Germany and Luxembourg demand was 50,670 MW in the hour starting 19 Sept 2026, 18:00 CEST (UTC+02:00). Wind was the largest source in the hour starting 19 Sept 2026, 18:00 CEST (UTC+02:00), at 58% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Germany and Luxembourg is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 19 Sept 2026, 18:00 CEST (UTC+02:00), demand in Germany and Luxembourg was 50,670 MW, against a day-ahead forecast of 50,146 MW.
- Wind supplied 57.7% of Germany and Luxembourg's generation in the hour starting 19 Sept 2026, 18:00 CEST (UTC+02:00).
- The day-ahead price in Germany and Luxembourg averaged EUR 21.75/MWh for delivery on 2026-09-20 (20 September 2026).
- Installed generating capacity in Germany and Luxembourg was 295 GW in 2026, as reported to ENTSO-E.
- Demand in Germany and Luxembourg totalled 471 TWh in 2025.
- Wind supplied 31.1% of Germany and Luxembourg's generation in 2025.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 19 Sept 2026, 18:00 CEST (UTC+02:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-19T16:00:00Z.
Generation by Source
Latest hour with generation by source: 19 Sept 2026, 18:00 CEST (UTC+02:00)| Source | Output | Share |
|---|---|---|
| Wind | 31,171 MW | 57.7% |
| Coal | 5,949 MW | 11.0% |
| Bioenergy | 4,390 MW | 8.1% |
| Gas | 4,201 MW | 7.8% |
| Solar | 3,868 MW | 7.2% |
| Storage | 1,816 MW | 3.4% |
| Hydro | 1,207 MW | 2.2% |
| Other | 947 MW | 1.8% |
| Oil | 370 MW | 0.7% |
| Other renewables | 71 MW | 0.1% |
| Geothermal | 19 MW | 0.0% |
| Total from these sources | 54,011 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-19T16:00:00Z.
Day-Ahead Price
Delivery day 2026-09-20 (20 September 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Germany and Luxembourg and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-20.
Last 30 Days, Hourly
Times in UTC| Hour starting (UTC) | Demand |
|---|---|
| 2026-08-21T22:00Z | 39,059 MW |
| 2026-08-21T23:00Z | 37,837 MW |
| 2026-08-22T00:00Z | 37,994 MW |
| 2026-08-22T01:00Z | 37,385 MW |
| 2026-08-22T02:00Z | 37,840 MW |
| 2026-08-22T03:00Z | 39,625 MW |
| 2026-08-22T04:00Z | 40,321 MW |
| 2026-08-22T05:00Z | 42,543 MW |
| 2026-08-22T06:00Z | 44,937 MW |
| 2026-08-22T07:00Z | 47,375 MW |
| 2026-08-22T08:00Z | 48,534 MW |
| 2026-08-22T09:00Z | 48,565 MW |
| 2026-08-22T10:00Z | 46,641 MW |
| 2026-08-22T11:00Z | 45,425 MW |
| 2026-08-22T12:00Z | 44,101 MW |
| 2026-08-22T13:00Z | 43,586 MW |
| 2026-08-22T14:00Z | 43,130 MW |
| 2026-08-22T15:00Z | 44,977 MW |
| 2026-08-22T16:00Z | 44,884 MW |
| 2026-08-22T17:00Z | 45,306 MW |
| 2026-08-22T18:00Z | 44,219 MW |
| 2026-08-22T19:00Z | 42,245 MW |
| 2026-08-22T20:00Z | 40,067 MW |
| 2026-08-22T21:00Z | 38,650 MW |
| 2026-08-22T22:00Z | 36,375 MW |
| 2026-08-22T23:00Z | 35,453 MW |
| 2026-08-23T00:00Z | 34,468 MW |
| 2026-08-23T01:00Z | 34,045 MW |
| 2026-08-23T02:00Z | 34,283 MW |
| 2026-08-23T03:00Z | 34,723 MW |
| 2026-08-23T04:00Z | 35,441 MW |
| 2026-08-23T05:00Z | 37,052 MW |
| 2026-08-23T06:00Z | 40,460 MW |
| 2026-08-23T07:00Z | 43,669 MW |
| 2026-08-23T08:00Z | 44,488 MW |
| 2026-08-23T09:00Z | 44,660 MW |
| 2026-08-23T10:00Z | 44,013 MW |
| 2026-08-23T11:00Z | 42,873 MW |
| 2026-08-23T12:00Z | 41,160 MW |
| 2026-08-23T13:00Z | 39,383 MW |
| 2026-08-23T14:00Z | 39,787 MW |
| 2026-08-23T15:00Z | 40,926 MW |
| 2026-08-23T16:00Z | 42,718 MW |
| 2026-08-23T17:00Z | 42,449 MW |
| 2026-08-23T18:00Z | 41,951 MW |
| 2026-08-23T19:00Z | 41,113 MW |
| 2026-08-23T20:00Z | 39,891 MW |
| 2026-08-23T21:00Z | 38,251 MW |
| 2026-08-23T22:00Z | 37,425 MW |
| 2026-08-23T23:00Z | 36,539 MW |
| 2026-08-24T00:00Z | 35,954 MW |
| 2026-08-24T01:00Z | 36,264 MW |
| 2026-08-24T02:00Z | 37,009 MW |
| 2026-08-24T03:00Z | 40,945 MW |
| 2026-08-24T04:00Z | 46,963 MW |
| 2026-08-24T05:00Z | 51,704 MW |
| 2026-08-24T06:00Z | 55,015 MW |
| 2026-08-24T07:00Z | 56,056 MW |
| 2026-08-24T08:00Z | 55,858 MW |
| 2026-08-24T09:00Z | 55,250 MW |
| 2026-08-24T10:00Z | 55,078 MW |
| 2026-08-24T11:00Z | 54,696 MW |
| 2026-08-24T12:00Z | 52,693 MW |
| 2026-08-24T13:00Z | 51,590 MW |
| 2026-08-24T14:00Z | 52,415 MW |
| 2026-08-24T15:00Z | 54,118 MW |
| 2026-08-24T16:00Z | 55,141 MW |
| 2026-08-24T17:00Z | 55,195 MW |
| 2026-08-24T18:00Z | 53,491 MW |
| 2026-08-24T19:00Z | 51,325 MW |
| 2026-08-24T20:00Z | 48,108 MW |
| 2026-08-24T21:00Z | 45,081 MW |
| 2026-08-24T22:00Z | 42,752 MW |
| 2026-08-24T23:00Z | 41,406 MW |
| 2026-08-25T00:00Z | 40,805 MW |
| 2026-08-25T01:00Z | 41,110 MW |
| 2026-08-25T02:00Z | 41,200 MW |
| 2026-08-25T03:00Z | 44,513 MW |
| 2026-08-25T04:00Z | 51,059 MW |
| 2026-08-25T05:00Z | 54,450 MW |
| 2026-08-25T06:00Z | 56,442 MW |
| 2026-08-25T07:00Z | 57,902 MW |
| 2026-08-25T08:00Z | 57,859 MW |
| 2026-08-25T09:00Z | 57,096 MW |
| 2026-08-25T10:00Z | 55,991 MW |
| 2026-08-25T11:00Z | 55,689 MW |
| 2026-08-25T12:00Z | 54,425 MW |
| 2026-08-25T13:00Z | 54,748 MW |
| 2026-08-25T14:00Z | 54,730 MW |
| 2026-08-25T15:00Z | 55,443 MW |
| 2026-08-25T16:00Z | 56,064 MW |
| 2026-08-25T17:00Z | 55,231 MW |
| 2026-08-25T18:00Z | 54,346 MW |
| 2026-08-25T19:00Z | 52,740 MW |
| 2026-08-25T20:00Z | 49,191 MW |
| 2026-08-25T21:00Z | 46,557 MW |
| 2026-08-25T22:00Z | 44,644 MW |
| 2026-08-25T23:00Z | 43,578 MW |
| 2026-08-26T00:00Z | 42,746 MW |
| 2026-08-26T01:00Z | 42,845 MW |
| 2026-08-26T02:00Z | 43,188 MW |
| 2026-08-26T03:00Z | 46,264 MW |
| 2026-08-26T04:00Z | 52,063 MW |
| 2026-08-26T05:00Z | 55,588 MW |
| 2026-08-26T06:00Z | 58,479 MW |
| 2026-08-26T07:00Z | 60,848 MW |
| 2026-08-26T08:00Z | 61,087 MW |
| 2026-08-26T09:00Z | 61,123 MW |
| 2026-08-26T10:00Z | 59,403 MW |
| 2026-08-26T11:00Z | 57,211 MW |
| 2026-08-26T12:00Z | 55,043 MW |
| 2026-08-26T13:00Z | 54,616 MW |
| 2026-08-26T14:00Z | 54,523 MW |
| 2026-08-26T15:00Z | 55,859 MW |
| 2026-08-26T16:00Z | 56,262 MW |
| 2026-08-26T17:00Z | 54,726 MW |
| 2026-08-26T18:00Z | 53,954 MW |
| 2026-08-26T19:00Z | 52,137 MW |
| 2026-08-26T20:00Z | 48,874 MW |
| 2026-08-26T21:00Z | 45,700 MW |
| 2026-08-26T22:00Z | 43,385 MW |
| 2026-08-26T23:00Z | 42,863 MW |
| 2026-08-27T00:00Z | 41,761 MW |
| 2026-08-27T01:00Z | 40,505 MW |
| 2026-08-27T02:00Z | 41,280 MW |
| 2026-08-27T03:00Z | 44,487 MW |
| 2026-08-27T04:00Z | 49,900 MW |
| 2026-08-27T05:00Z | 53,903 MW |
| 2026-08-27T06:00Z | 56,628 MW |
| 2026-08-27T07:00Z | 57,776 MW |
| 2026-08-27T08:00Z | 59,285 MW |
| 2026-08-27T09:00Z | 58,639 MW |
| 2026-08-27T10:00Z | 57,959 MW |
| 2026-08-27T11:00Z | 57,300 MW |
| 2026-08-27T12:00Z | 56,380 MW |
| 2026-08-27T13:00Z | 56,615 MW |
| 2026-08-27T14:00Z | 56,518 MW |
| 2026-08-27T15:00Z | 56,519 MW |
| 2026-08-27T16:00Z | 57,326 MW |
| 2026-08-27T17:00Z | 55,968 MW |
| 2026-08-27T18:00Z | 55,080 MW |
| 2026-08-27T19:00Z | 52,791 MW |
| 2026-08-27T20:00Z | 49,128 MW |
| 2026-08-27T21:00Z | 47,248 MW |
| 2026-08-27T22:00Z | 42,666 MW |
| 2026-08-27T23:00Z | 41,275 MW |
| 2026-08-28T00:00Z | 41,656 MW |
| 2026-08-28T01:00Z | 41,088 MW |
| 2026-08-28T02:00Z | 41,003 MW |
| 2026-08-28T03:00Z | 44,916 MW |
| 2026-08-28T04:00Z | 50,305 MW |
| 2026-08-28T05:00Z | 53,334 MW |
| 2026-08-28T06:00Z | 57,250 MW |
| 2026-08-28T07:00Z | 59,240 MW |
| 2026-08-28T08:00Z | 58,322 MW |
| 2026-08-28T09:00Z | 60,258 MW |
| 2026-08-28T10:00Z | 59,851 MW |
| 2026-08-28T11:00Z | 58,000 MW |
| 2026-08-28T12:00Z | 54,997 MW |
| 2026-08-28T13:00Z | 53,894 MW |
| 2026-08-28T14:00Z | 53,699 MW |
| 2026-08-28T15:00Z | 55,080 MW |
| 2026-08-28T16:00Z | 55,193 MW |
| 2026-08-28T17:00Z | 53,637 MW |
| 2026-08-28T18:00Z | 51,167 MW |
| 2026-08-28T19:00Z | 48,863 MW |
| 2026-08-28T20:00Z | 47,109 MW |
| 2026-08-28T21:00Z | 43,009 MW |
| 2026-08-28T22:00Z | 40,593 MW |
| 2026-08-28T23:00Z | 39,761 MW |
| 2026-08-29T00:00Z | 38,344 MW |
| 2026-08-29T01:00Z | 37,947 MW |
| 2026-08-29T02:00Z | 37,942 MW |
| 2026-08-29T03:00Z | 38,834 MW |
| 2026-08-29T04:00Z | 39,226 MW |
| 2026-08-29T05:00Z | 41,597 MW |
| 2026-08-29T06:00Z | 45,923 MW |
| 2026-08-29T07:00Z | 49,133 MW |
| 2026-08-29T08:00Z | 49,779 MW |
| 2026-08-29T09:00Z | 48,916 MW |
| 2026-08-29T10:00Z | 48,774 MW |
| 2026-08-29T11:00Z | 46,425 MW |
| 2026-08-29T12:00Z | 45,115 MW |
| 2026-08-29T13:00Z | 43,904 MW |
| 2026-08-29T14:00Z | 45,114 MW |
| 2026-08-29T15:00Z | 45,867 MW |
| 2026-08-29T16:00Z | 46,250 MW |
| 2026-08-29T17:00Z | 45,889 MW |
| 2026-08-29T18:00Z | 44,026 MW |
| 2026-08-29T19:00Z | 42,941 MW |
| 2026-08-29T20:00Z | 41,366 MW |
| 2026-08-29T21:00Z | 38,563 MW |
| 2026-08-29T22:00Z | 36,168 MW |
| 2026-08-29T23:00Z | 34,761 MW |
| 2026-08-30T00:00Z | 33,564 MW |
| 2026-08-30T01:00Z | 32,988 MW |
| 2026-08-30T02:00Z | 33,476 MW |
| 2026-08-30T03:00Z | 34,120 MW |
| 2026-08-30T04:00Z | 34,892 MW |
| 2026-08-30T05:00Z | 36,568 MW |
| 2026-08-30T06:00Z | 39,715 MW |
| 2026-08-30T07:00Z | 43,842 MW |
| 2026-08-30T08:00Z | 45,561 MW |
| 2026-08-30T09:00Z | 45,690 MW |
| 2026-08-30T10:00Z | 45,752 MW |
| 2026-08-30T11:00Z | 43,612 MW |
| 2026-08-30T12:00Z | 41,933 MW |
| 2026-08-30T13:00Z | 40,297 MW |
| 2026-08-30T14:00Z | 41,557 MW |
| 2026-08-30T15:00Z | 42,279 MW |
| 2026-08-30T16:00Z | 44,282 MW |
| 2026-08-30T17:00Z | 45,156 MW |
| 2026-08-30T18:00Z | 45,451 MW |
| 2026-08-30T19:00Z | 44,558 MW |
| 2026-08-30T20:00Z | 42,661 MW |
| 2026-08-30T21:00Z | 40,884 MW |
| 2026-08-30T22:00Z | 39,640 MW |
| 2026-08-30T23:00Z | 38,522 MW |
| 2026-08-31T00:00Z | 38,009 MW |
| 2026-08-31T01:00Z | 39,077 MW |
| 2026-08-31T02:00Z | 39,804 MW |
| 2026-08-31T03:00Z | 42,934 MW |
| 2026-08-31T04:00Z | 49,784 MW |
| 2026-08-31T05:00Z | 55,225 MW |
| 2026-08-31T06:00Z | 58,957 MW |
| 2026-08-31T07:00Z | 58,933 MW |
| 2026-08-31T08:00Z | 59,090 MW |
| 2026-08-31T09:00Z | 59,958 MW |
| 2026-08-31T10:00Z | 60,569 MW |
| 2026-08-31T11:00Z | 59,309 MW |
| 2026-08-31T12:00Z | 57,265 MW |
| 2026-08-31T13:00Z | 56,399 MW |
| 2026-08-31T14:00Z | 55,496 MW |
| 2026-08-31T15:00Z | 54,983 MW |
| 2026-08-31T16:00Z | 55,875 MW |
| 2026-08-31T17:00Z | 54,880 MW |
| 2026-08-31T18:00Z | 52,009 MW |
| 2026-08-31T19:00Z | 48,622 MW |
| 2026-08-31T20:00Z | 45,829 MW |
| 2026-08-31T21:00Z | 43,622 MW |
| 2026-08-31T22:00Z | 41,864 MW |
| 2026-08-31T23:00Z | 40,869 MW |
| 2026-09-01T00:00Z | 41,216 MW |
| 2026-09-01T01:00Z | 40,854 MW |
| 2026-09-01T02:00Z | 41,603 MW |
| 2026-09-01T03:00Z | 44,509 MW |
| 2026-09-01T04:00Z | 49,802 MW |
| 2026-09-01T05:00Z | 53,244 MW |
| 2026-09-01T06:00Z | 57,606 MW |
| 2026-09-01T07:00Z | 59,700 MW |
| 2026-09-01T08:00Z | 59,730 MW |
| 2026-09-01T09:00Z | 59,909 MW |
| 2026-09-01T10:00Z | 59,596 MW |
| 2026-09-01T11:00Z | 59,254 MW |
| 2026-09-01T12:00Z | 57,683 MW |
| 2026-09-01T13:00Z | 56,346 MW |
| 2026-09-01T14:00Z | 55,656 MW |
| 2026-09-01T15:00Z | 56,791 MW |
| 2026-09-01T16:00Z | 57,003 MW |
| 2026-09-01T17:00Z | 56,854 MW |
| 2026-09-01T18:00Z | 56,379 MW |
| 2026-09-01T19:00Z | 53,624 MW |
| 2026-09-01T20:00Z | 50,427 MW |
| 2026-09-01T21:00Z | 47,791 MW |
| 2026-09-01T22:00Z | 45,452 MW |
| 2026-09-01T23:00Z | 44,134 MW |
| 2026-09-02T00:00Z | 43,338 MW |
| 2026-09-02T01:00Z | 43,216 MW |
| 2026-09-02T02:00Z | 44,752 MW |
| 2026-09-02T03:00Z | 47,599 MW |
| 2026-09-02T04:00Z | 53,386 MW |
| 2026-09-02T05:00Z | 57,803 MW |
| 2026-09-02T06:00Z | 60,905 MW |
| 2026-09-02T07:00Z | 62,248 MW |
| 2026-09-02T08:00Z | 62,537 MW |
