Spain Electricity Demand and Generation Mix
Spain demand was 26,524 MW in the hour starting 19 Sept 2026, 18:00 CEST (UTC+02:00). Solar was the largest source in the hour starting 19 Sept 2026, 18:00 CEST (UTC+02:00), at 55% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Spain is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 19 Sept 2026, 18:00 CEST (UTC+02:00), demand in Spain was 26,524 MW, against a day-ahead forecast of 26,795 MW.
- Solar supplied 55.1% of Spain's generation in the hour starting 19 Sept 2026, 18:00 CEST (UTC+02:00).
- The day-ahead price in Spain averaged EUR 112.56/MWh for delivery on 2026-09-20 (20 September 2026).
- Installed generating capacity in Spain was 135 GW in 2026, as reported to ENTSO-E.
- Demand in Spain totalled 232 TWh in 2024.
- Wind supplied 24.4% of Spain's generation in 2024.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 19 Sept 2026, 18:00 CEST (UTC+02:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-19T16:00:00Z.
Generation by Source
Latest hour with generation by source: 19 Sept 2026, 18:00 CEST (UTC+02:00)| Source | Output | Share |
|---|---|---|
| Solar | 18,077 MW | 55.1% |
| Nuclear | 6,972 MW | 21.2% |
| Gas | 3,312 MW | 10.1% |
| Wind | 2,530 MW | 7.7% |
| Hydro | 1,186 MW | 3.6% |
| Bioenergy | 414 MW | 1.3% |
| Other | 262 MW | 0.8% |
| Other renewables | 56 MW | 0.2% |
| Oil | 12 MW | 0.0% |
| Coal | 0 MW | 0.0% |
| Geothermal | 0 MW | 0.0% |
| Other fossil | 0 MW | 0.0% |
| Storage | -2,025 MW | charging |
| Total from these sources | 32,821 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-19T16:00:00Z.
Day-Ahead Price
Delivery day 2026-09-20 (20 September 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Spain and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-20.
Last 30 Days, Hourly
Times in UTC| Hour starting (UTC) | Demand |
|---|---|
| 2026-08-21T22:00Z | 26,465 MW |
| 2026-08-21T23:00Z | 25,232 MW |
| 2026-08-22T00:00Z | 24,001 MW |
| 2026-08-22T01:00Z | 23,337 MW |
| 2026-08-22T02:00Z | 22,757 MW |
| 2026-08-22T03:00Z | 22,501 MW |
| 2026-08-22T04:00Z | 22,980 MW |
| 2026-08-22T05:00Z | 23,630 MW |
| 2026-08-22T06:00Z | 24,246 MW |
| 2026-08-22T07:00Z | 25,248 MW |
| 2026-08-22T08:00Z | 26,016 MW |
| 2026-08-22T09:00Z | 25,865 MW |
| 2026-08-22T10:00Z | 25,853 MW |
| 2026-08-22T11:00Z | 26,253 MW |
| 2026-08-22T12:00Z | 26,268 MW |
| 2026-08-22T13:00Z | 25,699 MW |
| 2026-08-22T14:00Z | 25,489 MW |
| 2026-08-22T15:00Z | 26,084 MW |
| 2026-08-22T16:00Z | 27,328 MW |
| 2026-08-22T17:00Z | 28,498 MW |
| 2026-08-22T18:00Z | 29,038 MW |
| 2026-08-22T19:00Z | 29,952 MW |
| 2026-08-22T20:00Z | 28,457 MW |
| 2026-08-22T21:00Z | 26,738 MW |
| 2026-08-22T22:00Z | 25,104 MW |
| 2026-08-22T23:00Z | 23,690 MW |
| 2026-08-23T00:00Z | 22,702 MW |
| 2026-08-23T01:00Z | 22,046 MW |
| 2026-08-23T02:00Z | 21,589 MW |
| 2026-08-23T03:00Z | 21,456 MW |
| 2026-08-23T04:00Z | 21,662 MW |
| 2026-08-23T05:00Z | 21,884 MW |
| 2026-08-23T06:00Z | 22,145 MW |
| 2026-08-23T07:00Z | 22,754 MW |
| 2026-08-23T08:00Z | 23,293 MW |
| 2026-08-23T09:00Z | 23,425 MW |
| 2026-08-23T10:00Z | 24,014 MW |
| 2026-08-23T11:00Z | 24,977 MW |
| 2026-08-23T12:00Z | 25,532 MW |
| 2026-08-23T13:00Z | 25,014 MW |
| 2026-08-23T14:00Z | 24,991 MW |
| 2026-08-23T15:00Z | 25,719 MW |
| 2026-08-23T16:00Z | 26,865 MW |
| 2026-08-23T17:00Z | 27,768 MW |
| 2026-08-23T18:00Z | 28,710 MW |
| 2026-08-23T19:00Z | 30,126 MW |
| 2026-08-23T20:00Z | 29,196 MW |
| 2026-08-23T21:00Z | 27,410 MW |
| 2026-08-23T22:00Z | 25,774 MW |
| 2026-08-23T23:00Z | 24,213 MW |
| 2026-08-24T00:00Z | 23,289 MW |
| 2026-08-24T01:00Z | 22,731 MW |
| 2026-08-24T02:00Z | 22,440 MW |
| 2026-08-24T03:00Z | 22,871 MW |
| 2026-08-24T04:00Z | 25,158 MW |
| 2026-08-24T05:00Z | 27,696 MW |
| 2026-08-24T06:00Z | 29,236 MW |
| 2026-08-24T07:00Z | 30,510 MW |
| 2026-08-24T08:00Z | 30,887 MW |
| 2026-08-24T09:00Z | 31,041 MW |
| 2026-08-24T10:00Z | 31,354 MW |
| 2026-08-24T11:00Z | 31,897 MW |
| 2026-08-24T12:00Z | 31,577 MW |
| 2026-08-24T13:00Z | 30,649 MW |
| 2026-08-24T14:00Z | 30,486 MW |
| 2026-08-24T15:00Z | 30,815 MW |
| 2026-08-24T16:00Z | 31,167 MW |
| 2026-08-24T17:00Z | 31,561 MW |
| 2026-08-24T18:00Z | 31,714 MW |
| 2026-08-24T19:00Z | 32,428 MW |
| 2026-08-24T20:00Z | 30,320 MW |
| 2026-08-24T21:00Z | 27,956 MW |
| 2026-08-24T22:00Z | 26,360 MW |
| 2026-08-24T23:00Z | 24,935 MW |
| 2026-08-25T00:00Z | 23,936 MW |
| 2026-08-25T01:00Z | 23,277 MW |
| 2026-08-25T02:00Z | 23,110 MW |
| 2026-08-25T03:00Z | 23,503 MW |
| 2026-08-25T04:00Z | 25,672 MW |
| 2026-08-25T05:00Z | 27,963 MW |
| 2026-08-25T06:00Z | 29,158 MW |
| 2026-08-25T07:00Z | 30,025 MW |
| 2026-08-25T08:00Z | 30,105 MW |
| 2026-08-25T09:00Z | 30,109 MW |
| 2026-08-25T10:00Z | 30,279 MW |
| 2026-08-25T11:00Z | 30,734 MW |
| 2026-08-25T12:00Z | 30,673 MW |
| 2026-08-25T13:00Z | 29,790 MW |
| 2026-08-25T14:00Z | 29,704 MW |
| 2026-08-25T15:00Z | 30,609 MW |
| 2026-08-25T16:00Z | 31,485 MW |
| 2026-08-25T17:00Z | 32,234 MW |
| 2026-08-25T18:00Z | 32,892 MW |
| 2026-08-25T19:00Z | 33,634 MW |
| 2026-08-25T20:00Z | 31,410 MW |
| 2026-08-25T21:00Z | 28,968 MW |
| 2026-08-25T22:00Z | 27,369 MW |
| 2026-08-25T23:00Z | 25,926 MW |
| 2026-08-26T00:00Z | 24,889 MW |
| 2026-08-26T01:00Z | 24,346 MW |
| 2026-08-26T02:00Z | 24,078 MW |
| 2026-08-26T03:00Z | 24,395 MW |
| 2026-08-26T04:00Z | 26,393 MW |
| 2026-08-26T05:00Z | 28,711 MW |
| 2026-08-26T06:00Z | 29,891 MW |
| 2026-08-26T07:00Z | 30,727 MW |
| 2026-08-26T08:00Z | 31,217 MW |
| 2026-08-26T09:00Z | 31,366 MW |
| 2026-08-26T10:00Z | 31,300 MW |
| 2026-08-26T11:00Z | 31,691 MW |
| 2026-08-26T12:00Z | 31,263 MW |
| 2026-08-26T13:00Z | 30,268 MW |
| 2026-08-26T14:00Z | 30,394 MW |
| 2026-08-26T15:00Z | 31,120 MW |
| 2026-08-26T16:00Z | 32,017 MW |
| 2026-08-26T17:00Z | 32,017 MW |
| 2026-08-26T18:00Z | 32,419 MW |
| 2026-08-26T19:00Z | 33,246 MW |
| 2026-08-26T20:00Z | 31,050 MW |
| 2026-08-26T21:00Z | 28,826 MW |
| 2026-08-26T22:00Z | 27,302 MW |
| 2026-08-26T23:00Z | 25,847 MW |
| 2026-08-27T00:00Z | 24,842 MW |
| 2026-08-27T01:00Z | 24,319 MW |
| 2026-08-27T02:00Z | 24,137 MW |
| 2026-08-27T03:00Z | 24,433 MW |
| 2026-08-27T04:00Z | 26,554 MW |
| 2026-08-27T05:00Z | 28,895 MW |
| 2026-08-27T06:00Z | 29,916 MW |
| 2026-08-27T07:00Z | 30,878 MW |
| 2026-08-27T08:00Z | 31,451 MW |
| 2026-08-27T09:00Z | 31,489 MW |
| 2026-08-27T10:00Z | 31,497 MW |
| 2026-08-27T11:00Z | 32,019 MW |
| 2026-08-27T12:00Z | 31,725 MW |
| 2026-08-27T13:00Z | 30,708 MW |
| 2026-08-27T14:00Z | 30,421 MW |
| 2026-08-27T15:00Z | 30,704 MW |
| 2026-08-27T16:00Z | 31,056 MW |
| 2026-08-27T17:00Z | 31,310 MW |
| 2026-08-27T18:00Z | 31,861 MW |
| 2026-08-27T19:00Z | 32,290 MW |
| 2026-08-27T20:00Z | 30,001 MW |
| 2026-08-27T21:00Z | 27,995 MW |
| 2026-08-27T22:00Z | 26,461 MW |
| 2026-08-27T23:00Z | 24,956 MW |
| 2026-08-28T00:00Z | 23,914 MW |
| 2026-08-28T01:00Z | 23,418 MW |
| 2026-08-28T02:00Z | 23,084 MW |
| 2026-08-28T03:00Z | 23,442 MW |
| 2026-08-28T04:00Z | 25,548 MW |
| 2026-08-28T05:00Z | 27,542 MW |
| 2026-08-28T06:00Z | 28,525 MW |
| 2026-08-28T07:00Z | 29,551 MW |
| 2026-08-28T08:00Z | 29,577 MW |
| 2026-08-28T09:00Z | 29,408 MW |
| 2026-08-28T10:00Z | 29,172 MW |
| 2026-08-28T11:00Z | 29,155 MW |
| 2026-08-28T12:00Z | 28,866 MW |
| 2026-08-28T13:00Z | 27,821 MW |
| 2026-08-28T14:00Z | 27,610 MW |
| 2026-08-28T15:00Z | 28,307 MW |
| 2026-08-28T16:00Z | 29,413 MW |
| 2026-08-28T17:00Z | 30,295 MW |
| 2026-08-28T18:00Z | 30,627 MW |
| 2026-08-28T19:00Z | 31,042 MW |
| 2026-08-28T20:00Z | 28,814 MW |
| 2026-08-28T21:00Z | 26,831 MW |
| 2026-08-28T22:00Z | 25,550 MW |
| 2026-08-28T23:00Z | 24,145 MW |
| 2026-08-29T00:00Z | 23,035 MW |
| 2026-08-29T01:00Z | 22,398 MW |
| 2026-08-29T02:00Z | 21,913 MW |
| 2026-08-29T03:00Z | 21,612 MW |
| 2026-08-29T04:00Z | 22,072 MW |
| 2026-08-29T05:00Z | 22,708 MW |
| 2026-08-29T06:00Z | 23,285 MW |
| 2026-08-29T07:00Z | 24,046 MW |
| 2026-08-29T08:00Z | 24,352 MW |
| 2026-08-29T09:00Z | 24,330 MW |
| 2026-08-29T10:00Z | 24,166 MW |
| 2026-08-29T11:00Z | 24,556 MW |
| 2026-08-29T12:00Z | 24,591 MW |
| 2026-08-29T13:00Z | 24,055 MW |
| 2026-08-29T14:00Z | 24,080 MW |
| 2026-08-29T15:00Z | 25,069 MW |
| 2026-08-29T16:00Z | 26,472 MW |
| 2026-08-29T17:00Z | 27,598 MW |
| 2026-08-29T18:00Z | 28,382 MW |
| 2026-08-29T19:00Z | 29,218 MW |
| 2026-08-29T20:00Z | 27,463 MW |
| 2026-08-29T21:00Z | 25,607 MW |
| 2026-08-29T22:00Z | 23,985 MW |
| 2026-08-29T23:00Z | 22,669 MW |
| 2026-08-30T00:00Z | 21,640 MW |
| 2026-08-30T01:00Z | 21,024 MW |
| 2026-08-30T02:00Z | 20,685 MW |
| 2026-08-30T03:00Z | 20,552 MW |
| 2026-08-30T04:00Z | 20,930 MW |
| 2026-08-30T05:00Z | 21,104 MW |
| 2026-08-30T06:00Z | 21,347 MW |
| 2026-08-30T07:00Z | 22,123 MW |
| 2026-08-30T08:00Z | 22,442 MW |
| 2026-08-30T09:00Z | 22,731 MW |
| 2026-08-30T10:00Z | 22,806 MW |
| 2026-08-30T11:00Z | 23,498 MW |
| 2026-08-30T12:00Z | 23,841 MW |
| 2026-08-30T13:00Z | 23,180 MW |
| 2026-08-30T14:00Z | 23,173 MW |
| 2026-08-30T15:00Z | 24,028 MW |
| 2026-08-30T16:00Z | 25,587 MW |
| 2026-08-30T17:00Z | 26,971 MW |
| 2026-08-30T18:00Z | 27,747 MW |
| 2026-08-30T19:00Z | 29,063 MW |
| 2026-08-30T20:00Z | 27,920 MW |
| 2026-08-30T21:00Z | 26,046 MW |
| 2026-08-30T22:00Z | 24,440 MW |
| 2026-08-30T23:00Z | 23,025 MW |
| 2026-08-31T00:00Z | 22,112 MW |
| 2026-08-31T01:00Z | 21,657 MW |
| 2026-08-31T02:00Z | 21,468 MW |
| 2026-08-31T03:00Z | 21,954 MW |
| 2026-08-31T04:00Z | 24,552 MW |
| 2026-08-31T05:00Z | 27,384 MW |
| 2026-08-31T06:00Z | 28,752 MW |
| 2026-08-31T07:00Z | 29,801 MW |
| 2026-08-31T08:00Z | 30,043 MW |
| 2026-08-31T09:00Z | 30,139 MW |
| 2026-08-31T10:00Z | 30,620 MW |
| 2026-08-31T11:00Z | 31,395 MW |
| 2026-08-31T12:00Z | 31,412 MW |
| 2026-08-31T13:00Z | 30,920 MW |
| 2026-08-31T14:00Z | 31,003 MW |
| 2026-08-31T15:00Z | 31,882 MW |
| 2026-08-31T16:00Z | 32,806 MW |
| 2026-08-31T17:00Z | 33,170 MW |
| 2026-08-31T18:00Z | 33,443 MW |
| 2026-08-31T19:00Z | 33,882 MW |
| 2026-08-31T20:00Z | 31,155 MW |
| 2026-08-31T21:00Z | 28,603 MW |
| 2026-08-31T22:00Z | 27,242 MW |
| 2026-08-31T23:00Z | 25,819 MW |
| 2026-09-01T00:00Z | 24,734 MW |
| 2026-09-01T01:00Z | 24,188 MW |
| 2026-09-01T02:00Z | 24,100 MW |
| 2026-09-01T03:00Z | 24,532 MW |
| 2026-09-01T04:00Z | 26,865 MW |
| 2026-09-01T05:00Z | 29,584 MW |
| 2026-09-01T06:00Z | 30,881 MW |
| 2026-09-01T07:00Z | 32,141 MW |
| 2026-09-01T08:00Z | 32,477 MW |
| 2026-09-01T09:00Z | 32,696 MW |
| 2026-09-01T10:00Z | 32,988 MW |
| 2026-09-01T11:00Z | 33,584 MW |
| 2026-09-01T12:00Z | 33,623 MW |
| 2026-09-01T13:00Z | 32,651 MW |
| 2026-09-01T14:00Z | 32,680 MW |
| 2026-09-01T15:00Z | 32,990 MW |
| 2026-09-01T16:00Z | 33,643 MW |
| 2026-09-01T17:00Z | 34,094 MW |
| 2026-09-01T18:00Z | 34,745 MW |
| 2026-09-01T19:00Z | 35,041 MW |
| 2026-09-01T20:00Z | 32,377 MW |
| 2026-09-01T21:00Z | 29,886 MW |
| 2026-09-01T22:00Z | 28,247 MW |
| 2026-09-01T23:00Z | 26,719 MW |
| 2026-09-02T00:00Z | 25,624 MW |
| 2026-09-02T01:00Z | 25,076 MW |
| 2026-09-02T02:00Z | 24,837 MW |
| 2026-09-02T03:00Z | 25,201 MW |
| 2026-09-02T04:00Z | 27,556 MW |
| 2026-09-02T05:00Z | 30,221 MW |
| 2026-09-02T06:00Z | 31,464 MW |
