North Macedonia Electricity Demand and Generation Mix
North Macedonia demand was 892 MW in the hour starting 4 Nov 2026, 23:00 CET (UTC+01:00). Coal was the largest source in the hour starting 4 Nov 2026, 23:00 CET (UTC+01:00), at 39% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- North Macedonia is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 4 Nov 2026, 23:00 CET (UTC+01:00), demand in North Macedonia was 892 MW, against a day-ahead forecast of 880 MW.
- Coal supplied 38.7% of North Macedonia's generation in the hour starting 4 Nov 2026, 23:00 CET (UTC+01:00).
- The day-ahead price in North Macedonia averaged EUR 307.62/MWh for delivery on 2026-11-06 (6 November 2026).
- Installed generating capacity in North Macedonia was 2.21 GW in 2026, as reported to ENTSO-E.
- Demand in North Macedonia totalled 5.66 TWh in 2023.
- Coal supplied 47.6% of North Macedonia's generation in 2023.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 4 Nov 2026, 23:00 CET (UTC+01:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-04T22:00:00Z.
Generation by Source
Latest hour with generation by source: 4 Nov 2026, 23:00 CET (UTC+01:00)| Source | Output | Share |
|---|---|---|
| Coal | 280 MW | 38.7% |
| Gas | 234 MW | 32.4% |
| Hydro | 137 MW | 18.9% |
| Wind | 72 MW | 10.0% |
| Oil | 0 MW | 0.0% |
| Solar | 0 MW | 0.0% |
| Total from these sources | 722 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-04T22:00:00Z.
Day-Ahead Price
Delivery day 2026-11-06 (6 November 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for North Macedonia and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-06.
Last 30 Days, Hourly
Times in UTCShow the data table (696 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-10-06T23:00Z | 532 MW |
| 2026-10-07T00:00Z | 522 MW |
| 2026-10-07T01:00Z | 505 MW |
| 2026-10-07T02:00Z | 484 MW |
| 2026-10-07T03:00Z | 508 MW |
| 2026-10-07T04:00Z | 553 MW |
| 2026-10-07T05:00Z | 520 MW |
| 2026-10-07T06:00Z | 375 MW |
| 2026-10-07T07:00Z | 211 MW |
| 2026-10-07T08:00Z | 119 MW |
| 2026-10-07T09:00Z | 72 MW |
| 2026-10-07T10:00Z | 45 MW |
| 2026-10-07T11:00Z | 132 MW |
| 2026-10-07T12:00Z | 214 MW |
| 2026-10-07T13:00Z | 315 MW |
| 2026-10-07T14:00Z | 463 MW |
| 2026-10-07T15:00Z | 615 MW |
| 2026-10-07T16:00Z | 682 MW |
| 2026-10-07T17:00Z | 717 MW |
| 2026-10-07T18:00Z | 741 MW |
| 2026-10-07T19:00Z | 738 MW |
| 2026-10-07T20:00Z | 765 MW |
| 2026-10-07T21:00Z | 696 MW |
| 2026-10-07T22:00Z | 595 MW |
| 2026-10-07T23:00Z | 526 MW |
| 2026-10-08T00:00Z | 520 MW |
| 2026-10-08T01:00Z | 507 MW |
| 2026-10-08T02:00Z | 482 MW |
| 2026-10-08T03:00Z | 509 MW |
| 2026-10-08T04:00Z | 550 MW |
| 2026-10-08T05:00Z | 542 MW |
| 2026-10-08T06:00Z | 410 MW |
| 2026-10-08T07:00Z | 239 MW |
| 2026-10-08T08:00Z | 135 MW |
| 2026-10-08T09:00Z | 75 MW |
| 2026-10-08T10:00Z | 40 MW |
| 2026-10-08T11:00Z | 147 MW |
| 2026-10-08T12:00Z | 249 MW |
| 2026-10-08T13:00Z | 379 MW |
| 2026-10-08T14:00Z | 564 MW |
| 2026-10-08T15:00Z | 671 MW |
| 2026-10-08T16:00Z | 695 MW |
| 2026-10-08T17:00Z | 718 MW |
| 2026-10-08T18:00Z | 735 MW |
| 2026-10-08T19:00Z | 725 MW |
| 2026-10-08T20:00Z | 746 MW |
| 2026-10-08T21:00Z | 681 MW |
| 2026-10-08T22:00Z | 588 MW |
| 2026-10-08T23:00Z | 525 MW |
| 2026-10-09T00:00Z | 514 MW |
| 2026-10-09T01:00Z | 495 MW |
| 2026-10-09T02:00Z | 472 MW |
| 2026-10-09T03:00Z | 487 MW |
| 2026-10-09T04:00Z | 523 MW |
| 2026-10-09T05:00Z | 488 MW |
| 2026-10-09T06:00Z | 422 MW |
| 2026-10-09T07:00Z | 427 MW |
| 2026-10-09T08:00Z | 453 MW |
| 2026-10-09T09:00Z | 336 MW |
| 2026-10-09T10:00Z | 307 MW |
| 2026-10-09T11:00Z | 443 MW |
| 2026-10-09T12:00Z | 462 MW |
| 2026-10-09T13:00Z | 498 MW |
| 2026-10-09T14:00Z | 586 MW |
| 2026-10-09T15:00Z | 658 MW |
| 2026-10-09T16:00Z | 671 MW |
| 2026-10-09T17:00Z | 680 MW |
| 2026-10-09T18:00Z | 685 MW |
| 2026-10-09T19:00Z | 665 MW |
| 2026-10-09T20:00Z | 686 MW |
| 2026-10-09T21:00Z | 650 MW |
| 2026-10-09T22:00Z | 578 MW |
| 2026-10-09T23:00Z | 509 MW |
| 2026-10-10T00:00Z | 473 MW |
| 2026-10-10T01:00Z | 453 MW |
| 2026-10-10T02:00Z | 449 MW |
| 2026-10-10T03:00Z | 462 MW |
| 2026-10-10T04:00Z | 488 MW |
| 2026-10-10T05:00Z | 446 MW |
| 2026-10-10T06:00Z | 315 MW |
| 2026-10-10T07:00Z | 156 MW |
| 2026-10-10T08:00Z | 79 MW |
| 2026-10-10T09:00Z | 42 MW |
| 2026-10-10T10:00Z | 43 MW |
| 2026-10-10T11:00Z | 138 MW |
| 2026-10-10T12:00Z | 198 MW |
| 2026-10-10T13:00Z | 298 MW |
| 2026-10-10T14:00Z | 456 MW |
| 2026-10-10T15:00Z | 586 MW |
| 2026-10-10T16:00Z | 608 MW |
| 2026-10-10T17:00Z | 599 MW |
| 2026-10-10T18:00Z | 614 MW |
| 2026-10-10T19:00Z | 604 MW |
| 2026-10-10T20:00Z | 619 MW |
| 2026-10-10T21:00Z | 591 MW |
| 2026-10-10T22:00Z | 533 MW |
| 2026-10-10T23:00Z | 478 MW |
| 2026-10-11T00:00Z | 442 MW |
| 2026-10-11T01:00Z | 421 MW |
| 2026-10-11T02:00Z | 414 MW |
| 2026-10-11T03:00Z | 421 MW |
| 2026-10-11T04:00Z | 436 MW |
| 2026-10-11T05:00Z | 446 MW |
| 2026-10-11T06:00Z | 491 MW |
| 2026-10-11T07:00Z | 576 MW |
| 2026-10-11T08:00Z | 600 MW |
| 2026-10-11T09:00Z | 554 MW |
| 2026-10-11T10:00Z | 480 MW |
| 2026-10-11T11:00Z | 502 MW |
| 2026-10-11T12:00Z | 517 MW |
| 2026-10-11T13:00Z | 543 MW |
| 2026-10-11T14:00Z | 571 MW |
| 2026-10-11T15:00Z | 631 MW |
| 2026-10-11T16:00Z | 664 MW |
| 2026-10-11T17:00Z | 667 MW |
| 2026-10-11T18:00Z | 665 MW |
| 2026-10-11T19:00Z | 653 MW |
| 2026-10-11T20:00Z | 627 MW |
| 2026-10-11T21:00Z | 575 MW |
| 2026-10-11T22:00Z | 516 MW |
| 2026-10-11T23:00Z | 454 MW |
| 2026-10-12T00:00Z | 426 MW |
| 2026-10-12T01:00Z | 410 MW |
| 2026-10-12T02:00Z | 394 MW |
| 2026-10-12T03:00Z | 403 MW |
| 2026-10-12T04:00Z | 411 MW |
| 2026-10-12T05:00Z | 402 MW |
| 2026-10-12T06:00Z | 387 MW |
| 2026-10-12T07:00Z | 263 MW |
| 2026-10-12T08:00Z | 156 MW |
| 2026-10-12T09:00Z | 57 MW |
| 2026-10-12T10:00Z | 43 MW |
| 2026-10-12T11:00Z | 184 MW |
| 2026-10-12T12:00Z | 313 MW |
| 2026-10-12T13:00Z | 354 MW |
| 2026-10-12T14:00Z | 508 MW |
| 2026-10-12T15:00Z | 613 MW |
| 2026-10-12T16:00Z | 653 MW |
| 2026-10-12T17:00Z | 671 MW |
| 2026-10-12T18:00Z | 682 MW |
| 2026-10-12T19:00Z | 671 MW |
| 2026-10-12T20:00Z | 701 MW |
| 2026-10-12T21:00Z | 629 MW |
| 2026-10-12T22:00Z | 541 MW |
| 2026-10-12T23:00Z | 465 MW |
| 2026-10-13T00:00Z | 442 MW |
| 2026-10-13T01:00Z | 428 MW |
| 2026-10-13T02:00Z | 408 MW |
| 2026-10-13T03:00Z | 441 MW |
| 2026-10-13T04:00Z | 510 MW |
| 2026-10-13T05:00Z | 582 MW |
| 2026-10-13T06:00Z | 645 MW |
| 2026-10-13T07:00Z | 668 MW |
| 2026-10-13T08:00Z | 716 MW |
| 2026-10-13T09:00Z | 736 MW |
| 2026-10-13T10:00Z | 748 MW |
| 2026-10-13T11:00Z | 828 MW |
| 2026-10-13T12:00Z | 824 MW |
| 2026-10-13T13:00Z | 800 MW |
| 2026-10-13T14:00Z | 817 MW |
| 2026-10-13T15:00Z | 845 MW |
| 2026-10-13T16:00Z | 834 MW |
| 2026-10-13T17:00Z | 839 MW |
| 2026-10-13T18:00Z | 821 MW |
| 2026-10-13T19:00Z | 790 MW |
| 2026-10-13T20:00Z | 805 MW |
| 2026-10-13T21:00Z | 740 MW |
| 2026-10-13T22:00Z | 633 MW |
| 2026-10-13T23:00Z | 547 MW |
| 2026-10-14T00:00Z | 538 MW |
| 2026-10-14T01:00Z | 510 MW |
| 2026-10-14T02:00Z | 486 MW |
| 2026-10-14T03:00Z | 505 MW |
| 2026-10-14T04:00Z | 597 MW |
| 2026-10-14T05:00Z | 675 MW |
| 2026-10-14T06:00Z | 745 MW |
| 2026-10-14T07:00Z | 669 MW |
| 2026-10-14T08:00Z | 596 MW |
| 2026-10-14T09:00Z | 554 MW |
| 2026-10-14T10:00Z | 485 MW |
| 2026-10-14T11:00Z | 545 MW |
| 2026-10-14T12:00Z | 541 MW |
| 2026-10-14T13:00Z | 559 MW |
| 2026-10-14T14:00Z | 625 MW |
| 2026-10-14T15:00Z | 767 MW |
| 2026-10-14T16:00Z | 801 MW |
| 2026-10-14T17:00Z | 812 MW |
| 2026-10-14T18:00Z | 833 MW |
| 2026-10-14T19:00Z | 818 MW |
| 2026-10-14T20:00Z | 847 MW |
| 2026-10-14T21:00Z | 790 MW |
| 2026-10-14T22:00Z | 676 MW |
| 2026-10-14T23:00Z | 587 MW |
| 2026-10-15T00:00Z | 567 MW |
| 2026-10-15T01:00Z | 533 MW |
| 2026-10-15T02:00Z | 553 MW |
| 2026-10-15T03:00Z | 597 MW |
| 2026-10-15T04:00Z | 642 MW |
| 2026-10-15T05:00Z | 640 MW |
| 2026-10-15T06:00Z | 522 MW |
| 2026-10-15T07:00Z | 384 MW |
| 2026-10-15T08:00Z | 298 MW |
| 2026-10-15T09:00Z | 263 MW |
| 2026-10-15T10:00Z | 260 MW |
| 2026-10-15T11:00Z | 414 MW |
| 2026-10-15T12:00Z | 571 MW |
| 2026-10-15T13:00Z | 641 MW |
| 2026-10-15T14:00Z | 659 MW |
| 2026-10-15T15:00Z | 774 MW |
| 2026-10-15T16:00Z | 818 MW |
| 2026-10-15T17:00Z | 822 MW |
| 2026-10-15T18:00Z | 833 MW |
| 2026-10-15T19:00Z | 835 MW |
| 2026-10-15T20:00Z | 867 MW |
| 2026-10-15T21:00Z | 789 MW |
| 2026-10-15T22:00Z | 674 MW |
| 2026-10-15T23:00Z | 591 MW |
| 2026-10-16T00:00Z | 571 MW |
| 2026-10-16T01:00Z | 547 MW |
| 2026-10-16T02:00Z | 520 MW |
| 2026-10-16T03:00Z | 543 MW |
| 2026-10-16T04:00Z | 588 MW |
| 2026-10-16T05:00Z | 594 MW |
| 2026-10-16T06:00Z | 499 MW |
| 2026-10-16T07:00Z | 375 MW |
| 2026-10-16T08:00Z | 369 MW |
| 2026-10-16T09:00Z | 449 MW |
| 2026-10-16T10:00Z | 462 MW |
| 2026-10-16T11:00Z | 512 MW |
| 2026-10-16T12:00Z | 576 MW |
| 2026-10-16T13:00Z | 653 MW |
| 2026-10-16T14:00Z | 743 MW |
| 2026-10-16T15:00Z | 845 MW |
| 2026-10-16T16:00Z | 866 MW |
| 2026-10-16T17:00Z | 856 MW |
| 2026-10-16T18:00Z | 865 MW |
| 2026-10-16T19:00Z | 848 MW |
| 2026-10-16T20:00Z | 875 MW |
| 2026-10-16T21:00Z | 828 MW |
| 2026-10-16T22:00Z | 727 MW |
| 2026-10-16T23:00Z | 637 MW |
| 2026-10-17T00:00Z | 625 MW |
| 2026-10-17T01:00Z | 568 MW |
| 2026-10-17T02:00Z | 588 MW |
| 2026-10-17T03:00Z | 600 MW |
| 2026-10-17T04:00Z | 648 MW |
| 2026-10-17T05:00Z | 619 MW |
| 2026-10-17T06:00Z | 486 MW |
| 2026-10-17T07:00Z | 350 MW |
| 2026-10-17T08:00Z | 332 MW |
| 2026-10-17T09:00Z | 282 MW |
| 2026-10-17T10:00Z | 263 MW |
| 2026-10-17T11:00Z | 450 MW |
| 2026-10-17T12:00Z | 524 MW |
| 2026-10-17T13:00Z | 518 MW |
| 2026-10-17T14:00Z | 669 MW |
| 2026-10-17T15:00Z | 793 MW |
| 2026-10-17T16:00Z | 836 MW |
| 2026-10-17T17:00Z | 817 MW |
| 2026-10-17T18:00Z | 816 MW |
| 2026-10-17T19:00Z | 799 MW |
| 2026-10-17T20:00Z | 808 MW |
| 2026-10-17T21:00Z | 777 MW |
| 2026-10-17T22:00Z | 712 MW |
| 2026-10-17T23:00Z | 672 MW |
| 2026-10-18T00:00Z | 614 MW |
