Ireland and Northern Ireland (SEM) Electricity Demand and Generation Mix
Wind was the largest source in the hour starting 19 Sept 2026, 16:00 (UTC+01:00), at 76% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Ireland and Northern Ireland (SEM) is a bidding zone of the European electricity market, with one wholesale price per market interval.
- Wind supplied 76.2% of Ireland and Northern Ireland (SEM)'s generation in the hour starting 19 Sept 2026, 16:00 (UTC+01:00).
- The day-ahead price in Ireland and Northern Ireland (SEM) averaged EUR 55.70/MWh for delivery on 2026-09-19 (19 September 2026).
- Installed generating capacity in Ireland and Northern Ireland (SEM) was 12.7 GW in 2024, as reported to ENTSO-E.
Generation by Source
Latest hour with generation by source: 19 Sept 2026, 16:00 (UTC+01:00)| Source | Output | Share |
|---|---|---|
| Wind | 2,041 MW | 76.2% |
| Gas | 392 MW | 14.6% |
| Oil | 171 MW | 6.4% |
| Other fossil | 41 MW | 1.5% |
| Hydro | 24 MW | 0.9% |
| Storage | 10 MW | 0.4% |
| Solar | 0 MW | 0.0% |
| Coal | -4 MW | own use |
| Total from these sources | 2,679 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Other is shown as Ireland and Northern Ireland (SEM) reports it: the platform has published zero for every day since 19 November 2025 (the last non zero daily total was on 18 November 2025). We have not changed or filled the figure, and cannot tell from the data whether the source stopped generating or stopped reporting. All flagged series.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-19T15:00:00Z.
Day-Ahead Price
Delivery day 2026-09-19 (19 September 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Ireland and Northern Ireland (SEM) and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-19.
Last 30 Days, Hourly
Times in UTC| Hour starting (UTC) | Wind | Gas | Oil | Other fossil | Storage |
|---|---|---|---|---|---|
| 2026-08-20T18:00Z | 1,489 MW | 1,141 MW | 435 MW | 76 MW | 122 MW |
| 2026-08-20T19:00Z | 1,310 MW | 1,154 MW | 291 MW | 68 MW | 178 MW |
| 2026-08-20T20:00Z | 1,322 MW | 1,191 MW | 248 MW | 69 MW | 206 MW |
| 2026-08-20T21:00Z | 1,219 MW | 1,216 MW | 260 MW | 69 MW | 162 MW |
| 2026-08-20T22:00Z | 1,186 MW | 1,135 MW | 201 MW | 67 MW | -35 MW |
| 2026-08-20T23:00Z | 1,095 MW | 1,205 MW | 242 MW | 69 MW | -75 MW |
| 2026-08-21T00:00Z | 961 MW | 1,347 MW | 239 MW | 71 MW | -147 MW |
| 2026-08-21T01:00Z | 969 MW | 1,395 MW | 167 MW | 81 MW | -147 MW |
| 2026-08-21T02:00Z | 964 MW | 1,423 MW | 179 MW | 90 MW | -145 MW |
| 2026-08-21T03:00Z | 957 MW | 1,450 MW | 174 MW | 81 MW | -144 MW |
| 2026-08-21T04:00Z | 896 MW | 1,405 MW | 210 MW | 70 MW | -144 MW |
| 2026-08-21T05:00Z | 878 MW | 1,337 MW | 251 MW | 69 MW | -108 MW |
| 2026-08-21T06:00Z | 854 MW | 1,330 MW | 189 MW | 67 MW | 3 MW |
| 2026-08-21T07:00Z | 773 MW | 1,397 MW | 204 MW | 70 MW | 3 MW |
| 2026-08-21T08:00Z | 826 MW | 1,296 MW | 170 MW | 68 MW | 0 MW |
| 2026-08-21T09:00Z | 1,060 MW | 1,033 MW | 167 MW | 69 MW | 0 MW |
| 2026-08-21T10:00Z | 1,100 MW | 691 MW | 164 MW | 66 MW | 0 MW |
| 2026-08-21T11:00Z | 1,183 MW | 656 MW | 164 MW | 65 MW | -36 MW |
| 2026-08-21T12:00Z | 1,228 MW | 717 MW | 255 MW | 68 MW | -70 MW |
| 2026-08-21T13:00Z | 1,260 MW | 698 MW | 225 MW | 79 MW | -144 MW |
| 2026-08-21T14:00Z | 1,259 MW | 731 MW | 258 MW | 94 MW | -144 MW |
| 2026-08-21T15:00Z | 1,323 MW | 845 MW | 365 MW | 98 MW | -65 MW |
| 2026-08-21T16:00Z | 1,447 MW | 886 MW | 363 MW | 103 MW | 50 MW |
| 2026-08-21T17:00Z | 1,399 MW | 932 MW | 398 MW | 110 MW | 15 MW |
| 2026-08-21T18:00Z | 1,290 MW | 974 MW | 419 MW | 99 MW | 119 MW |
| 2026-08-21T19:00Z | 1,133 MW | 1,016 MW | 408 MW | 76 MW | 246 MW |
| 2026-08-21T20:00Z | 1,033 MW | 1,071 MW | 367 MW | 82 MW | 264 MW |
| 2026-08-21T21:00Z | 903 MW | 1,080 MW | 329 MW | 80 MW | 94 MW |
| 2026-08-21T22:00Z | 930 MW | 1,165 MW | 171 MW | 90 MW | 13 MW |
| 2026-08-21T23:00Z | 884 MW | 1,367 MW | 180 MW | 76 MW | -31 MW |
| 2026-08-22T00:00Z | 848 MW | 1,409 MW | 180 MW | 70 MW | -151 MW |
| 2026-08-22T01:00Z | 741 MW | 1,136 MW | 233 MW | 79 MW | -151 MW |
| 2026-08-22T02:00Z | 708 MW | 1,139 MW | 203 MW | 99 MW | -150 MW |
| 2026-08-22T03:00Z | 679 MW | 1,154 MW | 203 MW | 99 MW | -148 MW |
| 2026-08-22T04:00Z | 530 MW | 1,188 MW | 240 MW | 101 MW | -147 MW |
| 2026-08-22T05:00Z | 480 MW | 1,166 MW | 246 MW | 99 MW | -72 MW |
| 2026-08-22T06:00Z | 396 MW | 1,166 MW | 193 MW | 99 MW | 0 MW |
| 2026-08-22T07:00Z | 286 MW | 1,205 MW | 165 MW | 100 MW | 0 MW |
| 2026-08-22T08:00Z | 270 MW | 1,179 MW | 179 MW | 99 MW | 0 MW |
| 2026-08-22T09:00Z | 310 MW | 1,020 MW | 167 MW | 99 MW | 0 MW |
| 2026-08-22T10:00Z | 306 MW | 847 MW | 167 MW | 100 MW | 0 MW |
| 2026-08-22T11:00Z | 315 MW | 798 MW | 167 MW | 105 MW | 0 MW |
| 2026-08-22T12:00Z | 359 MW | 645 MW | 166 MW | 100 MW | 0 MW |
| 2026-08-22T13:00Z | 355 MW | 621 MW | 176 MW | 101 MW | 0 MW |
| 2026-08-22T14:00Z | 365 MW | 695 MW | 168 MW | 100 MW | 0 MW |
| 2026-08-22T15:00Z | 346 MW | 862 MW | 173 MW | 101 MW | 0 MW |
| 2026-08-22T16:00Z | 286 MW | 1,051 MW | 174 MW | 109 MW | 0 MW |
| 2026-08-22T17:00Z | 224 MW | 1,165 MW | 200 MW | 110 MW | 67 MW |
| 2026-08-22T18:00Z | 193 MW | 1,231 MW | 255 MW | 110 MW | 196 MW |
| 2026-08-22T19:00Z | 204 MW | 1,214 MW | 266 MW | 107 MW | 152 MW |
| 2026-08-22T20:00Z | 232 MW | 1,261 MW | 286 MW | 110 MW | 184 MW |
| 2026-08-22T21:00Z | 194 MW | 1,248 MW | 280 MW | 110 MW | 141 MW |
| 2026-08-22T22:00Z | 172 MW | 1,261 MW | 303 MW | 110 MW | -68 MW |
| 2026-08-22T23:00Z | 169 MW | 1,242 MW | 277 MW | 108 MW | -153 MW |
| 2026-08-23T00:00Z | 151 MW | 1,249 MW | 271 MW | 110 MW | -151 MW |
| 2026-08-23T01:00Z | 114 MW | 1,229 MW | 269 MW | 110 MW | -151 MW |
| 2026-08-23T02:00Z | 98 MW | 1,223 MW | 267 MW | 110 MW | -150 MW |
| 2026-08-23T03:00Z | 72 MW | 1,232 MW | 273 MW | 110 MW | -148 MW |
| 2026-08-23T04:00Z | 63 MW | 1,225 MW | 267 MW | 109 MW | -147 MW |
| 2026-08-23T05:00Z | 45 MW | 1,213 MW | 278 MW | 108 MW | -109 MW |
| 2026-08-23T06:00Z | 46 MW | 1,226 MW | 258 MW | 109 MW | -36 MW |
| 2026-08-23T07:00Z | 55 MW | 1,259 MW | 307 MW | 110 MW | 0 MW |
| 2026-08-23T08:00Z | 73 MW | 1,215 MW | 275 MW | 109 MW | 5 MW |
| 2026-08-23T09:00Z | 97 MW | 1,236 MW | 190 MW | 110 MW | 51 MW |
| 2026-08-23T10:00Z | 120 MW | 1,140 MW | 164 MW | 108 MW | 30 MW |
| 2026-08-23T11:00Z | 123 MW | 883 MW | 175 MW | 104 MW | 14 MW |
| 2026-08-23T12:00Z | 117 MW | 751 MW | 164 MW | 98 MW | 5 MW |
| 2026-08-23T13:00Z | 99 MW | 656 MW | 168 MW | 81 MW | 6 MW |
| 2026-08-23T14:00Z | 86 MW | 696 MW | 181 MW | 85 MW | 9 MW |
| 2026-08-23T15:00Z | 94 MW | 756 MW | 176 MW | 110 MW | 107 MW |
| 2026-08-23T16:00Z | 97 MW | 945 MW | 169 MW | 108 MW | 53 MW |
| 2026-08-23T17:00Z | 129 MW | 1,183 MW | 181 MW | 111 MW | 35 MW |
| 2026-08-23T18:00Z | 188 MW | 1,228 MW | 188 MW | 99 MW | 103 MW |
| 2026-08-23T19:00Z | 281 MW | 1,333 MW | 207 MW | 85 MW | 152 MW |
| 2026-08-23T20:00Z | 433 MW | 1,392 MW | 185 MW | 83 MW | 138 MW |
| 2026-08-23T21:00Z | 433 MW | 1,334 MW | 164 MW | 98 MW | 95 MW |
| 2026-08-23T22:00Z | 438 MW | 1,292 MW | 170 MW | 108 MW | -30 MW |
| 2026-08-23T23:00Z | 380 MW | 1,391 MW | 211 MW | 110 MW | -226 MW |
| 2026-08-24T00:00Z | 397 MW | 1,214 MW | 286 MW | 109 MW | -224 MW |
| 2026-08-24T01:00Z | 412 MW | 1,230 MW | 267 MW | 109 MW | -222 MW |
| 2026-08-24T02:00Z | 413 MW | 1,237 MW | 253 MW | 110 MW | -219 MW |
| 2026-08-24T03:00Z | 448 MW | 1,224 MW | 246 MW | 110 MW | -218 MW |
| 2026-08-24T04:00Z | 465 MW | 1,220 MW | 257 MW | 109 MW | -215 MW |
| 2026-08-24T05:00Z | 430 MW | 1,233 MW | 225 MW | 108 MW | -177 MW |
| 2026-08-24T06:00Z | 484 MW | 1,215 MW | 234 MW | 109 MW | 9 MW |
| 2026-08-24T07:00Z | 486 MW | 1,238 MW | 225 MW | 109 MW | 69 MW |
