PJM Electricity Demand and Generation Mix
PJM demand was 94,490 MW in the hour starting 15 Sept 2026, 11:00 EDT (UTC-04:00). Gas was the largest source in the hour starting 14 Sept 2026, 22:00 EDT (UTC-04:00), at 43% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- PJM is a regional transmission organization and balancing authority in the United States, part of the EIA Mid-Atlantic region.
- In the hour starting 15 Sept 2026, 11:00 EDT (UTC-04:00), demand in PJM was 94,490 MW, against a day-ahead forecast of 98,392 MW.
- Gas supplied 43.2% of PJM's generation in the hour starting 14 Sept 2026, 22:00 EDT (UTC-04:00).
- Demand in PJM totalled 843 TWh in 2025.
- Gas supplied 42.0% of PJM's generation in 2025.
- The highest daily demand in PJM from 2019 onward was 3.34 TWh, on 2026-07-02 (2 July 2026).
- The highest hourly demand in PJM since 2026-06-16 (16 June 2026) was 162.6 GW, in the hour starting 2 Jul 2026, 17:00 EDT (UTC-04:00).
- Solar's highest share of PJM's daily generation from 2019 onward was 7.3%, on 2026-05-31 (31 May 2026).
- Wind's highest share of PJM's daily generation from 2019 onward was 10.6%, on 2024-04-12 (12 April 2024).
Latest Demand
Hourly operator dataLatest hour known when this page was built: 15 Sept 2026, 11:00 EDT (UTC-04:00).
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T15:00:00Z.
Generation by Source
Latest hour with generation by source: 14 Sept 2026, 22:00 EDT (UTC-04:00)| Source | Output | Share |
|---|---|---|
| Gas | 43,504 MW | 43.2% |
| Nuclear | 30,996 MW | 30.8% |
| Coal | 14,466 MW | 14.4% |
| Wind | 6,564 MW | 6.5% |
| Other | 3,719 MW | 3.7% |
| Hydro | 954 MW | 0.9% |
| Oil | 456 MW | 0.5% |
| Solar | 27 MW | 0.0% |
| Total from these sources | 100.7 GW | |
| Net interchange | 374 MW | net exports |
EIA publishes generation by source 10 or more hours after demand, so this hour can be earlier than the latest demand hour. Net interchange is positive when PJM exports.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T02:00:00Z.
Last 30 Days, Hourly
Times in UTC| Hour starting (UTC) | Demand |
|---|---|
| 2026-08-16T17:00Z | 114.9 GW |
| 2026-08-16T18:00Z | 116.7 GW |
| 2026-08-16T19:00Z | 118.4 GW |
| 2026-08-16T20:00Z | 120.3 GW |
| 2026-08-16T21:00Z | 121.8 GW |
| 2026-08-16T22:00Z | 121.5 GW |
| 2026-08-16T23:00Z | 119.8 GW |
| 2026-08-17T00:00Z | 117.6 GW |
| 2026-08-17T01:00Z | 114.0 GW |
| 2026-08-17T02:00Z | 108.5 GW |
| 2026-08-17T03:00Z | 103.3 GW |
| 2026-08-17T04:00Z | 100.3 GW |
| 2026-08-17T05:00Z | 97,587 MW |
| 2026-08-17T06:00Z | 95,035 MW |
| 2026-08-17T07:00Z | 93,553 MW |
| 2026-08-17T08:00Z | 93,986 MW |
| 2026-08-17T09:00Z | 96,728 MW |
| 2026-08-17T10:00Z | 100.9 GW |
| 2026-08-17T11:00Z | 104.8 GW |
| 2026-08-17T12:00Z | 108.7 GW |
| 2026-08-17T13:00Z | 111.7 GW |
| 2026-08-17T14:00Z | 115.1 GW |
| 2026-08-17T15:00Z | 119.6 GW |
| 2026-08-17T16:00Z | 124.2 GW |
| 2026-08-17T17:00Z | 129.0 GW |
| 2026-08-17T18:00Z | 132.9 GW |
| 2026-08-17T19:00Z | 135.9 GW |
| 2026-08-17T20:00Z | 137.9 GW |
| 2026-08-17T21:00Z | 138.8 GW |
| 2026-08-17T22:00Z | 136.9 GW |
| 2026-08-17T23:00Z | 132.5 GW |
| 2026-08-18T00:00Z | 128.5 GW |
| 2026-08-18T01:00Z | 123.0 GW |
| 2026-08-18T02:00Z | 115.2 GW |
| 2026-08-18T03:00Z | 108.2 GW |
| 2026-08-18T04:00Z | 104.1 GW |
| 2026-08-18T05:00Z | 100.8 GW |
| 2026-08-18T06:00Z | 97,454 MW |
| 2026-08-18T07:00Z | 95,063 MW |
| 2026-08-18T08:00Z | 94,767 MW |
| 2026-08-18T09:00Z | 97,069 MW |
| 2026-08-18T10:00Z | 100.6 GW |
| 2026-08-18T11:00Z | 104.4 GW |
| 2026-08-18T12:00Z | 108.4 GW |
| 2026-08-18T13:00Z | 111.5 GW |
| 2026-08-18T14:00Z | 115.4 GW |
| 2026-08-18T15:00Z | 119.2 GW |
| 2026-08-18T16:00Z | 123.4 GW |
| 2026-08-18T17:00Z | 128.2 GW |
| 2026-08-18T18:00Z | 131.5 GW |
| 2026-08-18T19:00Z | 133.5 GW |
| 2026-08-18T20:00Z | 134.4 GW |
| 2026-08-18T21:00Z | 134.5 GW |
| 2026-08-18T22:00Z | 133.3 GW |
| 2026-08-18T23:00Z | 129.3 GW |
| 2026-08-19T00:00Z | 125.3 GW |
| 2026-08-19T01:00Z | 120.1 GW |
| 2026-08-19T02:00Z | 112.3 GW |
| 2026-08-19T03:00Z | 105.1 GW |
| 2026-08-19T04:00Z | 99,735 MW |
| 2026-08-19T05:00Z | 96,018 MW |
| 2026-08-19T06:00Z | 93,493 MW |
| 2026-08-19T07:00Z | 91,490 MW |
| 2026-08-19T08:00Z | 91,244 MW |
| 2026-08-19T09:00Z | 93,249 MW |
| 2026-08-19T10:00Z | 96,776 MW |
| 2026-08-19T11:00Z | 100.4 GW |
| 2026-08-19T12:00Z | 104.0 GW |
| 2026-08-19T13:00Z | 108.0 GW |
| 2026-08-19T14:00Z | 111.7 GW |
| 2026-08-19T15:00Z | 115.1 GW |
| 2026-08-19T16:00Z | 120.5 GW |
| 2026-08-19T17:00Z | 125.2 GW |
| 2026-08-19T18:00Z | 128.8 GW |
| 2026-08-19T19:00Z | 131.9 GW |
| 2026-08-19T20:00Z | 134.3 GW |
| 2026-08-19T21:00Z | 135.3 GW |
| 2026-08-19T22:00Z | 133.6 GW |
| 2026-08-19T23:00Z | 129.7 GW |
| 2026-08-20T00:00Z | 126.0 GW |
| 2026-08-20T01:00Z | 120.3 GW |
| 2026-08-20T02:00Z | 112.4 GW |
| 2026-08-20T03:00Z | 105.4 GW |
| 2026-08-20T04:00Z | 101.2 GW |
| 2026-08-20T05:00Z | 98,420 MW |
| 2026-08-20T06:00Z | 95,203 MW |
| 2026-08-20T07:00Z | 93,271 MW |
| 2026-08-20T08:00Z | 92,931 MW |
| 2026-08-20T09:00Z | 95,444 MW |
| 2026-08-20T10:00Z | 99,637 MW |
| 2026-08-20T11:00Z | 103.4 GW |
| 2026-08-20T12:00Z | 107.0 GW |
| 2026-08-20T13:00Z | 110.0 GW |
| 2026-08-20T14:00Z | 112.8 GW |
| 2026-08-20T15:00Z | 115.2 GW |
| 2026-08-20T16:00Z | 119.7 GW |
| 2026-08-20T17:00Z | 123.0 GW |
| 2026-08-20T18:00Z | 126.5 GW |
| 2026-08-20T19:00Z | 128.5 GW |
| 2026-08-20T20:00Z | 129.0 GW |
| 2026-08-20T21:00Z | 128.2 GW |
| 2026-08-20T22:00Z | 125.1 GW |
| 2026-08-20T23:00Z | 120.7 GW |
| 2026-08-21T00:00Z | 116.7 GW |
| 2026-08-21T01:00Z | 111.8 GW |
| 2026-08-21T02:00Z | 104.9 GW |
| 2026-08-21T03:00Z | 98,903 MW |
| 2026-08-21T04:00Z | 94,032 MW |
| 2026-08-21T05:00Z | 90,944 MW |
| 2026-08-21T06:00Z | 88,749 MW |
| 2026-08-21T07:00Z | 86,988 MW |
| 2026-08-21T08:00Z | 86,755 MW |
| 2026-08-21T09:00Z | 88,684 MW |
| 2026-08-21T10:00Z | 91,269 MW |
| 2026-08-21T11:00Z | 94,439 MW |
| 2026-08-21T12:00Z | 98,261 MW |
| 2026-08-21T13:00Z | 102.0 GW |
| 2026-08-21T14:00Z | 104.9 GW |
| 2026-08-21T15:00Z | 106.8 GW |
| 2026-08-21T16:00Z | 109.7 GW |
| 2026-08-21T17:00Z | 113.4 GW |
| 2026-08-21T18:00Z | 116.8 GW |
| 2026-08-21T19:00Z | 120.0 GW |
| 2026-08-21T20:00Z | 123.1 GW |
| 2026-08-21T21:00Z | 124.0 GW |
| 2026-08-21T22:00Z | 121.6 GW |
| 2026-08-21T23:00Z | 117.2 GW |
| 2026-08-22T00:00Z | 114.1 GW |
| 2026-08-22T01:00Z | 110.0 GW |
| 2026-08-22T02:00Z | 104.9 GW |
| 2026-08-22T03:00Z | 99,537 MW |
| 2026-08-22T04:00Z | 94,294 MW |
| 2026-08-22T05:00Z | 91,286 MW |
| 2026-08-22T06:00Z | 89,269 MW |
| 2026-08-22T07:00Z | 87,340 MW |
| 2026-08-22T08:00Z | 86,295 MW |
| 2026-08-22T09:00Z | 86,362 MW |
| 2026-08-22T10:00Z | 87,259 MW |
| 2026-08-22T11:00Z | 89,057 MW |
| 2026-08-22T12:00Z | 92,203 MW |
| 2026-08-22T13:00Z | 94,705 MW |
| 2026-08-22T14:00Z | 98,076 MW |
| 2026-08-22T15:00Z | 101.4 GW |
| 2026-08-22T16:00Z | 104.8 GW |
| 2026-08-22T17:00Z | 108.3 GW |
| 2026-08-22T18:00Z | 111.1 GW |
| 2026-08-22T19:00Z | 112.7 GW |
| 2026-08-22T20:00Z | 114.2 GW |
| 2026-08-22T21:00Z | 114.7 GW |
| 2026-08-22T22:00Z | 112.9 GW |
| 2026-08-22T23:00Z | 110.0 GW |
| 2026-08-23T00:00Z | 107.4 GW |
| 2026-08-23T01:00Z | 104.1 GW |
| 2026-08-23T02:00Z | 98,987 MW |
| 2026-08-23T03:00Z | 94,309 MW |
| 2026-08-23T04:00Z | 89,786 MW |
| 2026-08-23T05:00Z | 86,403 MW |
| 2026-08-23T06:00Z | 84,567 MW |
| 2026-08-23T07:00Z | 83,667 MW |
| 2026-08-23T08:00Z | 82,322 MW |
| 2026-08-23T09:00Z | 81,921 MW |
| 2026-08-23T10:00Z | 82,208 MW |
| 2026-08-23T11:00Z | 83,291 MW |
| 2026-08-23T12:00Z | 86,209 MW |
| 2026-08-23T13:00Z | 89,493 MW |
| 2026-08-23T14:00Z | 92,138 MW |
| 2026-08-23T15:00Z | 95,729 MW |
| 2026-08-23T16:00Z | 99,379 MW |
| 2026-08-23T17:00Z | 103.0 GW |
| 2026-08-23T18:00Z | 106.0 GW |
| 2026-08-23T19:00Z | 109.3 GW |
| 2026-08-23T20:00Z | 112.5 GW |
| 2026-08-23T21:00Z | 115.0 GW |
| 2026-08-23T22:00Z | 115.0 GW |
| 2026-08-23T23:00Z | 111.5 GW |
| 2026-08-24T00:00Z | 108.0 GW |
| 2026-08-24T01:00Z | 103.5 GW |
| 2026-08-24T02:00Z | 97,069 MW |
| 2026-08-24T03:00Z | 91,334 MW |
| 2026-08-24T04:00Z | 87,431 MW |
| 2026-08-24T05:00Z | 85,151 MW |
| 2026-08-24T06:00Z | 82,953 MW |
| 2026-08-24T07:00Z | 81,656 MW |
| 2026-08-24T08:00Z | 82,031 MW |
| 2026-08-24T09:00Z | 83,814 MW |
| 2026-08-24T10:00Z | 87,339 MW |
| 2026-08-24T11:00Z | 90,248 MW |
| 2026-08-24T12:00Z | 93,943 MW |
| 2026-08-24T13:00Z | 96,993 MW |
| 2026-08-24T14:00Z | 99,421 MW |
| 2026-08-24T15:00Z | 99,993 MW |
| 2026-08-24T16:00Z | 103.1 GW |
| 2026-08-24T17:00Z | 106.9 GW |
| 2026-08-24T18:00Z | 110.1 GW |
| 2026-08-24T19:00Z | 113.1 GW |
| 2026-08-24T20:00Z | 115.8 GW |
| 2026-08-24T21:00Z | 117.6 GW |
| 2026-08-24T22:00Z | 116.8 GW |
| 2026-08-24T23:00Z | 113.7 GW |
| 2026-08-25T00:00Z | 110.6 GW |
| 2026-08-25T01:00Z | 105.7 GW |
| 2026-08-25T02:00Z | 98,624 MW |
| 2026-08-25T03:00Z | 92,613 MW |
| 2026-08-25T04:00Z | 89,642 MW |
| 2026-08-25T05:00Z | 86,785 MW |
| 2026-08-25T06:00Z | 84,283 MW |
| 2026-08-25T07:00Z | 82,743 MW |
| 2026-08-25T08:00Z | 83,159 MW |
| 2026-08-25T09:00Z | 85,773 MW |
| 2026-08-25T10:00Z | 88,484 MW |
| 2026-08-25T11:00Z | 91,741 MW |
| 2026-08-25T12:00Z | 94,271 MW |
| 2026-08-25T13:00Z | 95,987 MW |
| 2026-08-25T14:00Z | 98,940 MW |
| 2026-08-25T15:00Z | 100.9 GW |
| 2026-08-25T16:00Z | 103.8 GW |
| 2026-08-25T17:00Z | 107.8 GW |
| 2026-08-25T18:00Z | 111.1 GW |
| 2026-08-25T19:00Z | 114.5 GW |
| 2026-08-25T20:00Z | 117.3 GW |
| 2026-08-25T21:00Z | 119.4 GW |
| 2026-08-25T22:00Z | 119.1 GW |
| 2026-08-25T23:00Z | 116.6 GW |
| 2026-08-26T00:00Z | 113.5 GW |
| 2026-08-26T01:00Z | 108.3 GW |
| 2026-08-26T02:00Z | 101.2 GW |
| 2026-08-26T03:00Z | 95,141 MW |
| 2026-08-26T04:00Z | 91,396 MW |
| 2026-08-26T05:00Z | 88,440 MW |
| 2026-08-26T06:00Z | 86,142 MW |
| 2026-08-26T07:00Z | 84,599 MW |
| 2026-08-26T08:00Z | 84,858 MW |
| 2026-08-26T09:00Z | 86,603 MW |
| 2026-08-26T10:00Z | 89,620 MW |
| 2026-08-26T11:00Z | 93,165 MW |
| 2026-08-26T12:00Z | 96,345 MW |
| 2026-08-26T13:00Z | 99,482 MW |
| 2026-08-26T14:00Z | 102.8 GW |
| 2026-08-26T15:00Z | 106.7 GW |
| 2026-08-26T16:00Z | 110.1 GW |
| 2026-08-26T17:00Z | 115.1 GW |
| 2026-08-26T18:00Z | 119.7 GW |
| 2026-08-26T19:00Z | 123.4 GW |
| 2026-08-26T20:00Z | 126.8 GW |
| 2026-08-26T21:00Z | 128.3 GW |
| 2026-08-26T22:00Z | 126.7 GW |
| 2026-08-26T23:00Z | 123.4 GW |
| 2026-08-27T00:00Z | 120.6 GW |
| 2026-08-27T01:00Z | 115.4 GW |
| 2026-08-27T02:00Z | 108.0 GW |
| 2026-08-27T03:00Z | 102.0 GW |
| 2026-08-27T04:00Z | 98,241 MW |
| 2026-08-27T05:00Z | 95,121 MW |
| 2026-08-27T06:00Z | 92,420 MW |
| 2026-08-27T07:00Z | 90,514 MW |
| 2026-08-27T08:00Z | 90,464 MW |
| 2026-08-27T09:00Z | 93,030 MW |
| 2026-08-27T10:00Z | 96,995 MW |
| 2026-08-27T11:00Z | 101.0 GW |
| 2026-08-27T12:00Z | 105.6 GW |
| 2026-08-27T13:00Z | 108.3 GW |
| 2026-08-27T14:00Z | 111.6 GW |
| 2026-08-27T15:00Z | 115.2 GW |
| 2026-08-27T16:00Z | 120.4 GW |
| 2026-08-27T17:00Z | 124.5 GW |
| 2026-08-27T18:00Z | 127.0 GW |
| 2026-08-27T19:00Z | 128.6 GW |
| 2026-08-27T20:00Z | 129.6 GW |
| 2026-08-27T21:00Z | 129.8 GW |
| 2026-08-27T22:00Z | 128.0 GW |
| 2026-08-27T23:00Z | 124.5 GW |
| 2026-08-28T00:00Z | 120.7 GW |
| 2026-08-28T01:00Z | 115.5 GW |
| 2026-08-28T02:00Z | 108.4 GW |
| 2026-08-28T03:00Z | 103.0 GW |
| 2026-08-28T04:00Z | 98,278 MW |
| 2026-08-28T05:00Z | 94,910 MW |
| 2026-08-28T06:00Z | 92,065 MW |
| 2026-08-28T07:00Z | 89,925 MW |
| 2026-08-28T08:00Z | 89,719 MW |
| 2026-08-28T09:00Z | 92,082 MW |
| 2026-08-28T10:00Z | 95,212 MW |
| 2026-08-28T11:00Z | 98,130 MW |
| 2026-08-28T12:00Z | 102.6 GW |
| 2026-08-28T13:00Z | 105.3 GW |
| 2026-08-28T14:00Z | 109.2 GW |
| 2026-08-28T15:00Z | 112.9 GW |
| 2026-08-28T16:00Z | 117.0 GW |
| 2026-08-28T17:00Z | 121.3 GW |
