 | 542 GWh |
| 2026-07-07 | 544 GWh |
| 2026-07-08 | 541 GWh |
| 2026-07-09 | 563 GWh |
| 2026-07-10 | 537 GWh |
| 2026-07-11 | 531 GWh |
| 2026-07-12 | 491 GWh |
| 2026-07-13 | 524 GWh |
| 2026-07-14 | 532 GWh |
| 2026-07-15 | 547 GWh |
| 2026-07-16 | 570 GWh |
| 2026-07-17 | 566 GWh |
| 2026-07-18 | 559 GWh |
| 2026-07-19 | 547 GWh |
| 2026-07-20 | 593 GWh |
| 2026-07-21 | 618 GWh |
| 2026-07-22 | 573 GWh |
| 2026-07-23 | 522 GWh |
| 2026-07-24 | 507 GWh |
| 2026-07-25 | 485 GWh |
| 2026-07-26 | 561 GWh |
| 2026-07-27 | 599 GWh |
| 2026-07-28 | 628 GWh |
| 2026-07-29 | 595 GWh |
| 2026-07-30 | 547 GWh |
| 2026-07-31 | 529 GWh |
| 2026-08-01 | 506 GWh |
| 2026-08-02 | 468 GWh |
| 2026-08-03 | 516 GWh |
| 2026-08-04 | 538 GWh |
| 2026-08-05 | 547 GWh |
| 2026-08-06 | 560 GWh |
| 2026-08-07 | 557 GWh |
| 2026-08-08 | 513 GWh |
| 2026-08-09 | 530 GWh |
| 2026-08-10 | 584 GWh |
| 2026-08-11 | 608 GWh |
| 2026-08-12 | 599 GWh |
| 2026-08-13 | 624 GWh |
| 2026-08-14 | 625 GWh |
| 2026-08-15 | 606 GWh |
| 2026-08-16 | 606 GWh |
| 2026-08-17 | 621 GWh |
| 2026-08-18 | 575 GWh |
| 2026-08-19 | 563 GWh |
| 2026-08-20 | 577 GWh |
| 2026-08-21 | 566 GWh |
| 2026-08-22 | 533 GWh |
| 2026-08-23 | 499 GWh |
| 2026-08-24 | 515 GWh |
| 2026-08-25 | 529 GWh |
| 2026-08-26 | 515 GWh |
| 2026-08-27 | 538 GWh |
| 2026-08-28 | 538 GWh |
| 2026-08-29 | 526 GWh |
| 2026-08-30 | 549 GWh |
| 2026-08-31 | 590 GWh |
| 2026-09-01 | 607 GWh |
| 2026-09-02 | 617 GWh |
| 2026-09-03 | 629 GWh |
| 2026-09-04 | 623 GWh |
| 2026-09-05 | 588 GWh |
| 2026-09-06 | 570 GWh |
| 2026-09-07 | 532 GWh |
| 2026-09-08 | 567 GWh |
| 2026-09-09 | 583 GWh |
| 2026-09-10 | 577 GWh |
| 2026-09-11 | 568 GWh |
| 2026-09-12 | 522 GWh |
| 2026-09-13 | 538 GWh |
| 2026-09-14 | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13. Daily totals are EIA's own daily aggregation in the balancing authority's reporting time zone.
Year by Year
Summed from EIA daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 125 TWh | 119 TWh | Nuclear 40.4% | 256 |
| 2025 | 171 TWh | 162 TWh | Nuclear 36.3% | 365 |
| 2024 | 165 TWh | 158 TWh | Nuclear 38.8% | 366 |
| 2023 | 158 TWh | 155 TWh | Nuclear 44.2% | 365 |
| 2022 | 166 TWh | 160 TWh | Nuclear 40.9% | 365 |
| 2021 | 160 TWh | 156 TWh | Nuclear 42.8% | 365 |
| 2020 | 153 TWh | 153 TWh | Nuclear 43.1% | 366 |
| 2019 | 159 TWh | 161 TWh | Nuclear 40.8% | 365 |
A year is partial when EIA has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13.
Records
From EIA operator data held by World Power Monitor| Record | Value | When |
|---|---|---|
| Highest daily demand, 2019 onward | 736 GWh | 2022-12-23 (23 December 2022) |
| Highest hourly demand since 2026-06-16 (16 June 2026) | 33,092 MW | 3 Sept 2026, 15:00 CDT (UTC-05:00) |
| Highest solar share of a day's generation, 2019 onward | 7.5% | 2019-01-29 (29 January 2019) |
| Highest wind share of a day's generation, 2019 onward | 0.1% | 2022-10-25 (25 October 2022) |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13.
Power Flows With Neighbours
Net totals, 2026-08-16 (16 August 2026) to 2026-09-14 (14 September 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| MISO | TVA imports | 1.77 TWh |
| SOCO | TVA exports | 532 GWh |
| PJM | TVA exports | 261 GWh |
| LGEE | TVA exports | 158 GWh |
| AECI | TVA imports | 112 GWh |
| DUK | TVA exports | 61.5 GWh |
| CPLW | TVA exports | 7.96 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-14.