| 2026-08-24T08:00Z | 441 MW | 1,194 MW | 173 MW | 106 MW | 42 MW |
| 2026-08-24T09:00Z | 430 MW | 1,052 MW | 172 MW | 110 MW | 0 MW |
| 2026-08-24T10:00Z | 484 MW | 1,085 MW | 164 MW | 109 MW | 0 MW |
| 2026-08-24T11:00Z | 668 MW | 886 MW | 167 MW | 100 MW | 0 MW |
| 2026-08-24T12:00Z | 808 MW | 740 MW | 167 MW | 100 MW | 0 MW |
| 2026-08-24T13:00Z | 860 MW | 671 MW | 164 MW | 100 MW | 0 MW |
| 2026-08-24T14:00Z | 827 MW | 620 MW | 171 MW | 101 MW | 0 MW |
| 2026-08-24T15:00Z | n/a | n/a | n/a | 86 MW | 5 MW |
| 2026-08-24T16:00Z | 841 MW | 974 MW | 281 MW | 70 MW | 17 MW |
| 2026-08-24T17:00Z | 665 MW | 989 MW | 379 MW | 69 MW | 43 MW |
| 2026-08-24T18:00Z | 644 MW | 1,031 MW | 391 MW | 70 MW | 103 MW |
| 2026-08-24T19:00Z | 710 MW | 1,047 MW | 388 MW | 69 MW | 231 MW |
| 2026-08-24T20:00Z | 755 MW | 1,023 MW | 380 MW | 68 MW | 244 MW |
| 2026-08-24T21:00Z | 863 MW | 984 MW | 336 MW | 67 MW | 48 MW |
| 2026-08-24T22:00Z | 845 MW | 983 MW | 184 MW | 67 MW | -73 MW |
| 2026-08-24T23:00Z | 888 MW | 1,178 MW | 230 MW | 70 MW | -146 MW |
| 2026-08-25T00:00Z | 889 MW | 1,150 MW | 304 MW | 82 MW | -145 MW |
| 2026-08-25T01:00Z | 880 MW | 1,131 MW | 367 MW | 99 MW | -219 MW |
| 2026-08-25T02:00Z | 886 MW | 1,171 MW | 405 MW | 102 MW | -216 MW |
| 2026-08-25T03:00Z | 839 MW | 1,174 MW | 392 MW | 100 MW | -214 MW |
| 2026-08-25T04:00Z | 877 MW | 1,143 MW | 340 MW | 105 MW | -107 MW |
| 2026-08-25T05:00Z | 857 MW | 1,175 MW | 316 MW | 111 MW | 0 MW |
| 2026-08-25T06:00Z | 891 MW | 1,214 MW | 327 MW | 109 MW | 0 MW |
| 2026-08-25T07:00Z | 846 MW | 1,230 MW | 259 MW | 111 MW | 0 MW |
| 2026-08-25T08:00Z | 815 MW | 1,241 MW | 303 MW | 110 MW | 0 MW |
| 2026-08-25T09:00Z | 850 MW | 1,216 MW | 297 MW | 110 MW | 0 MW |
| 2026-08-25T10:00Z | 849 MW | 1,181 MW | 239 MW | 99 MW | 0 MW |
| 2026-08-25T11:00Z | 999 MW | 1,059 MW | 217 MW | 110 MW | 0 MW |
| 2026-08-25T12:00Z | 961 MW | 1,144 MW | 400 MW | 110 MW | 0 MW |
| 2026-08-25T13:00Z | 884 MW | 1,155 MW | 420 MW | 110 MW | 0 MW |
| 2026-08-25T14:00Z | 916 MW | 1,208 MW | 397 MW | 110 MW | 0 MW |
| 2026-08-25T15:00Z | 784 MW | 1,272 MW | 411 MW | 110 MW | 61 MW |
| 2026-08-25T16:00Z | 597 MW | 1,392 MW | 414 MW | 109 MW | 80 MW |
| 2026-08-25T17:00Z | 487 MW | 1,502 MW | 396 MW | 109 MW | 158 MW |
| 2026-08-25T18:00Z | 461 MW | 1,585 MW | 371 MW | 108 MW | 206 MW |
| 2026-08-25T19:00Z | n/a | n/a | n/a | 79 MW | 233 MW |
| 2026-08-25T20:00Z | 662 MW | 1,485 MW | 363 MW | 80 MW | 158 MW |
| 2026-08-25T21:00Z | 707 MW | 1,422 MW | 289 MW | 108 MW | 17 MW |
| 2026-08-25T22:00Z | 712 MW | 1,407 MW | 253 MW | 109 MW | -112 MW |
| 2026-08-25T23:00Z | 664 MW | 1,335 MW | 303 MW | 110 MW | -147 MW |
| 2026-08-26T00:00Z | 737 MW | 1,256 MW | 301 MW | 93 MW | -146 MW |
| 2026-08-26T01:00Z | 736 MW | 1,264 MW | 294 MW | 91 MW | -145 MW |
| 2026-08-26T02:00Z | 893 MW | 1,253 MW | 297 MW | 99 MW | -182 MW |
| 2026-08-26T03:00Z | 911 MW | 1,276 MW | 306 MW | 80 MW | -217 MW |
| 2026-08-26T04:00Z | 819 MW | 1,424 MW | 298 MW | 97 MW | -215 MW |
| 2026-08-26T05:00Z | 813 MW | 1,327 MW | 306 MW | 110 MW | -143 MW |
| 2026-08-26T06:00Z | 773 MW | 1,189 MW | 358 MW | 109 MW | 0 MW |
| 2026-08-26T07:00Z | 719 MW | 1,236 MW | 394 MW | 110 MW | 36 MW |
| 2026-08-26T08:00Z | 653 MW | 1,346 MW | 420 MW | 109 MW | 65 MW |
| 2026-08-26T09:00Z | 675 MW | 1,357 MW | 368 MW | 110 MW | 11 MW |
| 2026-08-26T10:00Z | 682 MW | 1,498 MW | 192 MW | 95 MW | 0 MW |
| 2026-08-26T11:00Z | 643 MW | 1,479 MW | 221 MW | 67 MW | 0 MW |
| 2026-08-26T12:00Z | 674 MW | 1,448 MW | 165 MW | 68 MW | -71 MW |
| 2026-08-26T13:00Z | 728 MW | 1,176 MW | 164 MW | 68 MW | -71 MW |
| 2026-08-26T14:00Z | 749 MW | 1,018 MW | 165 MW | 67 MW | -71 MW |
| 2026-08-26T15:00Z | 771 MW | 1,078 MW | 172 MW | 70 MW | 0 MW |
| 2026-08-26T16:00Z | 718 MW | 1,256 MW | 172 MW | 45 MW | 0 MW |
| 2026-08-26T17:00Z | 672 MW | 1,305 MW | 278 MW | -6 MW | 52 MW |
| 2026-08-26T18:00Z | 697 MW | 1,337 MW | 312 MW | -4 MW | 137 MW |
| 2026-08-26T19:00Z | 684 MW | 1,395 MW | 313 MW | -4 MW | 187 MW |
| 2026-08-26T20:00Z | 843 MW | 1,438 MW | 328 MW | -4 MW | 144 MW |
| 2026-08-26T21:00Z | 851 MW | 1,409 MW | 253 MW | -4 MW | 3 MW |
| 2026-08-26T22:00Z | 862 MW | 1,258 MW | 208 MW | -3 MW | 0 MW |
| 2026-08-26T23:00Z | 867 MW | 1,450 MW | 227 MW | -2 MW | -144 MW |
| 2026-08-27T00:00Z | n/a | n/a | n/a | -2 MW | -143 MW |
| 2026-08-27T01:00Z | 1,101 MW | 1,077 MW | 164 MW | -2 MW | -143 MW |
| 2026-08-27T02:00Z | 1,202 MW | 1,059 MW | 169 MW | -2 MW | -141 MW |
| 2026-08-27T03:00Z | 1,225 MW | 1,036 MW | 182 MW | -2 MW | -139 MW |
| 2026-08-27T04:00Z | n/a | n/a | n/a | -2 MW | 0 MW |
| 2026-08-27T05:00Z | 1,032 MW | 1,209 MW | 169 MW | -2 MW | 0 MW |
| 2026-08-27T06:00Z | 959 MW | 1,499 MW | 245 MW | -2 MW | 47 MW |
| 2026-08-27T07:00Z | n/a | n/a | n/a | -2 MW | 55 MW |
| 2026-08-27T08:00Z | 817 MW | 1,642 MW | 365 MW | -1 MW | 15 MW |
| 2026-08-27T09:00Z | 781 MW | 1,646 MW | 376 MW | -1 MW | 15 MW |
| 2026-08-27T10:00Z | 715 MW | 1,584 MW | 347 MW | -1 MW | 22 MW |
| 2026-08-27T11:00Z | 585 MW | 1,583 MW | 334 MW | -1 MW | 23 MW |
| 2026-08-27T12:00Z | 474 MW | 1,640 MW | 312 MW | -1 MW | 2 MW |
| 2026-08-27T13:00Z | 391 MW | 1,706 MW | 359 MW | -1 MW | -141 MW |
| 2026-08-27T14:00Z | 378 MW | 1,706 MW | 348 MW | -1 MW | -141 MW |
| 2026-08-27T15:00Z | 327 MW | 1,667 MW | 375 MW | -1 MW | -35 MW |
| 2026-08-27T16:00Z | 255 MW | 1,703 MW | 382 MW | -1 MW | 68 MW |
| 2026-08-27T17:00Z | 260 MW | 1,657 MW | 414 MW | -1 MW | 157 MW |
| 2026-08-27T18:00Z | 239 MW | 1,653 MW | 419 MW | -1 MW | 159 MW |
| 2026-08-27T19:00Z | 248 MW | 1,680 MW | 431 MW | -1 MW | 227 MW |
| 2026-08-27T20:00Z | n/a | n/a | n/a | -1 MW | 160 MW |
| 2026-08-27T21:00Z | 187 MW | 1,590 MW | 432 MW | -1 MW | 5 MW |
| 2026-08-27T22:00Z | 129 MW | 1,612 MW | 380 MW | -1 MW | -73 MW |
| 2026-08-27T23:00Z | 81 MW | 1,687 MW | 330 MW | -1 MW | -146 MW |
| 2026-08-28T00:00Z | 57 MW | 1,715 MW | 316 MW | -1 MW | -145 MW |
| 2026-08-28T01:00Z | 63 MW | 1,717 MW | 266 MW | -1 MW | -145 MW |
| 2026-08-28T02:00Z | 85 MW | 1,756 MW | 270 MW | -1 MW | -143 MW |
| 2026-08-28T03:00Z | 110 MW | 1,650 MW | 240 MW | -1 MW | -143 MW |
| 2026-08-28T04:00Z | 135 MW | 1,574 MW | 249 MW | -1 MW | -142 MW |
| 2026-08-28T05:00Z | 183 MW | 1,637 MW | 280 MW | -1 MW | -140 MW |
| 2026-08-28T06:00Z | 275 MW | 1,683 MW | 363 MW | -1 MW | 0 MW |
| 2026-08-28T07:00Z | 305 MW | 1,671 MW | 388 MW | -1 MW | 85 MW |
| 2026-08-28T08:00Z | 344 MW | 1,610 MW | 384 MW | -1 MW | 198 MW |
| 2026-08-28T09:00Z | 333 MW | 1,587 MW | 291 MW | -1 MW | 121 MW |
| 2026-08-28T10:00Z | 367 MW | 1,463 MW | 203 MW | 57 MW | 12 MW |
| 2026-08-28T11:00Z | 442 MW | 1,343 MW | 167 MW | -1 MW | 5 MW |
| 2026-08-28T12:00Z | 568 MW | 1,131 MW | 164 MW | -1 MW | -75 MW |
| 2026-08-28T13:00Z | 644 MW | 1,067 MW | 171 MW | -1 MW | -143 MW |
| 2026-08-28T14:00Z | 734 MW | 890 MW | 165 MW | -1 MW | -142 MW |
| 2026-08-28T15:00Z | 681 MW | 1,001 MW | 170 MW | -1 MW | -36 MW |
| 2026-08-28T16:00Z | 668 MW | 1,433 MW | 167 MW | -1 MW | 6 MW |
| 2026-08-28T17:00Z | 551 MW | 1,542 MW | 346 MW | -1 MW | 114 MW |
| 2026-08-28T18:00Z | 389 MW | 1,550 MW | 394 MW | -1 MW | 267 MW |
| 2026-08-28T19:00Z | 326 MW | 1,562 MW | 417 MW | -1 MW | 267 MW |
| 2026-08-28T20:00Z | 293 MW | 1,574 MW | 420 MW | -1 MW | 264 MW |
| 2026-08-28T21:00Z | 167 MW | 1,562 MW | 424 MW | -1 MW | 118 MW |
| 2026-08-28T22:00Z | 125 MW | 1,576 MW | 397 MW | -1 MW | -80 MW |
| 2026-08-28T23:00Z | 65 MW | 1,580 MW | 378 MW | -1 MW | -226 MW |
| 2026-08-29T00:00Z | 60 MW | 1,565 MW | 335 MW | -1 MW | -224 MW |
| 2026-08-29T01:00Z | 95 MW | 1,565 MW | 320 MW | -1 MW | -223 MW |
| 2026-08-29T02:00Z | 185 MW | 1,532 MW | 286 MW | -1 MW | -221 MW |
| 2026-08-29T03:00Z | 291 MW | 1,490 MW | 256 MW | -1 MW | -219 MW |