| 2026-09-02T09:00Z | 60,925 MW |
| 2026-09-02T10:00Z | 58,415 MW |
| 2026-09-02T11:00Z | 58,840 MW |
| 2026-09-02T12:00Z | 57,194 MW |
| 2026-09-02T13:00Z | 56,522 MW |
| 2026-09-02T14:00Z | 56,027 MW |
| 2026-09-02T15:00Z | 56,858 MW |
| 2026-09-02T16:00Z | 57,705 MW |
| 2026-09-02T17:00Z | 56,535 MW |
| 2026-09-02T18:00Z | 55,575 MW |
| 2026-09-02T19:00Z | 53,363 MW |
| 2026-09-02T20:00Z | 49,843 MW |
| 2026-09-02T21:00Z | 46,096 MW |
| 2026-09-02T22:00Z | 44,029 MW |
| 2026-09-02T23:00Z | 42,161 MW |
| 2026-09-03T00:00Z | 40,350 MW |
| 2026-09-03T01:00Z | 40,781 MW |
| 2026-09-03T02:00Z | 42,761 MW |
| 2026-09-03T03:00Z | 45,411 MW |
| 2026-09-03T04:00Z | 51,268 MW |
| 2026-09-03T05:00Z | 55,146 MW |
| 2026-09-03T06:00Z | 57,454 MW |
| 2026-09-03T07:00Z | 59,067 MW |
| 2026-09-03T08:00Z | 59,905 MW |
| 2026-09-03T09:00Z | 60,423 MW |
| 2026-09-03T10:00Z | 59,908 MW |
| 2026-09-03T11:00Z | 60,831 MW |
| 2026-09-03T12:00Z | 59,566 MW |
| 2026-09-03T13:00Z | 59,428 MW |
| 2026-09-03T14:00Z | 59,013 MW |
| 2026-09-03T15:00Z | 58,230 MW |
| 2026-09-03T16:00Z | 58,364 MW |
| 2026-09-03T17:00Z | 58,440 MW |
| 2026-09-03T18:00Z | 57,730 MW |
| 2026-09-03T19:00Z | 53,560 MW |
| 2026-09-03T20:00Z | 49,826 MW |
| 2026-09-03T21:00Z | 47,815 MW |
| 2026-09-03T22:00Z | 44,596 MW |
| 2026-09-03T23:00Z | 42,957 MW |
| 2026-09-04T00:00Z | 41,745 MW |
| 2026-09-04T01:00Z | 42,659 MW |
| 2026-09-04T02:00Z | 44,511 MW |
| 2026-09-04T03:00Z | 46,993 MW |
| 2026-09-04T04:00Z | 52,453 MW |
| 2026-09-04T05:00Z | 57,639 MW |
| 2026-09-04T06:00Z | 60,315 MW |
| 2026-09-04T07:00Z | 61,661 MW |
| 2026-09-04T08:00Z | 62,529 MW |
| 2026-09-04T09:00Z | 61,574 MW |
| 2026-09-04T10:00Z | 62,098 MW |
| 2026-09-04T11:00Z | 61,387 MW |
| 2026-09-04T12:00Z | 60,272 MW |
| 2026-09-04T13:00Z | 58,773 MW |
| 2026-09-04T14:00Z | 58,016 MW |
| 2026-09-04T15:00Z | 56,959 MW |
| 2026-09-04T16:00Z | 56,201 MW |
| 2026-09-04T17:00Z | 54,625 MW |
| 2026-09-04T18:00Z | 53,711 MW |
| 2026-09-04T19:00Z | 50,662 MW |
| 2026-09-04T20:00Z | 47,738 MW |
| 2026-09-04T21:00Z | 45,685 MW |
| 2026-09-04T22:00Z | 42,667 MW |
| 2026-09-04T23:00Z | 41,722 MW |
| 2026-09-05T00:00Z | 40,882 MW |
| 2026-09-05T01:00Z | 40,831 MW |
| 2026-09-05T02:00Z | 39,883 MW |
| 2026-09-05T03:00Z | 40,479 MW |
| 2026-09-05T04:00Z | 41,548 MW |
| 2026-09-05T05:00Z | 43,544 MW |
| 2026-09-05T06:00Z | 47,819 MW |
| 2026-09-05T07:00Z | 51,033 MW |
| 2026-09-05T08:00Z | 52,985 MW |
| 2026-09-05T09:00Z | 52,213 MW |
| 2026-09-05T10:00Z | 50,799 MW |
| 2026-09-05T11:00Z | 50,295 MW |
| 2026-09-05T12:00Z | 48,026 MW |
| 2026-09-05T13:00Z | 47,438 MW |
| 2026-09-05T14:00Z | 47,373 MW |
| 2026-09-05T15:00Z | 48,018 MW |
| 2026-09-05T16:00Z | 48,399 MW |
| 2026-09-05T17:00Z | 47,757 MW |
| 2026-09-05T18:00Z | 47,200 MW |
| 2026-09-05T19:00Z | 45,483 MW |
| 2026-09-05T20:00Z | 43,203 MW |
| 2026-09-05T21:00Z | 40,879 MW |
| 2026-09-05T22:00Z | 38,556 MW |
| 2026-09-05T23:00Z | 37,250 MW |
| 2026-09-06T00:00Z | 36,578 MW |
| 2026-09-06T01:00Z | 36,089 MW |
| 2026-09-06T02:00Z | 36,146 MW |
| 2026-09-06T03:00Z | 37,117 MW |
| 2026-09-06T04:00Z | 37,549 MW |
| 2026-09-06T05:00Z | 38,897 MW |
| 2026-09-06T06:00Z | 42,384 MW |
| 2026-09-06T07:00Z | 44,741 MW |
| 2026-09-06T08:00Z | 44,689 MW |
| 2026-09-06T09:00Z | 45,326 MW |
| 2026-09-06T10:00Z | 44,982 MW |
| 2026-09-06T11:00Z | 43,840 MW |
| 2026-09-06T12:00Z | 41,946 MW |
| 2026-09-06T13:00Z | 41,123 MW |
| 2026-09-06T14:00Z | 41,195 MW |
| 2026-09-06T15:00Z | 44,083 MW |
| 2026-09-06T16:00Z | 46,944 MW |
| 2026-09-06T17:00Z | 47,159 MW |
| 2026-09-06T18:00Z | 47,626 MW |
| 2026-09-06T19:00Z | 46,128 MW |
| 2026-09-06T20:00Z | 44,413 MW |
| 2026-09-06T21:00Z | 43,455 MW |
| 2026-09-06T22:00Z | 42,203 MW |
| 2026-09-06T23:00Z | 41,036 MW |
| 2026-09-07T00:00Z | 40,594 MW |
| 2026-09-07T01:00Z | 40,534 MW |
| 2026-09-07T02:00Z | 41,173 MW |
| 2026-09-07T03:00Z | 45,051 MW |
| 2026-09-07T04:00Z | 51,443 MW |
| 2026-09-07T05:00Z | 54,907 MW |
| 2026-09-07T06:00Z | 58,271 MW |
| 2026-09-07T07:00Z | 61,408 MW |
| 2026-09-07T08:00Z | 63,106 MW |
| 2026-09-07T09:00Z | 62,421 MW |
| 2026-09-07T10:00Z | 60,796 MW |
| 2026-09-07T11:00Z | 60,302 MW |
| 2026-09-07T12:00Z | 58,238 MW |
| 2026-09-07T13:00Z | 57,565 MW |
| 2026-09-07T14:00Z | 57,370 MW |
| 2026-09-07T15:00Z | 58,220 MW |
| 2026-09-07T16:00Z | 59,246 MW |
| 2026-09-07T17:00Z | 59,027 MW |
| 2026-09-07T18:00Z | 57,510 MW |
| 2026-09-07T19:00Z | 54,462 MW |
| 2026-09-07T20:00Z | 51,100 MW |
| 2026-09-07T21:00Z | 48,211 MW |
| 2026-09-07T22:00Z | 45,913 MW |
| 2026-09-07T23:00Z | 43,897 MW |
| 2026-09-08T00:00Z | 43,473 MW |
| 2026-09-08T01:00Z | 42,916 MW |
| 2026-09-08T02:00Z | 43,865 MW |
| 2026-09-08T03:00Z | 46,641 MW |
| 2026-09-08T04:00Z | 52,501 MW |
| 2026-09-08T05:00Z | 56,247 MW |
| 2026-09-08T06:00Z | 59,731 MW |
| 2026-09-08T07:00Z | 61,732 MW |
| 2026-09-08T08:00Z | 61,567 MW |
| 2026-09-08T09:00Z | 62,490 MW |
| 2026-09-08T10:00Z | 61,580 MW |
| 2026-09-08T11:00Z | 59,853 MW |
| 2026-09-08T12:00Z | 58,134 MW |
| 2026-09-08T13:00Z | 56,276 MW |
| 2026-09-08T14:00Z | 55,506 MW |
| 2026-09-08T15:00Z | 56,963 MW |
| 2026-09-08T16:00Z | 58,597 MW |
| 2026-09-08T17:00Z | 57,756 MW |
| 2026-09-08T18:00Z | 57,133 MW |
| 2026-09-08T19:00Z | 54,021 MW |
| 2026-09-08T20:00Z | 49,946 MW |
| 2026-09-08T21:00Z | 47,033 MW |
| 2026-09-08T22:00Z | 44,616 MW |
| 2026-09-08T23:00Z | 43,028 MW |
| 2026-09-09T00:00Z | 42,145 MW |
| 2026-09-09T01:00Z | 41,374 MW |
| 2026-09-09T02:00Z | 42,766 MW |
| 2026-09-09T03:00Z | 46,784 MW |
| 2026-09-09T04:00Z | 52,959 MW |
| 2026-09-09T05:00Z | 56,465 MW |
| 2026-09-09T06:00Z | 59,730 MW |
| 2026-09-09T07:00Z | 63,029 MW |
| 2026-09-09T08:00Z | 64,093 MW |
| 2026-09-09T09:00Z | 63,872 MW |
| 2026-09-09T10:00Z | 62,683 MW |
| 2026-09-09T11:00Z | 61,980 MW |
| 2026-09-09T12:00Z | 60,993 MW |
| 2026-09-09T13:00Z | 60,044 MW |
| 2026-09-09T14:00Z | 58,665 MW |
| 2026-09-09T15:00Z | 59,123 MW |
| 2026-09-09T16:00Z | 60,745 MW |
| 2026-09-09T17:00Z | 59,981 MW |
| 2026-09-09T18:00Z | 58,278 MW |
| 2026-09-09T19:00Z | 54,925 MW |
| 2026-09-09T20:00Z | 52,086 MW |
| 2026-09-09T21:00Z | 49,343 MW |
| 2026-09-09T22:00Z | 47,353 MW |
| 2026-09-09T23:00Z | 45,048 MW |
| 2026-09-10T00:00Z | 43,336 MW |
| 2026-09-10T01:00Z | 42,877 MW |
| 2026-09-10T02:00Z | 44,448 MW |
| 2026-09-10T03:00Z | 48,186 MW |
| 2026-09-10T04:00Z | 55,065 MW |
| 2026-09-10T05:00Z | 57,909 MW |
| 2026-09-10T06:00Z | 60,224 MW |
| 2026-09-10T07:00Z | 61,382 MW |
| 2026-09-10T08:00Z | 61,055 MW |
| 2026-09-10T09:00Z | 61,274 MW |
| 2026-09-10T10:00Z | 61,142 MW |
| 2026-09-10T11:00Z | 59,714 MW |
| 2026-09-10T12:00Z | 56,998 MW |
| 2026-09-10T13:00Z | 55,993 MW |
| 2026-09-10T14:00Z | 56,058 MW |
| 2026-09-10T15:00Z | 58,149 MW |
| 2026-09-10T16:00Z | 59,275 MW |
| 2026-09-10T17:00Z | 57,965 MW |
| 2026-09-10T18:00Z | 56,885 MW |
| 2026-09-10T19:00Z | 55,006 MW |
| 2026-09-10T20:00Z | 51,733 MW |
| 2026-09-10T21:00Z | 49,077 MW |
| 2026-09-10T22:00Z | 47,379 MW |
| 2026-09-10T23:00Z | 46,292 MW |
| 2026-09-11T00:00Z | 45,440 MW |
| 2026-09-11T01:00Z | 45,958 MW |
| 2026-09-11T02:00Z | 46,429 MW |
| 2026-09-11T03:00Z | 49,204 MW |
| 2026-09-11T04:00Z | 55,598 MW |
| 2026-09-11T05:00Z | 58,590 MW |
| 2026-09-11T06:00Z | 61,475 MW |
| 2026-09-11T07:00Z | 63,189 MW |
| 2026-09-11T08:00Z | 62,791 MW |
| 2026-09-11T09:00Z | 60,806 MW |
| 2026-09-11T10:00Z | 58,157 MW |
| 2026-09-11T11:00Z | 57,131 MW |
| 2026-09-11T12:00Z | 55,758 MW |
| 2026-09-11T13:00Z | 54,661 MW |
| 2026-09-11T14:00Z | 55,585 MW |
| 2026-09-11T15:00Z | 56,785 MW |
| 2026-09-11T16:00Z | 57,388 MW |
| 2026-09-11T17:00Z | 56,613 MW |
| 2026-09-11T18:00Z | 54,661 MW |
| 2026-09-11T19:00Z | 51,717 MW |
| 2026-09-11T20:00Z | 48,741 MW |
| 2026-09-11T21:00Z | 46,059 MW |
| 2026-09-11T22:00Z | 43,121 MW |
| 2026-09-11T23:00Z | 41,504 MW |
| 2026-09-12T00:00Z | 40,505 MW |
| 2026-09-12T01:00Z | 39,705 MW |
| 2026-09-12T02:00Z | 40,379 MW |
| 2026-09-12T03:00Z | 41,098 MW |
| 2026-09-12T04:00Z | 43,143 MW |
| 2026-09-12T05:00Z | 44,911 MW |
| 2026-09-12T06:00Z | 48,658 MW |
| 2026-09-12T07:00Z | 51,899 MW |
| 2026-09-12T08:00Z | 53,262 MW |
| 2026-09-12T09:00Z | 52,357 MW |
| 2026-09-12T10:00Z | 50,271 MW |
| 2026-09-12T11:00Z | 48,345 MW |
| 2026-09-12T12:00Z | 47,016 MW |
| 2026-09-12T13:00Z | 45,555 MW |
| 2026-09-12T14:00Z | 46,783 MW |
| 2026-09-12T15:00Z | 48,334 MW |
| 2026-09-12T16:00Z | 48,710 MW |
| 2026-09-12T17:00Z | 48,549 MW |
| 2026-09-12T18:00Z | 47,781 MW |
| 2026-09-12T19:00Z | 45,754 MW |
| 2026-09-12T20:00Z | 43,549 MW |
| 2026-09-12T21:00Z | 41,414 MW |
| 2026-09-12T22:00Z | 39,067 MW |
| 2026-09-12T23:00Z | 37,285 MW |
| 2026-09-13T00:00Z | 36,815 MW |
| 2026-09-13T01:00Z | 36,769 MW |
| 2026-09-13T02:00Z | 36,331 MW |
| 2026-09-13T03:00Z | 36,987 MW |
| 2026-09-13T04:00Z | 38,162 MW |
| 2026-09-13T05:00Z | 39,794 MW |
| 2026-09-13T06:00Z | 42,799 MW |
| 2026-09-13T07:00Z | 45,784 MW |
| 2026-09-13T08:00Z | 48,135 MW |
| 2026-09-13T09:00Z | 50,284 MW |
| 2026-09-13T10:00Z | 50,050 MW |
| 2026-09-13T11:00Z | 48,483 MW |
| 2026-09-13T12:00Z | 47,399 MW |
| 2026-09-13T13:00Z | 46,957 MW |
| 2026-09-13T14:00Z | 47,636 MW |
| 2026-09-13T15:00Z | 49,742 MW |
| 2026-09-13T16:00Z | 51,096 MW |
| 2026-09-13T17:00Z | 49,976 MW |
| 2026-09-13T18:00Z | 49,117 MW |
| 2026-09-13T19:00Z | 47,689 MW |
| 2026-09-13T20:00Z | 46,751 MW |
| 2026-09-13T21:00Z | 44,653 MW |
| 2026-09-13T22:00Z | 43,200 MW |
| 2026-09-13T23:00Z | 42,202 MW |
| 2026-09-14T00:00Z | 41,874 MW |
| 2026-09-14T01:00Z | 41,433 MW |
| 2026-09-14T02:00Z | 42,798 MW |
| 2026-09-14T03:00Z | 46,723 MW |
| 2026-09-14T04:00Z | 54,408 MW |
| 2026-09-14T05:00Z | 57,854 MW |
| 2026-09-14T06:00Z | 61,050 MW |
| 2026-09-14T07:00Z | 63,174 MW |
| 2026-09-14T08:00Z | 64,395 MW |
| 2026-09-14T09:00Z | 64,160 MW |
| 2026-09-14T10:00Z | 61,362 MW |
| 2026-09-14T11:00Z | 59,961 MW |
| 2026-09-14T12:00Z | 59,022 MW |
| 2026-09-14T13:00Z | 57,674 MW |
| 2026-09-14T14:00Z | 57,903 MW |
| 2026-09-14T15:00Z | 59,031 MW |
| 2026-09-14T16:00Z | 59,450 MW |
| 2026-09-14T17:00Z | 59,013 MW |
| 2026-09-14T18:00Z | 58,088 MW |
| 2026-09-14T19:00Z | 55,461 MW |
| 2026-09-14T20:00Z | 52,380 MW |
| 2026-09-14T21:00Z | 49,095 MW |
| 2026-09-14T22:00Z | 47,582 MW |
| 2026-09-14T23:00Z | 45,604 MW |
| 2026-09-15T00:00Z | 44,468 MW |
| 2026-09-15T01:00Z | 44,844 MW |
| 2026-09-15T02:00Z | 45,645 MW |
| 2026-09-15T03:00Z | 49,205 MW |
| 2026-09-15T04:00Z | 55,475 MW |
| 2026-09-15T05:00Z | 58,457 MW |
| 2026-09-15T06:00Z | 62,588 MW |
| 2026-09-15T07:00Z | 63,060 MW |
| 2026-09-15T08:00Z | 62,225 MW |
| 2026-09-15T09:00Z | 61,518 MW |
| 2026-09-15T10:00Z | 61,071 MW |
| 2026-09-15T11:00Z | 59,777 MW |
| 2026-09-15T12:00Z | 58,062 MW |
| 2026-09-15T13:00Z | 57,547 MW |
| 2026-09-15T14:00Z | 57,562 MW |
| 2026-09-15T15:00Z | 59,553 MW |
| 2026-09-15T16:00Z | 61,452 MW |
| 2026-09-15T17:00Z | 60,642 MW |
| 2026-09-15T18:00Z | 60,083 MW |
| 2026-09-15T19:00Z | 56,836 MW |
| 2026-09-15T20:00Z | 53,651 MW |
| 2026-09-15T21:00Z | 50,379 MW |
| 2026-09-15T22:00Z | 47,802 MW |
| 2026-09-15T23:00Z | 46,241 MW |
| 2026-09-16T00:00Z | 45,539 MW |
| 2026-09-16T01:00Z | 44,598 MW |
| 2026-09-16T02:00Z | 45,665 MW |
| 2026-09-16T03:00Z | 48,563 MW |
