Italy Centre-South Electricity Demand and Generation Mix
Italy Centre-South demand was 6,531 MW in the hour starting 17 Nov 2026, 13:00 CET (UTC+01:00). Wind was the largest source in the hour starting 17 Nov 2026, 13:00 CET (UTC+01:00), at 39% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Italy Centre-South is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 17 Nov 2026, 13:00 CET (UTC+01:00), demand in Italy Centre-South was 6,531 MW, against a day-ahead forecast of 6,207 MW.
- Wind supplied 38.6% of Italy Centre-South's generation in the hour starting 17 Nov 2026, 13:00 CET (UTC+01:00).
- The day-ahead price in Italy Centre-South averaged EUR 209.60/MWh for delivery on 2026-11-18 (18 November 2026).
- Demand in Italy Centre-South totalled 48.0 TWh in 2025.
- Gas supplied 46.1% of Italy Centre-South's generation in 2025.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 17 Nov 2026, 13:00 CET (UTC+01:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-17T12:00:00Z.
Generation by Source
Latest hour with generation by source: 17 Nov 2026, 13:00 CET (UTC+01:00)| Source | Output | Share |
|---|---|---|
| Wind | 1,464 MW | 38.6% |
| Solar | 1,231 MW | 32.5% |
| Gas | 555 MW | 14.7% |
| Hydro | 267 MW | 7.0% |
| Other | 196 MW | 5.2% |
| Bioenergy | 77 MW | 2.0% |
| Coal | 1 MW | 0.0% |
| Oil | 0 MW | 0.0% |
| Total from these sources | 3,790 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
The sources reported in this hour add up to 58% of demand, so the generation report for Italy Centre-South looks incomplete and the shares above are shares of what was reported.
Oil is shown as Italy Centre-South reports it: the platform has published zero for every day since 25 September 2026 (the last non zero daily total was on 24 September 2026). We have not changed or filled the figure, and cannot tell from the data whether the source stopped generating or stopped reporting. All flagged series.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-17T12:00:00Z.
Day-Ahead Price
Delivery day 2026-11-18 (18 November 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Italy Centre-South and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-18.
Last 30 Days, Hourly
Times in UTCShow the data table (686 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-10-19T23:00Z | 4,005 MW |
| 2026-10-20T00:00Z | 3,751 MW |
| 2026-10-20T01:00Z | 3,634 MW |
| 2026-10-20T02:00Z | 3,753 MW |
| 2026-10-20T03:00Z | 4,043 MW |
| 2026-10-20T04:00Z | 4,681 MW |
| 2026-10-20T05:00Z | 5,286 MW |
| 2026-10-20T06:00Z | 5,808 MW |
| 2026-10-20T07:00Z | 6,135 MW |
| 2026-10-20T08:00Z | 6,044 MW |
| 2026-10-20T09:00Z | 5,997 MW |
| 2026-10-20T10:00Z | 5,831 MW |
| 2026-10-20T11:00Z | 5,633 MW |
| 2026-10-20T12:00Z | 5,691 MW |
| 2026-10-20T13:00Z | 5,850 MW |
| 2026-10-20T14:00Z | 5,844 MW |
| 2026-10-20T15:00Z | 5,741 MW |
| 2026-10-20T16:00Z | 5,949 MW |
| 2026-10-20T17:00Z | 6,252 MW |
| 2026-10-20T18:00Z | 5,937 MW |
| 2026-10-20T19:00Z | 5,439 MW |
| 2026-10-20T20:00Z | 4,862 MW |
| 2026-10-20T21:00Z | 4,593 MW |
| 2026-10-20T22:00Z | 4,173 MW |
| 2026-10-20T23:00Z | 4,038 MW |
| 2026-10-21T00:00Z | 3,904 MW |
| 2026-10-21T01:00Z | 3,853 MW |
| 2026-10-21T02:00Z | 3,729 MW |
| 2026-10-21T03:00Z | 4,098 MW |
| 2026-10-21T04:00Z | 4,779 MW |
| 2026-10-21T05:00Z | 5,432 MW |
| 2026-10-21T06:00Z | 5,925 MW |
| 2026-10-21T07:00Z | 6,320 MW |
| 2026-10-21T08:00Z | 6,508 MW |
| 2026-10-21T09:00Z | 6,786 MW |
| 2026-10-21T10:00Z | 6,350 MW |
| 2026-10-21T11:00Z | 6,104 MW |
| 2026-10-21T12:00Z | 6,083 MW |
| 2026-10-21T13:00Z | 6,134 MW |
| 2026-10-21T14:00Z | 5,968 MW |
| 2026-10-21T15:00Z | 5,659 MW |
| 2026-10-21T16:00Z | 5,864 MW |
| 2026-10-21T17:00Z | 6,311 MW |
| 2026-10-21T18:00Z | 6,053 MW |
| 2026-10-21T19:00Z | 5,506 MW |
| 2026-10-21T20:00Z | 4,921 MW |
| 2026-10-21T21:00Z | 4,492 MW |
| 2026-10-21T22:00Z | 4,111 MW |
| 2026-10-21T23:00Z | 3,897 MW |
| 2026-10-22T00:00Z | 3,703 MW |
| 2026-10-22T01:00Z | 3,584 MW |
| 2026-10-22T02:00Z | 3,539 MW |
| 2026-10-22T03:00Z | 3,768 MW |
| 2026-10-22T04:00Z | 4,444 MW |
| 2026-10-22T05:00Z | 5,214 MW |
| 2026-10-22T06:00Z | 5,721 MW |
| 2026-10-22T07:00Z | 6,123 MW |
| 2026-10-22T08:00Z | 5,960 MW |
| 2026-10-22T09:00Z | 5,851 MW |
| 2026-10-22T10:00Z | 5,708 MW |
| 2026-10-22T11:00Z | 5,451 MW |
| 2026-10-22T12:00Z | 5,537 MW |
| 2026-10-22T13:00Z | 5,485 MW |
| 2026-10-22T14:00Z | 5,592 MW |
| 2026-10-22T15:00Z | 5,465 MW |
| 2026-10-22T16:00Z | 5,887 MW |
| 2026-10-22T17:00Z | 6,231 MW |
| 2026-10-22T18:00Z | 5,916 MW |
| 2026-10-22T19:00Z | 5,511 MW |
| 2026-10-22T20:00Z | 5,023 MW |
| 2026-10-22T21:00Z | 4,572 MW |
| 2026-10-22T22:00Z | 3,950 MW |
| 2026-10-22T23:00Z | 3,705 MW |
| 2026-10-23T00:00Z | 3,576 MW |
| 2026-10-23T01:00Z | 3,531 MW |
| 2026-10-23T02:00Z | 3,560 MW |
| 2026-10-23T03:00Z | 3,770 MW |
| 2026-10-23T04:00Z | 4,310 MW |
| 2026-10-23T05:00Z | 4,942 MW |
| 2026-10-23T06:00Z | 5,581 MW |
| 2026-10-23T07:00Z | 5,963 MW |
| 2026-10-23T08:00Z | 6,071 MW |
| 2026-10-23T09:00Z | 6,079 MW |
| 2026-10-23T10:00Z | 5,922 MW |
| 2026-10-23T11:00Z | 5,590 MW |
| 2026-10-23T12:00Z | 5,592 MW |
| 2026-10-23T13:00Z | 5,671 MW |
| 2026-10-23T14:00Z | 5,738 MW |
| 2026-10-23T15:00Z | 5,623 MW |
| 2026-10-23T16:00Z | 5,910 MW |
| 2026-10-23T17:00Z | 6,207 MW |
| 2026-10-23T18:00Z | 5,834 MW |
| 2026-10-23T19:00Z | 5,326 MW |
| 2026-10-23T20:00Z | 4,804 MW |
| 2026-10-23T21:00Z | 4,418 MW |
| 2026-10-23T22:00Z | 4,067 MW |
| 2026-10-23T23:00Z | 3,773 MW |
| 2026-10-24T00:00Z | 3,588 MW |
| 2026-10-24T01:00Z | 3,488 MW |
| 2026-10-24T02:00Z | 3,572 MW |
| 2026-10-24T03:00Z | 3,783 MW |
| 2026-10-24T04:00Z | 4,177 MW |
| 2026-10-24T05:00Z | 4,630 MW |
| 2026-10-24T06:00Z | 4,952 MW |
| 2026-10-24T07:00Z | 5,409 MW |
| 2026-10-24T08:00Z | 5,351 MW |
| 2026-10-24T09:00Z | 5,106 MW |
| 2026-10-24T10:00Z | 5,074 MW |
| 2026-10-24T11:00Z | 4,885 MW |
| 2026-10-24T12:00Z | 5,118 MW |
| 2026-10-24T13:00Z | 4,864 MW |
| 2026-10-24T14:00Z | 4,750 MW |
| 2026-10-24T15:00Z | 4,910 MW |
| 2026-10-24T16:00Z | 5,325 MW |
| 2026-10-24T17:00Z | 5,457 MW |
| 2026-10-24T18:00Z | 5,359 MW |
| 2026-10-24T19:00Z | 5,015 MW |
| 2026-10-24T20:00Z | 4,587 MW |
| 2026-10-24T21:00Z | 4,184 MW |
| 2026-10-24T22:00Z | 3,874 MW |
| 2026-10-24T23:00Z | 3,785 MW |
| 2026-10-25T00:00Z | 3,732 MW |
| 2026-10-25T01:00Z | 3,479 MW |
| 2026-10-25T02:00Z | 3,412 MW |
| 2026-10-25T03:00Z | 3,433 MW |
| 2026-10-25T04:00Z | 3,611 MW |
| 2026-10-25T05:00Z | 3,753 MW |
| 2026-10-25T06:00Z | 4,155 MW |
| 2026-10-25T07:00Z | 4,568 MW |
| 2026-10-25T08:00Z | 4,766 MW |
| 2026-10-25T09:00Z | 4,622 MW |
| 2026-10-25T10:00Z | 4,545 MW |
| 2026-10-25T11:00Z | 4,685 MW |
| 2026-10-25T12:00Z | 4,538 MW |
| 2026-10-25T13:00Z | 4,369 MW |
| 2026-10-25T14:00Z | 4,412 MW |
| 2026-10-25T15:00Z | 4,429 MW |
| 2026-10-25T16:00Z | 4,889 MW |
| 2026-10-25T17:00Z | 5,202 MW |
| 2026-10-25T18:00Z | 5,474 MW |
| 2026-10-25T19:00Z | 5,272 MW |
| 2026-10-25T20:00Z | 4,771 MW |
| 2026-10-25T21:00Z | 4,408 MW |
| 2026-10-25T22:00Z | 4,004 MW |
| 2026-10-25T23:00Z | 3,888 MW |
| 2026-10-26T00:00Z | 3,940 MW |
| 2026-10-26T01:00Z | 3,814 MW |
| 2026-10-26T02:00Z | 3,749 MW |
| 2026-10-26T03:00Z | 3,718 MW |
| 2026-10-26T04:00Z | 4,143 MW |
| 2026-10-26T05:00Z | 4,844 MW |
| 2026-10-26T06:00Z | 5,513 MW |
| 2026-10-26T07:00Z | 5,919 MW |
| 2026-10-26T08:00Z | 6,011 MW |
| 2026-10-26T09:00Z | 5,766 MW |
| 2026-10-26T10:00Z | 5,718 MW |
| 2026-10-26T11:00Z | 5,580 MW |
| 2026-10-26T12:00Z | 5,563 MW |
| 2026-10-26T13:00Z | 5,687 MW |
| 2026-10-26T14:00Z | 5,615 MW |
| 2026-10-26T15:00Z | 5,590 MW |
| 2026-10-26T16:00Z | 5,957 MW |
| 2026-10-26T17:00Z | 6,226 MW |
| 2026-10-26T18:00Z | 6,354 MW |
| 2026-10-26T19:00Z | 6,059 MW |
| 2026-10-26T20:00Z | 5,470 MW |
| 2026-10-26T21:00Z | 4,848 MW |
| 2026-10-26T22:00Z | 4,331 MW |
| 2026-10-26T23:00Z | 3,744 MW |
| 2026-10-27T00:00Z | 3,564 MW |
| 2026-10-27T01:00Z | 3,512 MW |
| 2026-10-27T02:00Z | 3,487 MW |
| 2026-10-27T03:00Z | 3,576 MW |
| 2026-10-27T04:00Z | 3,906 MW |
| 2026-10-27T05:00Z | 4,515 MW |
| 2026-10-27T06:00Z | 5,420 MW |
| 2026-10-27T07:00Z | 5,762 MW |
| 2026-10-27T08:00Z | 5,955 MW |
| 2026-10-27T09:00Z | 5,742 MW |
| 2026-10-27T10:00Z | 5,721 MW |
| 2026-10-27T11:00Z | 5,731 MW |
| 2026-10-27T12:00Z | 5,653 MW |
| 2026-10-27T13:00Z | 5,790 MW |
| 2026-10-27T14:00Z | 5,903 MW |
| 2026-10-27T15:00Z | 5,963 MW |
| 2026-10-27T16:00Z | 6,258 MW |
| 2026-10-27T17:00Z | 6,464 MW |
| 2026-10-27T18:00Z | 6,639 MW |
| 2026-10-27T19:00Z | 6,322 MW |
| 2026-10-27T20:00Z | 5,731 MW |
| 2026-10-27T21:00Z | 5,096 MW |
| 2026-10-27T22:00Z | 4,548 MW |
| 2026-10-27T23:00Z | 4,247 MW |
| 2026-10-28T00:00Z | 4,147 MW |
| 2026-10-28T01:00Z | 3,968 MW |
| 2026-10-28T02:00Z | 3,960 MW |
| 2026-10-28T03:00Z | 3,994 MW |
| 2026-10-28T04:00Z | 4,297 MW |
| 2026-10-28T05:00Z | 4,853 MW |
| 2026-10-28T06:00Z | 5,524 MW |
| 2026-10-28T07:00Z | 6,046 MW |
| 2026-10-28T08:00Z | 6,071 MW |
| 2026-10-28T09:00Z | 5,935 MW |
| 2026-10-28T10:00Z | 5,795 MW |
| 2026-10-28T11:00Z | 5,664 MW |
| 2026-10-28T12:00Z | 5,708 MW |
| 2026-10-28T13:00Z | 5,931 MW |
| 2026-10-28T14:00Z | 5,987 MW |
| 2026-10-28T15:00Z | 5,870 MW |
| 2026-10-28T16:00Z | 6,127 MW |
| 2026-10-28T17:00Z | 6,256 MW |
| 2026-10-28T18:00Z | 6,386 MW |
| 2026-10-28T19:00Z | 6,116 MW |
| 2026-10-28T20:00Z | 5,492 MW |
| 2026-10-28T21:00Z | 4,851 MW |
| 2026-10-28T22:00Z | 4,281 MW |
| 2026-10-28T23:00Z | 3,838 MW |
| 2026-10-29T00:00Z | 3,565 MW |
| 2026-10-29T01:00Z | 3,334 MW |
| 2026-10-29T02:00Z | 3,259 MW |
| 2026-10-29T03:00Z | 3,338 MW |
| 2026-10-29T04:00Z | 3,685 MW |
| 2026-10-29T05:00Z | 4,200 MW |
| 2026-10-29T06:00Z | 5,017 MW |
| 2026-10-29T07:00Z | 5,527 MW |
| 2026-10-29T08:00Z | 5,962 MW |
| 2026-10-29T09:00Z | 5,954 MW |
| 2026-10-29T10:00Z | 5,762 MW |
| 2026-10-29T11:00Z | 5,730 MW |
| 2026-10-29T12:00Z | 5,606 MW |
| 2026-10-29T13:00Z | 5,751 MW |
| 2026-10-29T14:00Z | 5,694 MW |
| 2026-10-29T15:00Z | 5,668 MW |
| 2026-10-29T16:00Z | 6,068 MW |
| 2026-10-29T17:00Z | 6,210 MW |
| 2026-10-29T18:00Z | 6,337 MW |
| 2026-10-29T19:00Z | 6,014 MW |
| 2026-10-29T20:00Z | 5,503 MW |
| 2026-10-29T21:00Z | 4,864 MW |
| 2026-10-29T22:00Z | 4,279 MW |
| 2026-10-29T23:00Z | 3,718 MW |
| 2026-10-30T00:00Z | 3,581 MW |
| 2026-10-30T01:00Z | 3,428 MW |
