France Electricity Demand and Generation Mix
France demand was 42,586 MW in the hour starting 19 Sept 2026, 19:00 CEST (UTC+02:00). Nuclear was the largest source in the hour starting 19 Sept 2026, 19:00 CEST (UTC+02:00), at 86% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- France is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 19 Sept 2026, 19:00 CEST (UTC+02:00), demand in France was 42,586 MW, against a day-ahead forecast of 42,288 MW.
- Nuclear supplied 86.4% of France's generation in the hour starting 19 Sept 2026, 19:00 CEST (UTC+02:00).
- The day-ahead price in France averaged EUR 59.17/MWh for delivery on 2026-09-20 (20 September 2026).
- Installed generating capacity in France was 164 GW in 2026, as reported to ENTSO-E.
- Demand in France totalled 428 TWh in 2024.
- Nuclear supplied 70.4% of France's generation in 2024.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 19 Sept 2026, 19:00 CEST (UTC+02:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-19T17:00:00Z.
Generation by Source
Latest hour with generation by source: 19 Sept 2026, 19:00 CEST (UTC+02:00)| Source | Output | Share |
|---|---|---|
| Nuclear | 35,042 MW | 86.4% |
| Hydro | 2,706 MW | 6.7% |
| Solar | 1,219 MW | 3.0% |
| Storage | 585 MW | 1.4% |
| Other | 398 MW | 1.0% |
| Gas | 292 MW | 0.7% |
| Bioenergy | 272 MW | 0.7% |
| Oil | 37 MW | 0.1% |
| Coal | -1 MW | own use |
| Total from these sources | 40,552 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Wind is shown as France reports it: the platform has published zero for every day since 1 December 2025 (the last non zero daily total was on 30 November 2025). We have not changed or filled the figure, and cannot tell from the data whether the source stopped generating or stopped reporting. All flagged series.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-19T17:00:00Z.
Day-Ahead Price
Delivery day 2026-09-20 (20 September 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for France and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-20.
Last 30 Days, Hourly
Times in UTC| Hour starting (UTC) | Demand |
|---|---|
| 2026-08-21T22:00Z | 38,533 MW |
| 2026-08-21T23:00Z | 36,868 MW |
| 2026-08-22T00:00Z | 34,709 MW |
| 2026-08-22T01:00Z | 32,877 MW |
| 2026-08-22T02:00Z | 32,242 MW |
| 2026-08-22T03:00Z | 32,687 MW |
| 2026-08-22T04:00Z | 33,217 MW |
| 2026-08-22T05:00Z | 33,608 MW |
| 2026-08-22T06:00Z | 34,894 MW |
| 2026-08-22T07:00Z | 36,453 MW |
| 2026-08-22T08:00Z | 37,497 MW |
| 2026-08-22T09:00Z | 38,646 MW |
| 2026-08-22T10:00Z | 40,522 MW |
| 2026-08-22T11:00Z | 39,721 MW |
| 2026-08-22T12:00Z | 39,786 MW |
| 2026-08-22T13:00Z | 38,732 MW |
| 2026-08-22T14:00Z | 38,024 MW |
| 2026-08-22T15:00Z | 38,700 MW |
| 2026-08-22T16:00Z | 39,803 MW |
| 2026-08-22T17:00Z | 40,920 MW |
| 2026-08-22T18:00Z | 40,094 MW |
| 2026-08-22T19:00Z | 39,701 MW |
| 2026-08-22T20:00Z | 39,960 MW |
| 2026-08-22T21:00Z | 39,251 MW |
| 2026-08-22T22:00Z | 37,109 MW |
| 2026-08-22T23:00Z | 35,304 MW |
| 2026-08-23T00:00Z | 33,297 MW |
| 2026-08-23T01:00Z | 31,585 MW |
| 2026-08-23T02:00Z | 30,821 MW |
| 2026-08-23T03:00Z | 30,659 MW |
| 2026-08-23T04:00Z | 31,408 MW |
| 2026-08-23T05:00Z | 31,352 MW |
| 2026-08-23T06:00Z | 32,529 MW |
| 2026-08-23T07:00Z | 33,658 MW |
| 2026-08-23T08:00Z | 35,028 MW |
| 2026-08-23T09:00Z | 36,108 MW |
| 2026-08-23T10:00Z | 38,350 MW |
| 2026-08-23T11:00Z | 37,408 MW |
| 2026-08-23T12:00Z | 37,538 MW |
| 2026-08-23T13:00Z | 37,124 MW |
| 2026-08-23T14:00Z | 36,321 MW |
| 2026-08-23T15:00Z | 37,112 MW |
| 2026-08-23T16:00Z | 39,246 MW |
| 2026-08-23T17:00Z | 41,177 MW |
| 2026-08-23T18:00Z | 40,727 MW |
| 2026-08-23T19:00Z | 40,424 MW |
| 2026-08-23T20:00Z | 40,648 MW |
| 2026-08-23T21:00Z | 39,895 MW |
| 2026-08-23T22:00Z | 37,677 MW |
| 2026-08-23T23:00Z | 35,925 MW |
| 2026-08-24T00:00Z | 34,002 MW |
| 2026-08-24T01:00Z | 32,714 MW |
| 2026-08-24T02:00Z | 32,862 MW |
| 2026-08-24T03:00Z | 34,358 MW |
| 2026-08-24T04:00Z | 37,176 MW |
| 2026-08-24T05:00Z | 39,508 MW |
| 2026-08-24T06:00Z | 42,668 MW |
| 2026-08-24T07:00Z | 44,341 MW |
| 2026-08-24T08:00Z | 45,633 MW |
| 2026-08-24T09:00Z | 47,151 MW |
| 2026-08-24T10:00Z | 48,630 MW |
| 2026-08-24T11:00Z | 48,532 MW |
| 2026-08-24T12:00Z | 49,710 MW |
| 2026-08-24T13:00Z | 49,164 MW |
| 2026-08-24T14:00Z | 48,047 MW |
| 2026-08-24T15:00Z | 46,920 MW |
| 2026-08-24T16:00Z | 47,171 MW |
| 2026-08-24T17:00Z | 47,216 MW |
| 2026-08-24T18:00Z | 45,103 MW |
| 2026-08-24T19:00Z | 43,709 MW |
| 2026-08-24T20:00Z | 43,513 MW |
| 2026-08-24T21:00Z | 42,160 MW |
| 2026-08-24T22:00Z | 39,746 MW |
| 2026-08-24T23:00Z | 37,910 MW |
| 2026-08-25T00:00Z | 35,953 MW |
| 2026-08-25T01:00Z | 34,343 MW |
| 2026-08-25T02:00Z | 34,048 MW |
| 2026-08-25T03:00Z | 35,468 MW |
| 2026-08-25T04:00Z | 38,125 MW |
| 2026-08-25T05:00Z | 40,453 MW |
| 2026-08-25T06:00Z | 43,097 MW |
| 2026-08-25T07:00Z | 44,251 MW |
| 2026-08-25T08:00Z | 45,071 MW |
| 2026-08-25T09:00Z | 46,145 MW |
| 2026-08-25T10:00Z | 47,751 MW |
| 2026-08-25T11:00Z | 47,054 MW |
| 2026-08-25T12:00Z | 46,952 MW |
| 2026-08-25T13:00Z | 46,310 MW |
| 2026-08-25T14:00Z | 45,480 MW |
| 2026-08-25T15:00Z | 45,662 MW |
| 2026-08-25T16:00Z | 47,292 MW |
| 2026-08-25T17:00Z | 47,853 MW |
| 2026-08-25T18:00Z | 46,124 MW |
| 2026-08-25T19:00Z | 45,013 MW |
| 2026-08-25T20:00Z | 44,830 MW |
| 2026-08-25T21:00Z | 43,757 MW |
| 2026-08-25T22:00Z | 41,275 MW |
| 2026-08-25T23:00Z | 39,307 MW |
| 2026-08-26T00:00Z | 37,226 MW |
| 2026-08-26T01:00Z | 35,496 MW |
| 2026-08-26T02:00Z | 35,050 MW |
| 2026-08-26T03:00Z | 36,293 MW |
| 2026-08-26T04:00Z | 38,857 MW |
| 2026-08-26T05:00Z | 41,150 MW |
| 2026-08-26T06:00Z | 43,525 MW |
| 2026-08-26T07:00Z | 45,254 MW |
| 2026-08-26T08:00Z | 46,630 MW |
| 2026-08-26T09:00Z | 47,951 MW |
| 2026-08-26T10:00Z | 49,443 MW |
| 2026-08-26T11:00Z | 49,030 MW |
| 2026-08-26T12:00Z | 49,605 MW |
| 2026-08-26T13:00Z | 48,926 MW |
| 2026-08-26T14:00Z | 47,799 MW |
| 2026-08-26T15:00Z | 47,315 MW |
| 2026-08-26T16:00Z | 48,869 MW |
| 2026-08-26T17:00Z | 49,177 MW |
| 2026-08-26T18:00Z | 46,844 MW |
| 2026-08-26T19:00Z | 45,314 MW |
| 2026-08-26T20:00Z | 45,095 MW |
| 2026-08-26T21:00Z | 43,917 MW |
| 2026-08-26T22:00Z | 41,268 MW |
| 2026-08-26T23:00Z | 39,188 MW |
| 2026-08-27T00:00Z | 37,231 MW |
| 2026-08-27T01:00Z | 35,444 MW |
| 2026-08-27T02:00Z | 35,237 MW |
| 2026-08-27T03:00Z | 36,513 MW |
| 2026-08-27T04:00Z | 39,602 MW |
| 2026-08-27T05:00Z | 41,853 MW |
| 2026-08-27T06:00Z | 44,713 MW |
| 2026-08-27T07:00Z | 46,592 MW |
| 2026-08-27T08:00Z | 47,914 MW |
| 2026-08-27T09:00Z | 49,556 MW |
| 2026-08-27T10:00Z | 50,854 MW |
| 2026-08-27T11:00Z | 50,934 MW |
| 2026-08-27T12:00Z | 51,692 MW |
| 2026-08-27T13:00Z | 50,904 MW |
| 2026-08-27T14:00Z | 50,110 MW |
| 2026-08-27T15:00Z | 49,287 MW |
| 2026-08-27T16:00Z | 49,777 MW |
| 2026-08-27T17:00Z | 49,378 MW |
| 2026-08-27T18:00Z | 47,372 MW |
| 2026-08-27T19:00Z | 46,167 MW |
| 2026-08-27T20:00Z | 45,931 MW |
| 2026-08-27T21:00Z | 44,507 MW |
| 2026-08-27T22:00Z | 42,169 MW |
| 2026-08-27T23:00Z | 40,533 MW |
| 2026-08-28T00:00Z | 38,404 MW |
| 2026-08-28T01:00Z | 36,424 MW |
| 2026-08-28T02:00Z | 36,168 MW |
| 2026-08-28T03:00Z | 37,326 MW |
| 2026-08-28T04:00Z | 39,855 MW |
| 2026-08-28T05:00Z | 42,077 MW |
| 2026-08-28T06:00Z | 45,063 MW |
| 2026-08-28T07:00Z | 46,567 MW |
| 2026-08-28T08:00Z | 47,531 MW |
| 2026-08-28T09:00Z | 48,475 MW |
| 2026-08-28T10:00Z | 49,275 MW |
| 2026-08-28T11:00Z | 48,297 MW |
| 2026-08-28T12:00Z | 48,127 MW |
| 2026-08-28T13:00Z | 47,155 MW |
| 2026-08-28T14:00Z | 45,709 MW |
| 2026-08-28T15:00Z | 45,104 MW |
| 2026-08-28T16:00Z | 46,187 MW |
| 2026-08-28T17:00Z | 46,623 MW |
| 2026-08-28T18:00Z | 45,159 MW |
| 2026-08-28T19:00Z | 44,029 MW |
| 2026-08-28T20:00Z | 44,032 MW |
| 2026-08-28T21:00Z | 42,779 MW |
| 2026-08-28T22:00Z | 40,383 MW |
| 2026-08-28T23:00Z | 38,550 MW |
| 2026-08-29T00:00Z | 36,144 MW |
| 2026-08-29T01:00Z | 34,075 MW |
| 2026-08-29T02:00Z | 33,071 MW |
| 2026-08-29T03:00Z | 33,384 MW |
| 2026-08-29T04:00Z | 34,301 MW |
| 2026-08-29T05:00Z | 34,552 MW |
| 2026-08-29T06:00Z | 36,386 MW |
| 2026-08-29T07:00Z | 38,666 MW |
| 2026-08-29T08:00Z | 40,390 MW |
| 2026-08-29T09:00Z | 42,161 MW |
| 2026-08-29T10:00Z | 44,088 MW |
| 2026-08-29T11:00Z | 43,227 MW |
| 2026-08-29T12:00Z | 42,398 MW |
| 2026-08-29T13:00Z | 41,769 MW |
| 2026-08-29T14:00Z | 40,908 MW |
| 2026-08-29T15:00Z | 40,457 MW |
| 2026-08-29T16:00Z | 42,756 MW |
| 2026-08-29T17:00Z | 43,169 MW |
| 2026-08-29T18:00Z | 42,003 MW |
| 2026-08-29T19:00Z | 41,358 MW |
| 2026-08-29T20:00Z | 41,659 MW |
| 2026-08-29T21:00Z | 41,225 MW |
| 2026-08-29T22:00Z | 39,104 MW |
| 2026-08-29T23:00Z | 37,142 MW |
| 2026-08-30T00:00Z | 34,806 MW |
| 2026-08-30T01:00Z | 32,665 MW |
| 2026-08-30T02:00Z | 31,880 MW |
| 2026-08-30T03:00Z | 31,735 MW |
| 2026-08-30T04:00Z | 32,033 MW |
| 2026-08-30T05:00Z | 32,101 MW |
| 2026-08-30T06:00Z | 33,669 MW |
| 2026-08-30T07:00Z | 35,489 MW |
| 2026-08-30T08:00Z | 37,647 MW |
| 2026-08-30T09:00Z | 39,014 MW |
| 2026-08-30T10:00Z | 40,537 MW |
| 2026-08-30T11:00Z | 39,162 MW |
| 2026-08-30T12:00Z | 39,000 MW |
| 2026-08-30T13:00Z | 39,361 MW |
| 2026-08-30T14:00Z | 38,729 MW |
| 2026-08-30T15:00Z | 39,653 MW |
| 2026-08-30T16:00Z | 41,451 MW |
| 2026-08-30T17:00Z | 42,804 MW |
| 2026-08-30T18:00Z | 42,118 MW |
| 2026-08-30T19:00Z | 41,636 MW |
| 2026-08-30T20:00Z | 41,699 MW |
| 2026-08-30T21:00Z | 40,845 MW |
| 2026-08-30T22:00Z | 38,486 MW |
| 2026-08-30T23:00Z | 36,726 MW |
| 2026-08-31T00:00Z | 34,838 MW |
| 2026-08-31T01:00Z | 33,266 MW |
| 2026-08-31T02:00Z | 33,244 MW |
| 2026-08-31T03:00Z | 34,904 MW |
| 2026-08-31T04:00Z | 38,156 MW |
| 2026-08-31T05:00Z | 40,985 MW |
| 2026-08-31T06:00Z | 43,860 MW |
| 2026-08-31T07:00Z | 45,716 MW |
| 2026-08-31T08:00Z | 47,613 MW |
| 2026-08-31T09:00Z | 48,990 MW |
| 2026-08-31T10:00Z | 49,944 MW |
| 2026-08-31T11:00Z | 48,858 MW |
| 2026-08-31T12:00Z | 49,439 MW |
| 2026-08-31T13:00Z | 47,934 MW |
| 2026-08-31T14:00Z | 46,909 MW |
| 2026-08-31T15:00Z | 46,347 MW |
| 2026-08-31T16:00Z | 47,994 MW |
| 2026-08-31T17:00Z | 49,071 MW |
| 2026-08-31T18:00Z | 47,111 MW |
| 2026-08-31T19:00Z | 45,167 MW |
| 2026-08-31T20:00Z | 44,499 MW |
| 2026-08-31T21:00Z | 43,507 MW |
| 2026-08-31T22:00Z | 41,076 MW |
| 2026-08-31T23:00Z | 39,051 MW |
| 2026-09-01T00:00Z | 37,090 MW |
| 2026-09-01T01:00Z | 35,210 MW |
| 2026-09-01T02:00Z | 35,001 MW |
| 2026-09-01T03:00Z | 36,248 MW |
| 2026-09-01T04:00Z | 39,310 MW |
| 2026-09-01T05:00Z | 42,464 MW |
| 2026-09-01T06:00Z | 44,273 MW |
| 2026-09-01T07:00Z | 45,295 MW |
| 2026-09-01T08:00Z | 46,327 MW |
| 2026-09-01T09:00Z | 47,587 MW |
| 2026-09-01T10:00Z | 48,908 MW |
| 2026-09-01T11:00Z | 48,203 MW |
| 2026-09-01T12:00Z | 48,368 MW |
| 2026-09-01T13:00Z | 47,373 MW |
| 2026-09-01T14:00Z | 46,159 MW |
| 2026-09-01T15:00Z | 46,029 MW |
| 2026-09-01T16:00Z | 48,106 MW |
| 2026-09-01T17:00Z | 48,743 MW |
| 2026-09-01T18:00Z | 46,828 MW |
| 2026-09-01T19:00Z | 45,102 MW |
| 2026-09-01T20:00Z | 44,503 MW |
| 2026-09-01T21:00Z | 43,469 MW |
