Greece Electricity Demand and Generation Mix
Greece demand was 6,002 MW in the hour starting 19 Sept 2026, 19:00 EEST (UTC+03:00). Gas was the largest source in the hour starting 19 Sept 2026, 19:00 EEST (UTC+03:00), at 50% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Greece is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 19 Sept 2026, 19:00 EEST (UTC+03:00), demand in Greece was 6,002 MW, against a day-ahead forecast of 5,910 MW.
- Gas supplied 50.3% of Greece's generation in the hour starting 19 Sept 2026, 19:00 EEST (UTC+03:00).
- The day-ahead price in Greece averaged EUR 139.28/MWh for delivery on 2026-09-20 (20 September 2026).
- Installed generating capacity in Greece was 27.2 GW in 2026, as reported to ENTSO-E.
- Demand in Greece totalled 50.1 TWh in 2025.
- Gas supplied 44.9% of Greece's generation in 2025.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 19 Sept 2026, 19:00 EEST (UTC+03:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-19T16:00:00Z.
Generation by Source
Latest hour with generation by source: 19 Sept 2026, 19:00 EEST (UTC+03:00)| Source | Output | Share |
|---|---|---|
| Gas | 2,222 MW | 50.3% |
| Storage | 734 MW | 16.6% |
| Hydro | 702 MW | 15.9% |
| Wind | 691 MW | 15.6% |
| Solar | 73 MW | 1.7% |
| Coal | 0 MW | 0.0% |
| Oil | 0 MW | 0.0% |
| Total from these sources | 4,421 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Coal is shown as Greece reports it: the platform has published zero for every day since 25 July 2026 (the last non zero daily total was on 24 July 2026). We have not changed or filled the figure, and cannot tell from the data whether the source stopped generating or stopped reporting. All flagged series.
Gas is shown as Greece reports it: the platform has published zero for every day since 1 August 2026 (the last non zero daily total was on 31 July 2026). We have not changed or filled the figure, and cannot tell from the data whether the source stopped generating or stopped reporting. All flagged series.
Hydro is shown as Greece reports it: the platform has published zero for every day since 1 August 2026 (the last non zero daily total was on 31 July 2026). We have not changed or filled the figure, and cannot tell from the data whether the source stopped generating or stopped reporting. All flagged series.
Storage is shown as Greece reports it: the platform has published zero for every day since 30 May 2026 (the last non zero daily total was on 29 May 2026). We have not changed or filled the figure, and cannot tell from the data whether the source stopped generating or stopped reporting. All flagged series.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-19T16:00:00Z.
Day-Ahead Price
Delivery day 2026-09-20 (20 September 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Greece and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-20.
Last 30 Days, Hourly
Times in UTC| Hour starting (UTC) | Demand |
|---|---|
| 2026-08-21T21:00Z | 6,282 MW |
| 2026-08-21T22:00Z | 5,904 MW |
| 2026-08-21T23:00Z | 5,599 MW |
| 2026-08-22T00:00Z | 5,394 MW |
| 2026-08-22T01:00Z | 5,227 MW |
| 2026-08-22T02:00Z | 5,141 MW |
| 2026-08-22T03:00Z | 5,183 MW |
| 2026-08-22T04:00Z | 5,236 MW |
| 2026-08-22T05:00Z | 5,550 MW |
| 2026-08-22T06:00Z | 5,954 MW |
| 2026-08-22T07:00Z | 6,329 MW |
| 2026-08-22T08:00Z | 6,656 MW |
| 2026-08-22T09:00Z | 7,090 MW |
| 2026-08-22T10:00Z | 8,018 MW |
| 2026-08-22T11:00Z | 8,223 MW |
| 2026-08-22T12:00Z | 7,820 MW |
| 2026-08-22T13:00Z | 7,759 MW |
| 2026-08-22T14:00Z | 7,535 MW |
| 2026-08-22T15:00Z | 7,587 MW |
| 2026-08-22T16:00Z | 7,557 MW |
| 2026-08-22T17:00Z | 7,467 MW |
| 2026-08-22T18:00Z | 7,499 MW |
| 2026-08-22T19:00Z | 7,157 MW |
| 2026-08-22T20:00Z | 6,784 MW |
| 2026-08-22T21:00Z | 6,412 MW |
| 2026-08-22T22:00Z | 6,040 MW |
| 2026-08-22T23:00Z | 5,726 MW |
| 2026-08-23T00:00Z | 5,508 MW |
| 2026-08-23T01:00Z | 5,347 MW |
| 2026-08-23T02:00Z | 5,249 MW |
| 2026-08-23T03:00Z | 5,214 MW |
| 2026-08-23T04:00Z | 5,140 MW |
| 2026-08-23T05:00Z | 5,333 MW |
| 2026-08-23T06:00Z | 5,614 MW |
| 2026-08-23T07:00Z | 6,150 MW |
| 2026-08-23T08:00Z | 6,806 MW |
| 2026-08-23T09:00Z | 7,338 MW |
| 2026-08-23T10:00Z | 7,302 MW |
| 2026-08-23T11:00Z | 7,382 MW |
| 2026-08-23T12:00Z | 7,251 MW |
| 2026-08-23T13:00Z | 7,304 MW |
| 2026-08-23T14:00Z | 7,373 MW |
| 2026-08-23T15:00Z | 7,465 MW |
| 2026-08-23T16:00Z | 7,458 MW |
| 2026-08-23T17:00Z | 7,476 MW |
| 2026-08-23T18:00Z | 7,665 MW |
| 2026-08-23T19:00Z | 7,478 MW |
| 2026-08-23T20:00Z | 7,143 MW |
| 2026-08-23T21:00Z | 6,694 MW |
| 2026-08-23T22:00Z | 6,246 MW |
| 2026-08-23T23:00Z | 5,943 MW |
| 2026-08-24T00:00Z | 5,713 MW |
| 2026-08-24T01:00Z | 5,534 MW |
| 2026-08-24T02:00Z | 5,511 MW |
| 2026-08-24T03:00Z | 5,686 MW |
| 2026-08-24T04:00Z | 5,974 MW |
| 2026-08-24T05:00Z | 6,588 MW |
| 2026-08-24T06:00Z | 7,191 MW |
| 2026-08-24T07:00Z | 7,604 MW |
| 2026-08-24T08:00Z | 7,949 MW |
| 2026-08-24T09:00Z | 8,281 MW |
| 2026-08-24T10:00Z | 8,656 MW |
| 2026-08-24T11:00Z | 8,856 MW |
| 2026-08-24T12:00Z | 8,801 MW |
| 2026-08-24T13:00Z | 8,696 MW |
| 2026-08-24T14:00Z | 8,673 MW |
| 2026-08-24T15:00Z | 8,690 MW |
| 2026-08-24T16:00Z | 8,556 MW |
| 2026-08-24T17:00Z | 8,451 MW |
| 2026-08-24T18:00Z | 8,430 MW |
| 2026-08-24T19:00Z | 7,968 MW |
| 2026-08-24T20:00Z | 7,503 MW |
| 2026-08-24T21:00Z | 7,013 MW |
| 2026-08-24T22:00Z | 6,560 MW |
| 2026-08-24T23:00Z | 6,209 MW |
| 2026-08-25T00:00Z | 5,957 MW |
| 2026-08-25T01:00Z | 5,772 MW |
| 2026-08-25T02:00Z | 5,679 MW |
| 2026-08-25T03:00Z | 5,810 MW |
| 2026-08-25T04:00Z | 6,075 MW |
| 2026-08-25T05:00Z | 6,670 MW |
| 2026-08-25T06:00Z | 7,241 MW |
| 2026-08-25T07:00Z | 7,702 MW |
| 2026-08-25T08:00Z | 8,035 MW |
| 2026-08-25T09:00Z | 8,390 MW |
| 2026-08-25T10:00Z | 8,763 MW |
| 2026-08-25T11:00Z | 8,951 MW |
| 2026-08-25T12:00Z | 8,941 MW |
| 2026-08-25T13:00Z | 8,851 MW |
| 2026-08-25T14:00Z | 8,779 MW |
| 2026-08-25T15:00Z | 8,795 MW |
| 2026-08-25T16:00Z | 8,672 MW |
| 2026-08-25T17:00Z | 8,556 MW |
| 2026-08-25T18:00Z | 8,471 MW |
| 2026-08-25T19:00Z | 8,021 MW |
| 2026-08-25T20:00Z | 7,530 MW |
| 2026-08-25T21:00Z | 7,036 MW |
| 2026-08-25T22:00Z | 6,592 MW |
| 2026-08-25T23:00Z | 6,222 MW |
| 2026-08-26T00:00Z | 5,956 MW |
| 2026-08-26T01:00Z | 5,795 MW |
| 2026-08-26T02:00Z | 5,760 MW |
| 2026-08-26T03:00Z | 5,888 MW |
| 2026-08-26T04:00Z | 6,150 MW |
| 2026-08-26T05:00Z | 6,744 MW |
| 2026-08-26T06:00Z | 7,311 MW |
| 2026-08-26T07:00Z | 7,787 MW |
| 2026-08-26T08:00Z | 8,115 MW |
| 2026-08-26T09:00Z | 8,488 MW |
| 2026-08-26T10:00Z | 8,843 MW |
| 2026-08-26T11:00Z | 9,022 MW |
| 2026-08-26T12:00Z | 8,987 MW |
| 2026-08-26T13:00Z | 8,869 MW |
| 2026-08-26T14:00Z | 8,787 MW |
| 2026-08-26T15:00Z | 8,729 MW |
| 2026-08-26T16:00Z | 8,557 MW |
| 2026-08-26T17:00Z | 8,465 MW |
| 2026-08-26T18:00Z | 8,470 MW |
| 2026-08-26T19:00Z | 8,079 MW |
| 2026-08-26T20:00Z | 7,624 MW |
| 2026-08-26T21:00Z | 7,100 MW |
| 2026-08-26T22:00Z | 6,606 MW |
| 2026-08-26T23:00Z | 6,250 MW |
| 2026-08-27T00:00Z | 6,011 MW |
| 2026-08-27T01:00Z | 5,835 MW |
| 2026-08-27T02:00Z | 5,745 MW |
| 2026-08-27T03:00Z | 5,885 MW |
| 2026-08-27T04:00Z | 6,166 MW |
| 2026-08-27T05:00Z | 6,749 MW |
| 2026-08-27T06:00Z | 7,317 MW |
| 2026-08-27T07:00Z | 7,704 MW |
| 2026-08-27T08:00Z | 8,000 MW |
| 2026-08-27T09:00Z | 8,343 MW |
| 2026-08-27T10:00Z | 8,712 MW |
| 2026-08-27T11:00Z | 8,899 MW |
| 2026-08-27T12:00Z | 8,874 MW |
| 2026-08-27T13:00Z | 8,773 MW |
| 2026-08-27T14:00Z | 8,758 MW |
| 2026-08-27T15:00Z | 8,744 MW |
| 2026-08-27T16:00Z | 8,592 MW |
| 2026-08-27T17:00Z | 8,468 MW |
| 2026-08-27T18:00Z | 8,344 MW |
| 2026-08-27T19:00Z | 7,904 MW |
| 2026-08-27T20:00Z | 7,517 MW |
| 2026-08-27T21:00Z | 7,039 MW |
| 2026-08-27T22:00Z | 6,511 MW |
| 2026-08-27T23:00Z | 6,135 MW |
| 2026-08-28T00:00Z | 5,985 MW |
| 2026-08-28T01:00Z | 5,858 MW |
| 2026-08-28T02:00Z | 5,795 MW |
| 2026-08-28T03:00Z | 5,909 MW |
| 2026-08-28T04:00Z | 6,108 MW |
| 2026-08-28T05:00Z | 6,655 MW |
| 2026-08-28T06:00Z | 7,224 MW |
| 2026-08-28T07:00Z | 7,707 MW |
| 2026-08-28T08:00Z | 8,086 MW |
| 2026-08-28T09:00Z | 8,445 MW |
| 2026-08-28T10:00Z | 8,818 MW |
| 2026-08-28T11:00Z | 8,956 MW |
| 2026-08-28T12:00Z | 8,918 MW |
| 2026-08-28T13:00Z | 8,781 MW |
| 2026-08-28T14:00Z | 8,666 MW |
| 2026-08-28T15:00Z | 8,578 MW |
| 2026-08-28T16:00Z | 8,337 MW |
| 2026-08-28T17:00Z | 8,204 MW |
| 2026-08-28T18:00Z | 7,925 MW |
| 2026-08-28T19:00Z | 7,441 MW |
| 2026-08-28T20:00Z | 7,065 MW |
| 2026-08-28T21:00Z | 6,705 MW |
| 2026-08-28T22:00Z | 6,342 MW |
| 2026-08-28T23:00Z | 6,029 MW |
| 2026-08-29T00:00Z | 5,794 MW |
| 2026-08-29T01:00Z | 5,618 MW |
| 2026-08-29T02:00Z | 5,508 MW |
| 2026-08-29T03:00Z | 5,537 MW |
| 2026-08-29T04:00Z | 5,535 MW |
| 2026-08-29T05:00Z | 5,750 MW |
| 2026-08-29T06:00Z | 6,063 MW |
| 2026-08-29T07:00Z | 6,294 MW |
| 2026-08-29T08:00Z | 6,499 MW |
| 2026-08-29T09:00Z | 6,705 MW |
| 2026-08-29T10:00Z | 6,954 MW |
| 2026-08-29T11:00Z | 7,084 MW |
| 2026-08-29T12:00Z | 7,051 MW |
| 2026-08-29T13:00Z | 7,039 MW |
| 2026-08-29T14:00Z | 7,049 MW |
| 2026-08-29T15:00Z | 7,026 MW |
| 2026-08-29T16:00Z | 6,965 MW |
| 2026-08-29T17:00Z | 7,008 MW |
| 2026-08-29T18:00Z | 6,934 MW |
| 2026-08-29T19:00Z | 6,619 MW |
| 2026-08-29T20:00Z | 6,298 MW |
| 2026-08-29T21:00Z | 5,958 MW |
| 2026-08-29T22:00Z | 5,643 MW |
| 2026-08-29T23:00Z | 5,416 MW |
| 2026-08-30T00:00Z | 5,231 MW |
| 2026-08-30T01:00Z | 5,089 MW |
| 2026-08-30T02:00Z | 4,999 MW |
| 2026-08-30T03:00Z | 5,015 MW |
| 2026-08-30T04:00Z | 4,941 MW |
| 2026-08-30T05:00Z | 5,115 MW |
| 2026-08-30T06:00Z | 5,407 MW |
| 2026-08-30T07:00Z | 5,648 MW |
| 2026-08-30T08:00Z | 5,952 MW |
| 2026-08-30T09:00Z | 6,238 MW |
| 2026-08-30T10:00Z | 6,501 MW |
| 2026-08-30T11:00Z | 6,582 MW |
| 2026-08-30T12:00Z | 6,573 MW |
| 2026-08-30T13:00Z | 6,584 MW |
| 2026-08-30T14:00Z | 6,683 MW |
| 2026-08-30T15:00Z | 6,771 MW |
| 2026-08-30T16:00Z | 6,779 MW |
| 2026-08-30T17:00Z | 6,863 MW |
| 2026-08-30T18:00Z | 6,947 MW |
| 2026-08-30T19:00Z | 6,721 MW |
| 2026-08-30T20:00Z | 6,410 MW |
| 2026-08-30T21:00Z | 5,968 MW |
| 2026-08-30T22:00Z | 5,623 MW |
| 2026-08-30T23:00Z | 5,350 MW |
| 2026-08-31T00:00Z | 5,170 MW |
| 2026-08-31T01:00Z | 5,060 MW |
| 2026-08-31T02:00Z | 5,041 MW |
| 2026-08-31T03:00Z | 5,286 MW |
| 2026-08-31T04:00Z | 5,623 MW |
| 2026-08-31T05:00Z | 6,232 MW |
| 2026-08-31T06:00Z | 6,803 MW |
| 2026-08-31T07:00Z | 7,182 MW |
| 2026-08-31T08:00Z | 7,458 MW |
| 2026-08-31T09:00Z | 7,725 MW |
| 2026-08-31T10:00Z | 8,028 MW |