| 2026-10-30T02:00Z | 3,318 MW |
| 2026-10-30T03:00Z | 3,385 MW |
| 2026-10-30T04:00Z | 3,599 MW |
| 2026-10-30T05:00Z | 4,154 MW |
| 2026-10-30T06:00Z | 4,857 MW |
| 2026-10-30T07:00Z | 5,538 MW |
| 2026-10-30T08:00Z | 5,889 MW |
| 2026-10-30T09:00Z | 5,858 MW |
| 2026-10-30T10:00Z | 5,900 MW |
| 2026-10-30T11:00Z | 5,728 MW |
| 2026-10-30T12:00Z | 5,538 MW |
| 2026-10-30T13:00Z | 5,615 MW |
| 2026-10-30T14:00Z | 5,571 MW |
| 2026-10-30T15:00Z | 5,648 MW |
| 2026-10-30T16:00Z | 6,093 MW |
| 2026-10-30T17:00Z | 6,414 MW |
| 2026-10-30T18:00Z | 6,572 MW |
| 2026-10-30T19:00Z | 6,244 MW |
| 2026-10-30T20:00Z | 5,707 MW |
| 2026-10-30T21:00Z | 5,083 MW |
| 2026-10-30T22:00Z | 4,444 MW |
| 2026-10-30T23:00Z | 3,983 MW |
| 2026-10-31T00:00Z | 3,741 MW |
| 2026-10-31T01:00Z | 3,600 MW |
| 2026-10-31T02:00Z | 3,518 MW |
| 2026-10-31T03:00Z | 3,492 MW |
| 2026-10-31T04:00Z | 3,630 MW |
| 2026-10-31T05:00Z | 3,893 MW |
| 2026-10-31T06:00Z | 4,403 MW |
| 2026-10-31T07:00Z | 5,082 MW |
| 2026-10-31T08:00Z | 5,411 MW |
| 2026-10-31T09:00Z | 5,475 MW |
| 2026-10-31T10:00Z | 5,499 MW |
| 2026-10-31T11:00Z | 5,243 MW |
| 2026-10-31T12:00Z | 5,124 MW |
| 2026-10-31T13:00Z | 4,907 MW |
| 2026-10-31T14:00Z | 5,046 MW |
| 2026-10-31T15:00Z | 5,046 MW |
| 2026-10-31T16:00Z | 5,515 MW |
| 2026-10-31T17:00Z | 5,756 MW |
| 2026-10-31T18:00Z | 5,834 MW |
| 2026-10-31T19:00Z | 5,545 MW |
| 2026-10-31T20:00Z | 5,044 MW |
| 2026-10-31T21:00Z | 4,631 MW |
| 2026-10-31T22:00Z | 4,215 MW |
| 2026-10-31T23:00Z | 3,782 MW |
| 2026-11-01T00:00Z | 3,993 MW |
| 2026-11-01T01:00Z | 3,928 MW |
| 2026-11-01T02:00Z | 3,793 MW |
| 2026-11-01T03:00Z | 3,786 MW |
| 2026-11-01T04:00Z | 3,884 MW |
| 2026-11-01T05:00Z | 4,005 MW |
| 2026-11-01T06:00Z | 4,194 MW |
| 2026-11-01T07:00Z | 4,699 MW |
| 2026-11-01T08:00Z | 5,213 MW |
| 2026-11-01T09:00Z | 5,143 MW |
| 2026-11-01T10:00Z | 5,397 MW |
| 2026-11-01T11:00Z | 5,536 MW |
| 2026-11-01T12:00Z | 5,311 MW |
| 2026-11-01T13:00Z | 4,996 MW |
| 2026-11-01T14:00Z | 4,871 MW |
| 2026-11-01T15:00Z | 4,938 MW |
| 2026-11-01T16:00Z | 5,336 MW |
| 2026-11-01T17:00Z | 5,571 MW |
| 2026-11-01T18:00Z | 5,759 MW |
| 2026-11-01T19:00Z | 5,630 MW |
| 2026-11-01T20:00Z | 5,243 MW |
| 2026-11-01T21:00Z | 4,828 MW |
| 2026-11-01T22:00Z | 4,365 MW |
| 2026-11-01T23:00Z | 3,964 MW |
| 2026-11-02T00:00Z | 3,743 MW |
| 2026-11-02T01:00Z | 3,608 MW |
| 2026-11-02T02:00Z | 3,547 MW |
| 2026-11-02T03:00Z | 3,664 MW |
| 2026-11-02T04:00Z | 4,032 MW |
| 2026-11-02T05:00Z | 4,901 MW |
| 2026-11-02T06:00Z | 5,650 MW |
| 2026-11-02T07:00Z | 6,563 MW |
| 2026-11-02T08:00Z | 7,051 MW |
| 2026-11-02T09:00Z | 7,094 MW |
| 2026-11-02T10:00Z | 7,264 MW |
| 2026-11-02T11:00Z | 7,225 MW |
| 2026-11-02T12:00Z | 6,886 MW |
| 2026-11-02T13:00Z | 6,898 MW |
| 2026-11-02T14:00Z | 6,831 MW |
| 2026-11-02T15:00Z | 7,021 MW |
| 2026-11-02T16:00Z | 7,454 MW |
| 2026-11-02T17:00Z | 7,501 MW |
| 2026-11-02T18:00Z | 7,421 MW |
| 2026-11-02T19:00Z | 6,999 MW |
| 2026-11-02T20:00Z | 6,409 MW |
| 2026-11-02T21:00Z | 5,708 MW |
| 2026-11-02T22:00Z | 5,063 MW |
| 2026-11-02T23:00Z | 4,463 MW |
| 2026-11-03T00:00Z | 4,204 MW |
| 2026-11-03T01:00Z | 3,937 MW |
| 2026-11-03T02:00Z | 3,999 MW |
| 2026-11-03T03:00Z | 3,971 MW |
| 2026-11-03T04:00Z | 4,453 MW |
| 2026-11-03T05:00Z | 5,243 MW |
| 2026-11-03T06:00Z | 6,055 MW |
| 2026-11-03T07:00Z | 6,706 MW |
| 2026-11-03T08:00Z | 6,821 MW |
| 2026-11-03T09:00Z | 6,788 MW |
| 2026-11-03T10:00Z | 6,889 MW |
| 2026-11-03T11:00Z | 6,714 MW |
| 2026-11-03T12:00Z | 6,465 MW |
| 2026-11-03T13:00Z | 6,558 MW |
| 2026-11-03T14:00Z | 6,720 MW |
| 2026-11-03T15:00Z | 6,882 MW |
| 2026-11-03T16:00Z | 7,127 MW |
| 2026-11-03T17:00Z | 7,165 MW |
| 2026-11-03T18:00Z | 7,265 MW |
| 2026-11-03T19:00Z | 6,946 MW |
| 2026-11-03T20:00Z | 6,570 MW |
| 2026-11-03T21:00Z | 5,870 MW |
| 2026-11-03T22:00Z | 5,147 MW |
| 2026-11-03T23:00Z | 4,479 MW |
| 2026-11-04T00:00Z | 4,128 MW |
| 2026-11-04T01:00Z | 4,021 MW |
| 2026-11-04T02:00Z | 3,912 MW |
| 2026-11-04T03:00Z | 4,005 MW |
| 2026-11-04T04:00Z | 4,427 MW |
| 2026-11-04T05:00Z | 5,211 MW |
| 2026-11-04T06:00Z | 6,072 MW |
| 2026-11-04T07:00Z | 6,768 MW |
| 2026-11-04T08:00Z | 7,100 MW |
| 2026-11-04T09:00Z | 7,058 MW |
| 2026-11-04T10:00Z | 6,999 MW |
| 2026-11-04T11:00Z | 6,823 MW |
| 2026-11-04T12:00Z | 6,585 MW |
| 2026-11-04T13:00Z | 6,726 MW |
| 2026-11-04T14:00Z | 6,673 MW |
| 2026-11-04T15:00Z | 6,682 MW |
| 2026-11-04T16:00Z | 7,028 MW |
| 2026-11-04T17:00Z | 7,029 MW |
| 2026-11-04T18:00Z | 7,094 MW |
| 2026-11-04T19:00Z | 6,886 MW |
| 2026-11-04T20:00Z | 6,426 MW |
| 2026-11-04T21:00Z | 5,743 MW |
| 2026-11-04T22:00Z | 5,107 MW |
| 2026-11-04T23:00Z | 4,600 MW |
| 2026-11-05T00:00Z | 4,322 MW |
| 2026-11-05T01:00Z | 4,033 MW |
| 2026-11-05T02:00Z | 3,962 MW |
| 2026-11-05T03:00Z | 4,029 MW |
| 2026-11-05T04:00Z | 4,423 MW |
| 2026-11-05T05:00Z | 5,130 MW |
| 2026-11-05T06:00Z | 6,091 MW |
| 2026-11-05T07:00Z | 6,720 MW |
| 2026-11-05T08:00Z | 6,982 MW |
| 2026-11-05T09:00Z | 6,921 MW |
| 2026-11-05T10:00Z | 6,799 MW |
| 2026-11-05T11:00Z | 6,561 MW |
| 2026-11-05T12:00Z | 6,298 MW |
| 2026-11-05T13:00Z | 6,502 MW |
| 2026-11-05T14:00Z | 6,527 MW |
| 2026-11-05T15:00Z | 6,543 MW |
| 2026-11-05T16:00Z | 6,934 MW |
| 2026-11-05T17:00Z | 7,078 MW |
| 2026-11-05T18:00Z | 7,056 MW |
| 2026-11-05T19:00Z | 6,679 MW |
| 2026-11-05T20:00Z | 6,172 MW |
| 2026-11-05T21:00Z | 5,738 MW |
| 2026-11-05T22:00Z | 5,185 MW |
| 2026-11-05T23:00Z | 4,668 MW |
| 2026-11-06T00:00Z | 4,373 MW |
| 2026-11-06T01:00Z | 4,175 MW |
| 2026-11-06T02:00Z | 4,047 MW |
| 2026-11-06T03:00Z | 4,139 MW |
| 2026-11-06T04:00Z | 4,427 MW |
| 2026-11-06T05:00Z | 5,193 MW |
| 2026-11-06T06:00Z | 5,916 MW |
| 2026-11-06T07:00Z | 6,579 MW |
| 2026-11-06T08:00Z | 6,869 MW |
| 2026-11-06T09:00Z | 6,962 MW |
| 2026-11-06T10:00Z | 6,967 MW |
| 2026-11-06T11:00Z | 6,976 MW |
| 2026-11-06T12:00Z | 6,901 MW |
| 2026-11-06T13:00Z | 6,958 MW |
| 2026-11-06T14:00Z | 6,923 MW |
| 2026-11-06T15:00Z | 7,027 MW |
| 2026-11-06T16:00Z | 7,387 MW |
| 2026-11-06T17:00Z | 7,474 MW |
| 2026-11-06T18:00Z | 7,475 MW |
| 2026-11-06T19:00Z | 7,045 MW |
| 2026-11-06T20:00Z | 6,559 MW |
| 2026-11-06T21:00Z | 6,015 MW |
| 2026-11-06T22:00Z | 5,480 MW |
| 2026-11-06T23:00Z | 4,792 MW |
| 2026-11-07T00:00Z | 4,303 MW |
| 2026-11-07T01:00Z | 4,103 MW |
| 2026-11-07T02:00Z | 3,980 MW |
| 2026-11-07T03:00Z | 3,934 MW |
| 2026-11-07T04:00Z | 4,089 MW |
| 2026-11-07T05:00Z | 4,362 MW |
| 2026-11-07T06:00Z | 4,873 MW |
| 2026-11-07T07:00Z | 5,637 MW |
| 2026-11-07T08:00Z | 6,088 MW |
| 2026-11-07T09:00Z | 6,227 MW |
| 2026-11-07T10:00Z | 6,193 MW |
| 2026-11-07T11:00Z | 6,052 MW |
| 2026-11-07T12:00Z | 5,887 MW |
| 2026-11-07T13:00Z | 5,764 MW |
| 2026-11-07T14:00Z | 5,912 MW |
| 2026-11-07T15:00Z | 5,868 MW |
| 2026-11-07T16:00Z | 6,369 MW |
| 2026-11-07T17:00Z | 6,563 MW |
| 2026-11-07T18:00Z | 6,652 MW |
| 2026-11-07T19:00Z | 6,355 MW |
| 2026-11-07T20:00Z | 5,910 MW |
| 2026-11-07T21:00Z | 5,512 MW |
| 2026-11-07T22:00Z | 5,015 MW |
| 2026-11-07T23:00Z | 4,466 MW |
| 2026-11-08T00:00Z | 4,097 MW |
| 2026-11-08T01:00Z | 3,940 MW |
| 2026-11-08T02:00Z | 3,782 MW |
| 2026-11-08T03:00Z | 3,753 MW |
| 2026-11-08T04:00Z | 3,854 MW |
| 2026-11-08T05:00Z | 4,024 MW |
| 2026-11-08T06:00Z | 4,280 MW |
| 2026-11-08T07:00Z | 4,854 MW |
| 2026-11-08T08:00Z | 5,251 MW |
| 2026-11-08T09:00Z | 5,520 MW |
| 2026-11-08T10:00Z | 5,609 MW |
| 2026-11-08T11:00Z | 5,644 MW |
| 2026-11-08T12:00Z | 5,528 MW |
| 2026-11-08T13:00Z | 5,395 MW |
| 2026-11-08T14:00Z | 5,483 MW |
| 2026-11-08T15:00Z | 5,373 MW |
| 2026-11-08T16:00Z | 5,982 MW |
| 2026-11-08T17:00Z | 6,180 MW |
| 2026-11-08T18:00Z | 6,323 MW |
| 2026-11-08T19:00Z | 6,136 MW |
| 2026-11-08T20:00Z | 5,807 MW |
| 2026-11-08T21:00Z | 5,387 MW |
| 2026-11-08T22:00Z | 4,922 MW |
| 2026-11-08T23:00Z | 4,187 MW |
| 2026-11-09T00:00Z | 3,876 MW |
| 2026-11-09T01:00Z | 3,758 MW |
| 2026-11-09T02:00Z | 3,700 MW |
| 2026-11-09T03:00Z | 3,769 MW |
| 2026-11-09T04:00Z | 4,162 MW |
| 2026-11-09T05:00Z | 5,191 MW |
| 2026-11-09T06:00Z | 6,021 MW |
| 2026-11-09T07:00Z | 6,784 MW |
| 2026-11-09T08:00Z | 7,100 MW |
| 2026-11-09T09:00Z | 7,110 MW |
| 2026-11-09T10:00Z | 7,068 MW |
| 2026-11-09T11:00Z | 6,940 MW |
| 2026-11-09T12:00Z | 7,016 MW |
| 2026-11-09T13:00Z | 7,010 MW |
| 2026-11-09T14:00Z | 7,006 MW |
| 2026-11-09T15:00Z | 7,124 MW |
| 2026-11-09T16:00Z | 7,359 MW |
| 2026-11-09T17:00Z | 7,383 MW |
| 2026-11-09T18:00Z | 7,507 MW |
| 2026-11-09T19:00Z | 7,174 MW |
| 2026-11-09T20:00Z | 6,729 MW |
| 2026-11-09T21:00Z | 6,099 MW |
| 2026-11-09T22:00Z | 5,605 MW |
| 2026-11-09T23:00Z | 4,807 MW |
| 2026-11-10T00:00Z | 4,455 MW |
| 2026-11-10T01:00Z | 4,336 MW |
| 2026-11-10T02:00Z | 4,252 MW |
| 2026-11-10T03:00Z | 4,247 MW |
| 2026-11-10T04:00Z | 4,513 MW |
| 2026-11-10T05:00Z | 5,398 MW |
| 2026-11-10T06:00Z | 6,150 MW |
| 2026-11-10T07:00Z | 6,696 MW |
| 2026-11-10T08:00Z | 7,122 MW |
| 2026-11-10T09:00Z | 7,133 MW |
| 2026-11-10T10:00Z | 7,179 MW |
| 2026-11-10T11:00Z | 7,170 MW |
| 2026-11-10T12:00Z | 6,885 MW |
| 2026-11-10T13:00Z | 6,877 MW |
| 2026-11-10T14:00Z | 6,934 MW |
| 2026-11-10T15:00Z | 7,025 MW |
| 2026-11-10T16:00Z | 7,385 MW |
| 2026-11-10T17:00Z | 7,478 MW |
| 2026-11-10T18:00Z | 7,639 MW |
| 2026-11-10T19:00Z | 7,262 MW |
| 2026-11-10T20:00Z | 6,634 MW |
| 2026-11-10T21:00Z | 5,987 MW |
| 2026-11-10T22:00Z | 5,349 MW |
| 2026-11-10T23:00Z | 4,707 MW |
| 2026-11-11T00:00Z | 4,377 MW |
| 2026-11-11T01:00Z | 4,291 MW |
| 2026-11-11T02:00Z | 4,194 MW |
| 2026-11-11T03:00Z | 4,222 MW |
| 2026-11-11T04:00Z | 4,577 MW |
| 2026-11-11T05:00Z | 5,344 MW |
| 2026-11-11T06:00Z | 6,143 MW |
| 2026-11-11T07:00Z | 6,937 MW |
| 2026-11-11T08:00Z | 7,102 MW |
| 2026-11-11T09:00Z | 6,998 MW |
| 2026-11-11T10:00Z | 6,886 MW |
| 2026-11-11T11:00Z | 6,813 MW |
| 2026-11-11T12:00Z | 6,626 MW |
| 2026-11-11T13:00Z | 6,841 MW |
| 2026-11-11T14:00Z | 6,759 MW |
| 2026-11-11T15:00Z | 6,741 MW |
| 2026-11-11T16:00Z | 7,054 MW |
| 2026-11-11T17:00Z | 7,451 MW |
| 2026-11-11T18:00Z | 7,602 MW |
| 2026-11-11T19:00Z | 7,125 MW |
| 2026-11-11T20:00Z | 6,377 MW |
| 2026-11-11T21:00Z | 5,724 MW |
| 2026-11-11T22:00Z | 5,149 MW |
| 2026-11-11T23:00Z | 4,563 MW |
| 2026-11-12T00:00Z | 4,005 MW |
| 2026-11-12T01:00Z | 3,740 MW |