| 2026-09-01T22:00Z | 41,198 MW |
| 2026-09-01T23:00Z | 39,456 MW |
| 2026-09-02T00:00Z | 37,273 MW |
| 2026-09-02T01:00Z | 35,508 MW |
| 2026-09-02T02:00Z | 35,196 MW |
| 2026-09-02T03:00Z | 36,601 MW |
| 2026-09-02T04:00Z | 39,895 MW |
| 2026-09-02T05:00Z | 42,379 MW |
| 2026-09-02T06:00Z | 45,002 MW |
| 2026-09-02T07:00Z | 46,093 MW |
| 2026-09-02T08:00Z | 46,841 MW |
| 2026-09-02T09:00Z | 48,303 MW |
| 2026-09-02T10:00Z | 49,349 MW |
| 2026-09-02T11:00Z | 48,504 MW |
| 2026-09-02T12:00Z | 49,459 MW |
| 2026-09-02T13:00Z | 48,361 MW |
| 2026-09-02T14:00Z | 47,187 MW |
| 2026-09-02T15:00Z | 47,439 MW |
| 2026-09-02T16:00Z | 49,147 MW |
| 2026-09-02T17:00Z | 49,792 MW |
| 2026-09-02T18:00Z | 48,016 MW |
| 2026-09-02T19:00Z | 46,290 MW |
| 2026-09-02T20:00Z | 46,097 MW |
| 2026-09-02T21:00Z | 44,625 MW |
| 2026-09-02T22:00Z | 41,880 MW |
| 2026-09-02T23:00Z | 40,094 MW |
| 2026-09-03T00:00Z | 37,991 MW |
| 2026-09-03T01:00Z | 36,277 MW |
| 2026-09-03T02:00Z | 35,909 MW |
| 2026-09-03T03:00Z | 37,330 MW |
| 2026-09-03T04:00Z | 40,774 MW |
| 2026-09-03T05:00Z | 43,837 MW |
| 2026-09-03T06:00Z | 45,801 MW |
| 2026-09-03T07:00Z | 46,679 MW |
| 2026-09-03T08:00Z | 47,823 MW |
| 2026-09-03T09:00Z | 48,462 MW |
| 2026-09-03T10:00Z | 49,277 MW |
| 2026-09-03T11:00Z | 48,635 MW |
| 2026-09-03T12:00Z | 49,525 MW |
| 2026-09-03T13:00Z | 48,761 MW |
| 2026-09-03T14:00Z | 47,942 MW |
| 2026-09-03T15:00Z | 47,983 MW |
| 2026-09-03T16:00Z | 49,978 MW |
| 2026-09-03T17:00Z | 50,697 MW |
| 2026-09-03T18:00Z | 48,743 MW |
| 2026-09-03T19:00Z | 46,747 MW |
| 2026-09-03T20:00Z | 46,249 MW |
| 2026-09-03T21:00Z | 44,833 MW |
| 2026-09-03T22:00Z | 42,240 MW |
| 2026-09-03T23:00Z | 40,616 MW |
| 2026-09-04T00:00Z | 38,669 MW |
| 2026-09-04T01:00Z | 36,764 MW |
| 2026-09-04T02:00Z | 36,284 MW |
| 2026-09-04T03:00Z | 37,732 MW |
| 2026-09-04T04:00Z | 41,231 MW |
| 2026-09-04T05:00Z | 44,459 MW |
| 2026-09-04T06:00Z | 46,674 MW |
| 2026-09-04T07:00Z | 47,502 MW |
| 2026-09-04T08:00Z | 48,478 MW |
| 2026-09-04T09:00Z | 49,651 MW |
| 2026-09-04T10:00Z | 50,654 MW |
| 2026-09-04T11:00Z | 49,965 MW |
| 2026-09-04T12:00Z | 50,896 MW |
| 2026-09-04T13:00Z | 50,695 MW |
| 2026-09-04T14:00Z | 49,111 MW |
| 2026-09-04T15:00Z | 49,517 MW |
| 2026-09-04T16:00Z | 50,681 MW |
| 2026-09-04T17:00Z | 50,972 MW |
| 2026-09-04T18:00Z | 49,137 MW |
| 2026-09-04T19:00Z | 47,140 MW |
| 2026-09-04T20:00Z | 46,792 MW |
| 2026-09-04T21:00Z | 45,162 MW |
| 2026-09-04T22:00Z | 42,519 MW |
| 2026-09-04T23:00Z | 40,475 MW |
| 2026-09-05T00:00Z | 38,091 MW |
| 2026-09-05T01:00Z | 35,863 MW |
| 2026-09-05T02:00Z | 35,126 MW |
| 2026-09-05T03:00Z | 35,291 MW |
| 2026-09-05T04:00Z | 36,043 MW |
| 2026-09-05T05:00Z | 36,562 MW |
| 2026-09-05T06:00Z | 38,379 MW |
| 2026-09-05T07:00Z | 39,813 MW |
| 2026-09-05T08:00Z | 40,984 MW |
| 2026-09-05T09:00Z | 42,458 MW |
| 2026-09-05T10:00Z | 43,716 MW |
| 2026-09-05T11:00Z | 43,191 MW |
| 2026-09-05T12:00Z | 43,744 MW |
| 2026-09-05T13:00Z | 42,303 MW |
| 2026-09-05T14:00Z | 41,601 MW |
| 2026-09-05T15:00Z | 42,218 MW |
| 2026-09-05T16:00Z | 43,569 MW |
| 2026-09-05T17:00Z | 44,419 MW |
| 2026-09-05T18:00Z | 43,883 MW |
| 2026-09-05T19:00Z | 42,682 MW |
| 2026-09-05T20:00Z | 42,564 MW |
| 2026-09-05T21:00Z | 41,842 MW |
| 2026-09-05T22:00Z | 39,495 MW |
| 2026-09-05T23:00Z | 37,479 MW |
| 2026-09-06T00:00Z | 35,216 MW |
| 2026-09-06T01:00Z | 33,168 MW |
| 2026-09-06T02:00Z | 32,353 MW |
| 2026-09-06T03:00Z | 32,317 MW |
| 2026-09-06T04:00Z | 32,826 MW |
| 2026-09-06T05:00Z | 33,108 MW |
| 2026-09-06T06:00Z | 34,483 MW |
| 2026-09-06T07:00Z | 36,518 MW |
| 2026-09-06T08:00Z | 38,677 MW |
| 2026-09-06T09:00Z | 40,841 MW |
| 2026-09-06T10:00Z | 43,197 MW |
| 2026-09-06T11:00Z | 42,586 MW |
| 2026-09-06T12:00Z | 43,534 MW |
| 2026-09-06T13:00Z | 42,198 MW |
| 2026-09-06T14:00Z | 41,263 MW |
| 2026-09-06T15:00Z | 41,498 MW |
| 2026-09-06T16:00Z | 43,891 MW |
| 2026-09-06T17:00Z | 45,420 MW |
| 2026-09-06T18:00Z | 45,082 MW |
| 2026-09-06T19:00Z | 44,053 MW |
| 2026-09-06T20:00Z | 43,736 MW |
| 2026-09-06T21:00Z | 42,601 MW |
| 2026-09-06T22:00Z | 40,171 MW |
| 2026-09-06T23:00Z | 38,065 MW |
| 2026-09-07T00:00Z | 36,007 MW |
| 2026-09-07T01:00Z | 34,378 MW |
| 2026-09-07T02:00Z | 34,070 MW |
| 2026-09-07T03:00Z | 36,090 MW |
| 2026-09-07T04:00Z | 40,114 MW |
| 2026-09-07T05:00Z | 43,668 MW |
| 2026-09-07T06:00Z | 46,138 MW |
| 2026-09-07T07:00Z | 47,569 MW |
| 2026-09-07T08:00Z | 48,835 MW |
| 2026-09-07T09:00Z | 50,120 MW |
| 2026-09-07T10:00Z | 51,211 MW |
| 2026-09-07T11:00Z | 50,798 MW |
| 2026-09-07T12:00Z | 51,939 MW |
| 2026-09-07T13:00Z | 50,907 MW |
| 2026-09-07T14:00Z | 49,674 MW |
| 2026-09-07T15:00Z | 49,672 MW |
| 2026-09-07T16:00Z | 51,457 MW |
| 2026-09-07T17:00Z | 51,746 MW |
| 2026-09-07T18:00Z | 49,794 MW |
| 2026-09-07T19:00Z | 47,320 MW |
| 2026-09-07T20:00Z | 46,553 MW |
| 2026-09-07T21:00Z | 45,257 MW |
| 2026-09-07T22:00Z | 42,614 MW |
| 2026-09-07T23:00Z | 40,729 MW |
| 2026-09-08T00:00Z | 38,596 MW |
| 2026-09-08T01:00Z | 36,773 MW |
| 2026-09-08T02:00Z | 36,349 MW |
| 2026-09-08T03:00Z | 37,785 MW |
| 2026-09-08T04:00Z | 41,274 MW |
| 2026-09-08T05:00Z | 44,608 MW |
| 2026-09-08T06:00Z | 46,883 MW |
| 2026-09-08T07:00Z | 47,923 MW |
| 2026-09-08T08:00Z | 49,222 MW |
| 2026-09-08T09:00Z | 50,621 MW |
| 2026-09-08T10:00Z | 51,334 MW |
| 2026-09-08T11:00Z | 50,707 MW |
| 2026-09-08T12:00Z | 51,719 MW |
| 2026-09-08T13:00Z | 50,292 MW |
| 2026-09-08T14:00Z | 49,496 MW |
| 2026-09-08T15:00Z | 49,368 MW |
| 2026-09-08T16:00Z | 50,494 MW |
| 2026-09-08T17:00Z | 51,092 MW |
| 2026-09-08T18:00Z | 49,393 MW |
| 2026-09-08T19:00Z | 46,997 MW |
| 2026-09-08T20:00Z | 46,272 MW |
| 2026-09-08T21:00Z | 44,877 MW |
| 2026-09-08T22:00Z | 42,030 MW |
| 2026-09-08T23:00Z | 40,029 MW |
| 2026-09-09T00:00Z | 38,134 MW |
| 2026-09-09T01:00Z | 36,200 MW |
| 2026-09-09T02:00Z | 35,872 MW |
| 2026-09-09T03:00Z | 37,228 MW |
| 2026-09-09T04:00Z | 40,692 MW |
| 2026-09-09T05:00Z | 43,811 MW |
| 2026-09-09T06:00Z | 46,466 MW |
| 2026-09-09T07:00Z | 47,251 MW |
| 2026-09-09T08:00Z | 47,680 MW |
| 2026-09-09T09:00Z | 48,741 MW |
| 2026-09-09T10:00Z | 49,837 MW |
| 2026-09-09T11:00Z | 48,756 MW |
| 2026-09-09T12:00Z | 48,654 MW |
| 2026-09-09T13:00Z | 46,667 MW |
| 2026-09-09T14:00Z | 44,979 MW |
| 2026-09-09T15:00Z | 44,798 MW |
| 2026-09-09T16:00Z | 46,881 MW |
| 2026-09-09T17:00Z | 48,369 MW |
| 2026-09-09T18:00Z | 47,211 MW |
| 2026-09-09T19:00Z | 44,898 MW |
| 2026-09-09T20:00Z | 44,338 MW |
| 2026-09-09T21:00Z | 43,273 MW |
| 2026-09-09T22:00Z | 40,947 MW |
| 2026-09-09T23:00Z | 39,316 MW |
| 2026-09-10T00:00Z | 37,383 MW |
| 2026-09-10T01:00Z | 35,467 MW |
| 2026-09-10T02:00Z | 35,114 MW |
| 2026-09-10T03:00Z | 36,793 MW |
| 2026-09-10T04:00Z | 40,611 MW |
| 2026-09-10T05:00Z | 44,073 MW |
| 2026-09-10T06:00Z | 45,858 MW |
| 2026-09-10T07:00Z | 46,564 MW |
| 2026-09-10T08:00Z | 46,838 MW |
| 2026-09-10T09:00Z | 47,407 MW |
| 2026-09-10T10:00Z | 47,755 MW |
| 2026-09-10T11:00Z | 46,854 MW |
| 2026-09-10T12:00Z | 46,898 MW |
| 2026-09-10T13:00Z | 45,480 MW |
| 2026-09-10T14:00Z | 44,010 MW |
| 2026-09-10T15:00Z | 44,751 MW |
| 2026-09-10T16:00Z | 46,953 MW |
| 2026-09-10T17:00Z | 48,069 MW |
| 2026-09-10T18:00Z | 46,982 MW |
| 2026-09-10T19:00Z | 44,661 MW |
| 2026-09-10T20:00Z | 44,328 MW |
| 2026-09-10T21:00Z | 43,391 MW |
| 2026-09-10T22:00Z | 40,975 MW |
| 2026-09-10T23:00Z | 39,383 MW |
| 2026-09-11T00:00Z | 37,272 MW |
| 2026-09-11T01:00Z | 35,226 MW |
| 2026-09-11T02:00Z | 35,020 MW |
| 2026-09-11T03:00Z | 36,737 MW |
| 2026-09-11T04:00Z | 40,328 MW |
| 2026-09-11T05:00Z | 43,837 MW |
| 2026-09-11T06:00Z | 45,589 MW |
| 2026-09-11T07:00Z | 46,429 MW |
| 2026-09-11T08:00Z | 46,830 MW |
| 2026-09-11T09:00Z | 47,655 MW |
| 2026-09-11T10:00Z | 48,364 MW |
| 2026-09-11T11:00Z | 47,168 MW |
| 2026-09-11T12:00Z | 47,330 MW |
| 2026-09-11T13:00Z | 46,127 MW |
| 2026-09-11T14:00Z | 44,769 MW |
| 2026-09-11T15:00Z | 44,882 MW |
| 2026-09-11T16:00Z | 46,441 MW |
| 2026-09-11T17:00Z | 46,699 MW |
| 2026-09-11T18:00Z | 45,827 MW |
| 2026-09-11T19:00Z | 43,721 MW |
| 2026-09-11T20:00Z | 43,580 MW |
| 2026-09-11T21:00Z | 42,528 MW |
| 2026-09-11T22:00Z | 40,201 MW |
| 2026-09-11T23:00Z | 38,195 MW |
| 2026-09-12T00:00Z | 35,920 MW |
| 2026-09-12T01:00Z | 34,031 MW |
| 2026-09-12T02:00Z | 33,117 MW |
| 2026-09-12T03:00Z | 33,302 MW |
| 2026-09-12T04:00Z | 34,374 MW |
| 2026-09-12T05:00Z | 34,946 MW |
| 2026-09-12T06:00Z | 36,792 MW |
| 2026-09-12T07:00Z | 38,694 MW |
| 2026-09-12T08:00Z | 39,925 MW |
| 2026-09-12T09:00Z | 40,863 MW |
| 2026-09-12T10:00Z | 42,891 MW |
| 2026-09-12T11:00Z | 41,498 MW |
| 2026-09-12T12:00Z | 41,305 MW |
| 2026-09-12T13:00Z | 40,568 MW |
| 2026-09-12T14:00Z | 39,866 MW |
| 2026-09-12T15:00Z | 40,060 MW |
| 2026-09-12T16:00Z | 41,402 MW |
| 2026-09-12T17:00Z | 42,404 MW |
| 2026-09-12T18:00Z | 41,932 MW |
| 2026-09-12T19:00Z | 40,496 MW |
| 2026-09-12T20:00Z | 40,734 MW |
| 2026-09-12T21:00Z | 40,200 MW |
| 2026-09-12T22:00Z | 38,573 MW |
| 2026-09-12T23:00Z | 36,693 MW |
| 2026-09-13T00:00Z | 34,315 MW |
| 2026-09-13T01:00Z | 32,236 MW |
| 2026-09-13T02:00Z | 31,417 MW |
| 2026-09-13T03:00Z | 31,383 MW |
| 2026-09-13T04:00Z | 31,913 MW |
| 2026-09-13T05:00Z | 32,252 MW |
| 2026-09-13T06:00Z | 33,272 MW |
| 2026-09-13T07:00Z | 35,403 MW |
| 2026-09-13T08:00Z | 38,001 MW |
| 2026-09-13T09:00Z | 39,629 MW |
| 2026-09-13T10:00Z | 41,656 MW |
| 2026-09-13T11:00Z | 40,660 MW |
| 2026-09-13T12:00Z | 40,549 MW |
| 2026-09-13T13:00Z | 39,826 MW |
| 2026-09-13T14:00Z | 39,084 MW |
| 2026-09-13T15:00Z | 39,441 MW |
| 2026-09-13T16:00Z | 41,363 MW |
| 2026-09-13T17:00Z | 43,121 MW |
| 2026-09-13T18:00Z | 42,861 MW |
| 2026-09-13T19:00Z | 41,307 MW |
| 2026-09-13T20:00Z | 41,238 MW |
| 2026-09-13T21:00Z | 40,522 MW |
| 2026-09-13T22:00Z | 38,408 MW |
| 2026-09-13T23:00Z | 36,653 MW |
| 2026-09-14T00:00Z | 34,694 MW |
| 2026-09-14T01:00Z | 32,853 MW |
| 2026-09-14T02:00Z | 32,745 MW |
| 2026-09-14T03:00Z | 34,760 MW |
| 2026-09-14T04:00Z | 38,887 MW |
| 2026-09-14T05:00Z | 42,654 MW |
| 2026-09-14T06:00Z | 44,996 MW |
| 2026-09-14T07:00Z | 46,210 MW |
| 2026-09-14T08:00Z | 47,433 MW |
| 2026-09-14T09:00Z | 48,313 MW |
| 2026-09-14T10:00Z | 48,798 MW |
| 2026-09-14T11:00Z | 48,337 MW |
| 2026-09-14T12:00Z | 48,886 MW |
| 2026-09-14T13:00Z | 48,445 MW |
| 2026-09-14T14:00Z | 47,620 MW |
| 2026-09-14T15:00Z | 47,530 MW |
| 2026-09-14T16:00Z | 49,328 MW |
| 2026-09-14T17:00Z | 50,083 MW |
| 2026-09-14T18:00Z | 48,316 MW |
| 2026-09-14T19:00Z | 45,483 MW |
| 2026-09-14T20:00Z | 44,797 MW |
| 2026-09-14T21:00Z | 43,638 MW |
| 2026-09-14T22:00Z | 40,945 MW |
| 2026-09-14T23:00Z | 39,010 MW |
| 2026-09-15T00:00Z | 36,825 MW |
| 2026-09-15T01:00Z | 35,012 MW |
| 2026-09-15T02:00Z | 34,621 MW |
| 2026-09-15T03:00Z | 35,997 MW |
| 2026-09-15T04:00Z | 39,916 MW |
| 2026-09-15T05:00Z | 43,543 MW |
| 2026-09-15T06:00Z | 44,914 MW |
| 2026-09-15T07:00Z | 45,834 MW |
| 2026-09-15T08:00Z | 46,952 MW |
| 2026-09-15T09:00Z | 48,438 MW |
| 2026-09-15T10:00Z | 49,872 MW |
| 2026-09-15T11:00Z | 49,442 MW |
| 2026-09-15T12:00Z | 49,893 MW |