| 2026-08-28T18:00Z | 125.0 GW |
| 2026-08-28T19:00Z | 127.6 GW |
| 2026-08-28T20:00Z | 129.6 GW |
| 2026-08-28T21:00Z | 130.0 GW |
| 2026-08-28T22:00Z | 127.2 GW |
| 2026-08-28T23:00Z | 122.2 GW |
| 2026-08-29T00:00Z | 117.6 GW |
| 2026-08-29T01:00Z | 112.2 GW |
| 2026-08-29T02:00Z | 105.4 GW |
| 2026-08-29T03:00Z | 99,752 MW |
| 2026-08-29T04:00Z | 94,377 MW |
| 2026-08-29T05:00Z | 89,826 MW |
| 2026-08-29T06:00Z | 86,821 MW |
| 2026-08-29T07:00Z | 85,394 MW |
| 2026-08-29T08:00Z | 84,200 MW |
| 2026-08-29T09:00Z | 83,990 MW |
| 2026-08-29T10:00Z | 84,864 MW |
| 2026-08-29T11:00Z | 86,271 MW |
| 2026-08-29T12:00Z | 88,832 MW |
| 2026-08-29T13:00Z | 91,975 MW |
| 2026-08-29T14:00Z | 94,350 MW |
| 2026-08-29T15:00Z | 96,890 MW |
| 2026-08-29T16:00Z | 100.4 GW |
| 2026-08-29T17:00Z | 104.5 GW |
| 2026-08-29T18:00Z | 108.4 GW |
| 2026-08-29T19:00Z | 112.0 GW |
| 2026-08-29T20:00Z | 115.4 GW |
| 2026-08-29T21:00Z | 117.1 GW |
| 2026-08-29T22:00Z | 115.6 GW |
| 2026-08-29T23:00Z | 111.6 GW |
| 2026-08-30T00:00Z | 108.6 GW |
| 2026-08-30T01:00Z | 104.5 GW |
| 2026-08-30T02:00Z | 98,857 MW |
| 2026-08-30T03:00Z | 93,903 MW |
| 2026-08-30T04:00Z | 89,986 MW |
| 2026-08-30T05:00Z | 87,738 MW |
| 2026-08-30T06:00Z | 86,003 MW |
| 2026-08-30T07:00Z | 84,282 MW |
| 2026-08-30T08:00Z | 83,377 MW |
| 2026-08-30T09:00Z | 83,361 MW |
| 2026-08-30T10:00Z | 84,157 MW |
| 2026-08-30T11:00Z | 85,666 MW |
| 2026-08-30T12:00Z | 88,644 MW |
| 2026-08-30T13:00Z | 91,167 MW |
| 2026-08-30T14:00Z | 95,380 MW |
| 2026-08-30T15:00Z | 100.8 GW |
| 2026-08-30T16:00Z | 106.3 GW |
| 2026-08-30T17:00Z | 112.1 GW |
| 2026-08-30T18:00Z | 116.1 GW |
| 2026-08-30T19:00Z | 119.0 GW |
| 2026-08-30T20:00Z | 121.9 GW |
| 2026-08-30T21:00Z | 123.6 GW |
| 2026-08-30T22:00Z | 123.5 GW |
| 2026-08-30T23:00Z | 121.6 GW |
| 2026-08-31T00:00Z | 119.6 GW |
| 2026-08-31T01:00Z | 114.9 GW |
| 2026-08-31T02:00Z | 108.6 GW |
| 2026-08-31T03:00Z | 103.4 GW |
| 2026-08-31T04:00Z | 99,723 MW |
| 2026-08-31T05:00Z | 96,359 MW |
| 2026-08-31T06:00Z | 93,826 MW |
| 2026-08-31T07:00Z | 92,240 MW |
| 2026-08-31T08:00Z | 92,594 MW |
| 2026-08-31T09:00Z | 95,611 MW |
| 2026-08-31T10:00Z | 100.3 GW |
| 2026-08-31T11:00Z | 103.8 GW |
| 2026-08-31T12:00Z | 106.4 GW |
| 2026-08-31T13:00Z | 108.7 GW |
| 2026-08-31T14:00Z | 112.1 GW |
| 2026-08-31T15:00Z | 116.6 GW |
| 2026-08-31T16:00Z | 122.5 GW |
| 2026-08-31T17:00Z | 128.1 GW |
| 2026-08-31T18:00Z | 132.0 GW |
| 2026-08-31T19:00Z | 133.3 GW |
| 2026-08-31T20:00Z | 134.4 GW |
| 2026-08-31T21:00Z | 135.5 GW |
| 2026-08-31T22:00Z | 134.3 GW |
| 2026-08-31T23:00Z | 132.1 GW |
| 2026-09-01T00:00Z | 129.6 GW |
| 2026-09-01T01:00Z | 123.9 GW |
| 2026-09-01T02:00Z | 116.1 GW |
| 2026-09-01T03:00Z | 110.3 GW |
| 2026-09-01T04:00Z | 106.3 GW |
| 2026-09-01T05:00Z | 103.0 GW |
| 2026-09-01T06:00Z | 99,937 MW |
| 2026-09-01T07:00Z | 97,943 MW |
| 2026-09-01T08:00Z | 97,756 MW |
| 2026-09-01T09:00Z | 100.8 GW |
| 2026-09-01T10:00Z | 106.1 GW |
| 2026-09-01T11:00Z | 110.4 GW |
| 2026-09-01T12:00Z | 113.9 GW |
| 2026-09-01T13:00Z | 118.2 GW |
| 2026-09-01T14:00Z | 124.0 GW |
| 2026-09-01T15:00Z | 129.3 GW |
| 2026-09-01T16:00Z | 135.2 GW |
| 2026-09-01T17:00Z | 140.2 GW |
| 2026-09-01T18:00Z | 145.0 GW |
| 2026-09-01T19:00Z | 148.7 GW |
| 2026-09-01T20:00Z | 151.2 GW |
| 2026-09-01T21:00Z | 152.5 GW |
| 2026-09-01T22:00Z | 150.8 GW |
| 2026-09-01T23:00Z | 147.5 GW |
| 2026-09-02T00:00Z | 142.4 GW |
| 2026-09-02T01:00Z | 134.9 GW |
| 2026-09-02T02:00Z | 126.3 GW |
| 2026-09-02T03:00Z | 119.2 GW |
| 2026-09-02T04:00Z | 113.9 GW |
| 2026-09-02T05:00Z | 109.3 GW |
| 2026-09-02T06:00Z | 105.3 GW |
| 2026-09-02T07:00Z | 102.5 GW |
| 2026-09-02T08:00Z | 101.7 GW |
| 2026-09-02T09:00Z | 103.8 GW |
| 2026-09-02T10:00Z | 107.7 GW |
| 2026-09-02T11:00Z | 110.8 GW |
| 2026-09-02T12:00Z | 114.8 GW |
| 2026-09-02T13:00Z | 119.8 GW |
| 2026-09-02T14:00Z | 125.5 GW |
| 2026-09-02T15:00Z | 130.2 GW |
| 2026-09-02T16:00Z | 135.0 GW |
| 2026-09-02T17:00Z | 139.0 GW |
| 2026-09-02T18:00Z | 139.8 GW |
| 2026-09-02T19:00Z | 140.3 GW |
| 2026-09-02T20:00Z | 141.0 GW |
| 2026-09-02T21:00Z | 141.6 GW |
| 2026-09-02T22:00Z | 140.4 GW |
| 2026-09-02T23:00Z | 138.5 GW |
| 2026-09-03T00:00Z | 135.9 GW |
| 2026-09-03T01:00Z | 130.3 GW |
| 2026-09-03T02:00Z | 122.5 GW |
| 2026-09-03T03:00Z | 115.7 GW |
| 2026-09-03T04:00Z | 111.1 GW |
| 2026-09-03T05:00Z | 107.4 GW |
| 2026-09-03T06:00Z | 103.8 GW |
| 2026-09-03T07:00Z | 101.4 GW |
| 2026-09-03T08:00Z | 101.4 GW |
| 2026-09-03T09:00Z | 103.9 GW |
| 2026-09-03T10:00Z | 109.1 GW |
| 2026-09-03T11:00Z | 112.3 GW |
| 2026-09-03T12:00Z | 115.0 GW |
| 2026-09-03T13:00Z | 119.3 GW |
| 2026-09-03T14:00Z | 125.1 GW |
| 2026-09-03T15:00Z | 129.7 GW |
| 2026-09-03T16:00Z | 132.8 GW |
| 2026-09-03T17:00Z | 137.6 GW |
| 2026-09-03T18:00Z | 142.3 GW |
| 2026-09-03T19:00Z | 145.9 GW |
| 2026-09-03T20:00Z | 149.1 GW |
| 2026-09-03T21:00Z | 149.9 GW |
| 2026-09-03T22:00Z | 147.8 GW |
| 2026-09-03T23:00Z | 143.5 GW |
| 2026-09-04T00:00Z | 139.4 GW |
| 2026-09-04T01:00Z | 133.1 GW |
| 2026-09-04T02:00Z | 125.3 GW |
| 2026-09-04T03:00Z | 118.6 GW |
| 2026-09-04T04:00Z | 112.9 GW |
| 2026-09-04T05:00Z | 108.1 GW |
| 2026-09-04T06:00Z | 104.0 GW |
| 2026-09-04T07:00Z | 101.5 GW |
| 2026-09-04T08:00Z | 100.9 GW |
| 2026-09-04T09:00Z | 102.8 GW |
| 2026-09-04T10:00Z | 107.0 GW |
| 2026-09-04T11:00Z | 110.4 GW |
| 2026-09-04T12:00Z | 114.5 GW |
| 2026-09-04T13:00Z | 119.1 GW |
| 2026-09-04T14:00Z | 123.7 GW |
| 2026-09-04T15:00Z | 127.8 GW |
| 2026-09-04T16:00Z | 132.0 GW |
| 2026-09-04T17:00Z | 135.6 GW |
| 2026-09-04T18:00Z | 138.9 GW |
| 2026-09-04T19:00Z | 141.4 GW |
| 2026-09-04T20:00Z | 142.2 GW |
| 2026-09-04T21:00Z | 140.8 GW |
| 2026-09-04T22:00Z | 137.2 GW |
| 2026-09-04T23:00Z | 133.0 GW |
| 2026-09-05T00:00Z | 129.1 GW |
| 2026-09-05T01:00Z | 123.6 GW |
| 2026-09-05T02:00Z | 116.8 GW |
| 2026-09-05T03:00Z | 110.7 GW |
| 2026-09-05T04:00Z | 104.5 GW |
| 2026-09-05T05:00Z | 100.5 GW |
| 2026-09-05T06:00Z | 98,685 MW |
| 2026-09-05T07:00Z | 96,382 MW |
| 2026-09-05T08:00Z | 94,722 MW |
| 2026-09-05T09:00Z | 94,262 MW |
| 2026-09-05T10:00Z | 94,719 MW |
| 2026-09-05T11:00Z | 95,980 MW |
| 2026-09-05T12:00Z | 99,171 MW |
| 2026-09-05T13:00Z | 102.5 GW |
| 2026-09-05T14:00Z | 106.0 GW |
| 2026-09-05T15:00Z | 108.3 GW |
| 2026-09-05T16:00Z | 112.0 GW |
| 2026-09-05T17:00Z | 114.7 GW |
| 2026-09-05T18:00Z | 116.8 GW |
| 2026-09-05T19:00Z | 118.8 GW |
| 2026-09-05T20:00Z | 120.4 GW |
| 2026-09-05T21:00Z | 121.1 GW |
| 2026-09-05T22:00Z | 119.3 GW |
| 2026-09-05T23:00Z | 115.3 GW |
| 2026-09-06T00:00Z | 111.9 GW |
| 2026-09-06T01:00Z | 107.4 GW |
| 2026-09-06T02:00Z | 102.0 GW |
| 2026-09-06T03:00Z | 96,874 MW |
| 2026-09-06T04:00Z | 91,835 MW |
| 2026-09-06T05:00Z | 88,484 MW |
| 2026-09-06T06:00Z | 86,319 MW |
| 2026-09-06T07:00Z | 84,714 MW |
| 2026-09-06T08:00Z | 83,905 MW |
| 2026-09-06T09:00Z | 83,444 MW |
| 2026-09-06T10:00Z | 83,735 MW |
| 2026-09-06T11:00Z | 84,309 MW |
| 2026-09-06T12:00Z | 86,814 MW |
| 2026-09-06T13:00Z | 90,822 MW |
| 2026-09-06T14:00Z | 94,653 MW |
| 2026-09-06T15:00Z | 97,664 MW |
| 2026-09-06T16:00Z | 100.0 GW |
| 2026-09-06T17:00Z | 103.4 GW |
| 2026-09-06T18:00Z | 106.3 GW |
| 2026-09-06T19:00Z | 108.9 GW |
| 2026-09-06T20:00Z | 111.2 GW |
| 2026-09-06T21:00Z | 112.4 GW |
| 2026-09-06T22:00Z | 111.2 GW |
| 2026-09-06T23:00Z | 107.2 GW |
| 2026-09-07T00:00Z | 104.0 GW |
| 2026-09-07T01:00Z | 99,641 MW |
| 2026-09-07T02:00Z | 94,477 MW |
| 2026-09-07T03:00Z | 89,592 MW |
| 2026-09-07T04:00Z | 85,013 MW |
| 2026-09-07T05:00Z | 81,639 MW |
| 2026-09-07T06:00Z | 80,305 MW |
| 2026-09-07T07:00Z | 79,835 MW |
| 2026-09-07T08:00Z | 79,541 MW |
| 2026-09-07T09:00Z | 79,679 MW |
| 2026-09-07T10:00Z | 80,821 MW |
| 2026-09-07T11:00Z | 80,955 MW |
| 2026-09-07T12:00Z | 83,085 MW |
| 2026-09-07T13:00Z | 86,573 MW |
| 2026-09-07T14:00Z | 89,230 MW |
| 2026-09-07T15:00Z | 93,069 MW |
| 2026-09-07T16:00Z | 97,364 MW |
| 2026-09-07T17:00Z | 101.3 GW |
| 2026-09-07T18:00Z | 105.2 GW |
| 2026-09-07T19:00Z | 109.2 GW |
| 2026-09-07T20:00Z | 113.6 GW |
| 2026-09-07T21:00Z | 116.5 GW |
| 2026-09-07T22:00Z | 115.7 GW |
| 2026-09-07T23:00Z | 112.3 GW |
| 2026-09-08T00:00Z | 109.0 GW |
| 2026-09-08T01:00Z | 103.4 GW |
| 2026-09-08T02:00Z | 96,653 MW |
| 2026-09-08T03:00Z | 91,489 MW |
| 2026-09-08T04:00Z | 87,815 MW |
| 2026-09-08T05:00Z | 84,792 MW |
| 2026-09-08T06:00Z | 82,731 MW |
| 2026-09-08T07:00Z | 81,477 MW |
| 2026-09-08T08:00Z | 81,525 MW |
| 2026-09-08T09:00Z | 83,226 MW |
| 2026-09-08T10:00Z | 87,898 MW |
| 2026-09-08T11:00Z | 91,522 MW |
| 2026-09-08T12:00Z | 94,329 MW |
| 2026-09-08T13:00Z | 96,473 MW |
| 2026-09-08T14:00Z | 100.1 GW |
| 2026-09-08T15:00Z | 104.5 GW |
| 2026-09-08T16:00Z | 109.1 GW |
| 2026-09-08T17:00Z | 114.7 GW |
| 2026-09-08T18:00Z | 120.1 GW |
| 2026-09-08T19:00Z | 124.3 GW |
| 2026-09-08T20:00Z | 127.8 GW |
| 2026-09-08T21:00Z | 130.3 GW |
| 2026-09-08T22:00Z | 129.1 GW |
| 2026-09-08T23:00Z | 125.4 GW |
| 2026-09-09T00:00Z | 122.1 GW |
| 2026-09-09T01:00Z | 116.2 GW |
| 2026-09-09T02:00Z | 108.3 GW |
| 2026-09-09T03:00Z | 102.4 GW |
| 2026-09-09T04:00Z | 98,710 MW |
| 2026-09-09T05:00Z | 94,604 MW |
| 2026-09-09T06:00Z | 91,765 MW |
| 2026-09-09T07:00Z | 90,204 MW |
| 2026-09-09T08:00Z | 90,192 MW |
| 2026-09-09T09:00Z | 92,991 MW |
| 2026-09-09T10:00Z | 97,305 MW |
| 2026-09-09T11:00Z | 101.0 GW |
| 2026-09-09T12:00Z | 104.3 GW |
| 2026-09-09T13:00Z | 107.1 GW |
| 2026-09-09T14:00Z | 111.2 GW |
| 2026-09-09T15:00Z | 115.3 GW |
| 2026-09-09T16:00Z | 121.1 GW |
| 2026-09-09T17:00Z | 126.5 GW |
| 2026-09-09T18:00Z | 130.6 GW |
| 2026-09-09T19:00Z | 134.0 GW |
| 2026-09-09T20:00Z | 136.5 GW |
| 2026-09-09T21:00Z | 136.9 GW |
| 2026-09-09T22:00Z | 134.8 GW |
| 2026-09-09T23:00Z | 131.2 GW |
| 2026-09-10T00:00Z | 128.1 GW |
| 2026-09-10T01:00Z | 121.8 GW |
| 2026-09-10T02:00Z | 114.1 GW |
| 2026-09-10T03:00Z | 108.6 GW |
| 2026-09-10T04:00Z | 104.9 GW |
| 2026-09-10T05:00Z | 100.1 GW |
| 2026-09-10T06:00Z | 96,865 MW |
| 2026-09-10T07:00Z | 95,231 MW |
| 2026-09-10T08:00Z | 94,582 MW |
| 2026-09-10T09:00Z | 97,243 MW |
| 2026-09-10T10:00Z | 101.3 GW |
| 2026-09-10T11:00Z | 104.9 GW |
| 2026-09-10T12:00Z | 107.8 GW |
| 2026-09-10T13:00Z | 110.1 GW |
| 2026-09-10T14:00Z | 112.7 GW |
| 2026-09-10T15:00Z | 116.4 GW |
| 2026-09-10T16:00Z | 121.2 GW |
| 2026-09-10T17:00Z | 125.5 GW |
| 2026-09-10T18:00Z | 128.6 GW |
| 2026-09-10T19:00Z | 130.9 GW |
| 2026-09-10T20:00Z | 132.7 GW |
| 2026-09-10T21:00Z | 132.8 GW |
| 2026-09-10T22:00Z | 130.4 GW |
| 2026-09-10T23:00Z | 127.1 GW |
| 2026-09-11T00:00Z | 124.0 GW |
| 2026-09-11T01:00Z | 118.7 GW |
| 2026-09-11T02:00Z | 111.6 GW |
| 2026-09-11T03:00Z | 105.8 GW |
| 2026-09-11T04:00Z | 101.7 GW |
| 2026-09-11T05:00Z | 98,242 MW |
| 2026-09-11T06:00Z | 95,167 MW |
| 2026-09-11T07:00Z | 93,360 MW |
| 2026-09-11T08:00Z | 92,989 MW |
| 2026-09-11T09:00Z | 95,271 MW |
| 2026-09-11T10:00Z | 98,522 MW |
| 2026-09-11T11:00Z | 101.0 GW |
| 2026-09-11T12:00Z | 103.6 GW |
| 2026-09-11T13:00Z | 106.0 GW |
| 2026-09-11T14:00Z | 108.2 GW |
| 2026-09-11T15:00Z | 109.7 GW |
| 2026-09-11T16:00Z | 111.7 GW |
| 2026-09-11T17:00Z | 114.7 GW |
| 2026-09-11T18:00Z | 117.6 GW |
| 2026-09-11T19:00Z | 120.5 GW |
| 2026-09-11T20:00Z | 123.3 GW |
| 2026-09-11T21:00Z | 124.4 GW |
| 2026-09-11T22:00Z | 121.6 GW |
| 2026-09-11T23:00Z | 116.9 GW |
| 2026-09-12T00:00Z | 113.1 GW |
| 2026-09-12T01:00Z | 108.2 GW |
| 2026-09-12T02:00Z | 102.7 GW |
| 2026-09-12T03:00Z | 97,250 MW |
| 2026-09-12T04:00Z | 93,074 MW |
| 2026-09-12T05:00Z | 90,653 MW |
| 2026-09-12T06:00Z | 88,122 MW |
| 2026-09-12T07:00Z | 86,225 MW |
| 2026-09-12T08:00Z | 85,328 MW |
| 2026-09-12T09:00Z | 85,559 MW |
| 2026-09-12T10:00Z | 87,048 MW |