| 2026-11-12T02:00Z | 3,824 MW |
| 2026-11-12T03:00Z | 3,823 MW |
| 2026-11-12T04:00Z | 4,122 MW |
| 2026-11-12T05:00Z | 4,803 MW |
| 2026-11-12T06:00Z | 5,906 MW |
| 2026-11-12T07:00Z | 6,849 MW |
| 2026-11-12T08:00Z | 7,103 MW |
| 2026-11-12T09:00Z | 7,278 MW |
| 2026-11-12T10:00Z | 7,311 MW |
| 2026-11-12T11:00Z | 7,019 MW |
| 2026-11-12T12:00Z | 6,805 MW |
| 2026-11-12T13:00Z | 6,967 MW |
| 2026-11-12T14:00Z | 6,847 MW |
| 2026-11-12T15:00Z | 6,981 MW |
| 2026-11-12T16:00Z | 7,351 MW |
| 2026-11-12T17:00Z | 7,277 MW |
| 2026-11-12T18:00Z | 7,296 MW |
| 2026-11-12T19:00Z | 6,851 MW |
| 2026-11-12T20:00Z | 6,328 MW |
| 2026-11-12T21:00Z | 5,699 MW |
| 2026-11-12T22:00Z | 5,150 MW |
| 2026-11-12T23:00Z | 4,512 MW |
| 2026-11-13T00:00Z | 4,144 MW |
| 2026-11-13T01:00Z | 3,960 MW |
| 2026-11-13T02:00Z | 3,864 MW |
| 2026-11-13T03:00Z | 3,896 MW |
| 2026-11-13T04:00Z | 4,279 MW |
| 2026-11-13T05:00Z | 4,978 MW |
| 2026-11-13T06:00Z | 5,597 MW |
| 2026-11-13T07:00Z | 6,333 MW |
| 2026-11-13T08:00Z | 6,703 MW |
| 2026-11-13T09:00Z | 6,977 MW |
| 2026-11-13T10:00Z | 7,468 MW |
| 2026-11-13T11:00Z | 7,205 MW |
| 2026-11-13T12:00Z | 6,900 MW |
| 2026-11-13T13:00Z | 6,693 MW |
| 2026-11-13T14:00Z | 6,669 MW |
| 2026-11-13T15:00Z | 6,707 MW |
| 2026-11-13T16:00Z | 6,919 MW |
| 2026-11-13T17:00Z | 6,903 MW |
| 2026-11-13T18:00Z | 6,891 MW |
| 2026-11-13T19:00Z | 6,570 MW |
| 2026-11-13T20:00Z | 6,081 MW |
| 2026-11-13T21:00Z | 5,382 MW |
| 2026-11-13T22:00Z | 4,841 MW |
| 2026-11-13T23:00Z | 4,366 MW |
| 2026-11-14T00:00Z | 4,064 MW |
| 2026-11-14T01:00Z | 3,912 MW |
| 2026-11-14T02:00Z | 3,807 MW |
| 2026-11-14T03:00Z | 3,746 MW |
| 2026-11-14T04:00Z | 3,830 MW |
| 2026-11-14T05:00Z | 4,040 MW |
| 2026-11-14T06:00Z | 4,422 MW |
| 2026-11-14T07:00Z | 5,102 MW |
| 2026-11-14T08:00Z | 5,583 MW |
| 2026-11-14T09:00Z | 5,575 MW |
| 2026-11-14T10:00Z | 5,739 MW |
| 2026-11-14T11:00Z | 5,567 MW |
| 2026-11-14T12:00Z | 5,416 MW |
| 2026-11-14T13:00Z | 5,213 MW |
| 2026-11-14T14:00Z | 4,961 MW |
| 2026-11-14T15:00Z | 4,976 MW |
| 2026-11-14T16:00Z | 5,535 MW |
| 2026-11-14T17:00Z | 5,599 MW |
| 2026-11-14T18:00Z | 5,736 MW |
| 2026-11-14T19:00Z | 5,455 MW |
| 2026-11-14T20:00Z | 5,078 MW |
| 2026-11-14T21:00Z | 4,746 MW |
| 2026-11-14T22:00Z | 4,356 MW |
| 2026-11-14T23:00Z | 4,248 MW |
| 2026-11-15T00:00Z | 4,254 MW |
| 2026-11-15T01:00Z | 4,056 MW |
| 2026-11-15T02:00Z | 3,970 MW |
| 2026-11-15T03:00Z | 3,884 MW |
| 2026-11-15T04:00Z | 3,975 MW |
| 2026-11-15T05:00Z | 4,191 MW |
| 2026-11-15T06:00Z | 4,315 MW |
| 2026-11-15T07:00Z | 4,539 MW |
| 2026-11-15T08:00Z | 4,778 MW |
| 2026-11-15T09:00Z | 5,016 MW |
| 2026-11-15T10:00Z | 5,221 MW |
| 2026-11-15T11:00Z | 5,592 MW |
| 2026-11-15T12:00Z | 5,427 MW |
| 2026-11-15T13:00Z | 4,876 MW |
| 2026-11-15T14:00Z | 4,584 MW |
| 2026-11-15T15:00Z | 4,767 MW |
| 2026-11-15T16:00Z | 5,029 MW |
| 2026-11-15T17:00Z | 5,161 MW |
| 2026-11-15T18:00Z | 5,370 MW |
| 2026-11-15T19:00Z | 5,172 MW |
| 2026-11-15T20:00Z | 4,794 MW |
| 2026-11-15T21:00Z | 4,424 MW |
| 2026-11-15T22:00Z | 3,947 MW |
| 2026-11-15T23:00Z | 3,745 MW |
| 2026-11-16T00:00Z | 3,610 MW |
| 2026-11-16T01:00Z | 3,557 MW |
| 2026-11-16T02:00Z | 3,554 MW |
| 2026-11-16T03:00Z | 3,762 MW |
| 2026-11-16T04:00Z | 3,996 MW |
| 2026-11-16T05:00Z | 4,661 MW |
| 2026-11-16T06:00Z | 5,389 MW |
| 2026-11-16T07:00Z | 6,266 MW |
| 2026-11-16T08:00Z | 6,633 MW |
| 2026-11-16T09:00Z | 6,607 MW |
| 2026-11-16T10:00Z | 6,677 MW |
| 2026-11-16T11:00Z | 6,503 MW |
| 2026-11-16T12:00Z | 6,261 MW |
| 2026-11-16T13:00Z | 6,585 MW |
| 2026-11-16T14:00Z | 6,664 MW |
| 2026-11-16T15:00Z | 6,705 MW |
| 2026-11-16T16:00Z | 7,018 MW |
| 2026-11-16T17:00Z | 6,932 MW |
| 2026-11-16T18:00Z | 6,909 MW |
| 2026-11-16T19:00Z | 6,679 MW |
| 2026-11-16T20:00Z | 6,108 MW |
| 2026-11-16T21:00Z | 5,508 MW |
| 2026-11-16T22:00Z | 4,934 MW |
| 2026-11-16T23:00Z | 4,460 MW |
| 2026-11-17T00:00Z | 4,209 MW |
| 2026-11-17T01:00Z | 4,066 MW |
| 2026-11-17T02:00Z | 3,956 MW |
| 2026-11-17T03:00Z | 3,943 MW |
| 2026-11-17T04:00Z | 4,336 MW |
| 2026-11-17T05:00Z | 5,202 MW |
| 2026-11-17T06:00Z | 5,983 MW |
| 2026-11-17T07:00Z | 6,371 MW |
| 2026-11-17T08:00Z | 6,583 MW |
| 2026-11-17T09:00Z | 6,573 MW |
| 2026-11-17T10:00Z | 6,650 MW |
| 2026-11-17T11:00Z | 6,702 MW |
| 2026-11-17T12:00Z | 6,531 MW |
Show the data table (686 rows)
| Hour starting (UTC) | Gas | Wind | Solar | Other | Hydro |
|---|---|---|---|---|---|
| 2026-10-19T23:00Z | 2,802 MW | 38 MW | 0 MW | 226 MW | 125 MW |
| 2026-10-20T00:00Z | 2,797 MW | 50 MW | 0 MW | 225 MW | 128 MW |
| 2026-10-20T01:00Z | 2,760 MW | 86 MW | 0 MW | 226 MW | 128 MW |
| 2026-10-20T02:00Z | 2,775 MW | 158 MW | 0 MW | 227 MW | 141 MW |
| 2026-10-20T03:00Z | 2,822 MW | 115 MW | 0 MW | 227 MW | 144 MW |
| 2026-10-20T04:00Z | 2,968 MW | 125 MW | 0 MW | 224 MW | 166 MW |
| 2026-10-20T05:00Z | 2,985 MW | 172 MW | 45 MW | 223 MW | 202 MW |
| 2026-10-20T06:00Z | 2,958 MW | 103 MW | 772 MW | 224 MW | 246 MW |
| 2026-10-20T07:00Z | 2,766 MW | 56 MW | 2,056 MW | 226 MW | 198 MW |
| 2026-10-20T08:00Z | 2,075 MW | 45 MW | 2,837 MW | 222 MW | 193 MW |
| 2026-10-20T09:00Z | 1,808 MW | 68 MW | 3,238 MW | 222 MW | 185 MW |
| 2026-10-20T10:00Z | 1,766 MW | 91 MW | 3,352 MW | 220 MW | 129 MW |
| 2026-10-20T11:00Z | 1,714 MW | 165 MW | 3,116 MW | 220 MW | 133 MW |
| 2026-10-20T12:00Z | 1,697 MW | 219 MW | 2,402 MW | 221 MW | 137 MW |
| 2026-10-20T13:00Z | 2,001 MW | 166 MW | 1,568 MW | 222 MW | 132 MW |
| 2026-10-20T14:00Z | 2,483 MW | 145 MW | 782 MW | 220 MW | 133 MW |
| 2026-10-20T15:00Z | 3,149 MW | 105 MW | 232 MW | 218 MW | 172 MW |
| 2026-10-20T16:00Z | 3,276 MW | 136 MW | 3 MW | 227 MW | 226 MW |
| 2026-10-20T17:00Z | 3,390 MW | 159 MW | 0 MW | 227 MW | 241 MW |
| 2026-10-20T18:00Z | 3,390 MW | 161 MW | 0 MW | 228 MW | 210 MW |
| 2026-10-20T19:00Z | 3,283 MW | 192 MW | 0 MW | 228 MW | 162 MW |
| 2026-10-20T20:00Z | 2,982 MW | 254 MW | 0 MW | 226 MW | 149 MW |
| 2026-10-20T21:00Z | 2,224 MW | 417 MW | 0 MW | 225 MW | 132 MW |
| 2026-10-20T22:00Z | 1,290 MW | 557 MW | 0 MW | 225 MW | 127 MW |
| 2026-10-20T23:00Z | 1,233 MW | 709 MW | 0 MW | 226 MW | 142 MW |
| 2026-10-21T00:00Z | 1,218 MW | 805 MW | 0 MW | 226 MW | 146 MW |
| 2026-10-21T01:00Z | 1,316 MW | 676 MW | 0 MW | 225 MW | 136 MW |
| 2026-10-21T02:00Z | 1,348 MW | 486 MW | 0 MW | 226 MW | 133 MW |
| 2026-10-21T03:00Z | 1,350 MW | 525 MW | 0 MW | 226 MW | 139 MW |
| 2026-10-21T04:00Z | 1,630 MW | 533 MW | 0 MW | 226 MW | 155 MW |
| 2026-10-21T05:00Z | 2,028 MW | 448 MW | 3 MW | 225 MW | 202 MW |
| 2026-10-21T06:00Z | 2,188 MW | 754 MW | 183 MW | 224 MW | 284 MW |
| 2026-10-21T07:00Z | 2,149 MW | 440 MW | 691 MW | 217 MW | 242 MW |
| 2026-10-21T08:00Z | 2,115 MW | 478 MW | 1,386 MW | 209 MW | 226 MW |
| 2026-10-21T09:00Z | 2,019 MW | 831 MW | 1,976 MW | 192 MW | 211 MW |
| 2026-10-21T10:00Z | 1,877 MW | 1,115 MW | 1,631 MW | 190 MW | 175 MW |
| 2026-10-21T11:00Z | 1,806 MW | 991 MW | 1,368 MW | 192 MW | 163 MW |
| 2026-10-21T12:00Z | 1,792 MW | 1,215 MW | 1,464 MW | 193 MW | 160 MW |
| 2026-10-21T13:00Z | 2,174 MW | 1,353 MW | 1,090 MW | 190 MW | 197 MW |
| 2026-10-21T14:00Z | 2,415 MW | 1,118 MW | 925 MW | 191 MW | 218 MW |
| 2026-10-21T15:00Z | 2,538 MW | 1,095 MW | 340 MW | 195 MW | 252 MW |
| 2026-10-21T16:00Z | 2,713 MW | 1,273 MW | 13 MW | 196 MW | 286 MW |
| 2026-10-21T17:00Z | 2,263 MW | 1,451 MW | 0 MW | 195 MW | 296 MW |
| 2026-10-21T18:00Z | 2,219 MW | 1,462 MW | 0 MW | 197 MW | 261 MW |
| 2026-10-21T19:00Z | 2,287 MW | 1,484 MW | 0 MW | 198 MW | 192 MW |
| 2026-10-21T20:00Z | 2,220 MW | 1,534 MW | 0 MW | 196 MW | 194 MW |
| 2026-10-21T21:00Z | 1,876 MW | 1,529 MW | 0 MW | 192 MW | 194 MW |
| 2026-10-21T22:00Z | 1,040 MW | 1,409 MW | 0 MW | 192 MW | 170 MW |
| 2026-10-21T23:00Z | 756 MW | 1,379 MW | 0 MW | 191 MW | 175 MW |
| 2026-10-22T00:00Z | 931 MW | 1,280 MW | 0 MW | 192 MW | 180 MW |
| 2026-10-22T01:00Z | 1,129 MW | 1,213 MW | 0 MW | 192 MW | 193 MW |
| 2026-10-22T02:00Z | 1,140 MW | 1,125 MW | 0 MW | 193 MW | 189 MW |
| 2026-10-22T03:00Z | 1,176 MW | 953 MW | 0 MW | 193 MW | 173 MW |
| 2026-10-22T04:00Z | 1,390 MW | 750 MW | 0 MW | 191 MW | 170 MW |
| 2026-10-22T05:00Z | 1,523 MW | 582 MW | 28 MW | 190 MW | 237 MW |
| 2026-10-22T06:00Z | 1,517 MW | 634 MW | 562 MW | 187 MW | 333 MW |
| 2026-10-22T07:00Z | 1,326 MW | 874 MW | 1,751 MW | 185 MW | 262 MW |
| 2026-10-22T08:00Z | 825 MW | 804 MW | 2,577 MW | 185 MW | 215 MW |
| 2026-10-22T09:00Z | 369 MW | 830 MW | 3,098 MW | 185 MW | 219 MW |
| 2026-10-22T10:00Z | 232 MW | 650 MW | 3,159 MW | 185 MW | 166 MW |
| 2026-10-22T11:00Z | 192 MW | 709 MW | 3,068 MW | 184 MW | 158 MW |
| 2026-10-22T12:00Z | 300 MW | 733 MW | 2,843 MW | 184 MW | 149 MW |
| 2026-10-22T13:00Z | 472 MW | 903 MW | 2,281 MW | 184 MW | 150 MW |
| 2026-10-22T14:00Z | 1,461 MW | 863 MW | 1,291 MW | 187 MW | 148 MW |
| 2026-10-22T15:00Z | 2,850 MW | 803 MW | 362 MW | 189 MW | 206 MW |
| 2026-10-22T16:00Z | 3,245 MW | 648 MW | 7 MW | 188 MW | 263 MW |
| 2026-10-22T17:00Z | 3,310 MW | 466 MW | 0 MW | 191 MW | 243 MW |
| 2026-10-22T18:00Z | 3,306 MW | 322 MW | 0 MW | 198 MW | 207 MW |
| 2026-10-22T19:00Z | 3,302 MW | 206 MW | 0 MW | 197 MW | 182 MW |
| 2026-10-22T20:00Z | 3,280 MW | 160 MW | 0 MW | 192 MW | 162 MW |
| 2026-10-22T21:00Z | 2,512 MW | 176 MW | 0 MW | 195 MW | 163 MW |
| 2026-10-22T22:00Z | 1,860 MW | 68 MW | 0 MW | 193 MW | 150 MW |
| 2026-10-22T23:00Z | 1,765 MW | 31 MW | 0 MW | 192 MW | 148 MW |
| 2026-10-23T00:00Z | 1,809 MW | 36 MW | 0 MW | 194 MW | 146 MW |
| 2026-10-23T01:00Z | 1,810 MW | 63 MW | 0 MW | 194 MW | 150 MW |
| 2026-10-23T02:00Z | 1,810 MW | 32 MW | 0 MW | 196 MW | 155 MW |
| 2026-10-23T03:00Z | 1,709 MW | 22 MW | 0 MW | 196 MW | 153 MW |
| 2026-10-23T04:00Z | 1,868 MW | 16 MW | 0 MW | 200 MW | 169 MW |
| 2026-10-23T05:00Z | 1,907 MW | 23 MW | 34 MW | 202 MW | 229 MW |
| 2026-10-23T06:00Z | 2,012 MW | 16 MW | 679 MW | 202 MW | 277 MW |
| 2026-10-23T07:00Z | 1,943 MW | 8 MW | 1,775 MW | 203 MW | 242 MW |
| 2026-10-23T08:00Z | 1,172 MW | 36 MW | 2,684 MW | 202 MW | 199 MW |
| 2026-10-23T09:00Z | 1,191 MW | 119 MW | 3,166 MW | 197 MW | 193 MW |
| 2026-10-23T10:00Z | 1,073 MW | 288 MW | 3,481 MW | 195 MW | 130 MW |
| 2026-10-23T11:00Z | 756 MW | 413 MW | 3,455 MW | 196 MW | 136 MW |
| 2026-10-23T12:00Z | 1,062 MW | 499 MW | 3,193 MW | 194 MW | 147 MW |