| 2026-10-18T01:00Z | 567 MW |
| 2026-10-18T02:00Z | 567 MW |
| 2026-10-18T03:00Z | 585 MW |
| 2026-10-18T04:00Z | 618 MW |
| 2026-10-18T05:00Z | 613 MW |
| 2026-10-18T06:00Z | 618 MW |
| 2026-10-18T07:00Z | 640 MW |
| 2026-10-18T08:00Z | 691 MW |
| 2026-10-18T09:00Z | 615 MW |
| 2026-10-18T10:00Z | 522 MW |
| 2026-10-18T11:00Z | 502 MW |
| 2026-10-18T12:00Z | 565 MW |
| 2026-10-18T13:00Z | 634 MW |
| 2026-10-18T14:00Z | 716 MW |
| 2026-10-18T15:00Z | 830 MW |
| 2026-10-18T16:00Z | 857 MW |
| 2026-10-18T17:00Z | 873 MW |
| 2026-10-18T18:00Z | 882 MW |
| 2026-10-18T19:00Z | 861 MW |
| 2026-10-18T20:00Z | 840 MW |
| 2026-10-18T21:00Z | 760 MW |
| 2026-10-18T22:00Z | 660 MW |
| 2026-10-18T23:00Z | 574 MW |
| 2026-10-19T00:00Z | 557 MW |
| 2026-10-19T01:00Z | 531 MW |
| 2026-10-19T02:00Z | 514 MW |
| 2026-10-19T03:00Z | 546 MW |
| 2026-10-19T04:00Z | 603 MW |
| 2026-10-19T05:00Z | 672 MW |
| 2026-10-19T06:00Z | 566 MW |
| 2026-10-19T07:00Z | 388 MW |
| 2026-10-19T08:00Z | 298 MW |
| 2026-10-19T09:00Z | 202 MW |
| 2026-10-19T10:00Z | 155 MW |
| 2026-10-19T11:00Z | 199 MW |
| 2026-10-19T12:00Z | 254 MW |
| 2026-10-19T13:00Z | 359 MW |
| 2026-10-19T14:00Z | 539 MW |
| 2026-10-19T15:00Z | 712 MW |
| 2026-10-19T16:00Z | 760 MW |
| 2026-10-19T17:00Z | 772 MW |
| 2026-10-19T18:00Z | 796 MW |
| 2026-10-19T19:00Z | 794 MW |
| 2026-10-19T20:00Z | 826 MW |
| 2026-10-19T21:00Z | 767 MW |
| 2026-10-19T22:00Z | 679 MW |
| 2026-10-19T23:00Z | 601 MW |
| 2026-10-20T00:00Z | 588 MW |
| 2026-10-20T01:00Z | 559 MW |
| 2026-10-20T02:00Z | 538 MW |
| 2026-10-20T03:00Z | 562 MW |
| 2026-10-20T04:00Z | 620 MW |
| 2026-10-20T05:00Z | 672 MW |
| 2026-10-20T06:00Z | 567 MW |
| 2026-10-20T07:00Z | 379 MW |
| 2026-10-20T08:00Z | 263 MW |
| 2026-10-20T09:00Z | 187 MW |
| 2026-10-20T10:00Z | 151 MW |
| 2026-10-20T11:00Z | 238 MW |
| 2026-10-20T12:00Z | 304 MW |
| 2026-10-20T13:00Z | 363 MW |
| 2026-10-20T14:00Z | 544 MW |
| 2026-10-20T15:00Z | 727 MW |
| 2026-10-20T16:00Z | 789 MW |
| 2026-10-20T17:00Z | 790 MW |
| 2026-10-20T18:00Z | 801 MW |
| 2026-10-20T19:00Z | 793 MW |
| 2026-10-20T20:00Z | 828 MW |
| 2026-10-20T21:00Z | 768 MW |
| 2026-10-20T22:00Z | 676 MW |
| 2026-10-20T23:00Z | 593 MW |
| 2026-10-21T00:00Z | 581 MW |
| 2026-10-21T01:00Z | 552 MW |
| 2026-10-21T02:00Z | 523 MW |
| 2026-10-21T03:00Z | 548 MW |
| 2026-10-21T04:00Z | 606 MW |
| 2026-10-21T05:00Z | 629 MW |
| 2026-10-21T06:00Z | 566 MW |
| 2026-10-21T07:00Z | 408 MW |
| 2026-10-21T08:00Z | 356 MW |
| 2026-10-21T09:00Z | 321 MW |
| 2026-10-21T10:00Z | 314 MW |
| 2026-10-21T11:00Z | 421 MW |
| 2026-10-21T12:00Z | 590 MW |
| 2026-10-21T13:00Z | 642 MW |
| 2026-10-21T14:00Z | 721 MW |
| 2026-10-21T15:00Z | 785 MW |
| 2026-10-21T16:00Z | 784 MW |
| 2026-10-21T17:00Z | 783 MW |
| 2026-10-21T18:00Z | 794 MW |
| 2026-10-21T19:00Z | 774 MW |
| 2026-10-21T20:00Z | 795 MW |
| 2026-10-21T21:00Z | 750 MW |
| 2026-10-21T22:00Z | 659 MW |
| 2026-10-21T23:00Z | 582 MW |
| 2026-10-22T00:00Z | 572 MW |
| 2026-10-22T01:00Z | 532 MW |
| 2026-10-22T02:00Z | 506 MW |
| 2026-10-22T03:00Z | 519 MW |
| 2026-10-22T04:00Z | 566 MW |
| 2026-10-22T05:00Z | 603 MW |
| 2026-10-22T06:00Z | 569 MW |
| 2026-10-22T07:00Z | 495 MW |
| 2026-10-22T08:00Z | 475 MW |
| 2026-10-22T09:00Z | 420 MW |
| 2026-10-22T10:00Z | 331 MW |
| 2026-10-22T11:00Z | 412 MW |
| 2026-10-22T12:00Z | 487 MW |
| 2026-10-22T13:00Z | 510 MW |
| 2026-10-22T14:00Z | 624 MW |
| 2026-10-22T15:00Z | 724 MW |
| 2026-10-22T16:00Z | 739 MW |
| 2026-10-22T17:00Z | 724 MW |
| 2026-10-22T18:00Z | 732 MW |
| 2026-10-22T19:00Z | 716 MW |
| 2026-10-22T20:00Z | 742 MW |
| 2026-10-22T21:00Z | 720 MW |
| 2026-10-22T22:00Z | 637 MW |
| 2026-10-22T23:00Z | 568 MW |
| 2026-10-23T00:00Z | 530 MW |
| 2026-10-23T01:00Z | 486 MW |
| 2026-10-23T02:00Z | 456 MW |
| 2026-10-23T03:00Z | 466 MW |
| 2026-10-23T04:00Z | 476 MW |
| 2026-10-23T05:00Z | 456 MW |
| 2026-10-23T06:00Z | 406 MW |
| 2026-10-23T07:00Z | 365 MW |
| 2026-10-23T08:00Z | 332 MW |
| 2026-10-23T09:00Z | 279 MW |
| 2026-10-23T10:00Z | 269 MW |
| 2026-10-23T11:00Z | 345 MW |
| 2026-10-23T12:00Z | 334 MW |
| 2026-10-23T13:00Z | 345 MW |
| 2026-10-23T14:00Z | 503 MW |
| 2026-10-23T15:00Z | 680 MW |
| 2026-10-23T16:00Z | 716 MW |
| 2026-10-23T17:00Z | 704 MW |
| 2026-10-23T18:00Z | 711 MW |
| 2026-10-23T19:00Z | 705 MW |
| 2026-10-23T20:00Z | 761 MW |
| 2026-10-23T21:00Z | 735 MW |
| 2026-10-23T22:00Z | 653 MW |
| 2026-10-23T23:00Z | 580 MW |
| 2026-10-24T00:00Z | 546 MW |
| 2026-10-24T01:00Z | 512 MW |
| 2026-10-24T02:00Z | 540 MW |
| 2026-10-24T03:00Z | 564 MW |
| 2026-10-24T04:00Z | 591 MW |
| 2026-10-24T05:00Z | 568 MW |
| 2026-10-24T06:00Z | 513 MW |
| 2026-10-24T07:00Z | 438 MW |
| 2026-10-24T08:00Z | 345 MW |
| 2026-10-24T09:00Z | 251 MW |
| 2026-10-24T10:00Z | 167 MW |
| 2026-10-24T11:00Z | 215 MW |
| 2026-10-24T12:00Z | 287 MW |
| 2026-10-24T13:00Z | 398 MW |
| 2026-10-24T14:00Z | 567 MW |
| 2026-10-24T15:00Z | 719 MW |
| 2026-10-24T16:00Z | 738 MW |
| 2026-10-24T17:00Z | 736 MW |
| 2026-10-24T18:00Z | 744 MW |
| 2026-10-24T19:00Z | 726 MW |
| 2026-10-24T20:00Z | 752 MW |
| 2026-10-24T21:00Z | 731 MW |
| 2026-10-24T22:00Z | 656 MW |
| 2026-10-24T23:00Z | 576 MW |
| 2026-10-25T00:00Z | 525 MW |
| 2026-10-25T01:00Z | 497 MW |
| 2026-10-25T02:00Z | 537 MW |
| 2026-10-25T03:00Z | 533 MW |
| 2026-10-25T04:00Z | 552 MW |
| 2026-10-25T05:00Z | 554 MW |
| 2026-10-25T06:00Z | 565 MW |
| 2026-10-25T07:00Z | 630 MW |
| 2026-10-25T08:00Z | 678 MW |
| 2026-10-25T09:00Z | 613 MW |
| 2026-10-25T10:00Z | 580 MW |
| 2026-10-25T11:00Z | 614 MW |
| 2026-10-25T12:00Z | 727 MW |
| 2026-10-25T13:00Z | 800 MW |
| 2026-10-25T14:00Z | 804 MW |
| 2026-10-25T15:00Z | 858 MW |
| 2026-10-25T16:00Z | 895 MW |
| 2026-10-25T17:00Z | 833 MW |
| 2026-10-25T18:00Z | 828 MW |
| 2026-10-25T19:00Z | 822 MW |
| 2026-10-25T20:00Z | 796 MW |
| 2026-10-25T21:00Z | 765 MW |
| 2026-10-25T22:00Z | 680 MW |
| 2026-10-25T23:00Z | 612 MW |
| 2026-10-26T00:00Z | 544 MW |
| 2026-10-26T01:00Z | 539 MW |
| 2026-10-26T02:00Z | 528 MW |
| 2026-10-26T03:00Z | 501 MW |
| 2026-10-26T04:00Z | 531 MW |
| 2026-10-26T05:00Z | 571 MW |
| 2026-10-26T06:00Z | 571 MW |
| 2026-10-26T07:00Z | 603 MW |
| 2026-10-26T08:00Z | 720 MW |
| 2026-10-26T09:00Z | 772 MW |
| 2026-10-26T10:00Z | 746 MW |
| 2026-10-26T11:00Z | 765 MW |
| 2026-10-26T12:00Z | 873 MW |
| 2026-10-26T13:00Z | 878 MW |
| 2026-10-26T14:00Z | 814 MW |
| 2026-10-26T15:00Z | 871 MW |
| 2026-10-26T16:00Z | 902 MW |
| 2026-10-26T17:00Z | 846 MW |
| 2026-10-26T18:00Z | 841 MW |
| 2026-10-26T19:00Z | 826 MW |
| 2026-10-26T20:00Z | 812 MW |
| 2026-10-26T21:00Z | 835 MW |
| 2026-10-26T22:00Z | 785 MW |
| 2026-10-26T23:00Z | 684 MW |
| 2026-10-27T00:00Z | 600 MW |
| 2026-10-27T01:00Z | 584 MW |
| 2026-10-27T02:00Z | 560 MW |
| 2026-10-27T03:00Z | 546 MW |
| 2026-10-27T04:00Z | 586 MW |
| 2026-10-27T05:00Z | 578 MW |
| 2026-10-27T06:00Z | 556 MW |
| 2026-10-27T07:00Z | 524 MW |
| 2026-10-27T08:00Z | 487 MW |
| 2026-10-27T09:00Z | 497 MW |
| 2026-10-27T10:00Z | 494 MW |
| 2026-10-27T11:00Z | 558 MW |
| 2026-10-27T12:00Z | 723 MW |
| 2026-10-27T13:00Z | 826 MW |
| 2026-10-27T14:00Z | 855 MW |
| 2026-10-27T15:00Z | 930 MW |
| 2026-10-27T16:00Z | 935 MW |
| 2026-10-27T17:00Z | 905 MW |
| 2026-10-27T18:00Z | 900 MW |
| 2026-10-27T19:00Z | 895 MW |
| 2026-10-27T20:00Z | 877 MW |
| 2026-10-27T21:00Z | 889 MW |
| 2026-10-27T22:00Z | 838 MW |
| 2026-10-27T23:00Z | 738 MW |
| 2026-10-28T00:00Z | 644 MW |
| 2026-10-28T01:00Z | 619 MW |
| 2026-10-28T02:00Z | 591 MW |
| 2026-10-28T03:00Z | 580 MW |
| 2026-10-28T04:00Z | 608 MW |
| 2026-10-28T05:00Z | 624 MW |
| 2026-10-28T06:00Z | 662 MW |
| 2026-10-28T07:00Z | 659 MW |
| 2026-10-28T08:00Z | 617 MW |
| 2026-10-28T09:00Z | 557 MW |
| 2026-10-28T10:00Z | 511 MW |
| 2026-10-28T11:00Z | 546 MW |
| 2026-10-28T12:00Z | 684 MW |
| 2026-10-28T13:00Z | 780 MW |
| 2026-10-28T14:00Z | 799 MW |
| 2026-10-28T15:00Z | 923 MW |
| 2026-10-28T16:00Z | 909 MW |
| 2026-10-28T17:00Z | 883 MW |
| 2026-10-28T18:00Z | 894 MW |
| 2026-10-28T19:00Z | 876 MW |
| 2026-10-28T20:00Z | 858 MW |
| 2026-10-28T21:00Z | 883 MW |
| 2026-10-28T22:00Z | 823 MW |
| 2026-10-28T23:00Z | 717 MW |
| 2026-10-29T00:00Z | 625 MW |
| 2026-10-29T01:00Z | 609 MW |
| 2026-10-29T02:00Z | 577 MW |
| 2026-10-29T03:00Z | 552 MW |
| 2026-10-29T04:00Z | 586 MW |
| 2026-10-29T05:00Z | 598 MW |
| 2026-10-29T06:00Z | 653 MW |
| 2026-10-29T07:00Z | 698 MW |
| 2026-10-29T08:00Z | 665 MW |
| 2026-10-29T09:00Z | 593 MW |
| 2026-10-29T10:00Z | 498 MW |
| 2026-10-29T11:00Z | 478 MW |
| 2026-10-29T12:00Z | 623 MW |
| 2026-10-29T13:00Z | 728 MW |
| 2026-10-29T14:00Z | 791 MW |
| 2026-10-29T15:00Z | 903 MW |
| 2026-10-29T16:00Z | 890 MW |
| 2026-10-29T17:00Z | 868 MW |
| 2026-10-29T18:00Z | 870 MW |
| 2026-10-29T19:00Z | 846 MW |
| 2026-10-29T20:00Z | 827 MW |
| 2026-10-29T21:00Z | 852 MW |
| 2026-10-29T22:00Z | 793 MW |
| 2026-10-29T23:00Z | n/a |
| 2026-10-30T00:00Z | n/a |
| 2026-10-30T01:00Z | n/a |
| 2026-10-30T02:00Z | n/a |
| 2026-10-30T03:00Z | n/a |
| 2026-10-30T04:00Z | n/a |
| 2026-10-30T05:00Z | n/a |
| 2026-10-30T06:00Z | n/a |
| 2026-10-30T07:00Z | n/a |
| 2026-10-30T08:00Z | n/a |
| 2026-10-30T09:00Z | n/a |
| 2026-10-30T10:00Z | n/a |
| 2026-10-30T11:00Z | n/a |
| 2026-10-30T12:00Z | n/a |
| 2026-10-30T13:00Z | n/a |
| 2026-10-30T14:00Z | n/a |
| 2026-10-30T15:00Z | n/a |
| 2026-10-30T16:00Z | n/a |
| 2026-10-30T17:00Z | n/a |
| 2026-10-30T18:00Z | n/a |
| 2026-10-30T19:00Z | n/a |
| 2026-10-30T20:00Z | n/a |
| 2026-10-30T21:00Z | n/a |
| 2026-10-30T22:00Z | n/a |
| 2026-10-30T23:00Z | n/a |
| 2026-10-31T00:00Z | n/a |
| 2026-10-31T01:00Z | n/a |
| 2026-10-31T02:00Z | n/a |
| 2026-10-31T03:00Z | n/a |
| 2026-10-31T04:00Z | n/a |
| 2026-10-31T05:00Z | n/a |
| 2026-10-31T06:00Z | n/a |
| 2026-10-31T07:00Z | n/a |
| 2026-10-31T08:00Z | n/a |
| 2026-10-31T09:00Z | n/a |
| 2026-10-31T10:00Z | n/a |
| 2026-10-31T11:00Z | n/a |
| 2026-10-31T12:00Z | n/a |
| 2026-10-31T13:00Z | n/a |
| 2026-10-31T14:00Z | n/a |