| 2026-09-02T07:00Z | 32,435 MW |
| 2026-09-02T08:00Z | 32,785 MW |
| 2026-09-02T09:00Z | 33,119 MW |
| 2026-09-02T10:00Z | 33,540 MW |
| 2026-09-02T11:00Z | 34,226 MW |
| 2026-09-02T12:00Z | 33,849 MW |
| 2026-09-02T13:00Z | 33,488 MW |
| 2026-09-02T14:00Z | 34,062 MW |
| 2026-09-02T15:00Z | 34,877 MW |
| 2026-09-02T16:00Z | 35,647 MW |
| 2026-09-02T17:00Z | 36,038 MW |
| 2026-09-02T18:00Z | 36,432 MW |
| 2026-09-02T19:00Z | 36,568 MW |
| 2026-09-02T20:00Z | 33,783 MW |
| 2026-09-02T21:00Z | 31,076 MW |
| 2026-09-02T22:00Z | 29,032 MW |
| 2026-09-02T23:00Z | 27,417 MW |
| 2026-09-03T00:00Z | 26,395 MW |
| 2026-09-03T01:00Z | 25,801 MW |
| 2026-09-03T02:00Z | 25,485 MW |
| 2026-09-03T03:00Z | 25,746 MW |
| 2026-09-03T04:00Z | 27,989 MW |
| 2026-09-03T05:00Z | 30,710 MW |
| 2026-09-03T06:00Z | 32,006 MW |
| 2026-09-03T07:00Z | 33,140 MW |
| 2026-09-03T08:00Z | 33,798 MW |
| 2026-09-03T09:00Z | 34,076 MW |
| 2026-09-03T10:00Z | 34,811 MW |
| 2026-09-03T11:00Z | 35,718 MW |
| 2026-09-03T12:00Z | 35,879 MW |
| 2026-09-03T13:00Z | 35,552 MW |
| 2026-09-03T14:00Z | 35,789 MW |
| 2026-09-03T15:00Z | 36,668 MW |
| 2026-09-03T16:00Z | 37,156 MW |
| 2026-09-03T17:00Z | 37,632 MW |
| 2026-09-03T18:00Z | 37,761 MW |
| 2026-09-03T19:00Z | 37,667 MW |
| 2026-09-03T20:00Z | 35,185 MW |
| 2026-09-03T21:00Z | 32,511 MW |
| 2026-09-03T22:00Z | 30,376 MW |
| 2026-09-03T23:00Z | 28,607 MW |
| 2026-09-04T00:00Z | 27,421 MW |
| 2026-09-04T01:00Z | 26,799 MW |
| 2026-09-04T02:00Z | 26,395 MW |
| 2026-09-04T03:00Z | 26,533 MW |
| 2026-09-04T04:00Z | 28,612 MW |
| 2026-09-04T05:00Z | 31,184 MW |
| 2026-09-04T06:00Z | 32,656 MW |
| 2026-09-04T07:00Z | 33,627 MW |
| 2026-09-04T08:00Z | 34,213 MW |
| 2026-09-04T09:00Z | 34,698 MW |
| 2026-09-04T10:00Z | 35,538 MW |
| 2026-09-04T11:00Z | 36,439 MW |
| 2026-09-04T12:00Z | 36,696 MW |
| 2026-09-04T13:00Z | 36,337 MW |
| 2026-09-04T14:00Z | 36,351 MW |
| 2026-09-04T15:00Z | 36,918 MW |
| 2026-09-04T16:00Z | 37,178 MW |
| 2026-09-04T17:00Z | 37,249 MW |
| 2026-09-04T18:00Z | 37,264 MW |
| 2026-09-04T19:00Z | 36,262 MW |
| 2026-09-04T20:00Z | 33,377 MW |
| 2026-09-04T21:00Z | 31,379 MW |
| 2026-09-04T22:00Z | 29,613 MW |
| 2026-09-04T23:00Z | 27,928 MW |
| 2026-09-05T00:00Z | 26,554 MW |
| 2026-09-05T01:00Z | 25,848 MW |
| 2026-09-05T02:00Z | 25,102 MW |
| 2026-09-05T03:00Z | 24,657 MW |
| 2026-09-05T04:00Z | 24,984 MW |
| 2026-09-05T05:00Z | 25,742 MW |
| 2026-09-05T06:00Z | 26,474 MW |
| 2026-09-05T07:00Z | 28,124 MW |
| 2026-09-05T08:00Z | 29,521 MW |
| 2026-09-05T09:00Z | 30,246 MW |
| 2026-09-05T10:00Z | 31,111 MW |
| 2026-09-05T11:00Z | 32,010 MW |
| 2026-09-05T12:00Z | 32,198 MW |
| 2026-09-05T13:00Z | 31,546 MW |
| 2026-09-05T14:00Z | 31,227 MW |
| 2026-09-05T15:00Z | 31,544 MW |
| 2026-09-05T16:00Z | 31,692 MW |
| 2026-09-05T17:00Z | 31,978 MW |
| 2026-09-05T18:00Z | 32,513 MW |
| 2026-09-05T19:00Z | 33,055 MW |
| 2026-09-05T20:00Z | 31,141 MW |
| 2026-09-05T21:00Z | 29,124 MW |
| 2026-09-05T22:00Z | 27,301 MW |
| 2026-09-05T23:00Z | 25,749 MW |
| 2026-09-06T00:00Z | 24,466 MW |
| 2026-09-06T01:00Z | 23,627 MW |
| 2026-09-06T02:00Z | 23,048 MW |
| 2026-09-06T03:00Z | 22,789 MW |
| 2026-09-06T04:00Z | 23,057 MW |
| 2026-09-06T05:00Z | 23,371 MW |
| 2026-09-06T06:00Z | 23,664 MW |
| 2026-09-06T07:00Z | 24,658 MW |
| 2026-09-06T08:00Z | 25,534 MW |
| 2026-09-06T09:00Z | 26,034 MW |
| 2026-09-06T10:00Z | 26,983 MW |
| 2026-09-06T11:00Z | 28,465 MW |
| 2026-09-06T12:00Z | 29,307 MW |
| 2026-09-06T13:00Z | 28,874 MW |
| 2026-09-06T14:00Z | 29,277 MW |
| 2026-09-06T15:00Z | 30,066 MW |
| 2026-09-06T16:00Z | 30,988 MW |
| 2026-09-06T17:00Z | 31,589 MW |
| 2026-09-06T18:00Z | 32,408 MW |
| 2026-09-06T19:00Z | 33,303 MW |
| 2026-09-06T20:00Z | 32,103 MW |
| 2026-09-06T21:00Z | 29,788 MW |
| 2026-09-06T22:00Z | 27,846 MW |
| 2026-09-06T23:00Z | 26,222 MW |
| 2026-09-07T00:00Z | 25,287 MW |
| 2026-09-07T01:00Z | 24,500 MW |
| 2026-09-07T02:00Z | 24,218 MW |
| 2026-09-07T03:00Z | 24,568 MW |
| 2026-09-07T04:00Z | 27,107 MW |
| 2026-09-07T05:00Z | 30,048 MW |
| 2026-09-07T06:00Z | 31,652 MW |
| 2026-09-07T07:00Z | 32,893 MW |
| 2026-09-07T08:00Z | 33,526 MW |
| 2026-09-07T09:00Z | 33,944 MW |
| 2026-09-07T10:00Z | 34,646 MW |
| 2026-09-07T11:00Z | 35,771 MW |
| 2026-09-07T12:00Z | 36,327 MW |
| 2026-09-07T13:00Z | 35,981 MW |
| 2026-09-07T14:00Z | 36,413 MW |
| 2026-09-07T15:00Z | 36,988 MW |
| 2026-09-07T16:00Z | 37,683 MW |
| 2026-09-07T17:00Z | 37,735 MW |
| 2026-09-07T18:00Z | 37,873 MW |
| 2026-09-07T19:00Z | 37,942 MW |
| 2026-09-07T20:00Z | 34,870 MW |
| 2026-09-07T21:00Z | 31,678 MW |
| 2026-09-07T22:00Z | 29,845 MW |
| 2026-09-07T23:00Z | 28,139 MW |
| 2026-09-08T00:00Z | 26,884 MW |
| 2026-09-08T01:00Z | 26,143 MW |
| 2026-09-08T02:00Z | 25,750 MW |
| 2026-09-08T03:00Z | 25,744 MW |
| 2026-09-08T04:00Z | 27,836 MW |
| 2026-09-08T05:00Z | 30,385 MW |
| 2026-09-08T06:00Z | 31,632 MW |
| 2026-09-08T07:00Z | 32,744 MW |
| 2026-09-08T08:00Z | 33,273 MW |
| 2026-09-08T09:00Z | 33,513 MW |
| 2026-09-08T10:00Z | 34,480 MW |
| 2026-09-08T11:00Z | 35,849 MW |
| 2026-09-08T12:00Z | 36,035 MW |
| 2026-09-08T13:00Z | 35,990 MW |
| 2026-09-08T14:00Z | 36,298 MW |
| 2026-09-08T15:00Z | 37,041 MW |
| 2026-09-08T16:00Z | 36,933 MW |
| 2026-09-08T17:00Z | 36,374 MW |
| 2026-09-08T18:00Z | 36,924 MW |
| 2026-09-08T19:00Z | 36,872 MW |
| 2026-09-08T20:00Z | 34,028 MW |
| 2026-09-08T21:00Z | 31,095 MW |
| 2026-09-08T22:00Z | 29,100 MW |
| 2026-09-08T23:00Z | 27,414 MW |
| 2026-09-09T00:00Z | 26,194 MW |
| 2026-09-09T01:00Z | 25,567 MW |
| 2026-09-09T02:00Z | 25,220 MW |
| 2026-09-09T03:00Z | 25,390 MW |
| 2026-09-09T04:00Z | 27,494 MW |
| 2026-09-09T05:00Z | 30,388 MW |
| 2026-09-09T06:00Z | 31,773 MW |
| 2026-09-09T07:00Z | 32,642 MW |
| 2026-09-09T08:00Z | 32,707 MW |
| 2026-09-09T09:00Z | 32,792 MW |
| 2026-09-09T10:00Z | 33,054 MW |
| 2026-09-09T11:00Z | 33,425 MW |
| 2026-09-09T12:00Z | 33,296 MW |
| 2026-09-09T13:00Z | 32,571 MW |
| 2026-09-09T14:00Z | 32,293 MW |
| 2026-09-09T15:00Z | 32,167 MW |
| 2026-09-09T16:00Z | 32,261 MW |
| 2026-09-09T17:00Z | 32,352 MW |
| 2026-09-09T18:00Z | 33,258 MW |
| 2026-09-09T19:00Z | 33,127 MW |
| 2026-09-09T20:00Z | 30,240 MW |
| 2026-09-09T21:00Z | 27,951 MW |
| 2026-09-09T22:00Z | 26,386 MW |
| 2026-09-09T23:00Z | 25,260 MW |
| 2026-09-10T00:00Z | 24,320 MW |
| 2026-09-10T01:00Z | 23,711 MW |
| 2026-09-10T02:00Z | 23,593 MW |
| 2026-09-10T03:00Z | 23,932 MW |
| 2026-09-10T04:00Z | 26,224 MW |
| 2026-09-10T05:00Z | 29,157 MW |
| 2026-09-10T06:00Z | 30,254 MW |
| 2026-09-10T07:00Z | 30,717 MW |
| 2026-09-10T08:00Z | 30,812 MW |
| 2026-09-10T09:00Z | 30,280 MW |
| 2026-09-10T10:00Z | 30,192 MW |
| 2026-09-10T11:00Z | 30,134 MW |
| 2026-09-10T12:00Z | 30,107 MW |
| 2026-09-10T13:00Z | 29,691 MW |
| 2026-09-10T14:00Z | 30,212 MW |
| 2026-09-10T15:00Z | 31,356 MW |
| 2026-09-10T16:00Z | 32,270 MW |
| 2026-09-10T17:00Z | 32,761 MW |
| 2026-09-10T18:00Z | 33,741 MW |
| 2026-09-10T19:00Z | 33,756 MW |
| 2026-09-10T20:00Z | 30,897 MW |
| 2026-09-10T21:00Z | 28,330 MW |
| 2026-09-10T22:00Z | 26,808 MW |
| 2026-09-10T23:00Z | 25,390 MW |
| 2026-09-11T00:00Z | 24,346 MW |
| 2026-09-11T01:00Z | 23,671 MW |
| 2026-09-11T02:00Z | 23,274 MW |
| 2026-09-11T03:00Z | 23,448 MW |
| 2026-09-11T04:00Z | 25,250 MW |
| 2026-09-11T05:00Z | 27,893 MW |
| 2026-09-11T06:00Z | 28,590 MW |
| 2026-09-11T07:00Z | 28,898 MW |
| 2026-09-11T08:00Z | 28,815 MW |
| 2026-09-11T09:00Z | 28,493 MW |
| 2026-09-11T10:00Z | 28,575 MW |
| 2026-09-11T11:00Z | 28,910 MW |
| 2026-09-11T12:00Z | 28,916 MW |
| 2026-09-11T13:00Z | 28,352 MW |
| 2026-09-11T14:00Z | 28,579 MW |
| 2026-09-11T15:00Z | 29,542 MW |
| 2026-09-11T16:00Z | 30,695 MW |
| 2026-09-11T17:00Z | 31,198 MW |
| 2026-09-11T18:00Z | 31,451 MW |
| 2026-09-11T19:00Z | 31,261 MW |
| 2026-09-11T20:00Z | 28,846 MW |
| 2026-09-11T21:00Z | 26,778 MW |
| 2026-09-11T22:00Z | 25,388 MW |
| 2026-09-11T23:00Z | 24,225 MW |
| 2026-09-12T00:00Z | 23,172 MW |
| 2026-09-12T01:00Z | 22,536 MW |
| 2026-09-12T02:00Z | 22,133 MW |
| 2026-09-12T03:00Z | 21,800 MW |
| 2026-09-12T04:00Z | 22,492 MW |
| 2026-09-12T05:00Z | 23,428 MW |
| 2026-09-12T06:00Z | 24,138 MW |
| 2026-09-12T07:00Z | 25,120 MW |
| 2026-09-12T08:00Z | 25,933 MW |
| 2026-09-12T09:00Z | 25,706 MW |
| 2026-09-12T10:00Z | 25,626 MW |
| 2026-09-12T11:00Z | 25,926 MW |
| 2026-09-12T12:00Z | 25,786 MW |
| 2026-09-12T13:00Z | 25,072 MW |
| 2026-09-12T14:00Z | 25,141 MW |
| 2026-09-12T15:00Z | 26,340 MW |
| 2026-09-12T16:00Z | 27,716 MW |
| 2026-09-12T17:00Z | 28,484 MW |
| 2026-09-12T18:00Z | 29,133 MW |
| 2026-09-12T19:00Z | 29,497 MW |
| 2026-09-12T20:00Z | 27,443 MW |
| 2026-09-12T21:00Z | 25,660 MW |
| 2026-09-12T22:00Z | 24,098 MW |
| 2026-09-12T23:00Z | 22,937 MW |
| 2026-09-13T00:00Z | 21,890 MW |
| 2026-09-13T01:00Z | 21,244 MW |
| 2026-09-13T02:00Z | 20,955 MW |
| 2026-09-13T03:00Z | 20,861 MW |
| 2026-09-13T04:00Z | 21,251 MW |
| 2026-09-13T05:00Z | 21,712 MW |
| 2026-09-13T06:00Z | 21,942 MW |
| 2026-09-13T07:00Z | 23,225 MW |
| 2026-09-13T08:00Z | 23,709 MW |
| 2026-09-13T09:00Z | 23,404 MW |
| 2026-09-13T10:00Z | 23,725 MW |
| 2026-09-13T11:00Z | 24,666 MW |
| 2026-09-13T12:00Z | 24,999 MW |
| 2026-09-13T13:00Z | 24,421 MW |
| 2026-09-13T14:00Z | 24,436 MW |
| 2026-09-13T15:00Z | 25,785 MW |
| 2026-09-13T16:00Z | 27,400 MW |
| 2026-09-13T17:00Z | 28,123 MW |
| 2026-09-13T18:00Z | 29,207 MW |
| 2026-09-13T19:00Z | 29,758 MW |
| 2026-09-13T20:00Z | 28,186 MW |
| 2026-09-13T21:00Z | 26,107 MW |
| 2026-09-13T22:00Z | 24,413 MW |
| 2026-09-13T23:00Z | 23,377 MW |
| 2026-09-14T00:00Z | 22,670 MW |
| 2026-09-14T01:00Z | 22,314 MW |
| 2026-09-14T02:00Z | 22,193 MW |
| 2026-09-14T03:00Z | 22,795 MW |
| 2026-09-14T04:00Z | 25,727 MW |
| 2026-09-14T05:00Z | 29,019 MW |
| 2026-09-14T06:00Z | 30,607 MW |
| 2026-09-14T07:00Z | 31,184 MW |
| 2026-09-14T08:00Z | 31,209 MW |
| 2026-09-14T09:00Z | 31,120 MW |
| 2026-09-14T10:00Z | 31,372 MW |
| 2026-09-14T11:00Z | 31,956 MW |
| 2026-09-14T12:00Z | 32,014 MW |
| 2026-09-14T13:00Z | 31,819 MW |
| 2026-09-14T14:00Z | 32,077 MW |
| 2026-09-14T15:00Z | 33,162 MW |
| 2026-09-14T16:00Z | 33,903 MW |
| 2026-09-14T17:00Z | 34,442 MW |
| 2026-09-14T18:00Z | 35,054 MW |
| 2026-09-14T19:00Z | 34,645 MW |
| 2026-09-14T20:00Z | 31,511 MW |
| 2026-09-14T21:00Z | 28,844 MW |
| 2026-09-14T22:00Z | 27,231 MW |
| 2026-09-14T23:00Z | 25,851 MW |
| 2026-09-15T00:00Z | 24,845 MW |
| 2026-09-15T01:00Z | 24,409 MW |
| 2026-09-15T02:00Z | 24,210 MW |
| 2026-09-15T03:00Z | 24,567 MW |
| 2026-09-15T04:00Z | 26,832 MW |
| 2026-09-15T05:00Z | 30,046 MW |
| 2026-09-15T06:00Z | 31,203 MW |
| 2026-09-15T07:00Z | 31,824 MW |
| 2026-09-15T08:00Z | 31,886 MW |
| 2026-09-15T09:00Z | 31,835 MW |
| 2026-09-15T10:00Z | 31,975 MW |
| 2026-09-15T11:00Z | 32,417 MW |
| 2026-09-15T12:00Z | 32,489 MW |
| 2026-09-15T13:00Z | 32,290 MW |
| 2026-09-15T14:00Z | 32,703 MW |
| 2026-09-15T15:00Z | 33,577 MW |
| 2026-09-15T16:00Z | 34,320 MW |
| 2026-09-15T17:00Z | 34,565 MW |
| 2026-09-15T18:00Z | 35,291 MW |
| 2026-09-15T19:00Z | 34,418 MW |
| 2026-09-15T20:00Z | 31,111 MW |
| 2026-09-15T21:00Z | 28,471 MW |
| 2026-09-15T22:00Z | 26,578 MW |