| 2026-08-31T11:00Z | 8,168 MW |
| 2026-08-31T12:00Z | 8,079 MW |
| 2026-08-31T13:00Z | 7,973 MW |
| 2026-08-31T14:00Z | 7,847 MW |
| 2026-08-31T15:00Z | 7,819 MW |
| 2026-08-31T16:00Z | 7,731 MW |
| 2026-08-31T17:00Z | 7,762 MW |
| 2026-08-31T18:00Z | 7,655 MW |
| 2026-08-31T19:00Z | 7,225 MW |
| 2026-08-31T20:00Z | 6,649 MW |
| 2026-08-31T21:00Z | 6,229 MW |
| 2026-08-31T22:00Z | 5,895 MW |
| 2026-08-31T23:00Z | 5,633 MW |
| 2026-09-01T00:00Z | 5,436 MW |
| 2026-09-01T01:00Z | 5,295 MW |
| 2026-09-01T02:00Z | 5,283 MW |
| 2026-09-01T03:00Z | 5,469 MW |
| 2026-09-01T04:00Z | 5,767 MW |
| 2026-09-01T05:00Z | 6,410 MW |
| 2026-09-01T06:00Z | 6,951 MW |
| 2026-09-01T07:00Z | 7,358 MW |
| 2026-09-01T08:00Z | 7,674 MW |
| 2026-09-01T09:00Z | 7,964 MW |
| 2026-09-01T10:00Z | 8,247 MW |
| 2026-09-01T11:00Z | 8,435 MW |
| 2026-09-01T12:00Z | 8,358 MW |
| 2026-09-01T13:00Z | 8,241 MW |
| 2026-09-01T14:00Z | 8,237 MW |
| 2026-09-01T15:00Z | 8,246 MW |
| 2026-09-01T16:00Z | 8,084 MW |
| 2026-09-01T17:00Z | 8,084 MW |
| 2026-09-01T18:00Z | 7,948 MW |
| 2026-09-01T19:00Z | 7,460 MW |
| 2026-09-01T20:00Z | 7,009 MW |
| 2026-09-01T21:00Z | 6,549 MW |
| 2026-09-01T22:00Z | 6,116 MW |
| 2026-09-01T23:00Z | 5,810 MW |
| 2026-09-02T00:00Z | 5,628 MW |
| 2026-09-02T01:00Z | 5,479 MW |
| 2026-09-02T02:00Z | 5,403 MW |
| 2026-09-02T03:00Z | 5,617 MW |
| 2026-09-02T04:00Z | 5,897 MW |
| 2026-09-02T05:00Z | 6,552 MW |
| 2026-09-02T06:00Z | 7,159 MW |
| 2026-09-02T07:00Z | 7,543 MW |
| 2026-09-02T08:00Z | 7,830 MW |
| 2026-09-02T09:00Z | 8,041 MW |
| 2026-09-02T10:00Z | 8,355 MW |
| 2026-09-02T11:00Z | 8,485 MW |
| 2026-09-02T12:00Z | 8,428 MW |
| 2026-09-02T13:00Z | 8,257 MW |
| 2026-09-02T14:00Z | 8,170 MW |
| 2026-09-02T15:00Z | 8,123 MW |
| 2026-09-02T16:00Z | 7,949 MW |
| 2026-09-02T17:00Z | 7,982 MW |
| 2026-09-02T18:00Z | 7,857 MW |
| 2026-09-02T19:00Z | 7,356 MW |
| 2026-09-02T20:00Z | 6,938 MW |
| 2026-09-02T21:00Z | 6,442 MW |
| 2026-09-02T22:00Z | 5,997 MW |
| 2026-09-02T23:00Z | 5,716 MW |
| 2026-09-03T00:00Z | 5,500 MW |
| 2026-09-03T01:00Z | 5,401 MW |
| 2026-09-03T02:00Z | 5,393 MW |
| 2026-09-03T03:00Z | 5,569 MW |
| 2026-09-03T04:00Z | 5,867 MW |
| 2026-09-03T05:00Z | 6,415 MW |
| 2026-09-03T06:00Z | 6,933 MW |
| 2026-09-03T07:00Z | 7,323 MW |
| 2026-09-03T08:00Z | 7,599 MW |
| 2026-09-03T09:00Z | 7,851 MW |
| 2026-09-03T10:00Z | 8,159 MW |
| 2026-09-03T11:00Z | 8,284 MW |
| 2026-09-03T12:00Z | 8,159 MW |
| 2026-09-03T13:00Z | 8,001 MW |
| 2026-09-03T14:00Z | 7,908 MW |
| 2026-09-03T15:00Z | 7,757 MW |
| 2026-09-03T16:00Z | 7,620 MW |
| 2026-09-03T17:00Z | 7,642 MW |
| 2026-09-03T18:00Z | 7,383 MW |
| 2026-09-03T19:00Z | 6,905 MW |
| 2026-09-03T20:00Z | 6,497 MW |
| 2026-09-03T21:00Z | 6,042 MW |
| 2026-09-03T22:00Z | 5,708 MW |
| 2026-09-03T23:00Z | 5,409 MW |
| 2026-09-04T00:00Z | 5,222 MW |
| 2026-09-04T01:00Z | 5,126 MW |
| 2026-09-04T02:00Z | 5,140 MW |
| 2026-09-04T03:00Z | 5,348 MW |
| 2026-09-04T04:00Z | 5,633 MW |
| 2026-09-04T05:00Z | 6,196 MW |
| 2026-09-04T06:00Z | 6,724 MW |
| 2026-09-04T07:00Z | 7,022 MW |
| 2026-09-04T08:00Z | 7,240 MW |
| 2026-09-04T09:00Z | 7,406 MW |
| 2026-09-04T10:00Z | 7,632 MW |
| 2026-09-04T11:00Z | 7,673 MW |
| 2026-09-04T12:00Z | 7,580 MW |
| 2026-09-04T13:00Z | 7,466 MW |
| 2026-09-04T14:00Z | 7,423 MW |
| 2026-09-04T15:00Z | 7,475 MW |
| 2026-09-04T16:00Z | 7,436 MW |
| 2026-09-04T17:00Z | 7,452 MW |
| 2026-09-04T18:00Z | 7,212 MW |
| 2026-09-04T19:00Z | 6,710 MW |
| 2026-09-04T20:00Z | 6,326 MW |
| 2026-09-04T21:00Z | 5,922 MW |
| 2026-09-04T22:00Z | 5,619 MW |
| 2026-09-04T23:00Z | 5,364 MW |
| 2026-09-05T00:00Z | 5,166 MW |
| 2026-09-05T01:00Z | 5,047 MW |
| 2026-09-05T02:00Z | 4,977 MW |
| 2026-09-05T03:00Z | 5,055 MW |
| 2026-09-05T04:00Z | 5,120 MW |
| 2026-09-05T05:00Z | 5,427 MW |
| 2026-09-05T06:00Z | 5,755 MW |
| 2026-09-05T07:00Z | 6,041 MW |
| 2026-09-05T08:00Z | 6,243 MW |
| 2026-09-05T09:00Z | 6,484 MW |
| 2026-09-05T10:00Z | 6,739 MW |
| 2026-09-05T11:00Z | 6,806 MW |
| 2026-09-05T12:00Z | 6,722 MW |
| 2026-09-05T13:00Z | 6,705 MW |
| 2026-09-05T14:00Z | 6,794 MW |
| 2026-09-05T15:00Z | 6,873 MW |
| 2026-09-05T16:00Z | 6,870 MW |
| 2026-09-05T17:00Z | 6,902 MW |
| 2026-09-05T18:00Z | 6,708 MW |
| 2026-09-05T19:00Z | 6,315 MW |
| 2026-09-05T20:00Z | 5,961 MW |
| 2026-09-05T21:00Z | 5,601 MW |
| 2026-09-05T22:00Z | 5,322 MW |
| 2026-09-05T23:00Z | 5,064 MW |
| 2026-09-06T00:00Z | 4,882 MW |
| 2026-09-06T01:00Z | 4,748 MW |
| 2026-09-06T02:00Z | 4,664 MW |
| 2026-09-06T03:00Z | 4,675 MW |
| 2026-09-06T04:00Z | 4,637 MW |
| 2026-09-06T05:00Z | 4,819 MW |
| 2026-09-06T06:00Z | 5,061 MW |
| 2026-09-06T07:00Z | 5,331 MW |
| 2026-09-06T08:00Z | 5,665 MW |
| 2026-09-06T09:00Z | 6,032 MW |
| 2026-09-06T10:00Z | 6,354 MW |
| 2026-09-06T11:00Z | 6,481 MW |
| 2026-09-06T12:00Z | 6,489 MW |
| 2026-09-06T13:00Z | 6,537 MW |
| 2026-09-06T14:00Z | 6,692 MW |
| 2026-09-06T15:00Z | 6,920 MW |
| 2026-09-06T16:00Z | 6,946 MW |
| 2026-09-06T17:00Z | 7,019 MW |
| 2026-09-06T18:00Z | 7,032 MW |
| 2026-09-06T19:00Z | 6,772 MW |
| 2026-09-06T20:00Z | 6,386 MW |
| 2026-09-06T21:00Z | 5,921 MW |
| 2026-09-06T22:00Z | 5,476 MW |
| 2026-09-06T23:00Z | 5,204 MW |
| 2026-09-07T00:00Z | 5,006 MW |
| 2026-09-07T01:00Z | 4,874 MW |
| 2026-09-07T02:00Z | 4,897 MW |
| 2026-09-07T03:00Z | 5,211 MW |
| 2026-09-07T04:00Z | 5,649 MW |
| 2026-09-07T05:00Z | 6,283 MW |
| 2026-09-07T06:00Z | 6,948 MW |
| 2026-09-07T07:00Z | 7,457 MW |
| 2026-09-07T08:00Z | 7,829 MW |
| 2026-09-07T09:00Z | 8,159 MW |
| 2026-09-07T10:00Z | 8,338 MW |
| 2026-09-07T11:00Z | 8,348 MW |
| 2026-09-07T12:00Z | 8,183 MW |
| 2026-09-07T13:00Z | 7,977 MW |
| 2026-09-07T14:00Z | 7,757 MW |
| 2026-09-07T15:00Z | 7,572 MW |
| 2026-09-07T16:00Z | 7,351 MW |
| 2026-09-07T17:00Z | 7,432 MW |
| 2026-09-07T18:00Z | 7,088 MW |
| 2026-09-07T19:00Z | 6,618 MW |
| 2026-09-07T20:00Z | 6,209 MW |
| 2026-09-07T21:00Z | 5,793 MW |
| 2026-09-07T22:00Z | 5,423 MW |
| 2026-09-07T23:00Z | 5,203 MW |
| 2026-09-08T00:00Z | 5,087 MW |
| 2026-09-08T01:00Z | 4,971 MW |
| 2026-09-08T02:00Z | 4,975 MW |
| 2026-09-08T03:00Z | 5,226 MW |
| 2026-09-08T04:00Z | 5,589 MW |
| 2026-09-08T05:00Z | 6,092 MW |
| 2026-09-08T06:00Z | 6,615 MW |
| 2026-09-08T07:00Z | 7,098 MW |
| 2026-09-08T08:00Z | 7,422 MW |
| 2026-09-08T09:00Z | 7,820 MW |
| 2026-09-08T10:00Z | 7,891 MW |
| 2026-09-08T11:00Z | 7,858 MW |
| 2026-09-08T12:00Z | 7,685 MW |
| 2026-09-08T13:00Z | 7,491 MW |
| 2026-09-08T14:00Z | 7,334 MW |
| 2026-09-08T15:00Z | 7,256 MW |
| 2026-09-08T16:00Z | 7,074 MW |
| 2026-09-08T17:00Z | 7,187 MW |
| 2026-09-08T18:00Z | 6,795 MW |
| 2026-09-08T19:00Z | 6,281 MW |
| 2026-09-08T20:00Z | 5,861 MW |
| 2026-09-08T21:00Z | 5,452 MW |
| 2026-09-08T22:00Z | 5,160 MW |
| 2026-09-08T23:00Z | 4,989 MW |
| 2026-09-09T00:00Z | 4,851 MW |
| 2026-09-09T01:00Z | 4,779 MW |
| 2026-09-09T02:00Z | 4,814 MW |
| 2026-09-09T03:00Z | 5,088 MW |
| 2026-09-09T04:00Z | 5,461 MW |
| 2026-09-09T05:00Z | 5,965 MW |
| 2026-09-09T06:00Z | 6,514 MW |
| 2026-09-09T07:00Z | 6,963 MW |
| 2026-09-09T08:00Z | 7,271 MW |
| 2026-09-09T09:00Z | 7,589 MW |
| 2026-09-09T10:00Z | 7,764 MW |
| 2026-09-09T11:00Z | 7,705 MW |
| 2026-09-09T12:00Z | 7,496 MW |
| 2026-09-09T13:00Z | 7,321 MW |
| 2026-09-09T14:00Z | 7,157 MW |
| 2026-09-09T15:00Z | 7,124 MW |
| 2026-09-09T16:00Z | 6,996 MW |
| 2026-09-09T17:00Z | 7,215 MW |
| 2026-09-09T18:00Z | 7,093 MW |
| 2026-09-09T19:00Z | 6,589 MW |
| 2026-09-09T20:00Z | 6,187 MW |
| 2026-09-09T21:00Z | 5,769 MW |
| 2026-09-09T22:00Z | 5,450 MW |
| 2026-09-09T23:00Z | 5,248 MW |
| 2026-09-10T00:00Z | 5,072 MW |
| 2026-09-10T01:00Z | 4,985 MW |
| 2026-09-10T02:00Z | 5,049 MW |
| 2026-09-10T03:00Z | 5,332 MW |
| 2026-09-10T04:00Z | 5,686 MW |
| 2026-09-10T05:00Z | 6,184 MW |
| 2026-09-10T06:00Z | 6,418 MW |
| 2026-09-10T07:00Z | 6,842 MW |
| 2026-09-10T08:00Z | 7,300 MW |
| 2026-09-10T09:00Z | 7,792 MW |
| 2026-09-10T10:00Z | 7,858 MW |
| 2026-09-10T11:00Z | 7,816 MW |
| 2026-09-10T12:00Z | 7,601 MW |
| 2026-09-10T13:00Z | 7,420 MW |
| 2026-09-10T14:00Z | 7,296 MW |
| 2026-09-10T15:00Z | 7,302 MW |
| 2026-09-10T16:00Z | 7,202 MW |
| 2026-09-10T17:00Z | 7,366 MW |
| 2026-09-10T18:00Z | 6,984 MW |
| 2026-09-10T19:00Z | 6,459 MW |
| 2026-09-10T20:00Z | 6,042 MW |
| 2026-09-10T21:00Z | 5,606 MW |
| 2026-09-10T22:00Z | 5,249 MW |
| 2026-09-10T23:00Z | 5,019 MW |
| 2026-09-11T00:00Z | 4,818 MW |
| 2026-09-11T01:00Z | 4,761 MW |
| 2026-09-11T02:00Z | 4,817 MW |
| 2026-09-11T03:00Z | 5,063 MW |
| 2026-09-11T04:00Z | 5,452 MW |
| 2026-09-11T05:00Z | 5,917 MW |
| 2026-09-11T06:00Z | 6,388 MW |
| 2026-09-11T07:00Z | 6,917 MW |
| 2026-09-11T08:00Z | 7,367 MW |
| 2026-09-11T09:00Z | 7,769 MW |
| 2026-09-11T10:00Z | 8,031 MW |
| 2026-09-11T11:00Z | 8,002 MW |
| 2026-09-11T12:00Z | 7,820 MW |
| 2026-09-11T13:00Z | 7,636 MW |
| 2026-09-11T14:00Z | 7,505 MW |
| 2026-09-11T15:00Z | 7,423 MW |
| 2026-09-11T16:00Z | 7,259 MW |
| 2026-09-11T17:00Z | 7,348 MW |
| 2026-09-11T18:00Z | 6,925 MW |
| 2026-09-11T19:00Z | 6,429 MW |
| 2026-09-11T20:00Z | 6,035 MW |
| 2026-09-11T21:00Z | 5,683 MW |
| 2026-09-11T22:00Z | 5,366 MW |
| 2026-09-11T23:00Z | 5,123 MW |
| 2026-09-12T00:00Z | 4,902 MW |
| 2026-09-12T01:00Z | 4,820 MW |
| 2026-09-12T02:00Z | 4,786 MW |
| 2026-09-12T03:00Z | 4,865 MW |
| 2026-09-12T04:00Z | 4,983 MW |
| 2026-09-12T05:00Z | 5,302 MW |
| 2026-09-12T06:00Z | 5,661 MW |
| 2026-09-12T07:00Z | 5,975 MW |
| 2026-09-12T08:00Z | 6,264 MW |
| 2026-09-12T09:00Z | 6,518 MW |
| 2026-09-12T10:00Z | 6,776 MW |
| 2026-09-12T11:00Z | 6,817 MW |
| 2026-09-12T12:00Z | 6,732 MW |
| 2026-09-12T13:00Z | 6,661 MW |
| 2026-09-12T14:00Z | 6,678 MW |
| 2026-09-12T15:00Z | 6,623 MW |
| 2026-09-12T16:00Z | 6,505 MW |
| 2026-09-12T17:00Z | 6,615 MW |
| 2026-09-12T18:00Z | 6,373 MW |
| 2026-09-12T19:00Z | 6,013 MW |
| 2026-09-12T20:00Z | 5,652 MW |
| 2026-09-12T21:00Z | 5,327 MW |
| 2026-09-12T22:00Z | 5,052 MW |
| 2026-09-12T23:00Z | 4,868 MW |
| 2026-09-13T00:00Z | 4,725 MW |
| 2026-09-13T01:00Z | 4,595 MW |
| 2026-09-13T02:00Z | 4,534 MW |
| 2026-09-13T03:00Z | 4,528 MW |
| 2026-09-13T04:00Z | 4,479 MW |
| 2026-09-13T05:00Z | 4,602 MW |
| 2026-09-13T06:00Z | 4,840 MW |
| 2026-09-13T07:00Z | 5,104 MW |
| 2026-09-13T08:00Z | 5,386 MW |
| 2026-09-13T09:00Z | 5,645 MW |
| 2026-09-13T10:00Z | 5,803 MW |
| 2026-09-13T11:00Z | 5,724 MW |
| 2026-09-13T12:00Z | 5,545 MW |
| 2026-09-13T13:00Z | 5,452 MW |
| 2026-09-13T14:00Z | 5,436 MW |
| 2026-09-13T15:00Z | 5,597 MW |
| 2026-09-13T16:00Z | 5,767 MW |
| 2026-09-13T17:00Z | 6,065 MW |