| 2026-09-16T04:00Z | 55,681 MW |
| 2026-09-16T05:00Z | 59,437 MW |
| 2026-09-16T06:00Z | 62,626 MW |
| 2026-09-16T07:00Z | 64,492 MW |
| 2026-09-16T08:00Z | 65,373 MW |
| 2026-09-16T09:00Z | 64,693 MW |
| 2026-09-16T10:00Z | 63,501 MW |
| 2026-09-16T11:00Z | 63,020 MW |
| 2026-09-16T12:00Z | 61,151 MW |
| 2026-09-16T13:00Z | 60,935 MW |
| 2026-09-16T14:00Z | 61,109 MW |
| 2026-09-16T15:00Z | 61,939 MW |
| 2026-09-16T16:00Z | 61,851 MW |
| 2026-09-16T17:00Z | 61,091 MW |
| 2026-09-16T18:00Z | 59,611 MW |
| 2026-09-16T19:00Z | 56,405 MW |
| 2026-09-16T20:00Z | 52,921 MW |
| 2026-09-16T21:00Z | 49,427 MW |
| 2026-09-16T22:00Z | 47,329 MW |
| 2026-09-16T23:00Z | 44,387 MW |
| 2026-09-17T00:00Z | 45,152 MW |
| 2026-09-17T01:00Z | 45,076 MW |
| 2026-09-17T02:00Z | 46,469 MW |
| 2026-09-17T03:00Z | 50,191 MW |
| 2026-09-17T04:00Z | 55,695 MW |
| 2026-09-17T05:00Z | 59,402 MW |
| 2026-09-17T06:00Z | 62,499 MW |
| 2026-09-17T07:00Z | 62,505 MW |
| 2026-09-17T08:00Z | 62,784 MW |
| 2026-09-17T09:00Z | 62,112 MW |
| 2026-09-17T10:00Z | 61,262 MW |
| 2026-09-17T11:00Z | 60,145 MW |
| 2026-09-17T12:00Z | 57,930 MW |
| 2026-09-17T13:00Z | 57,393 MW |
| 2026-09-17T14:00Z | 57,966 MW |
| 2026-09-17T15:00Z | 58,895 MW |
| 2026-09-17T16:00Z | 60,399 MW |
| 2026-09-17T17:00Z | 60,601 MW |
| 2026-09-17T18:00Z | 58,839 MW |
| 2026-09-17T19:00Z | 56,658 MW |
| 2026-09-17T20:00Z | 53,085 MW |
| 2026-09-17T21:00Z | 49,971 MW |
| 2026-09-17T22:00Z | 46,023 MW |
| 2026-09-17T23:00Z | 44,137 MW |
| 2026-09-18T00:00Z | 43,182 MW |
| 2026-09-18T01:00Z | 43,671 MW |
| 2026-09-18T02:00Z | 44,260 MW |
| 2026-09-18T03:00Z | 47,308 MW |
| 2026-09-18T04:00Z | 54,464 MW |
| 2026-09-18T05:00Z | 58,035 MW |
| 2026-09-18T06:00Z | 60,133 MW |
| 2026-09-18T07:00Z | 61,725 MW |
| 2026-09-18T08:00Z | 62,486 MW |
| 2026-09-18T09:00Z | 61,418 MW |
| 2026-09-18T10:00Z | 59,492 MW |
| 2026-09-18T11:00Z | 58,847 MW |
| 2026-09-18T12:00Z | 57,795 MW |
| 2026-09-18T13:00Z | 57,180 MW |
| 2026-09-18T14:00Z | 55,909 MW |
| 2026-09-18T15:00Z | 55,558 MW |
| 2026-09-18T16:00Z | 56,667 MW |
| 2026-09-18T17:00Z | 55,710 MW |
| 2026-09-18T18:00Z | 54,440 MW |
| 2026-09-18T19:00Z | 51,476 MW |
| 2026-09-18T20:00Z | 47,707 MW |
| 2026-09-18T21:00Z | 44,617 MW |
| 2026-09-18T22:00Z | 41,284 MW |
| 2026-09-18T23:00Z | 40,864 MW |
| 2026-09-19T00:00Z | 40,712 MW |
| 2026-09-19T01:00Z | 40,950 MW |
| 2026-09-19T02:00Z | 41,219 MW |
| 2026-09-19T03:00Z | 41,352 MW |
| 2026-09-19T04:00Z | 43,070 MW |
| 2026-09-19T05:00Z | 45,022 MW |
| 2026-09-19T06:00Z | 48,465 MW |
| 2026-09-19T07:00Z | 49,824 MW |
| 2026-09-19T08:00Z | 51,419 MW |
| 2026-09-19T09:00Z | 52,205 MW |
| 2026-09-19T10:00Z | 50,475 MW |
| 2026-09-19T11:00Z | 49,270 MW |
| 2026-09-19T12:00Z | 46,930 MW |
| 2026-09-19T13:00Z | 46,977 MW |
| 2026-09-19T14:00Z | 46,968 MW |
| 2026-09-19T15:00Z | 49,791 MW |
| 2026-09-19T16:00Z | 50,670 MW |
| Hour starting (UTC) | Wind | Solar | Coal | Gas | Bioenergy |
|---|---|---|---|---|---|
| 2026-08-21T22:00Z | 8,551 MW | 0 MW | 10,717 MW | 6,528 MW | 3,706 MW |
| 2026-08-21T23:00Z | 10,413 MW | 0 MW | 10,735 MW | 5,648 MW | 3,663 MW |
| 2026-08-22T00:00Z | 11,683 MW | 0 MW | 11,247 MW | 3,891 MW | 3,645 MW |
| 2026-08-22T01:00Z | 12,137 MW | 0 MW | 11,596 MW | 3,304 MW | 3,644 MW |
| 2026-08-22T02:00Z | 13,074 MW | 0 MW | 11,622 MW | 3,028 MW | 3,665 MW |
| 2026-08-22T03:00Z | 14,734 MW | 0 MW | 11,541 MW | 2,780 MW | 3,745 MW |
| 2026-08-22T04:00Z | 16,379 MW | 433 MW | 10,564 MW | 2,679 MW | 3,946 MW |
| 2026-08-22T05:00Z | 16,986 MW | 4,149 MW | 10,100 MW | 2,620 MW | 4,057 MW |
| 2026-08-22T06:00Z | 16,446 MW | 11,503 MW | 8,830 MW | 1,959 MW | 4,016 MW |
| 2026-08-22T07:00Z | 17,472 MW | 20,636 MW | 4,900 MW | 1,503 MW | 3,861 MW |
| 2026-08-22T08:00Z | 18,061 MW | 27,813 MW | 3,464 MW | 1,322 MW | 3,718 MW |
| 2026-08-22T09:00Z | 17,694 MW | 31,922 MW | 3,273 MW | 1,293 MW | 3,626 MW |
| 2026-08-22T10:00Z | 16,307 MW | 35,053 MW | 3,213 MW | 1,285 MW | 3,549 MW |
| 2026-08-22T11:00Z | 15,459 MW | 35,273 MW | 3,237 MW | 1,284 MW | 3,529 MW |
| 2026-08-22T12:00Z | 16,739 MW | 34,689 MW | 3,293 MW | 1,304 MW | 3,532 MW |
| 2026-08-22T13:00Z | 17,412 MW | 31,879 MW | 3,302 MW | 1,398 MW | 3,563 MW |
| 2026-08-22T14:00Z | 19,196 MW | 28,241 MW | 3,476 MW | 1,504 MW | 3,664 MW |
| 2026-08-22T15:00Z | 24,867 MW | 21,440 MW | 4,169 MW | 1,788 MW | 3,795 MW |
| 2026-08-22T16:00Z | 29,079 MW | 12,385 MW | 5,759 MW | 2,874 MW | 4,021 MW |
| 2026-08-22T17:00Z | 26,832 MW | 3,637 MW | 8,238 MW | 4,253 MW | 4,173 MW |
| 2026-08-22T18:00Z | 25,492 MW | 171 MW | 8,430 MW | 4,201 MW | 4,206 MW |
| 2026-08-22T19:00Z | 23,615 MW | 0 MW | 8,464 MW | 3,999 MW | 4,159 MW |
| 2026-08-22T20:00Z | 22,353 MW | 0 MW | 7,970 MW | 3,700 MW | 4,020 MW |
| 2026-08-22T21:00Z | 21,893 MW | 0 MW | 7,844 MW | 3,760 MW | 3,887 MW |
| 2026-08-22T22:00Z | 21,337 MW | 0 MW | 8,463 MW | 3,703 MW | 3,711 MW |
| 2026-08-22T23:00Z | 21,081 MW | 0 MW | 8,580 MW | 3,598 MW | 3,658 MW |
| 2026-08-23T00:00Z | 20,749 MW | 0 MW | 8,342 MW | 3,620 MW | 3,635 MW |
| 2026-08-23T01:00Z | 21,684 MW | 0 MW | 8,052 MW | 2,902 MW | 3,630 MW |
| 2026-08-23T02:00Z | 21,660 MW | 0 MW | 8,087 MW | 2,770 MW | 3,658 MW |
| 2026-08-23T03:00Z | 21,252 MW | 0 MW | 7,475 MW | 2,772 MW | 3,723 MW |
| 2026-08-23T04:00Z | 21,153 MW | 615 MW | 7,133 MW | 2,410 MW | 3,895 MW |
| 2026-08-23T05:00Z | 20,509 MW | 6,006 MW | 6,413 MW | 2,204 MW | 4,003 MW |
| 2026-08-23T06:00Z | 19,519 MW | 16,500 MW | 4,434 MW | 1,524 MW | 3,950 MW |
| 2026-08-23T07:00Z | 18,416 MW | 27,536 MW | 3,439 MW | 1,269 MW | 3,805 MW |
| 2026-08-23T08:00Z | 13,967 MW | 34,327 MW | 3,439 MW | 1,246 MW | 3,687 MW |
| 2026-08-23T09:00Z | 13,154 MW | 37,684 MW | 3,425 MW | 1,244 MW | 3,605 MW |
| 2026-08-23T10:00Z | 12,365 MW | 38,349 MW | 3,395 MW | 1,257 MW | 3,527 MW |
| 2026-08-23T11:00Z | 10,405 MW | 38,621 MW | 3,441 MW | 1,256 MW | 3,491 MW |
| 2026-08-23T12:00Z | 9,619 MW | 37,148 MW | 3,496 MW | 1,248 MW | 3,496 MW |
| 2026-08-23T13:00Z | 10,929 MW | 34,970 MW | 3,680 MW | 1,246 MW | 3,550 MW |
| 2026-08-23T14:00Z | 12,092 MW | 29,960 MW | 3,860 MW | 1,253 MW | 3,637 MW |
| 2026-08-23T15:00Z | 19,184 MW | 24,050 MW | 4,666 MW | 1,380 MW | 3,769 MW |
| 2026-08-23T16:00Z | 18,712 MW | 12,968 MW | 8,319 MW | 1,937 MW | 3,973 MW |
| 2026-08-23T17:00Z | 15,687 MW | 3,571 MW | 9,749 MW | 2,443 MW | 4,114 MW |
| 2026-08-23T18:00Z | 13,843 MW | 139 MW | 10,364 MW | 3,029 MW | 4,164 MW |
| 2026-08-23T19:00Z | 12,740 MW | 0 MW | 10,733 MW | 3,550 MW | 4,124 MW |
| 2026-08-23T20:00Z | 12,582 MW | 0 MW | 10,915 MW | 3,567 MW | 3,998 MW |
| 2026-08-23T21:00Z | 12,750 MW | 0 MW | 11,347 MW | 3,513 MW | 3,855 MW |
| 2026-08-23T22:00Z | 12,022 MW | 0 MW | 11,745 MW | 3,601 MW | 3,733 MW |
| 2026-08-23T23:00Z | 11,248 MW | 0 MW | 11,754 MW | 3,576 MW | 3,687 MW |
| 2026-08-24T00:00Z | 10,710 MW | 0 MW | 11,952 MW | 3,598 MW | 3,662 MW |
| 2026-08-24T01:00Z | 9,647 MW | 0 MW | 12,155 MW | 3,516 MW | 3,662 MW |
| 2026-08-24T02:00Z | 8,565 MW | 0 MW | 12,384 MW | 3,614 MW | 3,671 MW |
| 2026-08-24T03:00Z | 8,210 MW | 0 MW | 12,979 MW | 3,795 MW | 3,726 MW |
| 2026-08-24T04:00Z | 7,900 MW | 616 MW | 13,130 MW | 4,358 MW | 3,909 MW |
| 2026-08-24T05:00Z | 6,672 MW | 6,388 MW | 13,155 MW | 4,454 MW | 4,007 MW |
| 2026-08-24T06:00Z | 4,733 MW | 17,738 MW | 12,880 MW | 4,033 MW | 3,962 MW |
| 2026-08-24T07:00Z | 3,224 MW | 30,282 MW | 11,938 MW | 2,887 MW | 3,864 MW |
| 2026-08-24T08:00Z | 3,029 MW | 38,691 MW | 9,356 MW | 2,258 MW | 3,733 MW |
| 2026-08-24T09:00Z | 3,091 MW | 42,514 MW | 7,590 MW | 2,133 MW | 3,646 MW |
| 2026-08-24T10:00Z | 2,911 MW | 45,307 MW | 7,156 MW | 1,961 MW | 3,575 MW |
| 2026-08-24T11:00Z | 2,812 MW | 45,250 MW | 6,533 MW | 1,955 MW | 3,541 MW |
| 2026-08-24T12:00Z | 3,031 MW | 43,430 MW | 6,783 MW | 1,963 MW | 3,547 MW |
| 2026-08-24T13:00Z | 3,446 MW | 39,409 MW | 8,246 MW | 1,994 MW | 3,569 MW |
| 2026-08-24T14:00Z | 4,098 MW | 31,657 MW | 11,320 MW | 2,190 MW | 3,668 MW |
| 2026-08-24T15:00Z | 5,054 MW | 21,015 MW | 13,794 MW | 3,325 MW | 3,995 MW |
| 2026-08-24T16:00Z | 5,871 MW | 10,449 MW | 14,706 MW | 4,704 MW | 4,129 MW |
| 2026-08-24T17:00Z | 6,831 MW | 2,769 MW | 14,905 MW | 5,403 MW | 4,227 MW |
| 2026-08-24T18:00Z | 8,296 MW | 126 MW | 14,946 MW | 5,585 MW | 4,299 MW |
| 2026-08-24T19:00Z | 10,977 MW | 0 MW | 14,922 MW | 5,592 MW | 4,262 MW |
| 2026-08-24T20:00Z | 13,538 MW | 0 MW | 14,859 MW | 5,420 MW | 4,170 MW |
| 2026-08-24T21:00Z | 15,919 MW | 0 MW | 14,800 MW | 4,953 MW | 4,039 MW |
| 2026-08-24T22:00Z | 17,625 MW | 0 MW | 14,817 MW | 4,823 MW | 3,906 MW |
| 2026-08-24T23:00Z | 18,094 MW | 0 MW | 14,797 MW | 4,665 MW | 3,861 MW |
| 2026-08-25T00:00Z | 18,026 MW | 0 MW | 14,708 MW | 4,517 MW | 3,836 MW |
| 2026-08-25T01:00Z | 18,150 MW | 0 MW | 14,661 MW | 4,461 MW | 3,822 MW |
| 2026-08-25T02:00Z | 18,090 MW | 0 MW | 14,660 MW | 4,555 MW | 3,837 MW |
| 2026-08-25T03:00Z | 18,370 MW | 0 MW | 14,696 MW | 5,081 MW | 3,890 MW |
| 2026-08-25T04:00Z | 19,226 MW | 584 MW | 14,755 MW | 5,615 MW | 4,029 MW |
| 2026-08-25T05:00Z | 17,458 MW | 5,164 MW | 14,735 MW | 5,954 MW | 4,122 MW |
| 2026-08-25T06:00Z | 13,017 MW | 13,461 MW | 14,134 MW | 6,099 MW | 4,099 MW |
| 2026-08-25T07:00Z | 10,408 MW | 22,239 MW | 13,585 MW | 4,896 MW | 4,008 MW |
| 2026-08-25T08:00Z | 12,708 MW | 29,173 MW | 12,000 MW | 2,750 MW | 3,892 MW |
| 2026-08-25T09:00Z | 13,708 MW | 32,407 MW | 10,513 MW | 2,607 MW | 3,810 MW |
| 2026-08-25T10:00Z | 12,829 MW | 34,265 MW | 10,026 MW | 2,670 MW | 3,735 MW |
| 2026-08-25T11:00Z | 13,052 MW | 34,107 MW | 9,880 MW | 2,517 MW | 3,730 MW |
| 2026-08-25T12:00Z | 12,892 MW | 32,285 MW | 10,058 MW | 2,642 MW | 3,709 MW |
| 2026-08-25T13:00Z | 15,218 MW | 27,889 MW | 10,835 MW | 2,553 MW | 3,738 MW |
| 2026-08-25T14:00Z | 15,602 MW | 21,971 MW | 12,489 MW | 3,029 MW | 3,835 MW |
| 2026-08-25T15:00Z | 16,257 MW | 14,486 MW | 13,609 MW | 4,648 MW | 3,970 MW |
| 2026-08-25T16:00Z | 15,710 MW | 7,058 MW | 14,120 MW | 6,783 MW | 4,165 MW |
| 2026-08-25T17:00Z | 14,371 MW | 1,872 MW | 14,265 MW | 7,336 MW | 4,272 MW |
| 2026-08-25T18:00Z | 15,832 MW | 82 MW | 14,253 MW | 7,778 MW | 4,303 MW |
| 2026-08-25T19:00Z | 18,433 MW | 0 MW | 14,435 MW | 7,574 MW | 4,272 MW |
| 2026-08-25T20:00Z | 19,303 MW | 0 MW | 14,508 MW | 7,419 MW | 4,176 MW |
| 2026-08-25T21:00Z | 19,185 MW | 0 MW | 14,488 MW | 7,089 MW | 4,051 MW |
| 2026-08-25T22:00Z | 18,943 MW | 0 MW | 14,142 MW | 6,056 MW | 3,913 MW |
| 2026-08-25T23:00Z | 18,337 MW | 0 MW | 14,110 MW | 5,989 MW | 3,874 MW |
| 2026-08-26T00:00Z | 17,702 MW | 0 MW | 14,522 MW | 5,260 MW | 3,844 MW |
| 2026-08-26T01:00Z | 16,990 MW | 0 MW | 14,501 MW | 4,826 MW | 3,831 MW |
| 2026-08-26T02:00Z | 16,203 MW | 0 MW | 14,591 MW | 4,973 MW | 3,802 MW |
| 2026-08-26T03:00Z | 15,657 MW | 0 MW | 14,772 MW | 5,376 MW | 3,911 MW |
| 2026-08-26T04:00Z | 15,255 MW | 368 MW | 14,971 MW | 5,840 MW | 4,046 MW |
| 2026-08-26T05:00Z | 13,652 MW | 3,873 MW | 14,752 MW | 6,018 MW | 4,148 MW |
| 2026-08-26T06:00Z | 10,229 MW | 10,669 MW | 14,515 MW | 5,953 MW | 4,128 MW |
| 2026-08-26T07:00Z | 8,430 MW | 19,910 MW | 14,029 MW | 5,388 MW | 4,042 MW |
| 2026-08-26T08:00Z | 9,708 MW | 29,672 MW | 13,321 MW | 3,816 MW | 3,909 MW |
