Grid Stress Alerts for 29 August 2026
4 notable grid events on 29 August 2026 in ENTSO-E and EIA operator data: 4 net imports. Records are judged against the days loaded for each zone, and each sentence says how many.
Key Facts
- Net imports into Norway South-West (NO2) reached 29.8 GWh on 29 August 2026 (35% of demand), the highest daily net imports in 379 days of loaded history.
- Net imports into Serbia reached 25.3 GWh on 29 August 2026 (30% of demand), the highest daily net imports in 378 days of loaded history.
- Croatia imported a net 30.1 GWh on 29 August 2026, the 2nd highest daily net imports in 379 days of loaded history and 55% of its demand that day.
All Alerts, 29 August 2026
4 events- Net imports Net imports into Norway South-West (NO2) reached 29.8 GWh on 29 August 2026 (35% of demand), the highest daily net imports in 379 days of loaded history. Norway South-West (NO2) grid
- Net imports Net imports into Serbia reached 25.3 GWh on 29 August 2026 (30% of demand), the highest daily net imports in 378 days of loaded history. Serbia grid
- Net imports Croatia imported a net 30.1 GWh on 29 August 2026, the 2nd highest daily net imports in 379 days of loaded history and 55% of its demand that day. Croatia grid
- Net imports Norway Central (NO3) imported a net 20.8 GWh on 29 August 2026, the 2nd highest daily net imports in 379 days of loaded history and 33% of its demand that day. Norway Central (NO3) grid
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-08-29. Operator data only, kept apart from annual statistics.