| 2026-09-13T18:00Z | 5,984 MW |
| 2026-09-13T19:00Z | 5,724 MW |
| 2026-09-13T20:00Z | 5,380 MW |
| 2026-09-13T21:00Z | 4,949 MW |
| 2026-09-13T22:00Z | 4,646 MW |
| 2026-09-13T23:00Z | 4,500 MW |
| 2026-09-14T00:00Z | 4,332 MW |
| 2026-09-14T01:00Z | 4,281 MW |
| 2026-09-14T02:00Z | 4,364 MW |
| 2026-09-14T03:00Z | 4,737 MW |
| 2026-09-14T04:00Z | 5,208 MW |
| 2026-09-14T05:00Z | 5,583 MW |
| 2026-09-14T06:00Z | 6,013 MW |
| 2026-09-14T07:00Z | 6,398 MW |
| 2026-09-14T08:00Z | 6,637 MW |
| 2026-09-14T09:00Z | 6,898 MW |
| 2026-09-14T10:00Z | 7,032 MW |
| 2026-09-14T11:00Z | 6,888 MW |
| 2026-09-14T12:00Z | 6,639 MW |
| 2026-09-14T13:00Z | 6,479 MW |
| 2026-09-14T14:00Z | 6,426 MW |
| 2026-09-14T15:00Z | 6,420 MW |
| 2026-09-14T16:00Z | 6,446 MW |
| 2026-09-14T17:00Z | 6,656 MW |
| 2026-09-14T18:00Z | 6,320 MW |
| 2026-09-14T19:00Z | 5,828 MW |
| 2026-09-14T20:00Z | 5,470 MW |
| 2026-09-14T21:00Z | 5,120 MW |
| 2026-09-14T22:00Z | 4,877 MW |
| 2026-09-14T23:00Z | 4,708 MW |
| 2026-09-15T00:00Z | 4,652 MW |
| 2026-09-15T01:00Z | 4,574 MW |
| 2026-09-15T02:00Z | 4,639 MW |
| 2026-09-15T03:00Z | 4,875 MW |
| 2026-09-15T04:00Z | 5,364 MW |
| 2026-09-15T05:00Z | 6,020 MW |
| 2026-09-15T06:00Z | 6,967 MW |
| 2026-09-15T07:00Z | 6,980 MW |
| 2026-09-15T08:00Z | 6,726 MW |
| 2026-09-15T09:00Z | 6,775 MW |
| 2026-09-15T10:00Z | 7,017 MW |
| 2026-09-15T11:00Z | 7,121 MW |
| 2026-09-15T12:00Z | 6,843 MW |
| 2026-09-15T13:00Z | 6,553 MW |
| 2026-09-15T14:00Z | 6,267 MW |
| 2026-09-15T15:00Z | 6,096 MW |
| 2026-09-15T16:00Z | 6,151 MW |
| 2026-09-15T17:00Z | 6,311 MW |
| 2026-09-15T18:00Z | 5,900 MW |
| 2026-09-15T19:00Z | 5,385 MW |
| 2026-09-15T20:00Z | 5,085 MW |
| 2026-09-15T21:00Z | 4,746 MW |
| 2026-09-15T22:00Z | 4,550 MW |
| 2026-09-15T23:00Z | 4,432 MW |
| 2026-09-16T00:00Z | 4,347 MW |
| 2026-09-16T01:00Z | 4,319 MW |
| 2026-09-16T02:00Z | 4,456 MW |
| 2026-09-16T03:00Z | 4,783 MW |
| 2026-09-16T04:00Z | 5,246 MW |
| 2026-09-16T05:00Z | 5,732 MW |
| 2026-09-16T06:00Z | 6,098 MW |
| 2026-09-16T07:00Z | 6,320 MW |
| 2026-09-16T08:00Z | 6,514 MW |
| 2026-09-16T09:00Z | 6,804 MW |
| 2026-09-16T10:00Z | 6,842 MW |
| 2026-09-16T11:00Z | 6,601 MW |
| 2026-09-16T12:00Z | 6,282 MW |
| 2026-09-16T13:00Z | 6,066 MW |
| 2026-09-16T14:00Z | 5,903 MW |
| 2026-09-16T15:00Z | 5,898 MW |
| 2026-09-16T16:00Z | 6,087 MW |
| 2026-09-16T17:00Z | 6,305 MW |
| 2026-09-16T18:00Z | 5,928 MW |
| 2026-09-16T19:00Z | 5,412 MW |
| 2026-09-16T20:00Z | 5,111 MW |
| 2026-09-16T21:00Z | 4,749 MW |
| 2026-09-16T22:00Z | 4,506 MW |
| 2026-09-16T23:00Z | 4,368 MW |
| 2026-09-17T00:00Z | 4,288 MW |
| 2026-09-17T01:00Z | 4,302 MW |
| 2026-09-17T02:00Z | 4,380 MW |
| 2026-09-17T03:00Z | 4,746 MW |
| 2026-09-17T04:00Z | 5,140 MW |
| 2026-09-17T05:00Z | 5,462 MW |
| 2026-09-17T06:00Z | 5,878 MW |
| 2026-09-17T07:00Z | 6,348 MW |
| 2026-09-17T08:00Z | 7,024 MW |
| 2026-09-17T09:00Z | 7,316 MW |
| 2026-09-17T10:00Z | 7,302 MW |
| 2026-09-17T11:00Z | 7,115 MW |
| 2026-09-17T12:00Z | 6,755 MW |
| 2026-09-17T13:00Z | 6,207 MW |
| 2026-09-17T14:00Z | 6,068 MW |
| 2026-09-17T15:00Z | 6,192 MW |
| 2026-09-17T16:00Z | 6,355 MW |
| 2026-09-17T17:00Z | 6,534 MW |
| 2026-09-17T18:00Z | 6,114 MW |
| 2026-09-17T19:00Z | 5,616 MW |
| 2026-09-17T20:00Z | 5,282 MW |
| 2026-09-17T21:00Z | 4,892 MW |
| 2026-09-17T22:00Z | 4,666 MW |
| 2026-09-17T23:00Z | 4,500 MW |
| 2026-09-18T00:00Z | 4,444 MW |
| 2026-09-18T01:00Z | 4,412 MW |
| 2026-09-18T02:00Z | 4,548 MW |
| 2026-09-18T03:00Z | 4,888 MW |
| 2026-09-18T04:00Z | 5,276 MW |
| 2026-09-18T05:00Z | 5,613 MW |
| 2026-09-18T06:00Z | 5,930 MW |
| 2026-09-18T07:00Z | 6,273 MW |
| 2026-09-18T08:00Z | 6,520 MW |
| 2026-09-18T09:00Z | 6,735 MW |
| 2026-09-18T10:00Z | 6,842 MW |
| 2026-09-18T11:00Z | 6,707 MW |
| 2026-09-18T12:00Z | 6,404 MW |
| 2026-09-18T13:00Z | 6,209 MW |
| 2026-09-18T14:00Z | 6,185 MW |
| 2026-09-18T15:00Z | 6,320 MW |
| 2026-09-18T16:00Z | 6,418 MW |
| 2026-09-18T17:00Z | 6,528 MW |
| 2026-09-18T18:00Z | 6,089 MW |
| 2026-09-18T19:00Z | 5,613 MW |
| 2026-09-18T20:00Z | 5,246 MW |
| 2026-09-18T21:00Z | 4,904 MW |
| 2026-09-18T22:00Z | 4,658 MW |
| 2026-09-18T23:00Z | 4,523 MW |
| 2026-09-19T00:00Z | 4,406 MW |
| 2026-09-19T01:00Z | 4,369 MW |
| 2026-09-19T02:00Z | 4,374 MW |
| 2026-09-19T03:00Z | 4,550 MW |
| 2026-09-19T04:00Z | 4,642 MW |
| 2026-09-19T05:00Z | 4,899 MW |
| 2026-09-19T06:00Z | 5,327 MW |
| 2026-09-19T07:00Z | 5,822 MW |
| 2026-09-19T08:00Z | 6,290 MW |
| 2026-09-19T09:00Z | 6,664 MW |
| 2026-09-19T10:00Z | 6,581 MW |
| 2026-09-19T11:00Z | 6,447 MW |
| 2026-09-19T12:00Z | 5,982 MW |
| 2026-09-19T13:00Z | 5,728 MW |
| 2026-09-19T14:00Z | 5,839 MW |
| 2026-09-19T15:00Z | 5,928 MW |
| 2026-09-19T16:00Z | 6,002 MW |
| Hour starting (UTC) | Gas | Solar | Wind | Hydro | Coal |
|---|---|---|---|---|---|
| 2026-08-21T21:00Z | 3,703 MW | 0 MW | 534 MW | 938 MW | 521 MW |
| 2026-08-21T22:00Z | 3,767 MW | 0 MW | 583 MW | 398 MW | 546 MW |
| 2026-08-21T23:00Z | 3,484 MW | 0 MW | 650 MW | 388 MW | 558 MW |
| 2026-08-22T00:00Z | 3,285 MW | 0 MW | 686 MW | 243 MW | 539 MW |
| 2026-08-22T01:00Z | 3,078 MW | 0 MW | 725 MW | 220 MW | 512 MW |
| 2026-08-22T02:00Z | 3,043 MW | 0 MW | 809 MW | 284 MW | 508 MW |
| 2026-08-22T03:00Z | 3,162 MW | 4 MW | 729 MW | 461 MW | 524 MW |
| 2026-08-22T04:00Z | 3,221 MW | 419 MW | 583 MW | 468 MW | 556 MW |
| 2026-08-22T05:00Z | 2,962 MW | 1,992 MW | 392 MW | 353 MW | 491 MW |
| 2026-08-22T06:00Z | 1,980 MW | 4,018 MW | 228 MW | 239 MW | 305 MW |
| 2026-08-22T07:00Z | 1,182 MW | 5,580 MW | 177 MW | 142 MW | 299 MW |
| 2026-08-22T08:00Z | 946 MW | 5,865 MW | 121 MW | 153 MW | 299 MW |
| 2026-08-22T09:00Z | 946 MW | 6,549 MW | 143 MW | 169 MW | 313 MW |
| 2026-08-22T10:00Z | 1,010 MW | 7,290 MW | 238 MW | 236 MW | 375 MW |
| 2026-08-22T11:00Z | 960 MW | 7,083 MW | 329 MW | 130 MW | 357 MW |
| 2026-08-22T12:00Z | 1,089 MW | 6,427 MW | 424 MW | 103 MW | 394 MW |
| 2026-08-22T13:00Z | 1,495 MW | 5,184 MW | 505 MW | 156 MW | 394 MW |
| 2026-08-22T14:00Z | 2,189 MW | 3,738 MW | 490 MW | 271 MW | 322 MW |
| 2026-08-22T15:00Z | 3,364 MW | 1,953 MW | 477 MW | 570 MW | 389 MW |
| 2026-08-22T16:00Z | 3,695 MW | 467 MW | 549 MW | 1,336 MW | 553 MW |
| 2026-08-22T17:00Z | 3,767 MW | 11 MW | 637 MW | 1,427 MW | 560 MW |
| 2026-08-22T18:00Z | 3,883 MW | 0 MW | 672 MW | 1,618 MW | 562 MW |
| 2026-08-22T19:00Z | 3,967 MW | 0 MW | 556 MW | 1,531 MW | 564 MW |
| 2026-08-22T20:00Z | n/a | 0 MW | 464 MW | n/a | n/a |
| 2026-08-22T21:00Z | 3,847 MW | 0 MW | 395 MW | 1,456 MW | 565 MW |
| 2026-08-22T22:00Z | 4,272 MW | 0 MW | 348 MW | 718 MW | 533 MW |
| 2026-08-22T23:00Z | 3,981 MW | 0 MW | 382 MW | 185 MW | 476 MW |
| 2026-08-23T00:00Z | 3,691 MW | 0 MW | 403 MW | 167 MW | 436 MW |
| 2026-08-23T01:00Z | 3,401 MW | 0 MW | 525 MW | 143 MW | 391 MW |
| 2026-08-23T02:00Z | 2,966 MW | 0 MW | 675 MW | 266 MW | 451 MW |
| 2026-08-23T03:00Z | 2,924 MW | 0 MW | 721 MW | 328 MW | 491 MW |
| 2026-08-23T04:00Z | 2,648 MW | 393 MW | 813 MW | 320 MW | 495 MW |
| 2026-08-23T05:00Z | 1,869 MW | 1,848 MW | 774 MW | 205 MW | 501 MW |
| 2026-08-23T06:00Z | 1,265 MW | 3,753 MW | 665 MW | 201 MW | 366 MW |
| 2026-08-23T07:00Z | 1,137 MW | 5,349 MW | 652 MW | 141 MW | 303 MW |
| 2026-08-23T08:00Z | 654 MW | 5,984 MW | 562 MW | 155 MW | 303 MW |
| 2026-08-23T09:00Z | 650 MW | 6,673 MW | 581 MW | 118 MW | 300 MW |
| 2026-08-23T10:00Z | 649 MW | 6,566 MW | 502 MW | 153 MW | 301 MW |
| 2026-08-23T11:00Z | 652 MW | 6,219 MW | 490 MW | 193 MW | 299 MW |
| 2026-08-23T12:00Z | 775 MW | 5,758 MW | 496 MW | 171 MW | 359 MW |
| 2026-08-23T13:00Z | 1,099 MW | 4,808 MW | 733 MW | 199 MW | 321 MW |
| 2026-08-23T14:00Z | 1,724 MW | 2,813 MW | 811 MW | 336 MW | 491 MW |
| 2026-08-23T15:00Z | 2,380 MW | 1,274 MW | 773 MW | 748 MW | 570 MW |
| 2026-08-23T16:00Z | 3,006 MW | 363 MW | 865 MW | 1,208 MW | 493 MW |
| 2026-08-23T17:00Z | 3,471 MW | 6 MW | 839 MW | 1,371 MW | 424 MW |
| 2026-08-23T18:00Z | 3,754 MW | 0 MW | 759 MW | 1,500 MW | 563 MW |
| 2026-08-23T19:00Z | 3,908 MW | 0 MW | 686 MW | 1,557 MW | 566 MW |
| 2026-08-23T20:00Z | n/a | 0 MW | 762 MW | n/a | n/a |
| 2026-08-23T21:00Z | 3,767 MW | 0 MW | 905 MW | 1,314 MW | 558 MW |
| 2026-08-23T22:00Z | 3,967 MW | 0 MW | 963 MW | 401 MW | 561 MW |
| 2026-08-23T23:00Z | 3,993 MW | 0 MW | 1,025 MW | 70 MW | 546 MW |
| 2026-08-24T00:00Z | 3,933 MW | 0 MW | 1,202 MW | 49 MW | 533 MW |
| 2026-08-24T01:00Z | 3,809 MW | 0 MW | 1,361 MW | 51 MW | 505 MW |
| 2026-08-24T02:00Z | 3,936 MW | 0 MW | 1,446 MW | 177 MW | 543 MW |
| 2026-08-24T03:00Z | 3,798 MW | 3 MW | 1,652 MW | 598 MW | 511 MW |
| 2026-08-24T04:00Z | 3,538 MW | 371 MW | 1,901 MW | 1,056 MW | 346 MW |
| 2026-08-24T05:00Z | 3,533 MW | 1,802 MW | 1,947 MW | 908 MW | 319 MW |
| 2026-08-24T06:00Z | 2,832 MW | 3,760 MW | 1,968 MW | 456 MW | 327 MW |
| 2026-08-24T07:00Z | 1,324 MW | 5,356 MW | 2,112 MW | 120 MW | 300 MW |
| 2026-08-24T08:00Z | 826 MW | 6,355 MW | 2,130 MW | 76 MW | 302 MW |
| 2026-08-24T09:00Z | 813 MW | 6,836 MW | 2,151 MW | 70 MW | 304 MW |
| 2026-08-24T10:00Z | 821 MW | 7,188 MW | 2,200 MW | 130 MW | 302 MW |
| 2026-08-24T11:00Z | 766 MW | 7,020 MW | 2,114 MW | 162 MW | 306 MW |
| 2026-08-24T12:00Z | 1,018 MW | 6,176 MW | 1,937 MW | 183 MW | 325 MW |
| 2026-08-24T13:00Z | 1,321 MW | 4,507 MW | 1,824 MW | 418 MW | 430 MW |
| 2026-08-24T14:00Z | 2,024 MW | 2,972 MW | 1,718 MW | 1,022 MW | 553 MW |
| 2026-08-24T15:00Z | 3,072 MW | 1,513 MW | 1,594 MW | 1,489 MW | 559 MW |
| 2026-08-24T16:00Z | 3,620 MW | 420 MW | 1,569 MW | 1,492 MW | 561 MW |
| 2026-08-24T17:00Z | 3,839 MW | 11 MW | 1,401 MW | 1,536 MW | 562 MW |
| 2026-08-24T18:00Z | 3,919 MW | 0 MW | 1,260 MW | 1,519 MW | 564 MW |
| 2026-08-24T19:00Z | 3,882 MW | 0 MW | 1,182 MW | 1,535 MW | 565 MW |
| 2026-08-24T20:00Z | n/a | 0 MW | 1,149 MW | n/a | n/a |
| 2026-08-24T21:00Z | 3,967 MW | 0 MW | 1,030 MW | 1,020 MW | 566 MW |
| 2026-08-24T22:00Z | 4,028 MW | 0 MW | 989 MW | 680 MW | 523 MW |
| 2026-08-24T23:00Z | 3,721 MW | 0 MW | 981 MW | 695 MW | 521 MW |
| 2026-08-25T00:00Z | 3,539 MW | 0 MW | 1,036 MW | 388 MW | 512 MW |
| 2026-08-25T01:00Z | 3,536 MW | 0 MW | 1,202 MW | 234 MW | 442 MW |
| 2026-08-25T02:00Z | 3,545 MW | 0 MW | 1,257 MW | 309 MW | 459 MW |
| 2026-08-25T03:00Z | 3,598 MW | 0 MW | 1,254 MW | 380 MW | 477 MW |
| 2026-08-25T04:00Z | 3,324 MW | 392 MW | 1,158 MW | 714 MW | 566 MW |
| 2026-08-25T05:00Z | 3,374 MW | 1,974 MW | 1,009 MW | 704 MW | 511 MW |
| 2026-08-25T06:00Z | 3,025 MW | 4,037 MW | 825 MW | 442 MW | 310 MW |
| 2026-08-25T07:00Z | 2,284 MW | 5,605 MW | 719 MW | 126 MW | 302 MW |