| 2026-08-29T04:00Z | 413 MW | 1,487 MW | 231 MW | -1 MW | -216 MW |
| 2026-08-29T05:00Z | 495 MW | 1,407 MW | 164 MW | -1 MW | -214 MW |
| 2026-08-29T06:00Z | 593 MW | 1,326 MW | 164 MW | -1 MW | 0 MW |
| 2026-08-29T07:00Z | 613 MW | 1,433 MW | 175 MW | -1 MW | 3 MW |
| 2026-08-29T08:00Z | 616 MW | 1,480 MW | 173 MW | -1 MW | 86 MW |
| 2026-08-29T09:00Z | 663 MW | 1,474 MW | 165 MW | -1 MW | 51 MW |
| 2026-08-29T10:00Z | 593 MW | 1,438 MW | 164 MW | -1 MW | 0 MW |
| 2026-08-29T11:00Z | 590 MW | 1,416 MW | 165 MW | -1 MW | 0 MW |
| 2026-08-29T12:00Z | 524 MW | 1,400 MW | 168 MW | -1 MW | 0 MW |
| 2026-08-29T13:00Z | 552 MW | 1,274 MW | 165 MW | -1 MW | 0 MW |
| 2026-08-29T14:00Z | 630 MW | 1,276 MW | 172 MW | -1 MW | 0 MW |
| 2026-08-29T15:00Z | 659 MW | 1,279 MW | 168 MW | -1 MW | 0 MW |
| 2026-08-29T16:00Z | 618 MW | 1,501 MW | 208 MW | -1 MW | 0 MW |
| 2026-08-29T17:00Z | 524 MW | 1,592 MW | 224 MW | -1 MW | 30 MW |
| 2026-08-29T18:00Z | 433 MW | 1,631 MW | 254 MW | -1 MW | 73 MW |
| 2026-08-29T19:00Z | 330 MW | 1,526 MW | 262 MW | -1 MW | 127 MW |
| 2026-08-29T20:00Z | 304 MW | 1,228 MW | 323 MW | -1 MW | 198 MW |
| 2026-08-29T21:00Z | 271 MW | 1,210 MW | 347 MW | -1 MW | 215 MW |
| 2026-08-29T22:00Z | 285 MW | 1,170 MW | 388 MW | -1 MW | 44 MW |
| 2026-08-29T23:00Z | 293 MW | 1,197 MW | 401 MW | -1 MW | -113 MW |
| 2026-08-30T00:00Z | 353 MW | 1,222 MW | 413 MW | -1 MW | -151 MW |
| 2026-08-30T01:00Z | 357 MW | 1,206 MW | 397 MW | -1 MW | -150 MW |
| 2026-08-30T02:00Z | 454 MW | 1,186 MW | 402 MW | -1 MW | -148 MW |
| 2026-08-30T03:00Z | 521 MW | 1,072 MW | 329 MW | -1 MW | -149 MW |
| 2026-08-30T04:00Z | 733 MW | 1,015 MW | 213 MW | -1 MW | -147 MW |
| 2026-08-30T05:00Z | 809 MW | 1,026 MW | 169 MW | -1 MW | -146 MW |
| 2026-08-30T06:00Z | 658 MW | 1,178 MW | 302 MW | -1 MW | -108 MW |
| 2026-08-30T07:00Z | 578 MW | 1,165 MW | 262 MW | -1 MW | 10 MW |
| 2026-08-30T08:00Z | 517 MW | 1,200 MW | 267 MW | -1 MW | 15 MW |
| 2026-08-30T09:00Z | 523 MW | 1,223 MW | 295 MW | -1 MW | 6 MW |
| 2026-08-30T10:00Z | 555 MW | 1,177 MW | 275 MW | -1 MW | 5 MW |
| 2026-08-30T11:00Z | 584 MW | 1,039 MW | 174 MW | -1 MW | 6 MW |
| 2026-08-30T12:00Z | 569 MW | 1,064 MW | 205 MW | -1 MW | 6 MW |
| 2026-08-30T13:00Z | 460 MW | 857 MW | 164 MW | -1 MW | 5 MW |
| 2026-08-30T14:00Z | 528 MW | 889 MW | 176 MW | -1 MW | 7 MW |
| 2026-08-30T15:00Z | 602 MW | 1,052 MW | 239 MW | -1 MW | 12 MW |
| 2026-08-30T16:00Z | 633 MW | 1,107 MW | 295 MW | -1 MW | 50 MW |
| 2026-08-30T17:00Z | 644 MW | 1,084 MW | 280 MW | -1 MW | 214 MW |
| 2026-08-30T18:00Z | 707 MW | 1,122 MW | 247 MW | -1 MW | 220 MW |
| 2026-08-30T19:00Z | 755 MW | 1,128 MW | 338 MW | -1 MW | 219 MW |
| 2026-08-30T20:00Z | 1,026 MW | 1,134 MW | 373 MW | -1 MW | 76 MW |
| 2026-08-30T21:00Z | 1,331 MW | 1,186 MW | 307 MW | -1 MW | 8 MW |
| 2026-08-30T22:00Z | 1,454 MW | 1,199 MW | 308 MW | -1 MW | -36 MW |
| 2026-08-30T23:00Z | 1,870 MW | 1,020 MW | 165 MW | -1 MW | -190 MW |
| 2026-08-31T00:00Z | 2,108 MW | 936 MW | 198 MW | -1 MW | -224 MW |
| 2026-08-31T01:00Z | 2,210 MW | 947 MW | 172 MW | -1 MW | -223 MW |
| 2026-08-31T02:00Z | 2,324 MW | 883 MW | 164 MW | -1 MW | -222 MW |
| 2026-08-31T03:00Z | 2,245 MW | 829 MW | 164 MW | -1 MW | -219 MW |
| 2026-08-31T04:00Z | 2,104 MW | 1,015 MW | 165 MW | -1 MW | -216 MW |
| 2026-08-31T05:00Z | 2,038 MW | 1,038 MW | 164 MW | -1 MW | 5 MW |
| 2026-08-31T06:00Z | 1,889 MW | 1,096 MW | 165 MW | -1 MW | 5 MW |
| 2026-08-31T07:00Z | 1,590 MW | 1,041 MW | 181 MW | -1 MW | 6 MW |
| 2026-08-31T08:00Z | 1,385 MW | 766 MW | 167 MW | -1 MW | 5 MW |
| 2026-08-31T09:00Z | 1,252 MW | 594 MW | 177 MW | -1 MW | 8 MW |
| 2026-08-31T10:00Z | 1,280 MW | 591 MW | 175 MW | -1 MW | 7 MW |
| 2026-08-31T11:00Z | 1,162 MW | 564 MW | 164 MW | -1 MW | 5 MW |
| 2026-08-31T12:00Z | 1,289 MW | 595 MW | 174 MW | -1 MW | 7 MW |
| 2026-08-31T13:00Z | 1,222 MW | 616 MW | 180 MW | -1 MW | 8 MW |
| 2026-08-31T14:00Z | 1,110 MW | 813 MW | 254 MW | -1 MW | 7 MW |
| 2026-08-31T15:00Z | 1,134 MW | 809 MW | 253 MW | -1 MW | 5 MW |
| 2026-08-31T16:00Z | 1,273 MW | 906 MW | 215 MW | -1 MW | 6 MW |
| 2026-08-31T17:00Z | 1,235 MW | 1,061 MW | 192 MW | -1 MW | 116 MW |
| 2026-08-31T18:00Z | 1,159 MW | 1,110 MW | 169 MW | -1 MW | 217 MW |
| 2026-08-31T19:00Z | 1,116 MW | 1,179 MW | 246 MW | -1 MW | 219 MW |
| 2026-08-31T20:00Z | 1,116 MW | 1,123 MW | 283 MW | -1 MW | 216 MW |
| 2026-08-31T21:00Z | 1,115 MW | 1,072 MW | 265 MW | -1 MW | 76 MW |
| 2026-08-31T22:00Z | 1,354 MW | 1,062 MW | 193 MW | -1 MW | 2 MW |
| 2026-08-31T23:00Z | 1,505 MW | 1,086 MW | 175 MW | -1 MW | -152 MW |
| 2026-09-01T00:00Z | 1,529 MW | 1,040 MW | 165 MW | -1 MW | -151 MW |
| 2026-09-01T01:00Z | 1,558 MW | 1,046 MW | 165 MW | -1 MW | -151 MW |
| 2026-09-01T02:00Z | 1,589 MW | 1,113 MW | 170 MW | -1 MW | -149 MW |
| 2026-09-01T03:00Z | 1,595 MW | 1,173 MW | 170 MW | -1 MW | -148 MW |
| 2026-09-01T04:00Z | 1,573 MW | 1,191 MW | 164 MW | -1 MW | -148 MW |
| 2026-09-01T05:00Z | 1,632 MW | 1,236 MW | 189 MW | -1 MW | -72 MW |
| 2026-09-01T06:00Z | 1,631 MW | 1,183 MW | 256 MW | -1 MW | 5 MW |
| 2026-09-01T07:00Z | 1,467 MW | 1,136 MW | 356 MW | -1 MW | 5 MW |
| 2026-09-01T08:00Z | 1,572 MW | 855 MW | 211 MW | -1 MW | 5 MW |
| 2026-09-01T09:00Z | 1,671 MW | 612 MW | 166 MW | -1 MW | 5 MW |
| 2026-09-01T10:00Z | 1,668 MW | 636 MW | 171 MW | -1 MW | -73 MW |
| 2026-09-01T11:00Z | 1,583 MW | 751 MW | 168 MW | -1 MW | -145 MW |
| 2026-09-01T12:00Z | n/a | n/a | n/a | -1 MW | -107 MW |
| 2026-09-01T13:00Z | 1,502 MW | 822 MW | 175 MW | -1 MW | -35 MW |
| 2026-09-01T14:00Z | 1,391 MW | 834 MW | 176 MW | -1 MW | 0 MW |
| 2026-09-01T15:00Z | 1,364 MW | 827 MW | 177 MW | -1 MW | 0 MW |
| 2026-09-01T16:00Z | 1,286 MW | 958 MW | 167 MW | -1 MW | 2 MW |
| 2026-09-01T17:00Z | 1,066 MW | 1,117 MW | 168 MW | -1 MW | 116 MW |
| 2026-09-01T18:00Z | 861 MW | 1,200 MW | 180 MW | -1 MW | 116 MW |
| 2026-09-01T19:00Z | 743 MW | 1,217 MW | 176 MW | -1 MW | 179 MW |
| 2026-09-01T20:00Z | 733 MW | 1,223 MW | 259 MW | -1 MW | 202 MW |
| 2026-09-01T21:00Z | 802 MW | 1,102 MW | 200 MW | -1 MW | 71 MW |
| 2026-09-01T22:00Z | 929 MW | 982 MW | 164 MW | -1 MW | -37 MW |
| 2026-09-01T23:00Z | 1,044 MW | 1,013 MW | 168 MW | -1 MW | -150 MW |
| 2026-09-02T00:00Z | 1,113 MW | 803 MW | 172 MW | -1 MW | -149 MW |
| 2026-09-02T01:00Z | 1,222 MW | 916 MW | 164 MW | -1 MW | -148 MW |
| 2026-09-02T02:00Z | 1,312 MW | 848 MW | 193 MW | -1 MW | -147 MW |
| 2026-09-02T03:00Z | 1,290 MW | 882 MW | 176 MW | -1 MW | -145 MW |
| 2026-09-02T04:00Z | 1,213 MW | 1,012 MW | 185 MW | -1 MW | -145 MW |
| 2026-09-02T05:00Z | 1,196 MW | 1,119 MW | 178 MW | -1 MW | -72 MW |
| 2026-09-02T06:00Z | n/a | n/a | n/a | -1 MW | 35 MW |
| 2026-09-02T07:00Z | n/a | n/a | n/a | -1 MW | 42 MW |
| 2026-09-02T08:00Z | n/a | n/a | n/a | -1 MW | 18 MW |
| 2026-09-02T09:00Z | n/a | n/a | n/a | -1 MW | 13 MW |
| 2026-09-02T10:00Z | n/a | n/a | n/a | -1 MW | 2 MW |
| 2026-09-02T11:00Z | 1,509 MW | 681 MW | 165 MW | -1 MW | 0 MW |
| 2026-09-02T12:00Z | 1,562 MW | 632 MW | 164 MW | -1 MW | -72 MW |
| 2026-09-02T13:00Z | 1,819 MW | 598 MW | 164 MW | -1 MW | -71 MW |
| 2026-09-02T14:00Z | 2,066 MW | 671 MW | 172 MW | -1 MW | -71 MW |
| 2026-09-02T15:00Z | 2,089 MW | 1,028 MW | 169 MW | -1 MW | 12 MW |
| 2026-09-02T16:00Z | 2,036 MW | 1,215 MW | 260 MW | -1 MW | 14 MW |
| 2026-09-02T17:00Z | 2,121 MW | 1,223 MW | 429 MW | -1 MW | 75 MW |
| 2026-09-02T18:00Z | 2,191 MW | 1,191 MW | 426 MW | -1 MW | 174 MW |
| 2026-09-02T19:00Z | 2,160 MW | 1,153 MW | 428 MW | -1 MW | 215 MW |
| 2026-09-02T20:00Z | 2,230 MW | 1,145 MW | 425 MW | -3 MW | 99 MW |
| 2026-09-02T21:00Z | 2,287 MW | 1,103 MW | 343 MW | -3 MW | 3 MW |
| 2026-09-02T22:00Z | 2,367 MW | 1,019 MW | 169 MW | -4 MW | -37 MW |