| 2026-10-31T15:00Z | n/a |
| 2026-10-31T16:00Z | n/a |
| 2026-10-31T17:00Z | n/a |
| 2026-10-31T18:00Z | n/a |
| 2026-10-31T19:00Z | n/a |
| 2026-10-31T20:00Z | n/a |
| 2026-10-31T21:00Z | n/a |
| 2026-10-31T22:00Z | n/a |
| 2026-10-31T23:00Z | 730 MW |
| 2026-11-01T00:00Z | 654 MW |
| 2026-11-01T01:00Z | 601 MW |
| 2026-11-01T02:00Z | 563 MW |
| 2026-11-01T03:00Z | 556 MW |
| 2026-11-01T04:00Z | 570 MW |
| 2026-11-01T05:00Z | 574 MW |
| 2026-11-01T06:00Z | 595 MW |
| 2026-11-01T07:00Z | 659 MW |
| 2026-11-01T08:00Z | 753 MW |
| 2026-11-01T09:00Z | 811 MW |
| 2026-11-01T10:00Z | 854 MW |
| 2026-11-01T11:00Z | 880 MW |
| 2026-11-01T12:00Z | 910 MW |
| 2026-11-01T13:00Z | 939 MW |
| 2026-11-01T14:00Z | 954 MW |
| 2026-11-01T15:00Z | 982 MW |
| 2026-11-01T16:00Z | 951 MW |
| 2026-11-01T17:00Z | 941 MW |
| 2026-11-01T18:00Z | 933 MW |
| 2026-11-01T19:00Z | 918 MW |
| 2026-11-01T20:00Z | 902 MW |
| 2026-11-01T21:00Z | 868 MW |
| 2026-11-01T22:00Z | 790 MW |
| 2026-11-01T23:00Z | 694 MW |
| 2026-11-02T00:00Z | 625 MW |
| 2026-11-02T01:00Z | 612 MW |
| 2026-11-02T02:00Z | 583 MW |
| 2026-11-02T03:00Z | 571 MW |
| 2026-11-02T04:00Z | 596 MW |
| 2026-11-02T05:00Z | 639 MW |
| 2026-11-02T06:00Z | 704 MW |
| 2026-11-02T07:00Z | 748 MW |
| 2026-11-02T08:00Z | 765 MW |
| 2026-11-02T09:00Z | 788 MW |
| 2026-11-02T10:00Z | 763 MW |
| 2026-11-02T11:00Z | 805 MW |
| 2026-11-02T12:00Z | 892 MW |
| 2026-11-02T13:00Z | 894 MW |
| 2026-11-02T14:00Z | 918 MW |
| 2026-11-02T15:00Z | 955 MW |
| 2026-11-02T16:00Z | 919 MW |
| 2026-11-02T17:00Z | 902 MW |
| 2026-11-02T18:00Z | 902 MW |
| 2026-11-02T19:00Z | 897 MW |
| 2026-11-02T20:00Z | 885 MW |
| 2026-11-02T21:00Z | 912 MW |
| 2026-11-02T22:00Z | 864 MW |
| 2026-11-02T23:00Z | 758 MW |
| 2026-11-03T00:00Z | 689 MW |
| 2026-11-03T01:00Z | 644 MW |
| 2026-11-03T02:00Z | 606 MW |
| 2026-11-03T03:00Z | 593 MW |
| 2026-11-03T04:00Z | 611 MW |
| 2026-11-03T05:00Z | 658 MW |
| 2026-11-03T06:00Z | 714 MW |
| 2026-11-03T07:00Z | 759 MW |
| 2026-11-03T08:00Z | 780 MW |
| 2026-11-03T09:00Z | 785 MW |
| 2026-11-03T10:00Z | 799 MW |
| 2026-11-03T11:00Z | 839 MW |
| 2026-11-03T12:00Z | 974 MW |
| 2026-11-03T13:00Z | 978 MW |
| 2026-11-03T14:00Z | 928 MW |
| 2026-11-03T15:00Z | 934 MW |
| 2026-11-03T16:00Z | 921 MW |
| 2026-11-03T17:00Z | 905 MW |
| 2026-11-03T18:00Z | 898 MW |
| 2026-11-03T19:00Z | 890 MW |
| 2026-11-03T20:00Z | 861 MW |
| 2026-11-03T21:00Z | 904 MW |
| 2026-11-03T22:00Z | 861 MW |
| 2026-11-03T23:00Z | 756 MW |
| 2026-11-04T00:00Z | 677 MW |
| 2026-11-04T01:00Z | 629 MW |
| 2026-11-04T02:00Z | 588 MW |
| 2026-11-04T03:00Z | 577 MW |
| 2026-11-04T04:00Z | 617 MW |
| 2026-11-04T05:00Z | 660 MW |
| 2026-11-04T06:00Z | 638 MW |
| 2026-11-04T07:00Z | 597 MW |
| 2026-11-04T08:00Z | 588 MW |
| 2026-11-04T09:00Z | 631 MW |
| 2026-11-04T10:00Z | 680 MW |
| 2026-11-04T11:00Z | 750 MW |
| 2026-11-04T12:00Z | 878 MW |
| 2026-11-04T13:00Z | 914 MW |
| 2026-11-04T14:00Z | 920 MW |
| 2026-11-04T15:00Z | 950 MW |
| 2026-11-04T16:00Z | 931 MW |
| 2026-11-04T17:00Z | 914 MW |
| 2026-11-04T18:00Z | 912 MW |
| 2026-11-04T19:00Z | 899 MW |
| 2026-11-04T20:00Z | 876 MW |
| 2026-11-04T21:00Z | 925 MW |
| 2026-11-04T22:00Z | 892 MW |
Show the data table (696 rows)
| Hour starting (UTC) | Gas | Hydro | Coal | Wind | Solar |
|---|---|---|---|---|---|
| 2026-10-06T23:00Z | 227 MW | 127 MW | 140 MW | 7 MW | 0 MW |
| 2026-10-07T00:00Z | 228 MW | 74 MW | 136 MW | 5 MW | 0 MW |
| 2026-10-07T01:00Z | 228 MW | 73 MW | 135 MW | 5 MW | 0 MW |
| 2026-10-07T02:00Z | 229 MW | 73 MW | 135 MW | 3 MW | 0 MW |
| 2026-10-07T03:00Z | 229 MW | 90 MW | 135 MW | 2 MW | 0 MW |
| 2026-10-07T04:00Z | 228 MW | 185 MW | 138 MW | 2 MW | 1 MW |
| 2026-10-07T05:00Z | 227 MW | 188 MW | 133 MW | 1 MW | 26 MW |
| 2026-10-07T06:00Z | 218 MW | 128 MW | 136 MW | 0 MW | 69 MW |
| 2026-10-07T07:00Z | 156 MW | 0 MW | 134 MW | 0 MW | 100 MW |
| 2026-10-07T08:00Z | 140 MW | 0 MW | 134 MW | 0 MW | 103 MW |
| 2026-10-07T09:00Z | 140 MW | 0 MW | 134 MW | 0 MW | 83 MW |
| 2026-10-07T10:00Z | 140 MW | 0 MW | 134 MW | 0 MW | 78 MW |
| 2026-10-07T11:00Z | 140 MW | 0 MW | 135 MW | 1 MW | 71 MW |
| 2026-10-07T12:00Z | 147 MW | 12 MW | 137 MW | 3 MW | 88 MW |
| 2026-10-07T13:00Z | 165 MW | 45 MW | 136 MW | 7 MW | 95 MW |
| 2026-10-07T14:00Z | 205 MW | 185 MW | 134 MW | 10 MW | 55 MW |
| 2026-10-07T15:00Z | 198 MW | 295 MW | 135 MW | 16 MW | 15 MW |
| 2026-10-07T16:00Z | 223 MW | 350 MW | 136 MW | 26 MW | 30 MW |
| 2026-10-07T17:00Z | 224 MW | 346 MW | 135 MW | 40 MW | 35 MW |
| 2026-10-07T18:00Z | 225 MW | 365 MW | 136 MW | 36 MW | 18 MW |
| 2026-10-07T19:00Z | 226 MW | 313 MW | 138 MW | 29 MW | 16 MW |
| 2026-10-07T20:00Z | 226 MW | 337 MW | 138 MW | 21 MW | 0 MW |
| 2026-10-07T21:00Z | 227 MW | 307 MW | 138 MW | 16 MW | 0 MW |
| 2026-10-07T22:00Z | 228 MW | 127 MW | 139 MW | 20 MW | 0 MW |
| 2026-10-07T23:00Z | 227 MW | 89 MW | 138 MW | 20 MW | 0 MW |
| 2026-10-08T00:00Z | 228 MW | 66 MW | 138 MW | 19 MW | 0 MW |
| 2026-10-08T01:00Z | 229 MW | 41 MW | 140 MW | 13 MW | 0 MW |
| 2026-10-08T02:00Z | 229 MW | 64 MW | 140 MW | 7 MW | 0 MW |
| 2026-10-08T03:00Z | 229 MW | 130 MW | 140 MW | 7 MW | 0 MW |
| 2026-10-08T04:00Z | 229 MW | 180 MW | 142 MW | 7 MW | 0 MW |
| 2026-10-08T05:00Z | 230 MW | 200 MW | 142 MW | 6 MW | 15 MW |
| 2026-10-08T06:00Z | 230 MW | 142 MW | 140 MW | 4 MW | 64 MW |
| 2026-10-08T07:00Z | 197 MW | 18 MW | 141 MW | 2 MW | 93 MW |
| 2026-10-08T08:00Z | 154 MW | 0 MW | 137 MW | 5 MW | 102 MW |
| 2026-10-08T09:00Z | 140 MW | 0 MW | 138 MW | 9 MW | 77 MW |
| 2026-10-08T10:00Z | 140 MW | 0 MW | 139 MW | 10 MW | 75 MW |
| 2026-10-08T11:00Z | 140 MW | 0 MW | 140 MW | 14 MW | 66 MW |
| 2026-10-08T12:00Z | 161 MW | 6 MW | 139 MW | 17 MW | 43 MW |
| 2026-10-08T13:00Z | 226 MW | 68 MW | 140 MW | 23 MW | 34 MW |
| 2026-10-08T14:00Z | 227 MW | 237 MW | 139 MW | 26 MW | 29 MW |
| 2026-10-08T15:00Z | 226 MW | 295 MW | 139 MW | 32 MW | 9 MW |
| 2026-10-08T16:00Z | 226 MW | 326 MW | 140 MW | 30 MW | 35 MW |
| 2026-10-08T17:00Z | 226 MW | 313 MW | 140 MW | 39 MW | 19 MW |
| 2026-10-08T18:00Z | 225 MW | 286 MW | 144 MW | 42 MW | 18 MW |
| 2026-10-08T19:00Z | 225 MW | 284 MW | 144 MW | 36 MW | 0 MW |
| 2026-10-08T20:00Z | 226 MW | 294 MW | 143 MW | 43 MW | 0 MW |
| 2026-10-08T21:00Z | 227 MW | 285 MW | 139 MW | 32 MW | 0 MW |
| 2026-10-08T22:00Z | 227 MW | 213 MW | 138 MW | 23 MW | 0 MW |
| 2026-10-08T23:00Z | 226 MW | 108 MW | 139 MW | 24 MW | 0 MW |
| 2026-10-09T00:00Z | 227 MW | 60 MW | 139 MW | 17 MW | 0 MW |
| 2026-10-09T01:00Z | 227 MW | 43 MW | 140 MW | 12 MW | 0 MW |
| 2026-10-09T02:00Z | 227 MW | 56 MW | 141 MW | 9 MW | 0 MW |
| 2026-10-09T03:00Z | 228 MW | 155 MW | 141 MW | 3 MW | 0 MW |
| 2026-10-09T04:00Z | 228 MW | 176 MW | 139 MW | 2 MW | 1 MW |
| 2026-10-09T05:00Z | 217 MW | 170 MW | 142 MW | 2 MW | 18 MW |
| 2026-10-09T06:00Z | 197 MW | 168 MW | 140 MW | 2 MW | 38 MW |
| 2026-10-09T07:00Z | 213 MW | 207 MW | 139 MW | 1 MW | 22 MW |
| 2026-10-09T08:00Z | 226 MW | 277 MW | 139 MW | 1 MW | 34 MW |
| 2026-10-09T09:00Z | 225 MW | 114 MW | 140 MW | 1 MW | 44 MW |
| 2026-10-09T10:00Z | 216 MW | 43 MW | 139 MW | 1 MW | 40 MW |
| 2026-10-09T11:00Z | 223 MW | 153 MW | 133 MW | 7 MW | 28 MW |
| 2026-10-09T12:00Z | 226 MW | 224 MW | 130 MW | 2 MW | 30 MW |
| 2026-10-09T13:00Z | 212 MW | 191 MW | 136 MW | 0 MW | 27 MW |
| 2026-10-09T14:00Z | 226 MW | 260 MW | 136 MW | 1 MW | 13 MW |
| 2026-10-09T15:00Z | 226 MW | 295 MW | 135 MW | 6 MW | 5 MW |
| 2026-10-09T16:00Z | 224 MW | 296 MW | 135 MW | 6 MW | 37 MW |
| 2026-10-09T17:00Z | 225 MW | 281 MW | 142 MW | 3 MW | 39 MW |
| 2026-10-09T18:00Z | 225 MW | 274 MW | 141 MW | 4 MW | 38 MW |
| 2026-10-09T19:00Z | 195 MW | 290 MW | 140 MW | 2 MW | 19 MW |
| 2026-10-09T20:00Z | 209 MW | 298 MW | 142 MW | 1 MW | 19 MW |
| 2026-10-09T21:00Z | 226 MW | 282 MW | 141 MW | 4 MW | 0 MW |
| 2026-10-09T22:00Z | 226 MW | 207 MW | 141 MW | 4 MW | 0 MW |
| 2026-10-09T23:00Z | 226 MW | 144 MW | 139 MW | 2 MW | 0 MW |
| 2026-10-10T00:00Z | 227 MW | 78 MW | 141 MW | 3 MW | 0 MW |
| 2026-10-10T01:00Z | 227 MW | 76 MW | 142 MW | 4 MW | 0 MW |
| 2026-10-10T02:00Z | 227 MW | 77 MW | 140 MW | 2 MW | 0 MW |
| 2026-10-10T03:00Z | 227 MW | 106 MW | 139 MW | 0 MW | 0 MW |
| 2026-10-10T04:00Z | 226 MW | 130 MW | 141 MW | 0 MW | 1 MW |
| 2026-10-10T05:00Z | 225 MW | 189 MW | 139 MW | 0 MW | 19 MW |
| 2026-10-10T06:00Z | 55 MW | 100 MW | 139 MW | 0 MW | 62 MW |
| 2026-10-10T07:00Z | 0 MW | 69 MW | 139 MW | 0 MW | 103 MW |
| 2026-10-10T08:00Z | 0 MW | 55 MW | 135 MW | 2 MW | 65 MW |
| 2026-10-10T09:00Z | 0 MW | 55 MW | 135 MW | 5 MW | 70 MW |
| 2026-10-10T10:00Z | 0 MW | 54 MW | 138 MW | 12 MW | 73 MW |
| 2026-10-10T11:00Z | 0 MW | 71 MW | 134 MW | 19 MW | 78 MW |
| 2026-10-10T12:00Z | 0 MW | 71 MW | 136 MW | 29 MW | 62 MW |
| 2026-10-10T13:00Z | 0 MW | 110 MW | 135 MW | 44 MW | 46 MW |
| 2026-10-10T14:00Z | 46 MW | 228 MW | 136 MW | 56 MW | 18 MW |
| 2026-10-10T15:00Z | 205 MW | 285 MW | 135 MW | 63 MW | 3 MW |
| 2026-10-10T16:00Z | 207 MW | 344 MW | 134 MW | 65 MW | 37 MW |
| 2026-10-10T17:00Z | 198 MW | 321 MW | 136 MW | 67 MW | 38 MW |
| 2026-10-10T18:00Z | 198 MW | 294 MW | 137 MW | 71 MW | 37 MW |
| 2026-10-10T19:00Z | 199 MW | 268 MW | 138 MW | 69 MW | 19 MW |
| 2026-10-10T20:00Z | 204 MW | 258 MW | 132 MW | 75 MW | 19 MW |
| 2026-10-10T21:00Z | 225 MW | 211 MW | 134 MW | 71 MW | 19 MW |
| 2026-10-10T22:00Z | 55 MW | 69 MW | 136 MW | 71 MW | 19 MW |
| 2026-10-10T23:00Z | 0 MW | 28 MW | 135 MW | 64 MW | 19 MW |
| 2026-10-11T00:00Z | 0 MW | 18 MW | 135 MW | 58 MW | 0 MW |
| 2026-10-11T01:00Z | 0 MW | 17 MW | 136 MW | 56 MW | 0 MW |
| 2026-10-11T02:00Z | 0 MW | 16 MW | 136 MW | 68 MW | 0 MW |
| 2026-10-11T03:00Z | 0 MW | 17 MW | 135 MW | 68 MW | 0 MW |
| 2026-10-11T04:00Z | 0 MW | 41 MW | 135 MW | 69 MW | 0 MW |
| 2026-10-11T05:00Z | 0 MW | 63 MW | 136 MW | 70 MW | 1 MW |
| 2026-10-11T06:00Z | 0 MW | 127 MW | 135 MW | 50 MW | 3 MW |
| 2026-10-11T07:00Z | 0 MW | 167 MW | 135 MW | 39 MW | 16 MW |