| 2026-08-25T08:00Z | 1,777 MW | 6,664 MW | 693 MW | 60 MW | 302 MW |
| 2026-08-25T09:00Z | 1,842 MW | 7,191 MW | 678 MW | 43 MW | 302 MW |
| 2026-08-25T10:00Z | 1,906 MW | 7,306 MW | 667 MW | 41 MW | 302 MW |
| 2026-08-25T11:00Z | 2,148 MW | 7,097 MW | 617 MW | 55 MW | 302 MW |
| 2026-08-25T12:00Z | 2,110 MW | 6,518 MW | 669 MW | 112 MW | 306 MW |
| 2026-08-25T13:00Z | 2,368 MW | 5,471 MW | 709 MW | 297 MW | 318 MW |
| 2026-08-25T14:00Z | 2,982 MW | 3,907 MW | 746 MW | 420 MW | 323 MW |
| 2026-08-25T15:00Z | 3,803 MW | 1,923 MW | 688 MW | 881 MW | 424 MW |
| 2026-08-25T16:00Z | 4,177 MW | 397 MW | 537 MW | 1,145 MW | 460 MW |
| 2026-08-25T17:00Z | 4,245 MW | 0 MW | 546 MW | 1,184 MW | 343 MW |
| 2026-08-25T18:00Z | 4,291 MW | 0 MW | 595 MW | 1,227 MW | 324 MW |
| 2026-08-25T19:00Z | 3,876 MW | 0 MW | 669 MW | 1,007 MW | 309 MW |
| 2026-08-25T20:00Z | n/a | 0 MW | 708 MW | n/a | n/a |
| 2026-08-25T21:00Z | 3,917 MW | 0 MW | 653 MW | 951 MW | 338 MW |
| 2026-08-25T22:00Z | 3,843 MW | 0 MW | 731 MW | 45 MW | 391 MW |
| 2026-08-25T23:00Z | 3,920 MW | 0 MW | 814 MW | 41 MW | 384 MW |
| 2026-08-26T00:00Z | 3,769 MW | 0 MW | 813 MW | 40 MW | 317 MW |
| 2026-08-26T01:00Z | 3,809 MW | 0 MW | 793 MW | 45 MW | 306 MW |
| 2026-08-26T02:00Z | 3,787 MW | 0 MW | 803 MW | 165 MW | 302 MW |
| 2026-08-26T03:00Z | 3,944 MW | 0 MW | 796 MW | 421 MW | 376 MW |
| 2026-08-26T04:00Z | 3,768 MW | 377 MW | 801 MW | 414 MW | 320 MW |
| 2026-08-26T05:00Z | 3,594 MW | 1,949 MW | 665 MW | 467 MW | 314 MW |
| 2026-08-26T06:00Z | 3,696 MW | 4,002 MW | 487 MW | 426 MW | 394 MW |
| 2026-08-26T07:00Z | 3,252 MW | 5,589 MW | 529 MW | 123 MW | 333 MW |
| 2026-08-26T08:00Z | 2,731 MW | 6,608 MW | 609 MW | 62 MW | 319 MW |
| 2026-08-26T09:00Z | 2,711 MW | 7,129 MW | 619 MW | 41 MW | 325 MW |
| 2026-08-26T10:00Z | 2,958 MW | 7,275 MW | 616 MW | 41 MW | 322 MW |
| 2026-08-26T11:00Z | 2,781 MW | 7,112 MW | 675 MW | 42 MW | 303 MW |
| 2026-08-26T12:00Z | 2,749 MW | 6,509 MW | 764 MW | 174 MW | 303 MW |
| 2026-08-26T13:00Z | 3,129 MW | 5,362 MW | 877 MW | 348 MW | 339 MW |
| 2026-08-26T14:00Z | 3,690 MW | 3,912 MW | 863 MW | 360 MW | 348 MW |
| 2026-08-26T15:00Z | 4,374 MW | 1,989 MW | 840 MW | 797 MW | 352 MW |
| 2026-08-26T16:00Z | 4,396 MW | 418 MW | 811 MW | 1,163 MW | 378 MW |
| 2026-08-26T17:00Z | 4,453 MW | 4 MW | 830 MW | 1,295 MW | 400 MW |
| 2026-08-26T18:00Z | 4,473 MW | 0 MW | 653 MW | 1,564 MW | 601 MW |
| 2026-08-26T19:00Z | 4,453 MW | 0 MW | 561 MW | 1,557 MW | 598 MW |
| 2026-08-26T20:00Z | n/a | 0 MW | 683 MW | n/a | n/a |
| 2026-08-26T21:00Z | 4,524 MW | 0 MW | 841 MW | 1,055 MW | 510 MW |
| 2026-08-26T22:00Z | 4,227 MW | 0 MW | 991 MW | 766 MW | 541 MW |
| 2026-08-26T23:00Z | 4,332 MW | 0 MW | 1,192 MW | 270 MW | 511 MW |
| 2026-08-27T00:00Z | 4,236 MW | 0 MW | 1,385 MW | 42 MW | 444 MW |
| 2026-08-27T01:00Z | 4,196 MW | 0 MW | 1,575 MW | 64 MW | 324 MW |
| 2026-08-27T02:00Z | 4,227 MW | 0 MW | 1,612 MW | 211 MW | 312 MW |
| 2026-08-27T03:00Z | 4,223 MW | 0 MW | 1,670 MW | 433 MW | 334 MW |
| 2026-08-27T04:00Z | 4,142 MW | 374 MW | 1,702 MW | 530 MW | 467 MW |
| 2026-08-27T05:00Z | 4,090 MW | 1,808 MW | 1,574 MW | 565 MW | 520 MW |
| 2026-08-27T06:00Z | 3,753 MW | 3,743 MW | 1,333 MW | 261 MW | 433 MW |
| 2026-08-27T07:00Z | 2,401 MW | 5,375 MW | 1,342 MW | 75 MW | 325 MW |
| 2026-08-27T08:00Z | 1,639 MW | 6,474 MW | 1,416 MW | 52 MW | 302 MW |
| 2026-08-27T09:00Z | 1,697 MW | 7,008 MW | 1,308 MW | 53 MW | 325 MW |
| 2026-08-27T10:00Z | 2,200 MW | 7,126 MW | 1,084 MW | 61 MW | 367 MW |
| 2026-08-27T11:00Z | 2,380 MW | 7,038 MW | 964 MW | 62 MW | 357 MW |
| 2026-08-27T12:00Z | 2,309 MW | 6,462 MW | 878 MW | 62 MW | 331 MW |
| 2026-08-27T13:00Z | 2,452 MW | 5,454 MW | 944 MW | 67 MW | 313 MW |
| 2026-08-27T14:00Z | 3,660 MW | 3,919 MW | 913 MW | 393 MW | 349 MW |
| 2026-08-27T15:00Z | 4,460 MW | 1,948 MW | 831 MW | 1,131 MW | 390 MW |
| 2026-08-27T16:00Z | 4,552 MW | 395 MW | 776 MW | 1,666 MW | 586 MW |
| 2026-08-27T17:00Z | 4,534 MW | 0 MW | 664 MW | 1,397 MW | 604 MW |
| 2026-08-27T18:00Z | 4,417 MW | 0 MW | 670 MW | 1,246 MW | 554 MW |
| 2026-08-27T19:00Z | 4,633 MW | 0 MW | 575 MW | 1,105 MW | 507 MW |
| 2026-08-27T20:00Z | n/a | 0 MW | 540 MW | n/a | n/a |
| 2026-08-27T21:00Z | 4,500 MW | 0 MW | 463 MW | 1,186 MW | 566 MW |
| 2026-08-27T22:00Z | 4,355 MW | 0 MW | 409 MW | 396 MW | 557 MW |
| 2026-08-27T23:00Z | 4,295 MW | 0 MW | 412 MW | 142 MW | 553 MW |
| 2026-08-28T00:00Z | 4,264 MW | 0 MW | 514 MW | 68 MW | 483 MW |
| 2026-08-28T01:00Z | 4,301 MW | 0 MW | 526 MW | 80 MW | 357 MW |
| 2026-08-28T02:00Z | 4,305 MW | 0 MW | 522 MW | 212 MW | 415 MW |
| 2026-08-28T03:00Z | 4,251 MW | 0 MW | 482 MW | 410 MW | 458 MW |
| 2026-08-28T04:00Z | 4,200 MW | 348 MW | 564 MW | 629 MW | 442 MW |
| 2026-08-28T05:00Z | 4,211 MW | 1,689 MW | 490 MW | 647 MW | 392 MW |
| 2026-08-28T06:00Z | 3,981 MW | 3,557 MW | 405 MW | 587 MW | 384 MW |
| 2026-08-28T07:00Z | 2,708 MW | 5,169 MW | 402 MW | 96 MW | 384 MW |
| 2026-08-28T08:00Z | 2,122 MW | 6,295 MW | 432 MW | 103 MW | 379 MW |
| 2026-08-28T09:00Z | 1,625 MW | 6,866 MW | 561 MW | 82 MW | 401 MW |
| 2026-08-28T10:00Z | 1,607 MW | 6,979 MW | 717 MW | 97 MW | 442 MW |
| 2026-08-28T11:00Z | 1,326 MW | 6,711 MW | 950 MW | 89 MW | 355 MW |
| 2026-08-28T12:00Z | 1,318 MW | 6,036 MW | 1,100 MW | 82 MW | 346 MW |
| 2026-08-28T13:00Z | 1,529 MW | 5,012 MW | 1,314 MW | 208 MW | 317 MW |
| 2026-08-28T14:00Z | 2,625 MW | 3,428 MW | 1,410 MW | 429 MW | 309 MW |
| 2026-08-28T15:00Z | 3,722 MW | 1,621 MW | 1,222 MW | 862 MW | 318 MW |
| 2026-08-28T16:00Z | 4,090 MW | 348 MW | 1,186 MW | 1,163 MW | 309 MW |
| 2026-08-28T17:00Z | 4,250 MW | 0 MW | 1,189 MW | 1,362 MW | 345 MW |
| 2026-08-28T18:00Z | 4,387 MW | 0 MW | 1,172 MW | 1,357 MW | 375 MW |
| 2026-08-28T19:00Z | 3,981 MW | 0 MW | 1,249 MW | 1,174 MW | 309 MW |
| 2026-08-28T20:00Z | n/a | 0 MW | 1,383 MW | n/a | n/a |
| 2026-08-28T21:00Z | 4,036 MW | 0 MW | 1,546 MW | 573 MW | 316 MW |
| 2026-08-28T22:00Z | 3,928 MW | 0 MW | 1,606 MW | 657 MW | 461 MW |
| 2026-08-28T23:00Z | 3,682 MW | 0 MW | 1,666 MW | 236 MW | 519 MW |
| 2026-08-29T00:00Z | 3,089 MW | 0 MW | 1,731 MW | 138 MW | 509 MW |
| 2026-08-29T01:00Z | 2,586 MW | 0 MW | 1,844 MW | 206 MW | 499 MW |
| 2026-08-29T02:00Z | 2,422 MW | 0 MW | 1,894 MW | 145 MW | 498 MW |
| 2026-08-29T03:00Z | 2,443 MW | 0 MW | 1,815 MW | 224 MW | 501 MW |
| 2026-08-29T04:00Z | 2,737 MW | 294 MW | 1,689 MW | 270 MW | 449 MW |
| 2026-08-29T05:00Z | 2,603 MW | 1,399 MW | 1,455 MW | 282 MW | 495 MW |
| 2026-08-29T06:00Z | 1,572 MW | 2,977 MW | 1,245 MW | 270 MW | 478 MW |
| 2026-08-29T07:00Z | 1,261 MW | 4,486 MW | 1,146 MW | 224 MW | 468 MW |
| 2026-08-29T08:00Z | 646 MW | 5,705 MW | 1,034 MW | 94 MW | 308 MW |
| 2026-08-29T09:00Z | 644 MW | 6,174 MW | 870 MW | 82 MW | 302 MW |
| 2026-08-29T10:00Z | 649 MW | 6,683 MW | 878 MW | 139 MW | 302 MW |
| 2026-08-29T11:00Z | 645 MW | 6,798 MW | 796 MW | 113 MW | 300 MW |
| 2026-08-29T12:00Z | 693 MW | 6,181 MW | 701 MW | 83 MW | 362 MW |
| 2026-08-29T13:00Z | 948 MW | 5,093 MW | 784 MW | 133 MW | 320 MW |
| 2026-08-29T14:00Z | 2,125 MW | 2,984 MW | 831 MW | 288 MW | 409 MW |
| 2026-08-29T15:00Z | 3,248 MW | 1,421 MW | 774 MW | 704 MW | 535 MW |
| 2026-08-29T16:00Z | 3,529 MW | 322 MW | 715 MW | 1,111 MW | 383 MW |
| 2026-08-29T17:00Z | 3,591 MW | 0 MW | 692 MW | 1,323 MW | 399 MW |
| 2026-08-29T18:00Z | 3,649 MW | 0 MW | 663 MW | 1,270 MW | 395 MW |
| 2026-08-29T19:00Z | 3,703 MW | 0 MW | 540 MW | 1,179 MW | 311 MW |
| 2026-08-29T20:00Z | n/a | 0 MW | 476 MW | n/a | n/a |
| 2026-08-29T21:00Z | 3,551 MW | 0 MW | 389 MW | 885 MW | 357 MW |
| 2026-08-29T22:00Z | 3,341 MW | 0 MW | 384 MW | 610 MW | 529 MW |
| 2026-08-29T23:00Z | 3,293 MW | 0 MW | 691 MW | 335 MW | 482 MW |
| 2026-08-30T00:00Z | 3,154 MW | 0 MW | 1,064 MW | 204 MW | 323 MW |
| 2026-08-30T01:00Z | 3,124 MW | 0 MW | 987 MW | 220 MW | 313 MW |
| 2026-08-30T02:00Z | 3,314 MW | 0 MW | 567 MW | 273 MW | 435 MW |
| 2026-08-30T03:00Z | 3,340 MW | 0 MW | 533 MW | 409 MW | 523 MW |
| 2026-08-30T04:00Z | 3,242 MW | 296 MW | 561 MW | 399 MW | 464 MW |
| 2026-08-30T05:00Z | 2,291 MW | 1,635 MW | 545 MW | 335 MW | 409 MW |
| 2026-08-30T06:00Z | 1,339 MW | 3,517 MW | 472 MW | 190 MW | 310 MW |
| 2026-08-30T07:00Z | 1,023 MW | 5,055 MW | 388 MW | 94 MW | 299 MW |
| 2026-08-30T08:00Z | 573 MW | 5,948 MW | 388 MW | 94 MW | 298 MW |
| 2026-08-30T09:00Z | 574 MW | 6,251 MW | 382 MW | 137 MW | 302 MW |
| 2026-08-30T10:00Z | 574 MW | 6,737 MW | 378 MW | 108 MW | 301 MW |
| 2026-08-30T11:00Z | 575 MW | 6,574 MW | 360 MW | 82 MW | 300 MW |
| 2026-08-30T12:00Z | 765 MW | 6,056 MW | 372 MW | 82 MW | 343 MW |
| 2026-08-30T13:00Z | 1,144 MW | 4,995 MW | 511 MW | 145 MW | 341 MW |
| 2026-08-30T14:00Z | 1,653 MW | 3,492 MW | 594 MW | 283 MW | 325 MW |
| 2026-08-30T15:00Z | 2,891 MW | 1,440 MW | 580 MW | 632 MW | 516 MW |
| 2026-08-30T16:00Z | 3,332 MW | 249 MW | 493 MW | 1,069 MW | 514 MW |
| 2026-08-30T17:00Z | 3,623 MW | 0 MW | 493 MW | 1,293 MW | 467 MW |
| 2026-08-30T18:00Z | 3,557 MW | 0 MW | 521 MW | 1,275 MW | 413 MW |
| 2026-08-30T19:00Z | 3,552 MW | 0 MW | 567 MW | 1,105 MW | 351 MW |
| 2026-08-30T20:00Z | n/a | 0 MW | 460 MW | n/a | n/a |
| 2026-08-30T21:00Z | 3,503 MW | 0 MW | 451 MW | 1,123 MW | 527 MW |
| 2026-08-30T22:00Z | 3,724 MW | 0 MW | 433 MW | 414 MW | 535 MW |
| 2026-08-30T23:00Z | 3,711 MW | 0 MW | 472 MW | 381 MW | 556 MW |
| 2026-08-31T00:00Z | 3,731 MW | 0 MW | 489 MW | 361 MW | 564 MW |
| 2026-08-31T01:00Z | 3,619 MW | 0 MW | 563 MW | 401 MW | 568 MW |
| 2026-08-31T02:00Z | 3,388 MW | 0 MW | 577 MW | 638 MW | 563 MW |
| 2026-08-31T03:00Z | 3,339 MW | 0 MW | 626 MW | 825 MW | 550 MW |
| 2026-08-31T04:00Z | 3,524 MW | 325 MW | 607 MW | 602 MW | 596 MW |
| 2026-08-31T05:00Z | 3,660 MW | 1,760 MW | 553 MW | 574 MW | 578 MW |
| 2026-08-31T06:00Z | 3,101 MW | 3,755 MW | 534 MW | 351 MW | 427 MW |
| 2026-08-31T07:00Z | 2,244 MW | 5,391 MW | 508 MW | 301 MW | 387 MW |
| 2026-08-31T08:00Z | 1,432 MW | 6,516 MW | 525 MW | 53 MW | 308 MW |
| 2026-08-31T09:00Z | 1,385 MW | 7,083 MW | 554 MW | 72 MW | 301 MW |
| 2026-08-31T10:00Z | 1,522 MW | 7,239 MW | 558 MW | 82 MW | 321 MW |
| 2026-08-31T11:00Z | 1,276 MW | 7,056 MW | 592 MW | 82 MW | 302 MW |
| 2026-08-31T12:00Z | 1,401 MW | 6,429 MW | 625 MW | 88 MW | 336 MW |
| 2026-08-31T13:00Z | 2,333 MW | 5,287 MW | 633 MW | 243 MW | 447 MW |
| 2026-08-31T14:00Z | 3,031 MW | 3,588 MW | 643 MW | 532 MW | 378 MW |
| 2026-08-31T15:00Z | 3,651 MW | 1,643 MW | 649 MW | 1,533 MW | 532 MW |