| 2026-09-15T23:00Z | 25,154 MW |
| 2026-09-16T00:00Z | 24,067 MW |
| 2026-09-16T01:00Z | 23,705 MW |
| 2026-09-16T02:00Z | 23,502 MW |
| 2026-09-16T03:00Z | 23,938 MW |
| 2026-09-16T04:00Z | 26,295 MW |
| 2026-09-16T05:00Z | 29,559 MW |
| 2026-09-16T06:00Z | 30,740 MW |
| 2026-09-16T07:00Z | 31,202 MW |
| 2026-09-16T08:00Z | 31,215 MW |
| 2026-09-16T09:00Z | 31,288 MW |
| 2026-09-16T10:00Z | 31,170 MW |
| 2026-09-16T11:00Z | 31,465 MW |
| 2026-09-16T12:00Z | 31,121 MW |
| 2026-09-16T13:00Z | 31,082 MW |
| 2026-09-16T14:00Z | 31,348 MW |
| 2026-09-16T15:00Z | 31,759 MW |
| 2026-09-16T16:00Z | 32,144 MW |
| 2026-09-16T17:00Z | 32,726 MW |
| 2026-09-16T18:00Z | 33,535 MW |
| 2026-09-16T19:00Z | 32,603 MW |
| 2026-09-16T20:00Z | 29,429 MW |
| 2026-09-16T21:00Z | 26,923 MW |
| 2026-09-16T22:00Z | 25,360 MW |
| 2026-09-16T23:00Z | 24,272 MW |
| 2026-09-17T00:00Z | 23,628 MW |
| 2026-09-17T01:00Z | 23,192 MW |
| 2026-09-17T02:00Z | 23,151 MW |
| 2026-09-17T03:00Z | 23,540 MW |
| 2026-09-17T04:00Z | 25,899 MW |
| 2026-09-17T05:00Z | 29,187 MW |
| 2026-09-17T06:00Z | 30,301 MW |
| 2026-09-17T07:00Z | 30,740 MW |
| 2026-09-17T08:00Z | 30,549 MW |
| 2026-09-17T09:00Z | 30,066 MW |
| 2026-09-17T10:00Z | 30,021 MW |
| 2026-09-17T11:00Z | 30,318 MW |
| 2026-09-17T12:00Z | 29,713 MW |
| 2026-09-17T13:00Z | 29,114 MW |
| 2026-09-17T14:00Z | 29,460 MW |
| 2026-09-17T15:00Z | 30,500 MW |
| 2026-09-17T16:00Z | 31,034 MW |
| 2026-09-17T17:00Z | 31,465 MW |
| 2026-09-17T18:00Z | 32,827 MW |
| 2026-09-17T19:00Z | 32,336 MW |
| 2026-09-17T20:00Z | 29,329 MW |
| 2026-09-17T21:00Z | 27,159 MW |
| 2026-09-17T22:00Z | 25,619 MW |
| 2026-09-17T23:00Z | 24,237 MW |
| 2026-09-18T00:00Z | 23,374 MW |
| 2026-09-18T01:00Z | 22,893 MW |
| 2026-09-18T02:00Z | 22,662 MW |
| 2026-09-18T03:00Z | 23,147 MW |
| 2026-09-18T04:00Z | 25,604 MW |
| 2026-09-18T05:00Z | 28,926 MW |
| 2026-09-18T06:00Z | 30,157 MW |
| 2026-09-18T07:00Z | 30,384 MW |
| 2026-09-18T08:00Z | 30,106 MW |
| 2026-09-18T09:00Z | 29,736 MW |
| 2026-09-18T10:00Z | 29,750 MW |
| 2026-09-18T11:00Z | 29,969 MW |
| 2026-09-18T12:00Z | 29,657 MW |
| 2026-09-18T13:00Z | 29,062 MW |
| 2026-09-18T14:00Z | 29,186 MW |
| 2026-09-18T15:00Z | 30,030 MW |
| 2026-09-18T16:00Z | 30,730 MW |
| 2026-09-18T17:00Z | 30,821 MW |
| 2026-09-18T18:00Z | 31,635 MW |
| 2026-09-18T19:00Z | 31,113 MW |
| 2026-09-18T20:00Z | 28,645 MW |
| 2026-09-18T21:00Z | 26,558 MW |
| 2026-09-18T22:00Z | 25,156 MW |
| 2026-09-18T23:00Z | 23,821 MW |
| 2026-09-19T00:00Z | 22,786 MW |
| 2026-09-19T01:00Z | 22,218 MW |
| 2026-09-19T02:00Z | 21,900 MW |
| 2026-09-19T03:00Z | 21,681 MW |
| 2026-09-19T04:00Z | 22,324 MW |
| 2026-09-19T05:00Z | 23,332 MW |
| 2026-09-19T06:00Z | 24,272 MW |
| 2026-09-19T07:00Z | 25,465 MW |
| 2026-09-19T08:00Z | n/a |
| 2026-09-19T09:00Z | 25,696 MW |
| 2026-09-19T10:00Z | 25,326 MW |
| 2026-09-19T11:00Z | 25,505 MW |
| 2026-09-19T12:00Z | 25,247 MW |
| 2026-09-19T13:00Z | 24,470 MW |
| 2026-09-19T14:00Z | 24,330 MW |
| 2026-09-19T15:00Z | 25,432 MW |
| 2026-09-19T16:00Z | 26,524 MW |
| Hour starting (UTC) | Solar | Nuclear | Gas | Wind | Hydro |
|---|---|---|---|---|---|
| 2026-08-21T22:00Z | 682 MW | 6,971 MW | 7,239 MW | 6,630 MW | 2,201 MW |
| 2026-08-21T23:00Z | 663 MW | 6,977 MW | 6,513 MW | 6,471 MW | 2,042 MW |
| 2026-08-22T00:00Z | 606 MW | 6,980 MW | 5,373 MW | 6,365 MW | 1,976 MW |
| 2026-08-22T01:00Z | 553 MW | 6,986 MW | 4,994 MW | 6,099 MW | 1,773 MW |
| 2026-08-22T02:00Z | 460 MW | 6,991 MW | 4,853 MW | 5,744 MW | 1,662 MW |
| 2026-08-22T03:00Z | 384 MW | 6,994 MW | 4,734 MW | 5,387 MW | 1,774 MW |
| 2026-08-22T04:00Z | 285 MW | 6,999 MW | 5,201 MW | 5,187 MW | 1,820 MW |
| 2026-08-22T05:00Z | 468 MW | 6,997 MW | 5,647 MW | 5,117 MW | 1,932 MW |
| 2026-08-22T06:00Z | 5,354 MW | 6,999 MW | 4,354 MW | 4,623 MW | 1,934 MW |
| 2026-08-22T07:00Z | 16,105 MW | 6,995 MW | 3,183 MW | 3,316 MW | 1,030 MW |
| 2026-08-22T08:00Z | 21,091 MW | 6,990 MW | 2,938 MW | 2,626 MW | 888 MW |
| 2026-08-22T09:00Z | 21,161 MW | 6,977 MW | 2,817 MW | 2,351 MW | 799 MW |
| 2026-08-22T10:00Z | 20,816 MW | 6,964 MW | 2,800 MW | 2,482 MW | 773 MW |
| 2026-08-22T11:00Z | 20,451 MW | 6,953 MW | 2,823 MW | 2,789 MW | 804 MW |
| 2026-08-22T12:00Z | 20,220 MW | 6,953 MW | 2,979 MW | 3,274 MW | 775 MW |
| 2026-08-22T13:00Z | 19,238 MW | 6,949 MW | 2,976 MW | 3,643 MW | 724 MW |
| 2026-08-22T14:00Z | 18,915 MW | 6,948 MW | 2,945 MW | 4,097 MW | 700 MW |
| 2026-08-22T15:00Z | 18,665 MW | 6,949 MW | 2,958 MW | 4,576 MW | 748 MW |
| 2026-08-22T16:00Z | 18,946 MW | 6,950 MW | 2,936 MW | 5,710 MW | 917 MW |
| 2026-08-22T17:00Z | 13,559 MW | 6,950 MW | 4,731 MW | 7,289 MW | 1,386 MW |
| 2026-08-22T18:00Z | 3,817 MW | 6,952 MW | 7,737 MW | 8,348 MW | 2,859 MW |
| 2026-08-22T19:00Z | 782 MW | 6,954 MW | 8,477 MW | 8,026 MW | 3,410 MW |
| 2026-08-22T20:00Z | 668 MW | 6,959 MW | 7,911 MW | 7,294 MW | 3,088 MW |
| 2026-08-22T21:00Z | 639 MW | 6,960 MW | 8,097 MW | 6,347 MW | 2,880 MW |
| 2026-08-22T22:00Z | 629 MW | 6,959 MW | 6,558 MW | 5,897 MW | 2,164 MW |
| 2026-08-22T23:00Z | 628 MW | 6,954 MW | 5,554 MW | 5,969 MW | 1,578 MW |
| 2026-08-23T00:00Z | 627 MW | 6,957 MW | 4,805 MW | 5,899 MW | 1,545 MW |
| 2026-08-23T01:00Z | 625 MW | 6,959 MW | 4,579 MW | 5,319 MW | 1,636 MW |
| 2026-08-23T02:00Z | 622 MW | 6,965 MW | 4,584 MW | 4,870 MW | 1,599 MW |
| 2026-08-23T03:00Z | 517 MW | 6,972 MW | 4,455 MW | 4,518 MW | 1,628 MW |
| 2026-08-23T04:00Z | 331 MW | 6,972 MW | 4,562 MW | 4,175 MW | 1,733 MW |
| 2026-08-23T05:00Z | 500 MW | 6,974 MW | 4,735 MW | 3,975 MW | 1,899 MW |
| 2026-08-23T06:00Z | 5,301 MW | 6,977 MW | 3,879 MW | 3,534 MW | 1,534 MW |
| 2026-08-23T07:00Z | 14,225 MW | 6,968 MW | 2,657 MW | 2,446 MW | 865 MW |
| 2026-08-23T08:00Z | 18,928 MW | 6,958 MW | 2,819 MW | 2,107 MW | 793 MW |
| 2026-08-23T09:00Z | 18,964 MW | 6,951 MW | 2,741 MW | 2,275 MW | 764 MW |
| 2026-08-23T10:00Z | 18,973 MW | 6,946 MW | 2,744 MW | 1,999 MW | 735 MW |
| 2026-08-23T11:00Z | 19,302 MW | 6,942 MW | 2,774 MW | 2,030 MW | 733 MW |
| 2026-08-23T12:00Z | 19,307 MW | 6,938 MW | 2,783 MW | 2,316 MW | 721 MW |
| 2026-08-23T13:00Z | 19,142 MW | 6,934 MW | 2,816 MW | 2,671 MW | 700 MW |
| 2026-08-23T14:00Z | 18,668 MW | 6,935 MW | 2,980 MW | 3,079 MW | 701 MW |
| 2026-08-23T15:00Z | 18,985 MW | 6,932 MW | 3,060 MW | 3,993 MW | 714 MW |
| 2026-08-23T16:00Z | 18,560 MW | 6,936 MW | 3,103 MW | 5,337 MW | 741 MW |
| 2026-08-23T17:00Z | 12,992 MW | 6,943 MW | 3,738 MW | 7,887 MW | 1,308 MW |
| 2026-08-23T18:00Z | 3,586 MW | 6,945 MW | 6,895 MW | 8,204 MW | 2,731 MW |
| 2026-08-23T19:00Z | 790 MW | 6,949 MW | 8,657 MW | 7,739 MW | 3,142 MW |
| 2026-08-23T20:00Z | 704 MW | 6,952 MW | 7,701 MW | 7,615 MW | 2,826 MW |
| 2026-08-23T21:00Z | 686 MW | 6,952 MW | 7,044 MW | 7,492 MW | 2,419 MW |
| 2026-08-23T22:00Z | 678 MW | 6,952 MW | 5,896 MW | 7,881 MW | 1,714 MW |
| 2026-08-23T23:00Z | 650 MW | 6,952 MW | 4,558 MW | 7,915 MW | 1,458 MW |
| 2026-08-24T00:00Z | 653 MW | 6,951 MW | 4,419 MW | 7,113 MW | 1,452 MW |
| 2026-08-24T01:00Z | 651 MW | 6,956 MW | 4,410 MW | 6,282 MW | 1,420 MW |
| 2026-08-24T02:00Z | 572 MW | 6,957 MW | 4,278 MW | 6,018 MW | 1,312 MW |
| 2026-08-24T03:00Z | 433 MW | 6,960 MW | 4,116 MW | 5,844 MW | 1,356 MW |
| 2026-08-24T04:00Z | 327 MW | 6,964 MW | 5,711 MW | 6,089 MW | 1,677 MW |
| 2026-08-24T05:00Z | 433 MW | 6,962 MW | 6,676 MW | 6,589 MW | 1,905 MW |
| 2026-08-24T06:00Z | 4,323 MW | 6,955 MW | 6,241 MW | 6,410 MW | 1,680 MW |
| 2026-08-24T07:00Z | 12,280 MW | 6,953 MW | 4,001 MW | 6,032 MW | 1,322 MW |
| 2026-08-24T08:00Z | 17,099 MW | 6,949 MW | 3,169 MW | 6,629 MW | 953 MW |
| 2026-08-24T09:00Z | 19,717 MW | 6,945 MW | 3,150 MW | 6,392 MW | 957 MW |
| 2026-08-24T10:00Z | 20,386 MW | 6,945 MW | 3,181 MW | 5,947 MW | 851 MW |
| 2026-08-24T11:00Z | 20,264 MW | 6,945 MW | 3,132 MW | 7,085 MW | 880 MW |
| 2026-08-24T12:00Z | 20,073 MW | 6,943 MW | 2,776 MW | 7,182 MW | 761 MW |
| 2026-08-24T13:00Z | 19,034 MW | 6,944 MW | 2,695 MW | 7,787 MW | 703 MW |
| 2026-08-24T14:00Z | 18,415 MW | 6,949 MW | 2,918 MW | 8,097 MW | 701 MW |
| 2026-08-24T15:00Z | 17,327 MW | 6,957 MW | 3,418 MW | 8,589 MW | 761 MW |
| 2026-08-24T16:00Z | 14,859 MW | 6,964 MW | 4,374 MW | 10,779 MW | 904 MW |
| 2026-08-24T17:00Z | 9,030 MW | 6,968 MW | 5,780 MW | 11,701 MW | 1,266 MW |
| 2026-08-24T18:00Z | 2,468 MW | 6,972 MW | 8,379 MW | 11,165 MW | 2,350 MW |
| 2026-08-24T19:00Z | 437 MW | 6,972 MW | 10,038 MW | 10,123 MW | 2,924 MW |
| 2026-08-24T20:00Z | 308 MW | 6,970 MW | 9,450 MW | 9,851 MW | 2,624 MW |
| 2026-08-24T21:00Z | 304 MW | 6,970 MW | 6,629 MW | 10,127 MW | 2,289 MW |
| 2026-08-24T22:00Z | 272 MW | 6,972 MW | 5,262 MW | 10,331 MW | 1,769 MW |
| 2026-08-24T23:00Z | 236 MW | 6,972 MW | 4,454 MW | 10,465 MW | 1,732 MW |
| 2026-08-25T00:00Z | 216 MW | 6,974 MW | 4,303 MW | 10,210 MW | 1,627 MW |
| 2026-08-25T01:00Z | 207 MW | 6,977 MW | 4,283 MW | 9,619 MW | 1,525 MW |
| 2026-08-25T02:00Z | 192 MW | 6,981 MW | 4,157 MW | 9,101 MW | 1,491 MW |
| 2026-08-25T03:00Z | 176 MW | 6,986 MW | 5,153 MW | 8,357 MW | 1,709 MW |
| 2026-08-25T04:00Z | 137 MW | 6,987 MW | 7,246 MW | 7,460 MW | 2,135 MW |
| 2026-08-25T05:00Z | 389 MW | 6,989 MW | 8,359 MW | 6,183 MW | 2,293 MW |
| 2026-08-25T06:00Z | 4,173 MW | 6,991 MW | 8,156 MW | 4,738 MW | 2,289 MW |
| 2026-08-25T07:00Z | 12,901 MW | 6,986 MW | 5,826 MW | 3,854 MW | 1,532 MW |
| 2026-08-25T08:00Z | 19,667 MW | 6,976 MW | 3,666 MW | 3,437 MW | 1,318 MW |
| 2026-08-25T09:00Z | 23,221 MW | 6,972 MW | 3,404 MW | 2,880 MW | 998 MW |
| 2026-08-25T10:00Z | 24,626 MW | 6,962 MW | 3,344 MW | 2,658 MW | 1,049 MW |
| 2026-08-25T11:00Z | 25,774 MW | 6,956 MW | 3,087 MW | 2,611 MW | 1,024 MW |
| 2026-08-25T12:00Z | 26,264 MW | 6,953 MW | 3,003 MW | 2,479 MW | 831 MW |
| 2026-08-25T13:00Z | 25,489 MW | 6,948 MW | 3,143 MW | 2,487 MW | 771 MW |
| 2026-08-25T14:00Z | 24,661 MW | 6,947 MW | 3,351 MW | 2,383 MW | 802 MW |
| 2026-08-25T15:00Z | 23,555 MW | 6,945 MW | 3,721 MW | 2,304 MW | 884 MW |
| 2026-08-25T16:00Z | 20,023 MW | 6,949 MW | 4,896 MW | 2,181 MW | 1,002 MW |
| 2026-08-25T17:00Z | 11,370 MW | 6,957 MW | 8,445 MW | 2,481 MW | 1,864 MW |
| 2026-08-25T18:00Z | 2,670 MW | 6,958 MW | 12,361 MW | 2,363 MW | 3,560 MW |
| 2026-08-25T19:00Z | 627 MW | 6,963 MW | 13,500 MW | 2,241 MW | 4,346 MW |
| 2026-08-25T20:00Z | 578 MW | 6,968 MW | 12,926 MW | 2,156 MW | 3,751 MW |
| 2026-08-25T21:00Z | 518 MW | 6,970 MW | 11,938 MW | 2,087 MW | 3,038 MW |
| 2026-08-25T22:00Z | 483 MW | 6,972 MW | 10,829 MW | 2,057 MW | 2,221 MW |
| 2026-08-25T23:00Z | 428 MW | 6,972 MW | 9,061 MW | 2,282 MW | 2,250 MW |
| 2026-08-26T00:00Z | 360 MW | 6,976 MW | 8,475 MW | 2,514 MW | 2,081 MW |
| 2026-08-26T01:00Z | 313 MW | 6,976 MW | 8,070 MW | 2,993 MW | 1,987 MW |
| 2026-08-26T02:00Z | 228 MW | 6,977 MW | 7,850 MW | 3,467 MW | 1,954 MW |
| 2026-08-26T03:00Z | 130 MW | 6,976 MW | 8,002 MW | 3,736 MW | 2,021 MW |
| 2026-08-26T04:00Z | 71 MW | 6,976 MW | 9,787 MW | 3,945 MW | 2,527 MW |
| 2026-08-26T05:00Z | 223 MW | 6,975 MW | 10,029 MW | 4,688 MW | 2,415 MW |
| 2026-08-26T06:00Z | 3,309 MW | 6,976 MW | 8,745 MW | 4,809 MW | 2,032 MW |
| 2026-08-26T07:00Z | 11,815 MW | 6,972 MW | 5,636 MW | 5,038 MW | 1,464 MW |