| 2026-08-26T09:00Z | 13,268 MW | 37,054 MW | 11,106 MW | 2,852 MW | 3,811 MW |
| 2026-08-26T10:00Z | 15,295 MW | 40,693 MW | 8,254 MW | 2,572 MW | 3,759 MW |
| 2026-08-26T11:00Z | 15,951 MW | 41,633 MW | 7,548 MW | 2,484 MW | 3,724 MW |
| 2026-08-26T12:00Z | 16,460 MW | 39,649 MW | 7,349 MW | 2,425 MW | 3,712 MW |
| 2026-08-26T13:00Z | 17,840 MW | 35,898 MW | 8,200 MW | 2,416 MW | 3,749 MW |
| 2026-08-26T14:00Z | 18,904 MW | 29,545 MW | 10,295 MW | 2,680 MW | 3,866 MW |
| 2026-08-26T15:00Z | 19,614 MW | 21,004 MW | 12,523 MW | 3,910 MW | 4,002 MW |
| 2026-08-26T16:00Z | 19,386 MW | 10,488 MW | 13,506 MW | 5,811 MW | 4,202 MW |
| 2026-08-26T17:00Z | 18,137 MW | 2,554 MW | 13,739 MW | 6,590 MW | 4,323 MW |
| 2026-08-26T18:00Z | 19,858 MW | 57 MW | 13,711 MW | 7,180 MW | 4,335 MW |
| 2026-08-26T19:00Z | 22,389 MW | 0 MW | 13,263 MW | 6,862 MW | 4,301 MW |
| 2026-08-26T20:00Z | 23,830 MW | 0 MW | 12,907 MW | 7,228 MW | 4,173 MW |
| 2026-08-26T21:00Z | 24,599 MW | 0 MW | 12,425 MW | 6,192 MW | 4,036 MW |
| 2026-08-26T22:00Z | 24,998 MW | 0 MW | 12,700 MW | 4,902 MW | 3,905 MW |
| 2026-08-26T23:00Z | 25,688 MW | 0 MW | 12,681 MW | 4,542 MW | 3,840 MW |
| 2026-08-27T00:00Z | 25,796 MW | 0 MW | 12,379 MW | 4,428 MW | 3,807 MW |
| 2026-08-27T01:00Z | 25,218 MW | 0 MW | 12,330 MW | 4,325 MW | 3,803 MW |
| 2026-08-27T02:00Z | 25,635 MW | 0 MW | 12,507 MW | 4,475 MW | 3,828 MW |
| 2026-08-27T03:00Z | 25,630 MW | 0 MW | 12,802 MW | 4,751 MW | 3,895 MW |
| 2026-08-27T04:00Z | 25,829 MW | 517 MW | 12,919 MW | 5,270 MW | 4,049 MW |
| 2026-08-27T05:00Z | 23,547 MW | 5,977 MW | 12,797 MW | 5,166 MW | 4,132 MW |
| 2026-08-27T06:00Z | 20,150 MW | 16,898 MW | 11,788 MW | 4,327 MW | 4,089 MW |
| 2026-08-27T07:00Z | 17,316 MW | 28,857 MW | 10,741 MW | 3,625 MW | 3,986 MW |
| 2026-08-27T08:00Z | 15,770 MW | 39,339 MW | 9,406 MW | 3,159 MW | 3,872 MW |
| 2026-08-27T09:00Z | 16,409 MW | 46,751 MW | 8,253 MW | 2,503 MW | 3,794 MW |
| 2026-08-27T10:00Z | 17,245 MW | 49,906 MW | 8,074 MW | 2,523 MW | 3,711 MW |
| 2026-08-27T11:00Z | 17,032 MW | 49,421 MW | 8,169 MW | 2,496 MW | 3,667 MW |
| 2026-08-27T12:00Z | 18,137 MW | 45,906 MW | 8,040 MW | 2,423 MW | 3,673 MW |
| 2026-08-27T13:00Z | 20,406 MW | 39,326 MW | 8,105 MW | 2,814 MW | 3,704 MW |
| 2026-08-27T14:00Z | 20,672 MW | 29,832 MW | 9,649 MW | 3,367 MW | 3,834 MW |
| 2026-08-27T15:00Z | 22,871 MW | 17,833 MW | 10,681 MW | 4,529 MW | 3,980 MW |
| 2026-08-27T16:00Z | 24,866 MW | 7,851 MW | 11,141 MW | 5,981 MW | 4,182 MW |
| 2026-08-27T17:00Z | 25,036 MW | 1,722 MW | 11,805 MW | 6,968 MW | 4,305 MW |
| 2026-08-27T18:00Z | 27,812 MW | 32 MW | 11,642 MW | 7,068 MW | 4,314 MW |
| 2026-08-27T19:00Z | 29,262 MW | 0 MW | 11,388 MW | 6,864 MW | 4,267 MW |
| 2026-08-27T20:00Z | 29,434 MW | 0 MW | 10,953 MW | 6,483 MW | 4,103 MW |
| 2026-08-27T21:00Z | 29,828 MW | 0 MW | 11,184 MW | 6,245 MW | 3,976 MW |
| 2026-08-27T22:00Z | 29,677 MW | 0 MW | 11,865 MW | 5,082 MW | 3,830 MW |
| 2026-08-27T23:00Z | 28,247 MW | 0 MW | 12,235 MW | 4,394 MW | 3,789 MW |
| 2026-08-28T00:00Z | 25,170 MW | 0 MW | 11,853 MW | 4,237 MW | 3,763 MW |
| 2026-08-28T01:00Z | 22,492 MW | 0 MW | 11,537 MW | 4,374 MW | 3,767 MW |
| 2026-08-28T02:00Z | 20,233 MW | 0 MW | 11,258 MW | 4,400 MW | 3,793 MW |
| 2026-08-28T03:00Z | 19,567 MW | 0 MW | 11,304 MW | 4,501 MW | 3,871 MW |
| 2026-08-28T04:00Z | 19,491 MW | 163 MW | 12,084 MW | 4,921 MW | 4,060 MW |
| 2026-08-28T05:00Z | 18,095 MW | 2,621 MW | 12,380 MW | 4,823 MW | 4,185 MW |
| 2026-08-28T06:00Z | 17,189 MW | 8,072 MW | 11,810 MW | 4,695 MW | 4,161 MW |
| 2026-08-28T07:00Z | 14,466 MW | 14,173 MW | 11,417 MW | 4,211 MW | 4,054 MW |
| 2026-08-28T08:00Z | 13,057 MW | 19,011 MW | 10,867 MW | 4,137 MW | 3,914 MW |
| 2026-08-28T09:00Z | 12,110 MW | 20,555 MW | 10,874 MW | 4,959 MW | 3,816 MW |
| 2026-08-28T10:00Z | 12,579 MW | 20,763 MW | 10,857 MW | 4,690 MW | 3,745 MW |
| 2026-08-28T11:00Z | 16,291 MW | 22,257 MW | 10,845 MW | 3,509 MW | 3,725 MW |
| 2026-08-28T12:00Z | 18,594 MW | 21,843 MW | 10,677 MW | 3,178 MW | 3,733 MW |
| 2026-08-28T13:00Z | 19,382 MW | 20,345 MW | 10,721 MW | 2,824 MW | 3,736 MW |
| 2026-08-28T14:00Z | 20,012 MW | 17,256 MW | 12,199 MW | 2,883 MW | 3,820 MW |
| 2026-08-28T15:00Z | 21,192 MW | 11,829 MW | 12,741 MW | 3,314 MW | 4,019 MW |
| 2026-08-28T16:00Z | 20,619 MW | 6,464 MW | 13,064 MW | 3,750 MW | 4,223 MW |
| 2026-08-28T17:00Z | 21,986 MW | 1,680 MW | 13,187 MW | 3,947 MW | 4,309 MW |
| 2026-08-28T18:00Z | 22,424 MW | 48 MW | 13,125 MW | 4,006 MW | 4,328 MW |
| 2026-08-28T19:00Z | 23,462 MW | 0 MW | 13,078 MW | 3,793 MW | 4,266 MW |
| 2026-08-28T20:00Z | 26,107 MW | 0 MW | 12,287 MW | 3,387 MW | 4,116 MW |
| 2026-08-28T21:00Z | 26,376 MW | 0 MW | 10,979 MW | 2,970 MW | 3,978 MW |
| 2026-08-28T22:00Z | 26,424 MW | 0 MW | 9,885 MW | 2,631 MW | 3,836 MW |
| 2026-08-28T23:00Z | 28,112 MW | 0 MW | 9,066 MW | 2,223 MW | 3,803 MW |
| 2026-08-29T00:00Z | 29,292 MW | 0 MW | 8,207 MW | 1,988 MW | 3,780 MW |
| 2026-08-29T01:00Z | 30,129 MW | 0 MW | 7,204 MW | 1,983 MW | 3,764 MW |
| 2026-08-29T02:00Z | 30,583 MW | 0 MW | 7,030 MW | 1,798 MW | 3,797 MW |
| 2026-08-29T03:00Z | 30,582 MW | 0 MW | 7,028 MW | 1,810 MW | 3,888 MW |
| 2026-08-29T04:00Z | 31,663 MW | 299 MW | 6,943 MW | 1,805 MW | 4,111 MW |
| 2026-08-29T05:00Z | 30,330 MW | 5,145 MW | 6,484 MW | 1,855 MW | 4,244 MW |
| 2026-08-29T06:00Z | 29,254 MW | 16,136 MW | 4,577 MW | 1,717 MW | 4,233 MW |
| 2026-08-29T07:00Z | 26,826 MW | 27,352 MW | 3,467 MW | 1,647 MW | 4,088 MW |
| 2026-08-29T08:00Z | 20,368 MW | 34,966 MW | 3,275 MW | 1,638 MW | 3,896 MW |
| 2026-08-29T09:00Z | 18,105 MW | 39,129 MW | 3,265 MW | 1,625 MW | 3,792 MW |
| 2026-08-29T10:00Z | 17,669 MW | 40,597 MW | 3,203 MW | 1,547 MW | 3,696 MW |
| 2026-08-29T11:00Z | 18,702 MW | 39,227 MW | 3,196 MW | 1,455 MW | 3,666 MW |
| 2026-08-29T12:00Z | 19,822 MW | 35,670 MW | 3,258 MW | 1,378 MW | 3,660 MW |
| 2026-08-29T13:00Z | 21,971 MW | 31,498 MW | 3,366 MW | 1,263 MW | 3,700 MW |
| 2026-08-29T14:00Z | 24,623 MW | 24,954 MW | 3,737 MW | 1,234 MW | 3,823 MW |
| 2026-08-29T15:00Z | 23,561 MW | 16,021 MW | 4,850 MW | 1,445 MW | 4,008 MW |
| 2026-08-29T16:00Z | 20,653 MW | 7,004 MW | 7,711 MW | 1,885 MW | 4,214 MW |
| 2026-08-29T17:00Z | 16,439 MW | 1,567 MW | 8,238 MW | 2,254 MW | 4,331 MW |
| 2026-08-29T18:00Z | 15,123 MW | 16 MW | 8,304 MW | 2,329 MW | 4,329 MW |
| 2026-08-29T19:00Z | 17,586 MW | 0 MW | 8,362 MW | 2,346 MW | 4,283 MW |
| 2026-08-29T20:00Z | 21,558 MW | 0 MW | 8,335 MW | 2,287 MW | 4,114 MW |
| 2026-08-29T21:00Z | 24,781 MW | 0 MW | 7,312 MW | 2,136 MW | 3,957 MW |
| 2026-08-29T22:00Z | 27,160 MW | 0 MW | 6,692 MW | 1,827 MW | 3,889 MW |
| 2026-08-29T23:00Z | 28,373 MW | 0 MW | 6,161 MW | 1,581 MW | 3,828 MW |
| 2026-08-30T00:00Z | 29,875 MW | 0 MW | 5,805 MW | 1,458 MW | 3,796 MW |
| 2026-08-30T01:00Z | 31,242 MW | 0 MW | 5,209 MW | 1,330 MW | 3,805 MW |
| 2026-08-30T02:00Z | 32,415 MW | 0 MW | 4,557 MW | 1,398 MW | 3,834 MW |
| 2026-08-30T03:00Z | 34,296 MW | 0 MW | 4,000 MW | 1,631 MW | 3,908 MW |
| 2026-08-30T04:00Z | 36,667 MW | 203 MW | 3,785 MW | 1,601 MW | 4,105 MW |
| 2026-08-30T05:00Z | 37,802 MW | 3,928 MW | 3,989 MW | 1,664 MW | 4,230 MW |
| 2026-08-30T06:00Z | 36,119 MW | 12,793 MW | 3,956 MW | 1,773 MW | 4,231 MW |
| 2026-08-30T07:00Z | 31,058 MW | 21,487 MW | 3,594 MW | 1,349 MW | 4,099 MW |
| 2026-08-30T08:00Z | 28,840 MW | 27,988 MW | 3,326 MW | 1,218 MW | 3,949 MW |
| 2026-08-30T09:00Z | 27,632 MW | 31,698 MW | 3,342 MW | 1,223 MW | 3,820 MW |
| 2026-08-30T10:00Z | 24,942 MW | 33,602 MW | 3,371 MW | 1,205 MW | 3,715 MW |
| 2026-08-30T11:00Z | 21,777 MW | 34,603 MW | 3,352 MW | 1,183 MW | 3,705 MW |
| 2026-08-30T12:00Z | 20,397 MW | 33,874 MW | 3,412 MW | 1,187 MW | 3,698 MW |
| 2026-08-30T13:00Z | 22,206 MW | 30,792 MW | 3,526 MW | 1,201 MW | 3,750 MW |
| 2026-08-30T14:00Z | 22,321 MW | 24,573 MW | 3,999 MW | 1,264 MW | 3,857 MW |
| 2026-08-30T15:00Z | 21,626 MW | 17,328 MW | 6,635 MW | 1,651 MW | 4,035 MW |
| 2026-08-30T16:00Z | 16,767 MW | 8,112 MW | 9,322 MW | 2,656 MW | 4,300 MW |
| 2026-08-30T17:00Z | 11,434 MW | 1,783 MW | 10,482 MW | 3,440 MW | 4,439 MW |
| 2026-08-30T18:00Z | 7,313 MW | 18 MW | 10,931 MW | 3,893 MW | 4,443 MW |
| 2026-08-30T19:00Z | 6,324 MW | 0 MW | 10,949 MW | 4,080 MW | 4,318 MW |
| 2026-08-30T20:00Z | 6,027 MW | 0 MW | 10,992 MW | 3,993 MW | 4,126 MW |
| 2026-08-30T21:00Z | 5,632 MW | 0 MW | 11,053 MW | 3,915 MW | 3,985 MW |
| 2026-08-30T22:00Z | 5,885 MW | 0 MW | 11,130 MW | 3,849 MW | 3,883 MW |
| 2026-08-30T23:00Z | 6,906 MW | 0 MW | 11,141 MW | 3,704 MW | 3,837 MW |
| 2026-08-31T00:00Z | 9,537 MW | 0 MW | 11,168 MW | 2,773 MW | 3,796 MW |
| 2026-08-31T01:00Z | 12,960 MW | 0 MW | 11,105 MW | 2,572 MW | 3,786 MW |
| 2026-08-31T02:00Z | 15,474 MW | 0 MW | 10,936 MW | 2,558 MW | 3,802 MW |
| 2026-08-31T03:00Z | 18,109 MW | 0 MW | 10,811 MW | 2,679 MW | 3,870 MW |
| 2026-08-31T04:00Z | 20,563 MW | 128 MW | 10,720 MW | 2,611 MW | 4,059 MW |
| 2026-08-31T05:00Z | 21,951 MW | 2,736 MW | 10,284 MW | 2,727 MW | 4,183 MW |
| 2026-08-31T06:00Z | 22,946 MW | 10,534 MW | 8,521 MW | 2,733 MW | 4,165 MW |
| 2026-08-31T07:00Z | 24,425 MW | 20,527 MW | 7,277 MW | 2,276 MW | 4,083 MW |
| 2026-08-31T08:00Z | 26,053 MW | 29,427 MW | 5,913 MW | 1,916 MW | 3,931 MW |
| 2026-08-31T09:00Z | 27,157 MW | 36,094 MW | 4,427 MW | 1,630 MW | 3,847 MW |
| 2026-08-31T10:00Z | 25,202 MW | 38,479 MW | 4,277 MW | 1,413 MW | 3,725 MW |
| 2026-08-31T11:00Z | 25,914 MW | 39,122 MW | 4,258 MW | 1,374 MW | 3,685 MW |
| 2026-08-31T12:00Z | 26,442 MW | 36,779 MW | 4,158 MW | 1,391 MW | 3,668 MW |
| 2026-08-31T13:00Z | 27,362 MW | 32,602 MW | 4,310 MW | 1,357 MW | 3,695 MW |
| 2026-08-31T14:00Z | 29,985 MW | 25,658 MW | 4,877 MW | 1,410 MW | 3,824 MW |
| 2026-08-31T15:00Z | 30,593 MW | 17,425 MW | 7,543 MW | 1,748 MW | 3,997 MW |
| 2026-08-31T16:00Z | 29,866 MW | 8,328 MW | 10,644 MW | 2,954 MW | 4,239 MW |
| 2026-08-31T17:00Z | 28,550 MW | 1,653 MW | 11,558 MW | 4,165 MW | 4,349 MW |
| 2026-08-31T18:00Z | 28,312 MW | 20 MW | 12,032 MW | 4,856 MW | 4,353 MW |
| 2026-08-31T19:00Z | 28,408 MW | 0 MW | 11,876 MW | 5,398 MW | 4,252 MW |
| 2026-08-31T20:00Z | 28,233 MW | 0 MW | 12,080 MW | 5,496 MW | 4,109 MW |
| 2026-08-31T21:00Z | 28,504 MW | 0 MW | 12,273 MW | 5,361 MW | 3,990 MW |
| 2026-08-31T22:00Z | 29,175 MW | 0 MW | 11,924 MW | 4,863 MW | 3,893 MW |
| 2026-08-31T23:00Z | 28,111 MW | 0 MW | 12,231 MW | 5,387 MW | 3,908 MW |
| 2026-09-01T00:00Z | 26,852 MW | 0 MW | 12,382 MW | 5,478 MW | 3,887 MW |
| 2026-09-01T01:00Z | 25,179 MW | 0 MW | 12,466 MW | 5,391 MW | 3,874 MW |
| 2026-09-01T02:00Z | 23,661 MW | 0 MW | 12,232 MW | 5,552 MW | 3,893 MW |
| 2026-09-01T03:00Z | 22,907 MW | 0 MW | 12,528 MW | 5,387 MW | 3,954 MW |
| 2026-09-01T04:00Z | 22,129 MW | 219 MW | 12,772 MW | 5,926 MW | 4,124 MW |
| 2026-09-01T05:00Z | 20,856 MW | 4,185 MW | 12,497 MW | 5,802 MW | 4,202 MW |
| 2026-09-01T06:00Z | 19,671 MW | 13,412 MW | 12,218 MW | 5,396 MW | 4,155 MW |
| 2026-09-01T07:00Z | 20,384 MW | 23,976 MW | 11,629 MW | 3,841 MW | 4,067 MW |
| 2026-09-01T08:00Z | 22,412 MW | 32,492 MW | 10,011 MW | 2,648 MW | 3,952 MW |
| 2026-09-01T09:00Z | 24,208 MW | 37,970 MW | 6,752 MW | 2,259 MW | 3,834 MW |
| 2026-09-01T10:00Z | 24,303 MW | 40,629 MW | 5,769 MW | 1,784 MW | 3,764 MW |
