Built 2026-09-20 (20 September 2026)

Grid Stress Alerts for 17 September 2026

4 notable grid events on 17 September 2026 in ENTSO-E and EIA operator data: 4 net imports. Records are judged against the days loaded for each zone, and each sentence says how many.

Key Facts

  • Net imports into Albania reached 4.61 GWh on 17 September 2026 (23% of demand), the 2nd highest daily net imports in 381 days of loaded history.
  • Italy Centre-North imported a net 41.9 GWh on 17 September 2026, the 2nd highest daily net imports in 386 days of loaded history and 58% of its demand that day.
  • Net imports into Sweden South-Central (SE3) reached 61.7 GWh on 17 September 2026 (30% of demand), the 2nd highest daily net imports in 398 days of loaded history.

All Alerts, 17 September 2026

4 events

Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-17. Operator data only, kept apart from annual statistics.