| 2026-09-15T13:00Z | 49,151 MW |
| 2026-09-15T14:00Z | 48,300 MW |
| 2026-09-15T15:00Z | 48,129 MW |
| 2026-09-15T16:00Z | 49,394 MW |
| 2026-09-15T17:00Z | 49,932 MW |
| 2026-09-15T18:00Z | 48,269 MW |
| 2026-09-15T19:00Z | 45,406 MW |
| 2026-09-15T20:00Z | 45,303 MW |
| 2026-09-15T21:00Z | 44,215 MW |
| 2026-09-15T22:00Z | 41,204 MW |
| 2026-09-15T23:00Z | 39,465 MW |
| 2026-09-16T00:00Z | 37,316 MW |
| 2026-09-16T01:00Z | 35,490 MW |
| 2026-09-16T02:00Z | 35,229 MW |
| 2026-09-16T03:00Z | 36,510 MW |
| 2026-09-16T04:00Z | 40,374 MW |
| 2026-09-16T05:00Z | 43,246 MW |
| 2026-09-16T06:00Z | 45,498 MW |
| 2026-09-16T07:00Z | 46,722 MW |
| 2026-09-16T08:00Z | 47,765 MW |
| 2026-09-16T09:00Z | 49,321 MW |
| 2026-09-16T10:00Z | 50,190 MW |
| 2026-09-16T11:00Z | 50,134 MW |
| 2026-09-16T12:00Z | 50,319 MW |
| 2026-09-16T13:00Z | 48,894 MW |
| 2026-09-16T14:00Z | 46,352 MW |
| 2026-09-16T15:00Z | 46,077 MW |
| 2026-09-16T16:00Z | 47,546 MW |
| 2026-09-16T17:00Z | 48,702 MW |
| 2026-09-16T18:00Z | 47,154 MW |
| 2026-09-16T19:00Z | 44,634 MW |
| 2026-09-16T20:00Z | 44,059 MW |
| 2026-09-16T21:00Z | 42,919 MW |
| 2026-09-16T22:00Z | 40,822 MW |
| 2026-09-16T23:00Z | 39,292 MW |
| 2026-09-17T00:00Z | 37,302 MW |
| 2026-09-17T01:00Z | 35,461 MW |
| 2026-09-17T02:00Z | 35,094 MW |
| 2026-09-17T03:00Z | 36,688 MW |
| 2026-09-17T04:00Z | 40,559 MW |
| 2026-09-17T05:00Z | 44,159 MW |
| 2026-09-17T06:00Z | 45,676 MW |
| 2026-09-17T07:00Z | 46,014 MW |
| 2026-09-17T08:00Z | 46,660 MW |
| 2026-09-17T09:00Z | 47,501 MW |
| 2026-09-17T10:00Z | 48,603 MW |
| 2026-09-17T11:00Z | 47,402 MW |
| 2026-09-17T12:00Z | 47,652 MW |
| 2026-09-17T13:00Z | 46,931 MW |
| 2026-09-17T14:00Z | 46,082 MW |
| 2026-09-17T15:00Z | 45,941 MW |
| 2026-09-17T16:00Z | 47,654 MW |
| 2026-09-17T17:00Z | 48,554 MW |
| 2026-09-17T18:00Z | 47,281 MW |
| 2026-09-17T19:00Z | 44,515 MW |
| 2026-09-17T20:00Z | 44,178 MW |
| 2026-09-17T21:00Z | 43,262 MW |
| 2026-09-17T22:00Z | 40,880 MW |
| 2026-09-17T23:00Z | 39,163 MW |
| 2026-09-18T00:00Z | 37,148 MW |
| 2026-09-18T01:00Z | 35,277 MW |
| 2026-09-18T02:00Z | 34,981 MW |
| 2026-09-18T03:00Z | 36,477 MW |
| 2026-09-18T04:00Z | 40,137 MW |
| 2026-09-18T05:00Z | 43,854 MW |
| 2026-09-18T06:00Z | 45,854 MW |
| 2026-09-18T07:00Z | 46,372 MW |
| 2026-09-18T08:00Z | 46,745 MW |
| 2026-09-18T09:00Z | 47,591 MW |
| 2026-09-18T10:00Z | 47,956 MW |
| 2026-09-18T11:00Z | 46,197 MW |
| 2026-09-18T12:00Z | 46,660 MW |
| 2026-09-18T13:00Z | 45,377 MW |
| 2026-09-18T14:00Z | 44,098 MW |
| 2026-09-18T15:00Z | 44,387 MW |
| 2026-09-18T16:00Z | 46,216 MW |
| 2026-09-18T17:00Z | 46,773 MW |
| 2026-09-18T18:00Z | 46,018 MW |
| 2026-09-18T19:00Z | 43,713 MW |
| 2026-09-18T20:00Z | 43,405 MW |
| 2026-09-18T21:00Z | 42,833 MW |
| 2026-09-18T22:00Z | 40,763 MW |
| 2026-09-18T23:00Z | 38,541 MW |
| 2026-09-19T00:00Z | 36,279 MW |
| 2026-09-19T01:00Z | 34,263 MW |
| 2026-09-19T02:00Z | 33,507 MW |
| 2026-09-19T03:00Z | 33,727 MW |
| 2026-09-19T04:00Z | 34,620 MW |
| 2026-09-19T05:00Z | 35,471 MW |
| 2026-09-19T06:00Z | 36,997 MW |
| 2026-09-19T07:00Z | 38,467 MW |
| 2026-09-19T08:00Z | 39,693 MW |
| 2026-09-19T09:00Z | 40,976 MW |
| 2026-09-19T10:00Z | 42,402 MW |
| 2026-09-19T11:00Z | 41,031 MW |
| 2026-09-19T12:00Z | 41,226 MW |
| 2026-09-19T13:00Z | 40,771 MW |
| 2026-09-19T14:00Z | 39,838 MW |
| 2026-09-19T15:00Z | 40,004 MW |
| 2026-09-19T16:00Z | 41,350 MW |
| 2026-09-19T17:00Z | 42,586 MW |
| Hour starting (UTC) | Nuclear | Solar | Hydro | Gas | Storage |
|---|---|---|---|---|---|
| 2026-08-21T22:00Z | 39,075 MW | 0 MW | 3,754 MW | 2,424 MW | 90 MW |
| 2026-08-21T23:00Z | 38,960 MW | 0 MW | 3,458 MW | 2,105 MW | 79 MW |
| 2026-08-22T00:00Z | 38,897 MW | 0 MW | 3,317 MW | 1,186 MW | -43 MW |
| 2026-08-22T01:00Z | 39,020 MW | 0 MW | 3,270 MW | 497 MW | -25 MW |
| 2026-08-22T02:00Z | 39,183 MW | 0 MW | 3,050 MW | 511 MW | -133 MW |
| 2026-08-22T03:00Z | 39,171 MW | 0 MW | 3,071 MW | 512 MW | -207 MW |
| 2026-08-22T04:00Z | 39,167 MW | 215 MW | 3,106 MW | 502 MW | 48 MW |
| 2026-08-22T05:00Z | 39,080 MW | 737 MW | 3,226 MW | 470 MW | 36 MW |
| 2026-08-22T06:00Z | 38,362 MW | 3,383 MW | 3,225 MW | 490 MW | -427 MW |
| 2026-08-22T07:00Z | 35,582 MW | 7,858 MW | 3,193 MW | 481 MW | -1,071 MW |
| 2026-08-22T08:00Z | 33,492 MW | 12,317 MW | 2,852 MW | 487 MW | -1,442 MW |
| 2026-08-22T09:00Z | 32,057 MW | 13,871 MW | 2,773 MW | 470 MW | -2,067 MW |
| 2026-08-22T10:00Z | 31,336 MW | 16,536 MW | 2,870 MW | 482 MW | -2,304 MW |
| 2026-08-22T11:00Z | 31,279 MW | 15,480 MW | 2,911 MW | 483 MW | -2,257 MW |
| 2026-08-22T12:00Z | 31,337 MW | 14,329 MW | 2,892 MW | 359 MW | -2,378 MW |
| 2026-08-22T13:00Z | 31,558 MW | 13,909 MW | 2,881 MW | 261 MW | -2,039 MW |
| 2026-08-22T14:00Z | 32,957 MW | 12,816 MW | 2,996 MW | 367 MW | -1,584 MW |
| 2026-08-22T15:00Z | 34,751 MW | 11,671 MW | 2,983 MW | 503 MW | -1,532 MW |
| 2026-08-22T16:00Z | 35,764 MW | 7,487 MW | 3,426 MW | 593 MW | -139 MW |
| 2026-08-22T17:00Z | 35,854 MW | 3,181 MW | 3,543 MW | 683 MW | 1,809 MW |
| 2026-08-22T18:00Z | 36,963 MW | 677 MW | 3,978 MW | 844 MW | 2,439 MW |
| 2026-08-22T19:00Z | 37,114 MW | 230 MW | 3,992 MW | 860 MW | 2,041 MW |
| 2026-08-22T20:00Z | 37,059 MW | 228 MW | 3,992 MW | 854 MW | 1,204 MW |
| 2026-08-22T21:00Z | 37,538 MW | 0 MW | 3,608 MW | 767 MW | 599 MW |
| 2026-08-22T22:00Z | 37,610 MW | 0 MW | 3,189 MW | 634 MW | 390 MW |
| 2026-08-22T23:00Z | 37,532 MW | 0 MW | 3,147 MW | 288 MW | 195 MW |
| 2026-08-23T00:00Z | 37,547 MW | 0 MW | 3,065 MW | 290 MW | 211 MW |
| 2026-08-23T01:00Z | 37,713 MW | 0 MW | 2,977 MW | 298 MW | 64 MW |
| 2026-08-23T02:00Z | 37,751 MW | 0 MW | 2,818 MW | 298 MW | -3 MW |
| 2026-08-23T03:00Z | 37,961 MW | 0 MW | 2,690 MW | 293 MW | -9 MW |
| 2026-08-23T04:00Z | 38,109 MW | 227 MW | 2,785 MW | 307 MW | -35 MW |
| 2026-08-23T05:00Z | 37,605 MW | 738 MW | 2,731 MW | 289 MW | -1,159 MW |
| 2026-08-23T06:00Z | 36,831 MW | 3,374 MW | 2,497 MW | 300 MW | -1,568 MW |
| 2026-08-23T07:00Z | 34,593 MW | 7,264 MW | 2,471 MW | 309 MW | -1,943 MW |
| 2026-08-23T08:00Z | 33,730 MW | 7,972 MW | 2,307 MW | 300 MW | -1,914 MW |
| 2026-08-23T09:00Z | 32,576 MW | 9,469 MW | 2,298 MW | 290 MW | -2,152 MW |
| 2026-08-23T10:00Z | 31,814 MW | 11,143 MW | 2,321 MW | 303 MW | -2,356 MW |
| 2026-08-23T11:00Z | 31,090 MW | 11,707 MW | 2,248 MW | 306 MW | -2,390 MW |
| 2026-08-23T12:00Z | 30,638 MW | 11,509 MW | 2,269 MW | 316 MW | -1,675 MW |
| 2026-08-23T13:00Z | 30,616 MW | 11,085 MW | 2,294 MW | 300 MW | -1,455 MW |
| 2026-08-23T14:00Z | 31,357 MW | 11,084 MW | 2,415 MW | 313 MW | -1,041 MW |
| 2026-08-23T15:00Z | 32,370 MW | 8,724 MW | 2,672 MW | 693 MW | -1,216 MW |
| 2026-08-23T16:00Z | 32,780 MW | 6,548 MW | 3,559 MW | 1,122 MW | -847 MW |
| 2026-08-23T17:00Z | 33,878 MW | 2,687 MW | 4,048 MW | 1,508 MW | 677 MW |
| 2026-08-23T18:00Z | 34,652 MW | 595 MW | 4,342 MW | 1,681 MW | 1,940 MW |
| 2026-08-23T19:00Z | 35,201 MW | 220 MW | 4,300 MW | 1,251 MW | 2,719 MW |
| 2026-08-23T20:00Z | 35,961 MW | 212 MW | 4,160 MW | 1,066 MW | 2,399 MW |
| 2026-08-23T21:00Z | 36,686 MW | 0 MW | 3,617 MW | 961 MW | 1,696 MW |
| 2026-08-23T22:00Z | 37,279 MW | 0 MW | 3,320 MW | 840 MW | 336 MW |
| 2026-08-23T23:00Z | 37,346 MW | 0 MW | 2,858 MW | 467 MW | 90 MW |
| 2026-08-24T00:00Z | 37,479 MW | 0 MW | 2,676 MW | 304 MW | -956 MW |
| 2026-08-24T01:00Z | 38,003 MW | 0 MW | 2,459 MW | 287 MW | -1,819 MW |
| 2026-08-24T02:00Z | 38,373 MW | 0 MW | 2,429 MW | 266 MW | -1,834 MW |
| 2026-08-24T03:00Z | 38,368 MW | 0 MW | 2,678 MW | 268 MW | -801 MW |
| 2026-08-24T04:00Z | 38,449 MW | 239 MW | 2,910 MW | 276 MW | 189 MW |
| 2026-08-24T05:00Z | 38,502 MW | 680 MW | 3,088 MW | 591 MW | 782 MW |
| 2026-08-24T06:00Z | 38,436 MW | 2,876 MW | 3,147 MW | 657 MW | 854 MW |
| 2026-08-24T07:00Z | 38,353 MW | 6,395 MW | 2,702 MW | 573 MW | 40 MW |
| 2026-08-24T08:00Z | 37,964 MW | 10,488 MW | 2,327 MW | 573 MW | -1,220 MW |
| 2026-08-24T09:00Z | 37,875 MW | 13,481 MW | 2,171 MW | 518 MW | -2,037 MW |
| 2026-08-24T10:00Z | 37,477 MW | 14,762 MW | 2,349 MW | 429 MW | -2,137 MW |
| 2026-08-24T11:00Z | 36,395 MW | 15,158 MW | 2,495 MW | 468 MW | -2,228 MW |
| 2026-08-24T12:00Z | 36,059 MW | 14,468 MW | 2,699 MW | 444 MW | -2,290 MW |
| 2026-08-24T13:00Z | 36,394 MW | 12,553 MW | 2,700 MW | 497 MW | -1,938 MW |
| 2026-08-24T14:00Z | 36,764 MW | 10,027 MW | 2,662 MW | 774 MW | -1,130 MW |
| 2026-08-24T15:00Z | 37,171 MW | 7,124 MW | 3,087 MW | 889 MW | -645 MW |
| 2026-08-24T16:00Z | 36,822 MW | 4,531 MW | 3,921 MW | 1,590 MW | 1,248 MW |
| 2026-08-24T17:00Z | 37,267 MW | 2,057 MW | 4,438 MW | 2,651 MW | 1,887 MW |
| 2026-08-24T18:00Z | 37,722 MW | 566 MW | 4,176 MW | 2,830 MW | 2,528 MW |
| 2026-08-24T19:00Z | 37,905 MW | 215 MW | 3,944 MW | 2,863 MW | 1,568 MW |
| 2026-08-24T20:00Z | 38,008 MW | 202 MW | 3,924 MW | 2,672 MW | 955 MW |
| 2026-08-24T21:00Z | 38,209 MW | 0 MW | 3,312 MW | 2,136 MW | 234 MW |
| 2026-08-24T22:00Z | 38,621 MW | 0 MW | 2,883 MW | 1,526 MW | 190 MW |
| 2026-08-24T23:00Z | 38,824 MW | 0 MW | 2,783 MW | 697 MW | 8 MW |
| 2026-08-25T00:00Z | 38,851 MW | 0 MW | 2,659 MW | 729 MW | 15 MW |
| 2026-08-25T01:00Z | 38,917 MW | 0 MW | 2,565 MW | 742 MW | -252 MW |
| 2026-08-25T02:00Z | 38,980 MW | 0 MW | 2,720 MW | 724 MW | -160 MW |
| 2026-08-25T03:00Z | 38,996 MW | 0 MW | 2,971 MW | 1,060 MW | 82 MW |
| 2026-08-25T04:00Z | 38,981 MW | 201 MW | 3,391 MW | 2,238 MW | 1,054 MW |
| 2026-08-25T05:00Z | 38,997 MW | 512 MW | 3,843 MW | 2,318 MW | 1,129 MW |
| 2026-08-25T06:00Z | 38,977 MW | 2,295 MW | 4,038 MW | 2,005 MW | 800 MW |
| 2026-08-25T07:00Z | 38,914 MW | 5,358 MW | 3,535 MW | 1,592 MW | 406 MW |
| 2026-08-25T08:00Z | 38,347 MW | 8,992 MW | 2,974 MW | 968 MW | 61 MW |
| 2026-08-25T09:00Z | 38,072 MW | 11,991 MW | 2,799 MW | 911 MW | -644 MW |
| 2026-08-25T10:00Z | 37,969 MW | 13,577 MW | 2,624 MW | 727 MW | -1,232 MW |
| 2026-08-25T11:00Z | 37,673 MW | 14,103 MW | 2,624 MW | 708 MW | -1,783 MW |
| 2026-08-25T12:00Z | 37,168 MW | 13,922 MW | 2,729 MW | 721 MW | -1,404 MW |
| 2026-08-25T13:00Z | 36,899 MW | 13,148 MW | 2,904 MW | 858 MW | -1,321 MW |
| 2026-08-25T14:00Z | 36,236 MW | 11,447 MW | 3,564 MW | 1,115 MW | -447 MW |
| 2026-08-25T15:00Z | 36,142 MW | 8,775 MW | 3,987 MW | 1,608 MW | 898 MW |
| 2026-08-25T16:00Z | 35,735 MW | 5,672 MW | 4,329 MW | 3,305 MW | 1,454 MW |
| 2026-08-25T17:00Z | 35,806 MW | 2,434 MW | 5,003 MW | 3,910 MW | 1,704 MW |
| 2026-08-25T18:00Z | 35,836 MW | 528 MW | 5,238 MW | 4,178 MW | 2,110 MW |
| 2026-08-25T19:00Z | 35,873 MW | 204 MW | 4,762 MW | 4,201 MW | 1,170 MW |
| 2026-08-25T20:00Z | 35,953 MW | 202 MW | 4,627 MW | 4,181 MW | 840 MW |
| 2026-08-25T21:00Z | 36,238 MW | 0 MW | 3,909 MW | 4,045 MW | 644 MW |
| 2026-08-25T22:00Z | 36,975 MW | 0 MW | 3,459 MW | 3,499 MW | 531 MW |
| 2026-08-25T23:00Z | 37,514 MW | 0 MW | 3,103 MW | 2,812 MW | 135 MW |
| 2026-08-26T00:00Z | 37,560 MW | 0 MW | 2,779 MW | 2,690 MW | -283 MW |
| 2026-08-26T01:00Z | 37,557 MW | 0 MW | 2,784 MW | 2,759 MW | -715 MW |
| 2026-08-26T02:00Z | 37,309 MW | 0 MW | 2,730 MW | 2,870 MW | -530 MW |