| 2026-09-01T11:00Z | 23,839 MW | 41,017 MW | 5,500 MW | 1,754 MW | 3,715 MW |
| 2026-09-01T12:00Z | 22,842 MW | 39,561 MW | 5,358 MW | 1,771 MW | 3,719 MW |
| 2026-09-01T13:00Z | 21,965 MW | 35,978 MW | 5,651 MW | 1,945 MW | 3,739 MW |
| 2026-09-01T14:00Z | 21,093 MW | 29,454 MW | 7,858 MW | 2,413 MW | 3,856 MW |
| 2026-09-01T15:00Z | 20,935 MW | 20,594 MW | 10,385 MW | 3,761 MW | 4,021 MW |
| 2026-09-01T16:00Z | 19,058 MW | 9,780 MW | 12,573 MW | 6,263 MW | 4,266 MW |
| 2026-09-01T17:00Z | 16,672 MW | 1,858 MW | 13,317 MW | 7,237 MW | 4,382 MW |
| 2026-09-01T18:00Z | 15,591 MW | 17 MW | 11,644 MW | 6,982 MW | 4,374 MW |
| 2026-09-01T19:00Z | 14,545 MW | 0 MW | 9,872 MW | 7,492 MW | 4,210 MW |
| 2026-09-01T20:00Z | 13,315 MW | 0 MW | 9,599 MW | 7,491 MW | 3,947 MW |
| 2026-09-01T21:00Z | 11,990 MW | 0 MW | 9,740 MW | 7,108 MW | 3,811 MW |
| 2026-09-01T22:00Z | 11,442 MW | 0 MW | 9,697 MW | 6,465 MW | 3,711 MW |
| 2026-09-01T23:00Z | 10,738 MW | 0 MW | 10,280 MW | 6,400 MW | 3,673 MW |
| 2026-09-02T00:00Z | 10,581 MW | 0 MW | 10,647 MW | 6,047 MW | 3,656 MW |
| 2026-09-02T01:00Z | 10,604 MW | 0 MW | 10,730 MW | 5,977 MW | 3,638 MW |
| 2026-09-02T02:00Z | 10,380 MW | 0 MW | 10,768 MW | 6,122 MW | 3,652 MW |
| 2026-09-02T03:00Z | 10,181 MW | 0 MW | 10,719 MW | 6,566 MW | 3,728 MW |
| 2026-09-02T04:00Z | 10,814 MW | 273 MW | 11,011 MW | 6,849 MW | 3,902 MW |
| 2026-09-02T05:00Z | 11,020 MW | 4,698 MW | 11,181 MW | 7,067 MW | 4,013 MW |
| 2026-09-02T06:00Z | 10,074 MW | 13,536 MW | 11,255 MW | 6,239 MW | 4,009 MW |
| 2026-09-02T07:00Z | 8,649 MW | 23,906 MW | 11,146 MW | 4,551 MW | 3,896 MW |
| 2026-09-02T08:00Z | 8,798 MW | 34,168 MW | 11,042 MW | 2,502 MW | 3,749 MW |
| 2026-09-02T09:00Z | 9,884 MW | 40,949 MW | 9,603 MW | 1,851 MW | 3,645 MW |
| 2026-09-02T10:00Z | 11,298 MW | 43,792 MW | 8,941 MW | 1,807 MW | 3,576 MW |
| 2026-09-02T11:00Z | 12,636 MW | 43,448 MW | 8,875 MW | 1,725 MW | 3,555 MW |
| 2026-09-02T12:00Z | 13,136 MW | 40,986 MW | 9,052 MW | 1,797 MW | 3,552 MW |
| 2026-09-02T13:00Z | 13,269 MW | 35,980 MW | 9,735 MW | 1,932 MW | 3,586 MW |
| 2026-09-02T14:00Z | 13,288 MW | 28,002 MW | 10,880 MW | 2,374 MW | 3,701 MW |
| 2026-09-02T15:00Z | 12,591 MW | 17,561 MW | 12,573 MW | 4,558 MW | 3,863 MW |
| 2026-09-02T16:00Z | 10,819 MW | 7,684 MW | 13,192 MW | 6,385 MW | 4,084 MW |
| 2026-09-02T17:00Z | 8,565 MW | 1,418 MW | 13,149 MW | 7,317 MW | 4,201 MW |
| 2026-09-02T18:00Z | 7,767 MW | 6 MW | 13,129 MW | 7,313 MW | 4,197 MW |
| 2026-09-02T19:00Z | 8,300 MW | 0 MW | 13,235 MW | 7,183 MW | 4,095 MW |
| 2026-09-02T20:00Z | 8,947 MW | 0 MW | 13,744 MW | 6,842 MW | 3,962 MW |
| 2026-09-02T21:00Z | 9,115 MW | 0 MW | 13,773 MW | 5,988 MW | 3,836 MW |
| 2026-09-02T22:00Z | 11,025 MW | 0 MW | 13,045 MW | 4,555 MW | 3,699 MW |
| 2026-09-02T23:00Z | 12,910 MW | 0 MW | 12,424 MW | 3,376 MW | 3,669 MW |
| 2026-09-03T00:00Z | 14,244 MW | 0 MW | 12,039 MW | 3,207 MW | 3,646 MW |
| 2026-09-03T01:00Z | 14,496 MW | 0 MW | 12,795 MW | 3,182 MW | 3,640 MW |
| 2026-09-03T02:00Z | 15,899 MW | 0 MW | 13,061 MW | 3,075 MW | 3,669 MW |
| 2026-09-03T03:00Z | 17,863 MW | 0 MW | 12,922 MW | 3,231 MW | 3,751 MW |
| 2026-09-03T04:00Z | 22,077 MW | 157 MW | 12,962 MW | 3,559 MW | 4,035 MW |
| 2026-09-03T05:00Z | 25,554 MW | 3,739 MW | 12,576 MW | 3,874 MW | 4,231 MW |
| 2026-09-03T06:00Z | 26,789 MW | 11,578 MW | 11,302 MW | 3,543 MW | 4,090 MW |
| 2026-09-03T07:00Z | 27,626 MW | 19,790 MW | 9,896 MW | 3,216 MW | 3,996 MW |
| 2026-09-03T08:00Z | 29,232 MW | 26,314 MW | 8,155 MW | 2,453 MW | 3,884 MW |
| 2026-09-03T09:00Z | 31,031 MW | 29,830 MW | 6,872 MW | 2,215 MW | 3,802 MW |
| 2026-09-03T10:00Z | 32,328 MW | 30,599 MW | 6,497 MW | 2,231 MW | 3,759 MW |
| 2026-09-03T11:00Z | 33,352 MW | 29,729 MW | 6,105 MW | 2,492 MW | 3,739 MW |
| 2026-09-03T12:00Z | 35,371 MW | 27,229 MW | 5,782 MW | 2,339 MW | 3,753 MW |
| 2026-09-03T13:00Z | 37,493 MW | 23,677 MW | 5,964 MW | 2,165 MW | 3,780 MW |
| 2026-09-03T14:00Z | 38,123 MW | 18,095 MW | 6,787 MW | 2,497 MW | 3,897 MW |
| 2026-09-03T15:00Z | 37,984 MW | 11,771 MW | 8,536 MW | 3,439 MW | 4,051 MW |
| 2026-09-03T16:00Z | 35,215 MW | 5,463 MW | 9,048 MW | 4,877 MW | 4,282 MW |
| 2026-09-03T17:00Z | 33,579 MW | 1,063 MW | 9,280 MW | 5,551 MW | 4,388 MW |
| 2026-09-03T18:00Z | 31,131 MW | 4 MW | 9,354 MW | 5,954 MW | 4,390 MW |
| 2026-09-03T19:00Z | 30,413 MW | 0 MW | 9,394 MW | 5,725 MW | 4,293 MW |
| 2026-09-03T20:00Z | 30,133 MW | 0 MW | 9,149 MW | 5,232 MW | 4,126 MW |
| 2026-09-03T21:00Z | 29,781 MW | 0 MW | 9,151 MW | 4,784 MW | 3,988 MW |
| 2026-09-03T22:00Z | 27,694 MW | 0 MW | 8,752 MW | 4,872 MW | 3,856 MW |
| 2026-09-03T23:00Z | 26,583 MW | 0 MW | 9,101 MW | 3,977 MW | 3,805 MW |
| 2026-09-04T00:00Z | 26,027 MW | 0 MW | 9,379 MW | 3,726 MW | 3,778 MW |
| 2026-09-04T01:00Z | 26,673 MW | 0 MW | 9,614 MW | 3,827 MW | 3,774 MW |
| 2026-09-04T02:00Z | 28,152 MW | 0 MW | 9,832 MW | 3,278 MW | 3,796 MW |
| 2026-09-04T03:00Z | 27,597 MW | 0 MW | 9,873 MW | 3,222 MW | 3,889 MW |
| 2026-09-04T04:00Z | 29,612 MW | 63 MW | 9,580 MW | 3,211 MW | 4,101 MW |
| 2026-09-04T05:00Z | 32,704 MW | 2,330 MW | 10,148 MW | 3,297 MW | 4,222 MW |
| 2026-09-04T06:00Z | 33,590 MW | 8,726 MW | 10,057 MW | 3,393 MW | 4,205 MW |
| 2026-09-04T07:00Z | 33,965 MW | 17,643 MW | 8,425 MW | 2,947 MW | 4,056 MW |
| 2026-09-04T08:00Z | 35,510 MW | 26,302 MW | 5,365 MW | 2,333 MW | 3,864 MW |
| 2026-09-04T09:00Z | 37,221 MW | 31,547 MW | 3,827 MW | 2,008 MW | 3,710 MW |
| 2026-09-04T10:00Z | 34,176 MW | 33,762 MW | 3,675 MW | 2,004 MW | 3,627 MW |
| 2026-09-04T11:00Z | 33,762 MW | 34,097 MW | 3,616 MW | 1,984 MW | 3,590 MW |
| 2026-09-04T12:00Z | 32,088 MW | 31,823 MW | 4,243 MW | 2,035 MW | 3,573 MW |
| 2026-09-04T13:00Z | 34,027 MW | 27,614 MW | 4,354 MW | 2,036 MW | 3,622 MW |
| 2026-09-04T14:00Z | 39,127 MW | 21,567 MW | 4,570 MW | 2,223 MW | 3,598 MW |
| 2026-09-04T15:00Z | 43,591 MW | 14,325 MW | 4,807 MW | 2,758 MW | 3,766 MW |
| 2026-09-04T16:00Z | 45,940 MW | 6,293 MW | 5,555 MW | 3,285 MW | 3,982 MW |
| 2026-09-04T17:00Z | 41,987 MW | 916 MW | 6,272 MW | 3,954 MW | 4,107 MW |
| 2026-09-04T18:00Z | 40,915 MW | 3 MW | 6,737 MW | 4,560 MW | 4,075 MW |
| 2026-09-04T19:00Z | 39,448 MW | 0 MW | 6,443 MW | 4,693 MW | 3,974 MW |
| 2026-09-04T20:00Z | 37,404 MW | 0 MW | 6,256 MW | 4,561 MW | 3,824 MW |
| 2026-09-04T21:00Z | 36,504 MW | 0 MW | 6,737 MW | 4,631 MW | 3,688 MW |
| 2026-09-04T22:00Z | 33,341 MW | 0 MW | 6,892 MW | 4,317 MW | 3,590 MW |
| 2026-09-04T23:00Z | 31,995 MW | 0 MW | 7,070 MW | 4,176 MW | 3,549 MW |
| 2026-09-05T00:00Z | 30,670 MW | 0 MW | 7,061 MW | 4,326 MW | 3,521 MW |
| 2026-09-05T01:00Z | 30,512 MW | 0 MW | 6,910 MW | 4,266 MW | 3,499 MW |
| 2026-09-05T02:00Z | 30,618 MW | 0 MW | 6,442 MW | 4,255 MW | 3,524 MW |
| 2026-09-05T03:00Z | 30,704 MW | 0 MW | 6,287 MW | 4,226 MW | 3,625 MW |
| 2026-09-05T04:00Z | 31,490 MW | 110 MW | 6,109 MW | 3,907 MW | 3,869 MW |
| 2026-09-05T05:00Z | 28,649 MW | 3,224 MW | 6,010 MW | 3,944 MW | 3,991 MW |
| 2026-09-05T06:00Z | 26,056 MW | 11,787 MW | 6,159 MW | 3,483 MW | 3,976 MW |
| 2026-09-05T07:00Z | 26,861 MW | 21,750 MW | 5,858 MW | 2,589 MW | 3,813 MW |
| 2026-09-05T08:00Z | 26,154 MW | 27,480 MW | 4,867 MW | 1,970 MW | 3,617 MW |
| 2026-09-05T09:00Z | 23,967 MW | 31,753 MW | 4,328 MW | 1,889 MW | 3,522 MW |
| 2026-09-05T10:00Z | 19,624 MW | 35,731 MW | 4,245 MW | 1,485 MW | 3,444 MW |
| 2026-09-05T11:00Z | 19,113 MW | 37,266 MW | 4,222 MW | 1,442 MW | 3,416 MW |
| 2026-09-05T12:00Z | 19,067 MW | 36,464 MW | 4,197 MW | 1,387 MW | 3,413 MW |
| 2026-09-05T13:00Z | 19,193 MW | 33,002 MW | 4,293 MW | 1,434 MW | 3,447 MW |
| 2026-09-05T14:00Z | 25,571 MW | 26,997 MW | 4,698 MW | 1,565 MW | 3,545 MW |
| 2026-09-05T15:00Z | 35,309 MW | 19,049 MW | 5,429 MW | 2,599 MW | 3,763 MW |
| 2026-09-05T16:00Z | 35,829 MW | 8,982 MW | 6,370 MW | 4,127 MW | 3,989 MW |
| 2026-09-05T17:00Z | 31,228 MW | 1,359 MW | 7,106 MW | 5,099 MW | 4,129 MW |
| 2026-09-05T18:00Z | 29,191 MW | 5 MW | 7,810 MW | 5,300 MW | 4,114 MW |
| 2026-09-05T19:00Z | 29,671 MW | 0 MW | 7,591 MW | 5,305 MW | 4,007 MW |
| 2026-09-05T20:00Z | 28,603 MW | 0 MW | 7,546 MW | 5,176 MW | 3,855 MW |
| 2026-09-05T21:00Z | 27,212 MW | 0 MW | 7,116 MW | 5,171 MW | 3,725 MW |
| 2026-09-05T22:00Z | 26,772 MW | 0 MW | 7,020 MW | 4,829 MW | 3,586 MW |
| 2026-09-05T23:00Z | 26,139 MW | 0 MW | 7,023 MW | 4,411 MW | 3,563 MW |
| 2026-09-06T00:00Z | 24,958 MW | 0 MW | 6,892 MW | 4,130 MW | 3,524 MW |
| 2026-09-06T01:00Z | 23,382 MW | 0 MW | 6,870 MW | 3,698 MW | 3,516 MW |
| 2026-09-06T02:00Z | 20,658 MW | 0 MW | 6,635 MW | 3,039 MW | 3,542 MW |
| 2026-09-06T03:00Z | 18,637 MW | 0 MW | 6,385 MW | 2,045 MW | 3,624 MW |
| 2026-09-06T04:00Z | 17,039 MW | 134 MW | 6,037 MW | 1,847 MW | 3,838 MW |
| 2026-09-06T05:00Z | 14,043 MW | 4,784 MW | 5,769 MW | 1,727 MW | 3,970 MW |
| 2026-09-06T06:00Z | 10,171 MW | 17,611 MW | 4,412 MW | 1,540 MW | 3,942 MW |
| 2026-09-06T07:00Z | 7,252 MW | 31,872 MW | 3,721 MW | 1,426 MW | 3,820 MW |
| 2026-09-06T08:00Z | 5,145 MW | 42,097 MW | 3,492 MW | 1,447 MW | 3,642 MW |
| 2026-09-06T09:00Z | 4,935 MW | 46,137 MW | 3,464 MW | 1,441 MW | 3,502 MW |
| 2026-09-06T10:00Z | 4,690 MW | 47,957 MW | 3,451 MW | 1,422 MW | 3,426 MW |
| 2026-09-06T11:00Z | 4,299 MW | 47,767 MW | 3,549 MW | 1,422 MW | 3,411 MW |
| 2026-09-06T12:00Z | 4,338 MW | 45,762 MW | 3,963 MW | 1,216 MW | 3,416 MW |
| 2026-09-06T13:00Z | 4,242 MW | 40,918 MW | 4,487 MW | 1,221 MW | 3,469 MW |
| 2026-09-06T14:00Z | 4,974 MW | 34,370 MW | 5,604 MW | 1,274 MW | 3,606 MW |
| 2026-09-06T15:00Z | 4,732 MW | 22,347 MW | 8,170 MW | 1,730 MW | 3,787 MW |
| 2026-09-06T16:00Z | 3,872 MW | 8,780 MW | 10,329 MW | 2,761 MW | 4,045 MW |
| 2026-09-06T17:00Z | 4,014 MW | 1,237 MW | 11,564 MW | 3,442 MW | 4,137 MW |
| 2026-09-06T18:00Z | 5,612 MW | 2 MW | 12,404 MW | 3,716 MW | 4,118 MW |
| 2026-09-06T19:00Z | 9,382 MW | 0 MW | 12,575 MW | 4,005 MW | 4,006 MW |
| 2026-09-06T20:00Z | 13,201 MW | 0 MW | 12,520 MW | 4,262 MW | 3,860 MW |
| 2026-09-06T21:00Z | 16,434 MW | 0 MW | 12,568 MW | 4,158 MW | 3,723 MW |
| 2026-09-06T22:00Z | 17,708 MW | 0 MW | 11,597 MW | 4,322 MW | 3,622 MW |
| 2026-09-06T23:00Z | 18,067 MW | 0 MW | 11,833 MW | 4,587 MW | 3,582 MW |
| 2026-09-07T00:00Z | 17,805 MW | 0 MW | 11,733 MW | 4,598 MW | 3,586 MW |
| 2026-09-07T01:00Z | 16,896 MW | 0 MW | 11,714 MW | 4,609 MW | 3,556 MW |
| 2026-09-07T02:00Z | 17,046 MW | 0 MW | 11,831 MW | 4,541 MW | 3,566 MW |
| 2026-09-07T03:00Z | 16,831 MW | 0 MW | 12,388 MW | 4,773 MW | 3,643 MW |
| 2026-09-07T04:00Z | 16,972 MW | 96 MW | 12,381 MW | 5,582 MW | 3,854 MW |
| 2026-09-07T05:00Z | 16,994 MW | 2,980 MW | 12,466 MW | 5,149 MW | 3,958 MW |
| 2026-09-07T06:00Z | 15,881 MW | 9,901 MW | 11,817 MW | 4,845 MW | 3,948 MW |
| 2026-09-07T07:00Z | 12,749 MW | 18,563 MW | 10,914 MW | 4,909 MW | 3,813 MW |
| 2026-09-07T08:00Z | 11,048 MW | 27,157 MW | 10,007 MW | 4,302 MW | 3,671 MW |
| 2026-09-07T09:00Z | 10,263 MW | 34,254 MW | 7,917 MW | 2,735 MW | 3,562 MW |
| 2026-09-07T10:00Z | 10,036 MW | 39,526 MW | 6,972 MW | 2,452 MW | 3,484 MW |
| 2026-09-07T11:00Z | 10,725 MW | 42,277 MW | 6,647 MW | 2,373 MW | 3,453 MW |
| 2026-09-07T12:00Z | 12,087 MW | 41,539 MW | 6,407 MW | 2,157 MW | 3,453 MW |