| 2026-08-31T16:00Z | 3,599 MW | 247 MW | 609 MW | 1,897 MW | 587 MW |
| 2026-08-31T17:00Z | 3,633 MW | 0 MW | 651 MW | 1,857 MW | 603 MW |
| 2026-08-31T18:00Z | 3,546 MW | 0 MW | 648 MW | 1,487 MW | 579 MW |
| 2026-08-31T19:00Z | 3,627 MW | 0 MW | 580 MW | 1,489 MW | 565 MW |
| 2026-08-31T20:00Z | n/a | 0 MW | 562 MW | n/a | n/a |
| 2026-08-31T21:00Z | 3,659 MW | 0 MW | 623 MW | 1,387 MW | 525 MW |
| 2026-08-31T22:00Z | 3,737 MW | 0 MW | 620 MW | 604 MW | 398 MW |
| 2026-08-31T23:00Z | 3,595 MW | 0 MW | 718 MW | 539 MW | 550 MW |
| 2026-09-01T00:00Z | 3,616 MW | 0 MW | 848 MW | 264 MW | 456 MW |
| 2026-09-01T01:00Z | 3,685 MW | 0 MW | 965 MW | 148 MW | 494 MW |
| 2026-09-01T02:00Z | 3,752 MW | 0 MW | 1,011 MW | 231 MW | 541 MW |
| 2026-09-01T03:00Z | 3,747 MW | 0 MW | 1,084 MW | 306 MW | 538 MW |
| 2026-09-01T04:00Z | 3,731 MW | 300 MW | 1,047 MW | 314 MW | 548 MW |
| 2026-09-01T05:00Z | 3,660 MW | 1,702 MW | 950 MW | 370 MW | 565 MW |
| 2026-09-01T06:00Z | 3,174 MW | 3,775 MW | 851 MW | 292 MW | 454 MW |
| 2026-09-01T07:00Z | 2,072 MW | 5,336 MW | 830 MW | 111 MW | 365 MW |
| 2026-09-01T08:00Z | 1,105 MW | 6,468 MW | 880 MW | 72 MW | 308 MW |
| 2026-09-01T09:00Z | 1,055 MW | 7,036 MW | 895 MW | 70 MW | 313 MW |
| 2026-09-01T10:00Z | 1,240 MW | 7,184 MW | 874 MW | 135 MW | 357 MW |
| 2026-09-01T11:00Z | 1,220 MW | 6,963 MW | 873 MW | 150 MW | 386 MW |
| 2026-09-01T12:00Z | 1,594 MW | 6,074 MW | 891 MW | 140 MW | 430 MW |
| 2026-09-01T13:00Z | 2,171 MW | 4,870 MW | 945 MW | 203 MW | 328 MW |
| 2026-09-01T14:00Z | 2,883 MW | 3,397 MW | 841 MW | 277 MW | 336 MW |
| 2026-09-01T15:00Z | 3,738 MW | 1,485 MW | 713 MW | 981 MW | 451 MW |
| 2026-09-01T16:00Z | 3,573 MW | 229 MW | 664 MW | 1,490 MW | 517 MW |
| 2026-09-01T17:00Z | 3,630 MW | 0 MW | 629 MW | 1,444 MW | 373 MW |
| 2026-09-01T18:00Z | 3,734 MW | 0 MW | 586 MW | 1,380 MW | 549 MW |
| 2026-09-01T19:00Z | 3,962 MW | 0 MW | 585 MW | 1,208 MW | 511 MW |
| 2026-09-01T20:00Z | n/a | 0 MW | 527 MW | n/a | n/a |
| 2026-09-01T21:00Z | 3,836 MW | 0 MW | 563 MW | 832 MW | 562 MW |
| 2026-09-01T22:00Z | 3,711 MW | 0 MW | 709 MW | 893 MW | 584 MW |
| 2026-09-01T23:00Z | 3,710 MW | 0 MW | 877 MW | 392 MW | 560 MW |
| 2026-09-02T00:00Z | 3,759 MW | 0 MW | 1,067 MW | 17 MW | 546 MW |
| 2026-09-02T01:00Z | 3,735 MW | 0 MW | 1,218 MW | 103 MW | 549 MW |
| 2026-09-02T02:00Z | 3,694 MW | 0 MW | 1,268 MW | 364 MW | 571 MW |
| 2026-09-02T03:00Z | 3,563 MW | 0 MW | 1,520 MW | 583 MW | 549 MW |
| 2026-09-02T04:00Z | 3,488 MW | 276 MW | 1,750 MW | 567 MW | 563 MW |
| 2026-09-02T05:00Z | 3,442 MW | 1,613 MW | 1,746 MW | 381 MW | 491 MW |
| 2026-09-02T06:00Z | 2,872 MW | 3,582 MW | 1,664 MW | 252 MW | 383 MW |
| 2026-09-02T07:00Z | 1,624 MW | 5,185 MW | 1,700 MW | 71 MW | 315 MW |
| 2026-09-02T08:00Z | 1,415 MW | 6,253 MW | 1,781 MW | 61 MW | 318 MW |
| 2026-09-02T09:00Z | 1,429 MW | 6,794 MW | 1,740 MW | 56 MW | 363 MW |
| 2026-09-02T10:00Z | 1,179 MW | 6,909 MW | 1,702 MW | 53 MW | 302 MW |
| 2026-09-02T11:00Z | 1,196 MW | 6,594 MW | 1,636 MW | 52 MW | 301 MW |
| 2026-09-02T12:00Z | 1,359 MW | 5,772 MW | 1,473 MW | 55 MW | 302 MW |
| 2026-09-02T13:00Z | 2,204 MW | 4,278 MW | 1,335 MW | 133 MW | 346 MW |
| 2026-09-02T14:00Z | 3,404 MW | 2,255 MW | 1,243 MW | 571 MW | 512 MW |
| 2026-09-02T15:00Z | 3,836 MW | 898 MW | 1,180 MW | 1,317 MW | 583 MW |
| 2026-09-02T16:00Z | 3,794 MW | 194 MW | 1,032 MW | 1,300 MW | 548 MW |
| 2026-09-02T17:00Z | 3,672 MW | 0 MW | 875 MW | 1,225 MW | 476 MW |
| 2026-09-02T18:00Z | 3,613 MW | 0 MW | 872 MW | 1,214 MW | 552 MW |
| 2026-09-02T19:00Z | 3,823 MW | 0 MW | 723 MW | 1,012 MW | 542 MW |
| 2026-09-02T20:00Z | n/a | 0 MW | 720 MW | n/a | n/a |
| 2026-09-02T21:00Z | 3,784 MW | 0 MW | 796 MW | 1,145 MW | 537 MW |
| 2026-09-02T22:00Z | 3,784 MW | 0 MW | 851 MW | 781 MW | 523 MW |
| 2026-09-02T23:00Z | 3,764 MW | 0 MW | 871 MW | 435 MW | 523 MW |
| 2026-09-03T00:00Z | 3,749 MW | 0 MW | 913 MW | 14 MW | 520 MW |
| 2026-09-03T01:00Z | 3,761 MW | 0 MW | 1,088 MW | 67 MW | 496 MW |
| 2026-09-03T02:00Z | 3,648 MW | 0 MW | 1,533 MW | 172 MW | 406 MW |
| 2026-09-03T03:00Z | 3,314 MW | 0 MW | 1,870 MW | 220 MW | 302 MW |
| 2026-09-03T04:00Z | 3,338 MW | 241 MW | 1,897 MW | 297 MW | 321 MW |
| 2026-09-03T05:00Z | 3,414 MW | 1,477 MW | 1,667 MW | 250 MW | 306 MW |
| 2026-09-03T06:00Z | 3,000 MW | 3,087 MW | 1,452 MW | 308 MW | 314 MW |
| 2026-09-03T07:00Z | 1,769 MW | 4,794 MW | 1,405 MW | 72 MW | 327 MW |
| 2026-09-03T08:00Z | 1,042 MW | 5,798 MW | 1,377 MW | 31 MW | 303 MW |
| 2026-09-03T09:00Z | 828 MW | 6,477 MW | 1,558 MW | 40 MW | 326 MW |
| 2026-09-03T10:00Z | 715 MW | 6,489 MW | 1,556 MW | 44 MW | 303 MW |
| 2026-09-03T11:00Z | 789 MW | 6,108 MW | 1,513 MW | 31 MW | 305 MW |
| 2026-09-03T12:00Z | 1,050 MW | 5,144 MW | 1,686 MW | 95 MW | 333 MW |
| 2026-09-03T13:00Z | 1,695 MW | 3,987 MW | 1,785 MW | 332 MW | 418 MW |
| 2026-09-03T14:00Z | 3,019 MW | 2,623 MW | 1,717 MW | 657 MW | 365 MW |
| 2026-09-03T15:00Z | 3,453 MW | 1,172 MW | 1,414 MW | 921 MW | 394 MW |
| 2026-09-03T16:00Z | 3,673 MW | 220 MW | 1,281 MW | 1,195 MW | 357 MW |
| 2026-09-03T17:00Z | 3,508 MW | 0 MW | 1,396 MW | 1,202 MW | 349 MW |
| 2026-09-03T18:00Z | 3,446 MW | 0 MW | 1,479 MW | 1,290 MW | 334 MW |
| 2026-09-03T19:00Z | 3,470 MW | 0 MW | 1,586 MW | 1,027 MW | 344 MW |
| 2026-09-03T20:00Z | n/a | 0 MW | 1,594 MW | n/a | n/a |
| 2026-09-03T21:00Z | 3,598 MW | 0 MW | 1,702 MW | 759 MW | 339 MW |
| 2026-09-03T22:00Z | 3,327 MW | 0 MW | 1,711 MW | 334 MW | 354 MW |
| 2026-09-03T23:00Z | 3,345 MW | 0 MW | 1,844 MW | 147 MW | 389 MW |
| 2026-09-04T00:00Z | 3,202 MW | 0 MW | 2,026 MW | 88 MW | 349 MW |
| 2026-09-04T01:00Z | 3,061 MW | 0 MW | 2,054 MW | 57 MW | 322 MW |
| 2026-09-04T02:00Z | 2,851 MW | 0 MW | 2,231 MW | 180 MW | 335 MW |
| 2026-09-04T03:00Z | 2,990 MW | 0 MW | 2,396 MW | 326 MW | 312 MW |
| 2026-09-04T04:00Z | 2,966 MW | 287 MW | 2,362 MW | 555 MW | 328 MW |
| 2026-09-04T05:00Z | 3,021 MW | 1,758 MW | 2,113 MW | 535 MW | 391 MW |
| 2026-09-04T06:00Z | 1,871 MW | 3,855 MW | 2,042 MW | 256 MW | 461 MW |
| 2026-09-04T07:00Z | 673 MW | 5,599 MW | 2,118 MW | 67 MW | 434 MW |
| 2026-09-04T08:00Z | 595 MW | 6,576 MW | 2,082 MW | 62 MW | 337 MW |
| 2026-09-04T09:00Z | 592 MW | 7,013 MW | 2,096 MW | 45 MW | 330 MW |
| 2026-09-04T10:00Z | 604 MW | 6,950 MW | 2,014 MW | 45 MW | 349 MW |
| 2026-09-04T11:00Z | 586 MW | 6,385 MW | 2,014 MW | 40 MW | 320 MW |
| 2026-09-04T12:00Z | 765 MW | 5,730 MW | 2,061 MW | 89 MW | 359 MW |
| 2026-09-04T13:00Z | 892 MW | 4,987 MW | 2,346 MW | 144 MW | 339 MW |
| 2026-09-04T14:00Z | 1,684 MW | 3,668 MW | 2,383 MW | 171 MW | 319 MW |
| 2026-09-04T15:00Z | 2,625 MW | 1,729 MW | 2,301 MW | 425 MW | 375 MW |
| 2026-09-04T16:00Z | 3,280 MW | 245 MW | 2,098 MW | 955 MW | 350 MW |
| 2026-09-04T17:00Z | 3,447 MW | 0 MW | 2,017 MW | 1,145 MW | 365 MW |
| 2026-09-04T18:00Z | 3,097 MW | 0 MW | 1,894 MW | 1,001 MW | 333 MW |
| 2026-09-04T19:00Z | 3,176 MW | 0 MW | 1,690 MW | 650 MW | 348 MW |
| 2026-09-04T20:00Z | n/a | 0 MW | 1,577 MW | n/a | n/a |
| 2026-09-04T21:00Z | 3,154 MW | 0 MW | 1,570 MW | 317 MW | 389 MW |
| 2026-09-04T22:00Z | 2,978 MW | 0 MW | 1,580 MW | 515 MW | 527 MW |
| 2026-09-04T23:00Z | 3,026 MW | 0 MW | 1,643 MW | 270 MW | 563 MW |
| 2026-09-05T00:00Z | 3,013 MW | 0 MW | 1,676 MW | 216 MW | 522 MW |
| 2026-09-05T01:00Z | 2,869 MW | 0 MW | 1,752 MW | 52 MW | 526 MW |
| 2026-09-05T02:00Z | 2,761 MW | 0 MW | 1,926 MW | 170 MW | 413 MW |
| 2026-09-05T03:00Z | 2,789 MW | 0 MW | 1,905 MW | 312 MW | 385 MW |
| 2026-09-05T04:00Z | 2,922 MW | 291 MW | 1,811 MW | 332 MW | 402 MW |
| 2026-09-05T05:00Z | 1,987 MW | 1,975 MW | 1,698 MW | 242 MW | 378 MW |
| 2026-09-05T06:00Z | 932 MW | 4,196 MW | 1,647 MW | 126 MW | 313 MW |
| 2026-09-05T07:00Z | 722 MW | 5,481 MW | 1,635 MW | 65 MW | 314 MW |
| 2026-09-05T08:00Z | 647 MW | 6,013 MW | 1,550 MW | 101 MW | 317 MW |
| 2026-09-05T09:00Z | 645 MW | 6,445 MW | 1,527 MW | 63 MW | 315 MW |
| 2026-09-05T10:00Z | 646 MW | 6,656 MW | 1,457 MW | 55 MW | 314 MW |
| 2026-09-05T11:00Z | 646 MW | 6,665 MW | 1,385 MW | 63 MW | 312 MW |
| 2026-09-05T12:00Z | 744 MW | 6,451 MW | 1,389 MW | 48 MW | 352 MW |
| 2026-09-05T13:00Z | 1,121 MW | 5,557 MW | 1,374 MW | 33 MW | 308 MW |
| 2026-09-05T14:00Z | 1,786 MW | 3,934 MW | 1,219 MW | 88 MW | 324 MW |
| 2026-09-05T15:00Z | 2,793 MW | 1,805 MW | 1,084 MW | 286 MW | 434 MW |
| 2026-09-05T16:00Z | 3,198 MW | 242 MW | 848 MW | 989 MW | 458 MW |
| 2026-09-05T17:00Z | 3,252 MW | 0 MW | 661 MW | 1,150 MW | 378 MW |
| 2026-09-05T18:00Z | 3,494 MW | 0 MW | 551 MW | 1,207 MW | 414 MW |
| 2026-09-05T19:00Z | 3,473 MW | 0 MW | 456 MW | 1,177 MW | 538 MW |
| 2026-09-05T20:00Z | n/a | 0 MW | 427 MW | n/a | n/a |
| 2026-09-05T21:00Z | 3,360 MW | 0 MW | 436 MW | 301 MW | 332 MW |
| 2026-09-05T22:00Z | 3,562 MW | 0 MW | 355 MW | 238 MW | 483 MW |
| 2026-09-05T23:00Z | 3,487 MW | 0 MW | 390 MW | 184 MW | 510 MW |
| 2026-09-06T00:00Z | 3,327 MW | 0 MW | 511 MW | 122 MW | 489 MW |
| 2026-09-06T01:00Z | 3,133 MW | 0 MW | 553 MW | 27 MW | 490 MW |
| 2026-09-06T02:00Z | 2,767 MW | 0 MW | 693 MW | 79 MW | 458 MW |
| 2026-09-06T03:00Z | 2,500 MW | 0 MW | 900 MW | 167 MW | 456 MW |
| 2026-09-06T04:00Z | 2,423 MW | 282 MW | 945 MW | 213 MW | 430 MW |
| 2026-09-06T05:00Z | 1,716 MW | 1,940 MW | 868 MW | 122 MW | 329 MW |
| 2026-09-06T06:00Z | 991 MW | 4,127 MW | 765 MW | 63 MW | 305 MW |
| 2026-09-06T07:00Z | 729 MW | 5,559 MW | 719 MW | 65 MW | 339 MW |
| 2026-09-06T08:00Z | 562 MW | 6,222 MW | 614 MW | 73 MW | 328 MW |
| 2026-09-06T09:00Z | 556 MW | 6,654 MW | 617 MW | 64 MW | 318 MW |
| 2026-09-06T10:00Z | 556 MW | 6,815 MW | 654 MW | 53 MW | 316 MW |
| 2026-09-06T11:00Z | 556 MW | 6,740 MW | 707 MW | 52 MW | 309 MW |
| 2026-09-06T12:00Z | 579 MW | 6,162 MW | 675 MW | 53 MW | 313 MW |
| 2026-09-06T13:00Z | 1,127 MW | 5,219 MW | 775 MW | 101 MW | 409 MW |
| 2026-09-06T14:00Z | 1,564 MW | 3,733 MW | 743 MW | 146 MW | 422 MW |
| 2026-09-06T15:00Z | 2,514 MW | 1,637 MW | 716 MW | 458 MW | 491 MW |
| 2026-09-06T16:00Z | 3,284 MW | 213 MW | 727 MW | 891 MW | 518 MW |
| 2026-09-06T17:00Z | 3,256 MW | 0 MW | 904 MW | 1,290 MW | 512 MW |
| 2026-09-06T18:00Z | 3,200 MW | 0 MW | 972 MW | 1,280 MW | 522 MW |
| 2026-09-06T19:00Z | 3,303 MW | 0 MW | 982 MW | 998 MW | 497 MW |
| 2026-09-06T20:00Z | n/a | 0 MW | 955 MW | n/a | n/a |
| 2026-09-06T21:00Z | 3,229 MW | 0 MW | 918 MW | 738 MW | 522 MW |
| 2026-09-06T22:00Z | 3,292 MW | 0 MW | 975 MW | 616 MW | 526 MW |
| 2026-09-06T23:00Z | 2,882 MW | 0 MW | 1,127 MW | 403 MW | 568 MW |