| 2026-10-11T08:00Z | 0 MW | 165 MW | 134 MW | 24 MW | 41 MW |
| 2026-10-11T09:00Z | 0 MW | 160 MW | 136 MW | 13 MW | 32 MW |
| 2026-10-11T10:00Z | 0 MW | 104 MW | 134 MW | 17 MW | 50 MW |
| 2026-10-11T11:00Z | 0 MW | 63 MW | 134 MW | 27 MW | 35 MW |
| 2026-10-11T12:00Z | 0 MW | 73 MW | 135 MW | 28 MW | 45 MW |
| 2026-10-11T13:00Z | 0 MW | 154 MW | 135 MW | 37 MW | 18 MW |
| 2026-10-11T14:00Z | 35 MW | 153 MW | 135 MW | 27 MW | 21 MW |
| 2026-10-11T15:00Z | 195 MW | 260 MW | 134 MW | 19 MW | 6 MW |
| 2026-10-11T16:00Z | 193 MW | 340 MW | 134 MW | 14 MW | 5 MW |
| 2026-10-11T17:00Z | 193 MW | 330 MW | 133 MW | 13 MW | 25 MW |
| 2026-10-11T18:00Z | 194 MW | 325 MW | 134 MW | 14 MW | 25 MW |
| 2026-10-11T19:00Z | 194 MW | 283 MW | 134 MW | 5 MW | 19 MW |
| 2026-10-11T20:00Z | 195 MW | 248 MW | 135 MW | 21 MW | 19 MW |
| 2026-10-11T21:00Z | 196 MW | 223 MW | 134 MW | 36 MW | 19 MW |
| 2026-10-11T22:00Z | 196 MW | 151 MW | 134 MW | 70 MW | 0 MW |
| 2026-10-11T23:00Z | 196 MW | 72 MW | 136 MW | 99 MW | 0 MW |
| 2026-10-12T00:00Z | 196 MW | 24 MW | 140 MW | 108 MW | 0 MW |
| 2026-10-12T01:00Z | 196 MW | 17 MW | 138 MW | 108 MW | 0 MW |
| 2026-10-12T02:00Z | 197 MW | 17 MW | 139 MW | 109 MW | 0 MW |
| 2026-10-12T03:00Z | 197 MW | 39 MW | 138 MW | 110 MW | 0 MW |
| 2026-10-12T04:00Z | 197 MW | 116 MW | 138 MW | 112 MW | 0 MW |
| 2026-10-12T05:00Z | 197 MW | 180 MW | 138 MW | 110 MW | 5 MW |
| 2026-10-12T06:00Z | 196 MW | 164 MW | 139 MW | 108 MW | 25 MW |
| 2026-10-12T07:00Z | 195 MW | 73 MW | 139 MW | 105 MW | 73 MW |
| 2026-10-12T08:00Z | 194 MW | 0 MW | 138 MW | 101 MW | 52 MW |
| 2026-10-12T09:00Z | 193 MW | 24 MW | 140 MW | 92 MW | 26 MW |
| 2026-10-12T10:00Z | 181 MW | 0 MW | 139 MW | 93 MW | 37 MW |
| 2026-10-12T11:00Z | 192 MW | 9 MW | 140 MW | 96 MW | 31 MW |
| 2026-10-12T12:00Z | 205 MW | 81 MW | 138 MW | 91 MW | 19 MW |
| 2026-10-12T13:00Z | 211 MW | 153 MW | 140 MW | 91 MW | 16 MW |
| 2026-10-12T14:00Z | 192 MW | 216 MW | 140 MW | 94 MW | 13 MW |
| 2026-10-12T15:00Z | 193 MW | 305 MW | 140 MW | 93 MW | 4 MW |
| 2026-10-12T16:00Z | 205 MW | 333 MW | 140 MW | 95 MW | 35 MW |
| 2026-10-12T17:00Z | 225 MW | 368 MW | 140 MW | 100 MW | 37 MW |
| 2026-10-12T18:00Z | 226 MW | 362 MW | 142 MW | 101 MW | 36 MW |
| 2026-10-12T19:00Z | 226 MW | 311 MW | 140 MW | 104 MW | 19 MW |
| 2026-10-12T20:00Z | 227 MW | 320 MW | 139 MW | 102 MW | 19 MW |
| 2026-10-12T21:00Z | 227 MW | 278 MW | 139 MW | 100 MW | 19 MW |
| 2026-10-12T22:00Z | 230 MW | 227 MW | 138 MW | 103 MW | 0 MW |
| 2026-10-12T23:00Z | 228 MW | 123 MW | 138 MW | 104 MW | 0 MW |
| 2026-10-13T00:00Z | 228 MW | 76 MW | 136 MW | 101 MW | 0 MW |
| 2026-10-13T01:00Z | 228 MW | 54 MW | 135 MW | 104 MW | 0 MW |
| 2026-10-13T02:00Z | 207 MW | 66 MW | 137 MW | 103 MW | 0 MW |
| 2026-10-13T03:00Z | 195 MW | 118 MW | 139 MW | 99 MW | 0 MW |
| 2026-10-13T04:00Z | 212 MW | 197 MW | 140 MW | 98 MW | 0 MW |
| 2026-10-13T05:00Z | 214 MW | 217 MW | 139 MW | 104 MW | 2 MW |
| 2026-10-13T06:00Z | 217 MW | 274 MW | 139 MW | 106 MW | 12 MW |
| 2026-10-13T07:00Z | 218 MW | 322 MW | 139 MW | 103 MW | 23 MW |
| 2026-10-13T08:00Z | 219 MW | 334 MW | 141 MW | 106 MW | 12 MW |
| 2026-10-13T09:00Z | 219 MW | 256 MW | 138 MW | 107 MW | 15 MW |
| 2026-10-13T10:00Z | 221 MW | 204 MW | 139 MW | 107 MW | 12 MW |
| 2026-10-13T11:00Z | 220 MW | 256 MW | 140 MW | 108 MW | 14 MW |
| 2026-10-13T12:00Z | 218 MW | 330 MW | 139 MW | 107 MW | 8 MW |
| 2026-10-13T13:00Z | 219 MW | 389 MW | 141 MW | 111 MW | 10 MW |
| 2026-10-13T14:00Z | 220 MW | 389 MW | 140 MW | 111 MW | 4 MW |
| 2026-10-13T15:00Z | 220 MW | 388 MW | 139 MW | 110 MW | 1 MW |
| 2026-10-13T16:00Z | 221 MW | 429 MW | 140 MW | 112 MW | 19 MW |
| 2026-10-13T17:00Z | 220 MW | 422 MW | 138 MW | 113 MW | 19 MW |
| 2026-10-13T18:00Z | 220 MW | 397 MW | 136 MW | 113 MW | 19 MW |
| 2026-10-13T19:00Z | 231 MW | 400 MW | 135 MW | 113 MW | 11 MW |
| 2026-10-13T20:00Z | 231 MW | 396 MW | 136 MW | 113 MW | 15 MW |
| 2026-10-13T21:00Z | 231 MW | 355 MW | 137 MW | 113 MW | 15 MW |
| 2026-10-13T22:00Z | 231 MW | 260 MW | 137 MW | 113 MW | 0 MW |
| 2026-10-13T23:00Z | 231 MW | 153 MW | 136 MW | 113 MW | 0 MW |
| 2026-10-14T00:00Z | 231 MW | 103 MW | 134 MW | 113 MW | 0 MW |
| 2026-10-14T01:00Z | 231 MW | 66 MW | 136 MW | 113 MW | 0 MW |
| 2026-10-14T02:00Z | 230 MW | 60 MW | 135 MW | 113 MW | 0 MW |
| 2026-10-14T03:00Z | 217 MW | 101 MW | 136 MW | 113 MW | 0 MW |
| 2026-10-14T04:00Z | 214 MW | 194 MW | 136 MW | 112 MW | 0 MW |
| 2026-10-14T05:00Z | 216 MW | 238 MW | 136 MW | 110 MW | 3 MW |
| 2026-10-14T06:00Z | 216 MW | 280 MW | 136 MW | 110 MW | 17 MW |
| 2026-10-14T07:00Z | 217 MW | 276 MW | 135 MW | 110 MW | 27 MW |
| 2026-10-14T08:00Z | 220 MW | 256 MW | 136 MW | 110 MW | 25 MW |
| 2026-10-14T09:00Z | 231 MW | 253 MW | 136 MW | 111 MW | 45 MW |
| 2026-10-14T10:00Z | 230 MW | 212 MW | 136 MW | 111 MW | 43 MW |
| 2026-10-14T11:00Z | 230 MW | 189 MW | 134 MW | 111 MW | 56 MW |
| 2026-10-14T12:00Z | 229 MW | 147 MW | 136 MW | 110 MW | 44 MW |
| 2026-10-14T13:00Z | 229 MW | 165 MW | 135 MW | 110 MW | 25 MW |
| 2026-10-14T14:00Z | 228 MW | 272 MW | 135 MW | 111 MW | 42 MW |
| 2026-10-14T15:00Z | 220 MW | 310 MW | 136 MW | 108 MW | 8 MW |
| 2026-10-14T16:00Z | 219 MW | 422 MW | 136 MW | 111 MW | 29 MW |
| 2026-10-14T17:00Z | 219 MW | 431 MW | 134 MW | 111 MW | 31 MW |
| 2026-10-14T18:00Z | 221 MW | 429 MW | 136 MW | 111 MW | 30 MW |
| 2026-10-14T19:00Z | 232 MW | 420 MW | 133 MW | 111 MW | 19 MW |
| 2026-10-14T20:00Z | 233 MW | 430 MW | 137 MW | 111 MW | 19 MW |
| 2026-10-14T21:00Z | 234 MW | 389 MW | 133 MW | 111 MW | 16 MW |
| 2026-10-14T22:00Z | 233 MW | 289 MW | 132 MW | 110 MW | 0 MW |
| 2026-10-14T23:00Z | 234 MW | 182 MW | 134 MW | 111 MW | 0 MW |
| 2026-10-15T00:00Z | 220 MW | 136 MW | 136 MW | 111 MW | 0 MW |
| 2026-10-15T01:00Z | 234 MW | 114 MW | 135 MW | 107 MW | 0 MW |
| 2026-10-15T02:00Z | 234 MW | 110 MW | 135 MW | 104 MW | 0 MW |
| 2026-10-15T03:00Z | 214 MW | 135 MW | 135 MW | 110 MW | 0 MW |
| 2026-10-15T04:00Z | 214 MW | 193 MW | 134 MW | 110 MW | 0 MW |
| 2026-10-15T05:00Z | 216 MW | 253 MW | 133 MW | 103 MW | 17 MW |
| 2026-10-15T06:00Z | 212 MW | 208 MW | 133 MW | 107 MW | 75 MW |
| 2026-10-15T07:00Z | 189 MW | 105 MW | 135 MW | 109 MW | 123 MW |
| 2026-10-15T08:00Z | 150 MW | 64 MW | 140 MW | 110 MW | 88 MW |
| 2026-10-15T09:00Z | 140 MW | 89 MW | 141 MW | 110 MW | 62 MW |
| 2026-10-15T10:00Z | 140 MW | 135 MW | 143 MW | 111 MW | 59 MW |
| 2026-10-15T11:00Z | 155 MW | 159 MW | 140 MW | 110 MW | 53 MW |
| 2026-10-15T12:00Z | 225 MW | 225 MW | 139 MW | 110 MW | 35 MW |
| 2026-10-15T13:00Z | 228 MW | 273 MW | 139 MW | 110 MW | 34 MW |
| 2026-10-15T14:00Z | 229 MW | 305 MW | 141 MW | 108 MW | 12 MW |
| 2026-10-15T15:00Z | 211 MW | 316 MW | 139 MW | 107 MW | 3 MW |
| 2026-10-15T16:00Z | 211 MW | 366 MW | 141 MW | 109 MW | 37 MW |
| 2026-10-15T17:00Z | 216 MW | 375 MW | 138 MW | 106 MW | 39 MW |
| 2026-10-15T18:00Z | 220 MW | 374 MW | 132 MW | 107 MW | 38 MW |
| 2026-10-15T19:00Z | 231 MW | 368 MW | 133 MW | 102 MW | 19 MW |
| 2026-10-15T20:00Z | 231 MW | 398 MW | 137 MW | 89 MW | 19 MW |
| 2026-10-15T21:00Z | 233 MW | 380 MW | 133 MW | 93 MW | 19 MW |
| 2026-10-15T22:00Z | 234 MW | 285 MW | 133 MW | 94 MW | 10 MW |
| 2026-10-15T23:00Z | 234 MW | 231 MW | 133 MW | 90 MW | 0 MW |
| 2026-10-16T00:00Z | 234 MW | 175 MW | 134 MW | 78 MW | 0 MW |
| 2026-10-16T01:00Z | 233 MW | 165 MW | 138 MW | 72 MW | 0 MW |
| 2026-10-16T02:00Z | 234 MW | 199 MW | 135 MW | 59 MW | 0 MW |
| 2026-10-16T03:00Z | 218 MW | 211 MW | 136 MW | 59 MW | 0 MW |
| 2026-10-16T04:00Z | 217 MW | 263 MW | 139 MW | 57 MW | 0 MW |
| 2026-10-16T05:00Z | 218 MW | 306 MW | 137 MW | 57 MW | 9 MW |
| 2026-10-16T06:00Z | 218 MW | 283 MW | 136 MW | 42 MW | 39 MW |
| 2026-10-16T07:00Z | 201 MW | 236 MW | 140 MW | 41 MW | 88 MW |
| 2026-10-16T08:00Z | 219 MW | 102 MW | 140 MW | 77 MW | 63 MW |
| 2026-10-16T09:00Z | 230 MW | 148 MW | 137 MW | 88 MW | 32 MW |
| 2026-10-16T10:00Z | 230 MW | 146 MW | 138 MW | 98 MW | 30 MW |
| 2026-10-16T11:00Z | 228 MW | 120 MW | 137 MW | 98 MW | 29 MW |
| 2026-10-16T12:00Z | 226 MW | 128 MW | 139 MW | 94 MW | 17 MW |
| 2026-10-16T13:00Z | 208 MW | 274 MW | 139 MW | 102 MW | 26 MW |
| 2026-10-16T14:00Z | 211 MW | 306 MW | 133 MW | 107 MW | 13 MW |
| 2026-10-16T15:00Z | 214 MW | 316 MW | 134 MW | 51 MW | 2 MW |
| 2026-10-16T16:00Z | 220 MW | 418 MW | 134 MW | 66 MW | 35 MW |
| 2026-10-16T17:00Z | 222 MW | 411 MW | 136 MW | 63 MW | 36 MW |
| 2026-10-16T18:00Z | 223 MW | 394 MW | 134 MW | 78 MW | 35 MW |
| 2026-10-16T19:00Z | 233 MW | 383 MW | 133 MW | 72 MW | 17 MW |
| 2026-10-16T20:00Z | 233 MW | 419 MW | 135 MW | 69 MW | 17 MW |
| 2026-10-16T21:00Z | 235 MW | 418 MW | 133 MW | 70 MW | 0 MW |
| 2026-10-16T22:00Z | 235 MW | 279 MW | 133 MW | 80 MW | 0 MW |
| 2026-10-16T23:00Z | 234 MW | 219 MW | 134 MW | 78 MW | 0 MW |
| 2026-10-17T00:00Z | 212 MW | 184 MW | 133 MW | 90 MW | 0 MW |
| 2026-10-17T01:00Z | 200 MW | 142 MW | 133 MW | 89 MW | 0 MW |
| 2026-10-17T02:00Z | 233 MW | 151 MW | 132 MW | 83 MW | 0 MW |
| 2026-10-17T03:00Z | 202 MW | 151 MW | 135 MW | 79 MW | 0 MW |
| 2026-10-17T04:00Z | 195 MW | 178 MW | 135 MW | 72 MW | 0 MW |
| 2026-10-17T05:00Z | 214 MW | 223 MW | 133 MW | 68 MW | 11 MW |
| 2026-10-17T06:00Z | 211 MW | 223 MW | 134 MW | 62 MW | 60 MW |
| 2026-10-17T07:00Z | 199 MW | 118 MW | 133 MW | 65 MW | 94 MW |
| 2026-10-17T08:00Z | 145 MW | 86 MW | 137 MW | 72 MW | 56 MW |
| 2026-10-17T09:00Z | 143 MW | 123 MW | 134 MW | 66 MW | 46 MW |
| 2026-10-17T10:00Z | 143 MW | 93 MW | 133 MW | 64 MW | 66 MW |
| 2026-10-17T11:00Z | 160 MW | 95 MW | 134 MW | 66 MW | 70 MW |
| 2026-10-17T12:00Z | 228 MW | 153 MW | 136 MW | 72 MW | 78 MW |
| 2026-10-17T13:00Z | 202 MW | 156 MW | 134 MW | 85 MW | 64 MW |
| 2026-10-17T14:00Z | 207 MW | 273 MW | 134 MW | 83 MW | 35 MW |
| 2026-10-17T15:00Z | 211 MW | 374 MW | 134 MW | 77 MW | 6 MW |
| 2026-10-17T16:00Z | 215 MW | 392 MW | 142 MW | 66 MW | 37 MW |
| 2026-10-17T17:00Z | 200 MW | 383 MW | 142 MW | 65 MW | 39 MW |