| 2026-10-23T13:00Z | 1,522 MW | 560 MW | 2,713 MW | 192 MW | 136 MW |
| 2026-10-23T14:00Z | 1,914 MW | 614 MW | 1,453 MW | 193 MW | 139 MW |
| 2026-10-23T15:00Z | 3,027 MW | 545 MW | 360 MW | 201 MW | 201 MW |
| 2026-10-23T16:00Z | 3,049 MW | 556 MW | 5 MW | 204 MW | 255 MW |
| 2026-10-23T17:00Z | 2,941 MW | 570 MW | 0 MW | 206 MW | 251 MW |
| 2026-10-23T18:00Z | 3,090 MW | 683 MW | 0 MW | 207 MW | 203 MW |
| 2026-10-23T19:00Z | 3,055 MW | 891 MW | 0 MW | 208 MW | 182 MW |
| 2026-10-23T20:00Z | 2,677 MW | 1,155 MW | 0 MW | 205 MW | 165 MW |
| 2026-10-23T21:00Z | 1,749 MW | 1,352 MW | 0 MW | 203 MW | 154 MW |
| 2026-10-23T22:00Z | 1,053 MW | 1,433 MW | 0 MW | 200 MW | 140 MW |
| 2026-10-23T23:00Z | 985 MW | 1,393 MW | 0 MW | 196 MW | 136 MW |
| 2026-10-24T00:00Z | 984 MW | 1,311 MW | 0 MW | 198 MW | 129 MW |
| 2026-10-24T01:00Z | 980 MW | 1,216 MW | 0 MW | 198 MW | 134 MW |
| 2026-10-24T02:00Z | 976 MW | 1,121 MW | 0 MW | 199 MW | 140 MW |
| 2026-10-24T03:00Z | 989 MW | 937 MW | 0 MW | 201 MW | 160 MW |
| 2026-10-24T04:00Z | 1,097 MW | 1,103 MW | 0 MW | 205 MW | 167 MW |
| 2026-10-24T05:00Z | 1,099 MW | 1,168 MW | 22 MW | 203 MW | 204 MW |
| 2026-10-24T06:00Z | 1,102 MW | 1,022 MW | 528 MW | 204 MW | 203 MW |
| 2026-10-24T07:00Z | 767 MW | 1,132 MW | 1,247 MW | 201 MW | 160 MW |
| 2026-10-24T08:00Z | 529 MW | 930 MW | 1,541 MW | 201 MW | 139 MW |
| 2026-10-24T09:00Z | 18 MW | 1,055 MW | 1,731 MW | 197 MW | 129 MW |
| 2026-10-24T10:00Z | 15 MW | 1,206 MW | 1,971 MW | 194 MW | 125 MW |
| 2026-10-24T11:00Z | 12 MW | 1,209 MW | 1,933 MW | 192 MW | 139 MW |
| 2026-10-24T12:00Z | 15 MW | 1,356 MW | 2,071 MW | 193 MW | 141 MW |
| 2026-10-24T13:00Z | 113 MW | 1,343 MW | 1,606 MW | 195 MW | 130 MW |
| 2026-10-24T14:00Z | 604 MW | 1,239 MW | 882 MW | 198 MW | 130 MW |
| 2026-10-24T15:00Z | 914 MW | 1,190 MW | 372 MW | 203 MW | 185 MW |
| 2026-10-24T16:00Z | 1,004 MW | 974 MW | 4 MW | 204 MW | 262 MW |
| 2026-10-24T17:00Z | 1,071 MW | 571 MW | 0 MW | 204 MW | 255 MW |
| 2026-10-24T18:00Z | 1,076 MW | 299 MW | 0 MW | 202 MW | 195 MW |
| 2026-10-24T19:00Z | 1,080 MW | 436 MW | 0 MW | 202 MW | 180 MW |
| 2026-10-24T20:00Z | 961 MW | 883 MW | 0 MW | 200 MW | 153 MW |
| 2026-10-24T21:00Z | 694 MW | 992 MW | 0 MW | 195 MW | 141 MW |
| 2026-10-24T22:00Z | 731 MW | 909 MW | 0 MW | 109 MW | 133 MW |
| 2026-10-24T23:00Z | 732 MW | 650 MW | 0 MW | 108 MW | 132 MW |
| 2026-10-25T00:00Z | 730 MW | 482 MW | 0 MW | 108 MW | 138 MW |
| 2026-10-25T01:00Z | 728 MW | 459 MW | 0 MW | 110 MW | 130 MW |
| 2026-10-25T02:00Z | 737 MW | 459 MW | 0 MW | 109 MW | 138 MW |
| 2026-10-25T03:00Z | 738 MW | 450 MW | 0 MW | 109 MW | 133 MW |
| 2026-10-25T04:00Z | 738 MW | 454 MW | 0 MW | 110 MW | 135 MW |
| 2026-10-25T05:00Z | 735 MW | 429 MW | 37 MW | 108 MW | 177 MW |
| 2026-10-25T06:00Z | 652 MW | 296 MW | 772 MW | 108 MW | 169 MW |
| 2026-10-25T07:00Z | 714 MW | 169 MW | 1,691 MW | 108 MW | 134 MW |
| 2026-10-25T08:00Z | 555 MW | 87 MW | 2,492 MW | 108 MW | 134 MW |
| 2026-10-25T09:00Z | 111 MW | 100 MW | 2,899 MW | 108 MW | 132 MW |
| 2026-10-25T10:00Z | 15 MW | 106 MW | 3,201 MW | 107 MW | 125 MW |
| 2026-10-25T11:00Z | 15 MW | 93 MW | 3,112 MW | 106 MW | 121 MW |
| 2026-10-25T12:00Z | 78 MW | 119 MW | 2,516 MW | 105 MW | 140 MW |
| 2026-10-25T13:00Z | 240 MW | 131 MW | 2,254 MW | 105 MW | 142 MW |
| 2026-10-25T14:00Z | 902 MW | 78 MW | 1,545 MW | 112 MW | 122 MW |
| 2026-10-25T15:00Z | 1,533 MW | 26 MW | 432 MW | 136 MW | 125 MW |
| 2026-10-25T16:00Z | 1,890 MW | 19 MW | 9 MW | 161 MW | 170 MW |
| 2026-10-25T17:00Z | 1,920 MW | 32 MW | 0 MW | 186 MW | 240 MW |
| 2026-10-25T18:00Z | 1,932 MW | 45 MW | 0 MW | 187 MW | 231 MW |
| 2026-10-25T19:00Z | 1,922 MW | 114 MW | 0 MW | 170 MW | 201 MW |
| 2026-10-25T20:00Z | 1,937 MW | 159 MW | 0 MW | 149 MW | 171 MW |
| 2026-10-25T21:00Z | 1,825 MW | 167 MW | 0 MW | 118 MW | 136 MW |
| 2026-10-25T22:00Z | 1,733 MW | 202 MW | 0 MW | 111 MW | 133 MW |
| 2026-10-25T23:00Z | 1,444 MW | 124 MW | 0 MW | 196 MW | 136 MW |
| 2026-10-26T00:00Z | 1,642 MW | 59 MW | 0 MW | 195 MW | 145 MW |
| 2026-10-26T01:00Z | 1,454 MW | 72 MW | 0 MW | 195 MW | 130 MW |
| 2026-10-26T02:00Z | 1,425 MW | 93 MW | 0 MW | 196 MW | 130 MW |
| 2026-10-26T03:00Z | 1,558 MW | 174 MW | 0 MW | 198 MW | 135 MW |
| 2026-10-26T04:00Z | 1,682 MW | 307 MW | 0 MW | 198 MW | 148 MW |
| 2026-10-26T05:00Z | 1,856 MW | 422 MW | 19 MW | 204 MW | 151 MW |
| 2026-10-26T06:00Z | 1,856 MW | 565 MW | 632 MW | 202 MW | 200 MW |
| 2026-10-26T07:00Z | 1,777 MW | 498 MW | 1,817 MW | 201 MW | 180 MW |
| 2026-10-26T08:00Z | 1,383 MW | 662 MW | 2,864 MW | 203 MW | 139 MW |
| 2026-10-26T09:00Z | 548 MW | 912 MW | 3,132 MW | 207 MW | 143 MW |
| 2026-10-26T10:00Z | 399 MW | 990 MW | 3,252 MW | 223 MW | 141 MW |
| 2026-10-26T11:00Z | 377 MW | 885 MW | 3,378 MW | 222 MW | 129 MW |
| 2026-10-26T12:00Z | 400 MW | 1,004 MW | 3,224 MW | 224 MW | 120 MW |
| 2026-10-26T13:00Z | 1,176 MW | 1,127 MW | 2,333 MW | 225 MW | 141 MW |
| 2026-10-26T14:00Z | 2,550 MW | 1,273 MW | 1,203 MW | 226 MW | 134 MW |
| 2026-10-26T15:00Z | 3,403 MW | 1,069 MW | 337 MW | 228 MW | 129 MW |
| 2026-10-26T16:00Z | 3,628 MW | 777 MW | 4 MW | 229 MW | 140 MW |
| 2026-10-26T17:00Z | 3,657 MW | 502 MW | 0 MW | 232 MW | 203 MW |
| 2026-10-26T18:00Z | 3,654 MW | 389 MW | 0 MW | 234 MW | 205 MW |
| 2026-10-26T19:00Z | 3,610 MW | 332 MW | 0 MW | 235 MW | 165 MW |
| 2026-10-26T20:00Z | 3,546 MW | 284 MW | 0 MW | 234 MW | 143 MW |
| 2026-10-26T21:00Z | 3,488 MW | 327 MW | 0 MW | 231 MW | 130 MW |
| 2026-10-26T22:00Z | 2,384 MW | 369 MW | 0 MW | 229 MW | 135 MW |
| 2026-10-26T23:00Z | 1,613 MW | 391 MW | 0 MW | 228 MW | 150 MW |
| 2026-10-27T00:00Z | 1,566 MW | 363 MW | 0 MW | 227 MW | 128 MW |
| 2026-10-27T01:00Z | 1,574 MW | 305 MW | 0 MW | 229 MW | 124 MW |
| 2026-10-27T02:00Z | 1,555 MW | 337 MW | 0 MW | 230 MW | 124 MW |
| 2026-10-27T03:00Z | 1,589 MW | 298 MW | 0 MW | 229 MW | 139 MW |
| 2026-10-27T04:00Z | 1,747 MW | 309 MW | 0 MW | 227 MW | 136 MW |
| 2026-10-27T05:00Z | 1,783 MW | 329 MW | 18 MW | 226 MW | 136 MW |
| 2026-10-27T06:00Z | 1,747 MW | 281 MW | 662 MW | 228 MW | 172 MW |
| 2026-10-27T07:00Z | 1,587 MW | 207 MW | 1,966 MW | 224 MW | 169 MW |
| 2026-10-27T08:00Z | 1,283 MW | 288 MW | 2,933 MW | 223 MW | 135 MW |
| 2026-10-27T09:00Z | 912 MW | 411 MW | 3,344 MW | 220 MW | 130 MW |
| 2026-10-27T10:00Z | 528 MW | 440 MW | 3,423 MW | 219 MW | 124 MW |
| 2026-10-27T11:00Z | 478 MW | 527 MW | 3,409 MW | 219 MW | 113 MW |
| 2026-10-27T12:00Z | 475 MW | 695 MW | 3,235 MW | 222 MW | 127 MW |
| 2026-10-27T13:00Z | 930 MW | 801 MW | 2,726 MW | 223 MW | 131 MW |
| 2026-10-27T14:00Z | 2,019 MW | 828 MW | 1,608 MW | 220 MW | 121 MW |
| 2026-10-27T15:00Z | 2,428 MW | 757 MW | 402 MW | 219 MW | 144 MW |
| 2026-10-27T16:00Z | 2,834 MW | 734 MW | 3 MW | 225 MW | 162 MW |
| 2026-10-27T17:00Z | 2,845 MW | 780 MW | 0 MW | 229 MW | 224 MW |
| 2026-10-27T18:00Z | 2,776 MW | 928 MW | 0 MW | 227 MW | 225 MW |
| 2026-10-27T19:00Z | 2,818 MW | 947 MW | 0 MW | 229 MW | 170 MW |
| 2026-10-27T20:00Z | 2,694 MW | 902 MW | 0 MW | 229 MW | 123 MW |
| 2026-10-27T21:00Z | 1,967 MW | 803 MW | 0 MW | 225 MW | 125 MW |
| 2026-10-27T22:00Z | 1,474 MW | 709 MW | 0 MW | 226 MW | 138 MW |
| 2026-10-27T23:00Z | 1,560 MW | 839 MW | 0 MW | 226 MW | 126 MW |
| 2026-10-28T00:00Z | 1,552 MW | 1,122 MW | 0 MW | 224 MW | 123 MW |
| 2026-10-28T01:00Z | 1,489 MW | 1,333 MW | 0 MW | 225 MW | 132 MW |
| 2026-10-28T02:00Z | 1,628 MW | 1,282 MW | 0 MW | 223 MW | 149 MW |
| 2026-10-28T03:00Z | 1,673 MW | 1,065 MW | 0 MW | 224 MW | 138 MW |
| 2026-10-28T04:00Z | 1,728 MW | 994 MW | 0 MW | 225 MW | 130 MW |
| 2026-10-28T05:00Z | 1,844 MW | 946 MW | 22 MW | 224 MW | 135 MW |
| 2026-10-28T06:00Z | 1,850 MW | 974 MW | 589 MW | 223 MW | 169 MW |
| 2026-10-28T07:00Z | 1,773 MW | 1,029 MW | 1,723 MW | 226 MW | 220 MW |
| 2026-10-28T08:00Z | 1,272 MW | 1,077 MW | 2,622 MW | 225 MW | 183 MW |
| 2026-10-28T09:00Z | 1,253 MW | 523 MW | 3,083 MW | 220 MW | 178 MW |
| 2026-10-28T10:00Z | 1,327 MW | 343 MW | 3,192 MW | 221 MW | 170 MW |
| 2026-10-28T11:00Z | 1,134 MW | 237 MW | 2,666 MW | 221 MW | 118 MW |
| 2026-10-28T12:00Z | 1,186 MW | 210 MW | 2,524 MW | 220 MW | 117 MW |
| 2026-10-28T13:00Z | 1,653 MW | 237 MW | 2,010 MW | 221 MW | 123 MW |
| 2026-10-28T14:00Z | 2,700 MW | 250 MW | 967 MW | 219 MW | 124 MW |
| 2026-10-28T15:00Z | 3,315 MW | 436 MW | 284 MW | 221 MW | 168 MW |
| 2026-10-28T16:00Z | 3,522 MW | 638 MW | 3 MW | 226 MW | 174 MW |
| 2026-10-28T17:00Z | 3,624 MW | 710 MW | 0 MW | 228 MW | 214 MW |
| 2026-10-28T18:00Z | 3,489 MW | 817 MW | 0 MW | 229 MW | 208 MW |
| 2026-10-28T19:00Z | 3,523 MW | 779 MW | 0 MW | 229 MW | 163 MW |
| 2026-10-28T20:00Z | 3,100 MW | 660 MW | 0 MW | 228 MW | 146 MW |
| 2026-10-28T21:00Z | 2,904 MW | 554 MW | 0 MW | 226 MW | 135 MW |
| 2026-10-28T22:00Z | 1,953 MW | 511 MW | 0 MW | 228 MW | 122 MW |
| 2026-10-28T23:00Z | 1,705 MW | 502 MW | 0 MW | 224 MW | 122 MW |
| 2026-10-29T00:00Z | 1,559 MW | 514 MW | 0 MW | 225 MW | 125 MW |
| 2026-10-29T01:00Z | 1,544 MW | 548 MW | 0 MW | 226 MW | 126 MW |
| 2026-10-29T02:00Z | 1,476 MW | 542 MW | 0 MW | 224 MW | 141 MW |
| 2026-10-29T03:00Z | 1,554 MW | 520 MW | 0 MW | 224 MW | 135 MW |
| 2026-10-29T04:00Z | 1,706 MW | 527 MW | 0 MW | 224 MW | 131 MW |
| 2026-10-29T05:00Z | 1,846 MW | 578 MW | 12 MW | 221 MW | 133 MW |
| 2026-10-29T06:00Z | 1,896 MW | 587 MW | 568 MW | 222 MW | 167 MW |
| 2026-10-29T07:00Z | 1,878 MW | 539 MW | 1,895 MW | 222 MW | 222 MW |
| 2026-10-29T08:00Z | 1,814 MW | 624 MW | 2,877 MW | 219 MW | 181 MW |
| 2026-10-29T09:00Z | 1,624 MW | 658 MW | 3,253 MW | 219 MW | 175 MW |
| 2026-10-29T10:00Z | 1,522 MW | 673 MW | 3,117 MW | 216 MW | 171 MW |
| 2026-10-29T11:00Z | 1,461 MW | 566 MW | 3,003 MW | 216 MW | 116 MW |
| 2026-10-29T12:00Z | 1,559 MW | 491 MW | 2,768 MW | 220 MW | 127 MW |
| 2026-10-29T13:00Z | 2,069 MW | 576 MW | 2,362 MW | 220 MW | 112 MW |
| 2026-10-29T14:00Z | 3,262 MW | 726 MW | 1,460 MW | 220 MW | 121 MW |
| 2026-10-29T15:00Z | 3,623 MW | 730 MW | 336 MW | 222 MW | 137 MW |
| 2026-10-29T16:00Z | 3,818 MW | 634 MW | 2 MW | 220 MW | 184 MW |
| 2026-10-29T17:00Z | 3,948 MW | 678 MW | 0 MW | 222 MW | 214 MW |
| 2026-10-29T18:00Z | 3,959 MW | 641 MW | 0 MW | 225 MW | 208 MW |