| 2026-09-12T11:00Z | 89,389 MW |
| 2026-09-12T12:00Z | 92,490 MW |
| 2026-09-12T13:00Z | 95,402 MW |
| 2026-09-12T14:00Z | 98,632 MW |
| 2026-09-12T15:00Z | 102.2 GW |
| 2026-09-12T16:00Z | 104.7 GW |
| 2026-09-12T17:00Z | 108.1 GW |
| 2026-09-12T18:00Z | 111.1 GW |
| 2026-09-12T19:00Z | 113.3 GW |
| 2026-09-12T20:00Z | 114.8 GW |
| 2026-09-12T21:00Z | 115.0 GW |
| 2026-09-12T22:00Z | 113.9 GW |
| 2026-09-12T23:00Z | 112.1 GW |
| 2026-09-13T00:00Z | 110.3 GW |
| 2026-09-13T01:00Z | 107.0 GW |
| 2026-09-13T02:00Z | 102.7 GW |
| 2026-09-13T03:00Z | 98,361 MW |
| 2026-09-13T04:00Z | 94,453 MW |
| 2026-09-13T05:00Z | 92,208 MW |
| 2026-09-13T06:00Z | 90,212 MW |
| 2026-09-13T07:00Z | 88,178 MW |
| 2026-09-13T08:00Z | 86,861 MW |
| 2026-09-13T09:00Z | 86,618 MW |
| 2026-09-13T10:00Z | 87,502 MW |
| 2026-09-13T11:00Z | 89,236 MW |
| 2026-09-13T12:00Z | 92,843 MW |
| 2026-09-13T13:00Z | 96,343 MW |
| 2026-09-13T14:00Z | 100.3 GW |
| 2026-09-13T15:00Z | 104.0 GW |
| 2026-09-13T16:00Z | 108.0 GW |
| 2026-09-13T17:00Z | 112.1 GW |
| 2026-09-13T18:00Z | 116.0 GW |
| 2026-09-13T19:00Z | 119.6 GW |
| 2026-09-13T20:00Z | 121.9 GW |
| 2026-09-13T21:00Z | 122.7 GW |
| 2026-09-13T22:00Z | 121.1 GW |
| 2026-09-13T23:00Z | 118.1 GW |
| 2026-09-14T00:00Z | 115.2 GW |
| 2026-09-14T01:00Z | 109.6 GW |
| 2026-09-14T02:00Z | 103.1 GW |
| 2026-09-14T03:00Z | 97,804 MW |
| 2026-09-14T04:00Z | 93,207 MW |
| 2026-09-14T05:00Z | 90,170 MW |
| 2026-09-14T06:00Z | 88,090 MW |
| 2026-09-14T07:00Z | 86,595 MW |
| 2026-09-14T08:00Z | 86,844 MW |
| 2026-09-14T09:00Z | 88,669 MW |
| 2026-09-14T10:00Z | 91,925 MW |
| 2026-09-14T11:00Z | 94,942 MW |
| 2026-09-14T12:00Z | 96,631 MW |
| 2026-09-14T13:00Z | 98,995 MW |
| 2026-09-14T14:00Z | 101.2 GW |
| 2026-09-14T15:00Z | 102.5 GW |
| 2026-09-14T16:00Z | 103.1 GW |
| 2026-09-14T17:00Z | 104.6 GW |
| 2026-09-14T18:00Z | 106.0 GW |
| 2026-09-14T19:00Z | 107.7 GW |
| 2026-09-14T20:00Z | 109.7 GW |
| 2026-09-14T21:00Z | 110.8 GW |
| 2026-09-14T22:00Z | 109.3 GW |
| 2026-09-14T23:00Z | 106.5 GW |
| 2026-09-15T00:00Z | 104.1 GW |
| 2026-09-15T01:00Z | 98,911 MW |
| 2026-09-15T02:00Z | 93,044 MW |
| 2026-09-15T03:00Z | 88,619 MW |
| 2026-09-15T04:00Z | 84,896 MW |
| 2026-09-15T05:00Z | 81,780 MW |
| 2026-09-15T06:00Z | 79,763 MW |
| 2026-09-15T07:00Z | 78,739 MW |
| 2026-09-15T08:00Z | 79,151 MW |
| 2026-09-15T09:00Z | 82,175 MW |
| 2026-09-15T10:00Z | 85,815 MW |
| 2026-09-15T11:00Z | 88,051 MW |
| 2026-09-15T12:00Z | 90,051 MW |
| 2026-09-15T13:00Z | 92,063 MW |
| 2026-09-15T14:00Z | 93,716 MW |
| 2026-09-15T15:00Z | 94,490 MW |
| 2026-09-15T16:00Z | n/a |
| Hour starting (UTC) | Gas | Nuclear | Coal | Solar | Other |
|---|---|---|---|---|---|
| 2026-08-16T17:00Z | 54,437 MW | 32,452 MW | 18,510 MW | 7,536 MW | 3,215 MW |
| 2026-08-16T18:00Z | 54,004 MW | 32,434 MW | 18,278 MW | 8,892 MW | 3,191 MW |
| 2026-08-16T19:00Z | 54,122 MW | 32,442 MW | 18,654 MW | 9,078 MW | 3,184 MW |
| 2026-08-16T20:00Z | 55,626 MW | 32,446 MW | 19,754 MW | 7,928 MW | 3,281 MW |
| 2026-08-16T21:00Z | 57,290 MW | 32,435 MW | 20,699 MW | 6,342 MW | 3,408 MW |
| 2026-08-16T22:00Z | 57,386 MW | 32,436 MW | 21,210 MW | 3,963 MW | 3,334 MW |
| 2026-08-16T23:00Z | 58,147 MW | 32,440 MW | 21,831 MW | 1,605 MW | 3,236 MW |
| 2026-08-17T00:00Z | 58,735 MW | 32,450 MW | 21,952 MW | 135 MW | 3,251 MW |
| 2026-08-17T01:00Z | 57,429 MW | 32,468 MW | 21,137 MW | 61 MW | 3,109 MW |
| 2026-08-17T02:00Z | 54,653 MW | 32,479 MW | 20,002 MW | 61 MW | 3,145 MW |
| 2026-08-17T03:00Z | 51,712 MW | 32,485 MW | 19,644 MW | 61 MW | 2,667 MW |
| 2026-08-17T04:00Z | 48,808 MW | 32,493 MW | 19,315 MW | 61 MW | 2,340 MW |
| 2026-08-17T05:00Z | 46,937 MW | 32,506 MW | 18,353 MW | 61 MW | 2,296 MW |
| 2026-08-17T06:00Z | 45,692 MW | 32,524 MW | 17,281 MW | 61 MW | 2,185 MW |
| 2026-08-17T07:00Z | 45,384 MW | 32,535 MW | 16,676 MW | 61 MW | 2,159 MW |
| 2026-08-17T08:00Z | 45,350 MW | 32,542 MW | 16,689 MW | 61 MW | 2,141 MW |
| 2026-08-17T09:00Z | 47,152 MW | 32,544 MW | 17,654 MW | 61 MW | 2,256 MW |
| 2026-08-17T10:00Z | 49,160 MW | 32,559 MW | 18,421 MW | 75 MW | 2,500 MW |
| 2026-08-17T11:00Z | 50,966 MW | 32,585 MW | 19,364 MW | 783 MW | 2,650 MW |
| 2026-08-17T12:00Z | 52,787 MW | 32,616 MW | 19,660 MW | 3,110 MW | 2,692 MW |
| 2026-08-17T13:00Z | 53,816 MW | 32,641 MW | 19,266 MW | 6,342 MW | 2,709 MW |
| 2026-08-17T14:00Z | 54,907 MW | 32,619 MW | 18,882 MW | 8,680 MW | 3,022 MW |
| 2026-08-17T15:00Z | 57,033 MW | 32,597 MW | 19,125 MW | 10,357 MW | 3,049 MW |
| 2026-08-17T16:00Z | 59,286 MW | 32,574 MW | 19,291 MW | 10,873 MW | 3,136 MW |
| 2026-08-17T17:00Z | 63,699 MW | 32,561 MW | 19,816 MW | 10,572 MW | 3,236 MW |
| 2026-08-17T18:00Z | 65,127 MW | 32,532 MW | 19,825 MW | 10,467 MW | 3,297 MW |
| 2026-08-17T19:00Z | 66,320 MW | 32,499 MW | 20,463 MW | 10,143 MW | 3,349 MW |
| 2026-08-17T20:00Z | 66,743 MW | 32,488 MW | 20,717 MW | 8,978 MW | 3,464 MW |
| 2026-08-17T21:00Z | 68,186 MW | 32,474 MW | 20,773 MW | 7,782 MW | 3,366 MW |
| 2026-08-17T22:00Z | 68,529 MW | 32,461 MW | 20,801 MW | 5,019 MW | 3,543 MW |
| 2026-08-17T23:00Z | 68,540 MW | 32,486 MW | 20,869 MW | 1,548 MW | 3,544 MW |
| 2026-08-18T00:00Z | 68,520 MW | 32,525 MW | 21,118 MW | 115 MW | 3,558 MW |
| 2026-08-18T01:00Z | 67,001 MW | 32,544 MW | 20,848 MW | 13 MW | 3,433 MW |
| 2026-08-18T02:00Z | 63,498 MW | 32,558 MW | 20,258 MW | 12 MW | 3,401 MW |
| 2026-08-18T03:00Z | 57,755 MW | 32,566 MW | 19,686 MW | 27 MW | 3,048 MW |
| 2026-08-18T04:00Z | 53,040 MW | 32,584 MW | 18,735 MW | 47 MW | 2,665 MW |
| 2026-08-18T05:00Z | 50,457 MW | 32,601 MW | 18,253 MW | 47 MW | 2,636 MW |
| 2026-08-18T06:00Z | 48,530 MW | 32,614 MW | 17,296 MW | 47 MW | 2,543 MW |
| 2026-08-18T07:00Z | 47,021 MW | 32,634 MW | 16,525 MW | 47 MW | 2,343 MW |
| 2026-08-18T08:00Z | 46,774 MW | 32,648 MW | 15,981 MW | 47 MW | 2,306 MW |
| 2026-08-18T09:00Z | 47,882 MW | 32,656 MW | 16,425 MW | 47 MW | 2,467 MW |
| 2026-08-18T10:00Z | 49,641 MW | 32,653 MW | 17,826 MW | 64 MW | 2,563 MW |
| 2026-08-18T11:00Z | 50,558 MW | 32,662 MW | 18,971 MW | 1,475 MW | 2,689 MW |
| 2026-08-18T12:00Z | 50,379 MW | 32,654 MW | 18,922 MW | 6,066 MW | 2,655 MW |
| 2026-08-18T13:00Z | 50,540 MW | 32,647 MW | 18,141 MW | 9,913 MW | 2,630 MW |
| 2026-08-18T14:00Z | 53,263 MW | 32,615 MW | 18,647 MW | 10,912 MW | 2,686 MW |
| 2026-08-18T15:00Z | 55,533 MW | 32,583 MW | 19,385 MW | 11,490 MW | 2,774 MW |
| 2026-08-18T16:00Z | 57,704 MW | 32,546 MW | 19,545 MW | 11,659 MW | 3,224 MW |
| 2026-08-18T17:00Z | 59,690 MW | 32,533 MW | 19,773 MW | 11,449 MW | 3,290 MW |
| 2026-08-18T18:00Z | 62,007 MW | 32,540 MW | 19,613 MW | 11,181 MW | 3,295 MW |
| 2026-08-18T19:00Z | 63,795 MW | 32,531 MW | 20,019 MW | 10,616 MW | 3,295 MW |
| 2026-08-18T20:00Z | 64,587 MW | 32,519 MW | 20,106 MW | 10,500 MW | 3,289 MW |
| 2026-08-18T21:00Z | 65,401 MW | 32,524 MW | 20,318 MW | 9,525 MW | 3,376 MW |
| 2026-08-18T22:00Z | 66,321 MW | 32,532 MW | 20,719 MW | 6,206 MW | 3,414 MW |
| 2026-08-18T23:00Z | 67,566 MW | 32,535 MW | 20,725 MW | 1,938 MW | 3,417 MW |
| 2026-08-19T00:00Z | 67,448 MW | 32,550 MW | 20,727 MW | 135 MW | 3,558 MW |
| 2026-08-19T01:00Z | 65,828 MW | 32,572 MW | 19,927 MW | 69 MW | 3,490 MW |
| 2026-08-19T02:00Z | 61,777 MW | 32,598 MW | 19,508 MW | 69 MW | 3,375 MW |
| 2026-08-19T03:00Z | 56,074 MW | 32,618 MW | 18,709 MW | 69 MW | 3,163 MW |
| 2026-08-19T04:00Z | 51,282 MW | 32,627 MW | 17,300 MW | 53 MW | 2,548 MW |
| 2026-08-19T05:00Z | 49,267 MW | 32,632 MW | 16,102 MW | 47 MW | 2,114 MW |
| 2026-08-19T06:00Z | 48,033 MW | 32,610 MW | 15,347 MW | 47 MW | 1,947 MW |
| 2026-08-19T07:00Z | 46,158 MW | 32,589 MW | 14,635 MW | 47 MW | 1,911 MW |
| 2026-08-19T08:00Z | 46,228 MW | 32,590 MW | 14,360 MW | 47 MW | 1,844 MW |
| 2026-08-19T09:00Z | 47,044 MW | 32,599 MW | 14,861 MW | 47 MW | 1,877 MW |
| 2026-08-19T10:00Z | 48,782 MW | 32,599 MW | 16,132 MW | 60 MW | 1,929 MW |
| 2026-08-19T11:00Z | 49,979 MW | 32,604 MW | 17,459 MW | 1,525 MW | 1,964 MW |
| 2026-08-19T12:00Z | 49,509 MW | 32,603 MW | 17,069 MW | 6,517 MW | 1,969 MW |
| 2026-08-19T13:00Z | 50,386 MW | 32,578 MW | 16,761 MW | 10,370 MW | 1,999 MW |
| 2026-08-19T14:00Z | 52,543 MW | 32,527 MW | 17,688 MW | 11,579 MW | 2,247 MW |
| 2026-08-19T15:00Z | 54,398 MW | 32,509 MW | 17,458 MW | 11,851 MW | 3,151 MW |
| 2026-08-19T16:00Z | 57,741 MW | 32,483 MW | 17,944 MW | 11,733 MW | 3,290 MW |
| 2026-08-19T17:00Z | 59,390 MW | 32,492 MW | 18,818 MW | 10,931 MW | 3,308 MW |
| 2026-08-19T18:00Z | 61,503 MW | 32,487 MW | 18,916 MW | 10,056 MW | 3,317 MW |
| 2026-08-19T19:00Z | 63,025 MW | 32,472 MW | 19,836 MW | 9,716 MW | 3,311 MW |
| 2026-08-19T20:00Z | 65,289 MW | 32,452 MW | 20,368 MW | 8,830 MW | 3,407 MW |
| 2026-08-19T21:00Z | 67,481 MW | 32,443 MW | 20,775 MW | 7,170 MW | 3,580 MW |
| 2026-08-19T22:00Z | 68,365 MW | 32,439 MW | 20,983 MW | 4,076 MW | 3,624 MW |
| 2026-08-19T23:00Z | 68,158 MW | 32,440 MW | 21,259 MW | 1,065 MW | 3,661 MW |
| 2026-08-20T00:00Z | 68,435 MW | 32,465 MW | 21,329 MW | 99 MW | 3,664 MW |
| 2026-08-20T01:00Z | 65,737 MW | 32,490 MW | 20,568 MW | 67 MW | 3,529 MW |
| 2026-08-20T02:00Z | 60,465 MW | 32,458 MW | 19,114 MW | 67 MW | 3,365 MW |
| 2026-08-20T03:00Z | 56,263 MW | 32,475 MW | 18,856 MW | 67 MW | 2,794 MW |
| 2026-08-20T04:00Z | 51,266 MW | 32,515 MW | 18,127 MW | 67 MW | 2,738 MW |
| 2026-08-20T05:00Z | 49,700 MW | 32,564 MW | 16,946 MW | 67 MW | 2,445 MW |
| 2026-08-20T06:00Z | 48,509 MW | 32,591 MW | 15,859 MW | 67 MW | 2,244 MW |
| 2026-08-20T07:00Z | 47,272 MW | 32,593 MW | 15,140 MW | 67 MW | 2,191 MW |
| 2026-08-20T08:00Z | 47,046 MW | 32,606 MW | 14,841 MW | 67 MW | 2,188 MW |
| 2026-08-20T09:00Z | 48,341 MW | 32,613 MW | 15,120 MW | 67 MW | 2,272 MW |
| 2026-08-20T10:00Z | 50,678 MW | 32,621 MW | 16,257 MW | 78 MW | 2,496 MW |
| 2026-08-20T11:00Z | 51,839 MW | 32,634 MW | 17,646 MW | 793 MW | 2,733 MW |
| 2026-08-20T12:00Z | 52,672 MW | 32,630 MW | 18,186 MW | 3,247 MW | 2,754 MW |
| 2026-08-20T13:00Z | 52,959 MW | 32,639 MW | 17,195 MW | 6,387 MW | 2,781 MW |
| 2026-08-20T14:00Z | 53,946 MW | 32,623 MW | 17,103 MW | 8,773 MW | 3,209 MW |
| 2026-08-20T15:00Z | 55,294 MW | 32,604 MW | 16,546 MW | 9,864 MW | 3,304 MW |
| 2026-08-20T16:00Z | 58,725 MW | 32,589 MW | 17,011 MW | 9,922 MW | 3,256 MW |
| 2026-08-20T17:00Z | 60,081 MW | 32,548 MW | 17,389 MW | 9,838 MW | 3,366 MW |
| 2026-08-20T18:00Z | 61,125 MW | 32,530 MW | 17,980 MW | 9,542 MW | 3,358 MW |
| 2026-08-20T19:00Z | 62,249 MW | 32,526 MW | 18,617 MW | 8,588 MW | 3,266 MW |
| 2026-08-20T20:00Z | 62,394 MW | 32,514 MW | 19,264 MW | 7,707 MW | 3,298 MW |
| 2026-08-20T21:00Z | 61,729 MW | 32,534 MW | 19,200 MW | 7,260 MW | 3,430 MW |
| 2026-08-20T22:00Z | 61,102 MW | 32,548 MW | 18,506 MW | 5,498 MW | 3,479 MW |
| 2026-08-20T23:00Z | 61,778 MW | 32,577 MW | 19,036 MW | 2,151 MW | 3,475 MW |
| 2026-08-21T00:00Z | 61,800 MW | 32,612 MW | 19,577 MW | 99 MW | 3,494 MW |
| 2026-08-21T01:00Z | 60,075 MW | 32,635 MW | 19,375 MW | 20 MW | 3,364 MW |
| 2026-08-21T02:00Z | 55,565 MW | 32,662 MW | 18,860 MW | 20 MW | 3,257 MW |
| 2026-08-21T03:00Z | 50,900 MW | 32,676 MW | 18,067 MW | 20 MW | 2,659 MW |
| 2026-08-21T04:00Z | 47,476 MW | 32,658 MW | 16,178 MW | 20 MW | 2,236 MW |
| 2026-08-21T05:00Z | 46,369 MW | 32,552 MW | 14,933 MW | 20 MW | 2,226 MW |
| 2026-08-21T06:00Z | 44,683 MW | 32,514 MW | 14,315 MW | 20 MW | 2,136 MW |
| 2026-08-21T07:00Z | 43,436 MW | 32,504 MW | 13,702 MW | 20 MW | 2,075 MW |
| 2026-08-21T08:00Z | 43,413 MW | 32,521 MW | 13,672 MW | 20 MW | 2,039 MW |
| 2026-08-21T09:00Z | 44,129 MW | 32,519 MW | 13,625 MW | 20 MW | 2,045 MW |
| 2026-08-21T10:00Z | 45,715 MW | 32,522 MW | 14,195 MW | 32 MW | 2,235 MW |
| 2026-08-21T11:00Z | 46,301 MW | 32,540 MW | 14,725 MW | 1,412 MW | 2,411 MW |