| 2026-08-26T03:00Z | 37,628 MW | 0 MW | 2,981 MW | 3,066 MW | 92 MW |
| 2026-08-26T04:00Z | 37,652 MW | 218 MW | 3,683 MW | 3,760 MW | 797 MW |
| 2026-08-26T05:00Z | 37,663 MW | 599 MW | 4,188 MW | 3,767 MW | 1,476 MW |
| 2026-08-26T06:00Z | 37,453 MW | 2,806 MW | 4,015 MW | 3,743 MW | 1,529 MW |
| 2026-08-26T07:00Z | 37,326 MW | 6,443 MW | 3,264 MW | 3,074 MW | 834 MW |
| 2026-08-26T08:00Z | 36,562 MW | 10,471 MW | 2,946 MW | 2,093 MW | 140 MW |
| 2026-08-26T09:00Z | 36,004 MW | 13,409 MW | 2,832 MW | 2,060 MW | -730 MW |
| 2026-08-26T10:00Z | 35,972 MW | 15,212 MW | 2,967 MW | 1,517 MW | -1,394 MW |
| 2026-08-26T11:00Z | 35,930 MW | 15,675 MW | 2,854 MW | 1,025 MW | -1,759 MW |
| 2026-08-26T12:00Z | 35,897 MW | 15,483 MW | 2,749 MW | 1,092 MW | -1,421 MW |
| 2026-08-26T13:00Z | 35,814 MW | 14,546 MW | 2,743 MW | 969 MW | -1,091 MW |
| 2026-08-26T14:00Z | 35,185 MW | 12,586 MW | 3,243 MW | 947 MW | -479 MW |
| 2026-08-26T15:00Z | 34,999 MW | 9,830 MW | 3,826 MW | 1,366 MW | 884 MW |
| 2026-08-26T16:00Z | 34,777 MW | 6,232 MW | 4,194 MW | 3,512 MW | 1,604 MW |
| 2026-08-26T17:00Z | 34,662 MW | 2,545 MW | 4,754 MW | 3,881 MW | 1,718 MW |
| 2026-08-26T18:00Z | 34,276 MW | 528 MW | 5,430 MW | 4,271 MW | 2,312 MW |
| 2026-08-26T19:00Z | 33,969 MW | 223 MW | 5,116 MW | 4,303 MW | 1,074 MW |
| 2026-08-26T20:00Z | 33,496 MW | 221 MW | 4,150 MW | 4,061 MW | 552 MW |
| 2026-08-26T21:00Z | 33,457 MW | 0 MW | 3,529 MW | 3,267 MW | 223 MW |
| 2026-08-26T22:00Z | 33,143 MW | 0 MW | 3,499 MW | 2,429 MW | -176 MW |
| 2026-08-26T23:00Z | 33,027 MW | 0 MW | 3,541 MW | 1,648 MW | -468 MW |
| 2026-08-27T00:00Z | 33,020 MW | 0 MW | 3,444 MW | 1,610 MW | -762 MW |
| 2026-08-27T01:00Z | 33,252 MW | 0 MW | 3,177 MW | 1,506 MW | -975 MW |
| 2026-08-27T02:00Z | 33,565 MW | 0 MW | 2,738 MW | 1,592 MW | -1,124 MW |
| 2026-08-27T03:00Z | 34,000 MW | 0 MW | 2,803 MW | 1,763 MW | -728 MW |
| 2026-08-27T04:00Z | 34,021 MW | 216 MW | 3,615 MW | 3,319 MW | -158 MW |
| 2026-08-27T05:00Z | 33,977 MW | 539 MW | 4,406 MW | 3,952 MW | 144 MW |
| 2026-08-27T06:00Z | 33,874 MW | 2,337 MW | 4,097 MW | 3,601 MW | 276 MW |
| 2026-08-27T07:00Z | 33,864 MW | 5,094 MW | 3,570 MW | 2,785 MW | 463 MW |
| 2026-08-27T08:00Z | 33,807 MW | 8,577 MW | 3,115 MW | 1,601 MW | -133 MW |
| 2026-08-27T09:00Z | 33,782 MW | 11,552 MW | 3,091 MW | 1,461 MW | -1,085 MW |
| 2026-08-27T10:00Z | 33,753 MW | 13,462 MW | 2,932 MW | 1,108 MW | -1,545 MW |
| 2026-08-27T11:00Z | 33,472 MW | 14,065 MW | 2,917 MW | 1,096 MW | -1,732 MW |
| 2026-08-27T12:00Z | 33,319 MW | 13,653 MW | 3,675 MW | 1,130 MW | -1,447 MW |
| 2026-08-27T13:00Z | 33,292 MW | 12,705 MW | 3,448 MW | 1,569 MW | -965 MW |
| 2026-08-27T14:00Z | 33,360 MW | 11,050 MW | 3,523 MW | 1,931 MW | 312 MW |
| 2026-08-27T15:00Z | 33,258 MW | 8,209 MW | 4,026 MW | 3,632 MW | 996 MW |
| 2026-08-27T16:00Z | 33,077 MW | 5,083 MW | 4,616 MW | 4,382 MW | 1,506 MW |
| 2026-08-27T17:00Z | 33,225 MW | 2,165 MW | 5,055 MW | 4,818 MW | 2,358 MW |
| 2026-08-27T18:00Z | 33,283 MW | 523 MW | 5,103 MW | 4,912 MW | 2,423 MW |
| 2026-08-27T19:00Z | 33,391 MW | 216 MW | 4,678 MW | 4,670 MW | 1,305 MW |
| 2026-08-27T20:00Z | 33,228 MW | 210 MW | 4,425 MW | 4,715 MW | 819 MW |
| 2026-08-27T21:00Z | 33,863 MW | 0 MW | 4,136 MW | 4,305 MW | 533 MW |
| 2026-08-27T22:00Z | 34,451 MW | 0 MW | 3,522 MW | 3,675 MW | 129 MW |
| 2026-08-27T23:00Z | 34,799 MW | 0 MW | 3,496 MW | 2,592 MW | 72 MW |
| 2026-08-28T00:00Z | 34,922 MW | 0 MW | 3,331 MW | 1,225 MW | -856 MW |
| 2026-08-28T01:00Z | 35,376 MW | 0 MW | 3,267 MW | 1,078 MW | -726 MW |
| 2026-08-28T02:00Z | 35,905 MW | 0 MW | 3,296 MW | 1,077 MW | -465 MW |
| 2026-08-28T03:00Z | 35,994 MW | 0 MW | 3,334 MW | 1,347 MW | -114 MW |
| 2026-08-28T04:00Z | 36,062 MW | 204 MW | 3,680 MW | 3,026 MW | 174 MW |
| 2026-08-28T05:00Z | 36,109 MW | 469 MW | 4,233 MW | 3,278 MW | 1,196 MW |
| 2026-08-28T06:00Z | 36,123 MW | 2,140 MW | 3,833 MW | 3,189 MW | 1,054 MW |
| 2026-08-28T07:00Z | 36,098 MW | 5,200 MW | 3,545 MW | 2,248 MW | 578 MW |
| 2026-08-28T08:00Z | 36,047 MW | 8,694 MW | 3,393 MW | 2,055 MW | -278 MW |
| 2026-08-28T09:00Z | 36,357 MW | 11,566 MW | 3,376 MW | 2,092 MW | -1,043 MW |
| 2026-08-28T10:00Z | 36,148 MW | 13,252 MW | 3,015 MW | 2,005 MW | -2,129 MW |
| 2026-08-28T11:00Z | 35,666 MW | 14,084 MW | 2,989 MW | 964 MW | -2,398 MW |
| 2026-08-28T12:00Z | 35,742 MW | 14,142 MW | 2,935 MW | 419 MW | -2,474 MW |
| 2026-08-28T13:00Z | 35,292 MW | 13,730 MW | 2,901 MW | 422 MW | -2,573 MW |
| 2026-08-28T14:00Z | 34,916 MW | 11,962 MW | 2,900 MW | 445 MW | -2,260 MW |
| 2026-08-28T15:00Z | 35,624 MW | 9,832 MW | 2,876 MW | 685 MW | -804 MW |
| 2026-08-28T16:00Z | 36,522 MW | 6,503 MW | 3,188 MW | 1,089 MW | 1,053 MW |
| 2026-08-28T17:00Z | 37,015 MW | 2,683 MW | 3,944 MW | 2,177 MW | 1,687 MW |
| 2026-08-28T18:00Z | 37,282 MW | 542 MW | 4,392 MW | 2,605 MW | 2,327 MW |
| 2026-08-28T19:00Z | 37,431 MW | 220 MW | 4,192 MW | 2,485 MW | 1,610 MW |
| 2026-08-28T20:00Z | 36,657 MW | 219 MW | 3,585 MW | 2,441 MW | 978 MW |
| 2026-08-28T21:00Z | 35,307 MW | 0 MW | 3,714 MW | 1,146 MW | 431 MW |
| 2026-08-28T22:00Z | 35,083 MW | 0 MW | 3,871 MW | 560 MW | 48 MW |
| 2026-08-28T23:00Z | 34,837 MW | 0 MW | 3,673 MW | 359 MW | -3 MW |
| 2026-08-29T00:00Z | 34,707 MW | 0 MW | 3,515 MW | 265 MW | -126 MW |
| 2026-08-29T01:00Z | 34,741 MW | 0 MW | 3,282 MW | 221 MW | -787 MW |
| 2026-08-29T02:00Z | 34,786 MW | 0 MW | 2,986 MW | 228 MW | -872 MW |
| 2026-08-29T03:00Z | 34,865 MW | 0 MW | 2,794 MW | 240 MW | -857 MW |
| 2026-08-29T04:00Z | 34,895 MW | 223 MW | 2,785 MW | 253 MW | -804 MW |
| 2026-08-29T05:00Z | 34,789 MW | 573 MW | 3,187 MW | 278 MW | -806 MW |
| 2026-08-29T06:00Z | 34,196 MW | 2,859 MW | 3,016 MW | 285 MW | -1,242 MW |
| 2026-08-29T07:00Z | 32,703 MW | 6,717 MW | 2,788 MW | 236 MW | -1,710 MW |
| 2026-08-29T08:00Z | 32,365 MW | 9,044 MW | 2,891 MW | 264 MW | -2,020 MW |
| 2026-08-29T09:00Z | 31,326 MW | 10,476 MW | 2,601 MW | 273 MW | -2,257 MW |
| 2026-08-29T10:00Z | 30,156 MW | 11,367 MW | 2,670 MW | 266 MW | -2,401 MW |
| 2026-08-29T11:00Z | 29,341 MW | 11,489 MW | 2,689 MW | 257 MW | -2,560 MW |
| 2026-08-29T12:00Z | 29,043 MW | 11,733 MW | 2,678 MW | 245 MW | -2,464 MW |
| 2026-08-29T13:00Z | 29,800 MW | 11,012 MW | 2,769 MW | 252 MW | -1,551 MW |
| 2026-08-29T14:00Z | 30,943 MW | 9,817 MW | 2,752 MW | 282 MW | -1,293 MW |
| 2026-08-29T15:00Z | 32,328 MW | 7,908 MW | 2,793 MW | 302 MW | -1,130 MW |
| 2026-08-29T16:00Z | 33,604 MW | 5,852 MW | 3,430 MW | 260 MW | -997 MW |
| 2026-08-29T17:00Z | 34,872 MW | 2,410 MW | 4,113 MW | 384 MW | 655 MW |
| 2026-08-29T18:00Z | 35,493 MW | 488 MW | 4,183 MW | 452 MW | 2,113 MW |
| 2026-08-29T19:00Z | 35,623 MW | 212 MW | 4,073 MW | 456 MW | 1,789 MW |
| 2026-08-29T20:00Z | 35,588 MW | 213 MW | 3,856 MW | 454 MW | 1,502 MW |
| 2026-08-29T21:00Z | 35,640 MW | 0 MW | 3,621 MW | 561 MW | 1,015 MW |
| 2026-08-29T22:00Z | 35,534 MW | 0 MW | 3,252 MW | 501 MW | -159 MW |
| 2026-08-29T23:00Z | 35,450 MW | 0 MW | 3,158 MW | 268 MW | -440 MW |
| 2026-08-30T00:00Z | 35,384 MW | 0 MW | 3,071 MW | 251 MW | -548 MW |
| 2026-08-30T01:00Z | 35,420 MW | 0 MW | 3,010 MW | 261 MW | -587 MW |
| 2026-08-30T02:00Z | 35,559 MW | 0 MW | 2,883 MW | 257 MW | -949 MW |
| 2026-08-30T03:00Z | 35,654 MW | 0 MW | 2,791 MW | 260 MW | -890 MW |
| 2026-08-30T04:00Z | 35,672 MW | 207 MW | 2,879 MW | 253 MW | -595 MW |
| 2026-08-30T05:00Z | 35,800 MW | 522 MW | 2,905 MW | 278 MW | -972 MW |
| 2026-08-30T06:00Z | 34,906 MW | 2,737 MW | 2,703 MW | 269 MW | -1,635 MW |
| 2026-08-30T07:00Z | 34,013 MW | 6,442 MW | 2,764 MW | 303 MW | -2,204 MW |
| 2026-08-30T08:00Z | 33,309 MW | 7,375 MW | 2,590 MW | 274 MW | -2,264 MW |
| 2026-08-30T09:00Z | 32,640 MW | 8,001 MW | 2,402 MW | 257 MW | -2,205 MW |
| 2026-08-30T10:00Z | 32,297 MW | 8,826 MW | 2,557 MW | 237 MW | -1,990 MW |
| 2026-08-30T11:00Z | 31,970 MW | 9,222 MW | 2,678 MW | 245 MW | -2,189 MW |
| 2026-08-30T12:00Z | 32,075 MW | 9,148 MW | 2,670 MW | 230 MW | -2,458 MW |
| 2026-08-30T13:00Z | 32,359 MW | 9,716 MW | 2,695 MW | 235 MW | -1,811 MW |
| 2026-08-30T14:00Z | 33,592 MW | 9,570 MW | 3,035 MW | 259 MW | -1,108 MW |
| 2026-08-30T15:00Z | 34,555 MW | 7,916 MW | 3,246 MW | 243 MW | -1,278 MW |
| 2026-08-30T16:00Z | 35,399 MW | 5,754 MW | 3,684 MW | 866 MW | -334 MW |
| 2026-08-30T17:00Z | 35,779 MW | 2,281 MW | 4,490 MW | 2,008 MW | 1,963 MW |
| 2026-08-30T18:00Z | 35,937 MW | 482 MW | 4,931 MW | 2,804 MW | 2,649 MW |
| 2026-08-30T19:00Z | 36,001 MW | 219 MW | 4,751 MW | 3,083 MW | 2,696 MW |
| 2026-08-30T20:00Z | 36,070 MW | 217 MW | 4,739 MW | 3,104 MW | 2,027 MW |
| 2026-08-30T21:00Z | 36,449 MW | 0 MW | 4,096 MW | 2,473 MW | 525 MW |
| 2026-08-30T22:00Z | 36,527 MW | 0 MW | 3,222 MW | 1,250 MW | 315 MW |
| 2026-08-30T23:00Z | 36,192 MW | 0 MW | 3,068 MW | 472 MW | -296 MW |
| 2026-08-31T00:00Z | 36,020 MW | 0 MW | 2,810 MW | 511 MW | -1,822 MW |
| 2026-08-31T01:00Z | 36,005 MW | 0 MW | 2,708 MW | 503 MW | -2,635 MW |
| 2026-08-31T02:00Z | 36,090 MW | 0 MW | 2,766 MW | 495 MW | -2,645 MW |
| 2026-08-31T03:00Z | 36,161 MW | 0 MW | 2,910 MW | 570 MW | -1,767 MW |
| 2026-08-31T04:00Z | 36,260 MW | 220 MW | 3,250 MW | 690 MW | 638 MW |
| 2026-08-31T05:00Z | 36,292 MW | 537 MW | 3,433 MW | 735 MW | 1,396 MW |
| 2026-08-31T06:00Z | 36,212 MW | 2,739 MW | 3,421 MW | 616 MW | 1,091 MW |
| 2026-08-31T07:00Z | 36,230 MW | 6,799 MW | 2,987 MW | 491 MW | -447 MW |
| 2026-08-31T08:00Z | 35,726 MW | 11,390 MW | 2,753 MW | 279 MW | -1,292 MW |
| 2026-08-31T09:00Z | 34,643 MW | 14,463 MW | 2,667 MW | 297 MW | -1,537 MW |
| 2026-08-31T10:00Z | 34,440 MW | 15,953 MW | 2,688 MW | 284 MW | -1,470 MW |
| 2026-08-31T11:00Z | 34,350 MW | 14,299 MW | 2,647 MW | 315 MW | -1,042 MW |
| 2026-08-31T12:00Z | 34,372 MW | 14,736 MW | 2,726 MW | 342 MW | -1,017 MW |
| 2026-08-31T13:00Z | 34,194 MW | 13,919 MW | 2,679 MW | 510 MW | -806 MW |
| 2026-08-31T14:00Z | 34,195 MW | 13,525 MW | 2,819 MW | 670 MW | -974 MW |
| 2026-08-31T15:00Z | 34,776 MW | 11,057 MW | 2,945 MW | 799 MW | -822 MW |
| 2026-08-31T16:00Z | 35,185 MW | 6,975 MW | 3,564 MW | 1,526 MW | 1,076 MW |
| 2026-08-31T17:00Z | 35,643 MW | 2,632 MW | 4,237 MW | 3,000 MW | 1,768 MW |
| 2026-08-31T18:00Z | 36,251 MW | 476 MW | 4,411 MW | 3,296 MW | 2,208 MW |
| 2026-08-31T19:00Z | 36,469 MW | 220 MW | 4,209 MW | 3,334 MW | 1,719 MW |
| 2026-08-31T20:00Z | 36,636 MW | 0 MW | 3,898 MW | 3,194 MW | 1,218 MW |
| 2026-08-31T21:00Z | 36,924 MW | 0 MW | 3,200 MW | 2,799 MW | 691 MW |
| 2026-08-31T22:00Z | 37,385 MW | 0 MW | 3,141 MW | 1,770 MW | 294 MW |
| 2026-08-31T23:00Z | 37,631 MW | 0 MW | 3,012 MW | 843 MW | -31 MW |
| 2026-09-01T00:00Z | 37,839 MW | 0 MW | 2,849 MW | 278 MW | -234 MW |
| 2026-09-01T01:00Z | 37,925 MW | 0 MW | 2,800 MW | 235 MW | -425 MW |
| 2026-09-01T02:00Z | 37,660 MW | 0 MW | 2,752 MW | 455 MW | -477 MW |
| 2026-09-01T03:00Z | 38,044 MW | 0 MW | 2,923 MW | 1,163 MW | 242 MW |
| 2026-09-01T04:00Z | 38,098 MW | 0 MW | 3,944 MW | 3,042 MW | 951 MW |
| 2026-09-01T05:00Z | 38,123 MW | 565 MW | 4,297 MW | 3,231 MW | 1,556 MW |
| 2026-09-01T06:00Z | 38,072 MW | 3,033 MW | 3,903 MW | 3,197 MW | 1,450 MW |