| 2026-09-02T23:00Z | 2,366 MW | 615 MW | 172 MW | -4 MW | -73 MW |
| 2026-09-03T00:00Z | 2,150 MW | 551 MW | 181 MW | -4 MW | -73 MW |
| 2026-09-03T01:00Z | 1,897 MW | 561 MW | 174 MW | -4 MW | -73 MW |
| 2026-09-03T02:00Z | 1,731 MW | 623 MW | 164 MW | -4 MW | -73 MW |
| 2026-09-03T03:00Z | 1,600 MW | 573 MW | 184 MW | -4 MW | -72 MW |
| 2026-09-03T04:00Z | 1,464 MW | 581 MW | 176 MW | -4 MW | -72 MW |
| 2026-09-03T05:00Z | 1,324 MW | 719 MW | 166 MW | -2 MW | 0 MW |
| 2026-09-03T06:00Z | 1,327 MW | 1,019 MW | 193 MW | -1 MW | 36 MW |
| 2026-09-03T07:00Z | 1,370 MW | 1,068 MW | 209 MW | -1 MW | 64 MW |
| 2026-09-03T08:00Z | 1,813 MW | 802 MW | 164 MW | -1 MW | 15 MW |
| 2026-09-03T09:00Z | 1,809 MW | 719 MW | 165 MW | -1 MW | -34 MW |
| 2026-09-03T10:00Z | 1,624 MW | 708 MW | 166 MW | -3 MW | -73 MW |
| 2026-09-03T11:00Z | 1,737 MW | 623 MW | 169 MW | -4 MW | -110 MW |
| 2026-09-03T12:00Z | 2,058 MW | 634 MW | 176 MW | -4 MW | -146 MW |
| 2026-09-03T13:00Z | 2,145 MW | 657 MW | 174 MW | -5 MW | -145 MW |
| 2026-09-03T14:00Z | 2,104 MW | 687 MW | 169 MW | -6 MW | -71 MW |
| 2026-09-03T15:00Z | 2,064 MW | 775 MW | 180 MW | -5 MW | -35 MW |
| 2026-09-03T16:00Z | 1,919 MW | 1,092 MW | 192 MW | -5 MW | 17 MW |
| 2026-09-03T17:00Z | 1,878 MW | 1,054 MW | 224 MW | -6 MW | 95 MW |
| 2026-09-03T18:00Z | 1,822 MW | 951 MW | 184 MW | -6 MW | 217 MW |
| 2026-09-03T19:00Z | 1,586 MW | 955 MW | 180 MW | -7 MW | 216 MW |
| 2026-09-03T20:00Z | 1,514 MW | 877 MW | 196 MW | -7 MW | 217 MW |
| 2026-09-03T21:00Z | 1,278 MW | 741 MW | 167 MW | -7 MW | 110 MW |
| 2026-09-03T22:00Z | 1,349 MW | 658 MW | 168 MW | -7 MW | -37 MW |
| 2026-09-03T23:00Z | 1,335 MW | 761 MW | 172 MW | -8 MW | -151 MW |
| 2026-09-04T00:00Z | 1,609 MW | 661 MW | 164 MW | -8 MW | -151 MW |
| 2026-09-04T01:00Z | 2,237 MW | 535 MW | 169 MW | -8 MW | -150 MW |
| 2026-09-04T02:00Z | 2,519 MW | 542 MW | 171 MW | -1 MW | -149 MW |
| 2026-09-04T03:00Z | 2,608 MW | 514 MW | 166 MW | 38 MW | -148 MW |
| 2026-09-04T04:00Z | 2,741 MW | 552 MW | 170 MW | 42 MW | -146 MW |
| 2026-09-04T05:00Z | 2,794 MW | 559 MW | 165 MW | 42 MW | -73 MW |
| 2026-09-04T06:00Z | 2,998 MW | 587 MW | 167 MW | 41 MW | 0 MW |
| 2026-09-04T07:00Z | 3,020 MW | 552 MW | 164 MW | 42 MW | 5 MW |
| 2026-09-04T08:00Z | 3,019 MW | 546 MW | 163 MW | 42 MW | 6 MW |
| 2026-09-04T09:00Z | 2,967 MW | 532 MW | 164 MW | 42 MW | 10 MW |
| 2026-09-04T10:00Z | 2,442 MW | 544 MW | 166 MW | 42 MW | 11 MW |
| 2026-09-04T11:00Z | 2,314 MW | 540 MW | 167 MW | 42 MW | -36 MW |
| 2026-09-04T12:00Z | 2,256 MW | 562 MW | 168 MW | 42 MW | -72 MW |
| 2026-09-04T13:00Z | 2,481 MW | 549 MW | 164 MW | 42 MW | -71 MW |
| 2026-09-04T14:00Z | 2,500 MW | 555 MW | 164 MW | 42 MW | -71 MW |
| 2026-09-04T15:00Z | 2,818 MW | 584 MW | 174 MW | 41 MW | -71 MW |
| 2026-09-04T16:00Z | 2,667 MW | 663 MW | 169 MW | 41 MW | 0 MW |
| 2026-09-04T17:00Z | 2,451 MW | 535 MW | 165 MW | 41 MW | 0 MW |
| 2026-09-04T18:00Z | 2,118 MW | 610 MW | 165 MW | 41 MW | 0 MW |
| 2026-09-04T19:00Z | 1,864 MW | 752 MW | 168 MW | 41 MW | 0 MW |
| 2026-09-04T20:00Z | 1,655 MW | 771 MW | 123 MW | 41 MW | 9 MW |
| 2026-09-04T21:00Z | 1,532 MW | 761 MW | -5 MW | 41 MW | 15 MW |
| 2026-09-04T22:00Z | 1,425 MW | 695 MW | -5 MW | 41 MW | 15 MW |
| 2026-09-04T23:00Z | 1,347 MW | 670 MW | -5 MW | 41 MW | 19 MW |
| 2026-09-05T00:00Z | 1,187 MW | 684 MW | -5 MW | 41 MW | 19 MW |
| 2026-09-05T01:00Z | 1,124 MW | 663 MW | -5 MW | 41 MW | 19 MW |
| 2026-09-05T02:00Z | 1,095 MW | 684 MW | -4 MW | 41 MW | 18 MW |
| 2026-09-05T03:00Z | 890 MW | 647 MW | -3 MW | 41 MW | 16 MW |
| 2026-09-05T04:00Z | 784 MW | 736 MW | -3 MW | 60 MW | 5 MW |
| 2026-09-05T05:00Z | 586 MW | 855 MW | -3 MW | 68 MW | 3 MW |
| 2026-09-05T06:00Z | 507 MW | 954 MW | -3 MW | 70 MW | 33 MW |
| 2026-09-05T07:00Z | 449 MW | 1,024 MW | -3 MW | 70 MW | 59 MW |
| 2026-09-05T08:00Z | 397 MW | 1,037 MW | -3 MW | 70 MW | 26 MW |
| 2026-09-05T09:00Z | 396 MW | 909 MW | -3 MW | 70 MW | 22 MW |
| 2026-09-05T10:00Z | 498 MW | 817 MW | -3 MW | 68 MW | 0 MW |
| 2026-09-05T11:00Z | 589 MW | 726 MW | -3 MW | 69 MW | 0 MW |
| 2026-09-05T12:00Z | n/a | n/a | n/a | 69 MW | -76 MW |
| 2026-09-05T13:00Z | 778 MW | 651 MW | -3 MW | 68 MW | -149 MW |
| 2026-09-05T14:00Z | 827 MW | 695 MW | -3 MW | 72 MW | -147 MW |
| 2026-09-05T15:00Z | 931 MW | 648 MW | -4 MW | 71 MW | 4 MW |
| 2026-09-05T16:00Z | 1,172 MW | 680 MW | -8 MW | 71 MW | 79 MW |
| 2026-09-05T17:00Z | 1,189 MW | 719 MW | 184 MW | 69 MW | 93 MW |
| 2026-09-05T18:00Z | 1,430 MW | 769 MW | 170 MW | 70 MW | 98 MW |
| 2026-09-05T19:00Z | 1,757 MW | 757 MW | 178 MW | 71 MW | 102 MW |
| 2026-09-05T20:00Z | 1,881 MW | 742 MW | 170 MW | 67 MW | 99 MW |
| 2026-09-05T21:00Z | 2,123 MW | 725 MW | 179 MW | 70 MW | 102 MW |
| 2026-09-05T22:00Z | 2,409 MW | 654 MW | 168 MW | 66 MW | -11 MW |
| 2026-09-05T23:00Z | 2,599 MW | 619 MW | 165 MW | 41 MW | -152 MW |
| 2026-09-06T00:00Z | 2,648 MW | 530 MW | 164 MW | 41 MW | -151 MW |
| 2026-09-06T01:00Z | 2,623 MW | 499 MW | 164 MW | 41 MW | -150 MW |
| 2026-09-06T02:00Z | 2,642 MW | 529 MW | 166 MW | 41 MW | -148 MW |
| 2026-09-06T03:00Z | 2,629 MW | 538 MW | 165 MW | 41 MW | -147 MW |
| 2026-09-06T04:00Z | 2,631 MW | 529 MW | 164 MW | 41 MW | -147 MW |
| 2026-09-06T05:00Z | 2,657 MW | 545 MW | 165 MW | 41 MW | -146 MW |
| 2026-09-06T06:00Z | n/a | n/a | n/a | 41 MW | -69 MW |
| 2026-09-06T07:00Z | 2,791 MW | 533 MW | 174 MW | 41 MW | 20 MW |
| 2026-09-06T08:00Z | 2,835 MW | 519 MW | 170 MW | 41 MW | 18 MW |
| 2026-09-06T09:00Z | 2,810 MW | 523 MW | 171 MW | 41 MW | 19 MW |
| 2026-09-06T10:00Z | 2,328 MW | 483 MW | 166 MW | 41 MW | 10 MW |
| 2026-09-06T11:00Z | n/a | n/a | n/a | 41 MW | 5 MW |
| 2026-09-06T12:00Z | 2,029 MW | 512 MW | 173 MW | 41 MW | 0 MW |
| 2026-09-06T13:00Z | 2,089 MW | 502 MW | 168 MW | 41 MW | 0 MW |
| 2026-09-06T14:00Z | 2,610 MW | 536 MW | 171 MW | 41 MW | 0 MW |
| 2026-09-06T15:00Z | 2,638 MW | 593 MW | 168 MW | 41 MW | 3 MW |
| 2026-09-06T16:00Z | 2,378 MW | 515 MW | 195 MW | 41 MW | 143 MW |
| 2026-09-06T17:00Z | 1,996 MW | 517 MW | 238 MW | 41 MW | 215 MW |
| 2026-09-06T18:00Z | 1,644 MW | 578 MW | 256 MW | 50 MW | 215 MW |
| 2026-09-06T19:00Z | 1,445 MW | 632 MW | 265 MW | 60 MW | 200 MW |
| 2026-09-06T20:00Z | 1,317 MW | 593 MW | 247 MW | 67 MW | 165 MW |
| 2026-09-06T21:00Z | 1,253 MW | 614 MW | 253 MW | 67 MW | 38 MW |
| 2026-09-06T22:00Z | 1,317 MW | 567 MW | 182 MW | 53 MW | -40 MW |
| 2026-09-06T23:00Z | 1,301 MW | 597 MW | 169 MW | 50 MW | -153 MW |
| 2026-09-07T00:00Z | 1,629 MW | 517 MW | 164 MW | 41 MW | -153 MW |
| 2026-09-07T01:00Z | 1,638 MW | 513 MW | 170 MW | 41 MW | -152 MW |
| 2026-09-07T02:00Z | 1,675 MW | 522 MW | 170 MW | 41 MW | -150 MW |
| 2026-09-07T03:00Z | 1,724 MW | 563 MW | 175 MW | 41 MW | -149 MW |
| 2026-09-07T04:00Z | 1,917 MW | 700 MW | 211 MW | 41 MW | -148 MW |
| 2026-09-07T05:00Z | 1,923 MW | 738 MW | 213 MW | 41 MW | -148 MW |
| 2026-09-07T06:00Z | 1,993 MW | 682 MW | 166 MW | 41 MW | 0 MW |
| 2026-09-07T07:00Z | 2,070 MW | 571 MW | 166 MW | 41 MW | 0 MW |
| 2026-09-07T08:00Z | 2,014 MW | 596 MW | 170 MW | 41 MW | 0 MW |
| 2026-09-07T09:00Z | 1,970 MW | 594 MW | 166 MW | 41 MW | 0 MW |
| 2026-09-07T10:00Z | 2,063 MW | 542 MW | 168 MW | 41 MW | 0 MW |
| 2026-09-07T11:00Z | n/a | n/a | n/a | 41 MW | 0 MW |
| 2026-09-07T12:00Z | n/a | n/a | n/a | 41 MW | -73 MW |
| 2026-09-07T13:00Z | n/a | n/a | n/a | 41 MW | -146 MW |
| 2026-09-07T14:00Z | n/a | n/a | n/a | 41 MW | -145 MW |
| 2026-09-07T15:00Z | n/a | n/a | n/a | 41 MW | 0 MW |
| 2026-09-07T16:00Z | n/a | n/a | n/a | 41 MW | 151 MW |
| 2026-09-07T17:00Z | 2,454 MW | 731 MW | 205 MW | 41 MW | 181 MW |
| 2026-09-07T18:00Z | n/a | n/a | n/a | 41 MW | 197 MW |
| 2026-09-07T19:00Z | 1,838 MW | 872 MW | 205 MW | 41 MW | 216 MW |