| 2026-08-21T12:00Z | 45,442 MW | 32,546 MW | 14,260 MW | 6,297 MW | 2,427 MW |
| 2026-08-21T13:00Z | 45,186 MW | 32,525 MW | 13,915 MW | 10,465 MW | 2,376 MW |
| 2026-08-21T14:00Z | 46,326 MW | 32,515 MW | 14,020 MW | 11,698 MW | 2,432 MW |
| 2026-08-21T15:00Z | 46,714 MW | 32,524 MW | 14,734 MW | 11,960 MW | 3,000 MW |
| 2026-08-21T16:00Z | 48,902 MW | 32,512 MW | 15,130 MW | 12,027 MW | 3,170 MW |
| 2026-08-21T17:00Z | 51,789 MW | 32,489 MW | 15,671 MW | 12,188 MW | 3,470 MW |
| 2026-08-21T18:00Z | 54,084 MW | 32,480 MW | 16,335 MW | 11,284 MW | 3,772 MW |
| 2026-08-21T19:00Z | 55,766 MW | 32,460 MW | 16,653 MW | 10,291 MW | 3,835 MW |
| 2026-08-21T20:00Z | 57,386 MW | 32,438 MW | 17,339 MW | 9,208 MW | 3,800 MW |
| 2026-08-21T21:00Z | 58,435 MW | 32,453 MW | 17,957 MW | 7,275 MW | 3,949 MW |
| 2026-08-21T22:00Z | 59,373 MW | 32,465 MW | 18,211 MW | 4,320 MW | 4,057 MW |
| 2026-08-21T23:00Z | 58,927 MW | 32,527 MW | 18,192 MW | 1,373 MW | 4,127 MW |
| 2026-08-22T00:00Z | 58,859 MW | 32,582 MW | 18,374 MW | 74 MW | 4,190 MW |
| 2026-08-22T01:00Z | 56,986 MW | 32,547 MW | 18,009 MW | 16 MW | 4,067 MW |
| 2026-08-22T02:00Z | 53,735 MW | 32,395 MW | 17,740 MW | 0 MW | 3,793 MW |
| 2026-08-22T03:00Z | 50,076 MW | 32,255 MW | 17,149 MW | 0 MW | 3,169 MW |
| 2026-08-22T04:00Z | 46,580 MW | 32,212 MW | 15,794 MW | 0 MW | 2,784 MW |
| 2026-08-22T05:00Z | 45,110 MW | 32,180 MW | 14,653 MW | 0 MW | 2,655 MW |
| 2026-08-22T06:00Z | 44,237 MW | 32,301 MW | 13,955 MW | 0 MW | 2,633 MW |
| 2026-08-22T07:00Z | 43,103 MW | 32,476 MW | 13,342 MW | 0 MW | 2,558 MW |
| 2026-08-22T08:00Z | 41,971 MW | 32,623 MW | 12,973 MW | 0 MW | 2,487 MW |
| 2026-08-22T09:00Z | 41,688 MW | 32,710 MW | 12,735 MW | 0 MW | 2,480 MW |
| 2026-08-22T10:00Z | 41,472 MW | 32,730 MW | 12,634 MW | 1 MW | 2,437 MW |
| 2026-08-22T11:00Z | 42,377 MW | 32,734 MW | 12,490 MW | 582 MW | 2,367 MW |
| 2026-08-22T12:00Z | 43,353 MW | 32,721 MW | 12,537 MW | 3,252 MW | 2,453 MW |
| 2026-08-22T13:00Z | 43,589 MW | 32,707 MW | 12,568 MW | 5,824 MW | 2,561 MW |
| 2026-08-22T14:00Z | 44,711 MW | 32,685 MW | 12,582 MW | 7,890 MW | 2,615 MW |
| 2026-08-22T15:00Z | 45,195 MW | 32,639 MW | 12,601 MW | 10,118 MW | 2,642 MW |
| 2026-08-22T16:00Z | 46,688 MW | 32,591 MW | 12,964 MW | 10,469 MW | 2,651 MW |
| 2026-08-22T17:00Z | 48,372 MW | 32,557 MW | 14,289 MW | 10,636 MW | 2,660 MW |
| 2026-08-22T18:00Z | 49,613 MW | 32,552 MW | 15,086 MW | 10,393 MW | 2,651 MW |
| 2026-08-22T19:00Z | 50,574 MW | 32,562 MW | 15,381 MW | 8,842 MW | 2,681 MW |
| 2026-08-22T20:00Z | 50,308 MW | 32,557 MW | 14,924 MW | 8,623 MW | 2,708 MW |
| 2026-08-22T21:00Z | 51,138 MW | 32,554 MW | 14,762 MW | 7,973 MW | 2,962 MW |
| 2026-08-22T22:00Z | 51,965 MW | 32,563 MW | 15,124 MW | 5,815 MW | 2,963 MW |
| 2026-08-22T23:00Z | 53,140 MW | 32,596 MW | 15,910 MW | 1,878 MW | 2,938 MW |
| 2026-08-23T00:00Z | 52,596 MW | 32,612 MW | 16,609 MW | 78 MW | 2,943 MW |
| 2026-08-23T01:00Z | 50,920 MW | 32,646 MW | 16,333 MW | 0 MW | 2,876 MW |
| 2026-08-23T02:00Z | 48,393 MW | 32,669 MW | 15,545 MW | 0 MW | 2,705 MW |
| 2026-08-23T03:00Z | 45,925 MW | 32,674 MW | 14,900 MW | 0 MW | 2,655 MW |
| 2026-08-23T04:00Z | 43,251 MW | 32,677 MW | 13,093 MW | 0 MW | 2,397 MW |
| 2026-08-23T05:00Z | 41,888 MW | 32,689 MW | 11,772 MW | 0 MW | 2,041 MW |
| 2026-08-23T06:00Z | 41,548 MW | 32,709 MW | 11,258 MW | 0 MW | 1,991 MW |
| 2026-08-23T07:00Z | 41,271 MW | 32,737 MW | 11,097 MW | 0 MW | 1,991 MW |
| 2026-08-23T08:00Z | 39,776 MW | 32,753 MW | 10,977 MW | 0 MW | 1,975 MW |
| 2026-08-23T09:00Z | 39,182 MW | 32,763 MW | 10,936 MW | 0 MW | 1,898 MW |
| 2026-08-23T10:00Z | 39,031 MW | 32,774 MW | 10,936 MW | 6 MW | 1,798 MW |
| 2026-08-23T11:00Z | 39,017 MW | 32,786 MW | 10,904 MW | 1,378 MW | 1,761 MW |
| 2026-08-23T12:00Z | 36,451 MW | 32,789 MW | 10,878 MW | 7,322 MW | 1,615 MW |
| 2026-08-23T13:00Z | 35,120 MW | 32,777 MW | 10,938 MW | 12,245 MW | 1,498 MW |
| 2026-08-23T14:00Z | 36,345 MW | 32,759 MW | 10,917 MW | 13,544 MW | 1,531 MW |
| 2026-08-23T15:00Z | 39,367 MW | 32,747 MW | 10,875 MW | 13,800 MW | 1,574 MW |
| 2026-08-23T16:00Z | 42,683 MW | 32,709 MW | 10,858 MW | 13,639 MW | 1,693 MW |
| 2026-08-23T17:00Z | 45,142 MW | 32,695 MW | 11,513 MW | 13,474 MW | 1,813 MW |
| 2026-08-23T18:00Z | 46,916 MW | 32,690 MW | 13,071 MW | 12,813 MW | 1,896 MW |
| 2026-08-23T19:00Z | 47,351 MW | 32,670 MW | 13,934 MW | 12,647 MW | 2,037 MW |
| 2026-08-23T20:00Z | 48,014 MW | 32,647 MW | 14,358 MW | 12,180 MW | 2,160 MW |
| 2026-08-23T21:00Z | 49,490 MW | 32,660 MW | 15,441 MW | 10,397 MW | 2,331 MW |
| 2026-08-23T22:00Z | 52,150 MW | 32,655 MW | 16,343 MW | 7,058 MW | 2,298 MW |
| 2026-08-23T23:00Z | 52,934 MW | 32,670 MW | 16,847 MW | 2,183 MW | 2,318 MW |
| 2026-08-24T00:00Z | 52,267 MW | 32,679 MW | 17,576 MW | 76 MW | 2,306 MW |
| 2026-08-24T01:00Z | 50,603 MW | 32,695 MW | 17,822 MW | 21 MW | 2,183 MW |
| 2026-08-24T02:00Z | 48,180 MW | 32,715 MW | 16,380 MW | 21 MW | 2,102 MW |
| 2026-08-24T03:00Z | 45,674 MW | 32,738 MW | 15,038 MW | 21 MW | 2,013 MW |
| 2026-08-24T04:00Z | 42,780 MW | 32,764 MW | 13,536 MW | 21 MW | 1,965 MW |
| 2026-08-24T05:00Z | 42,417 MW | 32,783 MW | 12,516 MW | 21 MW | 1,921 MW |
| 2026-08-24T06:00Z | 41,371 MW | 32,797 MW | 12,168 MW | 21 MW | 1,819 MW |
| 2026-08-24T07:00Z | 39,631 MW | 32,800 MW | 11,948 MW | 21 MW | 1,712 MW |
| 2026-08-24T08:00Z | 39,893 MW | 32,814 MW | 11,819 MW | 21 MW | 1,668 MW |
| 2026-08-24T09:00Z | 41,048 MW | 32,818 MW | 11,720 MW | 21 MW | 1,722 MW |
| 2026-08-24T10:00Z | 43,227 MW | 32,822 MW | 11,897 MW | 31 MW | 1,806 MW |
| 2026-08-24T11:00Z | 44,413 MW | 32,831 MW | 12,607 MW | 1,409 MW | 1,905 MW |
| 2026-08-24T12:00Z | 43,413 MW | 32,833 MW | 12,437 MW | 6,755 MW | 1,921 MW |
| 2026-08-24T13:00Z | 41,782 MW | 32,820 MW | 12,097 MW | 11,568 MW | 1,811 MW |
| 2026-08-24T14:00Z | 42,294 MW | 32,801 MW | 11,992 MW | 13,577 MW | 1,795 MW |
| 2026-08-24T15:00Z | 42,561 MW | 32,768 MW | 12,198 MW | 14,032 MW | 1,796 MW |
| 2026-08-24T16:00Z | 44,837 MW | 32,746 MW | 12,499 MW | 13,781 MW | 1,926 MW |
| 2026-08-24T17:00Z | 47,569 MW | 32,714 MW | 13,467 MW | 13,252 MW | 2,132 MW |
| 2026-08-24T18:00Z | 49,113 MW | 32,697 MW | 14,658 MW | 12,822 MW | 2,160 MW |
| 2026-08-24T19:00Z | 50,030 MW | 32,689 MW | 15,167 MW | 12,254 MW | 2,191 MW |
| 2026-08-24T20:00Z | 50,499 MW | 32,671 MW | 15,674 MW | 12,307 MW | 2,257 MW |
| 2026-08-24T21:00Z | 51,902 MW | 32,664 MW | 16,817 MW | 11,033 MW | 2,512 MW |
| 2026-08-24T22:00Z | 53,372 MW | 32,664 MW | 17,017 MW | 7,378 MW | 2,571 MW |
| 2026-08-24T23:00Z | 55,101 MW | 32,670 MW | 17,510 MW | 2,017 MW | 2,584 MW |
| 2026-08-25T00:00Z | 55,122 MW | 32,680 MW | 18,366 MW | 74 MW | 2,592 MW |
| 2026-08-25T01:00Z | 53,170 MW | 32,682 MW | 18,273 MW | 21 MW | 2,393 MW |
| 2026-08-25T02:00Z | 48,968 MW | 32,685 MW | 16,799 MW | 21 MW | 2,147 MW |
| 2026-08-25T03:00Z | 45,603 MW | 32,693 MW | 15,990 MW | 21 MW | 2,095 MW |
| 2026-08-25T04:00Z | 43,567 MW | 32,710 MW | 14,528 MW | 21 MW | 1,822 MW |
| 2026-08-25T05:00Z | 42,643 MW | 32,726 MW | 13,666 MW | 21 MW | 1,631 MW |
| 2026-08-25T06:00Z | 41,807 MW | 32,736 MW | 13,370 MW | 21 MW | 1,557 MW |
| 2026-08-25T07:00Z | 40,467 MW | 32,747 MW | 12,965 MW | 21 MW | 1,447 MW |
| 2026-08-25T08:00Z | 40,759 MW | 32,760 MW | 12,496 MW | 21 MW | 1,389 MW |
| 2026-08-25T09:00Z | 42,171 MW | 32,775 MW | 12,133 MW | 21 MW | 1,389 MW |
| 2026-08-25T10:00Z | 44,414 MW | 32,795 MW | 13,026 MW | 31 MW | 1,489 MW |
| 2026-08-25T11:00Z | 44,388 MW | 32,795 MW | 14,241 MW | 1,662 MW | 1,606 MW |
| 2026-08-25T12:00Z | 41,435 MW | 32,792 MW | 14,062 MW | 7,778 MW | 1,587 MW |
| 2026-08-25T13:00Z | 39,622 MW | 32,786 MW | 12,778 MW | 12,439 MW | 1,471 MW |
| 2026-08-25T14:00Z | 41,881 MW | 32,762 MW | 12,409 MW | 13,823 MW | 1,508 MW |
| 2026-08-25T15:00Z | 43,454 MW | 32,728 MW | 12,330 MW | 14,198 MW | 1,577 MW |
| 2026-08-25T16:00Z | 43,454 MW | 32,728 MW | 12,330 MW | 14,198 MW | 1,577 MW |
| 2026-08-25T17:00Z | 47,569 MW | 32,714 MW | 13,467 MW | 13,252 MW | 2,132 MW |
| 2026-08-25T18:00Z | 49,545 MW | 32,659 MW | 15,477 MW | 13,286 MW | 1,669 MW |
| 2026-08-25T19:00Z | 50,910 MW | 32,640 MW | 15,682 MW | 13,050 MW | 1,698 MW |
| 2026-08-25T20:00Z | 52,366 MW | 32,632 MW | 16,368 MW | 12,745 MW | 1,875 MW |
| 2026-08-25T21:00Z | 53,925 MW | 32,632 MW | 16,759 MW | 11,603 MW | 2,202 MW |
| 2026-08-25T22:00Z | 56,657 MW | 32,621 MW | 17,384 MW | 7,778 MW | 2,338 MW |
| 2026-08-25T23:00Z | 59,864 MW | 32,620 MW | 18,163 MW | 2,087 MW | 2,335 MW |
| 2026-08-26T00:00Z | 60,123 MW | 32,639 MW | 18,694 MW | 109 MW | 2,354 MW |
| 2026-08-26T01:00Z | 57,204 MW | 32,658 MW | 18,459 MW | 59 MW | 2,072 MW |
| 2026-08-26T02:00Z | 53,003 MW | 32,684 MW | 17,365 MW | 59 MW | 1,824 MW |
| 2026-08-26T03:00Z | 49,034 MW | 32,697 MW | 16,966 MW | 59 MW | 1,686 MW |
| 2026-08-26T04:00Z | 45,123 MW | 32,715 MW | 15,688 MW | 59 MW | 1,654 MW |
| 2026-08-26T05:00Z | 43,478 MW | 32,731 MW | 14,563 MW | 59 MW | 1,659 MW |
| 2026-08-26T06:00Z | 42,161 MW | 32,735 MW | 13,543 MW | 59 MW | 1,643 MW |
| 2026-08-26T07:00Z | 41,100 MW | 32,747 MW | 12,505 MW | 59 MW | 1,609 MW |
| 2026-08-26T08:00Z | 41,847 MW | 32,753 MW | 12,040 MW | 59 MW | 1,571 MW |
| 2026-08-26T09:00Z | 42,463 MW | 32,758 MW | 12,205 MW | 59 MW | 1,614 MW |
| 2026-08-26T10:00Z | 44,170 MW | 32,764 MW | 13,699 MW | 66 MW | 1,646 MW |
| 2026-08-26T11:00Z | 45,056 MW | 32,767 MW | 13,794 MW | 1,518 MW | 1,627 MW |
| 2026-08-26T12:00Z | 43,233 MW | 32,769 MW | 13,576 MW | 7,162 MW | 1,602 MW |
| 2026-08-26T13:00Z | 42,846 MW | 32,743 MW | 13,417 MW | 11,784 MW | 1,621 MW |
| 2026-08-26T14:00Z | 45,378 MW | 32,703 MW | 13,609 MW | 13,094 MW | 2,228 MW |
| 2026-08-26T15:00Z | 47,818 MW | 32,673 MW | 14,204 MW | 13,216 MW | 2,226 MW |
| 2026-08-26T16:00Z | 49,846 MW | 32,634 MW | 14,581 MW | 13,154 MW | 2,306 MW |
| 2026-08-26T17:00Z | 53,534 MW | 32,613 MW | 15,314 MW | 12,685 MW | 2,463 MW |
| 2026-08-26T18:00Z | 55,374 MW | 32,605 MW | 15,387 MW | 12,571 MW | 2,523 MW |
| 2026-08-26T19:00Z | 56,260 MW | 32,602 MW | 15,484 MW | 11,979 MW | 2,611 MW |
| 2026-08-26T20:00Z | 57,425 MW | 32,584 MW | 15,906 MW | 11,503 MW | 2,660 MW |
| 2026-08-26T21:00Z | 62,285 MW | 32,493 MW | 17,114 MW | 8,544 MW | 3,062 MW |
| 2026-08-26T22:00Z | 63,908 MW | 32,477 MW | 17,601 MW | 4,809 MW | 3,144 MW |
| 2026-08-26T23:00Z | 64,751 MW | 32,490 MW | 18,316 MW | 1,083 MW | 3,069 MW |
| 2026-08-27T00:00Z | 64,781 MW | 32,516 MW | 18,564 MW | 93 MW | 3,021 MW |
| 2026-08-27T01:00Z | 62,170 MW | 32,500 MW | 18,523 MW | 60 MW | 2,935 MW |
| 2026-08-27T02:00Z | 57,517 MW | 32,521 MW | 17,698 MW | 60 MW | 2,667 MW |
| 2026-08-27T03:00Z | 53,188 MW | 32,554 MW | 17,166 MW | 60 MW | 2,313 MW |
| 2026-08-27T04:00Z | 49,667 MW | 32,593 MW | 16,877 MW | 60 MW | 1,658 MW |
| 2026-08-27T05:00Z | 47,677 MW | 32,654 MW | 16,368 MW | 60 MW | 1,644 MW |
| 2026-08-27T06:00Z | 46,433 MW | 32,717 MW | 15,279 MW | 60 MW | 1,636 MW |
| 2026-08-27T07:00Z | 45,687 MW | 32,764 MW | 14,255 MW | 60 MW | 1,636 MW |
| 2026-08-27T08:00Z | 45,682 MW | 32,791 MW | 13,837 MW | 60 MW | 1,649 MW |
| 2026-08-27T09:00Z | 46,728 MW | 32,820 MW | 13,964 MW | 60 MW | 1,860 MW |
| 2026-08-27T10:00Z | 48,558 MW | 32,833 MW | 14,872 MW | 61 MW | 2,221 MW |
| 2026-08-27T11:00Z | 50,045 MW | 32,831 MW | 16,129 MW | 1,153 MW | 2,549 MW |
| 2026-08-27T12:00Z | 50,280 MW | 32,818 MW | 16,369 MW | 5,714 MW | 2,580 MW |
| 2026-08-27T13:00Z | 49,319 MW | 32,800 MW | 16,146 MW | 9,695 MW | 2,657 MW |
| 2026-08-27T14:00Z | 51,327 MW | 32,757 MW | 16,292 MW | 11,824 MW | 2,845 MW |
| 2026-08-27T15:00Z | 53,378 MW | 32,730 MW | 16,458 MW | 12,311 MW | 3,412 MW |
| 2026-08-27T16:00Z | 56,460 MW | 32,694 MW | 17,417 MW | 11,960 MW | 3,618 MW |