| 2026-08-26T08:00Z | 20,125 MW | 6,968 MW | 2,913 MW | 5,861 MW | 1,132 MW |
| 2026-08-26T09:00Z | 22,762 MW | 6,962 MW | 2,764 MW | 6,089 MW | 879 MW |
| 2026-08-26T10:00Z | 22,052 MW | 6,951 MW | 3,134 MW | 6,552 MW | 800 MW |
| 2026-08-26T11:00Z | 21,614 MW | 6,947 MW | 3,258 MW | 6,857 MW | 800 MW |
| 2026-08-26T12:00Z | 20,733 MW | 6,944 MW | 3,238 MW | 7,601 MW | 752 MW |
| 2026-08-26T13:00Z | 19,448 MW | 6,944 MW | 3,233 MW | 7,921 MW | 659 MW |
| 2026-08-26T14:00Z | 19,459 MW | 6,945 MW | 3,396 MW | 7,917 MW | 646 MW |
| 2026-08-26T15:00Z | 18,068 MW | 6,947 MW | 3,685 MW | 8,834 MW | 835 MW |
| 2026-08-26T16:00Z | 14,305 MW | 6,948 MW | 5,035 MW | 10,195 MW | 1,151 MW |
| 2026-08-26T17:00Z | 7,333 MW | 6,953 MW | 7,132 MW | 11,250 MW | 2,381 MW |
| 2026-08-26T18:00Z | 1,789 MW | 6,956 MW | 10,858 MW | 9,853 MW | 2,725 MW |
| 2026-08-26T19:00Z | 623 MW | 6,962 MW | 13,463 MW | 8,228 MW | 3,391 MW |
| 2026-08-26T20:00Z | 558 MW | 6,964 MW | 12,313 MW | 7,129 MW | 3,189 MW |
| 2026-08-26T21:00Z | 542 MW | 6,964 MW | 11,089 MW | 6,224 MW | 2,349 MW |
| 2026-08-26T22:00Z | 461 MW | 6,960 MW | 9,489 MW | 5,567 MW | 2,066 MW |
| 2026-08-26T23:00Z | 456 MW | 6,956 MW | 8,243 MW | 5,121 MW | 2,571 MW |
| 2026-08-27T00:00Z | 442 MW | 6,958 MW | 7,185 MW | 5,031 MW | 2,258 MW |
| 2026-08-27T01:00Z | 391 MW | 6,961 MW | 6,437 MW | 5,174 MW | 1,957 MW |
| 2026-08-27T02:00Z | 336 MW | 6,967 MW | 6,360 MW | 5,199 MW | 1,570 MW |
| 2026-08-27T03:00Z | 289 MW | 6,970 MW | 6,496 MW | 5,087 MW | 1,916 MW |
| 2026-08-27T04:00Z | 156 MW | 6,972 MW | 7,745 MW | 4,981 MW | 2,119 MW |
| 2026-08-27T05:00Z | 250 MW | 6,972 MW | 8,133 MW | 5,004 MW | 2,713 MW |
| 2026-08-27T06:00Z | 3,911 MW | 6,972 MW | 7,347 MW | 4,887 MW | 2,050 MW |
| 2026-08-27T07:00Z | 11,572 MW | 6,968 MW | 4,957 MW | 4,777 MW | 1,748 MW |
| 2026-08-27T08:00Z | 16,613 MW | 6,959 MW | 3,419 MW | 5,691 MW | 1,382 MW |
| 2026-08-27T09:00Z | 18,752 MW | 6,960 MW | 3,410 MW | 7,117 MW | 1,158 MW |
| 2026-08-27T10:00Z | 19,855 MW | 6,963 MW | 3,000 MW | 6,988 MW | 858 MW |
| 2026-08-27T11:00Z | 19,566 MW | 6,958 MW | 3,070 MW | 7,129 MW | 846 MW |
| 2026-08-27T12:00Z | 19,118 MW | 6,956 MW | 3,218 MW | 7,190 MW | 786 MW |
| 2026-08-27T13:00Z | 18,179 MW | 6,956 MW | 3,125 MW | 7,931 MW | 683 MW |
| 2026-08-27T14:00Z | 17,218 MW | 6,956 MW | 3,179 MW | 8,618 MW | 658 MW |
| 2026-08-27T15:00Z | 16,209 MW | 6,959 MW | 3,084 MW | 10,128 MW | 692 MW |
| 2026-08-27T16:00Z | 12,495 MW | 6,965 MW | 3,873 MW | 13,035 MW | 794 MW |
| 2026-08-27T17:00Z | 7,441 MW | 6,969 MW | 5,478 MW | 13,503 MW | 1,211 MW |
| 2026-08-27T18:00Z | 2,101 MW | 6,974 MW | 7,987 MW | 13,346 MW | 2,268 MW |
| 2026-08-27T19:00Z | 277 MW | 6,976 MW | 9,770 MW | 12,091 MW | 3,256 MW |
| 2026-08-27T20:00Z | 175 MW | 6,974 MW | 9,785 MW | 10,647 MW | 2,724 MW |
| 2026-08-27T21:00Z | 175 MW | 6,974 MW | 9,735 MW | 10,770 MW | 2,097 MW |
| 2026-08-27T22:00Z | 142 MW | 6,980 MW | 6,373 MW | 11,377 MW | 1,503 MW |
| 2026-08-27T23:00Z | 114 MW | 6,982 MW | 5,390 MW | 11,252 MW | 1,308 MW |
| 2026-08-28T00:00Z | 84 MW | 6,987 MW | 5,095 MW | 11,085 MW | 1,449 MW |
| 2026-08-28T01:00Z | 48 MW | 6,993 MW | 4,688 MW | 10,485 MW | 1,472 MW |
| 2026-08-28T02:00Z | 33 MW | 6,997 MW | 4,390 MW | 10,416 MW | 1,457 MW |
| 2026-08-28T03:00Z | 32 MW | 7,000 MW | 4,983 MW | 9,949 MW | 1,678 MW |
| 2026-08-28T04:00Z | 32 MW | 6,999 MW | 6,673 MW | 9,160 MW | 2,076 MW |
| 2026-08-28T05:00Z | 165 MW | 6,998 MW | 7,355 MW | 8,367 MW | 2,119 MW |
| 2026-08-28T06:00Z | 4,537 MW | 7,000 MW | 6,646 MW | 7,192 MW | 2,010 MW |
| 2026-08-28T07:00Z | 15,242 MW | 7,000 MW | 3,831 MW | 6,050 MW | 1,384 MW |
| 2026-08-28T08:00Z | 20,767 MW | 7,000 MW | 3,475 MW | 5,177 MW | 878 MW |
| 2026-08-28T09:00Z | 21,828 MW | 7,000 MW | 3,533 MW | 4,457 MW | 770 MW |
| 2026-08-28T10:00Z | 21,684 MW | 7,000 MW | 3,637 MW | 4,205 MW | 739 MW |
| 2026-08-28T11:00Z | 22,333 MW | 6,998 MW | 3,621 MW | 4,085 MW | 736 MW |
| 2026-08-28T12:00Z | 21,656 MW | 6,995 MW | 3,879 MW | 3,826 MW | 735 MW |
| 2026-08-28T13:00Z | 20,984 MW | 6,989 MW | 3,928 MW | 3,497 MW | 704 MW |
| 2026-08-28T14:00Z | 20,730 MW | 6,988 MW | 3,873 MW | 3,470 MW | 670 MW |
| 2026-08-28T15:00Z | 21,194 MW | 6,988 MW | 3,692 MW | 3,404 MW | 650 MW |
| 2026-08-28T16:00Z | 21,070 MW | 6,988 MW | 3,792 MW | 3,546 MW | 761 MW |
| 2026-08-28T17:00Z | 13,934 MW | 6,988 MW | 5,820 MW | 4,562 MW | 1,459 MW |
| 2026-08-28T18:00Z | 3,316 MW | 6,992 MW | 8,639 MW | 4,487 MW | 2,427 MW |
| 2026-08-28T19:00Z | 788 MW | 6,994 MW | 9,356 MW | 4,670 MW | 3,177 MW |
| 2026-08-28T20:00Z | 683 MW | 6,996 MW | 8,474 MW | 4,882 MW | 2,704 MW |
| 2026-08-28T21:00Z | 680 MW | 6,995 MW | 7,812 MW | 5,002 MW | 2,493 MW |
| 2026-08-28T22:00Z | 672 MW | 6,999 MW | 6,404 MW | 4,836 MW | 2,340 MW |
| 2026-08-28T23:00Z | 564 MW | 7,001 MW | 5,489 MW | 4,441 MW | 2,048 MW |
| 2026-08-29T00:00Z | 520 MW | 7,004 MW | 5,094 MW | 4,421 MW | 1,608 MW |
| 2026-08-29T01:00Z | 514 MW | 7,006 MW | 4,855 MW | 4,242 MW | 1,556 MW |
| 2026-08-29T02:00Z | 491 MW | 7,008 MW | 4,968 MW | 3,997 MW | 1,521 MW |
| 2026-08-29T03:00Z | 413 MW | 7,011 MW | 4,995 MW | 3,830 MW | 1,535 MW |
| 2026-08-29T04:00Z | 300 MW | 7,009 MW | 5,228 MW | 3,774 MW | 1,637 MW |
| 2026-08-29T05:00Z | 317 MW | 7,012 MW | 5,514 MW | 3,660 MW | 1,881 MW |
| 2026-08-29T06:00Z | 5,954 MW | 7,012 MW | 4,147 MW | 3,486 MW | 1,360 MW |
| 2026-08-29T07:00Z | 15,557 MW | 7,013 MW | 2,310 MW | 2,757 MW | 874 MW |
| 2026-08-29T08:00Z | 19,282 MW | 7,012 MW | 2,234 MW | 2,196 MW | 739 MW |
| 2026-08-29T09:00Z | 21,329 MW | 7,009 MW | 2,500 MW | 2,248 MW | 718 MW |
| 2026-08-29T10:00Z | 20,928 MW | 7,002 MW | 2,668 MW | 2,370 MW | 732 MW |
| 2026-08-29T11:00Z | 20,651 MW | 6,993 MW | 2,714 MW | 2,307 MW | 741 MW |
| 2026-08-29T12:00Z | 20,433 MW | 6,986 MW | 2,835 MW | 2,296 MW | 728 MW |
| 2026-08-29T13:00Z | 20,786 MW | 6,981 MW | 2,825 MW | 2,077 MW | 760 MW |
| 2026-08-29T14:00Z | 20,894 MW | 6,976 MW | 2,816 MW | 2,149 MW | 720 MW |
| 2026-08-29T15:00Z | 21,045 MW | 6,971 MW | 2,945 MW | 2,369 MW | 725 MW |
| 2026-08-29T16:00Z | 20,204 MW | 6,968 MW | 2,697 MW | 2,664 MW | 803 MW |
| 2026-08-29T17:00Z | 13,625 MW | 6,971 MW | 4,520 MW | 2,854 MW | 1,409 MW |
| 2026-08-29T18:00Z | 3,090 MW | 6,977 MW | 7,585 MW | 2,681 MW | 2,234 MW |
| 2026-08-29T19:00Z | 701 MW | 6,981 MW | 8,931 MW | 2,625 MW | 2,912 MW |
| 2026-08-29T20:00Z | 610 MW | 6,986 MW | 8,156 MW | 2,579 MW | 2,576 MW |
| 2026-08-29T21:00Z | 608 MW | 6,988 MW | 7,654 MW | 2,601 MW | 2,196 MW |
| 2026-08-29T22:00Z | 608 MW | 6,988 MW | 6,842 MW | 2,538 MW | 2,172 MW |
| 2026-08-29T23:00Z | 601 MW | 6,991 MW | 6,340 MW | 2,444 MW | 2,037 MW |
| 2026-08-30T00:00Z | 600 MW | 6,995 MW | 5,923 MW | 2,346 MW | 1,646 MW |
| 2026-08-30T01:00Z | 593 MW | 6,999 MW | 5,745 MW | 2,192 MW | 1,592 MW |
| 2026-08-30T02:00Z | 546 MW | 7,003 MW | 5,539 MW | 2,074 MW | 1,759 MW |
| 2026-08-30T03:00Z | 417 MW | 7,005 MW | 5,833 MW | 1,948 MW | 1,685 MW |
| 2026-08-30T04:00Z | 301 MW | 7,004 MW | 6,288 MW | 1,897 MW | 1,746 MW |
| 2026-08-30T05:00Z | 307 MW | 7,004 MW | 6,430 MW | 1,889 MW | 1,822 MW |
| 2026-08-30T06:00Z | 5,595 MW | 7,007 MW | 4,195 MW | 1,897 MW | 1,537 MW |
| 2026-08-30T07:00Z | 15,648 MW | 7,004 MW | 2,653 MW | 1,317 MW | 840 MW |
| 2026-08-30T08:00Z | 19,047 MW | 6,999 MW | 2,495 MW | 1,309 MW | 687 MW |
| 2026-08-30T09:00Z | 21,223 MW | 6,989 MW | 2,607 MW | 1,510 MW | 656 MW |
| 2026-08-30T10:00Z | 20,947 MW | 6,981 MW | 2,573 MW | 1,708 MW | 624 MW |
| 2026-08-30T11:00Z | 20,626 MW | 6,976 MW | 2,741 MW | 1,914 MW | 643 MW |
| 2026-08-30T12:00Z | 20,526 MW | 6,969 MW | 2,745 MW | 2,315 MW | 636 MW |
| 2026-08-30T13:00Z | 19,420 MW | 6,960 MW | 3,009 MW | 2,464 MW | 658 MW |
| 2026-08-30T14:00Z | 18,717 MW | 6,956 MW | 3,049 MW | 2,679 MW | 688 MW |
| 2026-08-30T15:00Z | 19,008 MW | 6,958 MW | 3,174 MW | 2,974 MW | 695 MW |
| 2026-08-30T16:00Z | 19,342 MW | 6,956 MW | 3,192 MW | 3,697 MW | 708 MW |
| 2026-08-30T17:00Z | 13,337 MW | 6,960 MW | 4,408 MW | 4,485 MW | 1,333 MW |
| 2026-08-30T18:00Z | 3,044 MW | 6,965 MW | 6,934 MW | 4,893 MW | 2,068 MW |
| 2026-08-30T19:00Z | 754 MW | 6,972 MW | 7,495 MW | 6,048 MW | 2,585 MW |
| 2026-08-30T20:00Z | 632 MW | 6,976 MW | 6,259 MW | 6,391 MW | 2,378 MW |
| 2026-08-30T21:00Z | 618 MW | 6,976 MW | 6,234 MW | 6,638 MW | 2,056 MW |
| 2026-08-30T22:00Z | 608 MW | 6,976 MW | 5,707 MW | 7,052 MW | 1,676 MW |
| 2026-08-30T23:00Z | 601 MW | 6,980 MW | 4,841 MW | 7,015 MW | 1,464 MW |
| 2026-08-31T00:00Z | 600 MW | 6,978 MW | 4,640 MW | 6,662 MW | 1,466 MW |
| 2026-08-31T01:00Z | 596 MW | 6,984 MW | 4,435 MW | 6,303 MW | 1,409 MW |
| 2026-08-31T02:00Z | 587 MW | 6,991 MW | 4,308 MW | 5,975 MW | 1,371 MW |
| 2026-08-31T03:00Z | 488 MW | 6,996 MW | 4,601 MW | 5,834 MW | 1,760 MW |
| 2026-08-31T04:00Z | 348 MW | 6,997 MW | 5,718 MW | 5,524 MW | 1,750 MW |
| 2026-08-31T05:00Z | 323 MW | 7,003 MW | 6,733 MW | 4,947 MW | 1,930 MW |
| 2026-08-31T06:00Z | 5,757 MW | 7,003 MW | 6,628 MW | 4,286 MW | 1,711 MW |
| 2026-08-31T07:00Z | 18,649 MW | 6,996 MW | 3,336 MW | 3,509 MW | 985 MW |
| 2026-08-31T08:00Z | 23,428 MW | 6,990 MW | 2,586 MW | 2,678 MW | 738 MW |
| 2026-08-31T09:00Z | 24,081 MW | 6,988 MW | 2,799 MW | 1,822 MW | 658 MW |
| 2026-08-31T10:00Z | 24,970 MW | 6,982 MW | 2,790 MW | 1,335 MW | 630 MW |
| 2026-08-31T11:00Z | 26,519 MW | 6,973 MW | 2,861 MW | 1,300 MW | 627 MW |
| 2026-08-31T12:00Z | 26,429 MW | 6,963 MW | 2,867 MW | 1,522 MW | 624 MW |
| 2026-08-31T13:00Z | 26,113 MW | 6,952 MW | 2,881 MW | 1,835 MW | 617 MW |
| 2026-08-31T14:00Z | 25,379 MW | 6,947 MW | 2,858 MW | 2,241 MW | 666 MW |
| 2026-08-31T15:00Z | 25,150 MW | 6,941 MW | 3,132 MW | 2,839 MW | 767 MW |
| 2026-08-31T16:00Z | 23,267 MW | 6,938 MW | 4,416 MW | 3,853 MW | 950 MW |
| 2026-08-31T17:00Z | 13,017 MW | 6,943 MW | 7,145 MW | 4,984 MW | 1,835 MW |
| 2026-08-31T18:00Z | 2,722 MW | 6,948 MW | 10,790 MW | 5,929 MW | 3,197 MW |
| 2026-08-31T19:00Z | 778 MW | 6,955 MW | 11,426 MW | 7,028 MW | 3,406 MW |
| 2026-08-31T20:00Z | 706 MW | 6,957 MW | 10,519 MW | 7,512 MW | 2,266 MW |
| 2026-08-31T21:00Z | 702 MW | 6,957 MW | 9,506 MW | 7,818 MW | 1,903 MW |
| 2026-08-31T22:00Z | 701 MW | 6,963 MW | 7,445 MW | 7,893 MW | 1,621 MW |
| 2026-08-31T23:00Z | 699 MW | 6,968 MW | 6,530 MW | 7,402 MW | 1,631 MW |
| 2026-09-01T00:00Z | 699 MW | 6,968 MW | 5,975 MW | 6,940 MW | 1,555 MW |
| 2026-09-01T01:00Z | 696 MW | 6,968 MW | 5,347 MW | 6,229 MW | 1,627 MW |
| 2026-09-01T02:00Z | 633 MW | 6,968 MW | 5,544 MW | 5,476 MW | 1,711 MW |
| 2026-09-01T03:00Z | 472 MW | 6,965 MW | 6,288 MW | 4,941 MW | 1,869 MW |
| 2026-09-01T04:00Z | 372 MW | 6,964 MW | 8,020 MW | 4,474 MW | 2,074 MW |
| 2026-09-01T05:00Z | 362 MW | 6,972 MW | 9,754 MW | 4,058 MW | 2,456 MW |
| 2026-09-01T06:00Z | 4,159 MW | 6,972 MW | 9,719 MW | 3,699 MW | 2,222 MW |
| 2026-09-01T07:00Z | 15,091 MW | 6,960 MW | 6,229 MW | 3,019 MW | 1,397 MW |
| 2026-09-01T08:00Z | 21,379 MW | 6,954 MW | 3,979 MW | 2,630 MW | 1,031 MW |
| 2026-09-01T09:00Z | 24,418 MW | 6,960 MW | 3,340 MW | 2,690 MW | 1,010 MW |