| 2026-09-07T20:00Z | 1,692 MW | 702 MW | 222 MW | 41 MW | 198 MW |
| 2026-09-07T21:00Z | 1,666 MW | 635 MW | 241 MW | 41 MW | 152 MW |
| 2026-09-07T22:00Z | 1,617 MW | 773 MW | 230 MW | 41 MW | 28 MW |
| 2026-09-07T23:00Z | n/a | n/a | n/a | 41 MW | -192 MW |
| 2026-09-08T00:00Z | 1,659 MW | 683 MW | 231 MW | 41 MW | -229 MW |
| 2026-09-08T01:00Z | 1,742 MW | 595 MW | 164 MW | 41 MW | -227 MW |
| 2026-09-08T02:00Z | 1,781 MW | 607 MW | 173 MW | 41 MW | -222 MW |
| 2026-09-08T03:00Z | 1,900 MW | 630 MW | 172 MW | 41 MW | -220 MW |
| 2026-09-08T04:00Z | 1,990 MW | 603 MW | 165 MW | 41 MW | -219 MW |
| 2026-09-08T05:00Z | 2,008 MW | 554 MW | 166 MW | 41 MW | -217 MW |
| 2026-09-08T06:00Z | 1,891 MW | 705 MW | 164 MW | 41 MW | -31 MW |
| 2026-09-08T07:00Z | 1,992 MW | 759 MW | 172 MW | 41 MW | 13 MW |
| 2026-09-08T08:00Z | 1,962 MW | 643 MW | 164 MW | 41 MW | 10 MW |
| 2026-09-08T09:00Z | 2,065 MW | 597 MW | 169 MW | 41 MW | 12 MW |
| 2026-09-08T10:00Z | 2,184 MW | 620 MW | 173 MW | 41 MW | 12 MW |
| 2026-09-08T11:00Z | 2,180 MW | 682 MW | 176 MW | 41 MW | 11 MW |
| 2026-09-08T12:00Z | 2,193 MW | 710 MW | 174 MW | 41 MW | 3 MW |
| 2026-09-08T13:00Z | 2,197 MW | 669 MW | 169 MW | 41 MW | 0 MW |
| 2026-09-08T14:00Z | 2,403 MW | 613 MW | 167 MW | 41 MW | 0 MW |
| 2026-09-08T15:00Z | 2,518 MW | 603 MW | 173 MW | 41 MW | 0 MW |
| 2026-09-08T16:00Z | n/a | n/a | n/a | 41 MW | 0 MW |
| 2026-09-08T17:00Z | 2,651 MW | 721 MW | 170 MW | 41 MW | 87 MW |
| 2026-09-08T18:00Z | 2,346 MW | 684 MW | 194 MW | 41 MW | 174 MW |
| 2026-09-08T19:00Z | 2,012 MW | 663 MW | 248 MW | 41 MW | 188 MW |
| 2026-09-08T20:00Z | 1,773 MW | 648 MW | 203 MW | 41 MW | 185 MW |
| 2026-09-08T21:00Z | 1,428 MW | 634 MW | 164 MW | 41 MW | 177 MW |
| 2026-09-08T22:00Z | 1,356 MW | 681 MW | 171 MW | 41 MW | -31 MW |
| 2026-09-08T23:00Z | 1,256 MW | 697 MW | 165 MW | 41 MW | -193 MW |
| 2026-09-09T00:00Z | 1,090 MW | 705 MW | 167 MW | 41 MW | -224 MW |
| 2026-09-09T01:00Z | 982 MW | 874 MW | 172 MW | 41 MW | -221 MW |
| 2026-09-09T02:00Z | 870 MW | 985 MW | 174 MW | 41 MW | -219 MW |
| 2026-09-09T03:00Z | 825 MW | 1,038 MW | 171 MW | 41 MW | -217 MW |
| 2026-09-09T04:00Z | 683 MW | 1,137 MW | 351 MW | 41 MW | -180 MW |
| 2026-09-09T05:00Z | 515 MW | 1,220 MW | 407 MW | 41 MW | 11 MW |
| 2026-09-09T06:00Z | 397 MW | 1,256 MW | 372 MW | 41 MW | 111 MW |
| 2026-09-09T07:00Z | 325 MW | 1,225 MW | 295 MW | 59 MW | 189 MW |
| 2026-09-09T08:00Z | 259 MW | 1,225 MW | 247 MW | 70 MW | 156 MW |
| 2026-09-09T09:00Z | 224 MW | 1,195 MW | 203 MW | 69 MW | 0 MW |
| 2026-09-09T10:00Z | 230 MW | 1,214 MW | 172 MW | 45 MW | -40 MW |
| 2026-09-09T11:00Z | 276 MW | 1,268 MW | 173 MW | 41 MW | -149 MW |
| 2026-09-09T12:00Z | 413 MW | 1,295 MW | 185 MW | 52 MW | -147 MW |
| 2026-09-09T13:00Z | 470 MW | 1,214 MW | 171 MW | 70 MW | -147 MW |
| 2026-09-09T14:00Z | 597 MW | 1,267 MW | 222 MW | 69 MW | -146 MW |
| 2026-09-09T15:00Z | 671 MW | 1,337 MW | 277 MW | 71 MW | -33 MW |
| 2026-09-09T16:00Z | n/a | n/a | n/a | 68 MW | 69 MW |
| 2026-09-09T17:00Z | 684 MW | 1,398 MW | 444 MW | 71 MW | 174 MW |
| 2026-09-09T18:00Z | 815 MW | 1,252 MW | 375 MW | 69 MW | 179 MW |
| 2026-09-09T19:00Z | 1,011 MW | 1,116 MW | 321 MW | 70 MW | 178 MW |
| 2026-09-09T20:00Z | 1,277 MW | 1,215 MW | 230 MW | 71 MW | 100 MW |
| 2026-09-09T21:00Z | 1,502 MW | 1,209 MW | 192 MW | 72 MW | 14 MW |
| 2026-09-09T22:00Z | 1,673 MW | 1,075 MW | 375 MW | 70 MW | -112 MW |
| 2026-09-09T23:00Z | 2,018 MW | 771 MW | 203 MW | 49 MW | -150 MW |
| 2026-09-10T00:00Z | 2,347 MW | 565 MW | 164 MW | 41 MW | -150 MW |
| 2026-09-10T01:00Z | 2,530 MW | 580 MW | 171 MW | 41 MW | -147 MW |
| 2026-09-10T02:00Z | 2,743 MW | 560 MW | 169 MW | 41 MW | -147 MW |
| 2026-09-10T03:00Z | 2,770 MW | 519 MW | 169 MW | 41 MW | -146 MW |
| 2026-09-10T04:00Z | 2,781 MW | 481 MW | 164 MW | 41 MW | -109 MW |
| 2026-09-10T05:00Z | 2,850 MW | 567 MW | 184 MW | 41 MW | 17 MW |
| 2026-09-10T06:00Z | 2,661 MW | 717 MW | 209 MW | 41 MW | 21 MW |
| 2026-09-10T07:00Z | 2,459 MW | 700 MW | 180 MW | 41 MW | 10 MW |
| 2026-09-10T08:00Z | 2,425 MW | 598 MW | 165 MW | 41 MW | 10 MW |
| 2026-09-10T09:00Z | 2,198 MW | 594 MW | 164 MW | 41 MW | 3 MW |
| 2026-09-10T10:00Z | 1,937 MW | 738 MW | 166 MW | 41 MW | 0 MW |
| 2026-09-10T11:00Z | 2,002 MW | 752 MW | 173 MW | 41 MW | 0 MW |
| 2026-09-10T12:00Z | 2,006 MW | 729 MW | 171 MW | 41 MW | 0 MW |
| 2026-09-10T13:00Z | 2,100 MW | 542 MW | 173 MW | 41 MW | 0 MW |
| 2026-09-10T14:00Z | 2,277 MW | 705 MW | 168 MW | 41 MW | 0 MW |
| 2026-09-10T15:00Z | 2,426 MW | 653 MW | 165 MW | 41 MW | 0 MW |
| 2026-09-10T16:00Z | 2,436 MW | 849 MW | 175 MW | 41 MW | 63 MW |
| 2026-09-10T17:00Z | 2,249 MW | 944 MW | 192 MW | 41 MW | 153 MW |
| 2026-09-10T18:00Z | 1,855 MW | 896 MW | 165 MW | 41 MW | 177 MW |
| 2026-09-10T19:00Z | n/a | n/a | n/a | 46 MW | 180 MW |
| 2026-09-10T20:00Z | 1,338 MW | 879 MW | 84 MW | 71 MW | 184 MW |
| 2026-09-10T21:00Z | 1,466 MW | 766 MW | -5 MW | 69 MW | 9 MW |
| 2026-09-10T22:00Z | 1,467 MW | 601 MW | -5 MW | 69 MW | -37 MW |
| 2026-09-10T23:00Z | 1,340 MW | 627 MW | -3 MW | 69 MW | -153 MW |
| 2026-09-11T00:00Z | 1,444 MW | 614 MW | -3 MW | 69 MW | -224 MW |
| 2026-09-11T01:00Z | 1,256 MW | 620 MW | -3 MW | 66 MW | -222 MW |
| 2026-09-11T02:00Z | 1,265 MW | 705 MW | -3 MW | 71 MW | -218 MW |
| 2026-09-11T03:00Z | 1,094 MW | 665 MW | -3 MW | 69 MW | -217 MW |
| 2026-09-11T04:00Z | 1,045 MW | 727 MW | -8 MW | 68 MW | -145 MW |
| 2026-09-11T05:00Z | 819 MW | 787 MW | 107 MW | 68 MW | 13 MW |
| 2026-09-11T06:00Z | 718 MW | 967 MW | 331 MW | 60 MW | 105 MW |
| 2026-09-11T07:00Z | 511 MW | 1,030 MW | 311 MW | 40 MW | 214 MW |
| 2026-09-11T08:00Z | 406 MW | 1,037 MW | 358 MW | 70 MW | 84 MW |
| 2026-09-11T09:00Z | 455 MW | 969 MW | 392 MW | 70 MW | 0 MW |
| 2026-09-11T10:00Z | 525 MW | 785 MW | 263 MW | 70 MW | -36 MW |
| 2026-09-11T11:00Z | 541 MW | 1,221 MW | 283 MW | 69 MW | -148 MW |
| 2026-09-11T12:00Z | 525 MW | 901 MW | 338 MW | 71 MW | -147 MW |
| 2026-09-11T13:00Z | 474 MW | 928 MW | 281 MW | 70 MW | -146 MW |
| 2026-09-11T14:00Z | n/a | n/a | n/a | 70 MW | 0 MW |
| 2026-09-11T15:00Z | n/a | n/a | n/a | 71 MW | 0 MW |
| 2026-09-11T16:00Z | 916 MW | 933 MW | 231 MW | 70 MW | 7 MW |
| 2026-09-11T17:00Z | 1,216 MW | 918 MW | 202 MW | 68 MW | 178 MW |
| 2026-09-11T18:00Z | 1,455 MW | 891 MW | 351 MW | 70 MW | 181 MW |
| 2026-09-11T19:00Z | 2,056 MW | 792 MW | 325 MW | 68 MW | 175 MW |
| 2026-09-11T20:00Z | 2,698 MW | 743 MW | 240 MW | 56 MW | 75 MW |
| 2026-09-11T21:00Z | 2,878 MW | 694 MW | 167 MW | 41 MW | 4 MW |
| 2026-09-11T22:00Z | 3,024 MW | 461 MW | 168 MW | 41 MW | 0 MW |
| 2026-09-11T23:00Z | 3,041 MW | 397 MW | 165 MW | 41 MW | -114 MW |
| 2026-09-12T00:00Z | 2,977 MW | 374 MW | 164 MW | 41 MW | -151 MW |
| 2026-09-12T01:00Z | 2,984 MW | 386 MW | 170 MW | 41 MW | -149 MW |
| 2026-09-12T02:00Z | 2,936 MW | 389 MW | 170 MW | 41 MW | -147 MW |
| 2026-09-12T03:00Z | 2,878 MW | 370 MW | 164 MW | 41 MW | -147 MW |
| 2026-09-12T04:00Z | 2,880 MW | 367 MW | 164 MW | 41 MW | -146 MW |
| 2026-09-12T05:00Z | 2,971 MW | 377 MW | 166 MW | 41 MW | -72 MW |
| 2026-09-12T06:00Z | 2,996 MW | 376 MW | 167 MW | 41 MW | 17 MW |
| 2026-09-12T07:00Z | 2,782 MW | 363 MW | 164 MW | 41 MW | 11 MW |
| 2026-09-12T08:00Z | 2,077 MW | 458 MW | 166 MW | 41 MW | 0 MW |
| 2026-09-12T09:00Z | 1,635 MW | 435 MW | 165 MW | 41 MW | 0 MW |
| 2026-09-12T10:00Z | 1,636 MW | 447 MW | 169 MW | 41 MW | 0 MW |
| 2026-09-12T11:00Z | 1,462 MW | 431 MW | 164 MW | 41 MW | 0 MW |
| 2026-09-12T12:00Z | 1,307 MW | 435 MW | 167 MW | 41 MW | 0 MW |
| 2026-09-12T13:00Z | 1,269 MW | 443 MW | 174 MW | 41 MW | 0 MW |
| 2026-09-12T14:00Z | 1,210 MW | 394 MW | 171 MW | 41 MW | 0 MW |
| 2026-09-12T15:00Z | 1,059 MW | 449 MW | 180 MW | 41 MW | 0 MW |