| 2026-08-27T17:00Z | 58,716 MW | 32,667 MW | 18,183 MW | 11,290 MW | 3,613 MW |
| 2026-08-27T18:00Z | 60,202 MW | 32,633 MW | 18,661 MW | 11,028 MW | 3,480 MW |
| 2026-08-27T19:00Z | 60,998 MW | 32,632 MW | 19,537 MW | 10,499 MW | 3,427 MW |
| 2026-08-27T20:00Z | 60,502 MW | 32,640 MW | 20,243 MW | 9,456 MW | 3,504 MW |
| 2026-08-27T21:00Z | 61,301 MW | 32,634 MW | 20,601 MW | 7,720 MW | 3,536 MW |
| 2026-08-27T22:00Z | 61,854 MW | 32,630 MW | 20,686 MW | 5,189 MW | 3,588 MW |
| 2026-08-27T23:00Z | 62,846 MW | 32,646 MW | 21,053 MW | 1,531 MW | 3,455 MW |
| 2026-08-28T00:00Z | 63,092 MW | 32,693 MW | 21,176 MW | 142 MW | 3,579 MW |
| 2026-08-28T01:00Z | 60,433 MW | 32,716 MW | 20,973 MW | 101 MW | 3,716 MW |
| 2026-08-28T02:00Z | 56,030 MW | 32,760 MW | 19,989 MW | 101 MW | 3,689 MW |
| 2026-08-28T03:00Z | 52,101 MW | 32,766 MW | 19,177 MW | 101 MW | 3,706 MW |
| 2026-08-28T04:00Z | 48,594 MW | 32,764 MW | 18,669 MW | 101 MW | 3,019 MW |
| 2026-08-28T05:00Z | 46,599 MW | 32,767 MW | 17,838 MW | 101 MW | 2,977 MW |
| 2026-08-28T06:00Z | 45,376 MW | 32,774 MW | 17,094 MW | 101 MW | 2,826 MW |
| 2026-08-28T07:00Z | 44,242 MW | 32,783 MW | 16,196 MW | 84 MW | 2,509 MW |
| 2026-08-28T08:00Z | 44,121 MW | 32,789 MW | 15,780 MW | 61 MW | 2,439 MW |
| 2026-08-28T09:00Z | 45,295 MW | 32,791 MW | 16,125 MW | 35 MW | 2,656 MW |
| 2026-08-28T10:00Z | 46,602 MW | 32,799 MW | 17,341 MW | 35 MW | 2,880 MW |
| 2026-08-28T11:00Z | 47,660 MW | 32,802 MW | 17,897 MW | 826 MW | 3,086 MW |
| 2026-08-28T12:00Z | 47,302 MW | 32,806 MW | 17,610 MW | 5,260 MW | 3,107 MW |
| 2026-08-28T13:00Z | 45,905 MW | 32,796 MW | 17,660 MW | 9,435 MW | 3,198 MW |
| 2026-08-28T14:00Z | 48,305 MW | 32,776 MW | 17,515 MW | 11,607 MW | 3,671 MW |
| 2026-08-28T15:00Z | 51,137 MW | 32,731 MW | 17,412 MW | 12,438 MW | 3,818 MW |
| 2026-08-28T16:00Z | 53,596 MW | 32,719 MW | 17,864 MW | 12,607 MW | 3,936 MW |
| 2026-08-28T17:00Z | 55,264 MW | 32,711 MW | 17,959 MW | 12,536 MW | 4,019 MW |
| 2026-08-28T18:00Z | 56,900 MW | 32,687 MW | 18,122 MW | 12,311 MW | 4,074 MW |
| 2026-08-28T19:00Z | 58,474 MW | 32,682 MW | 19,099 MW | 11,858 MW | 4,019 MW |
| 2026-08-28T20:00Z | 60,522 MW | 32,679 MW | 20,102 MW | 10,143 MW | 3,989 MW |
| 2026-08-28T21:00Z | 60,807 MW | 32,676 MW | 20,617 MW | 8,735 MW | 4,019 MW |
| 2026-08-28T22:00Z | 61,019 MW | 32,670 MW | 20,557 MW | 5,818 MW | 3,959 MW |
| 2026-08-28T23:00Z | 61,120 MW | 32,679 MW | 20,709 MW | 1,744 MW | 3,856 MW |
| 2026-08-29T00:00Z | 59,214 MW | 32,701 MW | 20,621 MW | 139 MW | 3,774 MW |
| 2026-08-29T01:00Z | 57,462 MW | 32,718 MW | 20,490 MW | 109 MW | 3,845 MW |
| 2026-08-29T02:00Z | 52,937 MW | 32,668 MW | 19,509 MW | 60 MW | 3,679 MW |
| 2026-08-29T03:00Z | 48,700 MW | 32,549 MW | 18,198 MW | 0 MW | 3,363 MW |
| 2026-08-29T04:00Z | 45,325 MW | 32,565 MW | 16,276 MW | 0 MW | 2,654 MW |
| 2026-08-29T05:00Z | 43,058 MW | 32,619 MW | 14,909 MW | 0 MW | 2,456 MW |
| 2026-08-29T06:00Z | 40,463 MW | 32,683 MW | 14,247 MW | 0 MW | 2,125 MW |
| 2026-08-29T07:00Z | 39,172 MW | 32,706 MW | 13,820 MW | 0 MW | 1,909 MW |
| 2026-08-29T08:00Z | 38,298 MW | 32,729 MW | 13,430 MW | 0 MW | 1,710 MW |
| 2026-08-29T09:00Z | 37,539 MW | 32,761 MW | 13,229 MW | 0 MW | 1,593 MW |
| 2026-08-29T10:00Z | 38,031 MW | 32,785 MW | 13,199 MW | 95 MW | 1,550 MW |
| 2026-08-29T11:00Z | 37,470 MW | 32,768 MW | 13,228 MW | 1,307 MW | 1,581 MW |
| 2026-08-29T12:00Z | 35,513 MW | 32,784 MW | 13,268 MW | 5,920 MW | 1,556 MW |
| 2026-08-29T13:00Z | 34,709 MW | 32,795 MW | 13,557 MW | 10,295 MW | 1,550 MW |
| 2026-08-29T14:00Z | 35,923 MW | 32,808 MW | 13,689 MW | 11,828 MW | 1,558 MW |
| 2026-08-29T15:00Z | 39,196 MW | 32,811 MW | 13,714 MW | 12,183 MW | 1,636 MW |
| 2026-08-29T16:00Z | 41,904 MW | 32,798 MW | 13,790 MW | 11,913 MW | 2,110 MW |
| 2026-08-29T17:00Z | 45,097 MW | 32,768 MW | 14,696 MW | 11,640 MW | 2,285 MW |
| 2026-08-29T18:00Z | 46,659 MW | 32,760 MW | 15,571 MW | 11,606 MW | 2,541 MW |
| 2026-08-29T19:00Z | 48,093 MW | 32,739 MW | 15,828 MW | 11,005 MW | 2,737 MW |
| 2026-08-29T20:00Z | 50,551 MW | 32,740 MW | 16,080 MW | 10,190 MW | 3,054 MW |
| 2026-08-29T21:00Z | 52,804 MW | 32,741 MW | 17,171 MW | 7,877 MW | 3,571 MW |
| 2026-08-29T22:00Z | 53,790 MW | 32,738 MW | 17,118 MW | 4,409 MW | 3,768 MW |
| 2026-08-29T23:00Z | 54,293 MW | 32,748 MW | 17,455 MW | 894 MW | 3,853 MW |
| 2026-08-30T00:00Z | 52,929 MW | 32,765 MW | 16,996 MW | 119 MW | 3,761 MW |
| 2026-08-30T01:00Z | 50,421 MW | 32,784 MW | 16,726 MW | 101 MW | 3,463 MW |
| 2026-08-30T02:00Z | 46,540 MW | 32,812 MW | 16,047 MW | 60 MW | 3,153 MW |
| 2026-08-30T03:00Z | 44,399 MW | 32,833 MW | 14,706 MW | 60 MW | 2,926 MW |
| 2026-08-30T04:00Z | 41,708 MW | 32,833 MW | 13,999 MW | 60 MW | 2,544 MW |
| 2026-08-30T05:00Z | 41,055 MW | 32,843 MW | 13,775 MW | 60 MW | 1,935 MW |
| 2026-08-30T06:00Z | 40,085 MW | 32,852 MW | 13,851 MW | 60 MW | 1,695 MW |
| 2026-08-30T07:00Z | 37,413 MW | 32,853 MW | 14,098 MW | 60 MW | 1,584 MW |
| 2026-08-30T08:00Z | 35,796 MW | 32,855 MW | 14,223 MW | 60 MW | 1,589 MW |
| 2026-08-30T09:00Z | 35,647 MW | 32,867 MW | 14,268 MW | 60 MW | 1,570 MW |
| 2026-08-30T10:00Z | 36,570 MW | 32,870 MW | 14,314 MW | 62 MW | 1,516 MW |
| 2026-08-30T11:00Z | 36,685 MW | 32,869 MW | 14,375 MW | 851 MW | 1,496 MW |
| 2026-08-30T12:00Z | 35,817 MW | 32,864 MW | 14,344 MW | 4,326 MW | 1,494 MW |
| 2026-08-30T13:00Z | 35,504 MW | 32,841 MW | 14,395 MW | 7,541 MW | 1,512 MW |
| 2026-08-30T14:00Z | 38,593 MW | 32,798 MW | 14,608 MW | 8,966 MW | 1,743 MW |
| 2026-08-30T15:00Z | 42,609 MW | 32,763 MW | 14,954 MW | 9,557 MW | 2,275 MW |
| 2026-08-30T16:00Z | 45,474 MW | 32,735 MW | 15,515 MW | 10,307 MW | 2,438 MW |
| 2026-08-30T17:00Z | 49,260 MW | 32,714 MW | 16,925 MW | 10,554 MW | 2,628 MW |
| 2026-08-30T18:00Z | 51,576 MW | 32,699 MW | 17,655 MW | 10,332 MW | 2,843 MW |
| 2026-08-30T19:00Z | 53,367 MW | 32,695 MW | 17,836 MW | 9,575 MW | 3,030 MW |
| 2026-08-30T20:00Z | 55,472 MW | 32,675 MW | 18,622 MW | 8,827 MW | 3,305 MW |
| 2026-08-30T21:00Z | 56,023 MW | 32,665 MW | 19,051 MW | 8,031 MW | 3,629 MW |
| 2026-08-30T22:00Z | 57,251 MW | 32,671 MW | 20,314 MW | 4,498 MW | 3,919 MW |
| 2026-08-30T23:00Z | 58,812 MW | 32,661 MW | 21,933 MW | 773 MW | 4,083 MW |
| 2026-08-31T00:00Z | 58,690 MW | 32,664 MW | 22,765 MW | 63 MW | 4,119 MW |
| 2026-08-31T01:00Z | 57,167 MW | 32,676 MW | 22,314 MW | 52 MW | 3,989 MW |
| 2026-08-31T02:00Z | 53,864 MW | 32,685 MW | 20,627 MW | 52 MW | 3,804 MW |
| 2026-08-31T03:00Z | 49,798 MW | 32,696 MW | 19,030 MW | 52 MW | 3,541 MW |
| 2026-08-31T04:00Z | 47,388 MW | 32,698 MW | 18,165 MW | 52 MW | 2,308 MW |
| 2026-08-31T05:00Z | 45,607 MW | 32,659 MW | 17,323 MW | 52 MW | 2,131 MW |
| 2026-08-31T06:00Z | 44,493 MW | 32,657 MW | 16,827 MW | 39 MW | 2,030 MW |
| 2026-08-31T07:00Z | 43,412 MW | 32,668 MW | 16,239 MW | 0 MW | 1,903 MW |
| 2026-08-31T08:00Z | 43,297 MW | 32,693 MW | 16,040 MW | 0 MW | 1,824 MW |
| 2026-08-31T09:00Z | 44,925 MW | 32,725 MW | 16,162 MW | 0 MW | 1,897 MW |
| 2026-08-31T10:00Z | 47,752 MW | 32,740 MW | 17,737 MW | 0 MW | 2,082 MW |
| 2026-08-31T11:00Z | 48,604 MW | 32,744 MW | 18,956 MW | 646 MW | 2,168 MW |
| 2026-08-31T12:00Z | 48,061 MW | 32,755 MW | 18,747 MW | 4,082 MW | 2,207 MW |
| 2026-08-31T13:00Z | 47,661 MW | 32,747 MW | 18,453 MW | 7,752 MW | 2,215 MW |
| 2026-08-31T14:00Z | 48,810 MW | 32,723 MW | 18,632 MW | 10,618 MW | 2,309 MW |
| 2026-08-31T15:00Z | 51,725 MW | 32,662 MW | 19,287 MW | 11,559 MW | 2,954 MW |
| 2026-08-31T16:00Z | 55,401 MW | 32,623 MW | 20,236 MW | 11,367 MW | 3,211 MW |
| 2026-08-31T17:00Z | 58,566 MW | 32,583 MW | 21,787 MW | 10,567 MW | 3,159 MW |
| 2026-08-31T18:00Z | 60,898 MW | 32,568 MW | 22,453 MW | 9,629 MW | 3,150 MW |
| 2026-08-31T19:00Z | 62,490 MW | 32,557 MW | 23,533 MW | 8,431 MW | 3,153 MW |
| 2026-08-31T20:00Z | 63,225 MW | 32,544 MW | 23,529 MW | 8,074 MW | 3,050 MW |
| 2026-08-31T21:00Z | 64,851 MW | 32,526 MW | 23,937 MW | 6,320 MW | 3,355 MW |
| 2026-08-31T22:00Z | 66,053 MW | 32,517 MW | 24,691 MW | 4,096 MW | 3,395 MW |
| 2026-08-31T23:00Z | 68,078 MW | 32,522 MW | 25,278 MW | 1,096 MW | 3,187 MW |
| 2026-09-01T00:00Z | 68,771 MW | 32,534 MW | 25,466 MW | 59 MW | 3,239 MW |
| 2026-09-01T01:00Z | 64,094 MW | 32,544 MW | 24,856 MW | 0 MW | 3,164 MW |
| 2026-09-01T02:00Z | 59,102 MW | 32,551 MW | 23,524 MW | 0 MW | 3,062 MW |
| 2026-09-01T03:00Z | 55,098 MW | 32,555 MW | 22,155 MW | 0 MW | 2,919 MW |
| 2026-09-01T04:00Z | 50,566 MW | 32,563 MW | 21,094 MW | 0 MW | 3,148 MW |
| 2026-09-01T05:00Z | 48,807 MW | 32,566 MW | 19,731 MW | 0 MW | 2,944 MW |
| 2026-09-01T06:00Z | 47,622 MW | 32,558 MW | 19,142 MW | 0 MW | 2,784 MW |
| 2026-09-01T07:00Z | 46,317 MW | 32,552 MW | 18,204 MW | 0 MW | 2,617 MW |
| 2026-09-01T08:00Z | 46,152 MW | 32,551 MW | 17,588 MW | 0 MW | 2,514 MW |
| 2026-09-01T09:00Z | 48,301 MW | 32,545 MW | 18,593 MW | 0 MW | 2,706 MW |
| 2026-09-01T10:00Z | 51,105 MW | 32,552 MW | 21,029 MW | 1 MW | 2,947 MW |
| 2026-09-01T11:00Z | 52,788 MW | 32,553 MW | 22,983 MW | 830 MW | 3,005 MW |
| 2026-09-01T12:00Z | 52,865 MW | 32,555 MW | 22,900 MW | 4,558 MW | 2,995 MW |
| 2026-09-01T13:00Z | 53,562 MW | 32,534 MW | 22,663 MW | 8,490 MW | 3,090 MW |
| 2026-09-01T14:00Z | 55,472 MW | 32,499 MW | 24,151 MW | 10,261 MW | 3,627 MW |
| 2026-09-01T15:00Z | 58,357 MW | 32,452 MW | 24,584 MW | 11,356 MW | 3,855 MW |
| 2026-09-01T16:00Z | 62,114 MW | 32,425 MW | 24,765 MW | 11,716 MW | 3,918 MW |
| 2026-09-01T17:00Z | 64,491 MW | 32,366 MW | 25,877 MW | 11,768 MW | 3,888 MW |
| 2026-09-01T18:00Z | 67,382 MW | 32,300 MW | 26,731 MW | 12,183 MW | 3,778 MW |
| 2026-09-01T19:00Z | 69,864 MW | 32,253 MW | 27,595 MW | 11,748 MW | 3,797 MW |
| 2026-09-01T20:00Z | 72,826 MW | 32,197 MW | 28,455 MW | 10,476 MW | 4,313 MW |
| 2026-09-01T21:00Z | 73,443 MW | 32,156 MW | 29,090 MW | 8,849 MW | 4,558 MW |
| 2026-09-01T22:00Z | 73,992 MW | 32,132 MW | 29,360 MW | 5,129 MW | 4,667 MW |
| 2026-09-01T23:00Z | 73,577 MW | 32,144 MW | 29,547 MW | 1,135 MW | 4,539 MW |
| 2026-09-02T00:00Z | 72,231 MW | 32,225 MW | 29,583 MW | 71 MW | 4,289 MW |
| 2026-09-02T01:00Z | 67,300 MW | 32,326 MW | 28,962 MW | 52 MW | 3,780 MW |
| 2026-09-02T02:00Z | 63,773 MW | 32,396 MW | 27,649 MW | 47 MW | 3,713 MW |
| 2026-09-02T03:00Z | 60,022 MW | 32,435 MW | 26,021 MW | 47 MW | 3,785 MW |
| 2026-09-02T04:00Z | 54,704 MW | 32,444 MW | 23,977 MW | 47 MW | 2,139 MW |
| 2026-09-02T05:00Z | 50,815 MW | 32,447 MW | 23,072 MW | 41 MW | 2,079 MW |
| 2026-09-02T06:00Z | 48,525 MW | 32,445 MW | 22,292 MW | 35 MW | 2,032 MW |
| 2026-09-02T07:00Z | 47,252 MW | 32,461 MW | 20,945 MW | 35 MW | 1,995 MW |
| 2026-09-02T08:00Z | 47,018 MW | 32,480 MW | 20,137 MW | 35 MW | 2,031 MW |
| 2026-09-02T09:00Z | 48,358 MW | 32,491 MW | 21,349 MW | 35 MW | 2,095 MW |
| 2026-09-02T10:00Z | 51,145 MW | 32,488 MW | 23,577 MW | 36 MW | 2,041 MW |
| 2026-09-02T11:00Z | 52,053 MW | 32,491 MW | 25,367 MW | 918 MW | 2,081 MW |
| 2026-09-02T12:00Z | 52,036 MW | 32,492 MW | 24,255 MW | 5,694 MW | 2,055 MW |
| 2026-09-02T13:00Z | 52,623 MW | 32,481 MW | 23,715 MW | 10,240 MW | 2,124 MW |
| 2026-09-02T14:00Z | 54,210 MW | 32,465 MW | 25,827 MW | 11,952 MW | 2,571 MW |
| 2026-09-02T15:00Z | 56,907 MW | 32,412 MW | 26,497 MW | 12,329 MW | 2,600 MW |
| 2026-09-02T16:00Z | 60,279 MW | 32,374 MW | 27,779 MW | 12,226 MW | 2,549 MW |
| 2026-09-02T17:00Z | 63,454 MW | 32,347 MW | 28,741 MW | 11,928 MW | 2,567 MW |
| 2026-09-02T18:00Z | 62,682 MW | 32,317 MW | 28,958 MW | 11,547 MW | 2,669 MW |
| 2026-09-02T19:00Z | 62,875 MW | 32,286 MW | 29,042 MW | 11,065 MW | 2,651 MW |
| 2026-09-02T20:00Z | 63,336 MW | 32,267 MW | 29,804 MW | 9,969 MW | 2,760 MW |
| 2026-09-02T21:00Z | 64,736 MW | 32,243 MW | 30,065 MW | 7,911 MW | 2,832 MW |