| 2026-09-07T00:00Z | 2,556 MW | 0 MW | 1,284 MW | 537 MW | 523 MW |
| 2026-09-07T01:00Z | 2,515 MW | 0 MW | 1,616 MW | 345 MW | 521 MW |
| 2026-09-07T02:00Z | 2,478 MW | 0 MW | 1,893 MW | 306 MW | 521 MW |
| 2026-09-07T03:00Z | 2,501 MW | 4 MW | 2,032 MW | 337 MW | 554 MW |
| 2026-09-07T04:00Z | 2,405 MW | 298 MW | 2,001 MW | 383 MW | 532 MW |
| 2026-09-07T05:00Z | 2,352 MW | 2,110 MW | 1,920 MW | 417 MW | 532 MW |
| 2026-09-07T06:00Z | 1,425 MW | 4,682 MW | 1,742 MW | 153 MW | 366 MW |
| 2026-09-07T07:00Z | 922 MW | 6,676 MW | 1,627 MW | 81 MW | 329 MW |
| 2026-09-07T08:00Z | 674 MW | 7,931 MW | 1,485 MW | 89 MW | 323 MW |
| 2026-09-07T09:00Z | 688 MW | 8,483 MW | 1,272 MW | 61 MW | 316 MW |
| 2026-09-07T10:00Z | 688 MW | 8,608 MW | 1,194 MW | 69 MW | 323 MW |
| 2026-09-07T11:00Z | 686 MW | 8,313 MW | 1,131 MW | 51 MW | 301 MW |
| 2026-09-07T12:00Z | 732 MW | 7,794 MW | 1,234 MW | 54 MW | 320 MW |
| 2026-09-07T13:00Z | 1,107 MW | 6,536 MW | 1,427 MW | 97 MW | 331 MW |
| 2026-09-07T14:00Z | 1,962 MW | 4,478 MW | 1,451 MW | 196 MW | 360 MW |
| 2026-09-07T15:00Z | 3,044 MW | 1,974 MW | 1,520 MW | 737 MW | 442 MW |
| 2026-09-07T16:00Z | 3,044 MW | 269 MW | 1,416 MW | 1,161 MW | 405 MW |
| 2026-09-07T17:00Z | 3,398 MW | 4 MW | 1,395 MW | 1,145 MW | 470 MW |
| 2026-09-07T18:00Z | 3,264 MW | 0 MW | 1,396 MW | 1,134 MW | 477 MW |
| 2026-09-07T19:00Z | 3,274 MW | 0 MW | 1,375 MW | 991 MW | 449 MW |
| 2026-09-07T20:00Z | n/a | 0 MW | 1,462 MW | n/a | n/a |
| 2026-09-07T21:00Z | 3,235 MW | 0 MW | 1,510 MW | 839 MW | 546 MW |
| 2026-09-07T22:00Z | 3,448 MW | 0 MW | 1,450 MW | 396 MW | 532 MW |
| 2026-09-07T23:00Z | 3,387 MW | 0 MW | 1,463 MW | 469 MW | 520 MW |
| 2026-09-08T00:00Z | 3,353 MW | 0 MW | 1,640 MW | 125 MW | 497 MW |
| 2026-09-08T01:00Z | 3,354 MW | 0 MW | 1,756 MW | 59 MW | 518 MW |
| 2026-09-08T02:00Z | 3,344 MW | 0 MW | 1,882 MW | 213 MW | 510 MW |
| 2026-09-08T03:00Z | 3,382 MW | 4 MW | 1,997 MW | 422 MW | 511 MW |
| 2026-09-08T04:00Z | 3,417 MW | 279 MW | 1,982 MW | 480 MW | 584 MW |
| 2026-09-08T05:00Z | 3,095 MW | 1,974 MW | 1,758 MW | 405 MW | 510 MW |
| 2026-09-08T06:00Z | 1,600 MW | 4,512 MW | 1,677 MW | 205 MW | 343 MW |
| 2026-09-08T07:00Z | 769 MW | 6,402 MW | 1,700 MW | 104 MW | 347 MW |
| 2026-09-08T08:00Z | 532 MW | 7,212 MW | 1,567 MW | 113 MW | 303 MW |
| 2026-09-08T09:00Z | 530 MW | 7,887 MW | 1,602 MW | 108 MW | 301 MW |
| 2026-09-08T10:00Z | 530 MW | 8,108 MW | 1,530 MW | 107 MW | 300 MW |
| 2026-09-08T11:00Z | 529 MW | 7,969 MW | 1,469 MW | 53 MW | 300 MW |
| 2026-09-08T12:00Z | 533 MW | 7,556 MW | 1,646 MW | 54 MW | 300 MW |
| 2026-09-08T13:00Z | 897 MW | 6,512 MW | 1,749 MW | 60 MW | 355 MW |
| 2026-09-08T14:00Z | 1,578 MW | 4,500 MW | 1,710 MW | 171 MW | 324 MW |
| 2026-09-08T15:00Z | 2,810 MW | 1,956 MW | 1,671 MW | 435 MW | 347 MW |
| 2026-09-08T16:00Z | 3,270 MW | 247 MW | 1,571 MW | 787 MW | 332 MW |
| 2026-09-08T17:00Z | 3,245 MW | 4 MW | 1,532 MW | 1,110 MW | 416 MW |
| 2026-09-08T18:00Z | 2,782 MW | 0 MW | 1,499 MW | 861 MW | 354 MW |
| 2026-09-08T19:00Z | 3,211 MW | 0 MW | 1,447 MW | 586 MW | 304 MW |
| 2026-09-08T20:00Z | n/a | 0 MW | 1,451 MW | n/a | n/a |
| 2026-09-08T21:00Z | 3,035 MW | 0 MW | 1,514 MW | 335 MW | 409 MW |
| 2026-09-08T22:00Z | 3,012 MW | 0 MW | 1,518 MW | 183 MW | 527 MW |
| 2026-09-08T23:00Z | 2,934 MW | 0 MW | 1,548 MW | 151 MW | 445 MW |
| 2026-09-09T00:00Z | 2,957 MW | 0 MW | 1,561 MW | 135 MW | 311 MW |
| 2026-09-09T01:00Z | 2,917 MW | 0 MW | 1,626 MW | 136 MW | 309 MW |
| 2026-09-09T02:00Z | 2,947 MW | 0 MW | 1,744 MW | 200 MW | 300 MW |
| 2026-09-09T03:00Z | 2,872 MW | 4 MW | 1,772 MW | 301 MW | 321 MW |
| 2026-09-09T04:00Z | 2,964 MW | 276 MW | 1,718 MW | 371 MW | 309 MW |
| 2026-09-09T05:00Z | 2,722 MW | 2,012 MW | 1,530 MW | 294 MW | 318 MW |
| 2026-09-09T06:00Z | 1,669 MW | 4,577 MW | 1,360 MW | 143 MW | 305 MW |
| 2026-09-09T07:00Z | 908 MW | 6,656 MW | 1,260 MW | 65 MW | 309 MW |
| 2026-09-09T08:00Z | 661 MW | 7,484 MW | 1,130 MW | 77 MW | 303 MW |
| 2026-09-09T09:00Z | 662 MW | 8,245 MW | 1,096 MW | 59 MW | 301 MW |
| 2026-09-09T10:00Z | 661 MW | 8,540 MW | 1,070 MW | 61 MW | 302 MW |
| 2026-09-09T11:00Z | 660 MW | 8,280 MW | 995 MW | 59 MW | 300 MW |
| 2026-09-09T12:00Z | 728 MW | 7,725 MW | 1,019 MW | 71 MW | 353 MW |
| 2026-09-09T13:00Z | 1,043 MW | 6,465 MW | 1,138 MW | 53 MW | 339 MW |
| 2026-09-09T14:00Z | 1,779 MW | 4,235 MW | 1,080 MW | 92 MW | 314 MW |
| 2026-09-09T15:00Z | 3,203 MW | 1,605 MW | 977 MW | 437 MW | 486 MW |
| 2026-09-09T16:00Z | 3,305 MW | 178 MW | 752 MW | 1,013 MW | 472 MW |
| 2026-09-09T17:00Z | 3,321 MW | 4 MW | 650 MW | 1,154 MW | 388 MW |
| 2026-09-09T18:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-09T19:00Z | 3,360 MW | 0 MW | 519 MW | 612 MW | 360 MW |
| 2026-09-09T20:00Z | n/a | 0 MW | 450 MW | n/a | n/a |
| 2026-09-09T21:00Z | 3,604 MW | 0 MW | 487 MW | 279 MW | 519 MW |
| 2026-09-09T22:00Z | 3,338 MW | 0 MW | 542 MW | 288 MW | 536 MW |
| 2026-09-09T23:00Z | 3,429 MW | 0 MW | 657 MW | 342 MW | 570 MW |
| 2026-09-10T00:00Z | 3,405 MW | 0 MW | 864 MW | 94 MW | 521 MW |
| 2026-09-10T01:00Z | 3,328 MW | 0 MW | 1,057 MW | 40 MW | 507 MW |
| 2026-09-10T02:00Z | 3,385 MW | 0 MW | 1,136 MW | 112 MW | 520 MW |
| 2026-09-10T03:00Z | 3,179 MW | 4 MW | 1,209 MW | 221 MW | 473 MW |
| 2026-09-10T04:00Z | 3,042 MW | 260 MW | 1,228 MW | 250 MW | 390 MW |
| 2026-09-10T05:00Z | 2,607 MW | 1,921 MW | 1,262 MW | 195 MW | 339 MW |
| 2026-09-10T06:00Z | 1,912 MW | 4,390 MW | 1,191 MW | 136 MW | 326 MW |
| 2026-09-10T07:00Z | 900 MW | 6,400 MW | 1,098 MW | 46 MW | 306 MW |
| 2026-09-10T08:00Z | 681 MW | 7,365 MW | 822 MW | 72 MW | 310 MW |
| 2026-09-10T09:00Z | 732 MW | 8,379 MW | 778 MW | 60 MW | 306 MW |
| 2026-09-10T10:00Z | 833 MW | 8,544 MW | 651 MW | 54 MW | 374 MW |
| 2026-09-10T11:00Z | 837 MW | 8,360 MW | 590 MW | 58 MW | 392 MW |
| 2026-09-10T12:00Z | 1,012 MW | 7,634 MW | 614 MW | 56 MW | 431 MW |
| 2026-09-10T13:00Z | 1,824 MW | 6,263 MW | 694 MW | 51 MW | 337 MW |
| 2026-09-10T14:00Z | 2,522 MW | 4,226 MW | 786 MW | 149 MW | 376 MW |
| 2026-09-10T15:00Z | 3,249 MW | 1,756 MW | 751 MW | 625 MW | 544 MW |
| 2026-09-10T16:00Z | 3,423 MW | 197 MW | 665 MW | 1,118 MW | 545 MW |
| 2026-09-10T17:00Z | 3,284 MW | 3 MW | 574 MW | 1,239 MW | 523 MW |
| 2026-09-10T18:00Z | 3,290 MW | 0 MW | 512 MW | 1,220 MW | 465 MW |
| 2026-09-10T19:00Z | 3,321 MW | 0 MW | 390 MW | 988 MW | 457 MW |
| 2026-09-10T20:00Z | n/a | 0 MW | 345 MW | n/a | n/a |
| 2026-09-10T21:00Z | 3,092 MW | 0 MW | 328 MW | 538 MW | 528 MW |
| 2026-09-10T22:00Z | 3,268 MW | 0 MW | 399 MW | 239 MW | 540 MW |
| 2026-09-10T23:00Z | 3,332 MW | 0 MW | 563 MW | 201 MW | 580 MW |
| 2026-09-11T00:00Z | 3,281 MW | 0 MW | 682 MW | 144 MW | 553 MW |
| 2026-09-11T01:00Z | 3,340 MW | 0 MW | 802 MW | 53 MW | 508 MW |
| 2026-09-11T02:00Z | 3,453 MW | 0 MW | 898 MW | 240 MW | 558 MW |
| 2026-09-11T03:00Z | 3,432 MW | 3 MW | 1,050 MW | 342 MW | 545 MW |
| 2026-09-11T04:00Z | 3,266 MW | 254 MW | 1,120 MW | 759 MW | 515 MW |
| 2026-09-11T05:00Z | 2,884 MW | 1,942 MW | 1,189 MW | 545 MW | 310 MW |
| 2026-09-11T06:00Z | 1,921 MW | 4,482 MW | 1,096 MW | 163 MW | 309 MW |
| 2026-09-11T07:00Z | 1,161 MW | 6,522 MW | 958 MW | 62 MW | 308 MW |
| 2026-09-11T08:00Z | 559 MW | 7,641 MW | 761 MW | 108 MW | 315 MW |
| 2026-09-11T09:00Z | 635 MW | 8,503 MW | 618 MW | 105 MW | 315 MW |
| 2026-09-11T10:00Z | 673 MW | 8,681 MW | 561 MW | 178 MW | 363 MW |
| 2026-09-11T11:00Z | 605 MW | 8,465 MW | 582 MW | 158 MW | 303 MW |
| 2026-09-11T12:00Z | 982 MW | 7,723 MW | 564 MW | 147 MW | 366 MW |
| 2026-09-11T13:00Z | 1,902 MW | 6,215 MW | 565 MW | 191 MW | 343 MW |
| 2026-09-11T14:00Z | 2,479 MW | 4,115 MW | 548 MW | 372 MW | 553 MW |
| 2026-09-11T15:00Z | 3,000 MW | 1,621 MW | 531 MW | 881 MW | 582 MW |
| 2026-09-11T16:00Z | 3,366 MW | 171 MW | 449 MW | 1,078 MW | 540 MW |
| 2026-09-11T17:00Z | 3,552 MW | 4 MW | 372 MW | 1,085 MW | 554 MW |
| 2026-09-11T18:00Z | 3,332 MW | 0 MW | 345 MW | 1,235 MW | 429 MW |
| 2026-09-11T19:00Z | 3,269 MW | 0 MW | 314 MW | 1,095 MW | 355 MW |
| 2026-09-11T20:00Z | n/a | 0 MW | 256 MW | n/a | n/a |
| 2026-09-11T21:00Z | 3,185 MW | 0 MW | 277 MW | 658 MW | 426 MW |
| 2026-09-11T22:00Z | 3,199 MW | 0 MW | 332 MW | 427 MW | 414 MW |
| 2026-09-11T23:00Z | 3,003 MW | 0 MW | 386 MW | 270 MW | 493 MW |
| 2026-09-12T00:00Z | 2,908 MW | 0 MW | 459 MW | 63 MW | 331 MW |
| 2026-09-12T01:00Z | 2,917 MW | 0 MW | 496 MW | 71 MW | 459 MW |
| 2026-09-12T02:00Z | 2,974 MW | 0 MW | 533 MW | 95 MW | 492 MW |
| 2026-09-12T03:00Z | 2,985 MW | 4 MW | 543 MW | 266 MW | 466 MW |
| 2026-09-12T04:00Z | 2,981 MW | 233 MW | 503 MW | 334 MW | 420 MW |
| 2026-09-12T05:00Z | 2,957 MW | 1,882 MW | 415 MW | 213 MW | 369 MW |
| 2026-09-12T06:00Z | 1,944 MW | 4,276 MW | 320 MW | 152 MW | 304 MW |
| 2026-09-12T07:00Z | 835 MW | 6,267 MW | 257 MW | 76 MW | 300 MW |
| 2026-09-12T08:00Z | 654 MW | 6,912 MW | 172 MW | 65 MW | 299 MW |
| 2026-09-12T09:00Z | 655 MW | 7,677 MW | 161 MW | 64 MW | 303 MW |
| 2026-09-12T10:00Z | 653 MW | 8,132 MW | 218 MW | 68 MW | 300 MW |
| 2026-09-12T11:00Z | 650 MW | 7,586 MW | 310 MW | 115 MW | 300 MW |
| 2026-09-12T12:00Z | 849 MW | 6,273 MW | 461 MW | 85 MW | 372 MW |
| 2026-09-12T13:00Z | 1,412 MW | 4,265 MW | 970 MW | 72 MW | 366 MW |
| 2026-09-12T14:00Z | 2,155 MW | 2,303 MW | 1,281 MW | 275 MW | 477 MW |
| 2026-09-12T15:00Z | 2,680 MW | 988 MW | 1,210 MW | 491 MW | 409 MW |
| 2026-09-12T16:00Z | 2,517 MW | 126 MW | 1,089 MW | 778 MW | 316 MW |
| 2026-09-12T17:00Z | 2,848 MW | 2 MW | 1,182 MW | 844 MW | 308 MW |
| 2026-09-12T18:00Z | 3,082 MW | 0 MW | 928 MW | 907 MW | 409 MW |
| 2026-09-12T19:00Z | 2,931 MW | 0 MW | 799 MW | 763 MW | 309 MW |
| 2026-09-12T20:00Z | n/a | 0 MW | 828 MW | n/a | n/a |
| 2026-09-12T21:00Z | 2,784 MW | 0 MW | 861 MW | 182 MW | 315 MW |
| 2026-09-12T22:00Z | 2,903 MW | 0 MW | 1,013 MW | 217 MW | 395 MW |
| 2026-09-12T23:00Z | 2,829 MW | 0 MW | 1,213 MW | 146 MW | 312 MW |
| 2026-09-13T00:00Z | 2,676 MW | 0 MW | 1,272 MW | 78 MW | 300 MW |
| 2026-09-13T01:00Z | 2,764 MW | 0 MW | 1,229 MW | 44 MW | 301 MW |
| 2026-09-13T02:00Z | 2,854 MW | 0 MW | 1,305 MW | 105 MW | 299 MW |
| 2026-09-13T03:00Z | 2,740 MW | 2 MW | 1,373 MW | 214 MW | 299 MW |
| 2026-09-13T04:00Z | 2,783 MW | 187 MW | 1,371 MW | 203 MW | 319 MW |
| 2026-09-13T05:00Z | 2,509 MW | 1,681 MW | 1,202 MW | 119 MW | 307 MW |
| 2026-09-13T06:00Z | 1,132 MW | 3,822 MW | 1,003 MW | 105 MW | 300 MW |
| 2026-09-13T07:00Z | 590 MW | 5,248 MW | 875 MW | 45 MW | 300 MW |