| 2026-09-12T16:00Z | 916 MW | 800 MW | 236 MW | 70 MW | 0 MW |
| 2026-09-12T17:00Z | 684 MW | 996 MW | 417 MW | 69 MW | 79 MW |
| 2026-09-12T18:00Z | 549 MW | 1,005 MW | 439 MW | 72 MW | 220 MW |
| 2026-09-12T19:00Z | 437 MW | 923 MW | 429 MW | 70 MW | 218 MW |
| 2026-09-12T20:00Z | 380 MW | 958 MW | 433 MW | 68 MW | 215 MW |
| 2026-09-12T21:00Z | 363 MW | 955 MW | 376 MW | 70 MW | 185 MW |
| 2026-09-12T22:00Z | 330 MW | 952 MW | 378 MW | 70 MW | -114 MW |
| 2026-09-12T23:00Z | 261 MW | 950 MW | 361 MW | 68 MW | -154 MW |
| 2026-09-13T00:00Z | 237 MW | 908 MW | 301 MW | 69 MW | -152 MW |
| 2026-09-13T01:00Z | 228 MW | 907 MW | 316 MW | 71 MW | -151 MW |
| 2026-09-13T02:00Z | 168 MW | 912 MW | 349 MW | 70 MW | -149 MW |
| 2026-09-13T03:00Z | 119 MW | 918 MW | 354 MW | 72 MW | -148 MW |
| 2026-09-13T04:00Z | 82 MW | 912 MW | 371 MW | 71 MW | -147 MW |
| 2026-09-13T05:00Z | 70 MW | 943 MW | 392 MW | 70 MW | -147 MW |
| 2026-09-13T06:00Z | 68 MW | 954 MW | 385 MW | 68 MW | -146 MW |
| 2026-09-13T07:00Z | 75 MW | 980 MW | 397 MW | 70 MW | -35 MW |
| 2026-09-13T08:00Z | 88 MW | 999 MW | 401 MW | 70 MW | 0 MW |
| 2026-09-13T09:00Z | 109 MW | 1,016 MW | 404 MW | 70 MW | 0 MW |
| 2026-09-13T10:00Z | 153 MW | 1,003 MW | 420 MW | 68 MW | 5 MW |
| 2026-09-13T11:00Z | 185 MW | 1,001 MW | 383 MW | 70 MW | 52 MW |
| 2026-09-13T12:00Z | 257 MW | 986 MW | 380 MW | 68 MW | 72 MW |
| 2026-09-13T13:00Z | 404 MW | 974 MW | 333 MW | 67 MW | 34 MW |
| 2026-09-13T14:00Z | 527 MW | 953 MW | 299 MW | 68 MW | 13 MW |
| 2026-09-13T15:00Z | 593 MW | 951 MW | 346 MW | 72 MW | 15 MW |
| 2026-09-13T16:00Z | 522 MW | 981 MW | 400 MW | 69 MW | 52 MW |
| 2026-09-13T17:00Z | 476 MW | 996 MW | 400 MW | 69 MW | 114 MW |
| 2026-09-13T18:00Z | 453 MW | 1,013 MW | 412 MW | 71 MW | 159 MW |
| 2026-09-13T19:00Z | 486 MW | 1,030 MW | 391 MW | 70 MW | 180 MW |
| 2026-09-13T20:00Z | 487 MW | 1,004 MW | 368 MW | 68 MW | 175 MW |
| 2026-09-13T21:00Z | 613 MW | 1,012 MW | 376 MW | 70 MW | 14 MW |
| 2026-09-13T22:00Z | 606 MW | 1,010 MW | 406 MW | 70 MW | 96 MW |
| 2026-09-13T23:00Z | 673 MW | 1,003 MW | 402 MW | 70 MW | -115 MW |
| 2026-09-14T00:00Z | 752 MW | 1,003 MW | 414 MW | 72 MW | -227 MW |
| 2026-09-14T01:00Z | 742 MW | 984 MW | 412 MW | 68 MW | -227 MW |
| 2026-09-14T02:00Z | 813 MW | 999 MW | 406 MW | 71 MW | -223 MW |
| 2026-09-14T03:00Z | 939 MW | 1,009 MW | 388 MW | 69 MW | -222 MW |
| 2026-09-14T04:00Z | 1,146 MW | 1,008 MW | 414 MW | 70 MW | -219 MW |
| 2026-09-14T05:00Z | 1,270 MW | 1,000 MW | 401 MW | 68 MW | -145 MW |
| 2026-09-14T06:00Z | 1,257 MW | 1,012 MW | 389 MW | 70 MW | 97 MW |
| 2026-09-14T07:00Z | 1,177 MW | 1,016 MW | 405 MW | 70 MW | 182 MW |
| 2026-09-14T08:00Z | 1,006 MW | 1,005 MW | 404 MW | 68 MW | 90 MW |
| 2026-09-14T09:00Z | 1,242 MW | 998 MW | 367 MW | 70 MW | 0 MW |
| 2026-09-14T10:00Z | 1,484 MW | 920 MW | 244 MW | 66 MW | -75 MW |
| 2026-09-14T11:00Z | 1,790 MW | 786 MW | 172 MW | 71 MW | -148 MW |
| 2026-09-14T12:00Z | 2,090 MW | 666 MW | 164 MW | 44 MW | -148 MW |
| 2026-09-14T13:00Z | n/a | n/a | n/a | 41 MW | 0 MW |
| 2026-09-14T14:00Z | 2,403 MW | 764 MW | 178 MW | 41 MW | 44 MW |
| 2026-09-14T15:00Z | 2,361 MW | 1,025 MW | 331 MW | 45 MW | 136 MW |
| 2026-09-14T16:00Z | 2,386 MW | 1,056 MW | 430 MW | 50 MW | 167 MW |
| 2026-09-14T17:00Z | 2,620 MW | 999 MW | 389 MW | 45 MW | 154 MW |
| 2026-09-14T18:00Z | 2,538 MW | 880 MW | 283 MW | 41 MW | 174 MW |
| 2026-09-14T19:00Z | 2,485 MW | 851 MW | 205 MW | 45 MW | 115 MW |
| 2026-09-14T20:00Z | 2,437 MW | 728 MW | 164 MW | 55 MW | 10 MW |
| 2026-09-14T21:00Z | 2,280 MW | 407 MW | 164 MW | 50 MW | 4 MW |
| 2026-09-14T22:00Z | 2,280 MW | 474 MW | 173 MW | 41 MW | 6 MW |
| 2026-09-14T23:00Z | 2,178 MW | 528 MW | 168 MW | 41 MW | -74 MW |
| 2026-09-15T00:00Z | 1,873 MW | 628 MW | 173 MW | 41 MW | -227 MW |
| 2026-09-15T01:00Z | 2,004 MW | 522 MW | 170 MW | 41 MW | -227 MW |
| 2026-09-15T02:00Z | 2,142 MW | 494 MW | 175 MW | 41 MW | -223 MW |
| 2026-09-15T03:00Z | 2,141 MW | 443 MW | 166 MW | 48 MW | -222 MW |
| 2026-09-15T04:00Z | 2,270 MW | 499 MW | 169 MW | 50 MW | -218 MW |
| 2026-09-15T05:00Z | 2,264 MW | 640 MW | 167 MW | 55 MW | -216 MW |
| 2026-09-15T06:00Z | 2,144 MW | 706 MW | 164 MW | 41 MW | -103 MW |
| 2026-09-15T07:00Z | 2,026 MW | 588 MW | 170 MW | 41 MW | 18 MW |
| 2026-09-15T08:00Z | 1,962 MW | 503 MW | 164 MW | 41 MW | 15 MW |
| 2026-09-15T09:00Z | 1,998 MW | 508 MW | 171 MW | 41 MW | 8 MW |
| 2026-09-15T10:00Z | 1,867 MW | 536 MW | 166 MW | 41 MW | 0 MW |
| 2026-09-15T11:00Z | 1,748 MW | 543 MW | 168 MW | 41 MW | 0 MW |
| 2026-09-15T12:00Z | 1,601 MW | 560 MW | 165 MW | 41 MW | 0 MW |
| 2026-09-15T13:00Z | 1,709 MW | 491 MW | 167 MW | 41 MW | 0 MW |
| 2026-09-15T14:00Z | 1,803 MW | 476 MW | 168 MW | 41 MW | 0 MW |
| 2026-09-15T15:00Z | 2,225 MW | 467 MW | 177 MW | 41 MW | 0 MW |
| 2026-09-15T16:00Z | 2,418 MW | 688 MW | 223 MW | 60 MW | 2 MW |
| 2026-09-15T17:00Z | 2,378 MW | 904 MW | 243 MW | 48 MW | 219 MW |
| 2026-09-15T18:00Z | 2,039 MW | 1,021 MW | 354 MW | 41 MW | 215 MW |
| 2026-09-15T19:00Z | 2,059 MW | 935 MW | 357 MW | 41 MW | 216 MW |
| 2026-09-15T20:00Z | 1,899 MW | 911 MW | 274 MW | 53 MW | 112 MW |
| 2026-09-15T21:00Z | 1,928 MW | 872 MW | 228 MW | 66 MW | 5 MW |
| 2026-09-15T22:00Z | 1,949 MW | 782 MW | 173 MW | 71 MW | -98 MW |
| 2026-09-15T23:00Z | 1,810 MW | 632 MW | 169 MW | 69 MW | -151 MW |
| 2026-09-16T00:00Z | 1,863 MW | 512 MW | 174 MW | 70 MW | -149 MW |
| 2026-09-16T01:00Z | 1,871 MW | 413 MW | 164 MW | 65 MW | -150 MW |
| 2026-09-16T02:00Z | 1,616 MW | 365 MW | 164 MW | 41 MW | -148 MW |
| 2026-09-16T03:00Z | 1,609 MW | 398 MW | 173 MW | 41 MW | -146 MW |
| 2026-09-16T04:00Z | 1,510 MW | 808 MW | 224 MW | 70 MW | -144 MW |
| 2026-09-16T05:00Z | 1,355 MW | 994 MW | 195 MW | 69 MW | -108 MW |
| 2026-09-16T06:00Z | 1,373 MW | 944 MW | 189 MW | 68 MW | 0 MW |
| 2026-09-16T07:00Z | 1,146 MW | 1,035 MW | 327 MW | 71 MW | 111 MW |
| 2026-09-16T08:00Z | 1,071 MW | 1,015 MW | 308 MW | 67 MW | 154 MW |
| 2026-09-16T09:00Z | 1,077 MW | 910 MW | 307 MW | 68 MW | 59 MW |
| 2026-09-16T10:00Z | 1,176 MW | 816 MW | 164 MW | 68 MW | 0 MW |
| 2026-09-16T11:00Z | 1,333 MW | 834 MW | 230 MW | 71 MW | -36 MW |
| 2026-09-16T12:00Z | 1,861 MW | 746 MW | 164 MW | 67 MW | -72 MW |
| 2026-09-16T13:00Z | 2,078 MW | 476 MW | 202 MW | 46 MW | -72 MW |
| 2026-09-16T14:00Z | 2,190 MW | 644 MW | 181 MW | 42 MW | -33 MW |
| 2026-09-16T15:00Z | 2,468 MW | 798 MW | 164 MW | 43 MW | 5 MW |
| 2026-09-16T16:00Z | 2,887 MW | 855 MW | 243 MW | 52 MW | 38 MW |
| 2026-09-16T17:00Z | 3,043 MW | 918 MW | 357 MW | 41 MW | 170 MW |
| 2026-09-16T18:00Z | 2,960 MW | 893 MW | 384 MW | 41 MW | 204 MW |
| 2026-09-16T19:00Z | 3,120 MW | 995 MW | 430 MW | 41 MW | 126 MW |
| 2026-09-16T20:00Z | 3,146 MW | 743 MW | 365 MW | 41 MW | 10 MW |
| 2026-09-16T21:00Z | 2,962 MW | 508 MW | 245 MW | 41 MW | 10 MW |
| 2026-09-16T22:00Z | 2,462 MW | 439 MW | 164 MW | 41 MW | 5 MW |
| 2026-09-16T23:00Z | 2,091 MW | 455 MW | 175 MW | 42 MW | -150 MW |
| 2026-09-17T00:00Z | 1,981 MW | 406 MW | 177 MW | 43 MW | -149 MW |
| 2026-09-17T01:00Z | 2,004 MW | 382 MW | 168 MW | 41 MW | -148 MW |
| 2026-09-17T02:00Z | 2,032 MW | 393 MW | 173 MW | 41 MW | -147 MW |
| 2026-09-17T03:00Z | 2,024 MW | 398 MW | 172 MW | 42 MW | -146 MW |
| 2026-09-17T04:00Z | 2,115 MW | 410 MW | 179 MW | 43 MW | -144 MW |
| 2026-09-17T05:00Z | 2,315 MW | 404 MW | 177 MW | 43 MW | -107 MW |
| 2026-09-17T06:00Z | 2,477 MW | 395 MW | 171 MW | 42 MW | 0 MW |
| 2026-09-17T07:00Z | 2,574 MW | 414 MW | 164 MW | 41 MW | 0 MW |
| 2026-09-17T08:00Z | 2,500 MW | 377 MW | 168 MW | 41 MW | 0 MW |
| 2026-09-17T09:00Z | 2,456 MW | 371 MW | 165 MW | 41 MW | 0 MW |
| 2026-09-17T10:00Z | 2,333 MW | 371 MW | 164 MW | 41 MW | 0 MW |
