The 2006 European Grid Split

On 4 November 2006, Germany and the interconnected European grid: A line switched off so a ship could pass set off a cascade that split Europe's interconnected grid in three and cut power to over 15 million households.

Key Facts

  • The disturbance began at about 22:10 on 4 November 2006.
  • A line switched off for a ship to pass the Ems river left the grid so stretched that one more switch split Europe in three.
  • More than 15 million European households lost power.
  • Normal supply was back in all countries in less than 2 hours.

What Happened

On the evening of Saturday 4 November 2006, both circuits of a 380 kV line in northern Germany were switched off so that a ship could pass safely along the Ems river. The shutdown had been planned for the early hours of the next day, but the time was brought forward and the neighbouring grid operators were told late. A routine simulation run in advance showed no problem.

At about 22:10 an operator at the Landesbergen substation tried to reduce the flow on a heavily loaded line by coupling busbars, and the move tripped the line instead. Other lines tripped one after another across the interconnected grid, which split into three separate areas. Frequency fell to about 49 Hz in the west, rose to about 51.4 Hz in the north east and dipped only slightly, to about 49.7 Hz, in the south east. In the west, automatic load shedding cut about 17,000 MW of consumption and 1,600 MW of pumps within seconds, which stopped the system collapsing.

More than 15 million European households lost supply. Operators began reconnecting the areas at 22:47 and had a normal situation back in all countries in less than two hours. The investigation named two main causes: after the manual switch-off the grid no longer met the rule that it must survive the loss of any single element, and the operators had not coordinated enough. It also found that many wind turbines and other generators on distribution grids tripped as frequency fell, and that some local network operators reconnected customers without coordinating with the transmission operators.

Cause

A planned line shutdown that left the grid short of its single failure safety margin, and too little coordination between operators

Researched independently from public reporting, not from this site's own data. Source: UCTE Annual Report 2006, hosted by ENTSO-E.

Cite this page
APA 7

World Power Monitor. (2006). The 2006 European Grid Split: What Happened and Why. https://worldpowermonitor.com/grid-events/european-grid-split-2006/

Plain text

World Power Monitor. The 2006 European Grid Split: What Happened and Why. Data as of 2006-11-04. https://worldpowermonitor.com/grid-events/european-grid-split-2006/

BibTeX
@misc{wpm_grid_events_european_grid_split_2006_2006,
  title = {{The 2006 European Grid Split: What Happened and Why}},
  author = {{World Power Monitor}},
  year = {2006},
  note = {Data as of 2006-11-04.},
  url = {https://worldpowermonitor.com/grid-events/european-grid-split-2006/}
}

Permalink: https://worldpowermonitor.com/grid-events/european-grid-split-2006/

The Copy buttons add today's date as the access date.