| 2026-09-13T08:00Z | 582 MW | 6,005 MW | 783 MW | 44 MW | 328 MW |
| 2026-09-13T09:00Z | 581 MW | 6,660 MW | 829 MW | 34 MW | 337 MW |
| 2026-09-13T10:00Z | 578 MW | 6,979 MW | 932 MW | 39 MW | 337 MW |
| 2026-09-13T11:00Z | 577 MW | 6,771 MW | 983 MW | 36 MW | 336 MW |
| 2026-09-13T12:00Z | 562 MW | 6,440 MW | 961 MW | 54 MW | 301 MW |
| 2026-09-13T13:00Z | 715 MW | 5,611 MW | 1,251 MW | 63 MW | 312 MW |
| 2026-09-13T14:00Z | 1,640 MW | 3,851 MW | 1,261 MW | 127 MW | 312 MW |
| 2026-09-13T15:00Z | 2,313 MW | 1,521 MW | 1,209 MW | 291 MW | 310 MW |
| 2026-09-13T16:00Z | 2,900 MW | 151 MW | 1,193 MW | 744 MW | 315 MW |
| 2026-09-13T17:00Z | 3,096 MW | 3 MW | 1,162 MW | 1,109 MW | 302 MW |
| 2026-09-13T18:00Z | 2,967 MW | 0 MW | 991 MW | 1,137 MW | 300 MW |
| 2026-09-13T19:00Z | 2,712 MW | 0 MW | 761 MW | 884 MW | 299 MW |
| 2026-09-13T20:00Z | n/a | 0 MW | 668 MW | n/a | n/a |
| 2026-09-13T21:00Z | 2,903 MW | 0 MW | 638 MW | 380 MW | 303 MW |
| 2026-09-13T22:00Z | 3,313 MW | 0 MW | 700 MW | 283 MW | 395 MW |
| 2026-09-13T23:00Z | 3,186 MW | 0 MW | 744 MW | 143 MW | 578 MW |
| 2026-09-14T00:00Z | 3,169 MW | 0 MW | 812 MW | 120 MW | 530 MW |
| 2026-09-14T01:00Z | 2,733 MW | 0 MW | 835 MW | 142 MW | 524 MW |
| 2026-09-14T02:00Z | 2,726 MW | 0 MW | 834 MW | 233 MW | 541 MW |
| 2026-09-14T03:00Z | 2,714 MW | 3 MW | 866 MW | 264 MW | 505 MW |
| 2026-09-14T04:00Z | 3,039 MW | 214 MW | 1,008 MW | 275 MW | 482 MW |
| 2026-09-14T05:00Z | 2,871 MW | 1,875 MW | 1,098 MW | 228 MW | 321 MW |
| 2026-09-14T06:00Z | 1,802 MW | 4,371 MW | 996 MW | 114 MW | 300 MW |
| 2026-09-14T07:00Z | 789 MW | 6,131 MW | 830 MW | 68 MW | 332 MW |
| 2026-09-14T08:00Z | 679 MW | 7,054 MW | 722 MW | 51 MW | 313 MW |
| 2026-09-14T09:00Z | 697 MW | 7,639 MW | 636 MW | 43 MW | 313 MW |
| 2026-09-14T10:00Z | 705 MW | 8,322 MW | 468 MW | 36 MW | 307 MW |
| 2026-09-14T11:00Z | 710 MW | 7,823 MW | 338 MW | 32 MW | 306 MW |
| 2026-09-14T12:00Z | 895 MW | 7,105 MW | 311 MW | 67 MW | 301 MW |
| 2026-09-14T13:00Z | 1,454 MW | 5,893 MW | 384 MW | 119 MW | 331 MW |
| 2026-09-14T14:00Z | 2,220 MW | 3,877 MW | 350 MW | 182 MW | 305 MW |
| 2026-09-14T15:00Z | 3,115 MW | 1,478 MW | 349 MW | 645 MW | 305 MW |
| 2026-09-14T16:00Z | 3,506 MW | 136 MW | 337 MW | 1,053 MW | 434 MW |
| 2026-09-14T17:00Z | 3,489 MW | 4 MW | 333 MW | 1,115 MW | 490 MW |
| 2026-09-14T18:00Z | 3,290 MW | 0 MW | 363 MW | 1,154 MW | 420 MW |
| 2026-09-14T19:00Z | 3,386 MW | 0 MW | 415 MW | 945 MW | 322 MW |
| 2026-09-14T20:00Z | n/a | 0 MW | 462 MW | n/a | n/a |
| 2026-09-14T21:00Z | 3,191 MW | 0 MW | 400 MW | 286 MW | 444 MW |
| 2026-09-14T22:00Z | 3,082 MW | 0 MW | 467 MW | 235 MW | 517 MW |
| 2026-09-14T23:00Z | 3,142 MW | 0 MW | 519 MW | 274 MW | 533 MW |
| 2026-09-15T00:00Z | 2,933 MW | 0 MW | 687 MW | 296 MW | 526 MW |
| 2026-09-15T01:00Z | 3,093 MW | 0 MW | 1,018 MW | 188 MW | 528 MW |
| 2026-09-15T02:00Z | 3,072 MW | 0 MW | 1,327 MW | 229 MW | 513 MW |
| 2026-09-15T03:00Z | 2,887 MW | 4 MW | 1,458 MW | 265 MW | 501 MW |
| 2026-09-15T04:00Z | 2,949 MW | 153 MW | 1,635 MW | 374 MW | 396 MW |
| 2026-09-15T05:00Z | 2,989 MW | 1,197 MW | 1,718 MW | 442 MW | 548 MW |
| 2026-09-15T06:00Z | 2,674 MW | 2,856 MW | 1,823 MW | 356 MW | 539 MW |
| 2026-09-15T07:00Z | 1,559 MW | 4,145 MW | 1,930 MW | 418 MW | 517 MW |
| 2026-09-15T08:00Z | 590 MW | 5,075 MW | 1,871 MW | 131 MW | 318 MW |
| 2026-09-15T09:00Z | 588 MW | 4,919 MW | 1,559 MW | 90 MW | 304 MW |
| 2026-09-15T10:00Z | 587 MW | 5,238 MW | 1,757 MW | 82 MW | 312 MW |
| 2026-09-15T11:00Z | 792 MW | 4,831 MW | 1,629 MW | 175 MW | 462 MW |
| 2026-09-15T12:00Z | 737 MW | 4,043 MW | 1,531 MW | 36 MW | 364 MW |
| 2026-09-15T13:00Z | 1,475 MW | 2,621 MW | 1,615 MW | 50 MW | 405 MW |
| 2026-09-15T14:00Z | 2,420 MW | 1,612 MW | 1,699 MW | 169 MW | 503 MW |
| 2026-09-15T15:00Z | 2,639 MW | 702 MW | 1,802 MW | 223 MW | 430 MW |
| 2026-09-15T16:00Z | 2,667 MW | 66 MW | 1,913 MW | 645 MW | 324 MW |
| 2026-09-15T17:00Z | 3,217 MW | 2 MW | 2,026 MW | 1,206 MW | 492 MW |
| 2026-09-15T18:00Z | 2,962 MW | 0 MW | 2,167 MW | 1,160 MW | 385 MW |
| 2026-09-15T19:00Z | 2,585 MW | 0 MW | 2,322 MW | 715 MW | 307 MW |
| 2026-09-15T20:00Z | n/a | 0 MW | 2,423 MW | n/a | n/a |
| 2026-09-15T21:00Z | 2,537 MW | 0 MW | 2,467 MW | 254 MW | 464 MW |
| 2026-09-15T22:00Z | 2,594 MW | 0 MW | 2,320 MW | 114 MW | 367 MW |
| 2026-09-15T23:00Z | 2,463 MW | 0 MW | 2,191 MW | 212 MW | 463 MW |
| 2026-09-16T00:00Z | 2,471 MW | 0 MW | 2,236 MW | 216 MW | 472 MW |
| 2026-09-16T01:00Z | 2,407 MW | 0 MW | 2,310 MW | 230 MW | 466 MW |
| 2026-09-16T02:00Z | 2,451 MW | 0 MW | 2,574 MW | 265 MW | 484 MW |
| 2026-09-16T03:00Z | 2,419 MW | 2 MW | 2,644 MW | 341 MW | 478 MW |
| 2026-09-16T04:00Z | 2,510 MW | 130 MW | 2,722 MW | 405 MW | 468 MW |
| 2026-09-16T05:00Z | 2,430 MW | 1,241 MW | 2,844 MW | 374 MW | 456 MW |
| 2026-09-16T06:00Z | 1,399 MW | 3,283 MW | 2,811 MW | 165 MW | 337 MW |
| 2026-09-16T07:00Z | 726 MW | 5,070 MW | 2,654 MW | 51 MW | 322 MW |
| 2026-09-16T08:00Z | 598 MW | 5,683 MW | 2,386 MW | 55 MW | 299 MW |
| 2026-09-16T09:00Z | 594 MW | 6,012 MW | 2,593 MW | 72 MW | 298 MW |
| 2026-09-16T10:00Z | 594 MW | 6,135 MW | 2,660 MW | 104 MW | 302 MW |
| 2026-09-16T11:00Z | 594 MW | 5,887 MW | 2,443 MW | 62 MW | 299 MW |
| 2026-09-16T12:00Z | 714 MW | 5,300 MW | 2,348 MW | 53 MW | 345 MW |
| 2026-09-16T13:00Z | 779 MW | 4,693 MW | 2,458 MW | 40 MW | 344 MW |
| 2026-09-16T14:00Z | 1,416 MW | 3,459 MW | 2,500 MW | 93 MW | 336 MW |
| 2026-09-16T15:00Z | 2,116 MW | 1,405 MW | 2,547 MW | 181 MW | 314 MW |
| 2026-09-16T16:00Z | 2,673 MW | 118 MW | 2,510 MW | 877 MW | 322 MW |
| 2026-09-16T17:00Z | 2,860 MW | 2 MW | 2,486 MW | 1,114 MW | 316 MW |
| 2026-09-16T18:00Z | 2,746 MW | 0 MW | 2,377 MW | 1,132 MW | 310 MW |
| 2026-09-16T19:00Z | 2,471 MW | 0 MW | 2,318 MW | 574 MW | 303 MW |
| 2026-09-16T20:00Z | n/a | 0 MW | 2,212 MW | n/a | n/a |
| 2026-09-16T21:00Z | 2,622 MW | 0 MW | 2,202 MW | 118 MW | 308 MW |
| 2026-09-16T22:00Z | 2,404 MW | 0 MW | 2,217 MW | 63 MW | 300 MW |
| 2026-09-16T23:00Z | 2,496 MW | 0 MW | 2,200 MW | 63 MW | 301 MW |
| 2026-09-17T00:00Z | 2,583 MW | 0 MW | 2,175 MW | 66 MW | 311 MW |
| 2026-09-17T01:00Z | 2,658 MW | 0 MW | 2,184 MW | 110 MW | 320 MW |
| 2026-09-17T02:00Z | 2,691 MW | 0 MW | 2,124 MW | 150 MW | 348 MW |
| 2026-09-17T03:00Z | 2,654 MW | 2 MW | 2,123 MW | 273 MW | 364 MW |
| 2026-09-17T04:00Z | 2,522 MW | 208 MW | 2,123 MW | 315 MW | 354 MW |
| 2026-09-17T05:00Z | 1,977 MW | 2,062 MW | 2,068 MW | 220 MW | 308 MW |
| 2026-09-17T06:00Z | 865 MW | 4,816 MW | 1,839 MW | 84 MW | 301 MW |
| 2026-09-17T07:00Z | 678 MW | 6,349 MW | 1,434 MW | 62 MW | 302 MW |
| 2026-09-17T08:00Z | 586 MW | 7,251 MW | 1,229 MW | 86 MW | 301 MW |
| 2026-09-17T09:00Z | 592 MW | 7,655 MW | 1,203 MW | 137 MW | 314 MW |
| 2026-09-17T10:00Z | 571 MW | 7,867 MW | 1,190 MW | 106 MW | 322 MW |
| 2026-09-17T11:00Z | 573 MW | 7,578 MW | 1,176 MW | 115 MW | 319 MW |
| 2026-09-17T12:00Z | 571 MW | 7,121 MW | 1,147 MW | 125 MW | 300 MW |
| 2026-09-17T13:00Z | 660 MW | 6,301 MW | 1,185 MW | 90 MW | 330 MW |
| 2026-09-17T14:00Z | 1,248 MW | 4,424 MW | 1,297 MW | 194 MW | 351 MW |
| 2026-09-17T15:00Z | 2,140 MW | 1,677 MW | 1,247 MW | 455 MW | 407 MW |
| 2026-09-17T16:00Z | 2,449 MW | 160 MW | 1,110 MW | 756 MW | 503 MW |
| 2026-09-17T17:00Z | 2,492 MW | 49 MW | 922 MW | 1,050 MW | 459 MW |
| 2026-09-17T18:00Z | 2,569 MW | 0 MW | 793 MW | 1,045 MW | 464 MW |
| 2026-09-17T19:00Z | 2,550 MW | 0 MW | 706 MW | 780 MW | 436 MW |
| 2026-09-17T20:00Z | n/a | 0 MW | 591 MW | n/a | n/a |
| 2026-09-17T21:00Z | 2,613 MW | 0 MW | 572 MW | 480 MW | 513 MW |
| 2026-09-17T22:00Z | 2,695 MW | 0 MW | 495 MW | 334 MW | 521 MW |
| 2026-09-17T23:00Z | 2,914 MW | 0 MW | 430 MW | 90 MW | 523 MW |
| 2026-09-18T00:00Z | 3,077 MW | 0 MW | 452 MW | 64 MW | 524 MW |
| 2026-09-18T01:00Z | 3,148 MW | 0 MW | 405 MW | 92 MW | 543 MW |
| 2026-09-18T02:00Z | 3,231 MW | 0 MW | 429 MW | 226 MW | 564 MW |
| 2026-09-18T03:00Z | 3,358 MW | 54 MW | 465 MW | 809 MW | 537 MW |
| 2026-09-18T04:00Z | 3,350 MW | 244 MW | 488 MW | 875 MW | 549 MW |
| 2026-09-18T05:00Z | 2,910 MW | 1,944 MW | 434 MW | 330 MW | 349 MW |
| 2026-09-18T06:00Z | 2,006 MW | 4,599 MW | 388 MW | 171 MW | 307 MW |
| 2026-09-18T07:00Z | 767 MW | 6,365 MW | 332 MW | 99 MW | 302 MW |
| 2026-09-18T08:00Z | 611 MW | 6,807 MW | 294 MW | 99 MW | 299 MW |
| 2026-09-18T09:00Z | 624 MW | 8,040 MW | 352 MW | 95 MW | 299 MW |
| 2026-09-18T10:00Z | 613 MW | 8,503 MW | 340 MW | 76 MW | 298 MW |
| 2026-09-18T11:00Z | 611 MW | 8,124 MW | 304 MW | 77 MW | 298 MW |
| 2026-09-18T12:00Z | n/a | 7,178 MW | 286 MW | n/a | n/a |
| 2026-09-18T13:00Z | 1,428 MW | 5,858 MW | 368 MW | 50 MW | 329 MW |
| 2026-09-18T14:00Z | 2,074 MW | 3,891 MW | 475 MW | 237 MW | 368 MW |
| 2026-09-18T15:00Z | 2,981 MW | 1,318 MW | 467 MW | 643 MW | 413 MW |
| 2026-09-18T16:00Z | 3,123 MW | 89 MW | 471 MW | 967 MW | 476 MW |
| 2026-09-18T17:00Z | n/a | 4 MW | 435 MW | n/a | n/a |
| 2026-09-18T18:00Z | 3,129 MW | 0 MW | 404 MW | 1,184 MW | 322 MW |
| 2026-09-18T19:00Z | 3,196 MW | 0 MW | 299 MW | 794 MW | 354 MW |
| 2026-09-18T20:00Z | n/a | 0 MW | 262 MW | n/a | n/a |
| 2026-09-18T21:00Z | 3,062 MW | 0 MW | 260 MW | 569 MW | 573 MW |
| 2026-09-18T22:00Z | 3,006 MW | 0 MW | 243 MW | 667 MW | 592 MW |
| 2026-09-18T23:00Z | 2,879 MW | 0 MW | 238 MW | 667 MW | 601 MW |
| 2026-09-19T00:00Z | 2,684 MW | 0 MW | 287 MW | 691 MW | 566 MW |
| 2026-09-19T01:00Z | 2,536 MW | 0 MW | 372 MW | 671 MW | 560 MW |
| 2026-09-19T02:00Z | 2,508 MW | 0 MW | 496 MW | 713 MW | 560 MW |
| 2026-09-19T03:00Z | 2,553 MW | 4 MW | 632 MW | 849 MW | 544 MW |
| 2026-09-19T04:00Z | 2,467 MW | 192 MW | 715 MW | 1,015 MW | 571 MW |
| 2026-09-19T05:00Z | 2,072 MW | 1,779 MW | 747 MW | 357 MW | 463 MW |
| 2026-09-19T06:00Z | 1,115 MW | 4,211 MW | 775 MW | 60 MW | 331 MW |
| 2026-09-19T07:00Z | 905 MW | 6,277 MW | 826 MW | 36 MW | 243 MW |
| 2026-09-19T08:00Z | 957 MW | 7,230 MW | 781 MW | 123 MW | 0 MW |
| 2026-09-19T09:00Z | 829 MW | 7,813 MW | 782 MW | 127 MW | 0 MW |
| 2026-09-19T10:00Z | 970 MW | 7,649 MW | 792 MW | 118 MW | 0 MW |
| 2026-09-19T11:00Z | 790 MW | 7,168 MW | 825 MW | 128 MW | 0 MW |
| 2026-09-19T12:00Z | 866 MW | 6,247 MW | 866 MW | 73 MW | 0 MW |
| 2026-09-19T13:00Z | 1,080 MW | 5,110 MW | 771 MW | 66 MW | 0 MW |
| 2026-09-19T14:00Z | 1,646 MW | 3,135 MW | 700 MW | 382 MW | 0 MW |
| 2026-09-19T15:00Z | 2,258 MW | 1,120 MW | 699 MW | 864 MW | 0 MW |
| 2026-09-19T16:00Z | 2,222 MW | 73 MW | 691 MW | 702 MW | 0 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-19T16:00Z.