| 2026-10-29T19:00Z | 3,930 MW | 583 MW | 0 MW | 227 MW | 161 MW |
| 2026-10-29T20:00Z | 3,705 MW | 460 MW | 0 MW | 226 MW | 138 MW |
| 2026-10-29T21:00Z | 3,459 MW | 471 MW | 0 MW | 223 MW | 120 MW |
| 2026-10-29T22:00Z | 2,462 MW | 448 MW | 0 MW | 221 MW | 122 MW |
| 2026-10-29T23:00Z | 1,755 MW | 466 MW | 0 MW | 222 MW | 128 MW |
| 2026-10-30T00:00Z | 1,561 MW | 450 MW | 0 MW | 220 MW | 143 MW |
| 2026-10-30T01:00Z | 1,561 MW | 416 MW | 0 MW | 221 MW | 136 MW |
| 2026-10-30T02:00Z | 1,539 MW | 473 MW | 0 MW | 221 MW | 125 MW |
| 2026-10-30T03:00Z | 1,589 MW | 584 MW | 0 MW | 221 MW | 131 MW |
| 2026-10-30T04:00Z | 1,608 MW | 634 MW | 0 MW | 221 MW | 131 MW |
| 2026-10-30T05:00Z | 1,876 MW | 624 MW | 9 MW | 223 MW | 130 MW |
| 2026-10-30T06:00Z | 1,901 MW | 629 MW | 307 MW | 226 MW | 168 MW |
| 2026-10-30T07:00Z | 1,912 MW | 614 MW | 1,321 MW | 227 MW | 217 MW |
| 2026-10-30T08:00Z | 1,912 MW | 527 MW | 2,280 MW | 226 MW | 178 MW |
| 2026-10-30T09:00Z | 1,763 MW | 403 MW | 2,765 MW | 227 MW | 177 MW |
| 2026-10-30T10:00Z | 1,895 MW | 348 MW | 2,700 MW | 222 MW | 169 MW |
| 2026-10-30T11:00Z | 1,854 MW | 374 MW | 2,455 MW | 219 MW | 114 MW |
| 2026-10-30T12:00Z | 1,928 MW | 440 MW | 2,011 MW | 220 MW | 119 MW |
| 2026-10-30T13:00Z | 2,501 MW | 483 MW | 1,611 MW | 222 MW | 141 MW |
| 2026-10-30T14:00Z | 3,805 MW | 560 MW | 935 MW | 227 MW | 118 MW |
| 2026-10-30T15:00Z | 4,123 MW | 608 MW | 225 MW | 228 MW | 143 MW |
| 2026-10-30T16:00Z | 4,176 MW | 652 MW | 77 MW | 231 MW | 171 MW |
| 2026-10-30T17:00Z | 4,190 MW | 753 MW | 25 MW | 235 MW | 211 MW |
| 2026-10-30T18:00Z | 4,162 MW | 764 MW | 0 MW | 235 MW | 218 MW |
| 2026-10-30T19:00Z | 4,029 MW | 707 MW | 0 MW | 237 MW | 172 MW |
| 2026-10-30T20:00Z | 3,651 MW | 599 MW | 0 MW | 236 MW | 157 MW |
| 2026-10-30T21:00Z | 2,592 MW | 591 MW | 0 MW | 234 MW | 135 MW |
| 2026-10-30T22:00Z | 2,032 MW | 654 MW | 0 MW | 232 MW | 125 MW |
| 2026-10-30T23:00Z | 1,552 MW | 704 MW | 0 MW | 227 MW | 124 MW |
| 2026-10-31T00:00Z | 1,260 MW | 692 MW | 0 MW | 223 MW | 125 MW |
| 2026-10-31T01:00Z | 1,072 MW | 701 MW | 0 MW | 224 MW | 126 MW |
| 2026-10-31T02:00Z | 1,007 MW | 731 MW | 0 MW | 225 MW | 128 MW |
| 2026-10-31T03:00Z | 984 MW | 678 MW | 0 MW | 226 MW | 134 MW |
| 2026-10-31T04:00Z | 995 MW | 637 MW | 0 MW | 228 MW | 134 MW |
| 2026-10-31T05:00Z | 1,124 MW | 690 MW | 8 MW | 232 MW | 136 MW |
| 2026-10-31T06:00Z | 1,118 MW | 657 MW | 430 MW | 228 MW | 162 MW |
| 2026-10-31T07:00Z | 1,089 MW | 672 MW | 1,562 MW | 231 MW | 162 MW |
| 2026-10-31T08:00Z | 1,080 MW | 691 MW | 2,266 MW | 227 MW | 137 MW |
| 2026-10-31T09:00Z | 981 MW | 711 MW | 2,689 MW | 227 MW | 148 MW |
| 2026-10-31T10:00Z | 907 MW | 786 MW | 2,861 MW | 224 MW | 130 MW |
| 2026-10-31T11:00Z | 918 MW | 847 MW | 2,749 MW | 222 MW | 123 MW |
| 2026-10-31T12:00Z | 935 MW | 1,001 MW | 2,647 MW | 220 MW | 129 MW |
| 2026-10-31T13:00Z | 1,090 MW | 1,069 MW | 2,040 MW | 220 MW | 141 MW |
| 2026-10-31T14:00Z | 1,363 MW | 1,096 MW | 1,223 MW | 224 MW | 127 MW |
| 2026-10-31T15:00Z | 1,677 MW | 1,076 MW | 253 MW | 227 MW | 161 MW |
| 2026-10-31T16:00Z | 1,827 MW | 1,104 MW | 1 MW | 228 MW | 227 MW |
| 2026-10-31T17:00Z | 1,840 MW | 1,098 MW | 0 MW | 232 MW | 259 MW |
| 2026-10-31T18:00Z | 1,854 MW | 1,120 MW | 0 MW | 231 MW | 237 MW |
| 2026-10-31T19:00Z | 1,858 MW | 1,039 MW | 0 MW | 230 MW | 205 MW |
| 2026-10-31T20:00Z | 1,801 MW | 910 MW | 0 MW | 230 MW | 151 MW |
| 2026-10-31T21:00Z | 1,731 MW | 726 MW | 0 MW | 225 MW | 145 MW |
| 2026-10-31T22:00Z | 1,264 MW | 616 MW | 0 MW | 222 MW | 125 MW |
| 2026-10-31T23:00Z | 756 MW | 473 MW | 0 MW | 221 MW | 126 MW |
| 2026-11-01T00:00Z | 738 MW | 416 MW | 0 MW | 219 MW | 127 MW |
| 2026-11-01T01:00Z | 738 MW | 440 MW | 0 MW | 220 MW | 142 MW |
| 2026-11-01T02:00Z | 735 MW | 479 MW | 0 MW | 221 MW | 141 MW |
| 2026-11-01T03:00Z | 738 MW | 600 MW | 0 MW | 222 MW | 127 MW |
| 2026-11-01T04:00Z | 737 MW | 665 MW | 0 MW | 224 MW | 132 MW |
| 2026-11-01T05:00Z | 733 MW | 755 MW | 4 MW | 225 MW | 133 MW |
| 2026-11-01T06:00Z | 737 MW | 679 MW | 261 MW | 226 MW | 136 MW |
| 2026-11-01T07:00Z | 692 MW | 653 MW | 850 MW | 226 MW | 140 MW |
| 2026-11-01T08:00Z | 714 MW | 582 MW | 1,467 MW | 224 MW | 135 MW |
| 2026-11-01T09:00Z | 623 MW | 532 MW | 2,249 MW | 220 MW | 120 MW |
| 2026-11-01T10:00Z | 483 MW | 408 MW | 2,483 MW | 217 MW | 111 MW |
| 2026-11-01T11:00Z | 569 MW | 416 MW | 2,406 MW | 214 MW | 110 MW |
| 2026-11-01T12:00Z | 788 MW | 421 MW | 2,203 MW | 211 MW | 121 MW |
| 2026-11-01T13:00Z | 1,124 MW | 556 MW | 1,663 MW | 212 MW | 127 MW |
| 2026-11-01T14:00Z | 1,481 MW | 669 MW | 902 MW | 216 MW | 136 MW |
| 2026-11-01T15:00Z | 1,826 MW | 672 MW | 188 MW | 218 MW | 156 MW |
| 2026-11-01T16:00Z | 1,863 MW | 623 MW | 0 MW | 224 MW | 189 MW |
| 2026-11-01T17:00Z | 1,860 MW | 631 MW | 0 MW | 227 MW | 216 MW |
| 2026-11-01T18:00Z | 1,862 MW | 472 MW | 0 MW | 227 MW | 223 MW |
| 2026-11-01T19:00Z | 1,866 MW | 491 MW | 0 MW | 226 MW | 192 MW |
| 2026-11-01T20:00Z | 1,867 MW | 568 MW | 0 MW | 228 MW | 161 MW |
| 2026-11-01T21:00Z | 1,781 MW | 761 MW | 0 MW | 222 MW | 149 MW |
| 2026-11-01T22:00Z | 1,539 MW | 793 MW | 0 MW | 217 MW | 139 MW |
| 2026-11-01T23:00Z | 1,566 MW | 899 MW | 0 MW | 212 MW | 127 MW |
| 2026-11-02T00:00Z | 1,465 MW | 974 MW | 0 MW | 214 MW | 129 MW |
| 2026-11-02T01:00Z | 1,423 MW | 989 MW | 0 MW | 214 MW | 130 MW |
| 2026-11-02T02:00Z | 1,380 MW | 957 MW | 0 MW | 213 MW | 133 MW |
| 2026-11-02T03:00Z | 1,374 MW | 1,165 MW | 0 MW | 214 MW | 132 MW |
| 2026-11-02T04:00Z | 1,530 MW | 1,244 MW | 0 MW | 215 MW | 148 MW |
| 2026-11-02T05:00Z | 1,784 MW | 1,272 MW | 0 MW | 214 MW | 139 MW |
| 2026-11-02T06:00Z | 1,846 MW | 1,444 MW | 76 MW | 214 MW | 151 MW |
| 2026-11-02T07:00Z | 1,884 MW | 1,564 MW | 379 MW | 216 MW | 212 MW |
| 2026-11-02T08:00Z | 1,832 MW | 1,661 MW | 668 MW | 213 MW | 208 MW |
| 2026-11-02T09:00Z | 1,808 MW | 1,819 MW | 743 MW | 211 MW | 182 MW |
| 2026-11-02T10:00Z | 1,701 MW | 1,919 MW | 843 MW | 210 MW | 198 MW |
| 2026-11-02T11:00Z | 1,760 MW | 1,876 MW | 879 MW | 213 MW | 151 MW |
| 2026-11-02T12:00Z | 1,720 MW | 1,914 MW | 692 MW | 215 MW | 158 MW |
| 2026-11-02T13:00Z | 1,859 MW | 1,912 MW | 519 MW | 215 MW | 202 MW |
| 2026-11-02T14:00Z | 2,897 MW | 1,918 MW | 315 MW | 212 MW | 219 MW |
| 2026-11-02T15:00Z | 3,475 MW | 1,921 MW | 67 MW | 218 MW | 226 MW |
| 2026-11-02T16:00Z | 3,865 MW | 1,887 MW | 0 MW | 220 MW | 281 MW |
| 2026-11-02T17:00Z | 4,097 MW | 1,869 MW | 0 MW | 222 MW | 293 MW |
| 2026-11-02T18:00Z | 4,192 MW | 1,828 MW | 0 MW | 224 MW | 297 MW |
| 2026-11-02T19:00Z | 4,199 MW | 1,827 MW | 0 MW | 226 MW | 289 MW |
| 2026-11-02T20:00Z | 4,020 MW | 1,845 MW | 0 MW | 229 MW | 228 MW |
| 2026-11-02T21:00Z | 3,081 MW | 1,766 MW | 0 MW | 226 MW | 204 MW |
| 2026-11-02T22:00Z | 2,144 MW | 1,650 MW | 0 MW | 225 MW | 219 MW |
| 2026-11-02T23:00Z | 1,778 MW | 1,464 MW | 0 MW | 220 MW | 214 MW |
| 2026-11-03T00:00Z | 1,573 MW | 1,506 MW | 0 MW | 220 MW | 211 MW |
| 2026-11-03T01:00Z | 1,505 MW | 1,421 MW | 0 MW | 220 MW | 204 MW |
| 2026-11-03T02:00Z | 1,492 MW | 1,518 MW | 0 MW | 221 MW | 212 MW |
| 2026-11-03T03:00Z | 1,524 MW | 1,487 MW | 0 MW | 222 MW | 221 MW |
| 2026-11-03T04:00Z | 1,600 MW | 1,598 MW | 0 MW | 224 MW | 209 MW |
| 2026-11-03T05:00Z | 1,788 MW | 1,506 MW | 4 MW | 224 MW | 239 MW |
| 2026-11-03T06:00Z | 1,865 MW | 1,349 MW | 437 MW | 223 MW | 263 MW |
| 2026-11-03T07:00Z | 1,871 MW | 1,395 MW | 1,616 MW | 224 MW | 294 MW |
| 2026-11-03T08:00Z | 1,611 MW | 1,354 MW | 2,625 MW | 210 MW | 247 MW |
| 2026-11-03T09:00Z | 1,207 MW | 1,300 MW | 3,083 MW | 209 MW | 220 MW |
| 2026-11-03T10:00Z | 1,106 MW | 993 MW | 3,309 MW | 205 MW | 221 MW |
| 2026-11-03T11:00Z | 1,327 MW | 704 MW | 3,243 MW | 212 MW | 174 MW |
| 2026-11-03T12:00Z | 1,961 MW | 499 MW | 2,922 MW | 213 MW | 189 MW |
| 2026-11-03T13:00Z | 2,658 MW | 478 MW | 2,226 MW | 211 MW | 212 MW |
| 2026-11-03T14:00Z | 3,234 MW | 501 MW | 1,140 MW | 216 MW | 260 MW |
| 2026-11-03T15:00Z | 3,959 MW | 466 MW | 259 MW | 217 MW | 237 MW |
| 2026-11-03T16:00Z | 4,140 MW | 451 MW | 55 MW | 218 MW | 244 MW |
| 2026-11-03T17:00Z | 4,242 MW | 451 MW | 1 MW | 218 MW | 264 MW |
| 2026-11-03T18:00Z | 4,189 MW | 440 MW | 0 MW | 221 MW | 246 MW |
| 2026-11-03T19:00Z | 4,234 MW | 388 MW | 0 MW | 219 MW | 185 MW |
| 2026-11-03T20:00Z | 4,131 MW | 393 MW | 0 MW | 222 MW | 174 MW |
| 2026-11-03T21:00Z | 3,600 MW | 322 MW | 0 MW | 221 MW | 176 MW |
| 2026-11-03T22:00Z | 2,056 MW | 264 MW | 0 MW | 221 MW | 178 MW |
| 2026-11-03T23:00Z | 1,688 MW | 289 MW | 0 MW | 217 MW | 156 MW |
| 2026-11-04T00:00Z | 1,598 MW | 247 MW | 0 MW | 220 MW | 159 MW |
| 2026-11-04T01:00Z | 1,597 MW | 299 MW | 0 MW | 219 MW | 151 MW |
| 2026-11-04T02:00Z | 1,595 MW | 371 MW | 0 MW | 219 MW | 145 MW |
| 2026-11-04T03:00Z | 1,545 MW | 303 MW | 0 MW | 217 MW | 139 MW |
| 2026-11-04T04:00Z | 2,041 MW | 244 MW | 0 MW | 206 MW | 141 MW |
| 2026-11-04T05:00Z | 2,655 MW | 210 MW | 5 MW | 212 MW | 140 MW |
| 2026-11-04T06:00Z | 2,828 MW | 167 MW | 334 MW | 221 MW | 152 MW |
| 2026-11-04T07:00Z | 2,968 MW | 155 MW | 1,095 MW | 220 MW | 200 MW |
| 2026-11-04T08:00Z | 2,877 MW | 150 MW | 1,794 MW | 217 MW | 190 MW |
| 2026-11-04T09:00Z | 2,526 MW | 124 MW | 1,940 MW | 217 MW | 181 MW |
| 2026-11-04T10:00Z | 2,424 MW | 93 MW | 2,120 MW | 217 MW | 183 MW |
| 2026-11-04T11:00Z | 2,450 MW | 73 MW | 1,904 MW | 215 MW | 170 MW |
| 2026-11-04T12:00Z | 2,721 MW | 115 MW | 1,543 MW | 214 MW | 157 MW |
| 2026-11-04T13:00Z | 3,475 MW | 201 MW | 1,154 MW | 213 MW | 157 MW |
| 2026-11-04T14:00Z | 4,002 MW | 234 MW | 637 MW | 216 MW | 155 MW |
| 2026-11-04T15:00Z | 4,170 MW | 294 MW | 115 MW | 216 MW | 160 MW |
| 2026-11-04T16:00Z | 4,234 MW | 339 MW | 0 MW | 218 MW | 240 MW |
| 2026-11-04T17:00Z | 4,461 MW | 362 MW | 0 MW | 220 MW | 261 MW |
| 2026-11-04T18:00Z | 4,491 MW | 353 MW | 0 MW | 222 MW | 266 MW |
| 2026-11-04T19:00Z | 4,479 MW | 305 MW | 0 MW | 222 MW | 183 MW |
| 2026-11-04T20:00Z | 4,353 MW | 356 MW | 0 MW | 221 MW | 155 MW |
| 2026-11-04T21:00Z | 3,860 MW | 344 MW | 0 MW | 219 MW | 158 MW |
| 2026-11-04T22:00Z | 3,121 MW | 368 MW | 0 MW | 219 MW | 166 MW |
| 2026-11-04T23:00Z | 1,977 MW | 355 MW | 0 MW | 215 MW | 149 MW |
| 2026-11-05T00:00Z | 1,765 MW | 379 MW | 0 MW | 214 MW | 138 MW |
| 2026-11-05T01:00Z | 1,716 MW | 384 MW | 0 MW | 215 MW | 124 MW |