| 2026-09-01T10:00Z | 24,749 MW | 6,956 MW | 3,098 MW | 2,770 MW | 873 MW |
| 2026-09-01T11:00Z | 25,432 MW | 6,955 MW | 3,197 MW | 2,664 MW | 750 MW |
| 2026-09-01T12:00Z | 25,160 MW | 6,950 MW | 3,302 MW | 3,130 MW | 807 MW |
| 2026-09-01T13:00Z | 24,401 MW | 6,945 MW | 3,514 MW | 3,401 MW | 925 MW |
| 2026-09-01T14:00Z | 23,995 MW | 6,944 MW | 4,288 MW | 3,386 MW | 879 MW |
| 2026-09-01T15:00Z | 22,064 MW | 6,942 MW | 5,093 MW | 3,089 MW | 1,106 MW |
| 2026-09-01T16:00Z | 18,825 MW | 6,944 MW | 6,239 MW | 3,289 MW | 1,342 MW |
| 2026-09-01T17:00Z | 10,822 MW | 6,950 MW | 9,875 MW | 4,138 MW | 2,506 MW |
| 2026-09-01T18:00Z | 2,273 MW | 6,957 MW | 12,764 MW | 4,158 MW | 4,581 MW |
| 2026-09-01T19:00Z | 713 MW | 6,960 MW | 13,641 MW | 4,470 MW | 4,509 MW |
| 2026-09-01T20:00Z | 685 MW | 6,961 MW | 13,137 MW | 4,355 MW | 3,158 MW |
| 2026-09-01T21:00Z | 680 MW | 6,958 MW | 12,451 MW | 4,137 MW | 2,675 MW |
| 2026-09-01T22:00Z | 676 MW | 6,964 MW | 11,562 MW | 3,713 MW | 1,798 MW |
| 2026-09-01T23:00Z | 616 MW | 6,967 MW | 10,502 MW | 3,276 MW | 1,737 MW |
| 2026-09-02T00:00Z | 581 MW | 6,971 MW | 10,035 MW | 3,091 MW | 1,651 MW |
| 2026-09-02T01:00Z | 516 MW | 6,972 MW | 9,958 MW | 2,813 MW | 1,636 MW |
| 2026-09-02T02:00Z | 379 MW | 6,973 MW | 9,950 MW | 2,433 MW | 1,566 MW |
| 2026-09-02T03:00Z | 318 MW | 6,978 MW | 10,527 MW | 2,331 MW | 1,809 MW |
| 2026-09-02T04:00Z | 229 MW | 6,980 MW | 11,635 MW | 2,103 MW | 2,881 MW |
| 2026-09-02T05:00Z | 281 MW | 6,981 MW | 12,939 MW | 1,872 MW | 3,236 MW |
| 2026-09-02T06:00Z | 4,379 MW | 6,983 MW | 12,850 MW | 1,551 MW | 2,918 MW |
| 2026-09-02T07:00Z | 16,119 MW | 6,986 MW | 8,498 MW | 1,160 MW | 1,508 MW |
| 2026-09-02T08:00Z | 23,248 MW | 6,980 MW | 4,801 MW | 768 MW | 1,016 MW |
| 2026-09-02T09:00Z | 25,933 MW | 6,960 MW | 3,847 MW | 572 MW | 957 MW |
| 2026-09-02T10:00Z | 26,708 MW | 6,938 MW | 3,888 MW | 606 MW | 847 MW |
| 2026-09-02T11:00Z | 26,858 MW | 6,937 MW | 3,900 MW | 737 MW | 687 MW |
| 2026-09-02T12:00Z | 26,887 MW | 6,933 MW | 4,022 MW | 967 MW | 669 MW |
| 2026-09-02T13:00Z | 26,276 MW | 6,926 MW | 4,023 MW | 1,301 MW | 840 MW |
| 2026-09-02T14:00Z | 25,807 MW | 6,916 MW | 4,396 MW | 1,750 MW | 983 MW |
| 2026-09-02T15:00Z | 24,315 MW | 6,905 MW | 5,409 MW | 2,184 MW | 970 MW |
| 2026-09-02T16:00Z | 20,714 MW | 6,912 MW | 7,516 MW | 2,777 MW | 1,140 MW |
| 2026-09-02T17:00Z | 11,542 MW | 6,913 MW | 11,987 MW | 3,093 MW | 2,878 MW |
| 2026-09-02T18:00Z | 2,215 MW | 6,926 MW | 14,866 MW | 3,277 MW | 4,673 MW |
| 2026-09-02T19:00Z | 671 MW | 6,939 MW | 14,602 MW | 4,124 MW | 4,755 MW |
| 2026-09-02T20:00Z | 642 MW | 6,943 MW | 13,197 MW | 4,874 MW | 4,074 MW |
| 2026-09-02T21:00Z | 637 MW | 6,946 MW | 12,654 MW | 4,785 MW | 2,398 MW |
| 2026-09-02T22:00Z | 635 MW | 6,951 MW | 11,148 MW | 4,989 MW | 1,961 MW |
| 2026-09-02T23:00Z | 636 MW | 6,954 MW | 9,976 MW | 5,288 MW | 1,672 MW |
| 2026-09-03T00:00Z | 636 MW | 6,956 MW | 9,133 MW | 5,183 MW | 1,734 MW |
| 2026-09-03T01:00Z | 616 MW | 6,959 MW | 9,333 MW | 4,477 MW | 1,706 MW |
| 2026-09-03T02:00Z | 538 MW | 6,961 MW | 9,041 MW | 3,915 MW | 1,687 MW |
| 2026-09-03T03:00Z | 372 MW | 6,967 MW | 9,542 MW | 3,287 MW | 1,847 MW |
| 2026-09-03T04:00Z | 258 MW | 6,972 MW | 11,099 MW | 2,937 MW | 2,161 MW |
| 2026-09-03T05:00Z | 308 MW | 6,972 MW | 12,882 MW | 2,639 MW | 3,220 MW |
| 2026-09-03T06:00Z | 4,968 MW | 6,964 MW | 12,209 MW | 2,313 MW | 2,863 MW |
| 2026-09-03T07:00Z | 17,669 MW | 6,962 MW | 7,627 MW | 1,804 MW | 1,540 MW |
| 2026-09-03T08:00Z | 25,797 MW | 6,950 MW | 3,826 MW | 1,322 MW | 1,105 MW |
| 2026-09-03T09:00Z | 28,427 MW | 6,937 MW | 3,048 MW | 1,230 MW | 955 MW |
| 2026-09-03T10:00Z | 28,942 MW | 6,869 MW | 3,028 MW | 1,116 MW | 929 MW |
| 2026-09-03T11:00Z | 29,678 MW | 6,741 MW | 2,995 MW | 1,235 MW | 774 MW |
| 2026-09-03T12:00Z | 29,678 MW | 6,667 MW | 3,006 MW | 1,459 MW | 700 MW |
| 2026-09-03T13:00Z | 29,208 MW | 6,658 MW | 3,211 MW | 1,628 MW | 708 MW |
| 2026-09-03T14:00Z | 28,489 MW | 6,647 MW | 3,705 MW | 1,810 MW | 856 MW |
| 2026-09-03T15:00Z | 26,607 MW | 6,637 MW | 5,221 MW | 2,188 MW | 1,117 MW |
| 2026-09-03T16:00Z | 22,490 MW | 6,640 MW | 7,933 MW | 2,587 MW | 1,340 MW |
| 2026-09-03T17:00Z | 11,618 MW | 6,643 MW | 13,711 MW | 2,677 MW | 2,491 MW |
| 2026-09-03T18:00Z | 2,097 MW | 6,653 MW | 15,849 MW | 2,685 MW | 4,779 MW |
| 2026-09-03T19:00Z | 643 MW | 6,671 MW | 16,085 MW | 2,664 MW | 5,029 MW |
| 2026-09-03T20:00Z | 627 MW | 6,683 MW | 15,664 MW | 2,413 MW | 4,536 MW |
| 2026-09-03T21:00Z | 626 MW | 6,688 MW | 15,442 MW | 2,156 MW | 3,795 MW |
| 2026-09-03T22:00Z | 624 MW | 6,692 MW | 14,841 MW | 2,037 MW | 2,591 MW |
| 2026-09-03T23:00Z | 624 MW | 6,696 MW | 13,642 MW | 1,865 MW | 1,958 MW |
| 2026-09-04T00:00Z | 607 MW | 6,697 MW | 13,239 MW | 1,480 MW | 1,615 MW |
| 2026-09-04T01:00Z | 465 MW | 6,697 MW | 12,760 MW | 1,399 MW | 1,539 MW |
| 2026-09-04T02:00Z | 273 MW | 6,702 MW | 12,469 MW | 1,344 MW | 1,572 MW |
| 2026-09-04T03:00Z | 166 MW | 6,704 MW | 12,559 MW | 1,316 MW | 1,733 MW |
| 2026-09-04T04:00Z | 103 MW | 6,709 MW | 13,585 MW | 1,296 MW | 3,163 MW |
| 2026-09-04T05:00Z | 241 MW | 6,710 MW | 15,397 MW | 1,366 MW | 2,816 MW |
| 2026-09-04T06:00Z | 4,812 MW | 6,710 MW | 13,859 MW | 1,479 MW | 2,481 MW |
| 2026-09-04T07:00Z | 15,894 MW | 6,645 MW | 8,813 MW | 1,187 MW | 1,312 MW |
| 2026-09-04T08:00Z | 23,742 MW | 6,482 MW | 5,513 MW | 620 MW | 1,463 MW |
| 2026-09-04T09:00Z | 26,621 MW | 6,293 MW | 3,973 MW | 555 MW | 1,420 MW |
| 2026-09-04T10:00Z | 27,600 MW | 6,126 MW | 4,184 MW | 713 MW | 1,891 MW |
| 2026-09-04T11:00Z | 28,134 MW | 5,993 MW | 4,264 MW | 1,099 MW | 1,898 MW |
| 2026-09-04T12:00Z | 27,659 MW | 5,952 MW | 4,125 MW | 1,846 MW | 1,822 MW |
| 2026-09-04T13:00Z | 26,535 MW | 5,950 MW | 4,139 MW | 3,080 MW | 1,778 MW |
| 2026-09-04T14:00Z | 24,691 MW | 5,950 MW | 4,763 MW | 3,539 MW | 1,890 MW |
| 2026-09-04T15:00Z | 21,144 MW | 5,938 MW | 7,125 MW | 3,370 MW | 1,650 MW |
| 2026-09-04T16:00Z | 15,632 MW | 5,904 MW | 10,025 MW | 2,967 MW | 1,715 MW |
| 2026-09-04T17:00Z | 6,282 MW | 5,882 MW | 15,135 MW | 2,321 MW | 3,121 MW |
| 2026-09-04T18:00Z | 1,031 MW | 5,888 MW | 16,686 MW | 2,019 MW | 4,684 MW |
| 2026-09-04T19:00Z | 379 MW | 5,904 MW | 16,091 MW | 2,199 MW | 4,787 MW |
| 2026-09-04T20:00Z | 305 MW | 5,922 MW | 14,969 MW | 2,662 MW | 4,356 MW |
| 2026-09-04T21:00Z | 252 MW | 5,935 MW | 14,568 MW | 3,232 MW | 3,753 MW |
| 2026-09-04T22:00Z | 224 MW | 5,942 MW | 14,092 MW | 3,693 MW | 2,513 MW |
| 2026-09-04T23:00Z | 174 MW | 5,956 MW | 13,002 MW | 4,319 MW | 1,676 MW |
| 2026-09-05T00:00Z | 140 MW | 5,968 MW | 11,282 MW | 4,446 MW | 1,852 MW |
| 2026-09-05T01:00Z | 68 MW | 5,969 MW | 10,999 MW | 3,912 MW | 1,742 MW |
| 2026-09-05T02:00Z | 65 MW | 5,969 MW | 10,837 MW | 3,108 MW | 1,817 MW |
| 2026-09-05T03:00Z | 49 MW | 5,972 MW | 10,657 MW | 2,966 MW | 1,445 MW |
| 2026-09-05T04:00Z | 44 MW | 5,972 MW | 10,623 MW | 3,155 MW | 1,541 MW |
| 2026-09-05T05:00Z | 108 MW | 5,973 MW | 11,276 MW | 2,942 MW | 1,863 MW |
| 2026-09-05T06:00Z | 2,532 MW | 5,950 MW | 10,487 MW | 2,704 MW | 1,421 MW |
| 2026-09-05T07:00Z | 8,692 MW | 5,869 MW | 8,420 MW | 2,588 MW | 1,329 MW |
| 2026-09-05T08:00Z | 15,394 MW | 5,744 MW | 5,097 MW | 2,282 MW | 1,529 MW |
| 2026-09-05T09:00Z | 19,012 MW | 5,609 MW | 3,613 MW | 2,215 MW | 1,896 MW |
| 2026-09-05T10:00Z | 20,462 MW | 5,468 MW | 3,686 MW | 2,832 MW | 1,625 MW |
| 2026-09-05T11:00Z | 20,522 MW | 5,438 MW | 3,713 MW | 3,261 MW | 1,260 MW |
| 2026-09-05T12:00Z | 20,145 MW | 5,429 MW | 3,650 MW | 3,783 MW | 1,074 MW |
| 2026-09-05T13:00Z | 19,361 MW | 5,425 MW | 3,509 MW | 4,426 MW | 789 MW |
| 2026-09-05T14:00Z | 18,594 MW | 5,408 MW | 2,910 MW | 6,036 MW | 868 MW |
| 2026-09-05T15:00Z | 15,830 MW | 5,416 MW | 3,589 MW | 7,222 MW | 1,175 MW |
| 2026-09-05T16:00Z | 11,323 MW | 5,416 MW | 7,664 MW | 7,191 MW | 1,439 MW |
| 2026-09-05T17:00Z | 5,809 MW | 5,422 MW | 11,096 MW | 7,047 MW | 2,322 MW |
| 2026-09-05T18:00Z | 1,069 MW | 5,436 MW | 12,264 MW | 6,584 MW | 3,076 MW |
| 2026-09-05T19:00Z | 272 MW | 5,441 MW | 12,458 MW | 6,297 MW | 3,798 MW |
| 2026-09-05T20:00Z | 239 MW | 5,436 MW | 12,307 MW | 5,741 MW | 3,261 MW |
| 2026-09-05T21:00Z | 205 MW | 5,427 MW | 11,779 MW | 5,352 MW | 3,009 MW |
| 2026-09-05T22:00Z | 133 MW | 5,429 MW | 12,205 MW | 4,704 MW | 2,037 MW |
| 2026-09-05T23:00Z | 83 MW | 5,438 MW | 11,337 MW | 4,733 MW | 1,451 MW |
| 2026-09-06T00:00Z | 80 MW | 5,452 MW | 9,649 MW | 4,445 MW | 1,498 MW |
| 2026-09-06T01:00Z | 80 MW | 5,461 MW | 9,191 MW | 4,025 MW | 1,430 MW |
| 2026-09-06T02:00Z | 80 MW | 5,454 MW | 9,411 MW | 3,468 MW | 1,419 MW |
| 2026-09-06T03:00Z | 80 MW | 5,453 MW | 9,429 MW | 3,211 MW | 1,350 MW |
| 2026-09-06T04:00Z | 80 MW | 5,454 MW | 9,784 MW | 3,054 MW | 1,352 MW |
| 2026-09-06T05:00Z | 163 MW | 5,467 MW | 10,492 MW | 2,697 MW | 1,155 MW |
| 2026-09-06T06:00Z | 3,272 MW | 5,472 MW | 8,515 MW | 2,818 MW | 977 MW |
| 2026-09-06T07:00Z | 12,232 MW | 5,463 MW | 3,958 MW | 2,444 MW | 821 MW |
| 2026-09-06T08:00Z | 18,786 MW | 5,446 MW | 2,789 MW | 1,659 MW | 598 MW |
| 2026-09-06T09:00Z | 20,390 MW | 5,444 MW | 2,599 MW | 1,409 MW | 549 MW |
| 2026-09-06T10:00Z | 21,455 MW | 5,440 MW | 2,698 MW | 1,413 MW | 538 MW |
| 2026-09-06T11:00Z | 22,996 MW | 5,497 MW | 2,679 MW | 1,499 MW | 537 MW |
| 2026-09-06T12:00Z | 23,213 MW | 5,543 MW | 2,806 MW | 1,485 MW | 488 MW |
| 2026-09-06T13:00Z | 21,722 MW | 5,572 MW | 3,342 MW | 1,598 MW | 487 MW |
| 2026-09-06T14:00Z | 22,850 MW | 5,668 MW | 3,543 MW | 2,299 MW | 596 MW |
| 2026-09-06T15:00Z | 20,866 MW | 5,724 MW | 4,994 MW | 2,773 MW | 844 MW |
| 2026-09-06T16:00Z | 16,116 MW | 5,791 MW | 7,811 MW | 2,905 MW | 1,074 MW |
| 2026-09-06T17:00Z | 8,498 MW | 5,834 MW | 11,608 MW | 3,332 MW | 1,888 MW |
| 2026-09-06T18:00Z | 1,516 MW | 5,876 MW | 13,627 MW | 3,123 MW | 3,637 MW |
| 2026-09-06T19:00Z | 585 MW | 5,888 MW | 13,079 MW | 2,995 MW | 3,950 MW |
| 2026-09-06T20:00Z | 543 MW | 5,905 MW | 12,596 MW | 2,974 MW | 3,496 MW |
| 2026-09-06T21:00Z | 430 MW | 5,982 MW | 12,154 MW | 3,073 MW | 3,133 MW |
| 2026-09-06T22:00Z | 400 MW | 6,088 MW | 12,154 MW | 2,976 MW | 2,247 MW |
| 2026-09-06T23:00Z | 361 MW | 6,150 MW | 11,772 MW | 2,780 MW | 1,693 MW |
| 2026-09-07T00:00Z | 221 MW | 6,199 MW | 10,856 MW | 2,477 MW | 1,806 MW |
| 2026-09-07T01:00Z | 144 MW | 6,223 MW | 10,466 MW | 2,154 MW | 1,826 MW |
| 2026-09-07T02:00Z | 113 MW | 6,274 MW | 10,153 MW | 2,075 MW | 1,786 MW |
| 2026-09-07T03:00Z | 112 MW | 6,295 MW | 10,507 MW | 2,007 MW | 1,821 MW |
| 2026-09-07T04:00Z | 114 MW | 6,319 MW | 12,874 MW | 1,855 MW | 2,397 MW |
| 2026-09-07T05:00Z | 153 MW | 6,348 MW | 14,915 MW | 1,712 MW | 2,915 MW |
| 2026-09-07T06:00Z | 4,116 MW | 6,385 MW | 14,521 MW | 1,568 MW | 2,545 MW |
| 2026-09-07T07:00Z | 16,391 MW | 6,420 MW | 8,969 MW | 1,001 MW | 1,517 MW |
| 2026-09-07T08:00Z | 24,790 MW | 6,424 MW | 4,503 MW | 487 MW | 1,246 MW |
| 2026-09-07T09:00Z | 26,592 MW | 6,401 MW | 3,519 MW | 409 MW | 1,252 MW |
| 2026-09-07T10:00Z | 26,281 MW | 6,381 MW | 3,699 MW | 485 MW | 1,036 MW |
| 2026-09-07T11:00Z | 26,960 MW | 6,366 MW | 3,560 MW | 779 MW | 892 MW |