| 2026-10-17T18:00Z | 195 MW | 388 MW | 141 MW | 62 MW | 38 MW |
| 2026-10-17T19:00Z | 202 MW | 389 MW | 141 MW | 59 MW | 19 MW |
| 2026-10-17T20:00Z | 203 MW | 399 MW | 143 MW | 48 MW | 19 MW |
| 2026-10-17T21:00Z | 203 MW | 345 MW | 142 MW | 43 MW | 19 MW |
| 2026-10-17T22:00Z | 232 MW | 302 MW | 140 MW | 44 MW | 0 MW |
| 2026-10-17T23:00Z | 233 MW | 255 MW | 141 MW | 47 MW | 0 MW |
| 2026-10-18T00:00Z | 233 MW | 185 MW | 143 MW | 45 MW | 0 MW |
| 2026-10-18T01:00Z | 233 MW | 144 MW | 142 MW | 45 MW | 0 MW |
| 2026-10-18T02:00Z | 233 MW | 146 MW | 141 MW | 44 MW | 0 MW |
| 2026-10-18T03:00Z | 214 MW | 147 MW | 140 MW | 51 MW | 0 MW |
| 2026-10-18T04:00Z | 213 MW | 185 MW | 143 MW | 54 MW | 0 MW |
| 2026-10-18T05:00Z | 213 MW | 230 MW | 138 MW | 63 MW | 6 MW |
| 2026-10-18T06:00Z | 215 MW | 263 MW | 136 MW | 65 MW | 26 MW |
| 2026-10-18T07:00Z | 217 MW | 243 MW | 136 MW | 58 MW | 89 MW |
| 2026-10-18T08:00Z | 212 MW | 178 MW | 138 MW | 57 MW | 59 MW |
| 2026-10-18T09:00Z | 212 MW | 177 MW | 136 MW | 68 MW | 77 MW |
| 2026-10-18T10:00Z | 212 MW | 159 MW | 134 MW | 72 MW | 62 MW |
| 2026-10-18T11:00Z | 212 MW | 153 MW | 134 MW | 76 MW | 59 MW |
| 2026-10-18T12:00Z | 180 MW | 47 MW | 142 MW | 76 MW | 63 MW |
| 2026-10-18T13:00Z | 225 MW | 134 MW | 137 MW | 80 MW | 44 MW |
| 2026-10-18T14:00Z | 227 MW | 376 MW | 137 MW | 70 MW | 27 MW |
| 2026-10-18T15:00Z | 228 MW | 401 MW | 140 MW | 61 MW | 4 MW |
| 2026-10-18T16:00Z | 229 MW | 403 MW | 139 MW | 62 MW | 37 MW |
| 2026-10-18T17:00Z | 229 MW | 403 MW | 139 MW | 73 MW | 39 MW |
| 2026-10-18T18:00Z | 230 MW | 403 MW | 138 MW | 76 MW | 38 MW |
| 2026-10-18T19:00Z | 231 MW | 399 MW | 139 MW | 80 MW | 19 MW |
| 2026-10-18T20:00Z | 231 MW | 386 MW | 140 MW | 81 MW | 19 MW |
| 2026-10-18T21:00Z | 233 MW | 325 MW | 139 MW | 75 MW | 19 MW |
| 2026-10-18T22:00Z | 233 MW | 273 MW | 138 MW | 81 MW | 19 MW |
| 2026-10-18T23:00Z | 233 MW | 197 MW | 137 MW | 78 MW | 10 MW |
| 2026-10-19T00:00Z | 209 MW | 174 MW | 141 MW | 79 MW | 0 MW |
| 2026-10-19T01:00Z | 204 MW | 121 MW | 184 MW | 79 MW | 0 MW |
| 2026-10-19T02:00Z | 234 MW | 76 MW | 205 MW | 76 MW | 0 MW |
| 2026-10-19T03:00Z | 215 MW | 84 MW | 217 MW | 78 MW | 0 MW |
| 2026-10-19T04:00Z | 214 MW | 123 MW | 220 MW | 81 MW | 0 MW |
| 2026-10-19T05:00Z | 214 MW | 182 MW | 219 MW | 83 MW | 9 MW |
| 2026-10-19T06:00Z | 218 MW | 203 MW | 218 MW | 78 MW | 51 MW |
| 2026-10-19T07:00Z | 216 MW | 140 MW | 220 MW | 81 MW | 103 MW |
| 2026-10-19T08:00Z | 192 MW | 24 MW | 218 MW | 83 MW | 84 MW |
| 2026-10-19T09:00Z | 185 MW | 0 MW | 217 MW | 94 MW | 67 MW |
| 2026-10-19T10:00Z | 183 MW | 0 MW | 214 MW | 100 MW | 68 MW |
| 2026-10-19T11:00Z | 183 MW | 17 MW | 214 MW | 98 MW | 73 MW |
| 2026-10-19T12:00Z | 190 MW | 16 MW | 213 MW | 98 MW | 82 MW |
| 2026-10-19T13:00Z | 190 MW | 63 MW | 216 MW | 87 MW | 92 MW |
| 2026-10-19T14:00Z | 196 MW | 158 MW | 216 MW | 74 MW | 46 MW |
| 2026-10-19T15:00Z | 197 MW | 228 MW | 213 MW | 71 MW | 5 MW |
| 2026-10-19T16:00Z | 197 MW | 309 MW | 214 MW | 54 MW | 37 MW |
| 2026-10-19T17:00Z | 198 MW | 310 MW | 213 MW | 51 MW | 39 MW |
| 2026-10-19T18:00Z | 200 MW | 315 MW | 213 MW | 42 MW | 38 MW |
| 2026-10-19T19:00Z | 201 MW | 319 MW | 213 MW | 41 MW | 19 MW |
| 2026-10-19T20:00Z | 201 MW | 321 MW | 220 MW | 42 MW | 19 MW |
| 2026-10-19T21:00Z | 224 MW | 296 MW | 214 MW | 43 MW | 19 MW |
| 2026-10-19T22:00Z | 215 MW | 196 MW | 208 MW | 42 MW | 19 MW |
| 2026-10-19T23:00Z | 225 MW | 118 MW | 208 MW | 34 MW | 19 MW |
| 2026-10-20T00:00Z | 232 MW | 90 MW | 213 MW | 20 MW | 0 MW |
| 2026-10-20T01:00Z | 232 MW | 60 MW | 211 MW | 11 MW | 0 MW |
| 2026-10-20T02:00Z | 234 MW | 63 MW | 210 MW | 10 MW | 0 MW |
| 2026-10-20T03:00Z | 215 MW | 113 MW | 214 MW | 8 MW | 0 MW |
| 2026-10-20T04:00Z | 215 MW | 208 MW | 217 MW | 8 MW | 0 MW |
| 2026-10-20T05:00Z | 217 MW | 292 MW | 216 MW | 3 MW | 9 MW |
| 2026-10-20T06:00Z | 218 MW | 243 MW | 210 MW | 1 MW | 51 MW |
| 2026-10-20T07:00Z | 204 MW | 186 MW | 203 MW | 0 MW | 109 MW |
| 2026-10-20T08:00Z | 189 MW | 84 MW | 202 MW | 0 MW | 96 MW |
| 2026-10-20T09:00Z | 183 MW | 86 MW | 192 MW | 2 MW | 72 MW |
| 2026-10-20T10:00Z | 182 MW | 39 MW | 185 MW | 5 MW | 69 MW |
| 2026-10-20T11:00Z | 202 MW | 90 MW | 152 MW | 10 MW | 77 MW |
| 2026-10-20T12:00Z | 185 MW | 107 MW | 141 MW | 13 MW | 90 MW |
| 2026-10-20T13:00Z | 185 MW | 212 MW | 140 MW | 17 MW | 76 MW |
| 2026-10-20T14:00Z | 190 MW | 269 MW | 138 MW | 30 MW | 46 MW |
| 2026-10-20T15:00Z | 203 MW | 361 MW | 135 MW | 49 MW | 5 MW |
| 2026-10-20T16:00Z | 212 MW | 385 MW | 140 MW | 64 MW | 37 MW |
| 2026-10-20T17:00Z | 227 MW | 381 MW | 140 MW | 73 MW | 39 MW |
| 2026-10-20T18:00Z | 218 MW | 386 MW | 139 MW | 67 MW | 38 MW |
| 2026-10-20T19:00Z | 230 MW | 398 MW | 138 MW | 67 MW | 19 MW |
| 2026-10-20T20:00Z | 231 MW | 398 MW | 138 MW | 62 MW | 19 MW |
| 2026-10-20T21:00Z | 232 MW | 395 MW | 137 MW | 63 MW | 19 MW |
| 2026-10-20T22:00Z | 231 MW | 266 MW | 135 MW | 51 MW | 19 MW |
| 2026-10-20T23:00Z | 230 MW | 187 MW | 134 MW | 49 MW | 19 MW |
| 2026-10-21T00:00Z | 231 MW | 170 MW | 137 MW | 44 MW | 0 MW |
| 2026-10-21T01:00Z | 231 MW | 126 MW | 138 MW | 35 MW | 0 MW |
| 2026-10-21T02:00Z | 231 MW | 133 MW | 133 MW | 29 MW | 0 MW |
| 2026-10-21T03:00Z | 220 MW | 145 MW | 134 MW | 30 MW | 10 MW |
| 2026-10-21T04:00Z | 213 MW | 221 MW | 135 MW | 27 MW | 16 MW |
| 2026-10-21T05:00Z | 216 MW | 225 MW | 132 MW | 29 MW | 7 MW |
| 2026-10-21T06:00Z | 205 MW | 266 MW | 134 MW | 38 MW | 38 MW |
| 2026-10-21T07:00Z | 178 MW | 235 MW | 135 MW | 31 MW | 81 MW |
| 2026-10-21T08:00Z | 205 MW | 221 MW | 136 MW | 29 MW | 48 MW |
| 2026-10-21T09:00Z | 207 MW | 133 MW | 138 MW | 31 MW | 50 MW |
| 2026-10-21T10:00Z | 201 MW | 95 MW | 138 MW | 35 MW | 44 MW |
| 2026-10-21T11:00Z | 185 MW | 195 MW | 138 MW | 46 MW | 23 MW |
| 2026-10-21T12:00Z | 224 MW | 283 MW | 139 MW | 54 MW | 15 MW |
| 2026-10-21T13:00Z | 224 MW | 344 MW | 140 MW | 63 MW | 14 MW |
| 2026-10-21T14:00Z | 225 MW | 331 MW | 141 MW | 75 MW | 9 MW |
| 2026-10-21T15:00Z | 225 MW | 353 MW | 140 MW | 74 MW | 1 MW |
| 2026-10-21T16:00Z | 226 MW | 360 MW | 137 MW | 75 MW | 35 MW |
| 2026-10-21T17:00Z | 226 MW | 358 MW | 145 MW | 76 MW | 36 MW |
| 2026-10-21T18:00Z | 227 MW | 330 MW | 144 MW | 84 MW | 35 MW |
| 2026-10-21T19:00Z | 220 MW | 327 MW | 143 MW | 80 MW | 19 MW |
| 2026-10-21T20:00Z | 198 MW | 329 MW | 142 MW | 87 MW | 19 MW |
| 2026-10-21T21:00Z | 198 MW | 323 MW | 142 MW | 83 MW | 19 MW |
| 2026-10-21T22:00Z | 228 MW | 161 MW | 143 MW | 83 MW | 0 MW |
| 2026-10-21T23:00Z | 227 MW | 71 MW | 144 MW | 75 MW | 0 MW |
| 2026-10-22T00:00Z | 227 MW | 0 MW | 143 MW | 79 MW | 0 MW |
| 2026-10-22T01:00Z | 218 MW | 0 MW | 142 MW | 79 MW | 0 MW |
| 2026-10-22T02:00Z | 213 MW | 16 MW | 141 MW | 75 MW | 0 MW |
| 2026-10-22T03:00Z | 181 MW | 75 MW | 140 MW | 81 MW | 0 MW |
| 2026-10-22T04:00Z | 178 MW | 205 MW | 136 MW | 70 MW | 0 MW |
| 2026-10-22T05:00Z | 183 MW | 215 MW | 142 MW | 62 MW | 7 MW |
| 2026-10-22T06:00Z | 175 MW | 236 MW | 141 MW | 56 MW | 33 MW |
| 2026-10-22T07:00Z | 216 MW | 136 MW | 136 MW | 45 MW | 92 MW |
| 2026-10-22T08:00Z | 216 MW | 107 MW | 139 MW | 29 MW | 58 MW |
| 2026-10-22T09:00Z | 224 MW | 99 MW | 137 MW | 20 MW | 60 MW |
| 2026-10-22T10:00Z | 223 MW | 44 MW | 138 MW | 13 MW | 27 MW |
| 2026-10-22T11:00Z | 222 MW | 0 MW | 137 MW | 12 MW | 44 MW |
| 2026-10-22T12:00Z | 223 MW | 97 MW | 140 MW | 11 MW | 43 MW |
| 2026-10-22T13:00Z | 191 MW | 221 MW | 138 MW | 16 MW | 59 MW |
| 2026-10-22T14:00Z | 193 MW | 263 MW | 136 MW | 20 MW | 50 MW |
| 2026-10-22T15:00Z | 194 MW | 315 MW | 132 MW | 22 MW | 3 MW |
| 2026-10-22T16:00Z | 196 MW | 358 MW | 137 MW | 27 MW | 37 MW |
| 2026-10-22T17:00Z | 196 MW | 343 MW | 134 MW | 24 MW | 39 MW |
| 2026-10-22T18:00Z | 197 MW | 319 MW | 133 MW | 21 MW | 38 MW |
| 2026-10-22T19:00Z | 197 MW | 318 MW | 134 MW | 20 MW | 19 MW |
| 2026-10-22T20:00Z | 197 MW | 326 MW | 134 MW | 18 MW | 19 MW |
| 2026-10-22T21:00Z | 198 MW | 331 MW | 134 MW | 16 MW | 19 MW |
| 2026-10-22T22:00Z | 228 MW | 127 MW | 135 MW | 28 MW | 19 MW |
| 2026-10-22T23:00Z | 228 MW | 70 MW | 134 MW | 31 MW | 10 MW |
| 2026-10-23T00:00Z | 228 MW | 64 MW | 133 MW | 79 MW | 0 MW |
| 2026-10-23T01:00Z | 229 MW | 18 MW | 137 MW | 101 MW | 0 MW |
| 2026-10-23T02:00Z | 219 MW | 19 MW | 135 MW | 109 MW | 0 MW |
| 2026-10-23T03:00Z | 203 MW | 101 MW | 135 MW | 110 MW | 0 MW |
| 2026-10-23T04:00Z | 187 MW | 117 MW | 132 MW | 110 MW | 0 MW |
| 2026-10-23T05:00Z | 187 MW | 141 MW | 136 MW | 106 MW | 5 MW |
| 2026-10-23T06:00Z | 218 MW | 145 MW | 133 MW | 109 MW | 27 MW |
| 2026-10-23T07:00Z | 208 MW | 81 MW | 136 MW | 110 MW | 77 MW |
| 2026-10-23T08:00Z | 228 MW | 110 MW | 135 MW | 107 MW | 53 MW |
| 2026-10-23T09:00Z | 215 MW | 112 MW | 136 MW | 101 MW | 37 MW |
| 2026-10-23T10:00Z | 175 MW | 78 MW | 142 MW | 100 MW | 55 MW |
| 2026-10-23T11:00Z | 175 MW | 80 MW | 142 MW | 96 MW | 57 MW |
| 2026-10-23T12:00Z | 214 MW | 103 MW | 143 MW | 85 MW | 71 MW |
| 2026-10-23T13:00Z | 192 MW | 39 MW | 141 MW | 76 MW | 65 MW |
| 2026-10-23T14:00Z | 195 MW | 220 MW | 136 MW | 72 MW | 42 MW |
| 2026-10-23T15:00Z | 197 MW | 274 MW | 136 MW | 65 MW | 3 MW |
| 2026-10-23T16:00Z | 215 MW | 295 MW | 135 MW | 64 MW | 37 MW |
| 2026-10-23T17:00Z | 208 MW | 310 MW | 134 MW | 55 MW | 39 MW |
| 2026-10-23T18:00Z | 211 MW | 296 MW | 131 MW | 54 MW | 37 MW |
| 2026-10-23T19:00Z | 229 MW | 296 MW | 132 MW | 53 MW | 19 MW |
| 2026-10-23T20:00Z | 218 MW | 295 MW | 136 MW | 53 MW | 19 MW |
| 2026-10-23T21:00Z | 230 MW | 191 MW | 134 MW | 36 MW | 19 MW |
| 2026-10-23T22:00Z | 230 MW | 237 MW | 136 MW | 17 MW | 19 MW |
| 2026-10-23T23:00Z | 231 MW | 173 MW | 135 MW | 6 MW | 10 MW |
| 2026-10-24T00:00Z | 231 MW | 121 MW | 134 MW | 1 MW | 0 MW |
| 2026-10-24T01:00Z | 56 MW | 121 MW | 133 MW | 1 MW | 0 MW |
| 2026-10-24T02:00Z | 0 MW | 130 MW | 133 MW | 2 MW | 0 MW |
| 2026-10-24T03:00Z | 0 MW | 148 MW | 134 MW | 2 MW | 0 MW |
| 2026-10-24T04:00Z | 0 MW | 199 MW | 137 MW | 3 MW | 0 MW |