| 2026-11-05T02:00Z | 1,696 MW | 351 MW | 0 MW | 215 MW | 133 MW |
| 2026-11-05T03:00Z | 1,805 MW | 366 MW | 0 MW | 214 MW | 149 MW |
| 2026-11-05T04:00Z | 2,120 MW | 358 MW | 0 MW | 216 MW | 135 MW |
| 2026-11-05T05:00Z | 2,591 MW | 413 MW | 5 MW | 219 MW | 130 MW |
| 2026-11-05T06:00Z | 2,628 MW | 372 MW | 418 MW | 219 MW | 143 MW |
| 2026-11-05T07:00Z | 2,553 MW | 310 MW | 1,362 MW | 220 MW | 185 MW |
| 2026-11-05T08:00Z | 2,621 MW | 264 MW | 1,935 MW | 216 MW | 180 MW |
| 2026-11-05T09:00Z | 2,485 MW | 219 MW | 2,297 MW | 212 MW | 183 MW |
| 2026-11-05T10:00Z | 2,266 MW | 202 MW | 2,683 MW | 214 MW | 179 MW |
| 2026-11-05T11:00Z | 2,188 MW | 169 MW | 2,604 MW | 213 MW | 127 MW |
| 2026-11-05T12:00Z | 2,563 MW | 165 MW | 1,947 MW | 214 MW | 129 MW |
| 2026-11-05T13:00Z | 3,593 MW | 211 MW | 1,300 MW | 214 MW | 138 MW |
| 2026-11-05T14:00Z | 4,430 MW | 265 MW | 570 MW | 214 MW | 175 MW |
| 2026-11-05T15:00Z | 4,526 MW | 266 MW | 88 MW | 214 MW | 181 MW |
| 2026-11-05T16:00Z | 4,555 MW | 247 MW | 0 MW | 218 MW | 214 MW |
| 2026-11-05T17:00Z | 4,568 MW | 285 MW | 0 MW | 218 MW | 217 MW |
| 2026-11-05T18:00Z | 4,606 MW | 320 MW | 0 MW | 223 MW | 224 MW |
| 2026-11-05T19:00Z | 4,573 MW | 328 MW | 0 MW | 224 MW | 174 MW |
| 2026-11-05T20:00Z | 4,514 MW | 304 MW | 0 MW | 223 MW | 154 MW |
| 2026-11-05T21:00Z | 4,090 MW | 254 MW | 0 MW | 218 MW | 154 MW |
| 2026-11-05T22:00Z | 3,677 MW | 210 MW | 0 MW | 219 MW | 153 MW |
| 2026-11-05T23:00Z | 2,505 MW | 147 MW | 0 MW | 217 MW | 127 MW |
| 2026-11-06T00:00Z | 2,159 MW | 124 MW | 0 MW | 215 MW | 139 MW |
| 2026-11-06T01:00Z | 2,107 MW | 128 MW | 0 MW | 216 MW | 139 MW |
| 2026-11-06T02:00Z | 2,105 MW | 113 MW | 0 MW | 216 MW | 133 MW |
| 2026-11-06T03:00Z | 2,157 MW | 151 MW | 0 MW | 217 MW | 132 MW |
| 2026-11-06T04:00Z | 2,876 MW | 144 MW | 0 MW | 218 MW | 135 MW |
| 2026-11-06T05:00Z | 4,032 MW | 157 MW | 2 MW | 219 MW | 137 MW |
| 2026-11-06T06:00Z | 3,924 MW | 180 MW | 130 MW | 223 MW | 166 MW |
| 2026-11-06T07:00Z | 4,129 MW | 169 MW | 451 MW | 222 MW | 219 MW |
| 2026-11-06T08:00Z | 4,061 MW | 143 MW | 671 MW | 222 MW | 191 MW |
| 2026-11-06T09:00Z | 3,987 MW | 116 MW | 764 MW | 218 MW | 184 MW |
| 2026-11-06T10:00Z | 3,952 MW | 74 MW | 703 MW | 218 MW | 186 MW |
| 2026-11-06T11:00Z | 3,839 MW | 37 MW | 629 MW | 218 MW | 140 MW |
| 2026-11-06T12:00Z | 3,925 MW | 47 MW | 538 MW | 220 MW | 131 MW |
| 2026-11-06T13:00Z | 4,172 MW | 70 MW | 367 MW | 220 MW | 125 MW |
| 2026-11-06T14:00Z | 4,860 MW | 62 MW | 186 MW | 222 MW | 148 MW |
| 2026-11-06T15:00Z | 4,938 MW | 61 MW | 25 MW | 225 MW | 185 MW |
| 2026-11-06T16:00Z | 4,915 MW | 119 MW | 0 MW | 226 MW | 235 MW |
| 2026-11-06T17:00Z | 4,929 MW | 145 MW | 0 MW | 230 MW | 244 MW |
| 2026-11-06T18:00Z | 4,855 MW | 124 MW | 0 MW | 231 MW | 204 MW |
| 2026-11-06T19:00Z | 4,960 MW | 94 MW | 0 MW | 229 MW | 203 MW |
| 2026-11-06T20:00Z | 4,919 MW | 70 MW | 0 MW | 225 MW | 180 MW |
| 2026-11-06T21:00Z | 4,602 MW | 46 MW | 0 MW | 223 MW | 163 MW |
| 2026-11-06T22:00Z | 4,071 MW | 42 MW | 0 MW | 223 MW | 167 MW |
| 2026-11-06T23:00Z | 2,784 MW | 35 MW | 0 MW | 220 MW | 139 MW |
| 2026-11-07T00:00Z | 2,191 MW | 16 MW | 0 MW | 219 MW | 118 MW |
| 2026-11-07T01:00Z | 2,027 MW | 19 MW | 0 MW | 222 MW | 121 MW |
| 2026-11-07T02:00Z | 2,034 MW | 29 MW | 0 MW | 222 MW | 143 MW |
| 2026-11-07T03:00Z | 2,117 MW | 29 MW | 0 MW | 221 MW | 142 MW |
| 2026-11-07T04:00Z | 2,201 MW | 24 MW | 0 MW | 225 MW | 130 MW |
| 2026-11-07T05:00Z | 2,514 MW | 33 MW | 2 MW | 228 MW | 129 MW |
| 2026-11-07T06:00Z | 2,537 MW | 34 MW | 296 MW | 225 MW | 132 MW |
| 2026-11-07T07:00Z | 2,501 MW | 38 MW | 1,250 MW | 223 MW | 138 MW |
| 2026-11-07T08:00Z | 2,313 MW | 21 MW | 2,085 MW | 223 MW | 134 MW |
| 2026-11-07T09:00Z | 2,293 MW | 23 MW | 2,536 MW | 224 MW | 132 MW |
| 2026-11-07T10:00Z | 2,243 MW | 32 MW | 2,729 MW | 224 MW | 131 MW |
| 2026-11-07T11:00Z | 2,235 MW | 33 MW | 2,622 MW | 221 MW | 135 MW |
| 2026-11-07T12:00Z | 2,213 MW | 28 MW | 2,386 MW | 221 MW | 127 MW |
| 2026-11-07T13:00Z | 2,424 MW | 30 MW | 1,888 MW | 223 MW | 125 MW |
| 2026-11-07T14:00Z | 3,513 MW | 51 MW | 1,084 MW | 221 MW | 124 MW |
| 2026-11-07T15:00Z | 4,069 MW | 52 MW | 175 MW | 223 MW | 168 MW |
| 2026-11-07T16:00Z | 4,220 MW | 42 MW | 0 MW | 223 MW | 195 MW |
| 2026-11-07T17:00Z | 4,235 MW | 33 MW | 0 MW | 226 MW | 198 MW |
| 2026-11-07T18:00Z | 4,063 MW | 33 MW | 0 MW | 227 MW | 205 MW |
| 2026-11-07T19:00Z | 3,904 MW | 47 MW | 0 MW | 225 MW | 195 MW |
| 2026-11-07T20:00Z | 3,847 MW | 44 MW | 0 MW | 224 MW | 163 MW |
| 2026-11-07T21:00Z | 3,729 MW | 36 MW | 0 MW | 221 MW | 146 MW |
| 2026-11-07T22:00Z | 3,015 MW | 40 MW | 0 MW | 220 MW | 146 MW |
| 2026-11-07T23:00Z | 1,912 MW | 18 MW | 0 MW | 220 MW | 118 MW |
| 2026-11-08T00:00Z | 1,729 MW | 15 MW | 0 MW | 221 MW | 133 MW |
| 2026-11-08T01:00Z | 1,582 MW | 11 MW | 0 MW | 219 MW | 133 MW |
| 2026-11-08T02:00Z | 1,625 MW | 6 MW | 0 MW | 220 MW | 127 MW |
| 2026-11-08T03:00Z | 1,564 MW | 7 MW | 0 MW | 222 MW | 128 MW |
| 2026-11-08T04:00Z | 1,618 MW | 7 MW | 0 MW | 222 MW | 127 MW |
| 2026-11-08T05:00Z | 1,725 MW | 7 MW | 1 MW | 217 MW | 129 MW |
| 2026-11-08T06:00Z | 1,715 MW | 9 MW | 260 MW | 219 MW | 126 MW |
| 2026-11-08T07:00Z | 1,726 MW | 7 MW | 1,077 MW | 220 MW | 131 MW |
| 2026-11-08T08:00Z | 1,714 MW | 14 MW | 1,775 MW | 223 MW | 130 MW |
| 2026-11-08T09:00Z | 1,609 MW | 34 MW | 2,442 MW | 222 MW | 130 MW |
| 2026-11-08T10:00Z | 1,624 MW | 53 MW | 2,740 MW | 223 MW | 129 MW |
| 2026-11-08T11:00Z | 1,622 MW | 81 MW | 2,782 MW | 220 MW | 121 MW |
| 2026-11-08T12:00Z | 1,469 MW | 115 MW | 2,519 MW | 220 MW | 135 MW |
| 2026-11-08T13:00Z | 1,963 MW | 118 MW | 1,957 MW | 216 MW | 133 MW |
| 2026-11-08T14:00Z | 2,914 MW | 106 MW | 1,068 MW | 215 MW | 120 MW |
| 2026-11-08T15:00Z | 3,610 MW | 86 MW | 186 MW | 225 MW | 130 MW |
| 2026-11-08T16:00Z | 3,894 MW | 72 MW | 0 MW | 226 MW | 203 MW |
| 2026-11-08T17:00Z | 3,971 MW | 54 MW | 0 MW | 229 MW | 217 MW |
| 2026-11-08T18:00Z | 3,956 MW | 24 MW | 0 MW | 230 MW | 202 MW |
| 2026-11-08T19:00Z | 3,954 MW | 13 MW | 0 MW | 228 MW | 171 MW |
| 2026-11-08T20:00Z | 3,878 MW | 12 MW | 0 MW | 228 MW | 141 MW |
| 2026-11-08T21:00Z | 3,759 MW | 11 MW | 0 MW | 225 MW | 139 MW |
| 2026-11-08T22:00Z | 3,468 MW | 7 MW | 0 MW | 224 MW | 133 MW |
| 2026-11-08T23:00Z | 3,195 MW | 10 MW | 0 MW | 223 MW | 117 MW |
| 2026-11-09T00:00Z | 3,032 MW | 19 MW | 0 MW | 224 MW | 119 MW |
| 2026-11-09T01:00Z | 2,913 MW | 37 MW | 0 MW | 226 MW | 133 MW |
| 2026-11-09T02:00Z | 2,766 MW | 57 MW | 0 MW | 226 MW | 134 MW |
| 2026-11-09T03:00Z | 2,807 MW | 68 MW | 0 MW | 226 MW | 126 MW |
| 2026-11-09T04:00Z | 3,099 MW | 53 MW | 0 MW | 224 MW | 127 MW |
| 2026-11-09T05:00Z | 4,126 MW | 64 MW | 0 MW | 223 MW | 128 MW |
| 2026-11-09T06:00Z | 4,250 MW | 66 MW | 136 MW | 219 MW | 152 MW |
| 2026-11-09T07:00Z | 4,154 MW | 60 MW | 634 MW | 221 MW | 159 MW |
| 2026-11-09T08:00Z | 4,202 MW | 24 MW | 1,188 MW | 218 MW | 155 MW |
| 2026-11-09T09:00Z | 4,091 MW | 20 MW | 1,510 MW | 212 MW | 191 MW |
| 2026-11-09T10:00Z | 4,109 MW | 11 MW | 1,528 MW | 221 MW | 265 MW |
| 2026-11-09T11:00Z | 4,143 MW | 36 MW | 1,369 MW | 219 MW | 260 MW |
| 2026-11-09T12:00Z | 4,092 MW | 113 MW | 1,236 MW | 214 MW | 244 MW |
| 2026-11-09T13:00Z | 4,228 MW | 125 MW | 903 MW | 215 MW | 215 MW |
| 2026-11-09T14:00Z | 4,135 MW | 133 MW | 349 MW | 216 MW | 209 MW |
| 2026-11-09T15:00Z | 4,336 MW | 197 MW | 58 MW | 218 MW | 189 MW |
| 2026-11-09T16:00Z | 4,338 MW | 259 MW | 0 MW | 218 MW | 204 MW |
| 2026-11-09T17:00Z | 4,432 MW | 300 MW | 0 MW | 221 MW | 223 MW |
| 2026-11-09T18:00Z | 4,651 MW | 332 MW | 0 MW | 222 MW | 217 MW |
| 2026-11-09T19:00Z | 4,577 MW | 304 MW | 0 MW | 222 MW | 176 MW |
| 2026-11-09T20:00Z | 4,546 MW | 469 MW | 0 MW | 221 MW | 153 MW |
| 2026-11-09T21:00Z | 4,450 MW | 557 MW | 0 MW | 222 MW | 153 MW |
| 2026-11-09T22:00Z | 4,304 MW | 597 MW | 0 MW | 218 MW | 168 MW |
| 2026-11-09T23:00Z | 2,163 MW | 571 MW | 0 MW | 218 MW | 128 MW |
| 2026-11-10T00:00Z | 1,836 MW | 707 MW | 0 MW | 219 MW | 123 MW |
| 2026-11-10T01:00Z | 1,523 MW | 684 MW | 0 MW | 221 MW | 127 MW |
| 2026-11-10T02:00Z | 1,388 MW | 861 MW | 0 MW | 219 MW | 141 MW |
| 2026-11-10T03:00Z | 1,371 MW | 823 MW | 0 MW | 218 MW | 141 MW |
| 2026-11-10T04:00Z | 1,970 MW | 683 MW | 0 MW | 221 MW | 133 MW |
| 2026-11-10T05:00Z | 3,273 MW | 669 MW | 0 MW | 220 MW | 127 MW |
| 2026-11-10T06:00Z | 3,751 MW | 681 MW | 57 MW | 222 MW | 126 MW |
| 2026-11-10T07:00Z | 3,866 MW | 722 MW | 334 MW | 223 MW | 135 MW |
| 2026-11-10T08:00Z | 3,735 MW | 902 MW | 505 MW | 222 MW | 130 MW |
| 2026-11-10T09:00Z | 3,270 MW | 1,129 MW | 812 MW | 224 MW | 124 MW |
| 2026-11-10T10:00Z | 3,406 MW | 1,242 MW | 1,184 MW | 223 MW | 126 MW |
| 2026-11-10T11:00Z | 3,134 MW | 1,299 MW | 1,480 MW | 218 MW | 136 MW |
| 2026-11-10T12:00Z | 3,279 MW | 1,147 MW | 842 MW | 219 MW | 120 MW |
| 2026-11-10T13:00Z | 3,278 MW | 976 MW | 683 MW | 218 MW | 116 MW |
| 2026-11-10T14:00Z | 3,514 MW | 994 MW | 416 MW | 216 MW | 119 MW |
| 2026-11-10T15:00Z | 3,987 MW | 1,174 MW | 45 MW | 217 MW | 191 MW |
| 2026-11-10T16:00Z | 4,032 MW | 1,460 MW | 0 MW | 219 MW | 217 MW |
| 2026-11-10T17:00Z | 4,197 MW | 1,528 MW | 0 MW | 217 MW | 204 MW |
| 2026-11-10T18:00Z | 4,368 MW | 1,523 MW | 0 MW | 220 MW | 189 MW |
| 2026-11-10T19:00Z | 4,227 MW | 1,528 MW | 0 MW | 224 MW | 161 MW |
| 2026-11-10T20:00Z | 3,891 MW | 1,555 MW | 0 MW | 227 MW | 152 MW |
| 2026-11-10T21:00Z | 3,580 MW | 1,609 MW | 0 MW | 224 MW | 146 MW |
| 2026-11-10T22:00Z | 2,697 MW | 1,485 MW | 0 MW | 222 MW | 118 MW |
| 2026-11-10T23:00Z | 1,750 MW | 1,389 MW | 0 MW | 221 MW | 115 MW |
| 2026-11-11T00:00Z | 1,671 MW | 1,373 MW | 0 MW | 222 MW | 135 MW |
| 2026-11-11T01:00Z | 1,477 MW | 1,442 MW | 0 MW | 224 MW | 118 MW |
| 2026-11-11T02:00Z | 1,586 MW | 1,374 MW | 0 MW | 223 MW | 112 MW |
| 2026-11-11T03:00Z | 1,509 MW | 1,271 MW | 0 MW | 226 MW | 123 MW |
| 2026-11-11T04:00Z | 1,638 MW | 1,197 MW | 0 MW | 227 MW | 136 MW |
| 2026-11-11T05:00Z | 2,249 MW | 1,274 MW | 1 MW | 224 MW | 125 MW |
| 2026-11-11T06:00Z | 2,654 MW | 1,391 MW | 149 MW | 222 MW | 125 MW |
| 2026-11-11T07:00Z | 2,681 MW | 1,347 MW | 580 MW | 225 MW | 185 MW |
| 2026-11-11T08:00Z | 2,682 MW | 1,170 MW | 1,027 MW | 224 MW | 184 MW |
