Grid Stress Alerts for 30 August 2026
6 notable grid events on 30 August 2026 in ENTSO-E and EIA operator data: 6 net imports. Records are judged against the days loaded for each zone, and each sentence says how many.
Key Facts
- Norway Central (NO3) imported a net 28.8 GWh on 30 August 2026, the highest daily net imports in 380 days of loaded history and 45% of its demand that day.
- Net imports into Norway South-West (NO2) reached 36.5 GWh on 30 August 2026 (43% of demand), the highest daily net imports in 380 days of loaded history.
- Net imports into Serbia reached 25.7 GWh on 30 August 2026 (31% of demand), the highest daily net imports in 379 days of loaded history.
All Alerts, 30 August 2026
6 events- Net imports Norway Central (NO3) imported a net 28.8 GWh on 30 August 2026, the highest daily net imports in 380 days of loaded history and 45% of its demand that day. Norway Central (NO3) grid
- Net imports Net imports into Norway South-West (NO2) reached 36.5 GWh on 30 August 2026 (43% of demand), the highest daily net imports in 380 days of loaded history. Norway South-West (NO2) grid
- Net imports Net imports into Serbia reached 25.7 GWh on 30 August 2026 (31% of demand), the highest daily net imports in 379 days of loaded history. Serbia grid
- Net imports Denmark West (DK1) imported a net 24.1 GWh on 30 August 2026, the 3rd highest daily net imports in 374 days of loaded history and 43% of its demand that day. Denmark West (DK1) grid
- Net imports Net imports into Italy Centre-South reached 52.3 GWh on 30 August 2026 (35% of demand), the 3rd highest daily net imports in 380 days of loaded history. Italy Centre-South grid
- Net imports Montenegro imported a net 17.4 GWh on 30 August 2026, the 3rd highest daily net imports in 379 days of loaded history and 185% of its demand that day. Montenegro grid
Further alerts left out for space: 1 more net imports.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-08-30. Operator data only, kept apart from annual statistics.