| 2026-09-07T12:00Z | 27,007 MW | 6,359 MW | 3,591 MW | 1,254 MW | 780 MW |
| 2026-09-07T13:00Z | 25,779 MW | 6,357 MW | 3,682 MW | 1,710 MW | 776 MW |
| 2026-09-07T14:00Z | 25,681 MW | 6,365 MW | 4,139 MW | 2,047 MW | 956 MW |
| 2026-09-07T15:00Z | 23,097 MW | 6,362 MW | 6,312 MW | 2,313 MW | 1,448 MW |
| 2026-09-07T16:00Z | 19,393 MW | 6,369 MW | 9,443 MW | 2,792 MW | 1,543 MW |
| 2026-09-07T17:00Z | 9,123 MW | 6,380 MW | 14,014 MW | 3,259 MW | 2,912 MW |
| 2026-09-07T18:00Z | 1,372 MW | 6,401 MW | 15,555 MW | 3,653 MW | 4,477 MW |
| 2026-09-07T19:00Z | 604 MW | 6,419 MW | 15,778 MW | 3,938 MW | 4,438 MW |
| 2026-09-07T20:00Z | 596 MW | 6,430 MW | 15,186 MW | 4,119 MW | 3,545 MW |
| 2026-09-07T21:00Z | 591 MW | 6,444 MW | 13,189 MW | 4,433 MW | 3,315 MW |
| 2026-09-07T22:00Z | 485 MW | 6,459 MW | 11,558 MW | 4,411 MW | 2,944 MW |
| 2026-09-07T23:00Z | 367 MW | 6,480 MW | 11,112 MW | 4,304 MW | 2,656 MW |
| 2026-09-08T00:00Z | 271 MW | 6,490 MW | 10,217 MW | 4,233 MW | 2,038 MW |
| 2026-09-08T01:00Z | 219 MW | 6,504 MW | 9,638 MW | 4,226 MW | 1,741 MW |
| 2026-09-08T02:00Z | 199 MW | 6,516 MW | 9,209 MW | 4,208 MW | 1,752 MW |
| 2026-09-08T03:00Z | 177 MW | 6,516 MW | 9,330 MW | 4,282 MW | 1,690 MW |
| 2026-09-08T04:00Z | 121 MW | 6,516 MW | 10,590 MW | 4,413 MW | 2,532 MW |
| 2026-09-08T05:00Z | 126 MW | 6,511 MW | 11,649 MW | 4,615 MW | 2,819 MW |
| 2026-09-08T06:00Z | 3,600 MW | 6,517 MW | 11,827 MW | 4,448 MW | 2,517 MW |
| 2026-09-08T07:00Z | 15,296 MW | 6,525 MW | 8,068 MW | 3,600 MW | 1,437 MW |
| 2026-09-08T08:00Z | 23,794 MW | 6,536 MW | 3,883 MW | 2,762 MW | 1,127 MW |
| 2026-09-08T09:00Z | 25,302 MW | 6,540 MW | 3,367 MW | 2,427 MW | 928 MW |
| 2026-09-08T10:00Z | 26,423 MW | 6,532 MW | 3,513 MW | 2,714 MW | 744 MW |
| 2026-09-08T11:00Z | 27,117 MW | 6,533 MW | 3,343 MW | 3,305 MW | 619 MW |
| 2026-09-08T12:00Z | 26,362 MW | 6,545 MW | 3,379 MW | 3,842 MW | 589 MW |
| 2026-09-08T13:00Z | 24,591 MW | 6,548 MW | 3,898 MW | 4,377 MW | 710 MW |
| 2026-09-08T14:00Z | 23,317 MW | 6,550 MW | 4,425 MW | 5,645 MW | 716 MW |
| 2026-09-08T15:00Z | 19,744 MW | 6,562 MW | 5,462 MW | 6,662 MW | 1,446 MW |
| 2026-09-08T16:00Z | 14,641 MW | 6,583 MW | 7,443 MW | 8,238 MW | 1,675 MW |
| 2026-09-08T17:00Z | 7,520 MW | 6,595 MW | 11,537 MW | 8,711 MW | 2,253 MW |
| 2026-09-08T18:00Z | 1,305 MW | 6,617 MW | 13,888 MW | 8,995 MW | 2,621 MW |
| 2026-09-08T19:00Z | 591 MW | 6,627 MW | 14,232 MW | 9,123 MW | 3,163 MW |
| 2026-09-08T20:00Z | 580 MW | 6,647 MW | 13,819 MW | 9,022 MW | 1,994 MW |
| 2026-09-08T21:00Z | 555 MW | 6,672 MW | 11,383 MW | 8,990 MW | 2,072 MW |
| 2026-09-08T22:00Z | 509 MW | 6,686 MW | 8,965 MW | 9,058 MW | 1,814 MW |
| 2026-09-08T23:00Z | 422 MW | 6,695 MW | 7,595 MW | 9,507 MW | 1,508 MW |
| 2026-09-09T00:00Z | 389 MW | 6,715 MW | 5,786 MW | 10,004 MW | 1,297 MW |
| 2026-09-09T01:00Z | 314 MW | 6,736 MW | 4,876 MW | 10,438 MW | 1,266 MW |
| 2026-09-09T02:00Z | 217 MW | 6,749 MW | 4,498 MW | 10,990 MW | 1,218 MW |
| 2026-09-09T03:00Z | 118 MW | 6,761 MW | 5,412 MW | 11,211 MW | 1,402 MW |
| 2026-09-09T04:00Z | 83 MW | 6,772 MW | 8,036 MW | 11,637 MW | 1,533 MW |
| 2026-09-09T05:00Z | 98 MW | 6,793 MW | 10,168 MW | 11,919 MW | 1,943 MW |
| 2026-09-09T06:00Z | 2,252 MW | 6,798 MW | 10,865 MW | 10,884 MW | 2,091 MW |
| 2026-09-09T07:00Z | 11,218 MW | 6,810 MW | 7,643 MW | 10,091 MW | 1,005 MW |
| 2026-09-09T08:00Z | 19,956 MW | 6,819 MW | 3,634 MW | 9,314 MW | 679 MW |
| 2026-09-09T09:00Z | 22,193 MW | 6,826 MW | 3,783 MW | 7,846 MW | 568 MW |
| 2026-09-09T10:00Z | 23,443 MW | 6,833 MW | 3,896 MW | 7,318 MW | 528 MW |
| 2026-09-09T11:00Z | 23,839 MW | 6,845 MW | 3,987 MW | 7,138 MW | 506 MW |
| 2026-09-09T12:00Z | 23,511 MW | 6,855 MW | 3,953 MW | 6,867 MW | 484 MW |
| 2026-09-09T13:00Z | 23,272 MW | 6,862 MW | 3,761 MW | 7,038 MW | 533 MW |
| 2026-09-09T14:00Z | 22,543 MW | 6,850 MW | 3,815 MW | 7,056 MW | 537 MW |
| 2026-09-09T15:00Z | 21,871 MW | 6,849 MW | 4,096 MW | 7,631 MW | 582 MW |
| 2026-09-09T16:00Z | 18,737 MW | 6,842 MW | 4,579 MW | 9,137 MW | 754 MW |
| 2026-09-09T17:00Z | 9,952 MW | 6,833 MW | 6,452 MW | 10,293 MW | 1,385 MW |
| 2026-09-09T18:00Z | 1,523 MW | 6,836 MW | 9,802 MW | 11,151 MW | 2,491 MW |
| 2026-09-09T19:00Z | 608 MW | 6,839 MW | 10,545 MW | 11,238 MW | 2,530 MW |
| 2026-09-09T20:00Z | 547 MW | 6,848 MW | 9,753 MW | 10,470 MW | 2,142 MW |
| 2026-09-09T21:00Z | 465 MW | 6,844 MW | 8,884 MW | 9,669 MW | 1,647 MW |
| 2026-09-09T22:00Z | 444 MW | 6,858 MW | 6,301 MW | 8,870 MW | 1,438 MW |
| 2026-09-09T23:00Z | 442 MW | 6,880 MW | 5,707 MW | 7,871 MW | 1,506 MW |
| 2026-09-10T00:00Z | 401 MW | 6,901 MW | 5,605 MW | 7,113 MW | 1,269 MW |
| 2026-09-10T01:00Z | 368 MW | 6,917 MW | 5,020 MW | 7,076 MW | 1,299 MW |
| 2026-09-10T02:00Z | 310 MW | 6,936 MW | 4,833 MW | 6,981 MW | 1,216 MW |
| 2026-09-10T03:00Z | 304 MW | 6,954 MW | 5,802 MW | 6,403 MW | 1,317 MW |
| 2026-09-10T04:00Z | 285 MW | 6,968 MW | 8,434 MW | 6,028 MW | 2,121 MW |
| 2026-09-10T05:00Z | 205 MW | 6,985 MW | 10,206 MW | 5,549 MW | 3,364 MW |
| 2026-09-10T06:00Z | 3,676 MW | 6,994 MW | 9,882 MW | 4,543 MW | 2,931 MW |
| 2026-09-10T07:00Z | 14,709 MW | 6,981 MW | 6,095 MW | 3,434 MW | 1,407 MW |
| 2026-09-10T08:00Z | 23,532 MW | 6,964 MW | 3,648 MW | 2,080 MW | 852 MW |
| 2026-09-10T09:00Z | 25,517 MW | 6,960 MW | 3,265 MW | 1,383 MW | 664 MW |
| 2026-09-10T10:00Z | 25,937 MW | 6,951 MW | 3,233 MW | 1,011 MW | 620 MW |
| 2026-09-10T11:00Z | 25,038 MW | 6,971 MW | 3,294 MW | 777 MW | 567 MW |
| 2026-09-10T12:00Z | 25,328 MW | 6,977 MW | 3,360 MW | 779 MW | 564 MW |
| 2026-09-10T13:00Z | 25,569 MW | 6,975 MW | 3,365 MW | 809 MW | 547 MW |
| 2026-09-10T14:00Z | 25,720 MW | 6,975 MW | 3,338 MW | 922 MW | 588 MW |
| 2026-09-10T15:00Z | 25,445 MW | 6,969 MW | 3,513 MW | 1,427 MW | 949 MW |
| 2026-09-10T16:00Z | 21,514 MW | 6,973 MW | 4,657 MW | 1,869 MW | 1,258 MW |
| 2026-09-10T17:00Z | 10,660 MW | 6,976 MW | 9,172 MW | 2,132 MW | 2,741 MW |
| 2026-09-10T18:00Z | 1,679 MW | 6,976 MW | 12,656 MW | 2,367 MW | 4,515 MW |
| 2026-09-10T19:00Z | 677 MW | 6,980 MW | 13,145 MW | 2,593 MW | 4,500 MW |
| 2026-09-10T20:00Z | 648 MW | 6,980 MW | 12,375 MW | 2,952 MW | 3,293 MW |
| 2026-09-10T21:00Z | 643 MW | 6,975 MW | 11,127 MW | 2,992 MW | 2,310 MW |
| 2026-09-10T22:00Z | 608 MW | 6,978 MW | 9,063 MW | 3,117 MW | 2,682 MW |
| 2026-09-10T23:00Z | 606 MW | 6,981 MW | 8,294 MW | 2,962 MW | 2,165 MW |
| 2026-09-11T00:00Z | 604 MW | 6,984 MW | 7,603 MW | 2,778 MW | 1,992 MW |
| 2026-09-11T01:00Z | 572 MW | 6,984 MW | 6,883 MW | 2,973 MW | 2,005 MW |
| 2026-09-11T02:00Z | 460 MW | 6,988 MW | 6,405 MW | 3,128 MW | 1,942 MW |
| 2026-09-11T03:00Z | 319 MW | 6,992 MW | 6,354 MW | 3,348 MW | 1,943 MW |
| 2026-09-11T04:00Z | 181 MW | 6,990 MW | 8,153 MW | 3,588 MW | 2,430 MW |
| 2026-09-11T05:00Z | 144 MW | 6,990 MW | 10,020 MW | 3,734 MW | 2,935 MW |
| 2026-09-11T06:00Z | 4,088 MW | 6,988 MW | 9,783 MW | 3,537 MW | 2,852 MW |
| 2026-09-11T07:00Z | 16,711 MW | 6,988 MW | 5,418 MW | 3,049 MW | 1,287 MW |
| 2026-09-11T08:00Z | 23,112 MW | 6,988 MW | 3,242 MW | 2,359 MW | 931 MW |
| 2026-09-11T09:00Z | 23,065 MW | 6,985 MW | 3,325 MW | 2,347 MW | 909 MW |
| 2026-09-11T10:00Z | 23,745 MW | 6,978 MW | 3,351 MW | 2,146 MW | 805 MW |
| 2026-09-11T11:00Z | 23,400 MW | 6,975 MW | 3,486 MW | 1,860 MW | 768 MW |
| 2026-09-11T12:00Z | 24,055 MW | 6,972 MW | 3,458 MW | 2,004 MW | 781 MW |
| 2026-09-11T13:00Z | 24,016 MW | 6,968 MW | 3,448 MW | 2,297 MW | 772 MW |
| 2026-09-11T14:00Z | 24,150 MW | 6,968 MW | 3,464 MW | 2,735 MW | 758 MW |
| 2026-09-11T15:00Z | 23,205 MW | 6,965 MW | 3,485 MW | 3,428 MW | 779 MW |
| 2026-09-11T16:00Z | 20,193 MW | 6,965 MW | 4,215 MW | 4,633 MW | 1,012 MW |
| 2026-09-11T17:00Z | 10,090 MW | 6,966 MW | 7,632 MW | 6,481 MW | 2,381 MW |
| 2026-09-11T18:00Z | 1,502 MW | 6,964 MW | 11,056 MW | 7,835 MW | 3,780 MW |
| 2026-09-11T19:00Z | 635 MW | 6,964 MW | 11,264 MW | 8,801 MW | 3,753 MW |
| 2026-09-11T20:00Z | 614 MW | 6,968 MW | 11,316 MW | 9,279 MW | 2,438 MW |
| 2026-09-11T21:00Z | 605 MW | 6,971 MW | 9,645 MW | 9,399 MW | 1,997 MW |
| 2026-09-11T22:00Z | 604 MW | 6,976 MW | 6,699 MW | 9,161 MW | 1,915 MW |
| 2026-09-11T23:00Z | 604 MW | 6,978 MW | 6,030 MW | 8,743 MW | 1,798 MW |
| 2026-09-12T00:00Z | 602 MW | 6,980 MW | 5,747 MW | 8,345 MW | 1,474 MW |
| 2026-09-12T01:00Z | 600 MW | 6,982 MW | 5,205 MW | 7,927 MW | 1,323 MW |
| 2026-09-12T02:00Z | 565 MW | 6,984 MW | 5,041 MW | 7,504 MW | 1,229 MW |
| 2026-09-12T03:00Z | 383 MW | 6,985 MW | 5,306 MW | 6,891 MW | 1,413 MW |
| 2026-09-12T04:00Z | 281 MW | 6,984 MW | 5,919 MW | 6,267 MW | 1,651 MW |
| 2026-09-12T05:00Z | 209 MW | 6,985 MW | 6,434 MW | 5,780 MW | 1,991 MW |
| 2026-09-12T06:00Z | 3,884 MW | 6,988 MW | 5,392 MW | 5,171 MW | 1,782 MW |
| 2026-09-12T07:00Z | 16,362 MW | 6,984 MW | 2,838 MW | 4,067 MW | 1,061 MW |
| 2026-09-12T08:00Z | 22,127 MW | 6,984 MW | 2,913 MW | 2,537 MW | 593 MW |
| 2026-09-12T09:00Z | 22,016 MW | 6,980 MW | 2,932 MW | 1,847 MW | 541 MW |
| 2026-09-12T10:00Z | 21,527 MW | 6,976 MW | 3,062 MW | 1,507 MW | 512 MW |
| 2026-09-12T11:00Z | 20,988 MW | 6,971 MW | 3,062 MW | 1,452 MW | 516 MW |
| 2026-09-12T12:00Z | 20,611 MW | 6,968 MW | 3,057 MW | 1,615 MW | 490 MW |
| 2026-09-12T13:00Z | 20,179 MW | 6,965 MW | 3,037 MW | 1,726 MW | 468 MW |
| 2026-09-12T14:00Z | 20,837 MW | 6,958 MW | 3,076 MW | 2,002 MW | 446 MW |
| 2026-09-12T15:00Z | 22,800 MW | 6,953 MW | 3,059 MW | 2,621 MW | 464 MW |
| 2026-09-12T16:00Z | 20,139 MW | 6,952 MW | 3,735 MW | 3,963 MW | 734 MW |
| 2026-09-12T17:00Z | 9,744 MW | 6,954 MW | 6,643 MW | 5,258 MW | 1,879 MW |
| 2026-09-12T18:00Z | 1,490 MW | 6,960 MW | 8,551 MW | 6,458 MW | 2,492 MW |
| 2026-09-12T19:00Z | 751 MW | 6,965 MW | 8,534 MW | 7,000 MW | 2,569 MW |
| 2026-09-12T20:00Z | 738 MW | 6,968 MW | 7,684 MW | 7,122 MW | 2,098 MW |
| 2026-09-12T21:00Z | 708 MW | 6,968 MW | 6,984 MW | 6,844 MW | 1,752 MW |
| 2026-09-12T22:00Z | 600 MW | 6,971 MW | 5,645 MW | 6,408 MW | 1,631 MW |
| 2026-09-12T23:00Z | 596 MW | 6,977 MW | 5,461 MW | 5,737 MW | 1,634 MW |
| 2026-09-13T00:00Z | 596 MW | 6,980 MW | 5,307 MW | 5,191 MW | 1,566 MW |
| 2026-09-13T01:00Z | 596 MW | 6,980 MW | 5,158 MW | 4,781 MW | 1,732 MW |
| 2026-09-13T02:00Z | 557 MW | 6,985 MW | 5,209 MW | 4,384 MW | 1,670 MW |
| 2026-09-13T03:00Z | 381 MW | 6,984 MW | 5,261 MW | 4,186 MW | 1,547 MW |
| 2026-09-13T04:00Z | 204 MW | 6,984 MW | 5,880 MW | 3,859 MW | 1,734 MW |
| 2026-09-13T05:00Z | 189 MW | 6,984 MW | 6,110 MW | 3,576 MW | 1,919 MW |
| 2026-09-13T06:00Z | 3,688 MW | 6,984 MW | 5,178 MW | 3,295 MW | 1,913 MW |
| 2026-09-13T07:00Z | 16,299 MW | 6,984 MW | 3,686 MW | 2,562 MW | 853 MW |
| 2026-09-13T08:00Z | 21,743 MW | 6,984 MW | 2,792 MW | 1,442 MW | 540 MW |
| 2026-09-13T09:00Z | 20,690 MW | 6,980 MW | 2,856 MW | 997 MW | 523 MW |
| 2026-09-13T10:00Z | 21,102 MW | 6,972 MW | 3,183 MW | 960 MW | 500 MW |
| 2026-09-13T11:00Z | 22,472 MW | 6,962 MW | 3,194 MW | 976 MW | 495 MW |
| 2026-09-13T12:00Z | 23,406 MW | 6,954 MW | 3,245 MW | 1,034 MW | 479 MW |
| 2026-09-13T13:00Z | 22,989 MW | 6,947 MW | 3,354 MW | 997 MW | 471 MW |
| 2026-09-13T14:00Z | 22,503 MW | 6,946 MW | 3,212 MW | 1,070 MW | 476 MW |