| 2026-11-11T09:00Z | 2,447 MW | 1,122 MW | 1,402 MW | 223 MW | 185 MW |
| 2026-11-11T10:00Z | 2,404 MW | 1,150 MW | 1,562 MW | 220 MW | 182 MW |
| 2026-11-11T11:00Z | 2,342 MW | 1,203 MW | 1,696 MW | 218 MW | 111 MW |
| 2026-11-11T12:00Z | 2,311 MW | 1,228 MW | 1,577 MW | 220 MW | 108 MW |
| 2026-11-11T13:00Z | 3,209 MW | 1,448 MW | 989 MW | 216 MW | 116 MW |
| 2026-11-11T14:00Z | 3,799 MW | 1,525 MW | 461 MW | 214 MW | 139 MW |
| 2026-11-11T15:00Z | 4,180 MW | 1,641 MW | 95 MW | 216 MW | 174 MW |
| 2026-11-11T16:00Z | 4,190 MW | 1,590 MW | 0 MW | 219 MW | 211 MW |
| 2026-11-11T17:00Z | 4,176 MW | 1,568 MW | 0 MW | 221 MW | 223 MW |
| 2026-11-11T18:00Z | 4,389 MW | 1,551 MW | 0 MW | 224 MW | 198 MW |
| 2026-11-11T19:00Z | 4,346 MW | 1,416 MW | 0 MW | 225 MW | 169 MW |
| 2026-11-11T20:00Z | 3,943 MW | 1,327 MW | 0 MW | 225 MW | 152 MW |
| 2026-11-11T21:00Z | 3,462 MW | 1,268 MW | 0 MW | 221 MW | 147 MW |
| 2026-11-11T22:00Z | 2,650 MW | 1,155 MW | 0 MW | 220 MW | 119 MW |
| 2026-11-11T23:00Z | 2,019 MW | 1,067 MW | 0 MW | 221 MW | 112 MW |
| 2026-11-12T00:00Z | 1,838 MW | 1,263 MW | 0 MW | 221 MW | 128 MW |
| 2026-11-12T01:00Z | 1,801 MW | 1,303 MW | 0 MW | 221 MW | 114 MW |
| 2026-11-12T02:00Z | 1,821 MW | 1,297 MW | 0 MW | 223 MW | 111 MW |
| 2026-11-12T03:00Z | 1,848 MW | 1,296 MW | 0 MW | 223 MW | 106 MW |
| 2026-11-12T04:00Z | 2,143 MW | 1,215 MW | 0 MW | 218 MW | 132 MW |
| 2026-11-12T05:00Z | 2,903 MW | 1,227 MW | 0 MW | 213 MW | 118 MW |
| 2026-11-12T06:00Z | 3,293 MW | 1,393 MW | 58 MW | 212 MW | 139 MW |
| 2026-11-12T07:00Z | 3,658 MW | 1,384 MW | 445 MW | 209 MW | 209 MW |
| 2026-11-12T08:00Z | 3,814 MW | 1,070 MW | 566 MW | 210 MW | 206 MW |
| 2026-11-12T09:00Z | 3,839 MW | 1,096 MW | 790 MW | 209 MW | 181 MW |
| 2026-11-12T10:00Z | 3,794 MW | 1,206 MW | 924 MW | 204 MW | 205 MW |
| 2026-11-12T11:00Z | 3,803 MW | 1,387 MW | 873 MW | 205 MW | 133 MW |
| 2026-11-12T12:00Z | 3,835 MW | 1,743 MW | 592 MW | 205 MW | 132 MW |
| 2026-11-12T13:00Z | 3,696 MW | 1,892 MW | 449 MW | 207 MW | 143 MW |
| 2026-11-12T14:00Z | 3,885 MW | 1,859 MW | 141 MW | 212 MW | 174 MW |
| 2026-11-12T15:00Z | 4,052 MW | 1,859 MW | 23 MW | 210 MW | 158 MW |
| 2026-11-12T16:00Z | 3,691 MW | 1,843 MW | 0 MW | 209 MW | 172 MW |
| 2026-11-12T17:00Z | 3,720 MW | 1,782 MW | 0 MW | 213 MW | 179 MW |
| 2026-11-12T18:00Z | 3,710 MW | 1,713 MW | 0 MW | 214 MW | 184 MW |
| 2026-11-12T19:00Z | 3,702 MW | 1,623 MW | 0 MW | 214 MW | 141 MW |
| 2026-11-12T20:00Z | 3,308 MW | 1,661 MW | 0 MW | 217 MW | 139 MW |
| 2026-11-12T21:00Z | 2,311 MW | 1,711 MW | 0 MW | 214 MW | 136 MW |
| 2026-11-12T22:00Z | 1,880 MW | 1,767 MW | 0 MW | 213 MW | 162 MW |
| 2026-11-12T23:00Z | 1,074 MW | 1,776 MW | 0 MW | 212 MW | 132 MW |
| 2026-11-13T00:00Z | 819 MW | 1,723 MW | 0 MW | 212 MW | 138 MW |
| 2026-11-13T01:00Z | 711 MW | 1,702 MW | 0 MW | 212 MW | 132 MW |
| 2026-11-13T02:00Z | 749 MW | 1,752 MW | 0 MW | 214 MW | 132 MW |
| 2026-11-13T03:00Z | 624 MW | 1,737 MW | 0 MW | 214 MW | 135 MW |
| 2026-11-13T04:00Z | 882 MW | 1,725 MW | 0 MW | 214 MW | 151 MW |
| 2026-11-13T05:00Z | 1,258 MW | 1,674 MW | 0 MW | 215 MW | 162 MW |
| 2026-11-13T06:00Z | 1,191 MW | 1,679 MW | 201 MW | 210 MW | 230 MW |
| 2026-11-13T07:00Z | 1,354 MW | 1,732 MW | 700 MW | 214 MW | 311 MW |
| 2026-11-13T08:00Z | 1,348 MW | 1,730 MW | 1,335 MW | 210 MW | 277 MW |
| 2026-11-13T09:00Z | 1,109 MW | 1,742 MW | 1,854 MW | 188 MW | 238 MW |
| 2026-11-13T10:00Z | 936 MW | 1,776 MW | 2,225 MW | 184 MW | 247 MW |
| 2026-11-13T11:00Z | 846 MW | 1,792 MW | 1,962 MW | 185 MW | 193 MW |
| 2026-11-13T12:00Z | 979 MW | 1,818 MW | 1,808 MW | 187 MW | 188 MW |
| 2026-11-13T13:00Z | 1,276 MW | 1,761 MW | 1,296 MW | 188 MW | 188 MW |
| 2026-11-13T14:00Z | 2,139 MW | 1,780 MW | 700 MW | 188 MW | 198 MW |
| 2026-11-13T15:00Z | 2,704 MW | 1,704 MW | 131 MW | 190 MW | 207 MW |
| 2026-11-13T16:00Z | 2,796 MW | 1,564 MW | 0 MW | 191 MW | 234 MW |
| 2026-11-13T17:00Z | 2,848 MW | 1,552 MW | 0 MW | 192 MW | 269 MW |
| 2026-11-13T18:00Z | 2,811 MW | 1,668 MW | 0 MW | 195 MW | 264 MW |
| 2026-11-13T19:00Z | 2,820 MW | 1,663 MW | 0 MW | 195 MW | 241 MW |
| 2026-11-13T20:00Z | 2,629 MW | 1,541 MW | 0 MW | 196 MW | 253 MW |
| 2026-11-13T21:00Z | 1,387 MW | 1,425 MW | 0 MW | 193 MW | 232 MW |
| 2026-11-13T22:00Z | 1,143 MW | 1,218 MW | 0 MW | 192 MW | 238 MW |
| 2026-11-13T23:00Z | 1,053 MW | 1,000 MW | 0 MW | 190 MW | 263 MW |
| 2026-11-14T00:00Z | 1,124 MW | 825 MW | 0 MW | 190 MW | 255 MW |
| 2026-11-14T01:00Z | 1,086 MW | 803 MW | 0 MW | 191 MW | 273 MW |
| 2026-11-14T02:00Z | 1,093 MW | 658 MW | 0 MW | 189 MW | 247 MW |
| 2026-11-14T03:00Z | 1,115 MW | 408 MW | 0 MW | 188 MW | 244 MW |
| 2026-11-14T04:00Z | 1,126 MW | 283 MW | 0 MW | 193 MW | 284 MW |
| 2026-11-14T05:00Z | 1,107 MW | 187 MW | 0 MW | 193 MW | 277 MW |
| 2026-11-14T06:00Z | 1,084 MW | 159 MW | 213 MW | 192 MW | 296 MW |
| 2026-11-14T07:00Z | 1,084 MW | 161 MW | 1,228 MW | 192 MW | 292 MW |
| 2026-11-14T08:00Z | 1,005 MW | 209 MW | 2,185 MW | 192 MW | 261 MW |
| 2026-11-14T09:00Z | 1,031 MW | 194 MW | 2,520 MW | 192 MW | 226 MW |
| 2026-11-14T10:00Z | 943 MW | 178 MW | 2,887 MW | 188 MW | 221 MW |
| 2026-11-14T11:00Z | 791 MW | 172 MW | 2,748 MW | 188 MW | 224 MW |
| 2026-11-14T12:00Z | 815 MW | 140 MW | 2,762 MW | 188 MW | 223 MW |
| 2026-11-14T13:00Z | 1,002 MW | 120 MW | 2,171 MW | 189 MW | 239 MW |
| 2026-11-14T14:00Z | 1,601 MW | 119 MW | 1,010 MW | 190 MW | 212 MW |
| 2026-11-14T15:00Z | 2,082 MW | 107 MW | 128 MW | 194 MW | 207 MW |
| 2026-11-14T16:00Z | 2,040 MW | 75 MW | 0 MW | 194 MW | 246 MW |
| 2026-11-14T17:00Z | 2,050 MW | 60 MW | 0 MW | 196 MW | 292 MW |
| 2026-11-14T18:00Z | 2,053 MW | 66 MW | 0 MW | 199 MW | 274 MW |
| 2026-11-14T19:00Z | 2,049 MW | 124 MW | 0 MW | 200 MW | 251 MW |
| 2026-11-14T20:00Z | 2,033 MW | 183 MW | 0 MW | 200 MW | 221 MW |
| 2026-11-14T21:00Z | 1,716 MW | 213 MW | 0 MW | 195 MW | 221 MW |
| 2026-11-14T22:00Z | 1,613 MW | 231 MW | 0 MW | 194 MW | 249 MW |
| 2026-11-14T23:00Z | 1,504 MW | 265 MW | 0 MW | 194 MW | 206 MW |
| 2026-11-15T00:00Z | 1,609 MW | 288 MW | 0 MW | 193 MW | 201 MW |
| 2026-11-15T01:00Z | 1,169 MW | 259 MW | 0 MW | 195 MW | 193 MW |
| 2026-11-15T02:00Z | 1,065 MW | 281 MW | 0 MW | 195 MW | 193 MW |
| 2026-11-15T03:00Z | 1,061 MW | 278 MW | 0 MW | 195 MW | 207 MW |
| 2026-11-15T04:00Z | 1,004 MW | 355 MW | 0 MW | 195 MW | 224 MW |
| 2026-11-15T05:00Z | 1,070 MW | 485 MW | 0 MW | 195 MW | 243 MW |
| 2026-11-15T06:00Z | 1,095 MW | 538 MW | 83 MW | 196 MW | 274 MW |
| 2026-11-15T07:00Z | 1,030 MW | 463 MW | 499 MW | 197 MW | 310 MW |
| 2026-11-15T08:00Z | 358 MW | 413 MW | 1,270 MW | 198 MW | 267 MW |
| 2026-11-15T09:00Z | 279 MW | 570 MW | 1,483 MW | 199 MW | 223 MW |
| 2026-11-15T10:00Z | 410 MW | 726 MW | 1,368 MW | 194 MW | 239 MW |
| 2026-11-15T11:00Z | 917 MW | 1,321 MW | 1,409 MW | 194 MW | 251 MW |
| 2026-11-15T12:00Z | 1,063 MW | 1,355 MW | 1,223 MW | 192 MW | 250 MW |
| 2026-11-15T13:00Z | 1,035 MW | 1,393 MW | 980 MW | 190 MW | 257 MW |
| 2026-11-15T14:00Z | 1,394 MW | 1,170 MW | 472 MW | 190 MW | 262 MW |
| 2026-11-15T15:00Z | 2,125 MW | 1,043 MW | 41 MW | 195 MW | 286 MW |
| 2026-11-15T16:00Z | 2,048 MW | 1,049 MW | 0 MW | 197 MW | 338 MW |
| 2026-11-15T17:00Z | 2,119 MW | 872 MW | 0 MW | 198 MW | 352 MW |
| 2026-11-15T18:00Z | 2,173 MW | 770 MW | 0 MW | 195 MW | 352 MW |
| 2026-11-15T19:00Z | 2,200 MW | 704 MW | 0 MW | 197 MW | 320 MW |
| 2026-11-15T20:00Z | 2,146 MW | 740 MW | 0 MW | 197 MW | 292 MW |
| 2026-11-15T21:00Z | 2,076 MW | 811 MW | 0 MW | 196 MW | 335 MW |
| 2026-11-15T22:00Z | 2,056 MW | 840 MW | 0 MW | 192 MW | 285 MW |
| 2026-11-15T23:00Z | 1,306 MW | 742 MW | 0 MW | 190 MW | 300 MW |
| 2026-11-16T00:00Z | 1,195 MW | 786 MW | 0 MW | 190 MW | 276 MW |
| 2026-11-16T01:00Z | 1,151 MW | 783 MW | 0 MW | 190 MW | 296 MW |
| 2026-11-16T02:00Z | 1,226 MW | 1,165 MW | 0 MW | 190 MW | 271 MW |
| 2026-11-16T03:00Z | 1,128 MW | 1,514 MW | 0 MW | 189 MW | 269 MW |
| 2026-11-16T04:00Z | 1,143 MW | 1,529 MW | 0 MW | 188 MW | 271 MW |
| 2026-11-16T05:00Z | 1,459 MW | 1,459 MW | 1 MW | 187 MW | 326 MW |
| 2026-11-16T06:00Z | 1,851 MW | 1,479 MW | 61 MW | 187 MW | 324 MW |
| 2026-11-16T07:00Z | 1,855 MW | 1,506 MW | 442 MW | 189 MW | 405 MW |
| 2026-11-16T08:00Z | 1,834 MW | 1,616 MW | 1,166 MW | 192 MW | 413 MW |
| 2026-11-16T09:00Z | 1,785 MW | 1,602 MW | 1,745 MW | 188 MW | 319 MW |
| 2026-11-16T10:00Z | 1,690 MW | 1,566 MW | 2,054 MW | 186 MW | 327 MW |
| 2026-11-16T11:00Z | 1,722 MW | 1,336 MW | 2,203 MW | 186 MW | 296 MW |
| 2026-11-16T12:00Z | 1,787 MW | 1,361 MW | 1,852 MW | 186 MW | 275 MW |
| 2026-11-16T13:00Z | 2,724 MW | 1,351 MW | 1,379 MW | 184 MW | 302 MW |
| 2026-11-16T14:00Z | 3,398 MW | 1,253 MW | 587 MW | 186 MW | 337 MW |
| 2026-11-16T15:00Z | 3,566 MW | 1,233 MW | 86 MW | 188 MW | 331 MW |
| 2026-11-16T16:00Z | 3,569 MW | 1,108 MW | 0 MW | 188 MW | 362 MW |
| 2026-11-16T17:00Z | 3,615 MW | 897 MW | 0 MW | 191 MW | 354 MW |
| 2026-11-16T18:00Z | 3,617 MW | 844 MW | 0 MW | 192 MW | 355 MW |
| 2026-11-16T19:00Z | 3,573 MW | 965 MW | 0 MW | 194 MW | 355 MW |
| 2026-11-16T20:00Z | 2,786 MW | 1,141 MW | 0 MW | 195 MW | 328 MW |
| 2026-11-16T21:00Z | 2,369 MW | 1,364 MW | 0 MW | 193 MW | 295 MW |
| 2026-11-16T22:00Z | 1,561 MW | 1,384 MW | 0 MW | 191 MW | 299 MW |
| 2026-11-16T23:00Z | 1,169 MW | 1,442 MW | 0 MW | 156 MW | 299 MW |
| 2026-11-17T00:00Z | 1,065 MW | 1,464 MW | 0 MW | 141 MW | 279 MW |
| 2026-11-17T01:00Z | 1,063 MW | 1,409 MW | 0 MW | 144 MW | 308 MW |
| 2026-11-17T02:00Z | 1,122 MW | 1,461 MW | 0 MW | 144 MW | 280 MW |
| 2026-11-17T03:00Z | 1,083 MW | 1,409 MW | 0 MW | 146 MW | 298 MW |
| 2026-11-17T04:00Z | 1,077 MW | 1,370 MW | 0 MW | 153 MW | 282 MW |
| 2026-11-17T05:00Z | 1,091 MW | 1,416 MW | 82 MW | 189 MW | 321 MW |
| 2026-11-17T06:00Z | 1,132 MW | 1,388 MW | 278 MW | 200 MW | 361 MW |
| 2026-11-17T07:00Z | 813 MW | 1,406 MW | 769 MW | 192 MW | 383 MW |
| 2026-11-17T08:00Z | 556 MW | 1,454 MW | 981 MW | 189 MW | 381 MW |
| 2026-11-17T09:00Z | 567 MW | 1,452 MW | 1,279 MW | 195 MW | 360 MW |
| 2026-11-17T10:00Z | 593 MW | 1,454 MW | 1,749 MW | 194 MW | 348 MW |
| 2026-11-17T11:00Z | 541 MW | 1,484 MW | 1,491 MW | 190 MW | 279 MW |
| 2026-11-17T12:00Z | 555 MW | 1,464 MW | 1,231 MW | 196 MW | 267 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-17T12:00Z.
