Grid Stress Alerts for 1 October 2026
4 notable grid events on 1 October 2026 in ENTSO-E and EIA operator data: 4 net imports. Records are judged against the days loaded for each zone, and each sentence says how many.
Key Facts
- Net imports into Estonia reached 11.6 GWh on 1 October 2026 (56% of demand), the highest daily net imports in 362 days of loaded history.
- Germany and Luxembourg imported a net 141 GWh on 1 October 2026, the highest daily net imports in 373 days of loaded history and 10% of its demand that day.
- Net imports into North Macedonia reached 11.3 GWh on 1 October 2026 (118% of demand), the 2nd highest daily net imports in 306 days of loaded history.
All Alerts, 1 October 2026
4 events- Net imports Net imports into Estonia reached 11.6 GWh on 1 October 2026 (56% of demand), the highest daily net imports in 362 days of loaded history. Estonia grid
- Net imports Germany and Luxembourg imported a net 141 GWh on 1 October 2026, the highest daily net imports in 373 days of loaded history and 10% of its demand that day. Germany and Luxembourg grid
- Net imports Net imports into North Macedonia reached 11.3 GWh on 1 October 2026 (118% of demand), the 2nd highest daily net imports in 306 days of loaded history. North Macedonia grid
- Net imports Net imports into Slovakia reached 3.97 GWh on 1 October 2026 (6% of demand), the 2nd highest daily net imports in 371 days of loaded history. Slovakia grid
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-10-01. Operator data only, kept apart from annual statistics.