| 2026-09-07T13:00Z | 12,949 MW | 37,820 MW | 6,533 MW | 2,226 MW | 3,473 MW |
| 2026-09-07T14:00Z | 13,960 MW | 30,396 MW | 7,970 MW | 2,563 MW | 3,582 MW |
| 2026-09-07T15:00Z | 14,349 MW | 19,273 MW | 11,991 MW | 3,560 MW | 3,761 MW |
| 2026-09-07T16:00Z | 14,296 MW | 7,649 MW | 14,029 MW | 4,536 MW | 4,015 MW |
| 2026-09-07T17:00Z | 15,883 MW | 995 MW | 14,488 MW | 5,024 MW | 4,109 MW |
| 2026-09-07T18:00Z | 17,975 MW | 1 MW | 14,866 MW | 5,176 MW | 4,080 MW |
| 2026-09-07T19:00Z | 18,284 MW | 0 MW | 15,155 MW | 4,945 MW | 3,988 MW |
| 2026-09-07T20:00Z | 17,631 MW | 0 MW | 15,154 MW | 4,667 MW | 3,829 MW |
| 2026-09-07T21:00Z | 17,006 MW | 0 MW | 15,291 MW | 4,342 MW | 3,713 MW |
| 2026-09-07T22:00Z | 16,521 MW | 0 MW | 14,834 MW | 4,030 MW | 3,627 MW |
| 2026-09-07T23:00Z | 15,786 MW | 0 MW | 14,823 MW | 3,612 MW | 3,585 MW |
| 2026-09-08T00:00Z | 15,421 MW | 0 MW | 14,917 MW | 3,548 MW | 3,545 MW |
| 2026-09-08T01:00Z | 14,478 MW | 0 MW | 14,736 MW | 3,754 MW | 3,545 MW |
| 2026-09-08T02:00Z | 14,600 MW | 0 MW | 14,822 MW | 3,850 MW | 3,564 MW |
| 2026-09-08T03:00Z | 14,209 MW | 0 MW | 15,089 MW | 4,295 MW | 3,638 MW |
| 2026-09-08T04:00Z | 15,030 MW | 86 MW | 15,325 MW | 4,844 MW | 3,825 MW |
| 2026-09-08T05:00Z | 15,285 MW | 3,546 MW | 15,338 MW | 5,001 MW | 3,939 MW |
| 2026-09-08T06:00Z | 12,965 MW | 12,671 MW | 15,307 MW | 4,979 MW | 3,909 MW |
| 2026-09-08T07:00Z | 11,260 MW | 24,111 MW | 14,632 MW | 4,771 MW | 3,784 MW |
| 2026-09-08T08:00Z | 12,472 MW | 33,274 MW | 11,157 MW | 3,707 MW | 3,618 MW |
| 2026-09-08T09:00Z | 15,712 MW | 39,938 MW | 8,878 MW | 2,933 MW | 3,537 MW |
| 2026-09-08T10:00Z | 17,845 MW | 43,796 MW | 7,797 MW | 2,570 MW | 3,459 MW |
| 2026-09-08T11:00Z | 18,560 MW | 44,623 MW | 7,637 MW | 2,376 MW | 3,432 MW |
| 2026-09-08T12:00Z | 19,011 MW | 42,639 MW | 7,751 MW | 2,585 MW | 3,426 MW |
| 2026-09-08T13:00Z | 19,855 MW | 37,901 MW | 7,974 MW | 2,688 MW | 3,452 MW |
| 2026-09-08T14:00Z | 19,907 MW | 30,528 MW | 9,615 MW | 3,377 MW | 3,574 MW |
| 2026-09-08T15:00Z | 17,114 MW | 19,811 MW | 13,394 MW | 4,848 MW | 3,775 MW |
| 2026-09-08T16:00Z | 13,280 MW | 7,626 MW | 15,735 MW | 7,615 MW | 3,996 MW |
| 2026-09-08T17:00Z | 9,972 MW | 804 MW | 16,703 MW | 8,675 MW | 4,078 MW |
| 2026-09-08T18:00Z | 9,629 MW | 1 MW | 16,750 MW | 8,705 MW | 4,083 MW |
| 2026-09-08T19:00Z | 12,262 MW | 0 MW | 16,494 MW | 7,832 MW | 3,996 MW |
| 2026-09-08T20:00Z | 17,148 MW | 0 MW | 15,497 MW | 6,588 MW | 3,857 MW |
| 2026-09-08T21:00Z | 22,848 MW | 0 MW | 14,418 MW | 4,948 MW | 3,722 MW |
| 2026-09-08T22:00Z | 26,832 MW | 0 MW | 13,347 MW | 3,605 MW | 3,607 MW |
| 2026-09-08T23:00Z | 27,933 MW | 0 MW | 13,047 MW | 3,191 MW | 3,556 MW |
| 2026-09-09T00:00Z | 26,173 MW | 0 MW | 12,822 MW | 3,169 MW | 3,522 MW |
| 2026-09-09T01:00Z | 24,112 MW | 0 MW | 13,496 MW | 3,177 MW | 3,512 MW |
| 2026-09-09T02:00Z | 24,452 MW | 0 MW | 14,075 MW | 3,213 MW | 3,536 MW |
| 2026-09-09T03:00Z | 25,732 MW | 0 MW | 15,053 MW | 3,298 MW | 3,609 MW |
| 2026-09-09T04:00Z | 25,875 MW | 44 MW | 15,450 MW | 3,777 MW | 3,791 MW |
| 2026-09-09T05:00Z | 24,654 MW | 2,060 MW | 15,634 MW | 4,155 MW | 3,918 MW |
| 2026-09-09T06:00Z | 22,175 MW | 8,268 MW | 14,614 MW | 4,004 MW | 3,900 MW |
| 2026-09-09T07:00Z | 20,802 MW | 16,417 MW | 13,436 MW | 3,283 MW | 3,822 MW |
| 2026-09-09T08:00Z | 21,631 MW | 22,349 MW | 11,806 MW | 2,806 MW | 3,698 MW |
| 2026-09-09T09:00Z | 21,624 MW | 25,838 MW | 9,338 MW | 2,619 MW | 3,594 MW |
| 2026-09-09T10:00Z | 22,905 MW | 27,354 MW | 8,817 MW | 2,626 MW | 3,506 MW |
| 2026-09-09T11:00Z | 23,753 MW | 27,497 MW | 9,189 MW | 2,488 MW | 3,474 MW |
| 2026-09-09T12:00Z | 23,579 MW | 25,758 MW | 9,094 MW | 2,660 MW | 3,480 MW |
| 2026-09-09T13:00Z | 23,206 MW | 23,433 MW | 8,790 MW | 2,524 MW | 3,501 MW |
| 2026-09-09T14:00Z | 24,120 MW | 18,568 MW | 10,801 MW | 3,069 MW | 3,627 MW |
| 2026-09-09T15:00Z | 24,450 MW | 12,065 MW | 14,627 MW | 4,146 MW | 3,817 MW |
| 2026-09-09T16:00Z | 23,661 MW | 5,535 MW | 15,887 MW | 6,357 MW | 4,020 MW |
| 2026-09-09T17:00Z | 21,240 MW | 833 MW | 16,461 MW | 8,058 MW | 4,097 MW |
| 2026-09-09T18:00Z | 21,055 MW | 0 MW | 16,175 MW | 8,475 MW | 4,085 MW |
| 2026-09-09T19:00Z | 21,657 MW | 0 MW | 15,934 MW | 8,386 MW | 3,989 MW |
| 2026-09-09T20:00Z | 22,632 MW | 0 MW | 15,613 MW | 7,992 MW | 3,853 MW |
| 2026-09-09T21:00Z | 23,520 MW | 0 MW | 15,406 MW | 7,151 MW | 3,735 MW |
| 2026-09-09T22:00Z | 22,507 MW | 0 MW | 15,465 MW | 7,034 MW | 3,600 MW |
| 2026-09-09T23:00Z | 20,284 MW | 0 MW | 15,115 MW | 7,184 MW | 3,550 MW |
| 2026-09-10T00:00Z | 18,021 MW | 0 MW | 15,804 MW | 6,785 MW | 3,521 MW |
| 2026-09-10T01:00Z | 15,997 MW | 0 MW | 16,196 MW | 6,387 MW | 3,515 MW |
| 2026-09-10T02:00Z | 14,518 MW | 0 MW | 16,873 MW | 6,089 MW | 3,538 MW |
| 2026-09-10T03:00Z | 12,820 MW | 0 MW | 17,146 MW | 6,975 MW | 3,633 MW |
| 2026-09-10T04:00Z | 11,763 MW | 38 MW | 17,441 MW | 7,952 MW | 3,812 MW |
| 2026-09-10T05:00Z | 10,751 MW | 2,473 MW | 17,518 MW | 7,854 MW | 3,931 MW |
| 2026-09-10T06:00Z | 9,068 MW | 10,557 MW | 13,972 MW | 7,776 MW | 3,941 MW |
| 2026-09-10T07:00Z | 7,666 MW | 22,173 MW | 11,264 MW | 7,062 MW | 3,849 MW |
| 2026-09-10T08:00Z | 7,329 MW | 32,323 MW | 11,808 MW | 5,646 MW | 3,686 MW |
| 2026-09-10T09:00Z | 7,512 MW | 37,786 MW | 11,396 MW | 3,497 MW | 3,588 MW |
| 2026-09-10T10:00Z | 7,315 MW | 40,233 MW | 10,193 MW | 2,306 MW | 3,499 MW |
| 2026-09-10T11:00Z | 6,984 MW | 39,824 MW | 9,781 MW | 2,137 MW | 3,464 MW |
| 2026-09-10T12:00Z | 6,754 MW | 36,539 MW | 10,038 MW | 2,193 MW | 3,478 MW |
| 2026-09-10T13:00Z | 5,996 MW | 31,864 MW | 12,019 MW | 2,394 MW | 3,503 MW |
| 2026-09-10T14:00Z | 5,160 MW | 24,560 MW | 15,315 MW | 3,552 MW | 3,629 MW |
| 2026-09-10T15:00Z | 4,018 MW | 15,316 MW | 16,756 MW | 6,776 MW | 3,804 MW |
| 2026-09-10T16:00Z | 2,866 MW | 6,241 MW | 17,171 MW | 9,106 MW | 4,022 MW |
| 2026-09-10T17:00Z | 2,671 MW | 718 MW | 17,453 MW | 10,170 MW | 4,111 MW |
| 2026-09-10T18:00Z | 3,113 MW | 0 MW | 17,261 MW | 10,201 MW | 4,122 MW |
| 2026-09-10T19:00Z | 3,852 MW | 0 MW | 17,084 MW | 10,102 MW | 4,037 MW |
| 2026-09-10T20:00Z | 4,736 MW | 0 MW | 16,823 MW | 9,923 MW | 3,895 MW |
| 2026-09-10T21:00Z | 6,025 MW | 0 MW | 16,778 MW | 9,659 MW | 3,760 MW |
| 2026-09-10T22:00Z | 7,320 MW | 0 MW | 17,023 MW | 9,261 MW | 3,632 MW |
| 2026-09-10T23:00Z | 8,557 MW | 0 MW | 17,374 MW | 8,270 MW | 3,588 MW |
| 2026-09-11T00:00Z | 9,737 MW | 0 MW | 17,400 MW | 7,870 MW | 3,566 MW |
| 2026-09-11T01:00Z | 9,897 MW | 0 MW | 17,363 MW | 7,801 MW | 3,564 MW |
| 2026-09-11T02:00Z | 10,036 MW | 0 MW | 17,267 MW | 8,132 MW | 3,579 MW |
| 2026-09-11T03:00Z | 9,915 MW | 0 MW | 17,546 MW | 8,780 MW | 3,661 MW |
| 2026-09-11T04:00Z | 10,023 MW | 23 MW | 17,854 MW | 9,588 MW | 3,884 MW |
| 2026-09-11T05:00Z | 9,989 MW | 2,299 MW | 17,787 MW | 9,382 MW | 4,031 MW |
| 2026-09-11T06:00Z | 9,986 MW | 9,423 MW | 17,705 MW | 8,920 MW | 4,029 MW |
| 2026-09-11T07:00Z | 9,155 MW | 19,487 MW | 17,384 MW | 6,572 MW | 3,885 MW |
| 2026-09-11T08:00Z | 7,680 MW | 31,551 MW | 16,297 MW | 3,915 MW | 3,725 MW |
| 2026-09-11T09:00Z | 7,519 MW | 40,108 MW | 14,414 MW | 2,679 MW | 3,609 MW |
| 2026-09-11T10:00Z | 8,170 MW | 42,326 MW | 12,197 MW | 2,343 MW | 3,530 MW |
| 2026-09-11T11:00Z | 8,873 MW | 42,084 MW | 11,545 MW | 2,243 MW | 3,499 MW |
| 2026-09-11T12:00Z | 8,953 MW | 39,480 MW | 11,417 MW | 2,291 MW | 3,500 MW |
| 2026-09-11T13:00Z | 8,765 MW | 33,707 MW | 13,419 MW | 2,375 MW | 3,509 MW |
| 2026-09-11T14:00Z | 7,841 MW | 24,846 MW | 15,910 MW | 3,131 MW | 3,736 MW |
| 2026-09-11T15:00Z | 6,390 MW | 15,042 MW | 17,297 MW | 6,722 MW | 4,119 MW |
| 2026-09-11T16:00Z | 5,594 MW | 5,653 MW | 18,058 MW | 8,259 MW | 4,304 MW |
| 2026-09-11T17:00Z | 4,986 MW | 543 MW | 18,263 MW | 8,366 MW | 4,297 MW |
| 2026-09-11T18:00Z | 4,514 MW | 0 MW | 18,243 MW | 8,403 MW | 4,263 MW |
| 2026-09-11T19:00Z | 4,918 MW | 0 MW | 18,218 MW | 8,350 MW | 4,218 MW |
| 2026-09-11T20:00Z | 4,607 MW | 0 MW | 17,888 MW | 8,238 MW | 4,057 MW |
| 2026-09-11T21:00Z | 4,326 MW | 0 MW | 17,394 MW | 8,073 MW | 3,928 MW |
| 2026-09-11T22:00Z | 4,233 MW | 0 MW | 16,692 MW | 6,633 MW | 3,810 MW |
| 2026-09-11T23:00Z | 3,567 MW | 0 MW | 16,745 MW | 6,009 MW | 3,775 MW |
| 2026-09-12T00:00Z | 3,402 MW | 0 MW | 16,784 MW | 5,322 MW | 3,759 MW |
| 2026-09-12T01:00Z | 3,374 MW | 0 MW | 16,766 MW | 4,908 MW | 3,764 MW |
| 2026-09-12T02:00Z | 3,142 MW | 0 MW | 16,748 MW | 4,933 MW | 3,785 MW |
| 2026-09-12T03:00Z | 2,942 MW | 0 MW | 16,842 MW | 4,626 MW | 3,850 MW |
| 2026-09-12T04:00Z | 3,025 MW | 17 MW | 16,901 MW | 4,314 MW | 4,093 MW |
| 2026-09-12T05:00Z | 3,250 MW | 2,201 MW | 16,987 MW | 4,358 MW | 4,246 MW |
| 2026-09-12T06:00Z | 3,476 MW | 9,871 MW | 16,731 MW | 3,474 MW | 4,234 MW |
| 2026-09-12T07:00Z | 3,301 MW | 20,713 MW | 13,707 MW | 1,854 MW | 4,088 MW |
| 2026-09-12T08:00Z | 4,595 MW | 31,947 MW | 8,861 MW | 1,489 MW | 3,913 MW |
| 2026-09-12T09:00Z | 5,639 MW | 38,855 MW | 6,406 MW | 1,374 MW | 3,799 MW |
| 2026-09-12T10:00Z | 6,881 MW | 41,162 MW | 5,782 MW | 1,346 MW | 3,705 MW |
| 2026-09-12T11:00Z | 7,889 MW | 39,057 MW | 5,652 MW | 1,343 MW | 3,683 MW |
| 2026-09-12T12:00Z | 8,100 MW | 34,929 MW | 5,966 MW | 1,438 MW | 3,682 MW |
| 2026-09-12T13:00Z | 8,859 MW | 30,873 MW | 6,255 MW | 1,549 MW | 3,717 MW |
| 2026-09-12T14:00Z | 11,039 MW | 24,163 MW | 7,868 MW | 1,743 MW | 3,847 MW |
| 2026-09-12T15:00Z | 11,087 MW | 14,875 MW | 10,990 MW | 2,695 MW | 4,064 MW |
| 2026-09-12T16:00Z | 10,218 MW | 5,266 MW | 14,133 MW | 4,045 MW | 4,306 MW |
| 2026-09-12T17:00Z | 10,792 MW | 422 MW | 15,328 MW | 4,881 MW | 4,392 MW |
| 2026-09-12T18:00Z | 10,102 MW | 0 MW | 15,489 MW | 5,574 MW | 4,336 MW |
| 2026-09-12T19:00Z | 11,937 MW | 0 MW | 15,611 MW | 5,909 MW | 4,258 MW |
| 2026-09-12T20:00Z | 12,461 MW | 0 MW | 15,441 MW | 5,856 MW | 4,097 MW |
| 2026-09-12T21:00Z | 12,637 MW | 0 MW | 15,428 MW | 5,349 MW | 3,981 MW |
| 2026-09-12T22:00Z | 12,907 MW | 0 MW | 14,998 MW | 4,805 MW | 3,872 MW |
| 2026-09-12T23:00Z | 14,017 MW | 0 MW | 14,835 MW | 3,699 MW | 3,821 MW |
| 2026-09-13T00:00Z | 14,623 MW | 0 MW | 14,811 MW | 2,785 MW | 3,787 MW |
| 2026-09-13T01:00Z | 14,283 MW | 0 MW | 14,134 MW | 2,560 MW | 3,777 MW |
| 2026-09-13T02:00Z | 13,432 MW | 0 MW | 12,346 MW | 2,085 MW | 3,787 MW |
| 2026-09-13T03:00Z | 13,242 MW | 0 MW | 11,931 MW | 2,013 MW | 3,847 MW |
| 2026-09-13T04:00Z | 13,057 MW | 5 MW | 11,906 MW | 2,049 MW | 4,065 MW |
| 2026-09-13T05:00Z | 13,484 MW | 1,180 MW | 11,799 MW | 2,054 MW | 4,214 MW |
| 2026-09-13T06:00Z | 13,624 MW | 4,858 MW | 11,799 MW | 1,898 MW | 4,214 MW |
| 2026-09-13T07:00Z | 13,004 MW | 9,840 MW | 11,636 MW | 1,714 MW | 4,087 MW |
| 2026-09-13T08:00Z | 11,944 MW | 15,638 MW | 11,097 MW | 1,520 MW | 3,916 MW |
| 2026-09-13T09:00Z | 11,665 MW | 20,454 MW | 10,525 MW | 1,483 MW | 3,809 MW |
| 2026-09-13T10:00Z | 11,801 MW | 21,820 MW | 9,372 MW | 1,452 MW | 3,720 MW |
| 2026-09-13T11:00Z | 12,110 MW | 20,903 MW | 9,398 MW | 1,407 MW | 3,686 MW |
| 2026-09-13T12:00Z | 12,353 MW | 18,465 MW | 9,526 MW | 1,388 MW | 3,687 MW |
| 2026-09-13T13:00Z | 12,891 MW | 14,328 MW | 10,715 MW | 1,595 MW | 3,722 MW |
| 2026-09-13T14:00Z | 13,454 MW | 10,331 MW | 12,531 MW | 2,097 MW | 3,831 MW |