| 2026-09-17T11:00Z | 2,498 MW | 384 MW | 169 MW | 41 MW | 0 MW |
| 2026-09-17T12:00Z | 2,410 MW | 374 MW | 164 MW | 41 MW | 0 MW |
| 2026-09-17T13:00Z | 2,335 MW | 363 MW | 164 MW | 41 MW | 0 MW |
| 2026-09-17T14:00Z | 2,777 MW | 432 MW | 180 MW | 41 MW | 3 MW |
| 2026-09-17T15:00Z | 2,974 MW | 426 MW | 168 MW | 41 MW | 11 MW |
| 2026-09-17T16:00Z | 2,704 MW | 443 MW | 169 MW | 41 MW | 17 MW |
| 2026-09-17T17:00Z | 2,631 MW | 450 MW | 189 MW | 41 MW | 79 MW |
| 2026-09-17T18:00Z | 2,573 MW | 361 MW | 164 MW | 41 MW | 110 MW |
| 2026-09-17T19:00Z | 2,276 MW | 462 MW | 164 MW | 41 MW | 132 MW |
| 2026-09-17T20:00Z | 1,927 MW | 513 MW | 164 MW | 41 MW | 89 MW |
| 2026-09-17T21:00Z | 1,788 MW | 462 MW | 164 MW | 41 MW | 34 MW |
| 2026-09-17T22:00Z | 1,529 MW | 473 MW | 165 MW | 41 MW | 15 MW |
| 2026-09-17T23:00Z | 1,411 MW | 484 MW | 168 MW | 41 MW | -34 MW |
| 2026-09-18T00:00Z | 1,522 MW | 501 MW | 172 MW | 41 MW | -73 MW |
| 2026-09-18T01:00Z | 1,884 MW | 487 MW | 168 MW | 41 MW | -73 MW |
| 2026-09-18T02:00Z | 1,841 MW | 530 MW | 170 MW | 41 MW | -72 MW |
| 2026-09-18T03:00Z | 1,805 MW | 509 MW | 174 MW | 41 MW | -72 MW |
| 2026-09-18T04:00Z | 1,938 MW | 481 MW | 171 MW | 41 MW | -72 MW |
| 2026-09-18T05:00Z | 1,931 MW | 575 MW | 166 MW | 41 MW | -28 MW |
| 2026-09-18T06:00Z | 1,984 MW | 534 MW | 164 MW | 41 MW | 133 MW |
| 2026-09-18T07:00Z | 2,198 MW | 542 MW | 164 MW | 41 MW | 15 MW |
| 2026-09-18T08:00Z | 2,360 MW | 570 MW | 167 MW | 41 MW | 17 MW |
| 2026-09-18T09:00Z | 2,470 MW | 593 MW | 176 MW | 41 MW | 20 MW |
| 2026-09-18T10:00Z | 2,562 MW | 603 MW | 182 MW | 41 MW | -24 MW |
| 2026-09-18T11:00Z | 3,143 MW | 589 MW | 175 MW | 41 MW | -111 MW |
| 2026-09-18T12:00Z | 3,424 MW | 578 MW | 170 MW | 41 MW | -148 MW |
| 2026-09-18T13:00Z | 3,527 MW | 533 MW | 179 MW | 41 MW | -181 MW |
| 2026-09-18T14:00Z | 3,480 MW | 539 MW | 182 MW | 41 MW | -179 MW |
| 2026-09-18T15:00Z | 3,365 MW | 508 MW | 166 MW | 41 MW | -72 MW |
| 2026-09-18T16:00Z | 3,417 MW | 517 MW | 171 MW | 41 MW | 0 MW |
| 2026-09-18T17:00Z | 3,364 MW | 518 MW | 172 MW | 41 MW | 103 MW |
| 2026-09-18T18:00Z | n/a | n/a | n/a | 41 MW | 287 MW |
| 2026-09-18T19:00Z | 3,299 MW | 436 MW | 164 MW | 41 MW | 286 MW |
| 2026-09-18T20:00Z | 3,037 MW | 390 MW | 164 MW | 41 MW | 192 MW |
| 2026-09-18T21:00Z | 2,783 MW | 412 MW | 166 MW | 41 MW | -38 MW |
| 2026-09-18T22:00Z | 2,439 MW | 404 MW | 163 MW | 41 MW | -75 MW |
| 2026-09-18T23:00Z | 2,347 MW | 383 MW | 168 MW | 41 MW | -74 MW |
| 2026-09-19T00:00Z | 2,517 MW | 421 MW | 180 MW | 41 MW | -74 MW |
| 2026-09-19T01:00Z | 2,297 MW | 405 MW | 166 MW | 41 MW | -74 MW |
| 2026-09-19T02:00Z | 2,085 MW | 456 MW | 166 MW | 41 MW | -74 MW |
| 2026-09-19T03:00Z | 1,950 MW | 446 MW | 169 MW | 41 MW | -73 MW |
| 2026-09-19T04:00Z | 1,903 MW | 438 MW | 172 MW | 41 MW | -73 MW |
| 2026-09-19T05:00Z | 1,976 MW | 406 MW | 171 MW | 41 MW | -73 MW |
| 2026-09-19T06:00Z | 2,140 MW | 391 MW | 172 MW | 41 MW | -36 MW |
| 2026-09-19T07:00Z | 2,097 MW | 372 MW | 164 MW | 41 MW | 10 MW |
| 2026-09-19T08:00Z | 2,093 MW | 380 MW | 167 MW | 41 MW | 21 MW |
| 2026-09-19T09:00Z | 2,142 MW | 379 MW | 166 MW | 41 MW | 0 MW |
| 2026-09-19T10:00Z | 2,202 MW | 396 MW | 173 MW | 41 MW | 0 MW |
| 2026-09-19T11:00Z | 2,154 MW | 378 MW | 167 MW | 41 MW | -37 MW |
| 2026-09-19T12:00Z | 2,261 MW | 405 MW | 178 MW | 41 MW | -143 MW |
| 2026-09-19T13:00Z | 2,075 MW | 363 MW | 165 MW | 41 MW | -144 MW |
| 2026-09-19T14:00Z | 2,159 MW | 387 MW | 170 MW | 41 MW | -71 MW |
| 2026-09-19T15:00Z | 2,041 MW | 392 MW | 171 MW | 41 MW | 10 MW |
| 2026-09-19T16:00Z | n/a | n/a | n/a | 41 MW | 34 MW |
| 2026-09-19T17:00Z | n/a | n/a | n/a | 41 MW | 10 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-19T17:00Z.
Installed Capacity
Annual figure for 2024| Gas | |
|---|---|
| Wind | |
| Oil | |
| Coal | |
| Other |
Total installed capacity in Ireland and Northern Ireland (SEM): 12.7 GW in 2024. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2024.
Day by Day
Daily totals, Europe/Dublin time dates, through 2026-09-18| Date (Europe/Dublin time) | Net generation |
|---|---|
| 2025-08-15 | 50.9 GWh |
| 2025-08-16 | 64.0 GWh |
| 2025-08-17 | 60.1 GWh |
| 2025-08-18 | 48.5 GWh |
| 2025-08-19 | 47.9 GWh |
| 2025-08-20 | 46.6 GWh |
| 2025-08-21 | 37.3 GWh |
| 2025-08-22 | 38.0 GWh |
| 2025-08-23 | 46.5 GWh |
| 2025-08-24 | 53.7 GWh |
| 2025-08-25 | 69.2 GWh |
| 2025-08-26 | 67.1 GWh |
| 2025-08-27 | 70.3 GWh |
| 2025-08-28 | 71.9 GWh |
| 2025-08-29 | 67.0 GWh |
| 2025-08-30 | 68.4 GWh |
| 2025-08-31 | 60.1 GWh |
| 2025-09-01 | 60.7 GWh |
| 2025-09-02 | 44.7 GWh |
| 2025-09-03 | 51.4 GWh |
| 2025-09-04 | 50.8 GWh |
| 2025-09-05 | 49.1 GWh |
| 2025-09-06 | 72.7 GWh |
| 2025-09-07 | 56.8 GWh |
| 2025-09-08 | 54.4 GWh |
| 2025-09-09 | 61.4 GWh |
| 2025-09-10 | 62.4 GWh |
| 2025-09-11 | 60.6 GWh |
| 2025-09-12 | 50.1 GWh |
| 2025-09-13 | 47.1 GWh |
| 2025-09-14 | 66.9 GWh |
| 2025-09-15 | n/a |
| 2025-09-16 | 57.6 GWh |
| 2025-09-17 | 85.4 GWh |
| 2025-09-18 | 74.5 GWh |
| 2025-09-19 | 58.8 GWh |
| 2025-09-20 | 58.7 GWh |
| 2025-09-21 | 48.6 GWh |
| 2025-09-22 | 51.5 GWh |
| 2025-09-23 | 55.9 GWh |
| 2025-09-24 | 57.9 GWh |
| 2025-09-25 | 65.7 GWh |
| 2025-09-26 | 78.7 GWh |
| 2025-09-27 | 57.0 GWh |
| 2025-09-28 | 45.2 GWh |
| 2025-09-29 | 61.2 GWh |
| 2025-09-30 | 72.6 GWh |
| 2025-10-01 | 77.4 GWh |
| 2025-10-02 | 85.3 GWh |
| 2025-10-03 | 82.7 GWh |
| 2025-10-04 | 80.8 GWh |
| 2025-10-05 | 58.8 GWh |
| 2025-10-06 | 73.8 GWh |
| 2025-10-07 | 67.7 GWh |
| 2025-10-08 | 59.2 GWh |
| 2025-10-09 | 61.5 GWh |
| 2025-10-10 | 52.8 GWh |
| 2025-10-11 | 48.3 GWh |
| 2025-10-12 | n/a |
| 2025-10-13 | 4.68 GWh |
| 2025-10-14 | n/a |
| 2025-10-15 | 4.53 GWh |
| 2025-10-16 | 57.1 GWh |
| 2025-10-17 | 72.9 GWh |
| 2025-10-18 | 80.8 GWh |
| 2025-10-19 | 60.6 GWh |
| 2025-10-20 | 59.4 GWh |
| 2025-10-21 | n/a |
| 2025-10-22 | 54.5 GWh |
| 2025-10-23 | n/a |
| 2025-10-24 | 18.6 GWh |
| 2025-10-25 | 3.00 GWh |
| 2025-10-26 | n/a |
| 2025-10-27 | 23.5 GWh |
| 2025-10-28 | 19.1 GWh |
| 2025-10-29 | n/a |
| 2025-10-30 | n/a |
| 2025-10-31 | 22.9 GWh |
| 2025-11-01 | 56.2 GWh |
| 2025-11-02 | 65.4 GWh |
| 2025-11-03 | n/a |
| 2025-11-04 | n/a |
| 2025-11-05 | 54.8 GWh |
| 2025-11-06 | n/a |
| 2025-11-07 | n/a |
| 2025-11-08 | 3.28 GWh |
| 2025-11-09 | 72.7 GWh |
| 2025-11-10 | n/a |
| 2025-11-11 | n/a |
| 2025-11-12 | n/a |
| 2025-11-13 | n/a |
| 2025-11-14 | n/a |
| 2025-11-15 | 84.0 GWh |
| 2025-11-16 | 68.4 GWh |
| 2025-11-17 | 5.13 GWh |
| 2025-11-18 | 97.1 GWh |
| 2025-11-19 | 95.2 GWh |
| 2025-11-20 | 78.3 GWh |
| 2025-11-21 | 96.9 GWh |
| 2025-11-22 | 75.3 GWh |
| 2025-11-23 | 103 GWh |
| 2025-11-24 | n/a |
| 2025-11-25 | 68.0 GWh |
| 2025-11-26 | 99.2 GWh |
| 2025-11-27 | 111 GWh |
| 2025-11-28 | 104 GWh |
| 2025-11-29 | 78.3 GWh |
| 2025-11-30 | 94.0 GWh |
| 2025-12-01 | 81.4 GWh |
| 2025-12-02 | 94.3 GWh |
| 2025-12-03 | 95.5 GWh |
| 2025-12-04 | 84.4 GWh |
| 2025-12-05 | 107 GWh |
| 2025-12-06 | 89.2 GWh |
| 2025-12-07 | 84.2 GWh |
| 2025-12-08 | 107 GWh |
| 2025-12-09 | 115 GWh |
| 2025-12-10 | 111 GWh |
| 2025-12-11 | 99.0 GWh |
| 2025-12-12 | 3.52 GWh |
| 2025-12-13 | 108 GWh |
| 2025-12-14 | 99.1 GWh |
| 2025-12-15 | 62.3 GWh |
| 2025-12-16 | 76.6 GWh |
| 2025-12-17 | 107 GWh |
| 2025-12-18 | 92.0 GWh |
| 2025-12-19 | 92.5 GWh |
| 2025-12-20 | 102 GWh |
| 2025-12-21 | 60.5 GWh |
| 2025-12-22 | 61.5 GWh |
| 2025-12-23 | 70.5 GWh |
| 2025-12-24 | 86.9 GWh |
| 2025-12-25 | 80.8 GWh |
| 2025-12-26 | 77.9 GWh |
| 2025-12-27 | 83.5 GWh |
| 2025-12-28 | 66.1 GWh |
| 2025-12-29 | 63.7 GWh |
| 2025-12-30 | 77.1 GWh |
| 2025-12-31 | 66.0 GWh |
| 2026-01-01 | 63.8 GWh |
| 2026-01-02 | 76.4 GWh |
| 2026-01-03 | 74.4 GWh |
| 2026-01-04 | 69.5 GWh |