| 2026-10-24T05:00Z | 0 MW | 201 MW | 134 MW | 6 MW | 5 MW |
| 2026-10-24T06:00Z | 0 MW | 225 MW | 133 MW | 2 MW | 15 MW |
| 2026-10-24T07:00Z | 0 MW | 158 MW | 134 MW | 0 MW | 24 MW |
| 2026-10-24T08:00Z | 0 MW | 138 MW | 137 MW | 0 MW | 20 MW |
| 2026-10-24T09:00Z | 0 MW | 65 MW | 133 MW | 2 MW | 51 MW |
| 2026-10-24T10:00Z | 0 MW | 16 MW | 134 MW | 4 MW | 64 MW |
| 2026-10-24T11:00Z | 0 MW | 16 MW | 132 MW | 8 MW | 87 MW |
| 2026-10-24T12:00Z | 0 MW | 16 MW | 135 MW | 10 MW | 81 MW |
| 2026-10-24T13:00Z | 0 MW | 53 MW | 133 MW | 12 MW | 82 MW |
| 2026-10-24T14:00Z | 0 MW | 237 MW | 133 MW | 21 MW | 29 MW |
| 2026-10-24T15:00Z | 0 MW | 312 MW | 134 MW | 28 MW | 2 MW |
| 2026-10-24T16:00Z | 0 MW | 352 MW | 135 MW | 32 MW | 37 MW |
| 2026-10-24T17:00Z | 0 MW | 335 MW | 138 MW | 43 MW | 39 MW |
| 2026-10-24T18:00Z | 0 MW | 307 MW | 140 MW | 49 MW | 37 MW |
| 2026-10-24T19:00Z | 0 MW | 314 MW | 139 MW | 42 MW | 19 MW |
| 2026-10-24T20:00Z | 0 MW | 308 MW | 142 MW | 42 MW | 19 MW |
| 2026-10-24T21:00Z | 0 MW | 306 MW | 139 MW | 42 MW | 19 MW |
| 2026-10-24T22:00Z | 85 MW | 226 MW | 139 MW | 42 MW | 19 MW |
| 2026-10-24T23:00Z | 200 MW | 141 MW | 138 MW | 38 MW | 0 MW |
| 2026-10-25T00:00Z | 228 MW | 108 MW | 138 MW | 31 MW | 0 MW |
| 2026-10-25T01:00Z | 229 MW | 93 MW | 141 MW | 22 MW | 0 MW |
| 2026-10-25T02:00Z | 230 MW | 30 MW | 137 MW | 23 MW | 0 MW |
| 2026-10-25T03:00Z | 230 MW | 82 MW | 138 MW | 21 MW | 0 MW |
| 2026-10-25T04:00Z | 212 MW | 81 MW | 141 MW | 20 MW | 0 MW |
| 2026-10-25T05:00Z | 200 MW | 131 MW | 141 MW | 22 MW | 7 MW |
| 2026-10-25T06:00Z | 185 MW | 153 MW | 138 MW | 23 MW | 14 MW |
| 2026-10-25T07:00Z | 199 MW | 158 MW | 138 MW | 21 MW | 15 MW |
| 2026-10-25T08:00Z | 218 MW | 196 MW | 139 MW | 8 MW | 34 MW |
| 2026-10-25T09:00Z | 221 MW | 135 MW | 141 MW | 6 MW | 44 MW |
| 2026-10-25T10:00Z | 225 MW | 52 MW | 140 MW | 8 MW | 43 MW |
| 2026-10-25T11:00Z | 224 MW | 30 MW | 139 MW | 8 MW | 37 MW |
| 2026-10-25T12:00Z | 225 MW | 102 MW | 138 MW | 5 MW | 17 MW |
| 2026-10-25T13:00Z | 226 MW | 301 MW | 141 MW | 8 MW | 8 MW |
| 2026-10-25T14:00Z | 226 MW | 371 MW | 141 MW | 7 MW | 5 MW |
| 2026-10-25T15:00Z | 226 MW | 372 MW | 137 MW | 8 MW | 0 MW |
| 2026-10-25T16:00Z | 212 MW | 372 MW | 137 MW | 6 MW | 5 MW |
| 2026-10-25T17:00Z | 208 MW | 371 MW | 136 MW | 9 MW | 25 MW |
| 2026-10-25T18:00Z | 198 MW | 371 MW | 136 MW | 14 MW | 25 MW |
| 2026-10-25T19:00Z | 207 MW | 353 MW | 134 MW | 8 MW | 19 MW |
| 2026-10-25T20:00Z | 228 MW | 339 MW | 139 MW | 4 MW | 19 MW |
| 2026-10-25T21:00Z | 216 MW | 307 MW | 141 MW | 2 MW | 19 MW |
| 2026-10-25T22:00Z | 199 MW | 261 MW | 140 MW | 10 MW | 0 MW |
| 2026-10-25T23:00Z | 199 MW | 220 MW | 138 MW | 8 MW | 0 MW |
| 2026-10-26T00:00Z | 199 MW | 189 MW | 140 MW | 7 MW | 0 MW |
| 2026-10-26T01:00Z | 199 MW | 99 MW | 139 MW | 3 MW | 0 MW |
| 2026-10-26T02:00Z | 203 MW | 70 MW | 140 MW | 3 MW | 0 MW |
| 2026-10-26T03:00Z | 229 MW | 56 MW | 140 MW | 2 MW | 0 MW |
| 2026-10-26T04:00Z | 212 MW | 142 MW | 139 MW | 0 MW | 0 MW |
| 2026-10-26T05:00Z | 200 MW | 200 MW | 141 MW | 8 MW | 6 MW |
| 2026-10-26T06:00Z | 184 MW | 203 MW | 141 MW | 15 MW | 15 MW |
| 2026-10-26T07:00Z | 181 MW | 219 MW | 139 MW | 15 MW | 26 MW |
| 2026-10-26T08:00Z | 219 MW | 153 MW | 139 MW | 27 MW | 22 MW |
| 2026-10-26T09:00Z | 220 MW | 155 MW | 136 MW | 62 MW | 24 MW |
| 2026-10-26T10:00Z | 220 MW | 117 MW | 139 MW | 87 MW | 21 MW |
| 2026-10-26T11:00Z | 214 MW | 117 MW | 142 MW | 106 MW | 15 MW |
| 2026-10-26T12:00Z | 227 MW | 223 MW | 141 MW | 111 MW | 9 MW |
| 2026-10-26T13:00Z | 216 MW | 329 MW | 141 MW | 110 MW | 9 MW |
| 2026-10-26T14:00Z | 216 MW | 329 MW | 144 MW | 110 MW | 9 MW |
| 2026-10-26T15:00Z | 216 MW | 329 MW | 144 MW | 113 MW | 2 MW |
| 2026-10-26T16:00Z | 216 MW | 362 MW | 143 MW | 108 MW | 2 MW |
| 2026-10-26T17:00Z | 217 MW | 338 MW | 143 MW | 107 MW | 21 MW |
| 2026-10-26T18:00Z | 215 MW | 328 MW | 144 MW | 110 MW | 21 MW |
| 2026-10-26T19:00Z | 213 MW | 318 MW | 142 MW | 104 MW | 19 MW |
| 2026-10-26T20:00Z | 231 MW | 300 MW | 142 MW | 99 MW | 19 MW |
| 2026-10-26T21:00Z | 230 MW | 321 MW | 139 MW | 106 MW | 0 MW |
| 2026-10-26T22:00Z | 231 MW | 315 MW | 138 MW | 109 MW | 0 MW |
| 2026-10-26T23:00Z | 233 MW | 245 MW | 138 MW | 103 MW | 0 MW |
| 2026-10-27T00:00Z | 233 MW | 163 MW | 138 MW | 103 MW | 0 MW |
| 2026-10-27T01:00Z | 234 MW | 110 MW | 136 MW | 104 MW | 0 MW |
| 2026-10-27T02:00Z | 235 MW | 99 MW | 136 MW | 106 MW | 0 MW |
| 2026-10-27T03:00Z | 234 MW | 78 MW | 134 MW | 106 MW | 0 MW |
| 2026-10-27T04:00Z | 215 MW | 149 MW | 135 MW | 105 MW | 0 MW |
| 2026-10-27T05:00Z | 216 MW | 249 MW | 135 MW | 96 MW | 9 MW |
| 2026-10-27T06:00Z | 216 MW | 201 MW | 136 MW | 91 MW | 54 MW |
| 2026-10-27T07:00Z | 218 MW | 98 MW | 133 MW | 100 MW | 73 MW |
| 2026-10-27T08:00Z | 219 MW | 75 MW | 133 MW | 101 MW | 26 MW |
| 2026-10-27T09:00Z | 219 MW | 101 MW | 136 MW | 103 MW | 26 MW |
| 2026-10-27T10:00Z | 207 MW | 80 MW | 135 MW | 104 MW | 41 MW |
| 2026-10-27T11:00Z | 217 MW | 75 MW | 136 MW | 104 MW | 43 MW |
| 2026-10-27T12:00Z | 219 MW | 143 MW | 136 MW | 99 MW | 38 MW |
| 2026-10-27T13:00Z | 219 MW | 271 MW | 142 MW | 101 MW | 26 MW |
| 2026-10-27T14:00Z | 216 MW | 336 MW | 145 MW | 103 MW | 21 MW |
| 2026-10-27T15:00Z | 217 MW | 362 MW | 141 MW | 103 MW | 1 MW |
| 2026-10-27T16:00Z | 217 MW | 368 MW | 140 MW | 100 MW | 30 MW |
| 2026-10-27T17:00Z | 217 MW | 366 MW | 139 MW | 95 MW | 30 MW |
| 2026-10-27T18:00Z | 216 MW | 367 MW | 136 MW | 95 MW | 23 MW |
| 2026-10-27T19:00Z | 216 MW | 368 MW | 137 MW | 88 MW | 13 MW |
| 2026-10-27T20:00Z | 233 MW | 367 MW | 137 MW | 80 MW | 12 MW |
| 2026-10-27T21:00Z | 233 MW | 368 MW | 137 MW | 78 MW | 13 MW |
| 2026-10-27T22:00Z | 233 MW | 364 MW | 133 MW | 86 MW | 13 MW |
| 2026-10-27T23:00Z | 233 MW | 197 MW | 131 MW | 91 MW | 19 MW |
| 2026-10-28T00:00Z | 234 MW | 75 MW | 130 MW | 92 MW | 0 MW |
| 2026-10-28T01:00Z | 233 MW | 97 MW | 129 MW | 86 MW | 0 MW |
| 2026-10-28T02:00Z | 233 MW | 90 MW | 131 MW | 96 MW | 0 MW |
| 2026-10-28T03:00Z | 233 MW | 68 MW | 133 MW | 91 MW | 0 MW |
| 2026-10-28T04:00Z | 215 MW | 148 MW | 134 MW | 99 MW | 0 MW |
| 2026-10-28T05:00Z | 216 MW | 266 MW | 142 MW | 88 MW | 1 MW |
| 2026-10-28T06:00Z | 216 MW | 298 MW | 142 MW | 93 MW | 10 MW |
| 2026-10-28T07:00Z | 220 MW | 195 MW | 141 MW | 101 MW | 26 MW |
| 2026-10-28T08:00Z | 220 MW | 106 MW | 143 MW | 103 MW | 32 MW |
| 2026-10-28T09:00Z | 218 MW | 105 MW | 146 MW | 102 MW | 50 MW |
| 2026-10-28T10:00Z | 219 MW | 83 MW | 146 MW | 103 MW | 42 MW |
| 2026-10-28T11:00Z | 219 MW | 87 MW | 137 MW | 104 MW | 23 MW |
| 2026-10-28T12:00Z | 200 MW | 73 MW | 138 MW | 105 MW | 20 MW |
| 2026-10-28T13:00Z | 218 MW | 151 MW | 139 MW | 105 MW | 7 MW |
| 2026-10-28T14:00Z | 218 MW | 284 MW | 141 MW | 105 MW | 15 MW |
| 2026-10-28T15:00Z | 220 MW | 324 MW | 141 MW | 106 MW | 1 MW |
| 2026-10-28T16:00Z | 220 MW | 360 MW | 140 MW | 106 MW | 26 MW |
| 2026-10-28T17:00Z | 220 MW | 364 MW | 140 MW | 106 MW | 26 MW |
| 2026-10-28T18:00Z | 221 MW | 364 MW | 139 MW | 103 MW | 26 MW |
| 2026-10-28T19:00Z | 219 MW | 344 MW | 141 MW | 103 MW | 19 MW |
| 2026-10-28T20:00Z | 230 MW | 344 MW | 139 MW | 102 MW | 19 MW |
| 2026-10-28T21:00Z | 231 MW | 363 MW | 136 MW | 99 MW | 10 MW |
| 2026-10-28T22:00Z | 231 MW | 296 MW | 137 MW | 104 MW | 10 MW |
| 2026-10-28T23:00Z | 231 MW | 157 MW | 137 MW | 97 MW | 0 MW |
| 2026-10-29T00:00Z | 231 MW | 77 MW | 153 MW | 98 MW | 0 MW |
| 2026-10-29T01:00Z | 204 MW | 16 MW | 198 MW | 100 MW | 0 MW |
| 2026-10-29T02:00Z | 202 MW | 0 MW | 200 MW | 97 MW | 0 MW |
| 2026-10-29T03:00Z | 202 MW | 45 MW | 197 MW | 88 MW | 0 MW |
| 2026-10-29T04:00Z | 203 MW | 103 MW | 197 MW | 87 MW | 0 MW |
| 2026-10-29T05:00Z | 212 MW | 142 MW | 198 MW | 88 MW | 3 MW |
| 2026-10-29T06:00Z | 216 MW | 172 MW | 195 MW | 86 MW | 17 MW |
| 2026-10-29T07:00Z | 217 MW | 198 MW | 195 MW | 99 MW | 32 MW |
| 2026-10-29T08:00Z | 217 MW | 209 MW | 210 MW | 103 MW | 22 MW |
| 2026-10-29T09:00Z | 210 MW | 24 MW | 208 MW | 99 MW | 31 MW |
| 2026-10-29T10:00Z | 197 MW | 17 MW | 208 MW | 95 MW | 31 MW |
| 2026-10-29T11:00Z | 197 MW | 17 MW | 204 MW | 88 MW | 22 MW |
| 2026-10-29T12:00Z | 196 MW | 34 MW | 202 MW | 86 MW | 20 MW |
| 2026-10-29T13:00Z | 196 MW | 199 MW | 200 MW | 86 MW | 14 MW |
| 2026-10-29T14:00Z | 197 MW | 209 MW | 208 MW | 88 MW | 5 MW |
| 2026-10-29T15:00Z | 211 MW | 280 MW | 209 MW | 90 MW | 0 MW |
| 2026-10-29T16:00Z | 214 MW | 311 MW | 209 MW | 86 MW | 29 MW |
| 2026-10-29T17:00Z | 215 MW | 303 MW | 207 MW | 89 MW | 29 MW |
| 2026-10-29T18:00Z | 196 MW | 301 MW | 207 MW | 92 MW | 29 MW |
| 2026-10-29T19:00Z | 186 MW | 285 MW | 210 MW | 94 MW | 19 MW |
| 2026-10-29T20:00Z | 200 MW | 271 MW | 210 MW | 94 MW | 0 MW |
| 2026-10-29T21:00Z | 201 MW | 283 MW | 205 MW | 88 MW | 0 MW |
| 2026-10-29T22:00Z | 201 MW | 279 MW | 205 MW | 85 MW | 0 MW |
| 2026-10-29T23:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T00:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T01:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T02:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T03:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T04:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T05:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T13:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T14:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T15:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T16:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T17:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T18:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T19:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T20:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T21:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T22:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-30T23:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T00:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T01:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T02:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T03:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T04:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T05:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T13:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T14:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T15:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T16:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T17:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T18:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T19:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T20:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T21:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T22:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-10-31T23:00Z | 230 MW | 112 MW | 202 MW | 16 MW | 0 MW |