| 2026-09-13T15:00Z | 13,099 MW | 5,736 MW | 13,849 MW | 4,050 MW | 4,040 MW |
| 2026-09-13T16:00Z | 12,131 MW | 2,165 MW | 15,380 MW | 6,824 MW | 4,280 MW |
| 2026-09-13T17:00Z | 10,473 MW | 258 MW | 15,531 MW | 7,689 MW | 4,372 MW |
| 2026-09-13T18:00Z | 9,038 MW | 0 MW | 15,593 MW | 7,878 MW | 4,330 MW |
| 2026-09-13T19:00Z | 8,281 MW | 0 MW | 15,627 MW | 7,946 MW | 4,237 MW |
| 2026-09-13T20:00Z | 7,916 MW | 0 MW | 15,709 MW | 7,923 MW | 4,073 MW |
| 2026-09-13T21:00Z | 7,124 MW | 0 MW | 15,714 MW | 7,903 MW | 3,932 MW |
| 2026-09-13T22:00Z | 6,843 MW | 0 MW | 15,444 MW | 7,763 MW | 3,837 MW |
| 2026-09-13T23:00Z | 6,917 MW | 0 MW | 15,426 MW | 7,189 MW | 3,797 MW |
| 2026-09-14T00:00Z | 6,478 MW | 0 MW | 15,374 MW | 6,957 MW | 3,769 MW |
| 2026-09-14T01:00Z | 5,690 MW | 0 MW | 15,407 MW | 7,014 MW | 3,747 MW |
| 2026-09-14T02:00Z | 4,927 MW | 0 MW | 15,404 MW | 7,001 MW | 3,759 MW |
| 2026-09-14T03:00Z | 4,311 MW | 0 MW | 15,463 MW | 7,385 MW | 3,832 MW |
| 2026-09-14T04:00Z | 3,914 MW | 8 MW | 15,525 MW | 8,143 MW | 4,049 MW |
| 2026-09-14T05:00Z | 3,566 MW | 1,775 MW | 15,600 MW | 8,554 MW | 4,191 MW |
| 2026-09-14T06:00Z | 2,796 MW | 7,881 MW | 15,636 MW | 8,505 MW | 4,190 MW |
| 2026-09-14T07:00Z | 2,382 MW | 16,729 MW | 15,470 MW | 8,015 MW | 4,071 MW |
| 2026-09-14T08:00Z | 2,412 MW | 25,843 MW | 15,401 MW | 7,127 MW | 3,924 MW |
| 2026-09-14T09:00Z | 2,471 MW | 32,361 MW | 15,241 MW | 6,181 MW | 3,803 MW |
| 2026-09-14T10:00Z | 2,726 MW | 36,281 MW | 13,762 MW | 6,137 MW | 3,737 MW |
| 2026-09-14T11:00Z | 2,897 MW | 37,624 MW | 13,399 MW | 5,248 MW | 3,704 MW |
| 2026-09-14T12:00Z | 2,974 MW | 36,844 MW | 13,350 MW | 4,948 MW | 3,704 MW |
| 2026-09-14T13:00Z | 2,914 MW | 33,465 MW | 13,791 MW | 5,015 MW | 3,705 MW |
| 2026-09-14T14:00Z | 2,514 MW | 27,097 MW | 15,354 MW | 6,172 MW | 3,831 MW |
| 2026-09-14T15:00Z | 1,953 MW | 16,955 MW | 16,192 MW | 8,557 MW | 4,027 MW |
| 2026-09-14T16:00Z | 1,727 MW | 5,944 MW | 16,721 MW | 9,444 MW | 4,265 MW |
| 2026-09-14T17:00Z | 1,904 MW | 399 MW | 17,261 MW | 9,571 MW | 4,345 MW |
| 2026-09-14T18:00Z | 1,993 MW | 0 MW | 17,460 MW | 9,302 MW | 4,317 MW |
| 2026-09-14T19:00Z | 2,589 MW | 0 MW | 17,576 MW | 9,011 MW | 4,223 MW |
| 2026-09-14T20:00Z | 3,698 MW | 0 MW | 17,714 MW | 8,643 MW | 4,072 MW |
| 2026-09-14T21:00Z | 4,909 MW | 0 MW | 17,822 MW | 8,100 MW | 3,924 MW |
| 2026-09-14T22:00Z | 6,226 MW | 0 MW | 17,526 MW | 7,397 MW | 3,829 MW |
| 2026-09-14T23:00Z | 7,404 MW | 0 MW | 17,416 MW | 7,155 MW | 3,789 MW |
| 2026-09-15T00:00Z | 8,239 MW | 0 MW | 17,228 MW | 7,269 MW | 3,766 MW |
| 2026-09-15T01:00Z | 8,472 MW | 0 MW | 17,383 MW | 7,357 MW | 3,760 MW |
| 2026-09-15T02:00Z | 9,146 MW | 0 MW | 15,507 MW | 7,433 MW | 3,773 MW |
| 2026-09-15T03:00Z | 9,474 MW | 0 MW | 17,816 MW | 7,602 MW | 3,849 MW |
| 2026-09-15T04:00Z | 10,271 MW | 14 MW | 17,801 MW | 8,252 MW | 4,023 MW |
| 2026-09-15T05:00Z | 11,268 MW | 2,516 MW | 17,128 MW | 8,424 MW | 4,176 MW |
| 2026-09-15T06:00Z | 10,978 MW | 12,106 MW | 16,509 MW | 7,779 MW | 4,162 MW |
| 2026-09-15T07:00Z | 9,144 MW | 25,477 MW | 14,961 MW | 5,426 MW | 4,011 MW |
| 2026-09-15T08:00Z | 8,075 MW | 37,895 MW | 11,934 MW | 3,969 MW | 3,858 MW |
| 2026-09-15T09:00Z | 8,837 MW | 46,458 MW | 9,389 MW | 2,605 MW | 3,735 MW |
| 2026-09-15T10:00Z | 9,185 MW | 48,660 MW | 8,550 MW | 2,435 MW | 3,641 MW |
| 2026-09-15T11:00Z | 10,484 MW | 46,984 MW | 8,288 MW | 2,393 MW | 3,608 MW |
| 2026-09-15T12:00Z | 11,568 MW | 43,475 MW | 8,331 MW | 2,415 MW | 3,608 MW |
| 2026-09-15T13:00Z | 12,303 MW | 37,515 MW | 9,389 MW | 2,484 MW | 3,622 MW |
| 2026-09-15T14:00Z | 12,124 MW | 28,930 MW | 13,119 MW | 3,033 MW | 3,756 MW |
| 2026-09-15T15:00Z | 10,865 MW | 17,156 MW | 15,619 MW | 5,854 MW | 3,950 MW |
| 2026-09-15T16:00Z | 9,091 MW | 5,435 MW | 16,339 MW | 8,388 MW | 4,213 MW |
| 2026-09-15T17:00Z | 8,905 MW | 303 MW | 16,624 MW | 8,754 MW | 4,323 MW |
| 2026-09-15T18:00Z | 10,420 MW | 0 MW | 16,583 MW | 8,609 MW | 4,294 MW |
| 2026-09-15T19:00Z | 13,091 MW | 0 MW | 16,441 MW | 8,206 MW | 4,197 MW |
| 2026-09-15T20:00Z | 15,629 MW | 0 MW | 16,442 MW | 7,450 MW | 4,023 MW |
| 2026-09-15T21:00Z | 17,057 MW | 0 MW | 16,089 MW | 6,674 MW | 3,894 MW |
| 2026-09-15T22:00Z | 17,372 MW | 0 MW | 15,837 MW | 5,584 MW | 3,802 MW |
| 2026-09-15T23:00Z | 15,865 MW | 0 MW | 16,112 MW | 4,526 MW | 3,769 MW |
| 2026-09-16T00:00Z | 14,286 MW | 0 MW | 16,235 MW | 4,063 MW | 3,724 MW |
| 2026-09-16T01:00Z | 13,202 MW | 0 MW | 16,422 MW | 3,834 MW | 3,719 MW |
| 2026-09-16T02:00Z | 12,187 MW | 0 MW | 16,462 MW | 4,033 MW | 3,728 MW |
| 2026-09-16T03:00Z | 10,393 MW | 0 MW | 16,810 MW | 5,573 MW | 3,798 MW |
| 2026-09-16T04:00Z | 10,613 MW | 9 MW | 17,443 MW | 6,444 MW | 4,001 MW |
| 2026-09-16T05:00Z | 11,254 MW | 1,749 MW | 17,291 MW | 6,632 MW | 4,129 MW |
| 2026-09-16T06:00Z | 9,759 MW | 8,244 MW | 16,732 MW | 6,740 MW | 4,108 MW |
| 2026-09-16T07:00Z | 7,830 MW | 16,969 MW | 15,853 MW | 5,923 MW | 4,021 MW |
| 2026-09-16T08:00Z | 7,925 MW | 23,982 MW | 13,822 MW | 3,906 MW | 3,875 MW |
| 2026-09-16T09:00Z | 8,263 MW | 28,111 MW | 12,523 MW | 2,766 MW | 3,773 MW |
| 2026-09-16T10:00Z | 9,602 MW | 29,462 MW | 11,990 MW | 2,675 MW | 3,689 MW |
| 2026-09-16T11:00Z | 11,807 MW | 26,794 MW | 11,798 MW | 2,492 MW | 3,660 MW |
| 2026-09-16T12:00Z | 14,380 MW | 23,121 MW | 12,209 MW | 2,660 MW | 3,663 MW |
| 2026-09-16T13:00Z | 15,357 MW | 19,528 MW | 13,580 MW | 3,016 MW | 3,673 MW |
| 2026-09-16T14:00Z | 16,036 MW | 15,555 MW | 15,584 MW | 3,782 MW | 3,840 MW |
| 2026-09-16T15:00Z | 14,833 MW | 9,923 MW | 17,076 MW | 6,336 MW | 3,999 MW |
| 2026-09-16T16:00Z | 12,836 MW | 3,742 MW | 16,878 MW | 8,175 MW | 4,216 MW |
| 2026-09-16T17:00Z | 12,491 MW | 296 MW | 17,288 MW | 8,154 MW | 4,291 MW |
| 2026-09-16T18:00Z | 13,599 MW | 0 MW | 17,258 MW | 8,188 MW | 4,263 MW |
| 2026-09-16T19:00Z | 14,679 MW | 0 MW | 16,867 MW | 8,147 MW | 4,160 MW |
| 2026-09-16T20:00Z | 14,752 MW | 0 MW | 16,551 MW | 8,106 MW | 4,015 MW |
| 2026-09-16T21:00Z | 15,631 MW | 0 MW | 16,174 MW | 7,193 MW | 3,894 MW |
| 2026-09-16T22:00Z | 15,676 MW | 0 MW | 15,282 MW | 4,621 MW | 3,769 MW |
| 2026-09-16T23:00Z | 15,444 MW | 0 MW | 14,754 MW | 3,978 MW | 3,729 MW |
| 2026-09-17T00:00Z | 14,740 MW | 0 MW | 13,277 MW | 3,660 MW | 3,703 MW |
| 2026-09-17T01:00Z | 14,386 MW | 0 MW | 12,645 MW | 3,188 MW | 3,701 MW |
| 2026-09-17T02:00Z | 14,873 MW | 0 MW | 12,773 MW | 3,418 MW | 3,723 MW |
| 2026-09-17T03:00Z | 16,533 MW | 0 MW | 14,259 MW | 4,214 MW | 3,802 MW |
| 2026-09-17T04:00Z | 18,229 MW | 6 MW | 14,947 MW | 4,718 MW | 3,981 MW |
| 2026-09-17T05:00Z | 19,808 MW | 2,277 MW | 15,100 MW | 5,198 MW | 4,101 MW |
| 2026-09-17T06:00Z | 20,192 MW | 11,373 MW | 14,385 MW | 5,310 MW | 4,096 MW |
| 2026-09-17T07:00Z | 18,575 MW | 23,752 MW | 12,050 MW | 4,335 MW | 4,012 MW |
| 2026-09-17T08:00Z | 19,890 MW | 33,520 MW | 8,469 MW | 3,222 MW | 3,876 MW |
| 2026-09-17T09:00Z | 20,665 MW | 36,964 MW | 7,244 MW | 3,098 MW | 3,786 MW |
| 2026-09-17T10:00Z | 21,324 MW | 36,933 MW | 7,086 MW | 3,071 MW | 3,689 MW |
| 2026-09-17T11:00Z | 21,101 MW | 36,963 MW | 7,106 MW | 3,038 MW | 3,655 MW |
| 2026-09-17T12:00Z | 21,531 MW | 34,868 MW | 7,268 MW | 2,856 MW | 3,650 MW |
| 2026-09-17T13:00Z | 22,898 MW | 29,873 MW | 7,757 MW | 2,734 MW | 3,675 MW |
| 2026-09-17T14:00Z | 24,966 MW | 23,174 MW | 9,068 MW | 2,966 MW | 3,777 MW |
| 2026-09-17T15:00Z | 24,386 MW | 13,465 MW | 12,769 MW | 3,926 MW | 3,977 MW |
| 2026-09-17T16:00Z | 24,113 MW | 4,077 MW | 15,139 MW | 4,772 MW | 4,192 MW |
| 2026-09-17T17:00Z | 24,322 MW | 171 MW | 15,249 MW | 5,000 MW | 4,245 MW |
| 2026-09-17T18:00Z | 25,463 MW | 0 MW | 14,840 MW | 5,059 MW | 4,211 MW |
| 2026-09-17T19:00Z | 26,655 MW | 0 MW | 14,763 MW | 4,700 MW | 4,134 MW |
| 2026-09-17T20:00Z | 25,069 MW | 0 MW | 14,329 MW | 4,130 MW | 3,997 MW |
| 2026-09-17T21:00Z | 24,522 MW | 0 MW | 14,551 MW | 3,773 MW | 3,870 MW |
| 2026-09-17T22:00Z | 24,152 MW | 0 MW | 14,213 MW | 3,257 MW | 3,757 MW |
| 2026-09-17T23:00Z | 22,106 MW | 0 MW | 13,622 MW | 3,294 MW | 3,728 MW |
| 2026-09-18T00:00Z | 21,017 MW | 0 MW | 13,545 MW | 3,261 MW | 3,712 MW |
| 2026-09-18T01:00Z | 21,512 MW | 0 MW | 13,557 MW | 3,310 MW | 3,702 MW |
| 2026-09-18T02:00Z | 20,939 MW | 0 MW | 13,714 MW | 3,785 MW | 3,726 MW |
| 2026-09-18T03:00Z | 20,961 MW | 0 MW | 13,917 MW | 4,048 MW | 3,820 MW |
| 2026-09-18T04:00Z | 22,368 MW | 3 MW | 14,190 MW | 4,195 MW | 4,023 MW |
| 2026-09-18T05:00Z | 22,466 MW | 1,469 MW | 13,951 MW | 4,340 MW | 4,153 MW |
| 2026-09-18T06:00Z | 20,547 MW | 7,934 MW | 13,417 MW | 4,481 MW | 4,143 MW |
| 2026-09-18T07:00Z | 18,100 MW | 17,712 MW | 12,081 MW | 4,220 MW | 4,039 MW |
| 2026-09-18T08:00Z | 16,978 MW | 27,571 MW | 9,618 MW | 3,591 MW | 3,839 MW |
| 2026-09-18T09:00Z | 20,033 MW | 33,043 MW | 7,700 MW | 2,835 MW | 3,743 MW |
| 2026-09-18T10:00Z | 22,807 MW | 33,300 MW | 7,419 MW | 2,791 MW | 3,651 MW |
| 2026-09-18T11:00Z | 22,954 MW | 31,779 MW | 7,444 MW | 2,608 MW | 3,600 MW |
| 2026-09-18T12:00Z | 23,009 MW | 30,422 MW | 7,487 MW | 2,334 MW | 3,605 MW |
| 2026-09-18T13:00Z | 23,309 MW | 27,436 MW | 7,925 MW | 2,304 MW | 3,658 MW |
| 2026-09-18T14:00Z | 22,296 MW | 20,904 MW | 8,907 MW | 2,222 MW | 3,789 MW |
| 2026-09-18T15:00Z | 20,597 MW | 12,547 MW | 12,102 MW | 3,081 MW | 3,991 MW |
| 2026-09-18T16:00Z | 19,019 MW | 4,037 MW | 14,797 MW | 3,801 MW | 4,225 MW |
| 2026-09-18T17:00Z | 17,287 MW | 170 MW | 14,894 MW | 4,089 MW | 4,319 MW |
| 2026-09-18T18:00Z | 17,965 MW | 0 MW | 14,924 MW | 4,054 MW | 4,268 MW |
| 2026-09-18T19:00Z | 20,907 MW | 0 MW | 13,916 MW | 3,763 MW | 4,173 MW |
| 2026-09-18T20:00Z | 23,069 MW | 0 MW | 12,124 MW | 3,715 MW | 4,036 MW |
| 2026-09-18T21:00Z | 24,575 MW | 0 MW | 10,736 MW | 3,194 MW | 3,902 MW |
| 2026-09-18T22:00Z | 25,551 MW | 0 MW | 9,097 MW | 3,147 MW | 3,835 MW |
| 2026-09-18T23:00Z | 26,514 MW | 0 MW | 8,412 MW | 2,662 MW | 3,780 MW |
| 2026-09-19T00:00Z | 28,056 MW | 0 MW | 7,833 MW | 2,127 MW | 3,775 MW |
| 2026-09-19T01:00Z | 29,294 MW | 0 MW | 7,127 MW | 2,022 MW | 3,785 MW |
| 2026-09-19T02:00Z | 30,007 MW | 0 MW | 7,041 MW | 1,741 MW | 3,809 MW |
| 2026-09-19T03:00Z | 30,942 MW | 0 MW | 7,183 MW | 1,842 MW | 3,904 MW |
| 2026-09-19T04:00Z | 32,371 MW | 5 MW | 7,275 MW | 2,014 MW | 4,130 MW |
| 2026-09-19T05:00Z | 33,023 MW | 1,934 MW | 6,792 MW | 2,175 MW | 4,283 MW |
| 2026-09-19T06:00Z | 33,398 MW | 9,541 MW | 5,969 MW | 1,759 MW | 4,266 MW |
| 2026-09-19T07:00Z | 31,070 MW | 19,556 MW | 4,941 MW | 1,650 MW | 4,145 MW |
| 2026-09-19T08:00Z | 25,595 MW | 27,022 MW | 3,954 MW | 1,375 MW | 3,956 MW |
| 2026-09-19T09:00Z | 22,782 MW | 32,245 MW | 3,641 MW | 1,391 MW | 3,824 MW |
| 2026-09-19T10:00Z | 23,234 MW | 34,314 MW | 3,630 MW | 1,372 MW | 3,721 MW |
| 2026-09-19T11:00Z | 22,435 MW | 34,123 MW | 3,582 MW | 1,324 MW | 3,720 MW |
| 2026-09-19T12:00Z | 23,247 MW | 31,626 MW | 3,111 MW | 1,392 MW | 3,711 MW |
| 2026-09-19T13:00Z | 24,452 MW | 26,900 MW | 3,014 MW | 1,498 MW | 3,776 MW |
| 2026-09-19T14:00Z | 27,368 MW | 20,103 MW | 3,651 MW | 1,752 MW | 3,883 MW |
| 2026-09-19T15:00Z | 30,963 MW | 12,236 MW | 4,825 MW | 3,024 MW | 4,118 MW |
| 2026-09-19T16:00Z | 31,171 MW | 3,868 MW | 5,949 MW | 4,201 MW | 4,390 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-19T16:00Z.