Installed Capacity
Annual figure for 2026| Solar | |
|---|---|
| Gas | |
| Wind | |
| Hydro | |
| Coal | |
| Storage | |
| Other renewables | |
| Bioenergy |
Total installed capacity in Greece: 27.2 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Athens time dates, through 2026-09-18| Date (Europe/Athens time) | Demand |
|---|---|
| 2025-08-15 | 133 GWh |
| 2025-08-16 | 137 GWh |
| 2025-08-17 | 132 GWh |
| 2025-08-18 | 147 GWh |
| 2025-08-19 | 149 GWh |
| 2025-08-20 | 149 GWh |
| 2025-08-21 | 153 GWh |
| 2025-08-22 | 157 GWh |
| 2025-08-23 | 149 GWh |
| 2025-08-24 | 135 GWh |
| 2025-08-25 | 148 GWh |
| 2025-08-26 | 148 GWh |
| 2025-08-27 | 147 GWh |
| 2025-08-28 | 147 GWh |
| 2025-08-29 | 145 GWh |
| 2025-08-30 | 138 GWh |
| 2025-08-31 | 131 GWh |
| 2025-09-01 | 148 GWh |
| 2025-09-02 | 153 GWh |
| 2025-09-03 | 156 GWh |
| 2025-09-04 | 154 GWh |
| 2025-09-05 | 153 GWh |
| 2025-09-06 | 140 GWh |
| 2025-09-07 | 125 GWh |
| 2025-09-08 | 141 GWh |
| 2025-09-09 | 144 GWh |
| 2025-09-10 | 146 GWh |
| 2025-09-11 | 149 GWh |
| 2025-09-12 | 152 GWh |
| 2025-09-13 | 139 GWh |
| 2025-09-14 | 132 GWh |
| 2025-09-15 | 148 GWh |
| 2025-09-16 | 150 GWh |
| 2025-09-17 | 147 GWh |
| 2025-09-18 | 136 GWh |
| 2025-09-19 | 131 GWh |
| 2025-09-20 | 122 GWh |
| 2025-09-21 | 116 GWh |
| 2025-09-22 | 132 GWh |
| 2025-09-23 | 134 GWh |
| 2025-09-24 | 135 GWh |
| 2025-09-25 | 135 GWh |
| 2025-09-26 | 131 GWh |
| 2025-09-27 | 120 GWh |
| 2025-09-28 | 114 GWh |
| 2025-09-29 | 121 GWh |
| 2025-09-30 | 123 GWh |
| 2025-10-01 | 122 GWh |
| 2025-10-02 | 128 GWh |
| 2025-10-03 | 124 GWh |
| 2025-10-04 | 117 GWh |
| 2025-10-05 | 108 GWh |
| 2025-10-06 | 125 GWh |
| 2025-10-07 | 129 GWh |
| 2025-10-08 | 128 GWh |
| 2025-10-09 | 126 GWh |
| 2025-10-10 | 124 GWh |
| 2025-10-11 | 114 GWh |
| 2025-10-12 | 106 GWh |
| 2025-10-13 | 120 GWh |
| 2025-10-14 | 123 GWh |
| 2025-10-15 | 125 GWh |
| 2025-10-16 | 127 GWh |
| 2025-10-17 | 130 GWh |
| 2025-10-18 | 120 GWh |
| 2025-10-19 | 115 GWh |
| 2025-10-20 | 126 GWh |
| 2025-10-21 | 126 GWh |
| 2025-10-22 | 127 GWh |
| 2025-10-23 | 126 GWh |
| 2025-10-24 | 124 GWh |
| 2025-10-25 | 115 GWh |
| 2025-10-26 | 109 GWh |
| 2025-10-27 | 119 GWh |
| 2025-10-28 | 105 GWh |
| 2025-10-29 | 119 GWh |
| 2025-10-30 | 123 GWh |
| 2025-10-31 | 126 GWh |
| 2025-11-01 | 120 GWh |
| 2025-11-02 | 109 GWh |
| 2025-11-03 | 121 GWh |
| 2025-11-04 | 127 GWh |
| 2025-11-05 | 128 GWh |
| 2025-11-06 | 128 GWh |
| 2025-11-07 | 124 GWh |
| 2025-11-08 | 121 GWh |
| 2025-11-09 | 111 GWh |
| 2025-11-10 | 124 GWh |
| 2025-11-11 | 123 GWh |
| 2025-11-12 | 124 GWh |
| 2025-11-13 | n/a |
| 2025-11-14 | 125 GWh |
| 2025-11-15 | 118 GWh |
| 2025-11-16 | 112 GWh |
| 2025-11-17 | 125 GWh |
| 2025-11-18 | 127 GWh |
| 2025-11-19 | 128 GWh |
| 2025-11-20 | 125 GWh |
| 2025-11-21 | 125 GWh |
| 2025-11-22 | 118 GWh |
| 2025-11-23 | 112 GWh |
| 2025-11-24 | 125 GWh |
| 2025-11-25 | 133 GWh |
| 2025-11-26 | 130 GWh |
| 2025-11-27 | 134 GWh |
| 2025-11-28 | 135 GWh |
| 2025-11-29 | 125 GWh |
| 2025-11-30 | 121 GWh |
| 2025-12-01 | 133 GWh |
| 2025-12-02 | 138 GWh |
| 2025-12-03 | 141 GWh |
| 2025-12-04 | 141 GWh |
| 2025-12-05 | 143 GWh |
| 2025-12-06 | 131 GWh |
| 2025-12-07 | 125 GWh |
| 2025-12-08 | 137 GWh |
| 2025-12-09 | 142 GWh |
| 2025-12-10 | 142 GWh |
| 2025-12-11 | 141 GWh |
| 2025-12-12 | 141 GWh |
| 2025-12-13 | 138 GWh |
| 2025-12-14 | 128 GWh |
| 2025-12-15 | 142 GWh |
| 2025-12-16 | 147 GWh |
| 2025-12-17 | 147 GWh |
| 2025-12-18 | 150 GWh |
| 2025-12-19 | 148 GWh |
| 2025-12-20 | 145 GWh |
| 2025-12-21 | 134 GWh |
| 2025-12-22 | 139 GWh |
| 2025-12-23 | 135 GWh |
| 2025-12-24 | 136 GWh |
| 2025-12-25 | 115 GWh |
| 2025-12-26 | 115 GWh |
| 2025-12-27 | 125 GWh |
| 2025-12-28 | 124 GWh |
| 2025-12-29 | 136 GWh |
| 2025-12-30 | 140 GWh |
| 2025-12-31 | 148 GWh |
| 2026-01-01 | 130 GWh |
| 2026-01-02 | 143 GWh |
| 2026-01-03 | 138 GWh |
| 2026-01-04 | 124 GWh |
| 2026-01-05 | 132 GWh |
| 2026-01-06 | 117 GWh |
| 2026-01-07 | 132 GWh |
| 2026-01-08 | 139 GWh |
| 2026-01-09 | 148 GWh |
| 2026-01-10 | 138 GWh |
| 2026-01-11 | 134 GWh |
| 2026-01-12 | 158 GWh |
| 2026-01-13 | 161 GWh |
| 2026-01-14 | 155 GWh |
| 2026-01-15 | 151 GWh |
| 2026-01-16 | 150 GWh |
| 2026-01-17 | 150 GWh |
| 2026-01-18 | 147 GWh |
| 2026-01-19 | 167 GWh |
| 2026-01-20 | 169 GWh |
| 2026-01-21 | 170 GWh |
| 2026-01-22 | 159 GWh |
| 2026-01-23 | 150 GWh |
| 2026-01-24 | 139 GWh |
| 2026-01-25 | 130 GWh |
| 2026-01-26 | 149 GWh |
| 2026-01-27 | 147 GWh |
| 2026-01-28 | 146 GWh |
| 2026-01-29 | 147 GWh |
| 2026-01-30 | 139 GWh |
| 2026-01-31 | 130 GWh |
| 2026-02-01 | 130 GWh |
| 2026-02-02 | 142 GWh |
| 2026-02-03 | 142 GWh |
| 2026-02-04 | 142 GWh |
| 2026-02-05 | 144 GWh |
| 2026-02-06 | 142 GWh |
| 2026-02-07 | 126 GWh |
| 2026-02-08 | 117 GWh |
| 2026-02-09 | 133 GWh |
| 2026-02-10 | 141 GWh |
| 2026-02-11 | 143 GWh |
| 2026-02-12 | 139 GWh |
| 2026-02-13 | 139 GWh |
| 2026-02-14 | 127 GWh |
| 2026-02-15 | 122 GWh |
| 2026-02-16 | 130 GWh |
| 2026-02-17 | 144 GWh |
| 2026-02-18 | 140 GWh |
| 2026-02-19 | 140 GWh |
| 2026-02-20 | 143 GWh |
| 2026-02-21 | 131 GWh |
| 2026-02-22 | 125 GWh |
| 2026-02-23 | 119 GWh |
| 2026-02-24 | 135 GWh |
| 2026-02-25 | 136 GWh |
| 2026-02-26 | 139 GWh |
| 2026-02-27 | 141 GWh |
| 2026-02-28 | 133 GWh |
| 2026-03-01 | 122 GWh |
| 2026-03-02 | 134 GWh |
| 2026-03-03 | 135 GWh |
| 2026-03-04 | 135 GWh |
| 2026-03-05 | 134 GWh |
| 2026-03-06 | 132 GWh |
| 2026-03-07 | 125 GWh |
| 2026-03-08 | 119 GWh |
| 2026-03-09 | 130 GWh |
| 2026-03-10 | 133 GWh |
| 2026-03-11 | 134 GWh |
| 2026-03-12 | 133 GWh |
| 2026-03-13 | 131 GWh |
| 2026-03-14 | 125 GWh |
| 2026-03-15 | 118 GWh |
| 2026-03-16 | 132 GWh |
| 2026-03-17 | 144 GWh |
| 2026-03-18 | 147 GWh |
| 2026-03-19 | 151 GWh |
| 2026-03-20 | 152 GWh |
| 2026-03-21 | 139 GWh |
| 2026-03-22 | 129 GWh |
| 2026-03-23 | 139 GWh |
| 2026-03-24 | 147 GWh |
| 2026-03-25 | 124 GWh |
| 2026-03-26 | 131 GWh |
| 2026-03-27 | 140 GWh |
| 2026-03-28 | 131 GWh |
| 2026-03-29 | n/a |
| 2026-03-30 | 128 GWh |
| 2026-03-31 | 130 GWh |
| 2026-04-01 | 144 GWh |
| 2026-04-02 | 142 GWh |
| 2026-04-03 | 136 GWh |
| 2026-04-04 | 127 GWh |
| 2026-04-05 | 109 GWh |
| 2026-04-06 | 120 GWh |
| 2026-04-07 | 120 GWh |
| 2026-04-08 | 117 GWh |
| 2026-04-09 | 115 GWh |
| 2026-04-10 | 101 GWh |
| 2026-04-11 | 113 GWh |
| 2026-04-12 | 95.3 GWh |
| 2026-04-13 | 96.3 GWh |
| 2026-04-14 | 118 GWh |
| 2026-04-15 | 124 GWh |
| 2026-04-16 | 123 GWh |
| 2026-04-17 | 119 GWh |
| 2026-04-18 | 111 GWh |
| 2026-04-19 | 102 GWh |
| 2026-04-20 | 112 GWh |
| 2026-04-21 | 116 GWh |
| 2026-04-22 | 121 GWh |
| 2026-04-23 | 125 GWh |
| 2026-04-24 | 118 GWh |
| 2026-04-25 | 112 GWh |
| 2026-04-26 | 101 GWh |
| 2026-04-27 | 112 GWh |
| 2026-04-28 | 114 GWh |
| 2026-04-29 | 115 GWh |
| 2026-04-30 | 117 GWh |
| 2026-05-01 | 109 GWh |
| 2026-05-02 | 115 GWh |
| 2026-05-03 | 114 GWh |
| 2026-05-04 | 119 GWh |
| 2026-05-05 | 118 GWh |
| 2026-05-06 | 117 GWh |
| 2026-05-07 | 118 GWh |
| 2026-05-08 | 122 GWh |
| 2026-05-09 | 111 GWh |
| 2026-05-10 | 103 GWh |
| 2026-05-11 | 114 GWh |
| 2026-05-12 | 118 GWh |
| 2026-05-13 | 119 GWh |
| 2026-05-14 | 119 GWh |
| 2026-05-15 | 117 GWh |
| 2026-05-16 | 115 GWh |
| 2026-05-17 | 103 GWh |
| 2026-05-18 | 115 GWh |
| 2026-05-19 | 119 GWh |
| 2026-05-20 | 118 GWh |
| 2026-05-21 | 119 GWh |
| 2026-05-22 | 120 GWh |
| 2026-05-23 | 114 GWh |
| 2026-05-24 | 104 GWh |
| 2026-05-25 | 115 GWh |
| 2026-05-26 | 122 GWh |
| 2026-05-27 | 124 GWh |
| 2026-05-28 | 127 GWh |
| 2026-05-29 | 126 GWh |
| 2026-05-30 | 116 GWh |
| 2026-05-31 | 109 GWh |
| 2026-06-01 | 111 GWh |
| 2026-06-02 | 130 GWh |
| 2026-06-03 | 132 GWh |
| 2026-06-04 | 133 GWh |
| 2026-06-05 | 130 GWh |
| 2026-06-06 | 125 GWh |
| 2026-06-07 | 119 GWh |
| 2026-06-08 | 136 GWh |
| 2026-06-09 | 138 GWh |
| 2026-06-10 | 139 GWh |
| 2026-06-11 | 139 GWh |
| 2026-06-12 | 136 GWh |
| 2026-06-13 | 122 GWh |
| 2026-06-14 | 113 GWh |
| 2026-06-15 | 133 GWh |
| 2026-06-16 | 143 GWh |
| 2026-06-17 | 142 GWh |
| 2026-06-18 | 142 GWh |
| 2026-06-19 | 141 GWh |
| 2026-06-20 | 131 GWh |
| 2026-06-21 | 125 GWh |
| 2026-06-22 | 147 GWh |
| 2026-06-23 | 154 GWh |
| 2026-06-24 | 154 GWh |
| 2026-06-25 | 157 GWh |
| 2026-06-26 | 161 GWh |
| 2026-06-27 | 155 GWh |
| 2026-06-28 | 143 GWh |
| 2026-06-29 | 161 GWh |
| 2026-06-30 | 173 GWh |
| 2026-07-01 | 171 GWh |
| 2026-07-02 | 172 GWh |
| 2026-07-03 | 176 GWh |
| 2026-07-04 | 163 GWh |
| 2026-07-05 | 143 GWh |
| 2026-07-06 | 159 GWh |
| 2026-07-07 | 166 GWh |
| 2026-07-08 | 170 GWh |
| 2026-07-09 | 166 GWh |
| 2026-07-10 | 164 GWh |
| 2026-07-11 | 154 GWh |
| 2026-07-12 | 139 GWh |
| 2026-07-13 | 166 GWh |
| 2026-07-14 | 169 GWh |
| 2026-07-15 | 171 GWh |
| 2026-07-16 | 178 GWh |
| 2026-07-17 | 183 GWh |
| 2026-07-18 | 175 GWh |
| 2026-07-19 | 166 GWh |
| 2026-07-20 | 191 GWh |
| 2026-07-21 | 198 GWh |
| 2026-07-22 | 195 GWh |
| 2026-07-23 | 175 GWh |
| 2026-07-24 | 154 GWh |
| 2026-07-25 | 128 GWh |
| 2026-07-26 | 124 GWh |
| 2026-07-27 | 153 GWh |
| 2026-07-28 | 170 GWh |
| 2026-07-29 | 174 GWh |
| 2026-07-30 | 170 GWh |
| 2026-07-31 | 167 GWh |
| 2026-08-01 | 155 GWh |
| 2026-08-02 | 145 GWh |
| 2026-08-03 | 165 GWh |
| 2026-08-04 | 172 GWh |
| 2026-08-05 | 175 GWh |
| 2026-08-06 | 178 GWh |
| 2026-08-07 | 177 GWh |
| 2026-08-08 | 170 GWh |
| 2026-08-09 | 162 GWh |
| 2026-08-10 | 170 GWh |
| 2026-08-11 | 170 GWh |
| 2026-08-12 | 170 GWh |
| 2026-08-13 | 166 GWh |
| 2026-08-14 | 153 GWh |
| 2026-08-15 | 124 GWh |
| 2026-08-16 | 121 GWh |
| 2026-08-17 | 142 GWh |
| 2026-08-18 | 151 GWh |
| 2026-08-19 | 154 GWh |
| 2026-08-20 | 158 GWh |
| 2026-08-21 | 161 GWh |
| 2026-08-22 | 159 GWh |
| 2026-08-23 | 157 GWh |
| 2026-08-24 | 178 GWh |
| 2026-08-25 | 181 GWh |
| 2026-08-26 | 182 GWh |
| 2026-08-27 | 181 GWh |
| 2026-08-28 | 179 GWh |
| 2026-08-29 | 154 GWh |
| 2026-08-30 | 144 GWh |
| 2026-08-31 | 163 GWh |
| 2026-09-01 | 170 GWh |
| 2026-09-02 | 172 GWh |
| 2026-09-03 | 166 GWh |
| 2026-09-04 | 159 GWh |
| 2026-09-05 | 146 GWh |
| 2026-09-06 | 140 GWh |
| 2026-09-07 | 162 GWh |
| 2026-09-08 | 156 GWh |
| 2026-09-09 | 154 GWh |
| 2026-09-10 | 156 GWh |
| 2026-09-11 | 156 GWh |
| 2026-09-12 | 142 GWh |
| 2026-09-13 | 126 GWh |
| 2026-09-14 | 139 GWh |
| 2026-09-15 | 141 GWh |
| 2026-09-16 | 135 GWh |
| 2026-09-17 | 138 GWh |
| 2026-09-18 | 137 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-18. Daily totals are summed by World Power Monitor from complete Europe/Athens local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 36.4 TWh | 36.3 TWh | Gas 32.8% | 261 |
| 2025 | 50.1 TWh | 51.0 TWh | Gas 44.9% | 365 |
| 2024 | 50.3 TWh | 50.1 TWh | Gas 42.1% | 366 |
| 2023 | 47.9 TWh | 42.1 TWh | Gas 36.8% | 365 |
| 2022 | 48.8 TWh | 44.0 TWh | Gas 42.9% | 365 |
| 2021 | 51.2 TWh | 46.4 TWh | Gas 47.3% | 365 |
| 2020 | 48.9 TWh | 38.9 TWh | Gas 48.3% | 366 |
| 2019 | 51.7 TWh | 40.6 TWh | Gas 42.6% | 365 |
| 2018 | 51.2 TWh | 43.6 TWh | Gas 34.8% | 365 |
| 2017 (partial) | 51.3 TWh | 44.2 TWh | Coal 37.6% | 363 |
| 2016 (partial) | 49.5 TWh | 39.8 TWh | Coal 36.9% | 359 |
| 2015 (partial) | 50.5 TWh | 29.2 TWh | Coal 29.2% | 364 |
A year is partial when ENTSO-E has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-18.
Power Flows With Neighbours
Net totals, 2026-08-20 (20 August 2026) to 2026-09-18 (18 September 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Albania | Greece exports | 113 GWh |
| Bulgaria | Greece imports | 54.3 GWh |
| North Macedonia | Greece exports | 22.0 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-18.
Share and Embed
Figures as of 2026-09-19 (19 September 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Greece, credited to ENTSO-E. The image is rebuilt with the page.