| 2026-09-02T22:00Z | 66,798 MW | 32,238 MW | 30,462 MW | 4,895 MW | 2,866 MW |
| 2026-09-02T23:00Z | 68,634 MW | 32,249 MW | 30,641 MW | 1,209 MW | 2,862 MW |
| 2026-09-03T00:00Z | 67,369 MW | 32,268 MW | 30,227 MW | 56 MW | 2,563 MW |
| 2026-09-03T01:00Z | 65,687 MW | 32,292 MW | 29,434 MW | 38 MW | 2,707 MW |
| 2026-09-03T02:00Z | 62,581 MW | 32,296 MW | 28,482 MW | 35 MW | 2,702 MW |
| 2026-09-03T03:00Z | 57,846 MW | 32,324 MW | 26,934 MW | 35 MW | 2,626 MW |
| 2026-09-03T04:00Z | 52,599 MW | 32,334 MW | 24,840 MW | 35 MW | 2,607 MW |
| 2026-09-03T05:00Z | 48,663 MW | 32,367 MW | 23,347 MW | 35 MW | 2,364 MW |
| 2026-09-03T06:00Z | 46,852 MW | 32,393 MW | 22,192 MW | 35 MW | 2,199 MW |
| 2026-09-03T07:00Z | 45,148 MW | 32,418 MW | 21,253 MW | 35 MW | 2,096 MW |
| 2026-09-03T08:00Z | 45,552 MW | 32,442 MW | 20,884 MW | 35 MW | 2,195 MW |
| 2026-09-03T09:00Z | 47,306 MW | 32,159 MW | 21,113 MW | 35 MW | 2,318 MW |
| 2026-09-03T10:00Z | 51,005 MW | 31,568 MW | 23,271 MW | 35 MW | 2,522 MW |
| 2026-09-03T11:00Z | 52,412 MW | 31,589 MW | 26,040 MW | 673 MW | 2,632 MW |
| 2026-09-03T12:00Z | 51,491 MW | 31,601 MW | 25,682 MW | 4,587 MW | 2,692 MW |
| 2026-09-03T13:00Z | 52,083 MW | 31,595 MW | 24,784 MW | 9,188 MW | 2,834 MW |
| 2026-09-03T14:00Z | 53,999 MW | 31,554 MW | 25,680 MW | 11,649 MW | 3,219 MW |
| 2026-09-03T15:00Z | 56,504 MW | 31,507 MW | 26,853 MW | 12,486 MW | 3,486 MW |
| 2026-09-03T16:00Z | 58,989 MW | 31,473 MW | 26,448 MW | 12,567 MW | 3,501 MW |
| 2026-09-03T17:00Z | 60,847 MW | 31,431 MW | 26,808 MW | 12,695 MW | 3,516 MW |
| 2026-09-03T18:00Z | 62,752 MW | 31,400 MW | 28,808 MW | 12,274 MW | 3,499 MW |
| 2026-09-03T19:00Z | 65,104 MW | 31,366 MW | 30,047 MW | 11,701 MW | 3,534 MW |
| 2026-09-03T20:00Z | 66,579 MW | 31,336 MW | 30,744 MW | 11,309 MW | 3,599 MW |
| 2026-09-03T21:00Z | 67,750 MW | 31,338 MW | 30,962 MW | 9,314 MW | 3,872 MW |
| 2026-09-03T22:00Z | 70,034 MW | 31,356 MW | 30,821 MW | 4,739 MW | 3,968 MW |
| 2026-09-03T23:00Z | 69,954 MW | 31,363 MW | 30,852 MW | 888 MW | 3,983 MW |
| 2026-09-04T00:00Z | 69,082 MW | 31,375 MW | 30,947 MW | 50 MW | 4,009 MW |
| 2026-09-04T01:00Z | 65,350 MW | 31,408 MW | 30,737 MW | 44 MW | 3,685 MW |
| 2026-09-04T02:00Z | 61,324 MW | 31,427 MW | 30,019 MW | 44 MW | 3,569 MW |
| 2026-09-04T03:00Z | 56,802 MW | 31,459 MW | 29,227 MW | 44 MW | 3,521 MW |
| 2026-09-04T04:00Z | 51,613 MW | 31,463 MW | 27,555 MW | 44 MW | 3,684 MW |
| 2026-09-04T05:00Z | 49,113 MW | 31,473 MW | 25,497 MW | 44 MW | 3,291 MW |
| 2026-09-04T06:00Z | 47,523 MW | 31,491 MW | 23,034 MW | 44 MW | 3,294 MW |
| 2026-09-04T07:00Z | 45,771 MW | 31,507 MW | 21,283 MW | 35 MW | 3,153 MW |
| 2026-09-04T08:00Z | 45,660 MW | 31,536 MW | 20,901 MW | 35 MW | 2,995 MW |
| 2026-09-04T09:00Z | 47,300 MW | 31,545 MW | 21,216 MW | 35 MW | 3,001 MW |
| 2026-09-04T10:00Z | 49,621 MW | 31,549 MW | 22,454 MW | 35 MW | 3,249 MW |
| 2026-09-04T11:00Z | 51,065 MW | 31,574 MW | 23,827 MW | 839 MW | 3,427 MW |
| 2026-09-04T12:00Z | 50,963 MW | 31,577 MW | 23,419 MW | 5,148 MW | 3,481 MW |
| 2026-09-04T13:00Z | 51,480 MW | 31,573 MW | 23,188 MW | 9,825 MW | 3,543 MW |
| 2026-09-04T14:00Z | 54,399 MW | 31,552 MW | 24,901 MW | 11,343 MW | 4,215 MW |
| 2026-09-04T15:00Z | 56,503 MW | 31,543 MW | 25,705 MW | 11,672 MW | 4,187 MW |
| 2026-09-04T16:00Z | 59,320 MW | 31,529 MW | 26,377 MW | 11,672 MW | 4,190 MW |
| 2026-09-04T17:00Z | 61,402 MW | 31,491 MW | 26,251 MW | 11,514 MW | 4,205 MW |
| 2026-09-04T18:00Z | 63,298 MW | 31,448 MW | 28,350 MW | 10,932 MW | 4,197 MW |
| 2026-09-04T19:00Z | 65,321 MW | 31,412 MW | 29,530 MW | 9,783 MW | 4,213 MW |
| 2026-09-04T20:00Z | 66,870 MW | 31,402 MW | 30,288 MW | 7,478 MW | 4,239 MW |
| 2026-09-04T21:00Z | 66,760 MW | 31,399 MW | 30,557 MW | 5,191 MW | 4,173 MW |
| 2026-09-04T22:00Z | 65,321 MW | 31,395 MW | 30,182 MW | 3,328 MW | 4,086 MW |
| 2026-09-04T23:00Z | 65,017 MW | 31,406 MW | 30,067 MW | 968 MW | 3,980 MW |
| 2026-09-05T00:00Z | 64,517 MW | 31,440 MW | 29,415 MW | 53 MW | 4,049 MW |
| 2026-09-05T01:00Z | 62,092 MW | 31,454 MW | 28,683 MW | 48 MW | 4,102 MW |
| 2026-09-05T02:00Z | 58,266 MW | 31,427 MW | 27,540 MW | 48 MW | 4,132 MW |
| 2026-09-05T03:00Z | 53,381 MW | 31,367 MW | 26,778 MW | 48 MW | 3,894 MW |
| 2026-09-05T04:00Z | 48,191 MW | 31,327 MW | 25,814 MW | 44 MW | 3,321 MW |
| 2026-09-05T05:00Z | 45,833 MW | 31,262 MW | 25,252 MW | 42 MW | 3,237 MW |
| 2026-09-05T06:00Z | 45,189 MW | 31,059 MW | 24,389 MW | 42 MW | 3,251 MW |
| 2026-09-05T07:00Z | 44,658 MW | 30,870 MW | 22,351 MW | 42 MW | 3,200 MW |
| 2026-09-05T08:00Z | 44,285 MW | 30,949 MW | 20,722 MW | 42 MW | 3,178 MW |
| 2026-09-05T09:00Z | 44,220 MW | 31,188 MW | 19,808 MW | 42 MW | 3,192 MW |
| 2026-09-05T10:00Z | 44,628 MW | 31,300 MW | 20,197 MW | 43 MW | 3,195 MW |
| 2026-09-05T11:00Z | 44,651 MW | 31,333 MW | 21,291 MW | 790 MW | 3,206 MW |
| 2026-09-05T12:00Z | 44,412 MW | 31,329 MW | 20,672 MW | 3,844 MW | 3,183 MW |
| 2026-09-05T13:00Z | 44,178 MW | 31,335 MW | 20,511 MW | 7,016 MW | 3,190 MW |
| 2026-09-05T14:00Z | 44,864 MW | 31,390 MW | 20,861 MW | 9,565 MW | 3,190 MW |
| 2026-09-05T15:00Z | 45,976 MW | 31,459 MW | 21,248 MW | 10,670 MW | 3,264 MW |
| 2026-09-05T16:00Z | 48,275 MW | 31,476 MW | 23,079 MW | 9,699 MW | 3,788 MW |
| 2026-09-05T17:00Z | 50,448 MW | 31,497 MW | 23,642 MW | 8,846 MW | 3,815 MW |
| 2026-09-05T18:00Z | 50,842 MW | 31,486 MW | 23,472 MW | 9,092 MW | 3,819 MW |
| 2026-09-05T19:00Z | 52,075 MW | 31,478 MW | 24,547 MW | 8,408 MW | 3,875 MW |
| 2026-09-05T20:00Z | 53,032 MW | 31,488 MW | 25,364 MW | 7,348 MW | 4,013 MW |
| 2026-09-05T21:00Z | 53,678 MW | 31,482 MW | 25,587 MW | 5,747 MW | 4,187 MW |
| 2026-09-05T22:00Z | 54,260 MW | 31,470 MW | 25,928 MW | 3,243 MW | 4,276 MW |
| 2026-09-05T23:00Z | 53,590 MW | 31,478 MW | 25,651 MW | 531 MW | 4,368 MW |
| 2026-09-06T00:00Z | 52,530 MW | 31,443 MW | 24,999 MW | 46 MW | 4,090 MW |
| 2026-09-06T01:00Z | 50,639 MW | 31,125 MW | 24,020 MW | 44 MW | 3,911 MW |
| 2026-09-06T02:00Z | 47,696 MW | 30,873 MW | 23,537 MW | 44 MW | 3,754 MW |
| 2026-09-06T03:00Z | 44,480 MW | 30,785 MW | 22,728 MW | 44 MW | 3,200 MW |
| 2026-09-06T04:00Z | 41,562 MW | 30,810 MW | 19,831 MW | 44 MW | 2,861 MW |
| 2026-09-06T05:00Z | 41,437 MW | 30,865 MW | 17,935 MW | 44 MW | 2,639 MW |
| 2026-09-06T06:00Z | 40,930 MW | 30,923 MW | 17,029 MW | 44 MW | 2,491 MW |
| 2026-09-06T07:00Z | 40,034 MW | 30,985 MW | 16,682 MW | 44 MW | 2,312 MW |
| 2026-09-06T08:00Z | 39,038 MW | 31,019 MW | 16,503 MW | 44 MW | 2,146 MW |
| 2026-09-06T09:00Z | 38,823 MW | 31,033 MW | 16,436 MW | 44 MW | 1,948 MW |
| 2026-09-06T10:00Z | 37,997 MW | 31,054 MW | 16,375 MW | 45 MW | 1,902 MW |
| 2026-09-06T11:00Z | 37,195 MW | 31,063 MW | 16,192 MW | 758 MW | 1,901 MW |
| 2026-09-06T12:00Z | 35,498 MW | 31,063 MW | 16,013 MW | 5,093 MW | 1,892 MW |
| 2026-09-06T13:00Z | 35,593 MW | 31,040 MW | 15,921 MW | 9,433 MW | 1,898 MW |
| 2026-09-06T14:00Z | 38,391 MW | 31,031 MW | 15,850 MW | 11,303 MW | 2,007 MW |
| 2026-09-06T15:00Z | 41,491 MW | 31,004 MW | 16,052 MW | 12,071 MW | 2,154 MW |
| 2026-09-06T16:00Z | 42,458 MW | 30,985 MW | 16,212 MW | 12,341 MW | 2,742 MW |
| 2026-09-06T17:00Z | 43,652 MW | 30,969 MW | 17,187 MW | 12,414 MW | 3,240 MW |
| 2026-09-06T18:00Z | 45,336 MW | 30,942 MW | 17,814 MW | 12,558 MW | 3,431 MW |
| 2026-09-06T19:00Z | 47,015 MW | 30,898 MW | 18,448 MW | 12,055 MW | 3,546 MW |
| 2026-09-06T20:00Z | 47,320 MW | 30,870 MW | 18,747 MW | 11,967 MW | 3,918 MW |
| 2026-09-06T21:00Z | 48,562 MW | 30,880 MW | 19,408 MW | 10,411 MW | 4,223 MW |
| 2026-09-06T22:00Z | 49,727 MW | 30,889 MW | 20,693 MW | 6,158 MW | 4,364 MW |
| 2026-09-06T23:00Z | 50,220 MW | 30,917 MW | 21,336 MW | 1,080 MW | 4,343 MW |
| 2026-09-07T00:00Z | 49,427 MW | 30,957 MW | 20,898 MW | 51 MW | 4,167 MW |
| 2026-09-07T01:00Z | 47,293 MW | 30,999 MW | 19,327 MW | 48 MW | 3,864 MW |
| 2026-09-07T02:00Z | 44,763 MW | 31,012 MW | 18,250 MW | 48 MW | 3,687 MW |
| 2026-09-07T03:00Z | 42,346 MW | 31,034 MW | 17,246 MW | 48 MW | 3,086 MW |
| 2026-09-07T04:00Z | 38,809 MW | 31,063 MW | 16,497 MW | 48 MW | 2,681 MW |
| 2026-09-07T05:00Z | 37,203 MW | 31,092 MW | 15,944 MW | 48 MW | 2,278 MW |
| 2026-09-07T06:00Z | 36,991 MW | 31,110 MW | 15,569 MW | 48 MW | 2,006 MW |
| 2026-09-07T07:00Z | 37,358 MW | 31,123 MW | 15,258 MW | 48 MW | 1,779 MW |
| 2026-09-07T08:00Z | 36,554 MW | 31,135 MW | 15,223 MW | 48 MW | 1,756 MW |
| 2026-09-07T09:00Z | 36,505 MW | 31,151 MW | 15,160 MW | 48 MW | 1,750 MW |
| 2026-09-07T10:00Z | 36,705 MW | 31,165 MW | 15,229 MW | 48 MW | 1,731 MW |
| 2026-09-07T11:00Z | 34,822 MW | 31,178 MW | 15,176 MW | 1,071 MW | 1,747 MW |
| 2026-09-07T12:00Z | 31,500 MW | 31,174 MW | 15,028 MW | 7,145 MW | 1,635 MW |
| 2026-09-07T13:00Z | 30,101 MW | 31,142 MW | 14,950 MW | 12,595 MW | 1,622 MW |
| 2026-09-07T14:00Z | 30,934 MW | 31,103 MW | 15,249 MW | 13,742 MW | 1,599 MW |
| 2026-09-07T15:00Z | 34,662 MW | 31,071 MW | 15,360 MW | 13,555 MW | 1,783 MW |
| 2026-09-07T16:00Z | 39,113 MW | 31,056 MW | 15,466 MW | 13,276 MW | 2,125 MW |
| 2026-09-07T17:00Z | 42,392 MW | 31,028 MW | 16,007 MW | 13,053 MW | 2,700 MW |
| 2026-09-07T18:00Z | 44,235 MW | 31,018 MW | 17,183 MW | 12,769 MW | 2,851 MW |
| 2026-09-07T19:00Z | 46,151 MW | 31,006 MW | 17,509 MW | 12,622 MW | 2,985 MW |
| 2026-09-07T20:00Z | 47,964 MW | 30,996 MW | 18,500 MW | 12,457 MW | 3,226 MW |
| 2026-09-07T21:00Z | 49,342 MW | 30,979 MW | 19,888 MW | 11,119 MW | 3,720 MW |
| 2026-09-07T22:00Z | 51,065 MW | 30,949 MW | 21,450 MW | 6,213 MW | 3,923 MW |
| 2026-09-07T23:00Z | 51,562 MW | 30,945 MW | 22,511 MW | 1,023 MW | 3,982 MW |
| 2026-09-08T00:00Z | 50,234 MW | 30,795 MW | 22,624 MW | 62 MW | 4,016 MW |
| 2026-09-08T01:00Z | 47,990 MW | 30,586 MW | 21,319 MW | 59 MW | 3,794 MW |
| 2026-09-08T02:00Z | 44,853 MW | 30,373 MW | 19,579 MW | 59 MW | 3,545 MW |
| 2026-09-08T03:00Z | 42,279 MW | 30,275 MW | 17,746 MW | 59 MW | 2,784 MW |
| 2026-09-08T04:00Z | 39,667 MW | 30,223 MW | 16,459 MW | 59 MW | 2,491 MW |
| 2026-09-08T05:00Z | 38,411 MW | 30,237 MW | 15,982 MW | 59 MW | 2,219 MW |
| 2026-09-08T06:00Z | 37,158 MW | 30,248 MW | 15,664 MW | 59 MW | 1,868 MW |
| 2026-09-08T07:00Z | 35,988 MW | 30,255 MW | 15,530 MW | 59 MW | 1,857 MW |
| 2026-09-08T08:00Z | 36,229 MW | 30,264 MW | 15,458 MW | 59 MW | 1,879 MW |
| 2026-09-08T09:00Z | 37,499 MW | 30,265 MW | 15,722 MW | 55 MW | 2,044 MW |
| 2026-09-08T10:00Z | 41,362 MW | 30,269 MW | 16,181 MW | 49 MW | 2,360 MW |
| 2026-09-08T11:00Z | 43,789 MW | 30,269 MW | 17,314 MW | 1,001 MW | 2,493 MW |
| 2026-09-08T12:00Z | 41,581 MW | 30,271 MW | 17,199 MW | 6,161 MW | 2,449 MW |
| 2026-09-08T13:00Z | 40,163 MW | 30,243 MW | 16,635 MW | 11,156 MW | 2,312 MW |
| 2026-09-08T14:00Z | 43,012 MW | 30,223 MW | 16,326 MW | 12,460 MW | 2,391 MW |
| 2026-09-08T15:00Z | 45,615 MW | 30,183 MW | 17,767 MW | 12,481 MW | 2,485 MW |
| 2026-09-08T16:00Z | 47,123 MW | 30,156 MW | 19,038 MW | 12,845 MW | 2,984 MW |
| 2026-09-08T17:00Z | 50,904 MW | 30,130 MW | 21,005 MW | 12,021 MW | 3,220 MW |
| 2026-09-08T18:00Z | 52,602 MW | 30,115 MW | 23,405 MW | 11,343 MW | 3,428 MW |
| 2026-09-08T19:00Z | 53,214 MW | 30,083 MW | 24,132 MW | 11,210 MW | 3,521 MW |
| 2026-09-08T20:00Z | 56,720 MW | 30,055 MW | 24,193 MW | 10,447 MW | 3,827 MW |
| 2026-09-08T21:00Z | 58,718 MW | 30,034 MW | 25,211 MW | 8,932 MW | 4,099 MW |
| 2026-09-08T22:00Z | 60,146 MW | 30,027 MW | 25,953 MW | 4,701 MW | 4,125 MW |
| 2026-09-08T23:00Z | 61,072 MW | 30,035 MW | 26,627 MW | 784 MW | 4,137 MW |
| 2026-09-09T00:00Z | 59,561 MW | 30,039 MW | 26,866 MW | 59 MW | 4,006 MW |
| 2026-09-09T01:00Z | 55,336 MW | 30,044 MW | 26,495 MW | 56 MW | 3,639 MW |
| 2026-09-09T02:00Z | 50,472 MW | 29,939 MW | 24,967 MW | 51 MW | 3,543 MW |