| 2026-11-01T00:00Z | 230 MW | 26 MW | 201 MW | 17 MW | 0 MW |
| 2026-11-01T01:00Z | 231 MW | 24 MW | 203 MW | 20 MW | 0 MW |
| 2026-11-01T02:00Z | 231 MW | 16 MW | 201 MW | 21 MW | 0 MW |
| 2026-11-01T03:00Z | 182 MW | 37 MW | 201 MW | 22 MW | 0 MW |
| 2026-11-01T04:00Z | 178 MW | 35 MW | 204 MW | 30 MW | 0 MW |
| 2026-11-01T05:00Z | 182 MW | 20 MW | 200 MW | 40 MW | 2 MW |
| 2026-11-01T06:00Z | 181 MW | 34 MW | 202 MW | 30 MW | 11 MW |
| 2026-11-01T07:00Z | 181 MW | 22 MW | 204 MW | 28 MW | 15 MW |
| 2026-11-01T08:00Z | 181 MW | 34 MW | 205 MW | 24 MW | 20 MW |
| 2026-11-01T09:00Z | 181 MW | 73 MW | 203 MW | 20 MW | 26 MW |
| 2026-11-01T10:00Z | 181 MW | 100 MW | 202 MW | 16 MW | 23 MW |
| 2026-11-01T11:00Z | 180 MW | 128 MW | 199 MW | 13 MW | 19 MW |
| 2026-11-01T12:00Z | 180 MW | 148 MW | 201 MW | 9 MW | 15 MW |
| 2026-11-01T13:00Z | 209 MW | 191 MW | 199 MW | 10 MW | 6 MW |
| 2026-11-01T14:00Z | 215 MW | 330 MW | 199 MW | 14 MW | 2 MW |
| 2026-11-01T15:00Z | 215 MW | 359 MW | 197 MW | 18 MW | 0 MW |
| 2026-11-01T16:00Z | 218 MW | 361 MW | 198 MW | 19 MW | 10 MW |
| 2026-11-01T17:00Z | 218 MW | 361 MW | 197 MW | 14 MW | 10 MW |
| 2026-11-01T18:00Z | 219 MW | 361 MW | 202 MW | 14 MW | 0 MW |
| 2026-11-01T19:00Z | 219 MW | 361 MW | 200 MW | 18 MW | 0 MW |
| 2026-11-01T20:00Z | 233 MW | 358 MW | 200 MW | 18 MW | 0 MW |
| 2026-11-01T21:00Z | 224 MW | 281 MW | 206 MW | 19 MW | 0 MW |
| 2026-11-01T22:00Z | 224 MW | 209 MW | 217 MW | 21 MW | 0 MW |
| 2026-11-01T23:00Z | 217 MW | 63 MW | 224 MW | 19 MW | 0 MW |
| 2026-11-02T00:00Z | 196 MW | 0 MW | 231 MW | 13 MW | 0 MW |
| 2026-11-02T01:00Z | 186 MW | 0 MW | 239 MW | 14 MW | 0 MW |
| 2026-11-02T02:00Z | 186 MW | 0 MW | 291 MW | 14 MW | 0 MW |
| 2026-11-02T03:00Z | 176 MW | 0 MW | 331 MW | 12 MW | 0 MW |
| 2026-11-02T04:00Z | 176 MW | 0 MW | 328 MW | 9 MW | 0 MW |
| 2026-11-02T05:00Z | 181 MW | 0 MW | 340 MW | 5 MW | 1 MW |
| 2026-11-02T06:00Z | 207 MW | 59 MW | 342 MW | 3 MW | 10 MW |
| 2026-11-02T07:00Z | 216 MW | 88 MW | 344 MW | 4 MW | 14 MW |
| 2026-11-02T08:00Z | 217 MW | 108 MW | 338 MW | 1 MW | 15 MW |
| 2026-11-02T09:00Z | 219 MW | 39 MW | 339 MW | 1 MW | 22 MW |
| 2026-11-02T10:00Z | 219 MW | 39 MW | 339 MW | 1 MW | 20 MW |
| 2026-11-02T11:00Z | 222 MW | 39 MW | 340 MW | 0 MW | 17 MW |
| 2026-11-02T12:00Z | 225 MW | 140 MW | 342 MW | 1 MW | 14 MW |
| 2026-11-02T13:00Z | 202 MW | 131 MW | 343 MW | 1 MW | 9 MW |
| 2026-11-02T14:00Z | 180 MW | 135 MW | 342 MW | 1 MW | 3 MW |
| 2026-11-02T15:00Z | 175 MW | 179 MW | 340 MW | 3 MW | 0 MW |
| 2026-11-02T16:00Z | 179 MW | 212 MW | 342 MW | 4 MW | 15 MW |
| 2026-11-02T17:00Z | 181 MW | 201 MW | 341 MW | 5 MW | 15 MW |
| 2026-11-02T18:00Z | 181 MW | 195 MW | 337 MW | 5 MW | 15 MW |
| 2026-11-02T19:00Z | 179 MW | 181 MW | 338 MW | 15 MW | 0 MW |
| 2026-11-02T20:00Z | 194 MW | 181 MW | 343 MW | 31 MW | 0 MW |
| 2026-11-02T21:00Z | 194 MW | 201 MW | 346 MW | 38 MW | 0 MW |
| 2026-11-02T22:00Z | 194 MW | 156 MW | 348 MW | 47 MW | 0 MW |
| 2026-11-02T23:00Z | 209 MW | 18 MW | 352 MW | 49 MW | 0 MW |
| 2026-11-03T00:00Z | 194 MW | 0 MW | 359 MW | 38 MW | 0 MW |
| 2026-11-03T01:00Z | 195 MW | 0 MW | 357 MW | 27 MW | 0 MW |
| 2026-11-03T02:00Z | 182 MW | 0 MW | 353 MW | 35 MW | 0 MW |
| 2026-11-03T03:00Z | 189 MW | 0 MW | 352 MW | 13 MW | 0 MW |
| 2026-11-03T04:00Z | 185 MW | 0 MW | 355 MW | 9 MW | 0 MW |
| 2026-11-03T05:00Z | 180 MW | 28 MW | 352 MW | 15 MW | 1 MW |
| 2026-11-03T06:00Z | 180 MW | 100 MW | 354 MW | 37 MW | 7 MW |
| 2026-11-03T07:00Z | 180 MW | 113 MW | 354 MW | 28 MW | 13 MW |
| 2026-11-03T08:00Z | 181 MW | 117 MW | 356 MW | 28 MW | 13 MW |
| 2026-11-03T09:00Z | 181 MW | 121 MW | 355 MW | 28 MW | 13 MW |
| 2026-11-03T10:00Z | 181 MW | 135 MW | 354 MW | 30 MW | 11 MW |
| 2026-11-03T11:00Z | 179 MW | 126 MW | 354 MW | 43 MW | 10 MW |
| 2026-11-03T12:00Z | 195 MW | 193 MW | 352 MW | 59 MW | 6 MW |
| 2026-11-03T13:00Z | 215 MW | 195 MW | 356 MW | 81 MW | 7 MW |
| 2026-11-03T14:00Z | 193 MW | 164 MW | 359 MW | 102 MW | 9 MW |
| 2026-11-03T15:00Z | 179 MW | 221 MW | 356 MW | 106 MW | 16 MW |
| 2026-11-03T16:00Z | 179 MW | 279 MW | 355 MW | 110 MW | 14 MW |
| 2026-11-03T17:00Z | 180 MW | 260 MW | 355 MW | 111 MW | 14 MW |
| 2026-11-03T18:00Z | 181 MW | 257 MW | 355 MW | 109 MW | 14 MW |
| 2026-11-03T19:00Z | 178 MW | 242 MW | 357 MW | 109 MW | 0 MW |
| 2026-11-03T20:00Z | 196 MW | 226 MW | 356 MW | 111 MW | 0 MW |
| 2026-11-03T21:00Z | 196 MW | 192 MW | 353 MW | 112 MW | 0 MW |
| 2026-11-03T22:00Z | 196 MW | 148 MW | 354 MW | 111 MW | 0 MW |
| 2026-11-03T23:00Z | 231 MW | 0 MW | 354 MW | 113 MW | 0 MW |
| 2026-11-04T00:00Z | 231 MW | 0 MW | 354 MW | 112 MW | 0 MW |
| 2026-11-04T01:00Z | 197 MW | 0 MW | 346 MW | 112 MW | 0 MW |
| 2026-11-04T02:00Z | 192 MW | 0 MW | 346 MW | 112 MW | 0 MW |
| 2026-11-04T03:00Z | 172 MW | 0 MW | 347 MW | 104 MW | 0 MW |
| 2026-11-04T04:00Z | 189 MW | 2 MW | 348 MW | 99 MW | 0 MW |
| 2026-11-04T05:00Z | 215 MW | 18 MW | 347 MW | 98 MW | 2 MW |
| 2026-11-04T06:00Z | 214 MW | 86 MW | 350 MW | 93 MW | 26 MW |
| 2026-11-04T07:00Z | 176 MW | 77 MW | 349 MW | 95 MW | 53 MW |
| 2026-11-04T08:00Z | 177 MW | 101 MW | 346 MW | 100 MW | 31 MW |
| 2026-11-04T09:00Z | 208 MW | 46 MW | 347 MW | 98 MW | 31 MW |
| 2026-11-04T10:00Z | 220 MW | 78 MW | 346 MW | 91 MW | 29 MW |
| 2026-11-04T11:00Z | 220 MW | 131 MW | 347 MW | 99 MW | 25 MW |
| 2026-11-04T12:00Z | 219 MW | 203 MW | 349 MW | 96 MW | 18 MW |
| 2026-11-04T13:00Z | 219 MW | 204 MW | 349 MW | 91 MW | 12 MW |
| 2026-11-04T14:00Z | 216 MW | 193 MW | 350 MW | 90 MW | 6 MW |
| 2026-11-04T15:00Z | 207 MW | 232 MW | 353 MW | 97 MW | 19 MW |
| 2026-11-04T16:00Z | 217 MW | 277 MW | 347 MW | 93 MW | 31 MW |
| 2026-11-04T17:00Z | 216 MW | 281 MW | 341 MW | 89 MW | 32 MW |
| 2026-11-04T18:00Z | 216 MW | 280 MW | 337 MW | 85 MW | 32 MW |
| 2026-11-04T19:00Z | 215 MW | 255 MW | 337 MW | 88 MW | 0 MW |
| 2026-11-04T20:00Z | 231 MW | 233 MW | 335 MW | 83 MW | 0 MW |
| 2026-11-04T21:00Z | 231 MW | 216 MW | 318 MW | 75 MW | 0 MW |
| 2026-11-04T22:00Z | 234 MW | 137 MW | 280 MW | 72 MW | 0 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-04T22:00Z.
Installed Capacity
Annual figure for 2026| Coal | |
|---|---|
| Hydro | |
| Gas | |
| Oil | |
| Solar | |
| Wind | |
| Bioenergy |
Total installed capacity in North Macedonia: 2.21 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Skopje time dates, through 2026-11-04Show the data table (400 rows)
| Date (Europe/Skopje time) | Demand |
|---|---|
| 2025-10-01 | 11.8 GWh |
| 2025-10-02 | 16.7 GWh |
| 2025-10-03 | 16.9 GWh |
| 2025-10-04 | 14.7 GWh |
| 2025-10-05 | 15.4 GWh |
| 2025-10-06 | 17.3 GWh |
| 2025-10-07 | 16.9 GWh |
| 2025-10-08 | 17.6 GWh |
| 2025-10-09 | 12.5 GWh |
| 2025-10-10 | 13.4 GWh |
| 2025-10-11 | 12.7 GWh |
| 2025-10-12 | 15.0 GWh |
| 2025-10-13 | 14.6 GWh |
| 2025-10-14 | 14.6 GWh |
| 2025-10-15 | 14.4 GWh |
| 2025-10-16 | 16.8 GWh |
| 2025-10-17 | 17.8 GWh |
| 2025-10-18 | 16.7 GWh |
| 2025-10-19 | 15.4 GWh |
| 2025-10-20 | 14.6 GWh |
| 2025-10-21 | 15.3 GWh |
| 2025-10-22 | 16.5 GWh |
| 2025-10-23 | 13.5 GWh |
| 2025-10-24 | 12.3 GWh |
| 2025-10-25 | 13.6 GWh |
| 2025-10-26 | 18.2 GWh |
| 2025-10-27 | 14.0 GWh |
| 2025-10-28 | 15.8 GWh |
| 2025-10-29 | 14.3 GWh |
| 2025-10-30 | 15.2 GWh |
| 2025-10-31 | 15.1 GWh |
| 2025-11-01 | 13.8 GWh |
| 2025-11-02 | 13.6 GWh |
| 2025-11-03 | 14.8 GWh |
| 2025-11-04 | 17.1 GWh |
| 2025-11-05 | 16.1 GWh |
| 2025-11-06 | 17.4 GWh |
| 2025-11-07 | 16.5 GWh |
| 2025-11-08 | 15.3 GWh |
| 2025-11-09 | 15.4 GWh |
| 2025-11-10 | 15.8 GWh |
| 2025-11-11 | 14.8 GWh |
| 2025-11-12 | 14.6 GWh |
| 2025-11-13 | 15.7 GWh |
| 2025-11-14 | n/a |
| 2025-11-15 | 16.3 GWh |
| 2025-11-16 | n/a |
| 2025-11-17 | 14.7 GWh |
| 2025-11-18 | 18.3 GWh |
| 2025-11-19 | 18.5 GWh |
| 2025-11-20 | 16.0 GWh |
| 2025-11-21 | 15.6 GWh |
| 2025-11-22 | 14.3 GWh |
| 2025-11-23 | 15.9 GWh |
| 2025-11-24 | 15.7 GWh |
| 2025-11-25 | 17.8 GWh |
| 2025-11-26 | 18.3 GWh |
| 2025-11-27 | 19.3 GWh |
| 2025-11-28 | 19.8 GWh |
| 2025-11-29 | 18.2 GWh |
| 2025-11-30 | 17.8 GWh |
| 2025-12-01 | 16.3 GWh |
| 2025-12-02 | 19.2 GWh |
| 2025-12-03 | 20.1 GWh |
| 2025-12-04 | 18.8 GWh |
| 2025-12-05 | 19.4 GWh |
| 2025-12-06 | 17.2 GWh |
| 2025-12-07 | 16.1 GWh |
| 2025-12-08 | 15.2 GWh |
| 2025-12-09 | 16.7 GWh |
| 2025-12-10 | 18.6 GWh |
| 2025-12-11 | 18.3 GWh |
| 2025-12-12 | 17.5 GWh |
| 2025-12-13 | 18.4 GWh |
| 2025-12-14 | 20.3 GWh |
| 2025-12-15 | 20.4 GWh |
| 2025-12-16 | 22.9 GWh |
| 2025-12-17 | 24.0 GWh |
| 2025-12-18 | 24.1 GWh |
| 2025-12-19 | 22.8 GWh |
| 2025-12-20 | 23.5 GWh |
| 2025-12-21 | 25.3 GWh |
| 2025-12-22 | 25.8 GWh |
| 2025-12-23 | 25.6 GWh |
| 2025-12-24 | 24.5 GWh |
| 2025-12-25 | 24.8 GWh |
| 2025-12-26 | 24.4 GWh |
| 2025-12-27 | 20.7 GWh |
| 2025-12-28 | 22.8 GWh |
| 2025-12-29 | 22.6 GWh |
| 2025-12-30 | 23.6 GWh |
| 2025-12-31 | 23.8 GWh |
| 2026-01-01 | 23.2 GWh |
| 2026-01-02 | 25.4 GWh |
| 2026-01-03 | 22.5 GWh |
| 2026-01-04 | 20.1 GWh |
| 2026-01-05 | 18.8 GWh |
| 2026-01-06 | 18.6 GWh |
| 2026-01-07 | 16.7 GWh |
| 2026-01-08 | 19.7 GWh |
| 2026-01-09 | 22.3 GWh |