| 2026-09-13T15:00Z | 23,853 MW | 6,949 MW | 3,217 MW | 1,286 MW | 495 MW |
| 2026-09-13T16:00Z | 21,337 MW | 6,950 MW | 4,230 MW | 1,916 MW | 1,288 MW |
| 2026-09-13T17:00Z | 9,300 MW | 6,952 MW | 8,196 MW | 2,615 MW | 2,863 MW |
| 2026-09-13T18:00Z | 1,332 MW | 6,956 MW | 10,710 MW | 3,710 MW | 3,720 MW |
| 2026-09-13T19:00Z | 674 MW | 6,959 MW | 10,108 MW | 4,335 MW | 3,764 MW |
| 2026-09-13T20:00Z | 657 MW | 6,965 MW | 8,928 MW | 4,734 MW | 3,277 MW |
| 2026-09-13T21:00Z | 631 MW | 6,968 MW | 8,658 MW | 4,833 MW | 1,991 MW |
| 2026-09-13T22:00Z | 596 MW | 6,971 MW | 7,766 MW | 4,645 MW | 1,653 MW |
| 2026-09-13T23:00Z | 593 MW | 6,972 MW | 7,873 MW | 3,914 MW | 1,586 MW |
| 2026-09-14T00:00Z | 592 MW | 6,973 MW | 7,989 MW | 3,225 MW | 1,589 MW |
| 2026-09-14T01:00Z | 592 MW | 6,978 MW | 7,718 MW | 2,635 MW | 1,756 MW |
| 2026-09-14T02:00Z | 524 MW | 6,980 MW | 7,832 MW | 2,257 MW | 1,811 MW |
| 2026-09-14T03:00Z | 313 MW | 6,981 MW | 9,113 MW | 2,055 MW | 1,957 MW |
| 2026-09-14T04:00Z | 201 MW | 6,980 MW | 11,244 MW | 1,888 MW | 2,837 MW |
| 2026-09-14T05:00Z | 170 MW | 6,981 MW | 12,403 MW | 1,794 MW | 3,887 MW |
| 2026-09-14T06:00Z | 3,757 MW | 6,981 MW | 12,525 MW | 1,761 MW | 3,803 MW |
| 2026-09-14T07:00Z | 16,610 MW | 6,973 MW | 7,818 MW | 1,478 MW | 1,845 MW |
| 2026-09-14T08:00Z | 24,684 MW | 6,954 MW | 4,283 MW | 1,077 MW | 941 MW |
| 2026-09-14T09:00Z | 26,210 MW | 6,947 MW | 3,937 MW | 849 MW | 798 MW |
| 2026-09-14T10:00Z | 27,023 MW | 6,937 MW | 3,975 MW | 751 MW | 625 MW |
| 2026-09-14T11:00Z | 27,113 MW | 6,932 MW | 4,174 MW | 764 MW | 700 MW |
| 2026-09-14T12:00Z | 27,334 MW | 6,932 MW | 4,114 MW | 801 MW | 690 MW |
| 2026-09-14T13:00Z | 27,085 MW | 6,931 MW | 4,232 MW | 823 MW | 705 MW |
| 2026-09-14T14:00Z | 26,637 MW | 6,931 MW | 4,274 MW | 887 MW | 904 MW |
| 2026-09-14T15:00Z | 24,990 MW | 6,929 MW | 4,894 MW | 945 MW | 1,062 MW |
| 2026-09-14T16:00Z | 19,432 MW | 6,932 MW | 7,450 MW | 1,105 MW | 1,236 MW |
| 2026-09-14T17:00Z | 8,821 MW | 6,932 MW | 12,632 MW | 1,699 MW | 2,925 MW |
| 2026-09-14T18:00Z | 1,188 MW | 6,933 MW | 15,207 MW | 2,148 MW | 4,130 MW |
| 2026-09-14T19:00Z | 626 MW | 6,936 MW | 14,248 MW | 2,248 MW | 4,364 MW |
| 2026-09-14T20:00Z | 616 MW | 6,938 MW | 13,935 MW | 2,034 MW | 3,588 MW |
| 2026-09-14T21:00Z | 616 MW | 6,942 MW | 12,971 MW | 2,061 MW | 2,626 MW |
| 2026-09-14T22:00Z | 616 MW | 6,947 MW | 11,289 MW | 1,840 MW | 2,605 MW |
| 2026-09-14T23:00Z | 616 MW | 6,955 MW | 10,951 MW | 1,582 MW | 1,930 MW |
| 2026-09-15T00:00Z | 616 MW | 6,956 MW | 10,829 MW | 1,464 MW | 1,771 MW |
| 2026-09-15T01:00Z | 614 MW | 6,960 MW | 10,320 MW | 1,401 MW | 1,830 MW |
| 2026-09-15T02:00Z | 501 MW | 6,964 MW | 10,452 MW | 1,337 MW | 1,795 MW |
| 2026-09-15T03:00Z | 330 MW | 6,968 MW | 11,071 MW | 1,327 MW | 1,860 MW |
| 2026-09-15T04:00Z | 195 MW | 6,968 MW | 13,225 MW | 1,382 MW | 2,936 MW |
| 2026-09-15T05:00Z | 121 MW | 6,969 MW | 14,577 MW | 1,379 MW | 3,549 MW |
| 2026-09-15T06:00Z | 3,518 MW | 6,960 MW | 13,453 MW | 1,336 MW | 3,152 MW |
| 2026-09-15T07:00Z | 16,731 MW | 6,958 MW | 7,914 MW | 1,076 MW | 1,702 MW |
| 2026-09-15T08:00Z | 25,280 MW | 6,956 MW | 4,324 MW | 832 MW | 1,088 MW |
| 2026-09-15T09:00Z | 27,106 MW | 6,950 MW | 3,650 MW | 695 MW | 657 MW |
| 2026-09-15T10:00Z | 27,969 MW | 6,947 MW | 3,561 MW | 605 MW | 571 MW |
| 2026-09-15T11:00Z | 28,416 MW | 6,940 MW | 3,570 MW | 705 MW | 520 MW |
| 2026-09-15T12:00Z | 27,755 MW | 6,932 MW | 3,614 MW | 1,052 MW | 514 MW |
| 2026-09-15T13:00Z | 27,124 MW | 6,929 MW | 3,608 MW | 1,889 MW | 513 MW |
| 2026-09-15T14:00Z | 26,689 MW | 6,924 MW | 3,756 MW | 2,714 MW | 520 MW |
| 2026-09-15T15:00Z | 25,680 MW | 6,926 MW | 3,812 MW | 3,805 MW | 728 MW |
| 2026-09-15T16:00Z | 20,915 MW | 6,928 MW | 4,743 MW | 5,045 MW | 1,132 MW |
| 2026-09-15T17:00Z | 8,265 MW | 6,929 MW | 10,431 MW | 6,408 MW | 2,532 MW |
| 2026-09-15T18:00Z | 1,119 MW | 6,932 MW | 13,431 MW | 8,094 MW | 3,756 MW |
| 2026-09-15T19:00Z | 670 MW | 6,933 MW | 12,839 MW | 9,817 MW | 2,795 MW |
| 2026-09-15T20:00Z | 661 MW | 6,935 MW | 9,759 MW | 11,190 MW | 1,797 MW |
| 2026-09-15T21:00Z | 659 MW | 6,940 MW | 6,793 MW | 11,868 MW | 1,423 MW |
| 2026-09-15T22:00Z | 660 MW | 6,942 MW | 4,941 MW | 11,955 MW | 1,680 MW |
| 2026-09-15T23:00Z | 654 MW | 6,947 MW | 4,196 MW | 11,745 MW | 1,689 MW |
| 2026-09-16T00:00Z | 647 MW | 6,954 MW | 4,149 MW | 11,531 MW | 1,518 MW |
| 2026-09-16T01:00Z | 581 MW | 6,959 MW | 4,086 MW | 11,284 MW | 1,271 MW |
| 2026-09-16T02:00Z | 442 MW | 6,963 MW | 3,933 MW | 11,485 MW | 1,315 MW |
| 2026-09-16T03:00Z | 319 MW | 6,964 MW | 4,077 MW | 11,560 MW | 1,264 MW |
| 2026-09-16T04:00Z | 183 MW | 6,962 MW | 5,335 MW | 11,824 MW | 1,824 MW |
| 2026-09-16T05:00Z | 155 MW | 6,963 MW | 7,848 MW | 11,762 MW | 1,942 MW |
| 2026-09-16T06:00Z | 2,593 MW | 6,964 MW | 8,312 MW | 11,350 MW | 1,929 MW |
| 2026-09-16T07:00Z | 12,468 MW | 6,964 MW | 5,458 MW | 9,514 MW | 1,582 MW |
| 2026-09-16T08:00Z | 20,236 MW | 6,964 MW | 3,666 MW | 8,230 MW | 687 MW |
| 2026-09-16T09:00Z | 21,108 MW | 6,956 MW | 3,461 MW | 6,954 MW | 514 MW |
| 2026-09-16T10:00Z | 21,217 MW | 6,953 MW | 3,417 MW | 6,750 MW | 487 MW |
| 2026-09-16T11:00Z | 21,076 MW | 6,953 MW | 3,428 MW | 6,913 MW | 469 MW |
| 2026-09-16T12:00Z | 20,644 MW | 6,949 MW | 3,413 MW | 7,200 MW | 458 MW |
| 2026-09-16T13:00Z | 20,036 MW | 6,945 MW | 3,409 MW | 8,287 MW | 453 MW |
| 2026-09-16T14:00Z | 19,710 MW | 6,941 MW | 3,431 MW | 8,840 MW | 472 MW |
| 2026-09-16T15:00Z | 18,169 MW | 6,939 MW | 3,581 MW | 10,309 MW | 507 MW |
| 2026-09-16T16:00Z | 14,631 MW | 6,943 MW | 4,469 MW | 11,298 MW | 779 MW |
| 2026-09-16T17:00Z | 6,763 MW | 6,944 MW | 6,174 MW | 12,644 MW | 1,873 MW |
| 2026-09-16T18:00Z | 1,086 MW | 6,950 MW | 9,259 MW | 13,114 MW | 2,589 MW |
| 2026-09-16T19:00Z | 666 MW | 6,966 MW | 8,460 MW | 13,610 MW | 2,245 MW |
| 2026-09-16T20:00Z | 645 MW | 6,972 MW | 6,346 MW | 13,690 MW | 2,231 MW |
| 2026-09-16T21:00Z | 608 MW | 6,975 MW | 5,122 MW | 12,739 MW | 2,014 MW |
| 2026-09-16T22:00Z | 546 MW | 6,976 MW | 4,394 MW | 12,770 MW | 1,320 MW |
| 2026-09-16T23:00Z | 473 MW | 6,976 MW | 3,806 MW | 12,397 MW | 1,497 MW |
| 2026-09-17T00:00Z | 436 MW | 6,977 MW | 3,650 MW | 11,826 MW | 1,476 MW |
| 2026-09-17T01:00Z | 389 MW | 6,982 MW | 3,413 MW | 10,950 MW | 1,475 MW |
| 2026-09-17T02:00Z | 345 MW | 6,982 MW | 3,711 MW | 9,950 MW | 1,360 MW |
| 2026-09-17T03:00Z | 204 MW | 6,981 MW | 4,225 MW | 9,406 MW | 1,490 MW |
| 2026-09-17T04:00Z | 139 MW | 6,981 MW | 6,512 MW | 8,805 MW | 2,056 MW |
| 2026-09-17T05:00Z | 127 MW | 6,984 MW | 9,686 MW | 7,493 MW | 2,991 MW |
| 2026-09-17T06:00Z | 1,851 MW | 6,984 MW | 9,633 MW | 6,403 MW | 2,788 MW |
| 2026-09-17T07:00Z | 11,113 MW | 6,982 MW | 6,299 MW | 6,155 MW | 1,207 MW |
| 2026-09-17T08:00Z | 19,533 MW | 6,976 MW | 3,146 MW | 5,610 MW | 731 MW |
| 2026-09-17T09:00Z | 20,581 MW | 6,976 MW | 2,777 MW | 4,597 MW | 559 MW |
| 2026-09-17T10:00Z | 21,492 MW | 6,973 MW | 2,496 MW | 3,627 MW | 471 MW |
| 2026-09-17T11:00Z | 22,713 MW | 6,972 MW | 2,530 MW | 2,932 MW | 442 MW |
| 2026-09-17T12:00Z | 22,208 MW | 6,969 MW | 2,485 MW | 2,700 MW | 440 MW |
| 2026-09-17T13:00Z | 22,553 MW | 6,968 MW | 2,466 MW | 2,613 MW | 460 MW |
| 2026-09-17T14:00Z | 23,535 MW | 6,962 MW | 2,739 MW | 2,861 MW | 601 MW |
| 2026-09-17T15:00Z | 22,803 MW | 6,960 MW | 3,298 MW | 3,519 MW | 1,298 MW |
| 2026-09-17T16:00Z | 16,788 MW | 6,963 MW | 4,568 MW | 4,698 MW | 1,621 MW |
| 2026-09-17T17:00Z | 6,225 MW | 6,968 MW | 8,234 MW | 5,212 MW | 2,949 MW |
| 2026-09-17T18:00Z | 931 MW | 6,964 MW | 10,676 MW | 5,931 MW | 2,917 MW |
| 2026-09-17T19:00Z | 544 MW | 6,973 MW | 10,035 MW | 6,475 MW | 2,871 MW |
| 2026-09-17T20:00Z | 501 MW | 6,978 MW | 8,902 MW | 6,922 MW | 2,156 MW |
| 2026-09-17T21:00Z | 494 MW | 6,981 MW | 7,222 MW | 7,051 MW | 1,819 MW |
| 2026-09-17T22:00Z | 464 MW | 6,983 MW | 5,916 MW | 7,096 MW | 1,784 MW |
| 2026-09-17T23:00Z | 400 MW | 6,984 MW | 5,501 MW | 7,357 MW | 1,404 MW |
| 2026-09-18T00:00Z | 346 MW | 6,984 MW | 5,011 MW | 7,091 MW | 1,528 MW |
| 2026-09-18T01:00Z | 237 MW | 6,984 MW | 5,025 MW | 6,452 MW | 1,572 MW |
| 2026-09-18T02:00Z | 160 MW | 6,964 MW | 5,117 MW | 5,980 MW | 1,782 MW |
| 2026-09-18T03:00Z | 138 MW | 6,966 MW | 5,771 MW | 5,716 MW | 1,733 MW |
| 2026-09-18T04:00Z | 121 MW | 6,965 MW | 8,208 MW | 5,551 MW | 2,267 MW |
| 2026-09-18T05:00Z | 136 MW | 6,971 MW | 10,518 MW | 5,332 MW | 2,499 MW |
| 2026-09-18T06:00Z | 2,213 MW | 6,974 MW | 10,890 MW | 4,862 MW | 2,287 MW |
| 2026-09-18T07:00Z | 12,347 MW | 6,972 MW | 7,528 MW | 3,893 MW | 1,646 MW |
| 2026-09-18T08:00Z | 21,673 MW | 6,968 MW | 3,525 MW | 3,730 MW | 832 MW |
| 2026-09-18T09:00Z | 24,212 MW | 6,963 MW | 2,971 MW | 3,431 MW | 565 MW |
| 2026-09-18T10:00Z | 25,105 MW | 6,958 MW | 2,959 MW | 3,391 MW | 559 MW |
| 2026-09-18T11:00Z | 24,867 MW | 6,956 MW | 2,791 MW | 3,382 MW | 509 MW |
| 2026-09-18T12:00Z | 24,758 MW | 6,953 MW | 2,768 MW | 3,414 MW | 494 MW |
| 2026-09-18T13:00Z | 24,386 MW | 6,950 MW | 2,776 MW | 3,659 MW | 549 MW |
| 2026-09-18T14:00Z | 23,672 MW | 6,960 MW | 2,858 MW | 4,262 MW | 509 MW |
| 2026-09-18T15:00Z | 23,679 MW | 6,961 MW | 3,078 MW | 5,054 MW | 557 MW |
| 2026-09-18T16:00Z | 18,061 MW | 6,963 MW | 4,119 MW | 5,929 MW | 1,114 MW |
| 2026-09-18T17:00Z | 6,983 MW | 6,964 MW | 8,501 MW | 6,671 MW | 2,629 MW |
| 2026-09-18T18:00Z | 1,106 MW | 6,964 MW | 11,179 MW | 7,302 MW | 3,497 MW |
| 2026-09-18T19:00Z | 731 MW | 6,969 MW | 11,052 MW | 8,016 MW | 3,317 MW |
| 2026-09-18T20:00Z | 704 MW | 6,972 MW | 9,488 MW | 8,372 MW | 3,059 MW |
| 2026-09-18T21:00Z | 628 MW | 6,972 MW | 7,244 MW | 8,140 MW | 1,773 MW |
| 2026-09-18T22:00Z | 516 MW | 6,961 MW | 5,619 MW | 7,785 MW | 1,603 MW |
| 2026-09-18T23:00Z | 427 MW | 6,939 MW | 4,735 MW | 7,316 MW | 1,467 MW |
| 2026-09-19T00:00Z | 367 MW | 6,946 MW | 4,565 MW | 6,582 MW | 1,455 MW |
| 2026-09-19T01:00Z | 331 MW | 6,973 MW | 4,787 MW | 5,491 MW | 1,606 MW |
| 2026-09-19T02:00Z | 290 MW | 6,983 MW | 4,889 MW | 4,797 MW | 1,721 MW |
| 2026-09-19T03:00Z | 162 MW | 6,982 MW | 5,162 MW | 4,328 MW | 1,669 MW |
| 2026-09-19T04:00Z | 123 MW | 6,980 MW | 5,596 MW | 4,115 MW | 1,703 MW |
| 2026-09-19T05:00Z | 121 MW | 6,983 MW | 6,755 MW | 3,767 MW | 1,765 MW |
| 2026-09-19T06:00Z | 2,731 MW | 6,984 MW | 6,194 MW | 3,311 MW | 1,719 MW |
| 2026-09-19T07:00Z | 14,141 MW | 6,984 MW | 3,259 MW | 2,606 MW | 916 MW |
| 2026-09-19T08:00Z | 21,837 MW | 6,990 MW | 2,415 MW | 1,834 MW | 724 MW |
| 2026-09-19T09:00Z | 23,379 MW | 6,981 MW | 2,346 MW | 1,520 MW | 628 MW |
| 2026-09-19T10:00Z | 22,803 MW | 6,983 MW | 2,301 MW | 1,261 MW | 489 MW |
| 2026-09-19T11:00Z | 21,384 MW | 6,983 MW | 2,301 MW | 1,279 MW | 443 MW |
| 2026-09-19T12:00Z | 20,634 MW | 6,980 MW | 2,290 MW | 1,360 MW | 426 MW |
| 2026-09-19T13:00Z | 21,403 MW | 6,976 MW | 2,296 MW | 1,497 MW | 430 MW |
| 2026-09-19T14:00Z | 21,559 MW | 6,973 MW | 2,290 MW | 1,626 MW | 428 MW |
| 2026-09-19T15:00Z | 22,069 MW | 6,971 MW | 2,345 MW | 1,793 MW | 445 MW |
| 2026-09-19T16:00Z | 18,077 MW | 6,972 MW | 3,312 MW | 2,530 MW | 1,186 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-19T16:00Z.