| 2026-09-09T03:00Z | 48,152 MW | 29,794 MW | 23,402 MW | 52 MW | 3,079 MW |
| 2026-09-09T04:00Z | 45,978 MW | 29,772 MW | 21,190 MW | 56 MW | 2,767 MW |
| 2026-09-09T05:00Z | 45,066 MW | 29,790 MW | 19,602 MW | 54 MW | 2,343 MW |
| 2026-09-09T06:00Z | 44,543 MW | 29,849 MW | 18,860 MW | 46 MW | 2,305 MW |
| 2026-09-09T07:00Z | 43,999 MW | 29,958 MW | 18,318 MW | 46 MW | 2,238 MW |
| 2026-09-09T08:00Z | 43,788 MW | 30,000 MW | 18,279 MW | 46 MW | 2,230 MW |
| 2026-09-09T09:00Z | 44,836 MW | 30,055 MW | 19,077 MW | 46 MW | 2,249 MW |
| 2026-09-09T10:00Z | 46,698 MW | 30,076 MW | 20,731 MW | 46 MW | 2,370 MW |
| 2026-09-09T11:00Z | 48,220 MW | 30,092 MW | 22,087 MW | 907 MW | 2,301 MW |
| 2026-09-09T12:00Z | 47,659 MW | 30,103 MW | 21,675 MW | 5,544 MW | 2,263 MW |
| 2026-09-09T13:00Z | 46,622 MW | 30,098 MW | 20,630 MW | 10,714 MW | 2,106 MW |
| 2026-09-09T14:00Z | 47,299 MW | 30,059 MW | 21,236 MW | 12,484 MW | 2,511 MW |
| 2026-09-09T15:00Z | 49,919 MW | 30,001 MW | 23,130 MW | 12,663 MW | 2,758 MW |
| 2026-09-09T16:00Z | 52,542 MW | 29,944 MW | 24,880 MW | 12,409 MW | 2,817 MW |
| 2026-09-09T17:00Z | 54,966 MW | 29,871 MW | 26,931 MW | 11,965 MW | 2,893 MW |
| 2026-09-09T18:00Z | 56,414 MW | 29,804 MW | 26,970 MW | 11,501 MW | 3,019 MW |
| 2026-09-09T19:00Z | 56,895 MW | 29,802 MW | 27,324 MW | 11,263 MW | 3,173 MW |
| 2026-09-09T20:00Z | 57,630 MW | 29,806 MW | 27,308 MW | 10,993 MW | 3,200 MW |
| 2026-09-09T21:00Z | 61,697 MW | 29,842 MW | 27,670 MW | 8,038 MW | 3,264 MW |
| 2026-09-09T22:00Z | 63,556 MW | 29,885 MW | 27,949 MW | 3,733 MW | 3,256 MW |
| 2026-09-09T23:00Z | 63,737 MW | 30,041 MW | 28,155 MW | 532 MW | 3,213 MW |
| 2026-09-10T00:00Z | 62,798 MW | 30,085 MW | 28,295 MW | 49 MW | 3,014 MW |
| 2026-09-10T01:00Z | 58,912 MW | 30,085 MW | 27,510 MW | 47 MW | 3,038 MW |
| 2026-09-10T02:00Z | 55,302 MW | 30,121 MW | 26,476 MW | 47 MW | 2,943 MW |
| 2026-09-10T03:00Z | 52,542 MW | 30,178 MW | 26,270 MW | 48 MW | 2,511 MW |
| 2026-09-10T04:00Z | 49,500 MW | 30,302 MW | 24,870 MW | 47 MW | 2,327 MW |
| 2026-09-10T05:00Z | 47,195 MW | 30,390 MW | 23,001 MW | 48 MW | 2,225 MW |
| 2026-09-10T06:00Z | 46,266 MW | 30,457 MW | 21,356 MW | 47 MW | 2,149 MW |
| 2026-09-10T07:00Z | 46,037 MW | 30,460 MW | 20,956 MW | 48 MW | 2,187 MW |
| 2026-09-10T08:00Z | 45,679 MW | 30,550 MW | 20,385 MW | 48 MW | 2,266 MW |
| 2026-09-10T09:00Z | 47,381 MW | 30,592 MW | 20,705 MW | 47 MW | 2,353 MW |
| 2026-09-10T10:00Z | 49,455 MW | 30,589 MW | 22,470 MW | 48 MW | 2,588 MW |
| 2026-09-10T11:00Z | 51,233 MW | 30,579 MW | 23,107 MW | 688 MW | 2,789 MW |
| 2026-09-10T12:00Z | 51,648 MW | 30,581 MW | 22,946 MW | 3,688 MW | 2,832 MW |
| 2026-09-10T13:00Z | 51,252 MW | 30,646 MW | 22,229 MW | 6,737 MW | 2,792 MW |
| 2026-09-10T14:00Z | 51,662 MW | 30,729 MW | 21,256 MW | 8,866 MW | 3,208 MW |
| 2026-09-10T15:00Z | 54,101 MW | 30,737 MW | 20,860 MW | 10,017 MW | 3,250 MW |
| 2026-09-10T16:00Z | 55,159 MW | 30,853 MW | 22,812 MW | 10,215 MW | 3,272 MW |
| 2026-09-10T17:00Z | 56,418 MW | 30,893 MW | 22,828 MW | 10,512 MW | 3,455 MW |
| 2026-09-10T18:00Z | 58,013 MW | 30,895 MW | 23,851 MW | 9,622 MW | 3,592 MW |
| 2026-09-10T19:00Z | 58,873 MW | 30,893 MW | 24,969 MW | 8,742 MW | 3,863 MW |
| 2026-09-10T20:00Z | 62,128 MW | 30,893 MW | 25,357 MW | 6,570 MW | 3,974 MW |
| 2026-09-10T21:00Z | 62,802 MW | 30,898 MW | 25,276 MW | 4,525 MW | 3,915 MW |
| 2026-09-10T22:00Z | 63,599 MW | 30,898 MW | 25,510 MW | 1,721 MW | 3,928 MW |
| 2026-09-10T23:00Z | 62,638 MW | 30,902 MW | 25,708 MW | 197 MW | 3,922 MW |
| 2026-09-11T00:00Z | 61,767 MW | 30,916 MW | 25,586 MW | 26 MW | 4,018 MW |
| 2026-09-11T01:00Z | 59,236 MW | 30,956 MW | 25,430 MW | 25 MW | 3,970 MW |
| 2026-09-11T02:00Z | 54,570 MW | 30,961 MW | 24,650 MW | 25 MW | 3,984 MW |
| 2026-09-11T03:00Z | 51,582 MW | 30,967 MW | 24,010 MW | 25 MW | 3,331 MW |
| 2026-09-11T04:00Z | 48,647 MW | 31,013 MW | 22,073 MW | 25 MW | 3,067 MW |
| 2026-09-11T05:00Z | 47,408 MW | 31,033 MW | 20,054 MW | 25 MW | 2,952 MW |
| 2026-09-11T06:00Z | 45,958 MW | 31,044 MW | 18,790 MW | 25 MW | 2,830 MW |
| 2026-09-11T07:00Z | 45,036 MW | 31,061 MW | 18,203 MW | 25 MW | 2,646 MW |
| 2026-09-11T08:00Z | 44,971 MW | 31,077 MW | 17,388 MW | 25 MW | 2,552 MW |
| 2026-09-11T09:00Z | 46,009 MW | 31,089 MW | 17,916 MW | 25 MW | 2,574 MW |
| 2026-09-11T10:00Z | 47,297 MW | 31,115 MW | 19,262 MW | 24 MW | 2,647 MW |
| 2026-09-11T11:00Z | 48,466 MW | 31,133 MW | 20,403 MW | 498 MW | 2,810 MW |
| 2026-09-11T12:00Z | 48,267 MW | 31,139 MW | 19,763 MW | 4,012 MW | 2,820 MW |
| 2026-09-11T13:00Z | 48,424 MW | 31,139 MW | 18,312 MW | 8,322 MW | 2,757 MW |
| 2026-09-11T14:00Z | 48,528 MW | 31,136 MW | 18,327 MW | 10,180 MW | 3,177 MW |
| 2026-09-11T15:00Z | 48,911 MW | 31,124 MW | 19,304 MW | 10,688 MW | 3,162 MW |
| 2026-09-11T16:00Z | 49,441 MW | 31,105 MW | 18,913 MW | 11,106 MW | 3,100 MW |
| 2026-09-11T17:00Z | 50,522 MW | 31,097 MW | 19,650 MW | 11,024 MW | 3,011 MW |
| 2026-09-11T18:00Z | 52,176 MW | 31,072 MW | 19,900 MW | 10,340 MW | 3,032 MW |
| 2026-09-11T19:00Z | 53,522 MW | 31,039 MW | 20,190 MW | 9,705 MW | 3,219 MW |
| 2026-09-11T20:00Z | 56,002 MW | 31,018 MW | 20,409 MW | 9,339 MW | 3,648 MW |
| 2026-09-11T21:00Z | 58,101 MW | 30,995 MW | 20,670 MW | 6,697 MW | 4,016 MW |
| 2026-09-11T22:00Z | 58,891 MW | 31,004 MW | 20,839 MW | 3,005 MW | 4,158 MW |
| 2026-09-11T23:00Z | 57,807 MW | 31,013 MW | 20,882 MW | 443 MW | 3,858 MW |
| 2026-09-12T00:00Z | 56,258 MW | 31,022 MW | 20,741 MW | 13 MW | 3,634 MW |
| 2026-09-12T01:00Z | 53,974 MW | 31,050 MW | 20,043 MW | 12 MW | 3,491 MW |
| 2026-09-12T02:00Z | 50,713 MW | 31,010 MW | 19,680 MW | 12 MW | 3,365 MW |
| 2026-09-12T03:00Z | 46,947 MW | 30,717 MW | 18,449 MW | 12 MW | 2,686 MW |
| 2026-09-12T04:00Z | 43,856 MW | 30,653 MW | 16,297 MW | 12 MW | 2,557 MW |
| 2026-09-12T05:00Z | 42,551 MW | 30,647 MW | 15,005 MW | 12 MW | 2,696 MW |
| 2026-09-12T06:00Z | 41,815 MW | 30,641 MW | 14,018 MW | 12 MW | 2,728 MW |
| 2026-09-12T07:00Z | 41,007 MW | 30,671 MW | 13,480 MW | 12 MW | 2,670 MW |
| 2026-09-12T08:00Z | 40,524 MW | 30,676 MW | 13,117 MW | 12 MW | 2,545 MW |
| 2026-09-12T09:00Z | 40,812 MW | 30,689 MW | 12,749 MW | 12 MW | 2,440 MW |
| 2026-09-12T10:00Z | 41,612 MW | 30,703 MW | 13,141 MW | 12 MW | 2,406 MW |
| 2026-09-12T11:00Z | 42,534 MW | 30,705 MW | 14,232 MW | 202 MW | 2,384 MW |
| 2026-09-12T12:00Z | 43,394 MW | 30,686 MW | 14,982 MW | 1,146 MW | 2,464 MW |
| 2026-09-12T13:00Z | 44,238 MW | 30,664 MW | 15,099 MW | 2,511 MW | 2,599 MW |
| 2026-09-12T14:00Z | 44,537 MW | 30,620 MW | 15,138 MW | 3,862 MW | 2,854 MW |
| 2026-09-12T15:00Z | 45,904 MW | 30,500 MW | 15,205 MW | 5,467 MW | 2,832 MW |
| 2026-09-12T16:00Z | 46,934 MW | 30,362 MW | 14,607 MW | 6,517 MW | 2,840 MW |
| 2026-09-12T17:00Z | 49,016 MW | 30,298 MW | 15,240 MW | 6,856 MW | 2,874 MW |
| 2026-09-12T18:00Z | 49,537 MW | 30,225 MW | 15,174 MW | 7,189 MW | 3,061 MW |
| 2026-09-12T19:00Z | 51,724 MW | 30,188 MW | 15,548 MW | 6,023 MW | 3,396 MW |
| 2026-09-12T20:00Z | 53,747 MW | 30,027 MW | 15,802 MW | 4,743 MW | 3,507 MW |
| 2026-09-12T21:00Z | 54,315 MW | 29,916 MW | 16,128 MW | 3,263 MW | 3,734 MW |
| 2026-09-12T22:00Z | 54,947 MW | 29,919 MW | 16,033 MW | 1,546 MW | 4,015 MW |
| 2026-09-12T23:00Z | 56,090 MW | 29,893 MW | 16,168 MW | 443 MW | 4,145 MW |
| 2026-09-13T00:00Z | 55,794 MW | 29,907 MW | 16,256 MW | 13 MW | 4,131 MW |
| 2026-09-13T01:00Z | 53,644 MW | 29,924 MW | 16,005 MW | 12 MW | 3,839 MW |
| 2026-09-13T02:00Z | 51,938 MW | 29,919 MW | 15,988 MW | 12 MW | 3,813 MW |
| 2026-09-13T03:00Z | 49,498 MW | 29,952 MW | 16,008 MW | 12 MW | 3,773 MW |
| 2026-09-13T04:00Z | 46,486 MW | 29,961 MW | 16,019 MW | 12 MW | 3,297 MW |
| 2026-09-13T05:00Z | 44,173 MW | 29,908 MW | 15,751 MW | 12 MW | 3,229 MW |
| 2026-09-13T06:00Z | 42,753 MW | 29,884 MW | 15,431 MW | 12 MW | 3,187 MW |
| 2026-09-13T07:00Z | 41,571 MW | 29,845 MW | 14,915 MW | 12 MW | 3,084 MW |
| 2026-09-13T08:00Z | 41,720 MW | 29,696 MW | 14,073 MW | 12 MW | 3,116 MW |
| 2026-09-13T09:00Z | 41,992 MW | 29,947 MW | 13,780 MW | 12 MW | 3,206 MW |
| 2026-09-13T10:00Z | 42,563 MW | 30,051 MW | 14,203 MW | 12 MW | 3,197 MW |
| 2026-09-13T11:00Z | 42,569 MW | 30,159 MW | 14,796 MW | 164 MW | 3,207 MW |
| 2026-09-13T12:00Z | 43,200 MW | 30,207 MW | 14,831 MW | 2,212 MW | 3,207 MW |
| 2026-09-13T13:00Z | 43,774 MW | 30,221 MW | 14,487 MW | 5,909 MW | 3,294 MW |
| 2026-09-13T14:00Z | 44,407 MW | 30,216 MW | 14,371 MW | 8,293 MW | 3,807 MW |
| 2026-09-13T15:00Z | 45,869 MW | 30,227 MW | 15,096 MW | 9,498 MW | 3,783 MW |
| 2026-09-13T16:00Z | 47,490 MW | 30,211 MW | 15,439 MW | 10,383 MW | 3,751 MW |
| 2026-09-13T17:00Z | 47,980 MW | 30,187 MW | 14,933 MW | 10,784 MW | 3,699 MW |
| 2026-09-13T18:00Z | 48,816 MW | 30,180 MW | 15,179 MW | 10,949 MW | 3,648 MW |
| 2026-09-13T19:00Z | 52,087 MW | 30,148 MW | 15,455 MW | 10,521 MW | 3,783 MW |
| 2026-09-13T20:00Z | 55,134 MW | 30,124 MW | 15,911 MW | 9,139 MW | 4,106 MW |
| 2026-09-13T21:00Z | 57,208 MW | 30,127 MW | 16,264 MW | 7,823 MW | 4,409 MW |
| 2026-09-13T22:00Z | 59,272 MW | 30,147 MW | 16,534 MW | 3,913 MW | 4,474 MW |
| 2026-09-13T23:00Z | 59,993 MW | 30,174 MW | 17,173 MW | 487 MW | 4,415 MW |
| 2026-09-14T00:00Z | 58,228 MW | 30,201 MW | 16,995 MW | 32 MW | 4,243 MW |
| 2026-09-14T01:00Z | 55,565 MW | 30,206 MW | 16,402 MW | 32 MW | 4,055 MW |
| 2026-09-14T02:00Z | 53,179 MW | 30,235 MW | 16,051 MW | 30 MW | 3,821 MW |
| 2026-09-14T03:00Z | 49,514 MW | 30,347 MW | 15,047 MW | 28 MW | 3,681 MW |
| 2026-09-14T04:00Z | 45,672 MW | 30,476 MW | 14,815 MW | 28 MW | 3,294 MW |
| 2026-09-14T05:00Z | 42,592 MW | 30,505 MW | 14,831 MW | 28 MW | 3,151 MW |
| 2026-09-14T06:00Z | 41,388 MW | 30,552 MW | 13,504 MW | 28 MW | 3,135 MW |
| 2026-09-14T07:00Z | 40,766 MW | 30,727 MW | 12,420 MW | 28 MW | 3,162 MW |
| 2026-09-14T08:00Z | 40,646 MW | 30,805 MW | 12,295 MW | 28 MW | 3,154 MW |
| 2026-09-14T09:00Z | 41,347 MW | 30,831 MW | 12,891 MW | 28 MW | 3,124 MW |
| 2026-09-14T10:00Z | 42,366 MW | 30,854 MW | 13,789 MW | 28 MW | 3,104 MW |
| 2026-09-14T11:00Z | 44,035 MW | 30,890 MW | 15,004 MW | 680 MW | 3,127 MW |
| 2026-09-14T12:00Z | 42,476 MW | 30,916 MW | 13,791 MW | 5,846 MW | 3,077 MW |
| 2026-09-14T13:00Z | 41,395 MW | 30,924 MW | 11,800 MW | 11,589 MW | 3,101 MW |
| 2026-09-14T14:00Z | 42,086 MW | 30,929 MW | 11,409 MW | 13,162 MW | 3,726 MW |
| 2026-09-14T15:00Z | 42,018 MW | 30,914 MW | 11,841 MW | 13,705 MW | 3,712 MW |
| 2026-09-14T16:00Z | 43,578 MW | 30,900 MW | 11,858 MW | 13,452 MW | 3,603 MW |
| 2026-09-14T17:00Z | 44,633 MW | 30,884 MW | 12,910 MW | 13,336 MW | 3,657 MW |
| 2026-09-14T18:00Z | 45,474 MW | 30,872 MW | 13,979 MW | 13,247 MW | 3,716 MW |
| 2026-09-14T19:00Z | 46,325 MW | 30,856 MW | 14,435 MW | 12,823 MW | 3,730 MW |
| 2026-09-14T20:00Z | 47,019 MW | 30,844 MW | 14,765 MW | 12,253 MW | 3,986 MW |
| 2026-09-14T21:00Z | 48,461 MW | 30,835 MW | 15,195 MW | 9,776 MW | 4,259 MW |
| 2026-09-14T22:00Z | 51,024 MW | 30,835 MW | 15,815 MW | 4,722 MW | 4,247 MW |
| 2026-09-14T23:00Z | 51,703 MW | 30,861 MW | 16,065 MW | 630 MW | 4,072 MW |
| 2026-09-15T00:00Z | 50,477 MW | 30,907 MW | 16,693 MW | 27 MW | 3,886 MW |
| 2026-09-15T01:00Z | 46,906 MW | 30,950 MW | 16,136 MW | 27 MW | 3,782 MW |
| 2026-09-15T02:00Z | 43,504 MW | 30,996 MW | 14,466 MW | 27 MW | 3,719 MW |
| 2026-09-15T03:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T04:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T05:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T13:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T14:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T15:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-15T16:00Z | n/a | n/a | n/a | n/a | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-15T16:00Z.