Day by Day
Daily totals, Europe/Rome time dates, through 2026-11-16Show the data table (400 rows)
| Date (Europe/Rome time) | Demand |
|---|---|
| 2025-10-13 | 121 GWh |
| 2025-10-14 | 120 GWh |
| 2025-10-15 | 124 GWh |
| 2025-10-16 | 124 GWh |
| 2025-10-17 | 118 GWh |
| 2025-10-18 | 115 GWh |
| 2025-10-19 | 110 GWh |
| 2025-10-20 | 124 GWh |
| 2025-10-21 | 124 GWh |
| 2025-10-22 | 120 GWh |
| 2025-10-23 | 121 GWh |
| 2025-10-24 | 114 GWh |
| 2025-10-25 | 104 GWh |
| 2025-10-26 | 104 GWh |
| 2025-10-27 | 111 GWh |
| 2025-10-28 | 120 GWh |
| 2025-10-29 | 122 GWh |
| 2025-10-30 | 121 GWh |
| 2025-10-31 | 118 GWh |
| 2025-11-01 | 109 GWh |
| 2025-11-02 | 103 GWh |
| 2025-11-03 | 122 GWh |
| 2025-11-04 | 116 GWh |
| 2025-11-05 | 112 GWh |
| 2025-11-06 | 116 GWh |
| 2025-11-07 | 116 GWh |
| 2025-11-08 | 112 GWh |
| 2025-11-09 | 112 GWh |
| 2025-11-10 | 108 GWh |
| 2025-11-11 | 118 GWh |
| 2025-11-12 | 124 GWh |
| 2025-11-13 | 127 GWh |
| 2025-11-14 | 130 GWh |
| 2025-11-15 | 120 GWh |
| 2025-11-16 | 109 GWh |
| 2025-11-17 | 132 GWh |
| 2025-11-18 | 127 GWh |
| 2025-11-19 | 131 GWh |
| 2025-11-20 | 136 GWh |
| 2025-11-21 | 129 GWh |
| 2025-11-22 | 118 GWh |
| 2025-11-23 | 110 GWh |
| 2025-11-24 | 145 GWh |
| 2025-11-25 | 149 GWh |
| 2025-11-26 | 139 GWh |
| 2025-11-27 | 136 GWh |
| 2025-11-28 | 138 GWh |
| 2025-11-29 | 120 GWh |
| 2025-11-30 | 120 GWh |
| 2025-12-01 | 145 GWh |
| 2025-12-02 | 145 GWh |
| 2025-12-03 | 147 GWh |
| 2025-12-04 | 144 GWh |
| 2025-12-05 | 146 GWh |
| 2025-12-06 | 128 GWh |
| 2025-12-07 | 121 GWh |
| 2025-12-08 | 118 GWh |
| 2025-12-09 | 145 GWh |
| 2025-12-10 | 146 GWh |
| 2025-12-11 | 146 GWh |
| 2025-12-12 | 145 GWh |
| 2025-12-13 | 124 GWh |
| 2025-12-14 | 116 GWh |
| 2025-12-15 | 143 GWh |
| 2025-12-16 | 151 GWh |
| 2025-12-17 | 149 GWh |
| 2025-12-18 | 137 GWh |
| 2025-12-19 | 135 GWh |
| 2025-12-20 | 122 GWh |
| 2025-12-21 | 117 GWh |
| 2025-12-22 | 130 GWh |
| 2025-12-23 | 132 GWh |
| 2025-12-24 | 122 GWh |
| 2025-12-25 | 106 GWh |
| 2025-12-26 | 115 GWh |
| 2025-12-27 | 120 GWh |
| 2025-12-28 | 113 GWh |
| 2025-12-29 | 135 GWh |
| 2025-12-30 | 134 GWh |
| 2025-12-31 | 126 GWh |
| 2026-01-01 | 113 GWh |
| 2026-01-02 | 139 GWh |
| 2026-01-03 | 128 GWh |
| 2026-01-04 | 118 GWh |
| 2026-01-05 | 135 GWh |
| 2026-01-06 | 127 GWh |
| 2026-01-07 | 146 GWh |
| 2026-01-08 | 160 GWh |
| 2026-01-09 | 161 GWh |
| 2026-01-10 | 140 GWh |
| 2026-01-11 | 124 GWh |
| 2026-01-12 | 149 GWh |
| 2026-01-13 | 149 GWh |
| 2026-01-14 | 147 GWh |
| 2026-01-15 | 141 GWh |
| 2026-01-16 | 144 GWh |
| 2026-01-17 | 129 GWh |
| 2026-01-18 | 116 GWh |
| 2026-01-19 | 147 GWh |
| 2026-01-20 | 156 GWh |
| 2026-01-21 | 149 GWh |
| 2026-01-22 | 142 GWh |
| 2026-01-23 | 141 GWh |
| 2026-01-24 | 130 GWh |
| 2026-01-25 | 126 GWh |
| 2026-01-26 | 148 GWh |
| 2026-01-27 | 146 GWh |
| 2026-01-28 | 160 GWh |
| 2026-01-29 | 149 GWh |
| 2026-01-30 | 147 GWh |
| 2026-01-31 | 131 GWh |
| 2026-02-01 | 122 GWh |
| 2026-02-02 | 141 GWh |
| 2026-02-03 | 149 GWh |
| 2026-02-04 | 150 GWh |
| 2026-02-05 | 147 GWh |
| 2026-02-06 | 151 GWh |
| 2026-02-07 | 132 GWh |
| 2026-02-08 | 123 GWh |
| 2026-02-09 | 136 GWh |
| 2026-02-10 | 138 GWh |
| 2026-02-11 | 151 GWh |
| 2026-02-12 | 155 GWh |
| 2026-02-13 | 142 GWh |
| 2026-02-14 | 132 GWh |
| 2026-02-15 | 119 GWh |
| 2026-02-16 | 148 GWh |
| 2026-02-17 | 145 GWh |
| 2026-02-18 | 146 GWh |
| 2026-02-19 | 149 GWh |
| 2026-02-20 | 143 GWh |
| 2026-02-21 | 126 GWh |
| 2026-02-22 | 117 GWh |
| 2026-02-23 | 139 GWh |
| 2026-02-24 | 139 GWh |
| 2026-02-25 | 134 GWh |
| 2026-02-26 | 131 GWh |
| 2026-02-27 | 132 GWh |
| 2026-02-28 | 123 GWh |
| 2026-03-01 | 123 GWh |
| 2026-03-02 | 135 GWh |
| 2026-03-03 | 132 GWh |
| 2026-03-04 | 135 GWh |
| 2026-03-05 | 137 GWh |
| 2026-03-06 | 137 GWh |
| 2026-03-07 | 127 GWh |
| 2026-03-08 | 119 GWh |
| 2026-03-09 | 129 GWh |
| 2026-03-10 | 134 GWh |
| 2026-03-11 | 132 GWh |
| 2026-03-12 | 131 GWh |
| 2026-03-13 | 127 GWh |
| 2026-03-14 | 127 GWh |
| 2026-03-15 | 113 GWh |
| 2026-03-16 | 137 GWh |
| 2026-03-17 | 139 GWh |
| 2026-03-18 | 133 GWh |
| 2026-03-19 | 136 GWh |
| 2026-03-20 | 135 GWh |
| 2026-03-21 | 129 GWh |
| 2026-03-22 | 114 GWh |
| 2026-03-23 | 136 GWh |
| 2026-03-24 | 135 GWh |
| 2026-03-25 | 134 GWh |
| 2026-03-26 | 143 GWh |
| 2026-03-27 | 137 GWh |
| 2026-03-28 | 120 GWh |
| 2026-03-29 | 104 GWh |
| 2026-03-30 | 128 GWh |
| 2026-03-31 | 145 GWh |
| 2026-04-01 | 146 GWh |
| 2026-04-02 | 141 GWh |
| 2026-04-03 | 128 GWh |
| 2026-04-04 | 108 GWh |
| 2026-04-05 | 99.6 GWh |
| 2026-04-06 | 100 GWh |
| 2026-04-07 | 116 GWh |
| 2026-04-08 | 119 GWh |
| 2026-04-09 | 120 GWh |
| 2026-04-10 | 123 GWh |
| 2026-04-11 | 114 GWh |
| 2026-04-12 | 108 GWh |
| 2026-04-13 | 117 GWh |
| 2026-04-14 | 122 GWh |
| 2026-04-15 | 125 GWh |
| 2026-04-16 | 120 GWh |
| 2026-04-17 | 113 GWh |
| 2026-04-18 | 105 GWh |
| 2026-04-19 | 93.8 GWh |
| 2026-04-20 | 114 GWh |
| 2026-04-21 | 128 GWh |
| 2026-04-22 | 127 GWh |
| 2026-04-23 | 117 GWh |
| 2026-04-24 | 115 GWh |
| 2026-04-25 | 104 GWh |
| 2026-04-26 | 99.7 GWh |
| 2026-04-27 | 115 GWh |
| 2026-04-28 | 115 GWh |
| 2026-04-29 | 120 GWh |
| 2026-04-30 | 118 GWh |
| 2026-05-01 | 94.4 GWh |
| 2026-05-02 | 98.4 GWh |
| 2026-05-03 | 93.3 GWh |
| 2026-05-04 | 117 GWh |
| 2026-05-05 | 123 GWh |
| 2026-05-06 | 122 GWh |
| 2026-05-07 | 122 GWh |
| 2026-05-08 | 125 GWh |
| 2026-05-09 | 111 GWh |
| 2026-05-10 | 107 GWh |
| 2026-05-11 | 118 GWh |
| 2026-05-12 | 121 GWh |
| 2026-05-13 | 125 GWh |
| 2026-05-14 | 119 GWh |
| 2026-05-15 | 124 GWh |
| 2026-05-16 | 112 GWh |
| 2026-05-17 | 93.7 GWh |
| 2026-05-18 | 114 GWh |
| 2026-05-19 | 117 GWh |
| 2026-05-20 | 128 GWh |
| 2026-05-21 | 120 GWh |
| 2026-05-22 | 116 GWh |
| 2026-05-23 | 104 GWh |
| 2026-05-24 | 96.5 GWh |
| 2026-05-25 | 118 GWh |
| 2026-05-26 | 125 GWh |
| 2026-05-27 | 130 GWh |
| 2026-05-28 | 133 GWh |
| 2026-05-29 | 130 GWh |
| 2026-05-30 | 112 GWh |
| 2026-05-31 | 102 GWh |
| 2026-06-01 | 116 GWh |
| 2026-06-02 | 117 GWh |
| 2026-06-03 | 131 GWh |
| 2026-06-04 | 131 GWh |
| 2026-06-05 | 131 GWh |
| 2026-06-06 | 117 GWh |
| 2026-06-07 | 107 GWh |
| 2026-06-08 | 132 GWh |
| 2026-06-09 | 136 GWh |
| 2026-06-10 | 139 GWh |
| 2026-06-11 | 135 GWh |
| 2026-06-12 | 135 GWh |
| 2026-06-13 | 122 GWh |
| 2026-06-14 | 108 GWh |
| 2026-06-15 | 128 GWh |
| 2026-06-16 | 135 GWh |
| 2026-06-17 | 145 GWh |
| 2026-06-18 | 148 GWh |
| 2026-06-19 | 144 GWh |
| 2026-06-20 | 136 GWh |
| 2026-06-21 | 125 GWh |
| 2026-06-22 | 145 GWh |
| 2026-06-23 | 150 GWh |
| 2026-06-24 | 154 GWh |
| 2026-06-25 | 153 GWh |
| 2026-06-26 | 155 GWh |
| 2026-06-27 | 146 GWh |
| 2026-06-28 | 139 GWh |
| 2026-06-29 | 161 GWh |
| 2026-06-30 | 169 GWh |
| 2026-07-01 | 174 GWh |
| 2026-07-02 | 156 GWh |
| 2026-07-03 | 152 GWh |
| 2026-07-04 | 133 GWh |
| 2026-07-05 | 121 GWh |
| 2026-07-06 | 147 GWh |
| 2026-07-07 | 153 GWh |
| 2026-07-08 | 156 GWh |
| 2026-07-09 | 158 GWh |
| 2026-07-10 | 160 GWh |
| 2026-07-11 | 149 GWh |
| 2026-07-12 | 133 GWh |
| 2026-07-13 | 162 GWh |
| 2026-07-14 | 175 GWh |
| 2026-07-15 | 177 GWh |
| 2026-07-16 | 179 GWh |
| 2026-07-17 | 186 GWh |
| 2026-07-18 | 163 GWh |
| 2026-07-19 | 156 GWh |
| 2026-07-20 | 181 GWh |
| 2026-07-21 | 182 GWh |
| 2026-07-22 | 172 GWh |
| 2026-07-23 | 169 GWh |
| 2026-07-24 | 157 GWh |
| 2026-07-25 | 130 GWh |
| 2026-07-26 | 132 GWh |
| 2026-07-27 | 166 GWh |
| 2026-07-28 | 177 GWh |
| 2026-07-29 | 181 GWh |
| 2026-07-30 | 188 GWh |
| 2026-07-31 | 185 GWh |
| 2026-08-01 | 171 GWh |
| 2026-08-02 | 153 GWh |
| 2026-08-03 | 171 GWh |
| 2026-08-04 | 177 GWh |
| 2026-08-05 | 179 GWh |
| 2026-08-06 | 172 GWh |
| 2026-08-07 | 169 GWh |
| 2026-08-08 | 149 GWh |
| 2026-08-09 | 137 GWh |
| 2026-08-10 | 154 GWh |
| 2026-08-11 | 154 GWh |
| 2026-08-12 | 149 GWh |
| 2026-08-13 | 142 GWh |
| 2026-08-14 | 137 GWh |
| 2026-08-15 | 124 GWh |
| 2026-08-16 | 131 GWh |
| 2026-08-17 | 143 GWh |
| 2026-08-18 | 135 GWh |
| 2026-08-19 | 143 GWh |
| 2026-08-20 | 146 GWh |
| 2026-08-21 | 145 GWh |
| 2026-08-22 | 135 GWh |
| 2026-08-23 | 120 GWh |
| 2026-08-24 | 150 GWh |
| 2026-08-25 | 157 GWh |
| 2026-08-26 | 162 GWh |
| 2026-08-27 | 165 GWh |
| 2026-08-28 | 169 GWh |
| 2026-08-29 | 155 GWh |
| 2026-08-30 | 150 GWh |
| 2026-08-31 | 172 GWh |
| 2026-09-01 | 177 GWh |
| 2026-09-02 | 174 GWh |
| 2026-09-03 | 171 GWh |
| 2026-09-04 | 168 GWh |
| 2026-09-05 | 150 GWh |
| 2026-09-06 | 141 GWh |
| 2026-09-07 | 172 GWh |
| 2026-09-08 | 173 GWh |
| 2026-09-09 | 172 GWh |
| 2026-09-10 | 166 GWh |
| 2026-09-11 | 151 GWh |
| 2026-09-12 | 129 GWh |
| 2026-09-13 | 119 GWh |
| 2026-09-14 | 139 GWh |
| 2026-09-15 | 143 GWh |
| 2026-09-16 | 142 GWh |
| 2026-09-17 | 148 GWh |
| 2026-09-18 | 149 GWh |
| 2026-09-19 | 127 GWh |
| 2026-09-20 | 119 GWh |
| 2026-09-21 | 145 GWh |
| 2026-09-22 | 146 GWh |
| 2026-09-23 | 134 GWh |
| 2026-09-24 | 137 GWh |
| 2026-09-25 | 137 GWh |
| 2026-09-26 | 118 GWh |
| 2026-09-27 | 111 GWh |
| 2026-09-28 | 133 GWh |
| 2026-09-29 | 131 GWh |
| 2026-09-30 | 132 GWh |
| 2026-10-01 | 124 GWh |
| 2026-10-02 | 127 GWh |
| 2026-10-03 | 114 GWh |
| 2026-10-04 | 119 GWh |
| 2026-10-05 | 136 GWh |
| 2026-10-06 | 136 GWh |
| 2026-10-07 | 135 GWh |
| 2026-10-08 | 129 GWh |
| 2026-10-09 | 128 GWh |
| 2026-10-10 | 122 GWh |
| 2026-10-11 | 105 GWh |
| 2026-10-12 | 128 GWh |
| 2026-10-13 | 119 GWh |
| 2026-10-14 | 120 GWh |
| 2026-10-15 | 119 GWh |
| 2026-10-16 | 121 GWh |
| 2026-10-17 | 109 GWh |
| 2026-10-18 | 109 GWh |
| 2026-10-19 | 121 GWh |
| 2026-10-20 | 125 GWh |
| 2026-10-21 | 129 GWh |
| 2026-10-22 | 122 GWh |
| 2026-10-23 | 122 GWh |
| 2026-10-24 | 111 GWh |
| 2026-10-25 | 108 GWh |
| 2026-10-26 | 124 GWh |
| 2026-10-27 | 125 GWh |
| 2026-10-28 | 128 GWh |
| 2026-10-29 | 121 GWh |
| 2026-10-30 | 122 GWh |
| 2026-10-31 | 114 GWh |
| 2026-11-01 | 114 GWh |
| 2026-11-02 | 142 GWh |
| 2026-11-03 | 143 GWh |
| 2026-11-04 | 143 GWh |
| 2026-11-05 | 141 GWh |
| 2026-11-06 | 147 GWh |
| 2026-11-07 | 130 GWh |
| 2026-11-08 | 122 GWh |
| 2026-11-09 | 146 GWh |
| 2026-11-10 | 149 GWh |
| 2026-11-11 | 146 GWh |
| 2026-11-12 | 144 GWh |
| 2026-11-13 | 140 GWh |
| 2026-11-14 | 117 GWh |
| 2026-11-15 | 112 GWh |
| 2026-11-16 | 135 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-16. Daily totals are summed by World Power Monitor from complete Europe/Rome local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 43.4 TWh | 27.6 TWh | Gas 42.3% | 320 |
| 2025 | 48.0 TWh | 28.1 TWh | Gas 46.1% | 365 |
| 2024 (partial) | 49.3 TWh | 27.2 TWh | Gas 45.1% | 365 |
| 2023 | 49.1 TWh | 25.8 TWh | Gas 27.4% | 365 |
| 2022 | 50.7 TWh | 30.2 TWh | Gas 34.3% | 365 |
| 2021 | 49.9 TWh | 31.4 TWh | Gas 38.1% | 365 |
| 2020 | 42.8 TWh | 26.8 TWh | Gas 39.9% | 366 |
| 2019 | 45.6 TWh | 29.1 TWh | Gas 42.5% | 365 |
| 2018 | 44.5 TWh | 30.2 TWh | Coal 29.2% | 365 |
| 2017 | 46.3 TWh | 32.8 TWh | Coal 27.5% | 365 |
| 2016 | 45.2 TWh | 30.7 TWh | Other 30.0% | 366 |
| 2015 | 46.4 TWh | 29.4 TWh | Other 34.4% | 365 |
A year is partial when ENTSO-E has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-16.
Power Flows With Neighbours
Net totals, 2026-10-18 (18 October 2026) to 2026-11-16 (16 November 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Italy South | Italy Centre-South imports | 1.49 TWh |
| Italy Centre-North | Italy Centre-South exports | 616 GWh |
| Italy Sardinia | Italy Centre-South imports | 297 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-16.
Latest Grid Alerts
Newest alert 6 November 2026- Wind and solar On 6 November 2026 wind and solar made up 6.3% of generation in Italy Centre-South, the lowest daily wind and solar share in 370 days of loaded history (against a median of 40.5%). All alerts that day
- Net imports Italy Centre-South imported a net 54.0 GWh on 25 October 2026, the 3rd highest daily net imports in 377 days of loaded history and 50% of its demand that day. All alerts that day
Follow this grid: RSS feed of Italy Centre-South alerts. Source: ENTSO-E operator data, provisional. Alerts by zone.
Share and Embed
Figures as of 2026-11-17 (17 November 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Italy Centre-South, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). Italy Centre-South Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/it-csud/
World Power Monitor. Italy Centre-South Electricity Demand and Generation Mix. Data as of 2026-11-17 12:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/it-csud/
@misc{wpm_zones_it_csud_2026,
title = {{Italy Centre-South Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-17 12:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/it-csud/}
} Permalink: https://worldpowermonitor.com/zones/it-csud/
The Copy buttons add today's date as the access date.