Installed Capacity
Annual figure for 2026| Solar | |
|---|---|
| Wind | |
| Gas | |
| Coal | |
| Storage | |
| Bioenergy | |
| Hydro | |
| Other | |
| Oil | |
| Other renewables | |
| Geothermal |
Total installed capacity in Germany and Luxembourg: 295 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Berlin time dates, through 2026-09-18| Date (Europe/Berlin time) | Demand |
|---|---|
| 2025-08-15 | 1.23 TWh |
| 2025-08-16 | 1.09 TWh |
| 2025-08-17 | 973 GWh |
| 2025-08-18 | 1.17 TWh |
| 2025-08-19 | 1.22 TWh |
| 2025-08-20 | 1.24 TWh |
| 2025-08-21 | 1.24 TWh |
| 2025-08-22 | 1.23 TWh |
| 2025-08-23 | 1.06 TWh |
| 2025-08-24 | 977 GWh |
| 2025-08-25 | 1.19 TWh |
| 2025-08-26 | 1.22 TWh |
| 2025-08-27 | 1.26 TWh |
| 2025-08-28 | 1.28 TWh |
| 2025-08-29 | 1.22 TWh |
| 2025-08-30 | 1.04 TWh |
| 2025-08-31 | 980 GWh |
| 2025-09-01 | 1.24 TWh |
| 2025-09-02 | 1.26 TWh |
| 2025-09-03 | 1.29 TWh |
| 2025-09-04 | 1.29 TWh |
| 2025-09-05 | 1.25 TWh |
| 2025-09-06 | 1.03 TWh |
| 2025-09-07 | 968 GWh |
| 2025-09-08 | 1.25 TWh |
| 2025-09-09 | 1.30 TWh |
| 2025-09-10 | 1.30 TWh |
| 2025-09-11 | 1.28 TWh |
| 2025-09-12 | 1.26 TWh |
| 2025-09-13 | 1.07 TWh |
| 2025-09-14 | 995 GWh |
| 2025-09-15 | 1.28 TWh |
| 2025-09-16 | 1.32 TWh |
| 2025-09-17 | 1.31 TWh |
| 2025-09-18 | 1.32 TWh |
| 2025-09-19 | 1.28 TWh |
| 2025-09-20 | 1.07 TWh |
| 2025-09-21 | 1.05 TWh |
| 2025-09-22 | 1.29 TWh |
| 2025-09-23 | 1.29 TWh |
| 2025-09-24 | 1.33 TWh |
| 2025-09-25 | 1.38 TWh |
| 2025-09-26 | 1.36 TWh |
| 2025-09-27 | 1.13 TWh |
| 2025-09-28 | 1.04 TWh |
| 2025-09-29 | 1.29 TWh |
| 2025-09-30 | 1.32 TWh |
| 2025-10-01 | 1.30 TWh |
| 2025-10-02 | 1.29 TWh |
| 2025-10-03 | 1.11 TWh |
| 2025-10-04 | 1.18 TWh |
| 2025-10-05 | 1.14 TWh |
| 2025-10-06 | 1.38 TWh |
| 2025-10-07 | 1.35 TWh |
| 2025-10-08 | 1.35 TWh |
| 2025-10-09 | 1.38 TWh |
| 2025-10-10 | 1.40 TWh |
| 2025-10-11 | 1.19 TWh |
| 2025-10-12 | 1.10 TWh |
| 2025-10-13 | 1.33 TWh |
| 2025-10-14 | 1.35 TWh |
| 2025-10-15 | 1.37 TWh |
| 2025-10-16 | 1.40 TWh |
| 2025-10-17 | 1.38 TWh |
| 2025-10-18 | 1.17 TWh |
| 2025-10-19 | 1.12 TWh |
| 2025-10-20 | 1.41 TWh |
| 2025-10-21 | 1.42 TWh |
| 2025-10-22 | 1.39 TWh |
| 2025-10-23 | 1.42 TWh |
| 2025-10-24 | 1.42 TWh |
| 2025-10-25 | 1.26 TWh |
| 2025-10-26 | 1.23 TWh |
| 2025-10-27 | 1.45 TWh |
| 2025-10-28 | 1.46 TWh |
| 2025-10-29 | 1.43 TWh |
| 2025-10-30 | 1.41 TWh |
| 2025-10-31 | 1.31 TWh |
| 2025-11-01 | 1.17 TWh |
| 2025-11-02 | 1.12 TWh |
| 2025-11-03 | 1.40 TWh |
| 2025-11-04 | 1.42 TWh |
| 2025-11-05 | 1.42 TWh |
| 2025-11-06 | 1.43 TWh |
| 2025-11-07 | 1.42 TWh |
| 2025-11-08 | 1.23 TWh |
| 2025-11-09 | 1.15 TWh |
| 2025-11-10 | 1.40 TWh |
| 2025-11-11 | 1.43 TWh |
| 2025-11-12 | 1.45 TWh |
| 2025-11-13 | 1.47 TWh |
| 2025-11-14 | 1.41 TWh |
| 2025-11-15 | 1.25 TWh |
| 2025-11-16 | 1.16 TWh |
| 2025-11-17 | 1.49 TWh |
| 2025-11-18 | 1.54 TWh |
| 2025-11-19 | 1.53 TWh |
| 2025-11-20 | 1.54 TWh |
| 2025-11-21 | 1.51 TWh |
| 2025-11-22 | 1.36 TWh |
| 2025-11-23 | 1.33 TWh |
| 2025-11-24 | 1.54 TWh |
| 2025-11-25 | 1.51 TWh |
| 2025-11-26 | 1.53 TWh |
| 2025-11-27 | 1.59 TWh |
| 2025-11-28 | 1.54 TWh |
| 2025-11-29 | 1.30 TWh |
| 2025-11-30 | 1.26 TWh |
| 2025-12-01 | 1.53 TWh |
| 2025-12-02 | 1.58 TWh |
| 2025-12-03 | 1.55 TWh |
| 2025-12-04 | 1.56 TWh |
| 2025-12-05 | 1.52 TWh |
| 2025-12-06 | 1.33 TWh |
| 2025-12-07 | 1.20 TWh |
| 2025-12-08 | 1.50 TWh |
| 2025-12-09 | 1.48 TWh |
| 2025-12-10 | 1.52 TWh |
| 2025-12-11 | 1.54 TWh |
| 2025-12-12 | 1.45 TWh |
| 2025-12-13 | 1.32 TWh |
| 2025-12-14 | 1.29 TWh |
| 2025-12-15 | 1.50 TWh |
| 2025-12-16 | 1.49 TWh |
| 2025-12-17 | 1.47 TWh |
| 2025-12-18 | 1.46 TWh |
| 2025-12-19 | 1.41 TWh |
| 2025-12-20 | 1.21 TWh |
| 2025-12-21 | 1.16 TWh |
| 2025-12-22 | 1.34 TWh |
| 2025-12-23 | 1.35 TWh |
| 2025-12-24 | 1.23 TWh |
| 2025-12-25 | 1.17 TWh |
| 2025-12-26 | 1.17 TWh |
| 2025-12-27 | 1.25 TWh |
| 2025-12-28 | 1.21 TWh |
| 2025-12-29 | 1.33 TWh |
| 2025-12-30 | 1.32 TWh |
| 2025-12-31 | 1.27 TWh |
| 2026-01-01 | 1.18 TWh |
| 2026-01-02 | 1.34 TWh |
| 2026-01-03 | 1.34 TWh |
| 2026-01-04 | 1.29 TWh |
| 2026-01-05 | 1.47 TWh |
| 2026-01-06 | 1.50 TWh |
| 2026-01-07 | 1.64 TWh |
| 2026-01-08 | 1.64 TWh |
| 2026-01-09 | 1.61 TWh |
| 2026-01-10 | 1.44 TWh |
| 2026-01-11 | 1.40 TWh |
| 2026-01-12 | 1.62 TWh |
| 2026-01-13 | 1.56 TWh |
| 2026-01-14 | 1.57 TWh |
| 2026-01-15 | 1.54 TWh |
| 2026-01-16 | 1.52 TWh |
| 2026-01-17 | 1.34 TWh |
| 2026-01-18 | 1.31 TWh |
| 2026-01-19 | 1.59 TWh |
| 2026-01-20 | 1.59 TWh |
| 2026-01-21 | 1.62 TWh |
| 2026-01-22 | 1.67 TWh |
| 2026-01-23 | 1.63 TWh |
| 2026-01-24 | 1.41 TWh |
| 2026-01-25 | 1.37 TWh |
| 2026-01-26 | 1.62 TWh |
| 2026-01-27 | 1.61 TWh |
| 2026-01-28 | 1.63 TWh |
| 2026-01-29 | 1.68 TWh |
| 2026-01-30 | 1.62 TWh |
| 2026-01-31 | 1.42 TWh |
| 2026-02-01 | 1.36 TWh |
| 2026-02-02 | 1.61 TWh |
| 2026-02-03 | 1.68 TWh |
| 2026-02-04 | 1.64 TWh |
| 2026-02-05 | 1.64 TWh |
| 2026-02-06 | 1.58 TWh |
| 2026-02-07 | 1.35 TWh |
| 2026-02-08 | 1.30 TWh |
| 2026-02-09 | 1.52 TWh |
| 2026-02-10 | 1.53 TWh |
| 2026-02-11 | 1.53 TWh |
| 2026-02-12 | 1.55 TWh |
| 2026-02-13 | 1.52 TWh |
| 2026-02-14 | 1.35 TWh |
| 2026-02-15 | 1.28 TWh |
| 2026-02-16 | 1.56 TWh |
| 2026-02-17 | 1.53 TWh |
| 2026-02-18 | 1.55 TWh |
| 2026-02-19 | 1.59 TWh |
| 2026-02-20 | 1.58 TWh |
| 2026-02-21 | 1.37 TWh |
| 2026-02-22 | 1.22 TWh |
| 2026-02-23 | 1.48 TWh |
| 2026-02-24 | 1.45 TWh |
| 2026-02-25 | 1.43 TWh |
| 2026-02-26 | 1.45 TWh |
| 2026-02-27 | 1.38 TWh |
| 2026-02-28 | 1.20 TWh |
| 2026-03-01 | 1.16 TWh |
| 2026-03-02 | 1.36 TWh |
| 2026-03-03 | 1.37 TWh |
| 2026-03-04 | 1.39 TWh |
| 2026-03-05 | 1.37 TWh |
| 2026-03-06 | 1.36 TWh |
| 2026-03-07 | 1.15 TWh |
| 2026-03-08 | 1.10 TWh |
| 2026-03-09 | 1.34 TWh |
| 2026-03-10 | 1.35 TWh |
| 2026-03-11 | 1.42 TWh |
| 2026-03-12 | 1.42 TWh |
| 2026-03-13 | 1.41 TWh |
| 2026-03-14 | 1.22 TWh |
| 2026-03-15 | 1.16 TWh |
| 2026-03-16 | 1.43 TWh |
| 2026-03-17 | 1.41 TWh |
| 2026-03-18 | 1.37 TWh |
| 2026-03-19 | 1.34 TWh |
| 2026-03-20 | 1.33 TWh |
| 2026-03-21 | 1.18 TWh |
| 2026-03-22 | 1.08 TWh |
| 2026-03-23 | 1.32 TWh |
| 2026-03-24 | 1.38 TWh |
| 2026-03-25 | 1.48 TWh |
| 2026-03-26 | 1.47 TWh |
| 2026-03-27 | 1.40 TWh |
| 2026-03-28 | 1.25 TWh |
| 2026-03-29 | 1.11 TWh |
| 2026-03-30 | 1.42 TWh |
| 2026-03-31 | 1.42 TWh |
| 2026-04-01 | 1.38 TWh |
| 2026-04-02 | 1.37 TWh |
| 2026-04-03 | 1.14 TWh |
| 2026-04-04 | 1.16 TWh |
| 2026-04-05 | 1.05 TWh |
| 2026-04-06 | 1.06 TWh |
| 2026-04-07 | 1.29 TWh |
| 2026-04-08 | 1.29 TWh |
| 2026-04-09 | 1.32 TWh |
| 2026-04-10 | 1.34 TWh |
| 2026-04-11 | 1.13 TWh |
| 2026-04-12 | 1.10 TWh |
| 2026-04-13 | 1.38 TWh |
| 2026-04-14 | 1.37 TWh |
| 2026-04-15 | 1.31 TWh |
| 2026-04-16 | 1.30 TWh |
| 2026-04-17 | 1.27 TWh |
| 2026-04-18 | 1.10 TWh |
| 2026-04-19 | 1.08 TWh |
| 2026-04-20 | 1.35 TWh |
| 2026-04-21 | 1.34 TWh |
| 2026-04-22 | 1.31 TWh |
| 2026-04-23 | 1.32 TWh |
| 2026-04-24 | 1.29 TWh |
| 2026-04-25 | 1.12 TWh |
| 2026-04-26 | 1.00 TWh |
| 2026-04-27 | 1.23 TWh |
| 2026-04-28 | 1.27 TWh |
| 2026-04-29 | 1.27 TWh |
| 2026-04-30 | 1.26 TWh |
| 2026-05-01 | 996 GWh |
| 2026-05-02 | 1.03 TWh |
| 2026-05-03 | 1.00 TWh |
| 2026-05-04 | 1.27 TWh |
| 2026-05-05 | 1.29 TWh |
| 2026-05-06 | 1.34 TWh |
| 2026-05-07 | 1.31 TWh |
| 2026-05-08 | 1.26 TWh |
| 2026-05-09 | 1.06 TWh |
| 2026-05-10 | 991 GWh |
| 2026-05-11 | 1.30 TWh |
| 2026-05-12 | 1.32 TWh |
| 2026-05-13 | 1.28 TWh |
| 2026-05-14 | 1.06 TWh |
| 2026-05-15 | 1.12 TWh |
| 2026-05-16 | 1.06 TWh |
| 2026-05-17 | 1.02 TWh |
| 2026-05-18 | 1.24 TWh |
| 2026-05-19 | 1.25 TWh |
| 2026-05-20 | 1.30 TWh |
| 2026-05-21 | 1.28 TWh |
| 2026-05-22 | 1.22 TWh |
| 2026-05-23 | 1.04 TWh |
| 2026-05-24 | 951 GWh |
| 2026-05-25 | 977 GWh |
| 2026-05-26 | 1.23 TWh |
| 2026-05-27 | 1.28 TWh |
| 2026-05-28 | 1.23 TWh |
| 2026-05-29 | 1.23 TWh |
| 2026-05-30 | 1.08 TWh |
| 2026-05-31 | 995 GWh |
| 2026-06-01 | 1.21 TWh |
| 2026-06-02 | 1.29 TWh |
| 2026-06-03 | 1.28 TWh |
| 2026-06-04 | 1.16 TWh |
| 2026-06-05 | 1.16 TWh |
| 2026-06-06 | 1.04 TWh |
| 2026-06-07 | 991 GWh |
| 2026-06-08 | 1.23 TWh |
| 2026-06-09 | 1.31 TWh |
| 2026-06-10 | 1.30 TWh |
| 2026-06-11 | 1.27 TWh |
| 2026-06-12 | 1.30 TWh |
| 2026-06-13 | 1.08 TWh |
| 2026-06-14 | 1.03 TWh |
| 2026-06-15 | 1.27 TWh |
| 2026-06-16 | 1.28 TWh |
| 2026-06-17 | 1.26 TWh |
| 2026-06-18 | 1.27 TWh |
| 2026-06-19 | 1.26 TWh |
| 2026-06-20 | 1.09 TWh |
| 2026-06-21 | 1.03 TWh |
| 2026-06-22 | 1.28 TWh |
| 2026-06-23 | 1.30 TWh |
| 2026-06-24 | 1.32 TWh |
| 2026-06-25 | 1.35 TWh |
| 2026-06-26 | 1.33 TWh |
| 2026-06-27 | 1.15 TWh |
| 2026-06-28 | 1.10 TWh |
| 2026-06-29 | 1.32 TWh |
| 2026-06-30 | 1.32 TWh |
| 2026-07-01 | 1.34 TWh |
| 2026-07-02 | 1.32 TWh |
| 2026-07-03 | 1.23 TWh |
| 2026-07-04 | 1.09 TWh |
| 2026-07-05 | 1.02 TWh |
| 2026-07-06 | 1.29 TWh |
| 2026-07-07 | 1.31 TWh |
| 2026-07-08 | 1.30 TWh |
| 2026-07-09 | 1.31 TWh |
| 2026-07-10 | 1.26 TWh |
| 2026-07-11 | 1.09 TWh |
| 2026-07-12 | 1.03 TWh |
| 2026-07-13 | 1.31 TWh |
| 2026-07-14 | 1.34 TWh |
| 2026-07-15 | 1.34 TWh |
| 2026-07-16 | 1.35 TWh |
| 2026-07-17 | 1.33 TWh |
| 2026-07-18 | 1.11 TWh |
| 2026-07-19 | 1.02 TWh |
| 2026-07-20 | 1.24 TWh |
| 2026-07-21 | 1.25 TWh |
| 2026-07-22 | 1.29 TWh |
| 2026-07-23 | 1.27 TWh |
| 2026-07-24 | 1.26 TWh |
| 2026-07-25 | 1.08 TWh |
| 2026-07-26 | 1.04 TWh |
| 2026-07-27 | 1.24 TWh |
| 2026-07-28 | 1.28 TWh |
| 2026-07-29 | 1.30 TWh |
| 2026-07-30 | 1.34 TWh |
| 2026-07-31 | 1.28 TWh |
| 2026-08-01 | 1.09 TWh |
| 2026-08-02 | 997 GWh |
| 2026-08-03 | 1.23 TWh |
| 2026-08-04 | 1.28 TWh |
| 2026-08-05 | 1.27 TWh |
| 2026-08-06 | 1.24 TWh |
| 2026-08-07 | 1.18 TWh |
| 2026-08-08 | 1.03 TWh |
| 2026-08-09 | 982 GWh |
| 2026-08-10 | 1.21 TWh |
| 2026-08-11 | 1.21 TWh |
| 2026-08-12 | 1.20 TWh |
| 2026-08-13 | 1.21 TWh |
| 2026-08-14 | 1.20 TWh |
| 2026-08-15 | 1.08 TWh |
| 2026-08-16 | 1.03 TWh |
| 2026-08-17 | 1.20 TWh |
| 2026-08-18 | 1.23 TWh |
| 2026-08-19 | 1.22 TWh |
| 2026-08-20 | 1.17 TWh |
| 2026-08-21 | 1.16 TWh |
| 2026-08-22 | 1.03 TWh |
| 2026-08-23 | 950 GWh |
| 2026-08-24 | 1.17 TWh |
| 2026-08-25 | 1.23 TWh |
| 2026-08-26 | 1.26 TWh |
| 2026-08-27 | 1.25 TWh |
| 2026-08-28 | 1.23 TWh |
| 2026-08-29 | 1.04 TWh |
| 2026-08-30 | 970 GWh |
| 2026-08-31 | 1.22 TWh |
| 2026-09-01 | 1.26 TWh |
| 2026-09-02 | 1.29 TWh |
| 2026-09-03 | 1.28 TWh |
| 2026-09-04 | 1.29 TWh |
| 2026-09-05 | 1.10 TWh |
| 2026-09-06 | 1.01 TWh |
| 2026-09-07 | 1.28 TWh |
| 2026-09-08 | 1.29 TWh |
| 2026-09-09 | 1.32 TWh |
| 2026-09-10 | 1.31 TWh |
| 2026-09-11 | 1.30 TWh |
| 2026-09-12 | 1.10 TWh |
| 2026-09-13 | 1.07 TWh |
| 2026-09-14 | 1.31 TWh |
| 2026-09-15 | 1.34 TWh |
| 2026-09-16 | 1.36 TWh |
| 2026-09-17 | 1.34 TWh |
| 2026-09-18 | 1.28 TWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-18. Daily totals are summed by World Power Monitor from complete Europe/Berlin local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 335 TWh | 318 TWh | Wind 29.5% | 261 |
| 2025 | 471 TWh | 426 TWh | Wind 31.1% | 365 |
| 2024 | 470 TWh | 426 TWh | Wind 32.4% | 366 |
| 2023 | 463 TWh | 442 TWh | Wind 32.2% | 365 |
| 2022 | 487 TWh | 488 TWh | Coal 33.9% | 365 |
| 2021 | 510 TWh | 498 TWh | Coal 30.0% | 365 |
| 2020 | 490 TWh | 443 TWh | Wind 29.3% | 366 |
| 2019 | 503 TWh | 464 TWh | Coal 30.9% | 365 |
| 2018 (partial) | 125 TWh | 128 TWh | Coal 39.9% | 92 |
A year is partial when ENTSO-E has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-18.
Power Flows With Neighbours
Net totals, 2026-08-20 (20 August 2026) to 2026-09-18 (18 September 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| France | Germany and Luxembourg imports | 799 GWh |
| Austria | Germany and Luxembourg exports | 723 GWh |
| Poland | Germany and Luxembourg exports | 631 GWh |
| Czechia | Germany and Luxembourg exports | 456 GWh |
| Belgium | Germany and Luxembourg exports | 163 GWh |
| Norway South-West (NO2) | Germany and Luxembourg imports | 130 GWh |
| Denmark East (DK2) | Germany and Luxembourg exports | 96.1 GWh |
| Switzerland | Germany and Luxembourg imports | 83.7 GWh |
| Sweden South (SE4) | Germany and Luxembourg imports | 30.1 GWh |
| Denmark West (DK1) | Germany and Luxembourg exports | 19.0 GWh |
| Netherlands | Germany and Luxembourg imports | 12.7 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-18.