Day by Day
Daily totals, Eastern time dates, through 2026-09-13| Date (Eastern time) | Demand |
|---|---|
| 2025-08-11 | 2.78 TWh |
| 2025-08-12 | 2.90 TWh |
| 2025-08-13 | 2.85 TWh |
| 2025-08-14 | 2.83 TWh |
| 2025-08-15 | 2.85 TWh |
| 2025-08-16 | 2.77 TWh |
| 2025-08-17 | 2.70 TWh |
| 2025-08-18 | 2.60 TWh |
| 2025-08-19 | 2.51 TWh |
| 2025-08-20 | 2.46 TWh |
| 2025-08-21 | 2.32 TWh |
| 2025-08-22 | 2.36 TWh |
| 2025-08-23 | 2.28 TWh |
| 2025-08-24 | 2.25 TWh |
| 2025-08-25 | 2.31 TWh |
| 2025-08-26 | 2.18 TWh |
| 2025-08-27 | 2.12 TWh |
| 2025-08-28 | 2.13 TWh |
| 2025-08-29 | 2.11 TWh |
| 2025-08-30 | 1.91 TWh |
| 2025-08-31 | 1.88 TWh |
| 2025-09-01 | 1.97 TWh |
| 2025-09-02 | 2.16 TWh |
| 2025-09-03 | 2.21 TWh |
| 2025-09-04 | 2.20 TWh |
| 2025-09-05 | 2.29 TWh |
| 2025-09-06 | 2.17 TWh |
| 2025-09-07 | 1.93 TWh |
| 2025-09-08 | 2.02 TWh |
| 2025-09-09 | 2.05 TWh |
| 2025-09-10 | 2.12 TWh |
| 2025-09-11 | 2.21 TWh |
| 2025-09-12 | 2.20 TWh |
| 2025-09-13 | 2.10 TWh |
| 2025-09-14 | 2.17 TWh |
| 2025-09-15 | 2.32 TWh |
| 2025-09-16 | 2.23 TWh |
| 2025-09-17 | 2.22 TWh |
| 2025-09-18 | 2.33 TWh |
| 2025-09-19 | 2.38 TWh |
| 2025-09-20 | 2.16 TWh |
| 2025-09-21 | 2.10 TWh |
| 2025-09-22 | 2.24 TWh |
| 2025-09-23 | 2.33 TWh |
| 2025-09-24 | 2.32 TWh |
| 2025-09-25 | 2.35 TWh |
| 2025-09-26 | 2.31 TWh |
| 2025-09-27 | 2.14 TWh |
| 2025-09-28 | 2.17 TWh |
| 2025-09-29 | 2.28 TWh |
| 2025-09-30 | 2.25 TWh |
| 2025-10-01 | 2.10 TWh |
| 2025-10-02 | 2.05 TWh |
| 2025-10-03 | 2.08 TWh |
| 2025-10-04 | 2.03 TWh |
| 2025-10-05 | 2.03 TWh |
| 2025-10-06 | 2.21 TWh |
| 2025-10-07 | 2.19 TWh |
| 2025-10-08 | 2.07 TWh |
| 2025-10-09 | 1.94 TWh |
| 2025-10-10 | 1.94 TWh |
| 2025-10-11 | 1.85 TWh |
| 2025-10-12 | 1.84 TWh |
| 2025-10-13 | 1.99 TWh |
| 2025-10-14 | 2.01 TWh |
| 2025-10-15 | 1.98 TWh |
| 2025-10-16 | 1.96 TWh |
| 2025-10-17 | 1.97 TWh |
| 2025-10-18 | 1.88 TWh |
| 2025-10-19 | 1.85 TWh |
| 2025-10-20 | 1.96 TWh |
| 2025-10-21 | 2.01 TWh |
| 2025-10-22 | 2.01 TWh |
| 2025-10-23 | 2.04 TWh |
| 2025-10-24 | 2.05 TWh |
| 2025-10-25 | 1.95 TWh |
| 2025-10-26 | 1.90 TWh |
| 2025-10-27 | 2.06 TWh |
| 2025-10-28 | 2.10 TWh |
| 2025-10-29 | 2.10 TWh |
| 2025-10-30 | 2.08 TWh |
| 2025-10-31 | 2.03 TWh |
| 2025-11-01 | 1.93 TWh |
| 2025-11-02 | 2.00 TWh |
| 2025-11-03 | 2.07 TWh |
| 2025-11-04 | 2.08 TWh |
| 2025-11-05 | 2.06 TWh |
| 2025-11-06 | 2.06 TWh |
| 2025-11-07 | 2.10 TWh |
| 2025-11-08 | 1.90 TWh |
| 2025-11-09 | 1.98 TWh |
| 2025-11-10 | 2.27 TWh |
| 2025-11-11 | 2.43 TWh |
| 2025-11-12 | 2.26 TWh |
| 2025-11-13 | 2.19 TWh |
| 2025-11-14 | 2.17 TWh |
| 2025-11-15 | 1.96 TWh |
| 2025-11-16 | 1.94 TWh |
| 2025-11-17 | 2.24 TWh |
| 2025-11-18 | 2.31 TWh |
| 2025-11-19 | 2.24 TWh |
| 2025-11-20 | 2.24 TWh |
| 2025-11-21 | 2.15 TWh |
| 2025-11-22 | 2.02 TWh |
| 2025-11-23 | 2.03 TWh |
| 2025-11-24 | 2.20 TWh |
| 2025-11-25 | 2.17 TWh |
| 2025-11-26 | 2.15 TWh |
| 2025-11-27 | 2.15 TWh |
| 2025-11-28 | 2.29 TWh |
| 2025-11-29 | 2.33 TWh |
| 2025-11-30 | 2.31 TWh |
| 2025-12-01 | 2.46 TWh |
| 2025-12-02 | 2.57 TWh |
| 2025-12-03 | 2.57 TWh |
| 2025-12-04 | 2.63 TWh |
| 2025-12-05 | 2.70 TWh |
| 2025-12-06 | 2.47 TWh |
| 2025-12-07 | 2.41 TWh |
| 2025-12-08 | 2.67 TWh |
| 2025-12-09 | 2.76 TWh |
| 2025-12-10 | 2.59 TWh |
| 2025-12-11 | 2.63 TWh |
| 2025-12-12 | 2.65 TWh |
| 2025-12-13 | 2.57 TWh |
| 2025-12-14 | 2.75 TWh |
| 2025-12-15 | 3.04 TWh |
| 2025-12-16 | 2.81 TWh |
| 2025-12-17 | 2.54 TWh |
| 2025-12-18 | 2.44 TWh |
| 2025-12-19 | 2.43 TWh |
| 2025-12-20 | 2.45 TWh |
| 2025-12-21 | 2.37 TWh |
| 2025-12-22 | 2.55 TWh |
| 2025-12-23 | 2.37 TWh |
| 2025-12-24 | 2.15 TWh |
| 2025-12-25 | 2.05 TWh |
| 2025-12-26 | 2.29 TWh |
| 2025-12-27 | 2.24 TWh |
| 2025-12-28 | 2.23 TWh |
| 2025-12-29 | 2.42 TWh |
| 2025-12-30 | 2.71 TWh |
| 2025-12-31 | 2.61 TWh |
| 2026-01-01 | 2.48 TWh |
| 2026-01-02 | 2.58 TWh |
| 2026-01-03 | 2.54 TWh |
| 2026-01-04 | 2.46 TWh |
| 2026-01-05 | 2.56 TWh |
| 2026-01-06 | 2.42 TWh |
| 2026-01-07 | 2.29 TWh |
| 2026-01-08 | 2.30 TWh |
| 2026-01-09 | 2.25 TWh |
| 2026-01-10 | 2.16 TWh |
| 2026-01-11 | 2.30 TWh |
| 2026-01-12 | 2.53 TWh |
| 2026-01-13 | 2.46 TWh |
| 2026-01-14 | 2.40 TWh |
| 2026-01-15 | 2.68 TWh |
| 2026-01-16 | 2.76 TWh |
| 2026-01-17 | 2.49 TWh |
| 2026-01-18 | 2.55 TWh |
| 2026-01-19 | 2.79 TWh |
| 2026-01-20 | 2.94 TWh |
| 2026-01-21 | 2.86 TWh |
| 2026-01-22 | 2.56 TWh |
| 2026-01-23 | 2.74 TWh |
| 2026-01-24 | 3.05 TWh |
| 2026-01-25 | 2.97 TWh |
| 2026-01-26 | 2.95 TWh |
| 2026-01-27 | 3.10 TWh |
| 2026-01-28 | 3.09 TWh |
| 2026-01-29 | 3.10 TWh |
| 2026-01-30 | 3.12 TWh |
| 2026-01-31 | 3.08 TWh |
| 2026-02-01 | 3.00 TWh |
| 2026-02-02 | 2.99 TWh |
| 2026-02-03 | 2.79 TWh |
| 2026-02-04 | 2.75 TWh |
| 2026-02-05 | 2.89 TWh |
| 2026-02-06 | 2.86 TWh |
| 2026-02-07 | 2.90 TWh |
| 2026-02-08 | 3.00 TWh |
| 2026-02-09 | 2.94 TWh |
| 2026-02-10 | 2.61 TWh |
| 2026-02-11 | 2.49 TWh |
| 2026-02-12 | 2.63 TWh |
| 2026-02-13 | 2.60 TWh |
| 2026-02-14 | 2.36 TWh |
| 2026-02-15 | 2.28 TWh |
| 2026-02-16 | 2.42 TWh |
| 2026-02-17 | 2.38 TWh |
| 2026-02-18 | 2.30 TWh |
| 2026-02-19 | 2.31 TWh |
| 2026-02-20 | 2.32 TWh |
| 2026-02-21 | 2.23 TWh |
| 2026-02-22 | 2.43 TWh |
| 2026-02-23 | 2.69 TWh |
| 2026-02-24 | 2.68 TWh |
| 2026-02-25 | 2.47 TWh |
| 2026-02-26 | 2.41 TWh |
| 2026-02-27 | 2.33 TWh |
| 2026-02-28 | 2.13 TWh |
| 2026-03-01 | 2.16 TWh |
| 2026-03-02 | 2.53 TWh |
| 2026-03-03 | 2.50 TWh |
| 2026-03-04 | 2.29 TWh |
| 2026-03-05 | 2.22 TWh |
| 2026-03-06 | 2.18 TWh |
| 2026-03-07 | 2.04 TWh |
| 2026-03-08 | 1.86 TWh |
| 2026-03-09 | 2.06 TWh |
| 2026-03-10 | 2.06 TWh |
| 2026-03-11 | 2.10 TWh |
| 2026-03-12 | 2.22 TWh |
| 2026-03-13 | 2.29 TWh |
| 2026-03-14 | 2.07 TWh |
| 2026-03-15 | 2.08 TWh |
| 2026-03-16 | 2.21 TWh |
| 2026-03-17 | 2.48 TWh |
| 2026-03-18 | 2.52 TWh |
| 2026-03-19 | 2.30 TWh |
| 2026-03-20 | 2.13 TWh |
| 2026-03-21 | 1.92 TWh |
| 2026-03-22 | 1.93 TWh |
| 2026-03-23 | 2.14 TWh |
| 2026-03-24 | 2.22 TWh |
| 2026-03-25 | 2.16 TWh |
| 2026-03-26 | 2.07 TWh |
| 2026-03-27 | 2.09 TWh |
| 2026-03-28 | 2.08 TWh |
| 2026-03-29 | 2.03 TWh |
| 2026-03-30 | 2.05 TWh |
| 2026-03-31 | 2.07 TWh |
| 2026-04-01 | 2.12 TWh |
| 2026-04-02 | 2.10 TWh |
| 2026-04-03 | 2.01 TWh |
| 2026-04-04 | 1.98 TWh |
| 2026-04-05 | 1.88 TWh |
| 2026-04-06 | 2.02 TWh |
| 2026-04-07 | 2.08 TWh |
| 2026-04-08 | 2.14 TWh |
| 2026-04-09 | 2.08 TWh |
| 2026-04-10 | 2.01 TWh |
| 2026-04-11 | 1.85 TWh |
| 2026-04-12 | 1.87 TWh |
| 2026-04-13 | 2.08 TWh |
| 2026-04-14 | 2.21 TWh |
| 2026-04-15 | 2.32 TWh |
| 2026-04-16 | 2.33 TWh |
| 2026-04-17 | 2.22 TWh |
| 2026-04-18 | 1.96 TWh |
| 2026-04-19 | 1.86 TWh |
| 2026-04-20 | 2.04 TWh |
| 2026-04-21 | 2.08 TWh |
| 2026-04-22 | 2.05 TWh |
| 2026-04-23 | 2.09 TWh |
| 2026-04-24 | 2.08 TWh |
| 2026-04-25 | 1.91 TWh |
| 2026-04-26 | 1.87 TWh |
| 2026-04-27 | 2.00 TWh |
| 2026-04-28 | 2.02 TWh |
| 2026-04-29 | 2.02 TWh |
| 2026-04-30 | 2.01 TWh |
| 2026-05-01 | 1.99 TWh |
| 2026-05-02 | 1.89 TWh |
| 2026-05-03 | 1.88 TWh |
| 2026-05-04 | 2.01 TWh |
| 2026-05-05 | 2.05 TWh |
| 2026-05-06 | 2.05 TWh |
| 2026-05-07 | 2.00 TWh |
| 2026-05-08 | 1.98 TWh |
| 2026-05-09 | 1.89 TWh |
| 2026-05-10 | 1.86 TWh |
| 2026-05-11 | 1.98 TWh |
| 2026-05-12 | 2.02 TWh |
| 2026-05-13 | 2.02 TWh |
| 2026-05-14 | 2.01 TWh |
| 2026-05-15 | 2.00 TWh |
| 2026-05-16 | 1.97 TWh |
| 2026-05-17 | 2.21 TWh |
| 2026-05-18 | 2.61 TWh |
| 2026-05-19 | 2.70 TWh |
| 2026-05-20 | 2.50 TWh |
| 2026-05-21 | 2.12 TWh |
| 2026-05-22 | 2.00 TWh |
| 2026-05-23 | 1.93 TWh |
| 2026-05-24 | 1.91 TWh |
| 2026-05-25 | 2.03 TWh |
| 2026-05-26 | 2.26 TWh |
| 2026-05-27 | 2.38 TWh |
| 2026-05-28 | 2.27 TWh |
| 2026-05-29 | 2.16 TWh |
| 2026-05-30 | 1.97 TWh |
| 2026-05-31 | 1.93 TWh |
| 2026-06-01 | 2.11 TWh |
| 2026-06-02 | 2.10 TWh |
| 2026-06-03 | 2.19 TWh |
| 2026-06-04 | 2.35 TWh |
| 2026-06-05 | 2.49 TWh |
| 2026-06-06 | 2.46 TWh |
| 2026-06-07 | 2.45 TWh |
| 2026-06-08 | 2.49 TWh |
| 2026-06-09 | 2.54 TWh |
| 2026-06-10 | 2.75 TWh |
| 2026-06-11 | 2.91 TWh |
| 2026-06-12 | 2.82 TWh |
| 2026-06-13 | 2.54 TWh |
| 2026-06-14 | 2.46 TWh |
| 2026-06-15 | 2.32 TWh |
| 2026-06-16 | 2.22 TWh |
| 2026-06-17 | 2.37 TWh |
| 2026-06-18 | 2.53 TWh |
| 2026-06-19 | 2.37 TWh |
| 2026-06-20 | 2.20 TWh |
| 2026-06-21 | 2.23 TWh |
| 2026-06-22 | 2.44 TWh |
| 2026-06-23 | 2.34 TWh |
| 2026-06-24 | 2.32 TWh |
| 2026-06-25 | 2.44 TWh |
| 2026-06-26 | 2.49 TWh |
| 2026-06-27 | 2.34 TWh |
| 2026-06-28 | 2.39 TWh |
| 2026-06-29 | 2.82 TWh |
| 2026-06-30 | 3.01 TWh |
| 2026-07-01 | 3.23 TWh |
| 2026-07-02 | 3.34 TWh |
| 2026-07-03 | 3.21 TWh |
| 2026-07-04 | 2.91 TWh |
| 2026-07-05 | 2.69 TWh |
| 2026-07-06 | 2.75 TWh |
| 2026-07-07 | 2.70 TWh |
| 2026-07-08 | 2.78 TWh |
| 2026-07-09 | 2.85 TWh |
| 2026-07-10 | 2.81 TWh |
| 2026-07-11 | 2.61 TWh |
| 2026-07-12 | 2.56 TWh |
| 2026-07-13 | 2.75 TWh |
| 2026-07-14 | 2.95 TWh |
| 2026-07-15 | 3.16 TWh |
| 2026-07-16 | 3.14 TWh |
| 2026-07-17 | 2.93 TWh |
| 2026-07-18 | 2.76 TWh |
| 2026-07-19 | 2.55 TWh |
| 2026-07-20 | 2.61 TWh |
| 2026-07-21 | 2.79 TWh |
| 2026-07-22 | 2.61 TWh |
| 2026-07-23 | 2.41 TWh |
| 2026-07-24 | 2.41 TWh |
| 2026-07-25 | 2.32 TWh |
| 2026-07-26 | 2.44 TWh |
| 2026-07-27 | 2.74 TWh |
| 2026-07-28 | 2.68 TWh |
| 2026-07-29 | 2.57 TWh |
| 2026-07-30 | 2.58 TWh |
| 2026-07-31 | 2.66 TWh |
| 2026-08-01 | 2.51 TWh |
| 2026-08-02 | 2.51 TWh |
| 2026-08-03 | 2.72 TWh |
| 2026-08-04 | 2.69 TWh |
| 2026-08-05 | 2.80 TWh |
| 2026-08-06 | 2.93 TWh |
| 2026-08-07 | 2.90 TWh |
| 2026-08-08 | 2.75 TWh |
| 2026-08-09 | 2.75 TWh |
| 2026-08-10 | 2.86 TWh |
| 2026-08-11 | 2.71 TWh |
| 2026-08-12 | 2.66 TWh |
| 2026-08-13 | 2.77 TWh |
| 2026-08-14 | 2.75 TWh |
| 2026-08-15 | 2.59 TWh |
| 2026-08-16 | 2.56 TWh |
| 2026-08-17 | 2.78 TWh |
| 2026-08-18 | 2.76 TWh |
| 2026-08-19 | 2.70 TWh |
| 2026-08-20 | 2.66 TWh |
| 2026-08-21 | 2.51 TWh |
| 2026-08-22 | 2.39 TWh |
| 2026-08-23 | 2.31 TWh |
| 2026-08-24 | 2.38 TWh |
| 2026-08-25 | 2.41 TWh |
| 2026-08-26 | 2.53 TWh |
| 2026-08-27 | 2.66 TWh |
| 2026-08-28 | 2.62 TWh |
| 2026-08-29 | 2.36 TWh |
| 2026-08-30 | 2.45 TWh |
| 2026-08-31 | 2.75 TWh |
| 2026-09-01 | 3.00 TWh |
| 2026-09-02 | 2.97 TWh |
| 2026-09-03 | 3.00 TWh |
| 2026-09-04 | 2.91 TWh |
| 2026-09-05 | 2.55 TWh |
| 2026-09-06 | 2.31 TWh |
| 2026-09-07 | 2.27 TWh |
| 2026-09-08 | 2.51 TWh |
| 2026-09-09 | 2.72 TWh |
| 2026-09-10 | 2.73 TWh |
| 2026-09-11 | 2.58 TWh |
| 2026-09-12 | 2.41 TWh |
| 2026-09-13 | 2.47 TWh |
| 2026-09-14 | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13. Daily totals are EIA's own daily aggregation in the balancing authority's reporting time zone.
Year by Year
Summed from EIA daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 623 TWh | 644 TWh | Gas 41.5% | 256 |
| 2025 | 843 TWh | 875 TWh | Gas 42.0% | 365 |
| 2024 | 815 TWh | 848 TWh | Gas 43.7% | 366 |
| 2023 (partial) | 783 TWh | 823 TWh | Gas 43.8% | 364 |
| 2022 | 810 TWh | 842 TWh | Gas 39.5% | 365 |
| 2021 | 796 TWh | 834 TWh | Gas 37.5% | 365 |
| 2020 | 771 TWh | 804 TWh | Gas 39.6% | 366 |
| 2019 | 800 TWh | 822 TWh | Gas 35.8% | 365 |
A year is partial when EIA has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13.
Records
From EIA operator data held by World Power Monitor| Record | Value | When |
|---|---|---|
| Highest daily demand, 2019 onward | 3.34 TWh | 2026-07-02 (2 July 2026) |
| Highest hourly demand since 2026-06-16 (16 June 2026) | 162.6 GW | 2 Jul 2026, 17:00 EDT (UTC-04:00) |
| Highest solar share of a day's generation, 2019 onward | 7.3% | 2026-05-31 (31 May 2026) |
| Highest wind share of a day's generation, 2019 onward | 10.6% | 2024-04-12 (12 April 2024) |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-13.
Power Flows With Neighbours
Net totals, 2026-08-16 (16 August 2026) to 2026-09-14 (14 September 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| NYISO | PJM exports | 1.58 TWh |
| MISO | PJM exports | 1.44 TWh |
| TVA | PJM imports | 222 GWh |
| CPLE | PJM imports | 165 GWh |
| CPLW | PJM exports | 41.8 GWh |
| LGEE | PJM imports | 36.0 GWh |
| DUK | PJM imports | 12.1 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-14.