| 2026-09-01T07:00Z | 38,020 MW | 7,705 MW | 2,884 MW | 1,590 MW | 293 MW |
| 2026-09-01T08:00Z | 37,065 MW | 12,827 MW | 3,029 MW | 372 MW | -68 MW |
| 2026-09-01T09:00Z | 36,666 MW | 16,434 MW | 2,610 MW | 217 MW | -730 MW |
| 2026-09-01T10:00Z | 36,389 MW | 18,471 MW | 2,341 MW | 291 MW | -1,222 MW |
| 2026-09-01T11:00Z | 36,481 MW | 18,897 MW | 2,329 MW | 265 MW | -1,568 MW |
| 2026-09-01T12:00Z | 36,407 MW | 18,421 MW | 2,516 MW | 287 MW | -1,438 MW |
| 2026-09-01T13:00Z | 35,885 MW | 17,030 MW | 2,730 MW | 409 MW | -1,354 MW |
| 2026-09-01T14:00Z | 36,082 MW | 14,586 MW | 2,731 MW | 581 MW | -934 MW |
| 2026-09-01T15:00Z | 36,670 MW | 11,195 MW | 3,381 MW | 1,411 MW | -281 MW |
| 2026-09-01T16:00Z | 37,247 MW | 6,786 MW | 4,046 MW | 3,592 MW | 1,492 MW |
| 2026-09-01T17:00Z | 37,575 MW | 2,485 MW | 4,930 MW | 4,257 MW | 2,143 MW |
| 2026-09-01T18:00Z | 37,728 MW | 453 MW | 5,361 MW | 4,359 MW | 2,765 MW |
| 2026-09-01T19:00Z | 37,849 MW | 222 MW | 5,014 MW | 4,399 MW | 2,039 MW |
| 2026-09-01T20:00Z | 38,018 MW | 0 MW | 5,043 MW | 4,394 MW | 1,407 MW |
| 2026-09-01T21:00Z | 38,122 MW | 0 MW | 4,078 MW | 4,225 MW | 853 MW |
| 2026-09-01T22:00Z | 38,331 MW | 0 MW | 3,388 MW | 4,163 MW | 599 MW |
| 2026-09-01T23:00Z | 38,418 MW | 0 MW | 3,144 MW | 3,837 MW | 518 MW |
| 2026-09-02T00:00Z | 38,362 MW | 0 MW | 2,916 MW | 3,689 MW | 72 MW |
| 2026-09-02T01:00Z | 38,472 MW | 0 MW | 2,834 MW | 3,599 MW | -286 MW |
| 2026-09-02T02:00Z | 38,499 MW | 0 MW | 2,775 MW | 3,645 MW | -223 MW |
| 2026-09-02T03:00Z | 38,516 MW | 0 MW | 3,143 MW | 3,783 MW | 165 MW |
| 2026-09-02T04:00Z | 38,531 MW | 0 MW | 4,041 MW | 4,218 MW | 872 MW |
| 2026-09-02T05:00Z | 38,548 MW | 515 MW | 4,247 MW | 4,275 MW | 2,208 MW |
| 2026-09-02T06:00Z | 38,510 MW | 2,859 MW | 4,025 MW | 4,156 MW | 1,382 MW |
| 2026-09-02T07:00Z | 38,411 MW | 7,208 MW | 3,227 MW | 2,545 MW | 311 MW |
| 2026-09-02T08:00Z | 38,283 MW | 12,483 MW | 2,722 MW | 978 MW | -591 MW |
| 2026-09-02T09:00Z | 38,198 MW | 16,472 MW | 2,466 MW | 747 MW | -988 MW |
| 2026-09-02T10:00Z | 38,104 MW | 18,908 MW | 2,354 MW | 722 MW | -1,682 MW |
| 2026-09-02T11:00Z | 38,096 MW | 19,848 MW | 2,256 MW | 684 MW | -1,708 MW |
| 2026-09-02T12:00Z | 38,054 MW | 19,662 MW | 2,426 MW | 728 MW | -1,612 MW |
| 2026-09-02T13:00Z | 37,482 MW | 18,364 MW | 2,561 MW | 650 MW | -1,598 MW |
| 2026-09-02T14:00Z | 37,053 MW | 15,955 MW | 2,842 MW | 643 MW | -721 MW |
| 2026-09-02T15:00Z | 37,121 MW | 12,014 MW | 3,571 MW | 1,561 MW | 236 MW |
| 2026-09-02T16:00Z | 37,230 MW | 7,063 MW | 4,581 MW | 3,620 MW | 1,505 MW |
| 2026-09-02T17:00Z | 37,308 MW | 2,576 MW | 5,542 MW | 4,212 MW | 2,464 MW |
| 2026-09-02T18:00Z | 37,401 MW | 452 MW | 5,718 MW | 4,308 MW | 3,033 MW |
| 2026-09-02T19:00Z | 37,716 MW | 225 MW | 5,208 MW | 4,323 MW | 2,223 MW |
| 2026-09-02T20:00Z | 38,304 MW | 0 MW | 4,747 MW | 4,282 MW | 840 MW |
| 2026-09-02T21:00Z | 38,458 MW | 0 MW | 3,876 MW | 3,525 MW | 448 MW |
| 2026-09-02T22:00Z | 38,537 MW | 0 MW | 3,512 MW | 2,350 MW | 749 MW |
| 2026-09-02T23:00Z | 38,600 MW | 0 MW | 3,357 MW | 1,049 MW | 401 MW |
| 2026-09-03T00:00Z | 38,592 MW | 0 MW | 2,884 MW | 307 MW | -202 MW |
| 2026-09-03T01:00Z | 38,629 MW | 0 MW | 2,707 MW | 317 MW | -698 MW |
| 2026-09-03T02:00Z | 38,696 MW | 0 MW | 2,702 MW | 345 MW | -643 MW |
| 2026-09-03T03:00Z | 38,742 MW | 0 MW | 2,849 MW | 561 MW | -307 MW |
| 2026-09-03T04:00Z | 38,778 MW | 0 MW | 3,441 MW | 1,099 MW | 802 MW |
| 2026-09-03T05:00Z | 38,243 MW | 526 MW | 4,202 MW | 1,364 MW | 1,471 MW |
| 2026-09-03T06:00Z | 37,630 MW | 3,031 MW | 3,656 MW | 1,348 MW | 1,260 MW |
| 2026-09-03T07:00Z | 37,499 MW | 7,722 MW | 3,197 MW | 827 MW | 258 MW |
| 2026-09-03T08:00Z | 37,531 MW | 12,569 MW | 2,645 MW | 651 MW | -624 MW |
| 2026-09-03T09:00Z | 36,821 MW | 15,917 MW | 2,392 MW | 591 MW | -1,240 MW |
| 2026-09-03T10:00Z | 36,543 MW | 17,998 MW | 2,246 MW | 311 MW | -1,662 MW |
| 2026-09-03T11:00Z | 36,115 MW | 19,014 MW | 2,196 MW | 292 MW | -1,844 MW |
| 2026-09-03T12:00Z | 36,229 MW | 18,987 MW | 2,170 MW | 289 MW | -1,871 MW |
| 2026-09-03T13:00Z | 36,133 MW | 17,764 MW | 2,197 MW | 465 MW | -1,915 MW |
| 2026-09-03T14:00Z | 36,428 MW | 15,511 MW | 2,302 MW | 639 MW | -1,441 MW |
| 2026-09-03T15:00Z | 36,716 MW | 11,851 MW | 2,745 MW | 830 MW | -356 MW |
| 2026-09-03T16:00Z | 37,927 MW | 7,054 MW | 3,522 MW | 1,570 MW | 1,565 MW |
| 2026-09-03T17:00Z | 38,292 MW | 2,464 MW | 4,421 MW | 2,941 MW | 2,564 MW |
| 2026-09-03T18:00Z | 38,377 MW | 412 MW | 5,076 MW | 3,053 MW | 3,018 MW |
| 2026-09-03T19:00Z | 38,503 MW | 211 MW | 4,741 MW | 3,076 MW | 2,327 MW |
| 2026-09-03T20:00Z | 38,532 MW | 0 MW | 3,777 MW | 2,836 MW | 1,076 MW |
| 2026-09-03T21:00Z | 38,553 MW | 0 MW | 3,257 MW | 1,594 MW | 389 MW |
| 2026-09-03T22:00Z | 38,542 MW | 0 MW | 2,943 MW | 606 MW | 294 MW |
| 2026-09-03T23:00Z | 38,544 MW | 0 MW | 2,677 MW | 310 MW | -201 MW |
| 2026-09-04T00:00Z | 38,049 MW | 0 MW | 2,440 MW | 301 MW | -401 MW |
| 2026-09-04T01:00Z | 37,350 MW | 0 MW | 2,454 MW | 274 MW | -1,122 MW |
| 2026-09-04T02:00Z | 37,719 MW | 0 MW | 2,389 MW | 253 MW | -1,408 MW |
| 2026-09-04T03:00Z | 37,772 MW | 0 MW | 2,522 MW | 264 MW | -547 MW |
| 2026-09-04T04:00Z | 37,847 MW | 0 MW | 2,911 MW | 283 MW | 642 MW |
| 2026-09-04T05:00Z | 37,878 MW | 504 MW | 3,396 MW | 618 MW | 1,238 MW |
| 2026-09-04T06:00Z | 37,848 MW | 3,008 MW | 3,246 MW | 753 MW | 1,044 MW |
| 2026-09-04T07:00Z | 37,679 MW | 7,867 MW | 2,986 MW | 552 MW | 122 MW |
| 2026-09-04T08:00Z | 37,378 MW | 13,004 MW | 2,507 MW | 598 MW | -832 MW |
| 2026-09-04T09:00Z | 36,617 MW | 16,517 MW | 2,266 MW | 510 MW | -1,388 MW |
| 2026-09-04T10:00Z | 35,581 MW | 19,057 MW | 2,090 MW | 504 MW | -1,535 MW |
| 2026-09-04T11:00Z | 35,214 MW | 19,815 MW | 2,227 MW | 477 MW | -1,769 MW |
| 2026-09-04T12:00Z | 35,279 MW | 19,499 MW | 1,958 MW | 465 MW | -1,489 MW |
| 2026-09-04T13:00Z | 35,693 MW | 18,288 MW | 2,063 MW | 629 MW | -1,666 MW |
| 2026-09-04T14:00Z | 35,675 MW | 15,846 MW | 2,372 MW | 758 MW | -1,582 MW |
| 2026-09-04T15:00Z | 36,088 MW | 11,817 MW | 2,706 MW | 787 MW | -1,099 MW |
| 2026-09-04T16:00Z | 37,174 MW | 6,919 MW | 3,155 MW | 817 MW | 21 MW |
| 2026-09-04T17:00Z | 37,886 MW | 2,327 MW | 3,489 MW | 879 MW | 1,713 MW |
| 2026-09-04T18:00Z | 38,470 MW | 395 MW | 3,808 MW | 392 MW | 1,731 MW |
| 2026-09-04T19:00Z | 38,609 MW | 222 MW | 3,469 MW | 288 MW | 1,166 MW |
| 2026-09-04T20:00Z | 38,671 MW | 0 MW | 2,896 MW | 295 MW | 945 MW |
| 2026-09-04T21:00Z | 38,663 MW | 0 MW | 2,703 MW | 253 MW | 780 MW |
| 2026-09-04T22:00Z | 37,872 MW | 0 MW | 2,724 MW | 278 MW | -302 MW |
| 2026-09-04T23:00Z | 37,450 MW | 0 MW | 2,811 MW | 275 MW | -1,061 MW |
| 2026-09-05T00:00Z | 37,271 MW | 0 MW | 2,463 MW | 276 MW | -1,357 MW |
| 2026-09-05T01:00Z | 37,093 MW | 0 MW | 2,393 MW | 280 MW | -1,700 MW |
| 2026-09-05T02:00Z | 37,368 MW | 0 MW | 2,526 MW | 286 MW | -2,062 MW |
| 2026-09-05T03:00Z | 37,441 MW | 0 MW | 2,692 MW | 274 MW | -1,447 MW |
| 2026-09-05T04:00Z | 37,536 MW | 0 MW | 2,688 MW | 293 MW | -1,064 MW |
| 2026-09-05T05:00Z | 37,544 MW | 465 MW | 2,710 MW | 293 MW | -179 MW |
| 2026-09-05T06:00Z | 36,672 MW | 2,676 MW | 2,372 MW | 304 MW | -652 MW |
| 2026-09-05T07:00Z | 34,683 MW | 6,718 MW | 2,086 MW | 291 MW | -1,535 MW |
| 2026-09-05T08:00Z | 32,660 MW | 11,692 MW | 1,924 MW | 297 MW | -1,886 MW |
| 2026-09-05T09:00Z | 32,154 MW | 15,942 MW | 1,765 MW | 290 MW | -2,261 MW |
| 2026-09-05T10:00Z | 31,352 MW | 18,415 MW | 1,775 MW | 327 MW | -2,007 MW |
| 2026-09-05T11:00Z | 31,232 MW | 16,821 MW | 1,757 MW | 456 MW | -1,979 MW |
| 2026-09-05T12:00Z | 31,035 MW | 16,102 MW | 1,778 MW | 490 MW | -1,686 MW |
| 2026-09-05T13:00Z | 30,724 MW | 17,821 MW | 1,836 MW | 476 MW | -1,889 MW |
| 2026-09-05T14:00Z | 31,272 MW | 15,862 MW | 2,168 MW | 529 MW | -1,716 MW |
| 2026-09-05T15:00Z | 33,325 MW | 12,268 MW | 2,463 MW | 697 MW | -705 MW |
| 2026-09-05T16:00Z | 35,479 MW | 7,096 MW | 2,867 MW | 844 MW | 807 MW |
| 2026-09-05T17:00Z | 36,810 MW | 2,324 MW | 3,636 MW | 1,218 MW | 2,117 MW |
| 2026-09-05T18:00Z | 37,609 MW | 394 MW | 4,074 MW | 1,374 MW | 2,384 MW |
| 2026-09-05T19:00Z | 37,925 MW | 227 MW | 4,090 MW | 1,259 MW | 2,388 MW |
| 2026-09-05T20:00Z | 38,123 MW | 0 MW | 3,858 MW | 889 MW | 1,965 MW |
| 2026-09-05T21:00Z | 38,115 MW | 0 MW | 3,302 MW | 1,209 MW | 1,015 MW |
| 2026-09-05T22:00Z | 37,782 MW | 0 MW | 2,874 MW | 788 MW | 751 MW |
| 2026-09-05T23:00Z | 37,948 MW | 0 MW | 2,567 MW | 234 MW | 140 MW |
| 2026-09-06T00:00Z | 37,969 MW | 0 MW | 2,583 MW | 245 MW | -96 MW |
| 2026-09-06T01:00Z | 37,974 MW | 0 MW | 2,473 MW | 239 MW | -458 MW |
| 2026-09-06T02:00Z | 38,087 MW | 0 MW | 2,348 MW | 215 MW | -617 MW |
| 2026-09-06T03:00Z | 38,086 MW | 0 MW | 2,289 MW | 218 MW | -618 MW |
| 2026-09-06T04:00Z | 38,082 MW | 0 MW | 2,385 MW | 218 MW | -399 MW |
| 2026-09-06T05:00Z | 38,054 MW | 462 MW | 2,511 MW | 220 MW | -491 MW |
| 2026-09-06T06:00Z | 36,036 MW | 2,599 MW | 2,470 MW | 226 MW | -915 MW |
| 2026-09-06T07:00Z | 33,551 MW | 6,474 MW | 2,117 MW | 240 MW | -1,554 MW |
| 2026-09-06T08:00Z | 32,626 MW | 10,727 MW | 1,890 MW | 235 MW | -2,143 MW |
| 2026-09-06T09:00Z | 32,511 MW | 12,190 MW | 1,745 MW | 234 MW | -1,753 MW |
| 2026-09-06T10:00Z | 31,823 MW | 13,343 MW | 1,682 MW | 238 MW | -1,764 MW |
| 2026-09-06T11:00Z | 30,706 MW | 13,758 MW | 1,707 MW | 234 MW | -2,038 MW |
| 2026-09-06T12:00Z | 30,575 MW | 13,476 MW | 1,718 MW | 230 MW | -1,990 MW |
| 2026-09-06T13:00Z | 31,250 MW | 14,044 MW | 1,788 MW | 228 MW | -1,892 MW |
| 2026-09-06T14:00Z | 32,938 MW | 13,347 MW | 2,195 MW | 339 MW | -1,874 MW |
| 2026-09-06T15:00Z | 36,264 MW | 9,894 MW | 2,821 MW | 650 MW | -465 MW |
| 2026-09-06T16:00Z | 37,571 MW | 5,656 MW | 3,688 MW | 1,168 MW | 1,747 MW |
| 2026-09-06T17:00Z | 37,863 MW | 1,887 MW | 4,785 MW | 1,920 MW | 2,633 MW |
| 2026-09-06T18:00Z | 37,908 MW | 359 MW | 5,073 MW | 2,013 MW | 3,005 MW |
| 2026-09-06T19:00Z | 37,957 MW | 220 MW | 4,655 MW | 2,021 MW | 2,430 MW |
| 2026-09-06T20:00Z | 37,986 MW | 0 MW | 3,747 MW | 1,717 MW | 1,952 MW |
| 2026-09-06T21:00Z | 38,018 MW | 0 MW | 3,238 MW | 1,108 MW | 1,084 MW |
| 2026-09-06T22:00Z | 38,009 MW | 0 MW | 2,919 MW | 882 MW | 314 MW |
| 2026-09-06T23:00Z | 38,011 MW | 0 MW | 2,823 MW | 476 MW | -27 MW |
| 2026-09-07T00:00Z | 38,007 MW | 0 MW | 2,772 MW | 513 MW | -224 MW |
| 2026-09-07T01:00Z | 38,024 MW | 0 MW | 2,620 MW | 541 MW | -481 MW |
| 2026-09-07T02:00Z | 37,540 MW | 0 MW | 2,664 MW | 771 MW | -229 MW |
| 2026-09-07T03:00Z | 37,410 MW | 0 MW | 2,979 MW | 1,161 MW | 77 MW |
| 2026-09-07T04:00Z | 37,460 MW | 0 MW | 3,629 MW | 2,727 MW | 1,482 MW |
| 2026-09-07T05:00Z | 37,497 MW | 434 MW | 3,786 MW | 2,989 MW | 2,443 MW |
| 2026-09-07T06:00Z | 37,499 MW | 2,285 MW | 3,627 MW | 3,053 MW | 1,836 MW |
| 2026-09-07T07:00Z | 37,419 MW | 5,924 MW | 3,144 MW | 2,499 MW | 1,037 MW |
| 2026-09-07T08:00Z | 37,285 MW | 10,214 MW | 2,708 MW | 1,423 MW | -251 MW |
| 2026-09-07T09:00Z | 37,272 MW | 14,171 MW | 2,484 MW | 1,248 MW | -1,249 MW |
| 2026-09-07T10:00Z | 37,095 MW | 16,819 MW | 2,214 MW | 872 MW | -1,816 MW |