| 2026-01-10 | 22.4 GWh |
| 2026-01-11 | 22.7 GWh |
| 2026-01-12 | 22.4 GWh |
| 2026-01-13 | 24.6 GWh |
| 2026-01-14 | 22.0 GWh |
| 2026-01-15 | 21.1 GWh |
| 2026-01-16 | 22.4 GWh |
| 2026-01-17 | 23.2 GWh |
| 2026-01-18 | 21.3 GWh |
| 2026-01-19 | 21.1 GWh |
| 2026-01-20 | 22.8 GWh |
| 2026-01-21 | 27.0 GWh |
| 2026-01-22 | 25.7 GWh |
| 2026-01-23 | 24.0 GWh |
| 2026-01-24 | 22.9 GWh |
| 2026-01-25 | 21.2 GWh |
| 2026-01-26 | 21.2 GWh |
| 2026-01-27 | 20.2 GWh |
| 2026-01-28 | 21.4 GWh |
| 2026-01-29 | 21.8 GWh |
| 2026-01-30 | 18.0 GWh |
| 2026-01-31 | 17.0 GWh |
| 2026-02-01 | 21.2 GWh |
| 2026-02-02 | 21.0 GWh |
| 2026-02-03 | 19.9 GWh |
| 2026-02-04 | 19.6 GWh |
| 2026-02-05 | 18.4 GWh |
| 2026-02-06 | 19.8 GWh |
| 2026-02-07 | 15.2 GWh |
| 2026-02-08 | 16.6 GWh |
| 2026-02-09 | 18.0 GWh |
| 2026-02-10 | 17.9 GWh |
| 2026-02-11 | 16.9 GWh |
| 2026-02-12 | 17.3 GWh |
| 2026-02-13 | 16.1 GWh |
| 2026-02-14 | 17.9 GWh |
| 2026-02-15 | 16.6 GWh |
| 2026-02-16 | 15.8 GWh |
| 2026-02-17 | 19.2 GWh |
| 2026-02-18 | 16.5 GWh |
| 2026-02-19 | 17.3 GWh |
| 2026-02-20 | 18.6 GWh |
| 2026-02-21 | 16.4 GWh |
| 2026-02-22 | 17.1 GWh |
| 2026-02-23 | 17.1 GWh |
| 2026-02-24 | 17.0 GWh |
| 2026-02-25 | 14.0 GWh |
| 2026-02-26 | 14.0 GWh |
| 2026-02-27 | 14.5 GWh |
| 2026-02-28 | 14.7 GWh |
| 2026-03-01 | 14.9 GWh |
| 2026-03-02 | 15.1 GWh |
| 2026-03-03 | 13.9 GWh |
| 2026-03-04 | 14.1 GWh |
| 2026-03-05 | 16.1 GWh |
| 2026-03-06 | 13.4 GWh |
| 2026-03-07 | 13.6 GWh |
| 2026-03-08 | 14.3 GWh |
| 2026-03-09 | 13.7 GWh |
| 2026-03-10 | 13.0 GWh |
| 2026-03-11 | 13.6 GWh |
| 2026-03-12 | 13.2 GWh |
| 2026-03-13 | 12.7 GWh |
| 2026-03-14 | 12.4 GWh |
| 2026-03-15 | 13.1 GWh |
| 2026-03-16 | 12.6 GWh |
| 2026-03-17 | 15.0 GWh |
| 2026-03-18 | 18.3 GWh |
| 2026-03-19 | 18.8 GWh |
| 2026-03-20 | 14.8 GWh |
| 2026-03-21 | 14.9 GWh |
| 2026-03-22 | 15.2 GWh |
| 2026-03-23 | 15.0 GWh |
| 2026-03-24 | 16.7 GWh |
| 2026-03-25 | 12.8 GWh |
| 2026-03-26 | 12.7 GWh |
| 2026-03-27 | 15.5 GWh |
| 2026-03-28 | 13.7 GWh |
| 2026-03-29 | 10.9 GWh |
| 2026-03-30 | 12.9 GWh |
| 2026-03-31 | 17.2 GWh |
| 2026-04-01 | 19.1 GWh |
| 2026-04-02 | 18.9 GWh |
| 2026-04-03 | 14.9 GWh |
| 2026-04-04 | 11.7 GWh |
| 2026-04-05 | 11.4 GWh |
| 2026-04-06 | 11.2 GWh |
| 2026-04-07 | 8.84 GWh |
| 2026-04-08 | n/a |
| 2026-04-09 | n/a |
| 2026-04-10 | n/a |
| 2026-04-11 | 13.0 GWh |
| 2026-04-12 | 8.96 GWh |
| 2026-04-13 | 8.28 GWh |
| 2026-04-14 | 8.58 GWh |
| 2026-04-15 | 13.7 GWh |
| 2026-04-16 | 11.2 GWh |
| 2026-04-17 | n/a |
| 2026-04-18 | 8.84 GWh |
| 2026-04-19 | 8.15 GWh |
| 2026-04-20 | 9.00 GWh |
| 2026-04-21 | 13.6 GWh |
| 2026-04-22 | 14.2 GWh |
| 2026-04-23 | 10.6 GWh |
| 2026-04-24 | 9.80 GWh |
| 2026-04-25 | 10.1 GWh |
| 2026-04-26 | 10.6 GWh |
| 2026-04-27 | 8.75 GWh |
| 2026-04-28 | 8.12 GWh |
| 2026-04-29 | n/a |
| 2026-04-30 | 11.9 GWh |
| 2026-05-01 | 11.4 GWh |
| 2026-05-02 | 10.9 GWh |
| 2026-05-03 | 9.40 GWh |
| 2026-05-04 | 8.08 GWh |
| 2026-05-05 | n/a |
| 2026-05-06 | n/a |
| 2026-05-07 | 9.90 GWh |
| 2026-05-08 | 11.7 GWh |
| 2026-05-09 | 9.64 GWh |
| 2026-05-10 | 8.13 GWh |
| 2026-05-11 | 7.19 GWh |
| 2026-05-12 | 6.51 GWh |
| 2026-05-13 | 7.95 GWh |
| 2026-05-14 | 7.58 GWh |
| 2026-05-15 | 6.78 GWh |
| 2026-05-16 | 8.48 GWh |
| 2026-05-17 | 7.98 GWh |
| 2026-05-18 | 7.23 GWh |
| 2026-05-19 | 12.6 GWh |
| 2026-05-20 | 7.20 GWh |
| 2026-05-21 | 6.81 GWh |
| 2026-05-22 | 8.32 GWh |
| 2026-05-23 | 8.51 GWh |
| 2026-05-24 | n/a |
| 2026-05-25 | 7.34 GWh |
| 2026-05-26 | n/a |
| 2026-05-27 | 7.18 GWh |
| 2026-05-28 | 6.85 GWh |
| 2026-05-29 | 6.19 GWh |
| 2026-05-30 | 6.25 GWh |
| 2026-05-31 | n/a |
| 2026-06-01 | 6.78 GWh |
| 2026-06-02 | 7.33 GWh |
| 2026-06-03 | 6.94 GWh |
| 2026-06-04 | 7.12 GWh |
| 2026-06-05 | 7.16 GWh |
| 2026-06-06 | 7.00 GWh |
| 2026-06-07 | 7.47 GWh |
| 2026-06-08 | n/a |
| 2026-06-09 | n/a |
| 2026-06-10 | 7.81 GWh |
| 2026-06-11 | 7.22 GWh |
| 2026-06-12 | 5.77 GWh |
| 2026-06-13 | 7.26 GWh |
| 2026-06-14 | 7.76 GWh |
| 2026-06-15 | 6.81 GWh |
| 2026-06-16 | 7.78 GWh |
| 2026-06-17 | 8.36 GWh |
| 2026-06-18 | 7.56 GWh |
| 2026-06-19 | 7.49 GWh |
| 2026-06-20 | n/a |
| 2026-06-21 | 7.76 GWh |
| 2026-06-22 | 8.62 GWh |
| 2026-06-23 | n/a |
| 2026-06-24 | n/a |
| 2026-06-25 | 8.45 GWh |
| 2026-06-26 | 8.63 GWh |
| 2026-06-27 | 8.66 GWh |
| 2026-06-28 | 8.41 GWh |
| 2026-06-29 | 8.90 GWh |
| 2026-06-30 | 9.81 GWh |
| 2026-07-01 | 8.82 GWh |
| 2026-07-02 | 7.19 GWh |
| 2026-07-03 | 6.38 GWh |
| 2026-07-04 | 5.66 GWh |
| 2026-07-05 | 5.84 GWh |
| 2026-07-06 | 6.76 GWh |
| 2026-07-07 | 7.86 GWh |
| 2026-07-08 | 8.13 GWh |
| 2026-07-09 | 6.99 GWh |
| 2026-07-10 | 7.30 GWh |
| 2026-07-11 | 7.52 GWh |
| 2026-07-12 | 7.34 GWh |
| 2026-07-13 | 6.55 GWh |
| 2026-07-14 | 7.44 GWh |
| 2026-07-15 | 9.78 GWh |
| 2026-07-16 | 10.3 GWh |
| 2026-07-17 | 9.55 GWh |
| 2026-07-18 | 9.76 GWh |
| 2026-07-19 | 9.67 GWh |
| 2026-07-20 | 9.76 GWh |
| 2026-07-21 | 8.60 GWh |
| 2026-07-22 | 7.37 GWh |
| 2026-07-23 | 7.44 GWh |
| 2026-07-24 | 10.3 GWh |
| 2026-07-25 | 7.00 GWh |
| 2026-07-26 | 8.00 GWh |
| 2026-07-27 | 9.62 GWh |
| 2026-07-28 | 7.82 GWh |
| 2026-07-29 | 8.38 GWh |
| 2026-07-30 | 8.98 GWh |
| 2026-07-31 | 8.67 GWh |
| 2026-08-01 | 7.95 GWh |
| 2026-08-02 | n/a |
| 2026-08-03 | 7.82 GWh |
| 2026-08-04 | 8.56 GWh |
| 2026-08-05 | 9.48 GWh |
| 2026-08-06 | 11.7 GWh |
| 2026-08-07 | 11.3 GWh |
| 2026-08-08 | 10.4 GWh |
| 2026-08-09 | 10.3 GWh |
| 2026-08-10 | 11.4 GWh |
| 2026-08-11 | 11.9 GWh |
| 2026-08-12 | 12.0 GWh |
| 2026-08-13 | 13.0 GWh |
| 2026-08-14 | 11.9 GWh |
| 2026-08-15 | 9.86 GWh |
| 2026-08-16 | 9.19 GWh |
| 2026-08-17 | 10.5 GWh |
| 2026-08-18 | 11.4 GWh |
| 2026-08-19 | 10.9 GWh |
| 2026-08-20 | 12.1 GWh |
| 2026-08-21 | 12.9 GWh |
| 2026-08-22 | 12.6 GWh |
| 2026-08-23 | 12.3 GWh |
| 2026-08-24 | 13.0 GWh |
| 2026-08-25 | 13.0 GWh |
| 2026-08-26 | 13.5 GWh |
| 2026-08-27 | 13.2 GWh |
| 2026-08-28 | 11.2 GWh |
| 2026-08-29 | 11.2 GWh |
| 2026-08-30 | 10.4 GWh |
| 2026-08-31 | 12.3 GWh |
| 2026-09-01 | 12.5 GWh |
| 2026-09-02 | 12.2 GWh |
| 2026-09-03 | 10.4 GWh |
| 2026-09-04 | 9.54 GWh |
| 2026-09-05 | 9.02 GWh |
| 2026-09-06 | 8.22 GWh |
| 2026-09-07 | 8.57 GWh |
| 2026-09-08 | 8.13 GWh |
| 2026-09-09 | 9.63 GWh |
| 2026-09-10 | 10.5 GWh |
| 2026-09-11 | 10.5 GWh |
| 2026-09-12 | 10.8 GWh |
| 2026-09-13 | 7.98 GWh |
| 2026-09-14 | 8.44 GWh |
| 2026-09-15 | 10.6 GWh |
| 2026-09-16 | 10.2 GWh |
| 2026-09-17 | 9.25 GWh |
| 2026-09-18 | 9.51 GWh |
| 2026-09-19 | 9.61 GWh |
| 2026-09-20 | 10.5 GWh |
| 2026-09-21 | 10.7 GWh |
| 2026-09-22 | 7.62 GWh |
| 2026-09-23 | 7.36 GWh |
| 2026-09-24 | 8.14 GWh |
| 2026-09-25 | 13.7 GWh |
| 2026-09-26 | 13.6 GWh |
| 2026-09-27 | 11.5 GWh |
| 2026-09-28 | 9.74 GWh |
| 2026-09-29 | 11.2 GWh |
| 2026-09-30 | 10.5 GWh |
| 2026-10-01 | 9.62 GWh |
| 2026-10-02 | 9.60 GWh |
| 2026-10-03 | 9.32 GWh |
| 2026-10-04 | 9.64 GWh |
| 2026-10-05 | 10.2 GWh |
| 2026-10-06 | 10.5 GWh |
| 2026-10-07 | 11.1 GWh |
| 2026-10-08 | 11.4 GWh |
| 2026-10-09 | 12.7 GWh |
| 2026-10-10 | 9.81 GWh |
| 2026-10-11 | 12.9 GWh |
| 2026-10-12 | 10.3 GWh |
| 2026-10-13 | 16.3 GWh |
| 2026-10-14 | 15.5 GWh |
| 2026-10-15 | 14.5 GWh |
| 2026-10-16 | 15.3 GWh |
| 2026-10-17 | 14.5 GWh |
| 2026-10-18 | 16.4 GWh |
| 2026-10-19 | 13.0 GWh |
| 2026-10-20 | 13.3 GWh |
| 2026-10-21 | 14.5 GWh |
| 2026-10-22 | 14.0 GWh |
| 2026-10-23 | 12.3 GWh |
| 2026-10-24 | 12.9 GWh |
| 2026-10-25 | 16.9 GWh |
| 2026-10-26 | 17.3 GWh |
| 2026-10-27 | 16.8 GWh |
| 2026-10-28 | 17.3 GWh |
| 2026-10-29 | 16.8 GWh |
| 2026-10-30 | n/a |
| 2026-10-31 | n/a |
| 2026-11-01 | 18.9 GWh |
| 2026-11-02 | 18.8 GWh |
| 2026-11-03 | 19.3 GWh |
| 2026-11-04 | 18.4 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-04. Daily totals are summed by World Power Monitor from complete Europe/Skopje local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 3.64 TWh | 3.18 TWh | Coal 41.6% | 308 |
| 2025 (partial) | 4.40 TWh | 4.06 TWh | Coal 51.7% | 362 |
| 2024 (partial) | 5.01 TWh | 4.31 TWh | Coal 50.9% | 351 |
| 2023 | 5.66 TWh | 5.49 TWh | Coal 47.6% | 365 |
| 2022 | 6.35 TWh | 4.81 TWh | Coal 55.3% | 365 |
| 2021 | 7.21 TWh | 4.73 TWh | Coal 43.8% | 365 |
| 2020 | 6.91 TWh | 4.60 TWh | Coal 55.3% | 366 |
| 2019 | 6.25 TWh | 5.16 TWh | Coal 63.9% | 365 |
| 2018 | 6.62 TWh | 4.91 TWh | Coal 55.7% | 365 |
| 2017 | 5.95 TWh | 4.93 TWh | Coal 66.3% | 365 |
| 2016 (partial) | 6.36 TWh | 3.12 TWh | Coal 50.2% | 358 |
| 2015 (partial) | 7.03 TWh | n/a | n/a | 332 |
A year is partial when ENTSO-E has not published every day; 2023 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-04.
Power Flows With Neighbours
Net totals, 2026-10-06 (6 October 2026) to 2026-11-04 (4 November 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Greece | North Macedonia imports | 285 GWh |
| Serbia | North Macedonia exports | 140 GWh |
| Bulgaria | North Macedonia exports | 19.7 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-04.
Latest Grid Alerts
Newest alert 20 October 2026- Day ahead price North Macedonia had a day ahead price averaging EUR 306.44/MWh for 20 October 2026, 2.1 times its own 90 day median (EUR 146.93/MWh). All alerts that day
Follow this grid: RSS feed of North Macedonia alerts. Source: ENTSO-E operator data, provisional. Alerts by zone.
Share and Embed
Figures as of 2026-11-04 (4 November 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for North Macedonia, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). North Macedonia Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/mk/
World Power Monitor. North Macedonia Electricity Demand and Generation Mix. Data as of 2026-11-04 22:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/mk/
@misc{wpm_zones_mk_2026,
title = {{North Macedonia Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-04 22:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/mk/}
} Permalink: https://worldpowermonitor.com/zones/mk/
The Copy buttons add today's date as the access date.