| 2026-01-05 | 77.6 GWh |
| 2026-01-06 | 105 GWh |
| 2026-01-07 | 83.4 GWh |
| 2026-01-08 | 78.4 GWh |
| 2026-01-09 | 77.8 GWh |
| 2026-01-10 | 90.6 GWh |
| 2026-01-11 | 116 GWh |
| 2026-01-12 | 106 GWh |
| 2026-01-13 | 74.3 GWh |
| 2026-01-14 | 109 GWh |
| 2026-01-15 | 84.7 GWh |
| 2026-01-16 | 87.4 GWh |
| 2026-01-17 | 70.1 GWh |
| 2026-01-18 | 92.7 GWh |
| 2026-01-19 | 85.8 GWh |
| 2026-01-20 | 119 GWh |
| 2026-01-21 | 101 GWh |
| 2026-01-22 | 75.1 GWh |
| 2026-01-23 | 108 GWh |
| 2026-01-24 | 95.4 GWh |
| 2026-01-25 | 78.0 GWh |
| 2026-01-26 | n/a |
| 2026-01-27 | 120 GWh |
| 2026-01-28 | 121 GWh |
| 2026-01-29 | n/a |
| 2026-01-30 | 4.95 GWh |
| 2026-01-31 | 72.2 GWh |
| 2026-02-01 | 77.8 GWh |
| 2026-02-02 | n/a |
| 2026-02-03 | n/a |
| 2026-02-04 | 96.3 GWh |
| 2026-02-05 | n/a |
| 2026-02-06 | n/a |
| 2026-02-07 | n/a |
| 2026-02-08 | n/a |
| 2026-02-09 | n/a |
| 2026-02-10 | n/a |
| 2026-02-11 | n/a |
| 2026-02-12 | n/a |
| 2026-02-13 | n/a |
| 2026-02-14 | n/a |
| 2026-02-15 | n/a |
| 2026-02-16 | n/a |
| 2026-02-17 | n/a |
| 2026-02-18 | n/a |
| 2026-02-19 | n/a |
| 2026-02-20 | n/a |
| 2026-02-21 | n/a |
| 2026-02-22 | n/a |
| 2026-02-23 | n/a |
| 2026-02-24 | n/a |
| 2026-02-25 | n/a |
| 2026-02-26 | n/a |
| 2026-02-27 | n/a |
| 2026-02-28 | n/a |
| 2026-03-01 | n/a |
| 2026-03-02 | n/a |
| 2026-03-03 | n/a |
| 2026-03-04 | n/a |
| 2026-03-05 | n/a |
| 2026-03-06 | n/a |
| 2026-03-07 | 89.1 GWh |
| 2026-03-08 | 85.8 GWh |
| 2026-03-09 | n/a |
| 2026-03-10 | 4.19 GWh |
| 2026-03-11 | 4.31 GWh |
| 2026-03-12 | 4.34 GWh |
| 2026-03-13 | 4.51 GWh |
| 2026-03-14 | n/a |
| 2026-03-15 | 3.71 GWh |
| 2026-03-16 | 3.74 GWh |
| 2026-03-17 | n/a |
| 2026-03-18 | n/a |
| 2026-03-19 | n/a |
| 2026-03-20 | n/a |
| 2026-03-21 | n/a |
| 2026-03-22 | n/a |
| 2026-03-23 | n/a |
| 2026-03-24 | n/a |
| 2026-03-25 | n/a |
| 2026-03-26 | n/a |
| 2026-03-27 | n/a |
| 2026-03-28 | 3.01 GWh |
| 2026-03-29 | n/a |
| 2026-03-30 | n/a |
| 2026-03-31 | n/a |
| 2026-04-01 | 4.33 GWh |
| 2026-04-02 | n/a |
| 2026-04-03 | n/a |
| 2026-04-04 | 57.3 GWh |
| 2026-04-05 | n/a |
| 2026-04-06 | 3.75 GWh |
| 2026-04-07 | 4.25 GWh |
| 2026-04-08 | 5.29 GWh |
| 2026-04-09 | n/a |
| 2026-04-10 | 93.7 GWh |
| 2026-04-11 | n/a |
| 2026-04-12 | n/a |
| 2026-04-13 | 5.03 GWh |
| 2026-04-14 | 87.1 GWh |
| 2026-04-15 | 3.89 GWh |
| 2026-04-16 | n/a |
| 2026-04-17 | n/a |
| 2026-04-18 | n/a |
| 2026-04-19 | n/a |
| 2026-04-20 | 55.3 GWh |
| 2026-04-21 | 78.2 GWh |
| 2026-04-22 | 87.8 GWh |
| 2026-04-23 | n/a |
| 2026-04-24 | 64.6 GWh |
| 2026-04-25 | 46.2 GWh |
| 2026-04-26 | n/a |
| 2026-04-27 | 49.0 GWh |
| 2026-04-28 | n/a |
| 2026-04-29 | 67.8 GWh |
| 2026-04-30 | 969 MWh |
| 2026-05-01 | n/a |
| 2026-05-02 | n/a |
| 2026-05-03 | 51.7 GWh |
| 2026-05-04 | 50.6 GWh |
| 2026-05-05 | 51.9 GWh |
| 2026-05-06 | 8.96 GWh |
| 2026-05-07 | 2.63 GWh |
| 2026-05-08 | 50.4 GWh |
| 2026-05-09 | n/a |
| 2026-05-10 | n/a |
| 2026-05-11 | 28.3 GWh |
| 2026-05-12 | 78.0 GWh |
| 2026-05-13 | 91.0 GWh |
| 2026-05-14 | n/a |
| 2026-05-15 | n/a |
| 2026-05-16 | n/a |
| 2026-05-17 | n/a |
| 2026-05-18 | n/a |
| 2026-05-19 | 73.7 GWh |
| 2026-05-20 | n/a |
| 2026-05-21 | 83.3 GWh |
| 2026-05-22 | 72.3 GWh |
| 2026-05-23 | 59.5 GWh |
| 2026-05-24 | 1.76 GWh |
| 2026-05-25 | 43.7 GWh |
| 2026-05-26 | n/a |
| 2026-05-27 | n/a |
| 2026-05-28 | 1.73 GWh |
| 2026-05-29 | 70.4 GWh |
| 2026-05-30 | n/a |
| 2026-05-31 | 60.3 GWh |
| 2026-06-01 | 1.27 GWh |
| 2026-06-02 | n/a |
| 2026-06-03 | n/a |
| 2026-06-04 | 714 MWh |
| 2026-06-05 | 2.47 GWh |
| 2026-06-06 | n/a |
| 2026-06-07 | 1.54 GWh |
| 2026-06-08 | 68.4 GWh |
| 2026-06-09 | 2.17 GWh |
| 2026-06-10 | 2.39 GWh |
| 2026-06-11 | 63.0 GWh |
| 2026-06-12 | n/a |
| 2026-06-13 | 25.4 GWh |
| 2026-06-14 | 2.81 GWh |
| 2026-06-15 | 20.6 GWh |
| 2026-06-16 | 56.9 GWh |
| 2026-06-17 | n/a |
| 2026-06-18 | 70.2 GWh |
| 2026-06-19 | 57.6 GWh |
| 2026-06-20 | 2.86 GWh |
| 2026-06-21 | n/a |
| 2026-06-22 | 48.7 GWh |
| 2026-06-23 | n/a |
| 2026-06-24 | 48.7 GWh |
| 2026-06-25 | 1.76 GWh |
| 2026-06-26 | 1.34 GWh |
| 2026-06-27 | 752 MWh |
| 2026-06-28 | 69.1 GWh |
| 2026-06-29 | 72.3 GWh |
| 2026-06-30 | n/a |
| 2026-07-01 | n/a |
| 2026-07-02 | 59.1 GWh |
| 2026-07-03 | n/a |
| 2026-07-04 | 593 MWh |
| 2026-07-05 | n/a |
| 2026-07-06 | n/a |
| 2026-07-07 | 55.7 GWh |
| 2026-07-08 | n/a |
| 2026-07-09 | n/a |
| 2026-07-10 | 47.4 GWh |
| 2026-07-11 | 435 MWh |
| 2026-07-12 | 50.5 GWh |
| 2026-07-13 | 58.5 GWh |
| 2026-07-14 | 51.9 GWh |
| 2026-07-15 | 45.4 GWh |
| 2026-07-16 | 40.7 GWh |
| 2026-07-17 | 52.7 GWh |
| 2026-07-18 | n/a |
| 2026-07-19 | 37.2 GWh |
| 2026-07-20 | 37 MWh |
| 2026-07-21 | 52.2 GWh |
| 2026-07-22 | n/a |
| 2026-07-23 | 45.9 GWh |
| 2026-07-24 | n/a |
| 2026-07-25 | 60.8 GWh |
| 2026-07-26 | n/a |
| 2026-07-27 | n/a |
| 2026-07-28 | 72.5 GWh |
| 2026-07-29 | 51.2 GWh |
| 2026-07-30 | n/a |
| 2026-07-31 | n/a |
| 2026-08-01 | 944 MWh |
| 2026-08-02 | 42.6 GWh |
| 2026-08-03 | 1.07 GWh |
| 2026-08-04 | 1.38 GWh |
| 2026-08-05 | 916 MWh |
| 2026-08-06 | 2.44 GWh |
| 2026-08-07 | 1.59 GWh |
| 2026-08-08 | 49.2 GWh |
| 2026-08-09 | 44.7 GWh |
| 2026-08-10 | 2.62 GWh |
| 2026-08-11 | 49.8 GWh |
| 2026-08-12 | 639 MWh |
| 2026-08-13 | 661 MWh |
| 2026-08-14 | 52.4 GWh |
| 2026-08-15 | 1.27 GWh |
| 2026-08-16 | 2.37 GWh |
| 2026-08-17 | 63.6 GWh |
| 2026-08-18 | 1.75 GWh |
| 2026-08-19 | 1.65 GWh |
| 2026-08-20 | 1.42 GWh |
| 2026-08-21 | 59.1 GWh |
| 2026-08-22 | 42.8 GWh |
| 2026-08-23 | 38.1 GWh |
| 2026-08-24 | 1.52 GWh |
| 2026-08-25 | 2.21 GWh |
| 2026-08-26 | 56.7 GWh |
| 2026-08-27 | n/a |
| 2026-08-28 | 51.0 GWh |
| 2026-08-29 | 49.7 GWh |
| 2026-08-30 | 48.8 GWh |
| 2026-08-31 | 62.4 GWh |
| 2026-09-01 | n/a |
| 2026-09-02 | n/a |
| 2026-09-03 | 64.3 GWh |
| 2026-09-04 | 74.0 GWh |
| 2026-09-05 | 1.95 GWh |
| 2026-09-06 | 1.12 GWh |
| 2026-09-07 | 968 MWh |
| 2026-09-08 | 407 MWh |
| 2026-09-09 | 734 MWh |
| 2026-09-10 | 1.17 GWh |
| 2026-09-11 | 1.14 GWh |
| 2026-09-12 | 61.9 GWh |
| 2026-09-13 | 41.2 GWh |
| 2026-09-14 | 1.05 GWh |
| 2026-09-15 | 69.0 GWh |
| 2026-09-16 | 72.6 GWh |
| 2026-09-17 | 70.0 GWh |
| 2026-09-18 | 971 MWh |
Demand figures for Ireland and Northern Ireland (SEM) stop on 2025-10-22 (22 October 2025), so this chart shows net generation instead.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-18. Daily totals are summed by World Power Monitor from complete Europe/Dublin local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | n/a | 7.08 TWh | Wind 48.8% | 172 |
| 2025 (partial) | 18.7 TWh | 19.1 TWh | Wind 47.4% | 344 |
| 2024 (partial) | 24.3 TWh | 11.4 TWh | Wind 43.3% | 354 |
| 2023 (partial) | 24.7 TWh | 19.2 TWh | Wind 43.6% | 349 |
| 2022 (partial) | 21.8 TWh | 16.2 TWh | Wind 43.6% | 356 |
| 2021 (partial) | 27.6 TWh | 11.0 TWh | Wind 48.3% | 362 |
| 2020 (partial) | 30.2 TWh | 23.3 TWh | Wind 42.3% | 351 |
| 2019 (partial) | 35.1 TWh | 23.1 TWh | Gas 41.2% | 360 |
| 2018 (partial) | 36.1 TWh | 28.1 TWh | Gas 39.8% | 364 |
| 2017 (partial) | 34.0 TWh | 27.1 TWh | Gas 41.4% | 361 |
| 2016 (partial) | 30.1 TWh | 28.9 TWh | Gas 39.7% | 365 |
| 2015 (partial) | 31.2 TWh | 28.2 TWh | Gas 37.2% | 364 |
A year is partial when ENTSO-E has not published every day. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-18.
Power Flows With Neighbours
Net totals, 2026-08-20 (20 August 2026) to 2026-09-18 (18 September 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Great Britain | Ireland and Northern Ireland (SEM) imports | 141 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-18.
Share and Embed
Figures as of 2026-09-19 (19 September 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Ireland and Northern Ireland (SEM), credited to ENTSO-E. The image is rebuilt with the page.