| 2026-09-07T11:00Z | 36,909 MW | 18,151 MW | 2,004 MW | 692 MW | -1,778 MW |
| 2026-09-07T12:00Z | 37,300 MW | 18,247 MW | 1,967 MW | 494 MW | -1,739 MW |
| 2026-09-07T13:00Z | 37,643 MW | 17,186 MW | 2,072 MW | 630 MW | -1,368 MW |
| 2026-09-07T14:00Z | 37,364 MW | 14,982 MW | 2,493 MW | 855 MW | -862 MW |
| 2026-09-07T15:00Z | 37,886 MW | 11,229 MW | 2,907 MW | 1,300 MW | 754 MW |
| 2026-09-07T16:00Z | 38,694 MW | 6,402 MW | 3,680 MW | 3,021 MW | 1,743 MW |
| 2026-09-07T17:00Z | 38,974 MW | 2,019 MW | 4,656 MW | 3,437 MW | 2,337 MW |
| 2026-09-07T18:00Z | 38,996 MW | 346 MW | 5,018 MW | 3,677 MW | 2,852 MW |
| 2026-09-07T19:00Z | 39,031 MW | 219 MW | 4,592 MW | 3,570 MW | 2,222 MW |
| 2026-09-07T20:00Z | 39,056 MW | 0 MW | 4,131 MW | 3,660 MW | 1,652 MW |
| 2026-09-07T21:00Z | 39,095 MW | 0 MW | 3,726 MW | 3,224 MW | 1,236 MW |
| 2026-09-07T22:00Z | 39,033 MW | 0 MW | 2,905 MW | 1,731 MW | 112 MW |
| 2026-09-07T23:00Z | 38,979 MW | 0 MW | 2,578 MW | 657 MW | -169 MW |
| 2026-09-08T00:00Z | 38,200 MW | 0 MW | 2,391 MW | 642 MW | -270 MW |
| 2026-09-08T01:00Z | 38,075 MW | 0 MW | 2,376 MW | 586 MW | -430 MW |
| 2026-09-08T02:00Z | 38,147 MW | 0 MW | 2,418 MW | 812 MW | -572 MW |
| 2026-09-08T03:00Z | 38,168 MW | 0 MW | 2,797 MW | 1,918 MW | -464 MW |
| 2026-09-08T04:00Z | 38,239 MW | 0 MW | 3,530 MW | 3,239 MW | 616 MW |
| 2026-09-08T05:00Z | 38,245 MW | 421 MW | 3,804 MW | 3,296 MW | 1,777 MW |
| 2026-09-08T06:00Z | 38,015 MW | 2,284 MW | 3,247 MW | 2,980 MW | 902 MW |
| 2026-09-08T07:00Z | 37,667 MW | 5,933 MW | 2,964 MW | 1,557 MW | 352 MW |
| 2026-09-08T08:00Z | 37,449 MW | 9,981 MW | 2,752 MW | 923 MW | -312 MW |
| 2026-09-08T09:00Z | 36,385 MW | 13,053 MW | 2,452 MW | 799 MW | -919 MW |
| 2026-09-08T10:00Z | 35,493 MW | 14,620 MW | 2,367 MW | 566 MW | -1,754 MW |
| 2026-09-08T11:00Z | 34,237 MW | 15,236 MW | 2,310 MW | 264 MW | -1,773 MW |
| 2026-09-08T12:00Z | 34,495 MW | 15,189 MW | 2,217 MW | 225 MW | -1,504 MW |
| 2026-09-08T13:00Z | 34,624 MW | 13,769 MW | 2,243 MW | 372 MW | -1,607 MW |
| 2026-09-08T14:00Z | 35,642 MW | 11,261 MW | 2,363 MW | 532 MW | -1,748 MW |
| 2026-09-08T15:00Z | 36,143 MW | 7,904 MW | 2,593 MW | 682 MW | -1,106 MW |
| 2026-09-08T16:00Z | 37,895 MW | 4,229 MW | 3,326 MW | 2,189 MW | 668 MW |
| 2026-09-08T17:00Z | 38,676 MW | 1,463 MW | 3,920 MW | 2,545 MW | 929 MW |
| 2026-09-08T18:00Z | 38,819 MW | 332 MW | 4,024 MW | 2,626 MW | 1,399 MW |
| 2026-09-08T19:00Z | 38,705 MW | 233 MW | 3,674 MW | 2,633 MW | 1,264 MW |
| 2026-09-08T20:00Z | 38,025 MW | 0 MW | 3,232 MW | 2,651 MW | 1,239 MW |
| 2026-09-08T21:00Z | 37,974 MW | 0 MW | 2,840 MW | 2,558 MW | 683 MW |
| 2026-09-08T22:00Z | 38,019 MW | 0 MW | 2,684 MW | 1,486 MW | -272 MW |
| 2026-09-08T23:00Z | 38,125 MW | 0 MW | 2,524 MW | 632 MW | -942 MW |
| 2026-09-09T00:00Z | 38,121 MW | 0 MW | 2,432 MW | 480 MW | -1,474 MW |
| 2026-09-09T01:00Z | 38,083 MW | 0 MW | 2,353 MW | 217 MW | -1,721 MW |
| 2026-09-09T02:00Z | 38,088 MW | 0 MW | 2,390 MW | 542 MW | -1,536 MW |
| 2026-09-09T03:00Z | 38,027 MW | 0 MW | 2,612 MW | 769 MW | -990 MW |
| 2026-09-09T04:00Z | 37,917 MW | 0 MW | 2,818 MW | 1,380 MW | -1 MW |
| 2026-09-09T05:00Z | 37,922 MW | 373 MW | 2,893 MW | 1,934 MW | 713 MW |
| 2026-09-09T06:00Z | 38,174 MW | 1,915 MW | 2,951 MW | 1,945 MW | 1,009 MW |
| 2026-09-09T07:00Z | 38,075 MW | 5,055 MW | 2,743 MW | 1,723 MW | 466 MW |
| 2026-09-09T08:00Z | 38,031 MW | 8,955 MW | 2,644 MW | 1,077 MW | -1,054 MW |
| 2026-09-09T09:00Z | 37,990 MW | 11,831 MW | 2,730 MW | 863 MW | -1,185 MW |
| 2026-09-09T10:00Z | 37,992 MW | 13,450 MW | 2,678 MW | 823 MW | -1,624 MW |
| 2026-09-09T11:00Z | 37,983 MW | 13,396 MW | 2,551 MW | 825 MW | -1,494 MW |
| 2026-09-09T12:00Z | 37,902 MW | 12,931 MW | 2,647 MW | 377 MW | -997 MW |
| 2026-09-09T13:00Z | 37,704 MW | 11,994 MW | 2,439 MW | 385 MW | -828 MW |
| 2026-09-09T14:00Z | 37,828 MW | 10,356 MW | 2,492 MW | 523 MW | -757 MW |
| 2026-09-09T15:00Z | 38,616 MW | 8,180 MW | 2,943 MW | 783 MW | 134 MW |
| 2026-09-09T16:00Z | 38,941 MW | 5,040 MW | 3,423 MW | 2,697 MW | 1,235 MW |
| 2026-09-09T17:00Z | 39,096 MW | 1,709 MW | 4,174 MW | 3,494 MW | 2,002 MW |
| 2026-09-09T18:00Z | 39,134 MW | 317 MW | 4,414 MW | 3,680 MW | 1,887 MW |
| 2026-09-09T19:00Z | 39,199 MW | 223 MW | 3,751 MW | 3,430 MW | 1,030 MW |
| 2026-09-09T20:00Z | 39,273 MW | 0 MW | 3,201 MW | 3,211 MW | 790 MW |
| 2026-09-09T21:00Z | 39,268 MW | 0 MW | 3,072 MW | 2,802 MW | 423 MW |
| 2026-09-09T22:00Z | 39,323 MW | 0 MW | 3,092 MW | 1,812 MW | 17 MW |
| 2026-09-09T23:00Z | 39,292 MW | 0 MW | 3,012 MW | 1,105 MW | -334 MW |
| 2026-09-10T00:00Z | 39,240 MW | 0 MW | 2,657 MW | 1,117 MW | -345 MW |
| 2026-09-10T01:00Z | 39,384 MW | 0 MW | 2,474 MW | 1,122 MW | -597 MW |
| 2026-09-10T02:00Z | 39,420 MW | 0 MW | 2,521 MW | 1,170 MW | -441 MW |
| 2026-09-10T03:00Z | 39,448 MW | 0 MW | 2,732 MW | 2,266 MW | -287 MW |
| 2026-09-10T04:00Z | 39,189 MW | 0 MW | 3,301 MW | 3,307 MW | 542 MW |
| 2026-09-10T05:00Z | 38,500 MW | 416 MW | 3,726 MW | 3,404 MW | 2,088 MW |
| 2026-09-10T06:00Z | 38,451 MW | 2,647 MW | 3,391 MW | 3,391 MW | 1,307 MW |
| 2026-09-10T07:00Z | 38,355 MW | 7,504 MW | 2,897 MW | 1,867 MW | 318 MW |
| 2026-09-10T08:00Z | 38,205 MW | 12,339 MW | 2,434 MW | 555 MW | -753 MW |
| 2026-09-10T09:00Z | 38,049 MW | 15,730 MW | 2,395 MW | 502 MW | -1,415 MW |
| 2026-09-10T10:00Z | 37,929 MW | 17,376 MW | 2,428 MW | 255 MW | -1,714 MW |
| 2026-09-10T11:00Z | 37,721 MW | 18,268 MW | 2,501 MW | 227 MW | -1,886 MW |
| 2026-09-10T12:00Z | 36,901 MW | 18,167 MW | 2,423 MW | 235 MW | -1,625 MW |
| 2026-09-10T13:00Z | 36,340 MW | 17,352 MW | 2,411 MW | 505 MW | -1,650 MW |
| 2026-09-10T14:00Z | 36,728 MW | 15,421 MW | 2,348 MW | 857 MW | -1,335 MW |
| 2026-09-10T15:00Z | 37,161 MW | 11,966 MW | 2,678 MW | 1,739 MW | -503 MW |
| 2026-09-10T16:00Z | 37,686 MW | 6,668 MW | 3,449 MW | 3,246 MW | 1,253 MW |
| 2026-09-10T17:00Z | 37,857 MW | 1,939 MW | 4,222 MW | 3,848 MW | 2,163 MW |
| 2026-09-10T18:00Z | 37,983 MW | 304 MW | 4,695 MW | 4,056 MW | 2,638 MW |
| 2026-09-10T19:00Z | 38,049 MW | 207 MW | 4,443 MW | 4,088 MW | 2,381 MW |
| 2026-09-10T20:00Z | 38,091 MW | 0 MW | 3,824 MW | 3,947 MW | 1,583 MW |
| 2026-09-10T21:00Z | 38,133 MW | 0 MW | 3,268 MW | 3,691 MW | 578 MW |
| 2026-09-10T22:00Z | 38,146 MW | 0 MW | 2,871 MW | 2,584 MW | 29 MW |
| 2026-09-10T23:00Z | 38,167 MW | 0 MW | 2,667 MW | 1,134 MW | -311 MW |
| 2026-09-11T00:00Z | 38,179 MW | 0 MW | 2,494 MW | 1,104 MW | -575 MW |
| 2026-09-11T01:00Z | 37,371 MW | 0 MW | 2,447 MW | 1,098 MW | -585 MW |
| 2026-09-11T02:00Z | 37,201 MW | 0 MW | 2,362 MW | 1,089 MW | -395 MW |
| 2026-09-11T03:00Z | 37,247 MW | 0 MW | 2,503 MW | 1,521 MW | 57 MW |
| 2026-09-11T04:00Z | 37,246 MW | 0 MW | 3,199 MW | 3,283 MW | 1,007 MW |
| 2026-09-11T05:00Z | 37,261 MW | 371 MW | 3,665 MW | 3,347 MW | 2,635 MW |
| 2026-09-11T06:00Z | 37,258 MW | 2,316 MW | 3,259 MW | 3,336 MW | 2,081 MW |
| 2026-09-11T07:00Z | 37,141 MW | 6,800 MW | 2,932 MW | 2,214 MW | 844 MW |
| 2026-09-11T08:00Z | 37,007 MW | 12,051 MW | 2,553 MW | 776 MW | -72 MW |
| 2026-09-11T09:00Z | 36,980 MW | 15,969 MW | 2,378 MW | 487 MW | -1,586 MW |
| 2026-09-11T10:00Z | 36,529 MW | 17,741 MW | 2,374 MW | 219 MW | -1,767 MW |
| 2026-09-11T11:00Z | 36,177 MW | 18,332 MW | 2,451 MW | 208 MW | -2,153 MW |
| 2026-09-11T12:00Z | 35,987 MW | 18,070 MW | 2,623 MW | 200 MW | -2,005 MW |
| 2026-09-11T13:00Z | 35,701 MW | 16,888 MW | 2,268 MW | 216 MW | -2,002 MW |
| 2026-09-11T14:00Z | 35,772 MW | 14,516 MW | 2,237 MW | 437 MW | -1,304 MW |
| 2026-09-11T15:00Z | 36,573 MW | 10,769 MW | 2,632 MW | 1,112 MW | 346 MW |
| 2026-09-11T16:00Z | 36,800 MW | 6,076 MW | 4,109 MW | 3,611 MW | 1,485 MW |
| 2026-09-11T17:00Z | 36,951 MW | 1,765 MW | 4,917 MW | 4,019 MW | 2,031 MW |
| 2026-09-11T18:00Z | 36,993 MW | 283 MW | 4,673 MW | 4,040 MW | 2,529 MW |
| 2026-09-11T19:00Z | 37,031 MW | 198 MW | 4,105 MW | 4,028 MW | 1,920 MW |
| 2026-09-11T20:00Z | 37,064 MW | 0 MW | 3,708 MW | 4,033 MW | 1,833 MW |
| 2026-09-11T21:00Z | 37,083 MW | 0 MW | 3,556 MW | 3,853 MW | 829 MW |
| 2026-09-11T22:00Z | 36,376 MW | 0 MW | 3,625 MW | 3,187 MW | 1,483 MW |
| 2026-09-11T23:00Z | 36,095 MW | 0 MW | 3,295 MW | 3,057 MW | 724 MW |
| 2026-09-12T00:00Z | 36,014 MW | 0 MW | 3,249 MW | 2,159 MW | 629 MW |
| 2026-09-12T01:00Z | 36,026 MW | 0 MW | 3,143 MW | 1,186 MW | 450 MW |
| 2026-09-12T02:00Z | 36,198 MW | 0 MW | 3,162 MW | 1,041 MW | -51 MW |
| 2026-09-12T03:00Z | 36,216 MW | 0 MW | 2,796 MW | 1,051 MW | -106 MW |
| 2026-09-12T04:00Z | 36,220 MW | 0 MW | 2,968 MW | 1,061 MW | 387 MW |
| 2026-09-12T05:00Z | 36,199 MW | 367 MW | 2,885 MW | 1,026 MW | 1,218 MW |
| 2026-09-12T06:00Z | 36,043 MW | 2,574 MW | 2,539 MW | 956 MW | 678 MW |
| 2026-09-12T07:00Z | 35,203 MW | 7,837 MW | 2,130 MW | 730 MW | -409 MW |
| 2026-09-12T08:00Z | 32,587 MW | 13,613 MW | 1,913 MW | 466 MW | -671 MW |
| 2026-09-12T09:00Z | 30,619 MW | 17,740 MW | 1,851 MW | 439 MW | -1,200 MW |
| 2026-09-12T10:00Z | 30,707 MW | 19,809 MW | 1,879 MW | 440 MW | -1,275 MW |
| 2026-09-12T11:00Z | 30,852 MW | 20,131 MW | 1,907 MW | 367 MW | -1,585 MW |
| 2026-09-12T12:00Z | 31,037 MW | 19,704 MW | 1,771 MW | 209 MW | -1,447 MW |
| 2026-09-12T13:00Z | 31,392 MW | 18,709 MW | 1,826 MW | 209 MW | -1,365 MW |
| 2026-09-12T14:00Z | 32,217 MW | 16,190 MW | 1,955 MW | 208 MW | -1,133 MW |
| 2026-09-12T15:00Z | 34,002 MW | 12,096 MW | 2,004 MW | 206 MW | -511 MW |
| 2026-09-12T16:00Z | 36,882 MW | 6,687 MW | 2,493 MW | 825 MW | 605 MW |
| 2026-09-12T17:00Z | 38,370 MW | 1,843 MW | 3,325 MW | 1,464 MW | 905 MW |
| 2026-09-12T18:00Z | 38,712 MW | 271 MW | 3,060 MW | 1,495 MW | 1,418 MW |
| 2026-09-12T19:00Z | 38,815 MW | 193 MW | 2,868 MW | 1,506 MW | 1,156 MW |
| 2026-09-12T20:00Z | 38,705 MW | 0 MW | 2,578 MW | 1,516 MW | 625 MW |
| 2026-09-12T21:00Z | 37,770 MW | 0 MW | 2,478 MW | 1,523 MW | 638 MW |
| 2026-09-12T22:00Z | 36,997 MW | 0 MW | 2,417 MW | 961 MW | 126 MW |
| 2026-09-12T23:00Z | 36,980 MW | 0 MW | 2,265 MW | 420 MW | -143 MW |
| 2026-09-13T00:00Z | 36,264 MW | 0 MW | 2,143 MW | 421 MW | -437 MW |
| 2026-09-13T01:00Z | 36,129 MW | 0 MW | 2,140 MW | 423 MW | -566 MW |
| 2026-09-13T02:00Z | 36,193 MW | 0 MW | 2,271 MW | 426 MW | -834 MW |
| 2026-09-13T03:00Z | 36,217 MW | 0 MW | 2,186 MW | 425 MW | -431 MW |
| 2026-09-13T04:00Z | 36,163 MW | 0 MW | 2,270 MW | 427 MW | -157 MW |
| 2026-09-13T05:00Z | 36,114 MW | 340 MW | 2,202 MW | 415 MW | -99 MW |
| 2026-09-13T06:00Z | 35,869 MW | 2,409 MW | 1,982 MW | 414 MW | -292 MW |
| 2026-09-13T07:00Z | 35,209 MW | 7,165 MW | 1,733 MW | 299 MW | -1,185 MW |
| 2026-09-13T08:00Z | 33,202 MW | 12,356 MW | 1,535 MW | 189 MW | -2,033 MW |
| 2026-09-13T09:00Z | 31,996 MW | 16,052 MW | 1,482 MW | 208 MW | -1,955 MW |
| 2026-09-13T10:00Z | 32,027 MW | 15,842 MW | 1,535 MW | 211 MW | -1,692 MW |
| 2026-09-13T11:00Z | 31,984 MW | 15,623 MW | 1,603 MW | 211 MW | -1,948 MW |
| 2026-09-13T12:00Z | 32,231 MW | 15,389 MW | 1,572 MW | 212 MW | -1,939 MW |
| 2026-09-13T13:00Z | 32,396 MW | 14,494 MW | 1,614 MW | 213 MW | -1,664 MW |
| 2026-09-13T14:00Z | 32,709 MW | 14,675 MW | 1,751 MW | 213 MW | -1,997 MW |
| 2026-09-13T15:00Z | 35,826 MW | 10,896 MW | 2,065 MW | 389 MW | -1,073 MW |
| 2026-09-13T16:00Z | 37,881 MW | 6,008 MW | 2,873 MW | 1,831 MW | 601 MW |
| 2026-09-13T17:00Z | 38,241 MW | 1,643 MW | 3,573 MW | 2,544 MW | 1,831 MW |
| 2026-09-13T18:00Z | 38,355 MW | 252 MW | 3,739 MW | 2,654 MW | 1,841 MW |
| 2026-09-13T19:00Z | 38,658 MW | 192 MW | 3,104 MW | 2,715 MW | 1,455 MW |
| 2026-09-13T20:00Z | 39,006 MW | 0 MW | 2,848 MW | 2,898 MW | 1,066 MW |
| 2026-09-13T21:00Z | 38,799 MW | 0 MW | 2,652 MW | 3,068 MW | 394 MW |
| 2026-09-13T22:00Z | 38,182 MW | 0 MW | 2,462 MW | 2,752 MW | 52 MW |
| 2026-09-13T23:00Z | 38,214 MW | 0 MW | 2,471 MW | 2,487 MW | 8 MW |
| 2026-09-14T00:00Z | 38,220 MW | 0 MW | 2,434 MW | 2,563 MW | -528 MW |
| 2026-09-14T01:00Z | 38,243 MW | 0 MW | 2,313 MW | 2,652 MW | -937 MW |
| 2026-09-14T02:00Z | 38,270 MW | 0 MW | 2,275 MW | 2,736 MW | -454 MW |
| 2026-09-14T03:00Z | 38,246 MW | 0 MW | 2,578 MW | 3,056 MW | -23 MW |
| 2026-09-14T04:00Z | 38,099 MW | 0 MW | 2,730 MW | 3,349 MW | 763 MW |
| 2026-09-14T05:00Z | 37,497 MW | 342 MW | 3,292 MW | 3,506 MW | 2,560 MW |
| 2026-09-14T06:00Z | 37,170 MW | 2,262 MW | 3,178 MW | 3,458 MW | 2,325 MW |
| 2026-09-14T07:00Z | 37,463 MW | 7,083 MW | 2,675 MW | 3,302 MW | 1,098 MW |
| 2026-09-14T08:00Z | 37,838 MW | 12,565 MW | 2,043 MW | 2,060 MW | 14 MW |
| 2026-09-14T09:00Z | 37,693 MW | 16,649 MW | 1,984 MW | 505 MW | -682 MW |
| 2026-09-14T10:00Z | 36,598 MW | 18,954 MW | 1,968 MW | 210 MW | -755 MW |
| 2026-09-14T11:00Z | 36,227 MW | 19,764 MW | 1,863 MW | 211 MW | -958 MW |
| 2026-09-14T12:00Z | 36,224 MW | 19,365 MW | 1,875 MW | 198 MW | -575 MW |
| 2026-09-14T13:00Z | 36,204 MW | 18,356 MW | 1,867 MW | 209 MW | -340 MW |
| 2026-09-14T14:00Z | 36,981 MW | 15,920 MW | 2,134 MW | 350 MW | 123 MW |
| 2026-09-14T15:00Z | 37,298 MW | 11,710 MW | 2,611 MW | 2,248 MW | 369 MW |
| 2026-09-14T16:00Z | 37,607 MW | 6,280 MW | 3,922 MW | 3,067 MW | 1,545 MW |
| 2026-09-14T17:00Z | 38,328 MW | 1,625 MW | 4,755 MW | 3,211 MW | 1,796 MW |
| 2026-09-14T18:00Z | 38,716 MW | 267 MW | 4,727 MW | 2,955 MW | 1,951 MW |
| 2026-09-14T19:00Z | 38,619 MW | 205 MW | 4,299 MW | 2,858 MW | 1,288 MW |
| 2026-09-14T20:00Z | 38,151 MW | 0 MW | 3,801 MW | 2,532 MW | 1,453 MW |
| 2026-09-14T21:00Z | 36,868 MW | 0 MW | 3,301 MW | 2,507 MW | 648 MW |
| 2026-09-14T22:00Z | 36,131 MW | 0 MW | 3,550 MW | 2,516 MW | 547 MW |
| 2026-09-14T23:00Z | 35,968 MW | 0 MW | 3,601 MW | 2,256 MW | 287 MW |
| 2026-09-15T00:00Z | 35,611 MW | 0 MW | 3,156 MW | 2,107 MW | 20 MW |
| 2026-09-15T01:00Z | 34,692 MW | 0 MW | 2,646 MW | 1,990 MW | -14 MW |
| 2026-09-15T02:00Z | 34,698 MW | 0 MW | 2,808 MW | 1,901 MW | -140 MW |
| 2026-09-15T03:00Z | 34,719 MW | 0 MW | 2,948 MW | 1,901 MW | 2 MW |
| 2026-09-15T04:00Z | 34,689 MW | 0 MW | 3,588 MW | 2,287 MW | 542 MW |
| 2026-09-15T05:00Z | 34,623 MW | 344 MW | 4,057 MW | 2,370 MW | 1,345 MW |
| 2026-09-15T06:00Z | 34,429 MW | 2,399 MW | 3,448 MW | 1,966 MW | 1,137 MW |
| 2026-09-15T07:00Z | 33,771 MW | 7,515 MW | 2,390 MW | 1,665 MW | 437 MW |
| 2026-09-15T08:00Z | 32,855 MW | 13,168 MW | 1,841 MW | 1,149 MW | 482 MW |
| 2026-09-15T09:00Z | 32,751 MW | 17,161 MW | 1,690 MW | 1,120 MW | -34 MW |
| 2026-09-15T10:00Z | 32,821 MW | 19,313 MW | 1,628 MW | 735 MW | -452 MW |
| 2026-09-15T11:00Z | 33,016 MW | 19,403 MW | 1,655 MW | 230 MW | -567 MW |
| 2026-09-15T12:00Z | 33,150 MW | 18,683 MW | 1,722 MW | 232 MW | -345 MW |
| 2026-09-15T13:00Z | 33,088 MW | 17,874 MW | 1,891 MW | 228 MW | -231 MW |
| 2026-09-15T14:00Z | 33,282 MW | 15,237 MW | 2,235 MW | 236 MW | -385 MW |
| 2026-09-15T15:00Z | 33,291 MW | 10,822 MW | 2,639 MW | 421 MW | 15 MW |
| 2026-09-15T16:00Z | 33,406 MW | 5,635 MW | 3,653 MW | 1,565 MW | 1,464 MW |
| 2026-09-15T17:00Z | 33,528 MW | 1,439 MW | 4,335 MW | 1,776 MW | 1,906 MW |
| 2026-09-15T18:00Z | 33,618 MW | 247 MW | 4,363 MW | 1,823 MW | 2,150 MW |
| 2026-09-15T19:00Z | 34,518 MW | 200 MW | 3,922 MW | 1,684 MW | 1,461 MW |
| 2026-09-15T20:00Z | 37,434 MW | 0 MW | 3,280 MW | 1,767 MW | 424 MW |
| 2026-09-15T21:00Z | 38,151 MW | 0 MW | 3,094 MW | 1,727 MW | 48 MW |
| 2026-09-15T22:00Z | 37,760 MW | 0 MW | 2,808 MW | 508 MW | -506 MW |
| 2026-09-15T23:00Z | 37,477 MW | 0 MW | 2,507 MW | 164 MW | -696 MW |
| 2026-09-16T00:00Z | 37,329 MW | 0 MW | 2,586 MW | 165 MW | -945 MW |
| 2026-09-16T01:00Z | 37,383 MW | 0 MW | 2,569 MW | 166 MW | -1,019 MW |
| 2026-09-16T02:00Z | 37,492 MW | 0 MW | 2,510 MW | 166 MW | -1,124 MW |
| 2026-09-16T03:00Z | 37,628 MW | 0 MW | 2,713 MW | 266 MW | -600 MW |
| 2026-09-16T04:00Z | 37,628 MW | 0 MW | 2,896 MW | 1,648 MW | 158 MW |
| 2026-09-16T05:00Z | 37,665 MW | 304 MW | 3,074 MW | 1,869 MW | 1,885 MW |
| 2026-09-16T06:00Z | 37,777 MW | 1,885 MW | 2,807 MW | 1,854 MW | 1,906 MW |
| 2026-09-16T07:00Z | 37,773 MW | 5,384 MW | 2,233 MW | 1,838 MW | 1,028 MW |
| 2026-09-16T08:00Z | 37,634 MW | 9,727 MW | 2,085 MW | 1,516 MW | -9 MW |
| 2026-09-16T09:00Z | 37,258 MW | 13,183 MW | 2,124 MW | 1,282 MW | -652 MW |
| 2026-09-16T10:00Z | 37,110 MW | 14,968 MW | 1,939 MW | 1,165 MW | -748 MW |
| 2026-09-16T11:00Z | 37,093 MW | 16,028 MW | 1,874 MW | 1,074 MW | -903 MW |
| 2026-09-16T12:00Z | 36,529 MW | 15,824 MW | 2,258 MW | 302 MW | -441 MW |
| 2026-09-16T13:00Z | 36,616 MW | 14,687 MW | 2,527 MW | 170 MW | -684 MW |
| 2026-09-16T14:00Z | 36,912 MW | 11,527 MW | 2,887 MW | 225 MW | -672 MW |
| 2026-09-16T15:00Z | 37,602 MW | 8,307 MW | 3,351 MW | 581 MW | 766 MW |
| 2026-09-16T16:00Z | 37,820 MW | 4,610 MW | 4,080 MW | 2,349 MW | 1,890 MW |
| 2026-09-16T17:00Z | 38,150 MW | 1,283 MW | 4,680 MW | 2,626 MW | 2,420 MW |
| 2026-09-16T18:00Z | 38,818 MW | 237 MW | 4,258 MW | 2,644 MW | 2,905 MW |
| 2026-09-16T19:00Z | 39,351 MW | 197 MW | 3,402 MW | 2,635 MW | 1,862 MW |
| 2026-09-16T20:00Z | 39,466 MW | 0 MW | 3,037 MW | 2,500 MW | 360 MW |
| 2026-09-16T21:00Z | 39,498 MW | 0 MW | 2,867 MW | 1,669 MW | 216 MW |
| 2026-09-16T22:00Z | 38,883 MW | 0 MW | 2,791 MW | 987 MW | 380 MW |
| 2026-09-16T23:00Z | 38,423 MW | 0 MW | 2,331 MW | 475 MW | 518 MW |
| 2026-09-17T00:00Z | 38,300 MW | 0 MW | 1,985 MW | 250 MW | 18 MW |
| 2026-09-17T01:00Z | 38,297 MW | 0 MW | 2,044 MW | 165 MW | -831 MW |
| 2026-09-17T02:00Z | 38,246 MW | 0 MW | 1,895 MW | 162 MW | -1,124 MW |
| 2026-09-17T03:00Z | 38,293 MW | 0 MW | 1,903 MW | 161 MW | -977 MW |
| 2026-09-17T04:00Z | 38,395 MW | 0 MW | 2,218 MW | 359 MW | 376 MW |
| 2026-09-17T05:00Z | 38,378 MW | 310 MW | 2,745 MW | 590 MW | 1,624 MW |
| 2026-09-17T06:00Z | 38,253 MW | 2,144 MW | 2,598 MW | 595 MW | 1,299 MW |
| 2026-09-17T07:00Z | 37,983 MW | 6,421 MW | 2,377 MW | 282 MW | -241 MW |
| 2026-09-17T08:00Z | 37,400 MW | 11,424 MW | 1,924 MW | 173 MW | -1,187 MW |
| 2026-09-17T09:00Z | 35,847 MW | 15,030 MW | 1,879 MW | 169 MW | -1,492 MW |
| 2026-09-17T10:00Z | 35,098 MW | 16,344 MW | 1,914 MW | 169 MW | -1,303 MW |
| 2026-09-17T11:00Z | 34,930 MW | 15,778 MW | 1,781 MW | 171 MW | -1,820 MW |
| 2026-09-17T12:00Z | 34,907 MW | 15,011 MW | 1,707 MW | 170 MW | -1,728 MW |
| 2026-09-17T13:00Z | 34,464 MW | 13,922 MW | 1,730 MW | 227 MW | -1,436 MW |
| 2026-09-17T14:00Z | 34,964 MW | 11,595 MW | 1,895 MW | 326 MW | -1,290 MW |
| 2026-09-17T15:00Z | 36,426 MW | 8,023 MW | 2,282 MW | 421 MW | -782 MW |
| 2026-09-17T16:00Z | 37,408 MW | 4,157 MW | 2,916 MW | 1,047 MW | 667 MW |
| 2026-09-17T17:00Z | 37,959 MW | 1,056 MW | 3,474 MW | 2,386 MW | 1,497 MW |
| 2026-09-17T18:00Z | 38,425 MW | 228 MW | 3,758 MW | 2,472 MW | 1,810 MW |
| 2026-09-17T19:00Z | 38,452 MW | 199 MW | 3,362 MW | 2,706 MW | 1,075 MW |
| 2026-09-17T20:00Z | 38,451 MW | 0 MW | 2,844 MW | 2,464 MW | 557 MW |
| 2026-09-17T21:00Z | 38,406 MW | 0 MW | 2,656 MW | 1,567 MW | 263 MW |
| 2026-09-17T22:00Z | 38,477 MW | 0 MW | 2,432 MW | 790 MW | -74 MW |
| 2026-09-17T23:00Z | 38,475 MW | 0 MW | 2,274 MW | 298 MW | -714 MW |
| 2026-09-18T00:00Z | 38,407 MW | 0 MW | 1,995 MW | 230 MW | -866 MW |
| 2026-09-18T01:00Z | 38,213 MW | 0 MW | 1,960 MW | 229 MW | -1,244 MW |
| 2026-09-18T02:00Z | 38,478 MW | 0 MW | 1,986 MW | 228 MW | -1,578 MW |
| 2026-09-18T03:00Z | 38,570 MW | 0 MW | 2,056 MW | 588 MW | -703 MW |
| 2026-09-18T04:00Z | 38,536 MW | 0 MW | 2,312 MW | 2,082 MW | 1,089 MW |
| 2026-09-18T05:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-09-18T06:00Z | 37,682 MW | 1,746 MW | 2,381 MW | 2,893 MW | 2,013 MW |
| 2026-09-18T07:00Z | 37,609 MW | 5,589 MW | 2,187 MW | 1,758 MW | 449 MW |
| 2026-09-18T08:00Z | 37,111 MW | 10,597 MW | 1,692 MW | 452 MW | -618 MW |
| 2026-09-18T09:00Z | 35,934 MW | 14,225 MW | 1,969 MW | 159 MW | -1,142 MW |
| 2026-09-18T10:00Z | 35,705 MW | 15,303 MW | 1,789 MW | 292 MW | -1,468 MW |
| 2026-09-18T11:00Z | 35,503 MW | 15,310 MW | 1,572 MW | 320 MW | -1,464 MW |
| 2026-09-18T12:00Z | 35,681 MW | 15,580 MW | 1,489 MW | 304 MW | -1,356 MW |
| 2026-09-18T13:00Z | 35,900 MW | 14,676 MW | 1,561 MW | 381 MW | -1,641 MW |
| 2026-09-18T14:00Z | 36,041 MW | 12,772 MW | 1,836 MW | 486 MW | -1,429 MW |
| 2026-09-18T15:00Z | 37,163 MW | 9,387 MW | 1,964 MW | 512 MW | -705 MW |
| 2026-09-18T16:00Z | 38,623 MW | 4,932 MW | 2,225 MW | 1,238 MW | 1,051 MW |
| 2026-09-18T17:00Z | 39,079 MW | 1,179 MW | 2,775 MW | 1,521 MW | 1,861 MW |
| 2026-09-18T18:00Z | 38,930 MW | 226 MW | 2,984 MW | 1,564 MW | 2,406 MW |
| 2026-09-18T19:00Z | 37,529 MW | 198 MW | 2,690 MW | 1,465 MW | 1,490 MW |
| 2026-09-18T20:00Z | 37,050 MW | 0 MW | 2,630 MW | 897 MW | 329 MW |
| 2026-09-18T21:00Z | 37,009 MW | 0 MW | 2,630 MW | 546 MW | 77 MW |
| 2026-09-18T22:00Z | 37,021 MW | 0 MW | 2,493 MW | 398 MW | -273 MW |
| 2026-09-18T23:00Z | 36,411 MW | 0 MW | 2,294 MW | 292 MW | -890 MW |
| 2026-09-19T00:00Z | 36,077 MW | 0 MW | 2,196 MW | 292 MW | -1,409 MW |
| 2026-09-19T01:00Z | 35,586 MW | 0 MW | 2,114 MW | 294 MW | -1,802 MW |
| 2026-09-19T02:00Z | 35,524 MW | 0 MW | 2,079 MW | 298 MW | -2,283 MW |
| 2026-09-19T03:00Z | 34,927 MW | 0 MW | 2,090 MW | 298 MW | -1,498 MW |
| 2026-09-19T04:00Z | 34,360 MW | 0 MW | 2,124 MW | 301 MW | -1,273 MW |
| 2026-09-19T05:00Z | 34,057 MW | 276 MW | 1,916 MW | 301 MW | -815 MW |
| 2026-09-19T06:00Z | 33,465 MW | 2,045 MW | 1,695 MW | 302 MW | -1,083 MW |
| 2026-09-19T07:00Z | 32,380 MW | 6,932 MW | 1,550 MW | 306 MW | -2,027 MW |
| 2026-09-19T08:00Z | 31,495 MW | 12,235 MW | 1,417 MW | 306 MW | -2,207 MW |
| 2026-09-19T09:00Z | 30,701 MW | 12,947 MW | 1,379 MW | 303 MW | -1,568 MW |
| 2026-09-19T10:00Z | 29,636 MW | 12,422 MW | 1,423 MW | 296 MW | -1,781 MW |
| 2026-09-19T11:00Z | 29,239 MW | 12,788 MW | 1,390 MW | 295 MW | -2,202 MW |
| 2026-09-19T12:00Z | 29,926 MW | 12,733 MW | 1,363 MW | 291 MW | -2,314 MW |
| 2026-09-19T13:00Z | 30,442 MW | 12,716 MW | 1,406 MW | 290 MW | -2,391 MW |
| 2026-09-19T14:00Z | 31,087 MW | 12,223 MW | 1,507 MW | 292 MW | -2,286 MW |
| 2026-09-19T15:00Z | 31,756 MW | 10,159 MW | 1,687 MW | 291 MW | -1,543 MW |
| 2026-09-19T16:00Z | 34,404 MW | 5,469 MW | 2,274 MW | 292 MW | -799 MW |
| 2026-09-19T17:00Z | 35,042 MW | 1,219 MW | 2,706 MW | 292 MW | 585 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-19T17:00Z.
Installed Capacity
Annual figure for 2026| Nuclear | |
|---|---|
| Solar | |
| Wind | |
| Hydro | |
| Gas | |
| Storage | |
| Oil | |
| Other | |
| Coal | |
| Bioenergy | |
| Other renewables | |
| Geothermal |
Total installed capacity in France: 164 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Paris time dates, through 2026-09-18| Date (Europe/Paris time) | Demand |
|---|---|
| 2025-08-15 | 976 GWh |
| 2025-08-16 | 965 GWh |
| 2025-08-17 | 917 GWh |
| 2025-08-18 | 1.02 TWh |
| 2025-08-19 | 1.03 TWh |
| 2025-08-20 | 1.00 TWh |
| 2025-08-21 | 981 GWh |
| 2025-08-22 | 979 GWh |
| 2025-08-23 | 905 GWh |
| 2025-08-24 | 870 GWh |
| 2025-08-25 | 1.01 TWh |
| 2025-08-26 | 1.05 TWh |
| 2025-08-27 | 1.06 TWh |
| 2025-08-28 | 1.05 TWh |
| 2025-08-29 | 1.01 TWh |
| 2025-08-30 | 920 GWh |
| 2025-08-31 | 897 GWh |
| 2025-09-01 | 1.01 TWh |
| 2025-09-02 | 1.02 TWh |
| 2025-09-03 | 1.04 TWh |
| 2025-09-04 | 1.05 TWh |
| 2025-09-05 | 1.04 TWh |
| 2025-09-06 | 921 GWh |
| 2025-09-07 | 897 GWh |
| 2025-09-08 | 1.04 TWh |
| 2025-09-09 | 1.04 TWh |
| 2025-09-10 | 1.03 TWh |
| 2025-09-11 | 1.04 TWh |
| 2025-09-12 | 1.03 TWh |
| 2025-09-13 | 925 GWh |
| 2025-09-14 | 896 GWh |
| 2025-09-15 | 1.03 TWh |
| 2025-09-16 | 1.05 TWh |
| 2025-09-17 | 1.06 TWh |
| 2025-09-18 | 1.06 TWh |
| 2025-09-19 | 1.05 TWh |
| 2025-09-20 | 949 GWh |
| 2025-09-21 | 912 GWh |
| 2025-09-22 | 1.03 TWh |
| 2025-09-23 | 1.08 TWh |
| 2025-09-24 | 1.12 TWh |
| 2025-09-25 | 1.14 TWh |
| 2025-09-26 | 1.14 TWh |
| 2025-09-27 | 1.01 TWh |
| 2025-09-28 | 970 GWh |
| 2025-09-29 | 1.09 TWh |
| 2025-09-30 | 1.10 TWh |
| 2025-10-01 | 1.11 TWh |
| 2025-10-02 | 1.10 TWh |
| 2025-10-03 | 1.10 TWh |
| 2025-10-04 | 989 GWh |
| 2025-10-05 | 963 GWh |
| 2025-10-06 | 1.12 TWh |
| 2025-10-07 | 1.11 TWh |
| 2025-10-08 | 1.11 TWh |
| 2025-10-09 | 1.12 TWh |
| 2025-10-10 | 1.11 TWh |
| 2025-10-11 | 999 GWh |
| 2025-10-12 | 956 GWh |
| 2025-10-13 | 1.10 TWh |
| 2025-10-14 | 1.12 TWh |
| 2025-10-15 | 1.13 TWh |
| 2025-10-16 | 1.14 TWh |
| 2025-10-17 | 1.13 TWh |
| 2025-10-18 | 1.03 TWh |
| 2025-10-19 | 1.01 TWh |
| 2025-10-20 | 1.11 TWh |
| 2025-10-21 | 1.13 TWh |
| 2025-10-22 | 1.13 TWh |
| 2025-10-23 | 1.14 TWh |
| 2025-10-24 | 1.18 TWh |
| 2025-10-25 | 1.08 TWh |
| 2025-10-26 | 1.09 TWh |
| 2025-10-27 | 1.21 TWh |
| 2025-10-28 | 1.20 TWh |
| 2025-10-29 | 1.20 TWh |
| 2025-10-30 | 1.19 TWh |
| 2025-10-31 | 1.16 TWh |
| 2025-11-01 | 1.03 TWh |
| 2025-11-02 | 1.03 TWh |
| 2025-11-03 | 1.19 TWh |
| 2025-11-04 | 1.19 TWh |
| 2025-11-05 | 1.19 TWh |
| 2025-11-06 | 1.19 TWh |
| 2025-11-07 | 1.20 TWh |
| 2025-11-08 | 1.12 TWh |
| 2025-11-09 | 1.10 TWh |
| 2025-11-10 | 1.19 TWh |
| 2025-11-11 | 1.12 TWh |
| 2025-11-12 | 1.21 TWh |
| 2025-11-13 | 1.19 TWh |
| 2025-11-14 | 1.16 TWh |
| 2025-11-15 | 1.07 TWh |
| 2025-11-16 | 1.07 TWh |
| 2025-11-17 | 1.27 TWh |
| 2025-11-18 | 1.43 TWh |
| 2025-11-19 | 1.48 TWh |
| 2025-11-20 | 1.56 TWh |
| 2025-11-21 | 1.65 TWh |
| 2025-11-22 | 1.61 TWh |
| 2025-11-23 | 1.50 TWh |
| 2025-11-24 | 1.49 TWh |
| 2025-11-25 | 1.51 TWh |
| 2025-11-26 | 1.58 TWh |
| 2025-11-27 | 1.60 TWh |
| 2025-11-28 | 1.53 TWh |
| 2025-11-29 | 1.35 TWh |
| 2025-11-30 | 1.32 TWh |
| 2025-12-01 | 1.54 TWh |
| 2025-12-02 | 1.52 TWh |
| 2025-12-03 | 1.51 TWh |
| 2025-12-04 | 1.52 TWh |
| 2025-12-05 | 1.55 TWh |
| 2025-12-06 | 1.35 TWh |
| 2025-12-07 | 1.24 TWh |
| 2025-12-08 | 1.31 TWh |
| 2025-12-09 | 1.33 TWh |
| 2025-12-10 | n/a |
| 2025-12-11 | 1.39 TWh |
| 2025-12-12 | 1.36 TWh |
| 2025-12-13 | 1.30 TWh |
| 2025-12-14 | 1.31 TWh |
| 2025-12-15 | 1.43 TWh |
| 2025-12-16 | 1.39 TWh |
| 2025-12-17 | 1.42 TWh |
| 2025-12-18 | 1.39 TWh |
| 2025-12-19 | 1.34 TWh |
| 2025-12-20 | 1.27 TWh |
| 2025-12-21 | 1.22 TWh |
| 2025-12-22 | 1.37 TWh |
| 2025-12-23 | 1.44 TWh |
| 2025-12-24 | 1.48 TWh |
| 2025-12-25 | 1.44 TWh |
| 2025-12-26 | 1.55 TWh |
| 2025-12-27 | 1.53 TWh |
| 2025-12-28 | 1.51 TWh |
| 2025-12-29 | 1.63 TWh |
| 2025-12-30 | 1.64 TWh |
| 2025-12-31 | 1.66 TWh |
| 2026-01-01 | 1.63 TWh |
| 2026-01-02 | 1.67 TWh |
| 2026-01-03 | 1.67 TWh |
| 2026-01-04 | 1.69 TWh |
| 2026-01-05 | 1.93 TWh |
| 2026-01-06 | 1.98 TWh |
| 2026-01-07 | 1.94 TWh |
| 2026-01-08 | 1.75 TWh |
| 2026-01-09 | 1.67 TWh |
| 2026-01-10 | 1.60 TWh |
| 2026-01-11 | 1.59 TWh |
| 2026-01-12 | 1.63 TWh |
| 2026-01-13 | 1.52 TWh |
| 2026-01-14 | 1.47 TWh |
| 2026-01-15 | 1.46 TWh |
| 2026-01-16 | 1.46 TWh |
| 2026-01-17 | 1.36 TWh |
| 2026-01-18 | 1.33 TWh |
| 2026-01-19 | 1.51 TWh |
| 2026-01-20 | 1.54 TWh |
| 2026-01-21 | 1.53 TWh |
| 2026-01-22 | 1.51 TWh |
| 2026-01-23 | 1.55 TWh |
| 2026-01-24 | 1.47 TWh |
| 2026-01-25 | 1.44 TWh |
| 2026-01-26 | 1.59 TWh |
| 2026-01-27 | 1.60 TWh |
| 2026-01-28 | 1.60 TWh |
| 2026-01-29 | 1.63 TWh |
| 2026-01-30 | 1.55 TWh |
| 2026-01-31 | 1.42 TWh |
| 2026-02-01 | 1.35 TWh |
| 2026-02-02 | 1.50 TWh |
| 2026-02-03 | 1.47 TWh |
| 2026-02-04 | 1.50 TWh |
| 2026-02-05 | 1.49 TWh |
| 2026-02-06 | 1.42 TWh |
| 2026-02-07 | 1.32 TWh |
| 2026-02-08 | 1.30 TWh |
| 2026-02-09 | 1.47 TWh |
| 2026-02-10 | 1.45 TWh |
| 2026-02-11 | 1.40 TWh |
| 2026-02-12 | 1.40 TWh |
| 2026-02-13 | 1.45 TWh |
| 2026-02-14 | 1.42 TWh |
| 2026-02-15 | 1.48 TWh |
| 2026-02-16 | 1.51 TWh |
| 2026-02-17 | 1.51 TWh |
| 2026-02-18 | 1.53 TWh |
| 2026-02-19 | 1.51 TWh |
| 2026-02-20 | 1.47 TWh |
| 2026-02-21 | 1.27 TWh |
| 2026-02-22 | 1.20 TWh |
| 2026-02-23 | 1.31 TWh |
| 2026-02-24 | 1.27 TWh |
| 2026-02-25 | 1.26 TWh |
| 2026-02-26 | 1.24 TWh |
| 2026-02-27 | 1.25 TWh |
| 2026-02-28 | 1.18 TWh |
| 2026-03-01 | 1.18 TWh |
| 2026-03-02 | 1.28 TWh |
| 2026-03-03 | 1.27 TWh |
| 2026-03-04 | 1.25 TWh |
| 2026-03-05 | 1.24 TWh |
| 2026-03-06 | 1.25 TWh |
| 2026-03-07 | 1.14 TWh |
| 2026-03-08 | 1.10 TWh |
| 2026-03-09 | 1.22 TWh |
| 2026-03-10 | 1.24 TWh |
| 2026-03-11 | 1.29 TWh |
| 2026-03-12 | 1.30 TWh |
| 2026-03-13 | 1.33 TWh |
| 2026-03-14 | 1.27 TWh |
| 2026-03-15 | 1.26 TWh |
| 2026-03-16 | 1.35 TWh |
| 2026-03-17 | 1.27 TWh |
| 2026-03-18 | 1.24 TWh |
| 2026-03-19 | 1.23 TWh |
| 2026-03-20 | 1.21 TWh |
| 2026-03-21 | 1.11 TWh |
| 2026-03-22 | 1.11 TWh |
| 2026-03-23 | 1.24 TWh |
| 2026-03-24 | 1.23 TWh |
| 2026-03-25 | 1.32 TWh |
| 2026-03-26 | 1.40 TWh |
| 2026-03-27 | 1.40 TWh |
| 2026-03-28 | 1.28 TWh |
| 2026-03-29 | 1.19 TWh |
| 2026-03-30 | 1.34 TWh |
| 2026-03-31 | 1.36 TWh |
| 2026-04-01 | 1.35 TWh |
| 2026-04-02 | 1.33 TWh |
| 2026-04-03 | 1.31 TWh |
| 2026-04-04 | 1.09 TWh |
| 2026-04-05 | 1.01 TWh |
| 2026-04-06 | 1.02 TWh |
| 2026-04-07 | 1.09 TWh |
| 2026-04-08 | 1.08 TWh |
| 2026-04-09 | 1.08 TWh |
| 2026-04-10 | 1.07 TWh |
| 2026-04-11 | 1.01 TWh |
| 2026-04-12 | 1.03 TWh |
| 2026-04-13 | 1.20 TWh |
| 2026-04-14 | 1.19 TWh |
| 2026-04-15 | 1.14 TWh |
| 2026-04-16 | 1.10 TWh |
| 2026-04-17 | 1.07 TWh |
| 2026-04-18 | 955 GWh |
| 2026-04-19 | 919 GWh |
| 2026-04-20 | 1.05 TWh |
| 2026-04-21 | 1.09 TWh |
| 2026-04-22 | 1.10 TWh |
| 2026-04-23 | 1.08 TWh |
| 2026-04-24 | 1.06 TWh |
| 2026-04-25 | 956 GWh |
| 2026-04-26 | 910 GWh |
| 2026-04-27 | 1.03 TWh |
| 2026-04-28 | 1.05 TWh |
| 2026-04-29 | 1.05 TWh |
| 2026-04-30 | 1.04 TWh |
| 2026-05-01 | 879 GWh |
| 2026-05-02 | 904 GWh |
| 2026-05-03 | 896 GWh |
| 2026-05-04 | 1.05 TWh |
| 2026-05-05 | 1.07 TWh |
| 2026-05-06 | 1.09 TWh |
| 2026-05-07 | 1.08 TWh |
| 2026-05-08 | 942 GWh |
| 2026-05-09 | 895 GWh |
| 2026-05-10 | 901 GWh |
| 2026-05-11 | 1.05 TWh |
| 2026-05-12 | 1.06 TWh |
| 2026-05-13 | 1.08 TWh |
| 2026-05-14 | 1.01 TWh |
| 2026-05-15 | 1.06 TWh |
| 2026-05-16 | 1.01 TWh |
| 2026-05-17 | 965 GWh |
| 2026-05-18 | 1.09 TWh |
| 2026-05-19 | 1.10 TWh |
| 2026-05-20 | 1.07 TWh |
| 2026-05-21 | 1.06 TWh |
| 2026-05-22 | 1.04 TWh |
| 2026-05-23 | 925 GWh |
| 2026-05-24 | 873 GWh |
| 2026-05-25 | 936 GWh |
| 2026-05-26 | 1.08 TWh |
| 2026-05-27 | 1.10 TWh |
| 2026-05-28 | 1.11 TWh |
| 2026-05-29 | 1.10 TWh |
| 2026-05-30 | 984 GWh |
| 2026-05-31 | 906 GWh |
| 2026-06-01 | 1.03 TWh |
| 2026-06-02 | 1.06 TWh |
| 2026-06-03 | 1.04 TWh |
| 2026-06-04 | 1.06 TWh |
| 2026-06-05 | 1.02 TWh |
| 2026-06-06 | 918 GWh |
| 2026-06-07 | 873 GWh |
| 2026-06-08 | 1.03 TWh |
| 2026-06-09 | 1.03 TWh |
| 2026-06-10 | 1.04 TWh |
| 2026-06-11 | 1.05 TWh |
| 2026-06-12 | 1.05 TWh |
| 2026-06-13 | 946 GWh |
| 2026-06-14 | 893 GWh |
| 2026-06-15 | 1.05 TWh |
| 2026-06-16 | 1.08 TWh |
| 2026-06-17 | 1.11 TWh |
| 2026-06-18 | 1.15 TWh |
| 2026-06-19 | 1.13 TWh |
| 2026-06-20 | 1.03 TWh |
| 2026-06-21 | 1.01 TWh |
| 2026-06-22 | 1.19 TWh |
| 2026-06-23 | 1.23 TWh |
| 2026-06-24 | 1.25 TWh |
| 2026-06-25 | 1.26 TWh |
| 2026-06-26 | 1.23 TWh |
| 2026-06-27 | 1.10 TWh |
| 2026-06-28 | 1.03 TWh |
| 2026-06-29 | 1.12 TWh |
| 2026-06-30 | 1.14 TWh |
| 2026-07-01 | 1.12 TWh |
| 2026-07-02 | 1.11 TWh |
| 2026-07-03 | 1.12 TWh |
| 2026-07-04 | 1.01 TWh |
| 2026-07-05 | 973 GWh |
| 2026-07-06 | 1.15 TWh |
| 2026-07-07 | 1.17 TWh |
| 2026-07-08 | 1.19 TWh |
| 2026-07-09 | 1.20 TWh |
| 2026-07-10 | 1.20 TWh |
| 2026-07-11 | 1.08 TWh |
| 2026-07-12 | 1.02 TWh |
| 2026-07-13 | 1.12 TWh |
| 2026-07-14 | 1.08 TWh |
| 2026-07-15 | 1.19 TWh |
| 2026-07-16 | 1.19 TWh |
| 2026-07-17 | 1.15 TWh |
| 2026-07-18 | 1.03 TWh |
| 2026-07-19 | 949 GWh |
| 2026-07-20 | 1.08 TWh |
| 2026-07-21 | 1.10 TWh |
| 2026-07-22 | 1.07 TWh |
| 2026-07-23 | 1.08 TWh |
| 2026-07-24 | 1.08 TWh |
| 2026-07-25 | 982 GWh |
| 2026-07-26 | 919 GWh |
| 2026-07-27 | 1.04 TWh |
| 2026-07-28 | 1.09 TWh |
| 2026-07-29 | 1.13 TWh |
| 2026-07-30 | 1.12 TWh |
| 2026-07-31 | 1.09 TWh |
| 2026-08-01 | 973 GWh |
| 2026-08-02 | 943 GWh |
| 2026-08-03 | 1.06 TWh |
| 2026-08-04 | 1.07 TWh |
| 2026-08-05 | 1.06 TWh |
| 2026-08-06 | 1.04 TWh |
| 2026-08-07 | 1.02 TWh |
| 2026-08-08 | 959 GWh |
| 2026-08-09 | 935 GWh |
| 2026-08-10 | 1.02 TWh |
| 2026-08-11 | 1.04 TWh |
| 2026-08-12 | 1.06 TWh |
| 2026-08-13 | 1.09 TWh |
| 2026-08-14 | 1.09 TWh |
| 2026-08-15 | 996 GWh |
| 2026-08-16 | 948 GWh |
| 2026-08-17 | 1.03 TWh |
| 2026-08-18 | 1.05 TWh |
| 2026-08-19 | 1.05 TWh |
| 2026-08-20 | 1.03 TWh |
| 2026-08-21 | 991 GWh |
| 2026-08-22 | 897 GWh |
| 2026-08-23 | 865 GWh |
| 2026-08-24 | 1.02 TWh |
| 2026-08-25 | 1.03 TWh |
| 2026-08-26 | 1.06 TWh |
| 2026-08-27 | 1.08 TWh |
| 2026-08-28 | 1.05 TWh |
| 2026-08-29 | 947 GWh |
| 2026-08-30 | 904 GWh |
| 2026-08-31 | 1.04 TWh |
| 2026-09-01 | 1.05 TWh |
| 2026-09-02 | 1.07 TWh |
| 2026-09-03 | 1.08 TWh |
| 2026-09-04 | 1.10 TWh |
| 2026-09-05 | 977 GWh |
| 2026-09-06 | 946 GWh |
| 2026-09-07 | 1.09 TWh |
| 2026-09-08 | 1.11 TWh |
| 2026-09-09 | 1.06 TWh |
| 2026-09-10 | 1.05 TWh |
| 2026-09-11 | 1.04 TWh |
| 2026-09-12 | 934 GWh |
| 2026-09-13 | 907 GWh |
| 2026-09-14 | 1.05 TWh |
| 2026-09-15 | 1.07 TWh |
| 2026-09-16 | 1.07 TWh |
| 2026-09-17 | 1.05 TWh |
| 2026-09-18 | 1.04 TWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-18. Daily totals are summed by World Power Monitor from complete Europe/Paris local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 307 TWh | 338 TWh | Nuclear 76.2% | 261 |
| 2025 (partial) | 433 TWh | 486 TWh | Nuclear 76.1% | 364 |
| 2024 | 428 TWh | 510 TWh | Nuclear 70.4% | 366 |
| 2023 | 422 TWh | 452 TWh | Nuclear 70.0% | 365 |
| 2022 | 431 TWh | 401 TWh | Nuclear 69.2% | 365 |
| 2021 | 456 TWh | 498 TWh | Nuclear 72.2% | 365 |
| 2020 | 442 TWh | 478 TWh | Nuclear 70.0% | 366 |
| 2019 (partial) | 464 TWh | 516 TWh | Nuclear 73.0% | 364 |
| 2018 | 463 TWh | 523 TWh | Nuclear 74.5% | 365 |
| 2017 | 469 TWh | 502 TWh | Nuclear 75.3% | 365 |
| 2016 (partial) | 473 TWh | 495 TWh | Nuclear 74.9% | 364 |
| 2015 | 469 TWh | 523 TWh | Nuclear 78.8% | 365 |
A year is partial when ENTSO-E has not published every day; 2024 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-18.
Power Flows With Neighbours
Net totals, 2026-08-20 (20 August 2026) to 2026-09-18 (18 September 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Italy North | France exports | 2.19 TWh |
| Great Britain | France exports | 1.29 TWh |
| Belgium | France exports | 1.07 TWh |
| Germany and Luxembourg | France exports | 799 GWh |
| Switzerland | France exports | 700 GWh |
| Spain | France exports | 479 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-18.
Share and Embed
Figures as of 2026-09-19 (19 September 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for France, credited to ENTSO-E. The image is rebuilt with the page.