Installed Capacity
Annual figure for 2026| Solar | |
|---|---|
| Wind | |
| Gas | |
| Hydro | |
| Nuclear | |
| Storage | |
| Coal | |
| Other renewables | |
| Bioenergy | |
| Oil | |
| Other |
Total installed capacity in Spain: 135 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Madrid time dates, through 2026-09-18| Date (Europe/Madrid time) | Demand |
|---|---|
| 2025-08-15 | 645 GWh |
| 2025-08-16 | 657 GWh |
| 2025-08-17 | 644 GWh |
| 2025-08-18 | 732 GWh |
| 2025-08-19 | 704 GWh |
| 2025-08-20 | 662 GWh |
| 2025-08-21 | 649 GWh |
| 2025-08-22 | 643 GWh |
| 2025-08-23 | 599 GWh |
| 2025-08-24 | 574 GWh |
| 2025-08-25 | 683 GWh |
| 2025-08-26 | 714 GWh |
| 2025-08-27 | 719 GWh |
| 2025-08-28 | 675 GWh |
| 2025-08-29 | 646 GWh |
| 2025-08-30 | 594 GWh |
| 2025-08-31 | 561 GWh |
| 2025-09-01 | 633 GWh |
| 2025-09-02 | 649 GWh |
| 2025-09-03 | 671 GWh |
| 2025-09-04 | 685 GWh |
| 2025-09-05 | 677 GWh |
| 2025-09-06 | 608 GWh |
| 2025-09-07 | 587 GWh |
| 2025-09-08 | 679 GWh |
| 2025-09-09 | 672 GWh |
| 2025-09-10 | 663 GWh |
| 2025-09-11 | 652 GWh |
| 2025-09-12 | 668 GWh |
| 2025-09-13 | 601 GWh |
| 2025-09-14 | 564 GWh |
| 2025-09-15 | 687 GWh |
| 2025-09-16 | 712 GWh |
| 2025-09-17 | 724 GWh |
| 2025-09-18 | 725 GWh |
| 2025-09-19 | 716 GWh |
| 2025-09-20 | 625 GWh |
| 2025-09-21 | 562 GWh |
| 2025-09-22 | 612 GWh |
| 2025-09-23 | 623 GWh |
| 2025-09-24 | 620 GWh |
| 2025-09-25 | 637 GWh |
| 2025-09-26 | 635 GWh |
| 2025-09-27 | 565 GWh |
| 2025-09-28 | 528 GWh |
| 2025-09-29 | 615 GWh |
| 2025-09-30 | 633 GWh |
| 2025-10-01 | 633 GWh |
| 2025-10-02 | 640 GWh |
| 2025-10-03 | 645 GWh |
| 2025-10-04 | 571 GWh |
| 2025-10-05 | 516 GWh |
| 2025-10-06 | 624 GWh |
| 2025-10-07 | 639 GWh |
| 2025-10-08 | 644 GWh |
| 2025-10-09 | 627 GWh |
| 2025-10-10 | 617 GWh |
| 2025-10-11 | 549 GWh |
| 2025-10-12 | 510 GWh |
| 2025-10-13 | 603 GWh |
| 2025-10-14 | 642 GWh |
| 2025-10-15 | 641 GWh |
| 2025-10-16 | 648 GWh |
| 2025-10-17 | 639 GWh |
| 2025-10-18 | 555 GWh |
| 2025-10-19 | 517 GWh |
| 2025-10-20 | 618 GWh |
| 2025-10-21 | 637 GWh |
| 2025-10-22 | 640 GWh |
| 2025-10-23 | 635 GWh |
| 2025-10-24 | 636 GWh |
| 2025-10-25 | 567 GWh |
| 2025-10-26 | 545 GWh |
| 2025-10-27 | 617 GWh |
| 2025-10-28 | 642 GWh |
| 2025-10-29 | 653 GWh |
| 2025-10-30 | 643 GWh |
| 2025-10-31 | 632 GWh |
| 2025-11-01 | 545 GWh |
| 2025-11-02 | 517 GWh |
| 2025-11-03 | 622 GWh |
| 2025-11-04 | 644 GWh |
| 2025-11-05 | 652 GWh |
| 2025-11-06 | 643 GWh |
| 2025-11-07 | 658 GWh |
| 2025-11-08 | 583 GWh |
| 2025-11-09 | 548 GWh |
| 2025-11-10 | 652 GWh |
| 2025-11-11 | 670 GWh |
| 2025-11-12 | 661 GWh |
| 2025-11-13 | 680 GWh |
| 2025-11-14 | 672 GWh |
| 2025-11-15 | 593 GWh |
| 2025-11-16 | 544 GWh |
| 2025-11-17 | 660 GWh |
| 2025-11-18 | 677 GWh |
| 2025-11-19 | 699 GWh |
| 2025-11-20 | 714 GWh |
| 2025-11-21 | 726 GWh |
| 2025-11-22 | 649 GWh |
| 2025-11-23 | 608 GWh |
| 2025-11-24 | 716 GWh |
| 2025-11-25 | 724 GWh |
| 2025-11-26 | 739 GWh |
| 2025-11-27 | 748 GWh |
| 2025-11-28 | 744 GWh |
| 2025-11-29 | 656 GWh |
| 2025-11-30 | 617 GWh |
| 2025-12-01 | 740 GWh |
| 2025-12-02 | 756 GWh |
| 2025-12-03 | 752 GWh |
| 2025-12-04 | 773 GWh |
| 2025-12-05 | 739 GWh |
| 2025-12-06 | 629 GWh |
| 2025-12-07 | 578 GWh |
| 2025-12-08 | 611 GWh |
| 2025-12-09 | 716 GWh |
| 2025-12-10 | 749 GWh |
| 2025-12-11 | 740 GWh |
| 2025-12-12 | 741 GWh |
| 2025-12-13 | 642 GWh |
| 2025-12-14 | 616 GWh |
| 2025-12-15 | 727 GWh |
| 2025-12-16 | 753 GWh |
| 2025-12-17 | 735 GWh |
| 2025-12-18 | 730 GWh |
| 2025-12-19 | 732 GWh |
| 2025-12-20 | 642 GWh |
| 2025-12-21 | 618 GWh |
| 2025-12-22 | 713 GWh |
| 2025-12-23 | 723 GWh |
| 2025-12-24 | 633 GWh |
| 2025-12-25 | 568 GWh |
| 2025-12-26 | 642 GWh |
| 2025-12-27 | 627 GWh |
| 2025-12-28 | 593 GWh |
| 2025-12-29 | 673 GWh |
| 2025-12-30 | 679 GWh |
| 2025-12-31 | 640 GWh |
| 2026-01-01 | 569 GWh |
| 2026-01-02 | 663 GWh |
| 2026-01-03 | 645 GWh |
| 2026-01-04 | 612 GWh |
| 2026-01-05 | 681 GWh |
| 2026-01-06 | 624 GWh |
| 2026-01-07 | 791 GWh |
| 2026-01-08 | 795 GWh |
| 2026-01-09 | 769 GWh |
| 2026-01-10 | 671 GWh |
| 2026-01-11 | 637 GWh |
| 2026-01-12 | 763 GWh |
| 2026-01-13 | 776 GWh |
| 2026-01-14 | 774 GWh |
| 2026-01-15 | 777 GWh |
| 2026-01-16 | 774 GWh |
| 2026-01-17 | 692 GWh |
| 2026-01-18 | 650 GWh |
| 2026-01-19 | 773 GWh |
| 2026-01-20 | 792 GWh |
| 2026-01-21 | 794 GWh |
| 2026-01-22 | 767 GWh |
| 2026-01-23 | 759 GWh |
| 2026-01-24 | 690 GWh |
| 2026-01-25 | 639 GWh |
| 2026-01-26 | 768 GWh |
| 2026-01-27 | 777 GWh |
| 2026-01-28 | 783 GWh |
| 2026-01-29 | 765 GWh |
| 2026-01-30 | 737 GWh |
| 2026-01-31 | 637 GWh |
| 2026-02-01 | 631 GWh |
| 2026-02-02 | 748 GWh |
| 2026-02-03 | 765 GWh |
| 2026-02-04 | 775 GWh |
| 2026-02-05 | 745 GWh |
| 2026-02-06 | 726 GWh |
| 2026-02-07 | 659 GWh |
| 2026-02-08 | 609 GWh |
| 2026-02-09 | 727 GWh |
| 2026-02-10 | 729 GWh |
| 2026-02-11 | 716 GWh |
| 2026-02-12 | 676 GWh |
| 2026-02-13 | 717 GWh |
| 2026-02-14 | 614 GWh |
| 2026-02-15 | 586 GWh |
| 2026-02-16 | 691 GWh |
| 2026-02-17 | 686 GWh |
| 2026-02-18 | 703 GWh |
| 2026-02-19 | 687 GWh |
| 2026-02-20 | 701 GWh |
| 2026-02-21 | 612 GWh |
| 2026-02-22 | 573 GWh |
| 2026-02-23 | 675 GWh |
| 2026-02-24 | 684 GWh |
| 2026-02-25 | 685 GWh |
| 2026-02-26 | 672 GWh |
| 2026-02-27 | 675 GWh |
| 2026-02-28 | 605 GWh |
| 2026-03-01 | 561 GWh |
| 2026-03-02 | 680 GWh |
| 2026-03-03 | 704 GWh |
| 2026-03-04 | 706 GWh |
| 2026-03-05 | 719 GWh |
| 2026-03-06 | 724 GWh |
| 2026-03-07 | 627 GWh |
| 2026-03-08 | 595 GWh |
| 2026-03-09 | 703 GWh |
| 2026-03-10 | 728 GWh |
| 2026-03-11 | 707 GWh |
| 2026-03-12 | 684 GWh |
| 2026-03-13 | 671 GWh |
| 2026-03-14 | 611 GWh |
| 2026-03-15 | 555 GWh |
| 2026-03-16 | 628 GWh |
| 2026-03-17 | 595 GWh |
| 2026-03-18 | 665 GWh |
| 2026-03-19 | 631 GWh |
| 2026-03-20 | 660 GWh |
| 2026-03-21 | 606 GWh |
| 2026-03-22 | 549 GWh |
| 2026-03-23 | 651 GWh |
| 2026-03-24 | 669 GWh |
| 2026-03-25 | 654 GWh |
| 2026-03-26 | 651 GWh |
| 2026-03-27 | 654 GWh |
| 2026-03-28 | 576 GWh |
| 2026-03-29 | 513 GWh |
| 2026-03-30 | 642 GWh |
| 2026-03-31 | 637 GWh |
| 2026-04-01 | 628 GWh |
| 2026-04-02 | 561 GWh |
| 2026-04-03 | 510 GWh |
| 2026-04-04 | 511 GWh |
| 2026-04-05 | 489 GWh |
| 2026-04-06 | 531 GWh |
| 2026-04-07 | 618 GWh |
| 2026-04-08 | 649 GWh |
| 2026-04-09 | 644 GWh |
| 2026-04-10 | 637 GWh |
| 2026-04-11 | 573 GWh |
| 2026-04-12 | 537 GWh |
| 2026-04-13 | 617 GWh |
| 2026-04-14 | 632 GWh |
| 2026-04-15 | 628 GWh |
| 2026-04-16 | 632 GWh |
| 2026-04-17 | 632 GWh |
| 2026-04-18 | 554 GWh |
| 2026-04-19 | 512 GWh |
| 2026-04-20 | 618 GWh |
| 2026-04-21 | 634 GWh |
| 2026-04-22 | 626 GWh |
| 2026-04-23 | 615 GWh |
| 2026-04-24 | 626 GWh |
| 2026-04-25 | 552 GWh |
| 2026-04-26 | 506 GWh |
| 2026-04-27 | 609 GWh |
| 2026-04-28 | 629 GWh |
| 2026-04-29 | 643 GWh |
| 2026-04-30 | 627 GWh |
| 2026-05-01 | 517 GWh |
| 2026-05-02 | 531 GWh |
| 2026-05-03 | 515 GWh |
| 2026-05-04 | 610 GWh |
| 2026-05-05 | 625 GWh |
| 2026-05-06 | 626 GWh |
| 2026-05-07 | 635 GWh |
| 2026-05-08 | 630 GWh |
| 2026-05-09 | 565 GWh |
| 2026-05-10 | 516 GWh |
| 2026-05-11 | 609 GWh |
| 2026-05-12 | 632 GWh |
| 2026-05-13 | 623 GWh |
| 2026-05-14 | 620 GWh |
| 2026-05-15 | 618 GWh |
| 2026-05-16 | 546 GWh |
| 2026-05-17 | 518 GWh |
| 2026-05-18 | 615 GWh |
| 2026-05-19 | 624 GWh |
| 2026-05-20 | 635 GWh |
| 2026-05-21 | 635 GWh |
| 2026-05-22 | 639 GWh |
| 2026-05-23 | 562 GWh |
| 2026-05-24 | 525 GWh |
| 2026-05-25 | 633 GWh |
| 2026-05-26 | 662 GWh |
| 2026-05-27 | 677 GWh |
| 2026-05-28 | 689 GWh |
| 2026-05-29 | 693 GWh |
| 2026-05-30 | 615 GWh |
| 2026-05-31 | 571 GWh |
| 2026-06-01 | 687 GWh |
| 2026-06-02 | 702 GWh |
| 2026-06-03 | 684 GWh |
| 2026-06-04 | 688 GWh |
| 2026-06-05 | 664 GWh |
| 2026-06-06 | 593 GWh |
| 2026-06-07 | 550 GWh |
| 2026-06-08 | 670 GWh |
| 2026-06-09 | 675 GWh |
| 2026-06-10 | 672 GWh |
| 2026-06-11 | n/a |
| 2026-06-12 | 674 GWh |
| 2026-06-13 | 612 GWh |
| 2026-06-14 | 578 GWh |
| 2026-06-15 | 696 GWh |
| 2026-06-16 | 722 GWh |
| 2026-06-17 | 734 GWh |
| 2026-06-18 | 736 GWh |
| 2026-06-19 | 739 GWh |
| 2026-06-20 | 664 GWh |
| 2026-06-21 | 633 GWh |
| 2026-06-22 | 767 GWh |
| 2026-06-23 | 785 GWh |
| 2026-06-24 | 744 GWh |
| 2026-06-25 | 762 GWh |
| 2026-06-26 | 756 GWh |
| 2026-06-27 | 676 GWh |
| 2026-06-28 | 634 GWh |
| 2026-06-29 | 735 GWh |
| 2026-06-30 | 778 GWh |
| 2026-07-01 | 767 GWh |
| 2026-07-02 | 755 GWh |
| 2026-07-03 | 750 GWh |
| 2026-07-04 | 676 GWh |
| 2026-07-05 | 655 GWh |
| 2026-07-06 | 790 GWh |
| 2026-07-07 | 806 GWh |
| 2026-07-08 | 819 GWh |
| 2026-07-09 | 812 GWh |
| 2026-07-10 | 789 GWh |
| 2026-07-11 | 685 GWh |
| 2026-07-12 | 629 GWh |
| 2026-07-13 | 762 GWh |
| 2026-07-14 | 793 GWh |
| 2026-07-15 | 815 GWh |
| 2026-07-16 | 813 GWh |
| 2026-07-17 | 798 GWh |
| 2026-07-18 | 699 GWh |
| 2026-07-19 | 659 GWh |
| 2026-07-20 | 786 GWh |
| 2026-07-21 | 808 GWh |
| 2026-07-22 | 813 GWh |
| 2026-07-23 | 823 GWh |
| 2026-07-24 | 791 GWh |
| 2026-07-25 | 663 GWh |
| 2026-07-26 | 596 GWh |
| 2026-07-27 | 723 GWh |
| 2026-07-28 | 772 GWh |
| 2026-07-29 | 792 GWh |
| 2026-07-30 | 796 GWh |
| 2026-07-31 | 777 GWh |
| 2026-08-01 | 701 GWh |
| 2026-08-02 | 652 GWh |
| 2026-08-03 | 742 GWh |
| 2026-08-04 | 742 GWh |
| 2026-08-05 | 749 GWh |
| 2026-08-06 | 758 GWh |
| 2026-08-07 | 753 GWh |
| 2026-08-08 | 694 GWh |
| 2026-08-09 | 654 GWh |
| 2026-08-10 | 727 GWh |
| 2026-08-11 | 734 GWh |
| 2026-08-12 | 749 GWh |
| 2026-08-13 | 770 GWh |
| 2026-08-14 | 755 GWh |
| 2026-08-15 | 658 GWh |
| 2026-08-16 | 616 GWh |
| 2026-08-17 | 729 GWh |
| 2026-08-18 | 752 GWh |
| 2026-08-19 | 765 GWh |
| 2026-08-20 | 737 GWh |
| 2026-08-21 | 683 GWh |
| 2026-08-22 | 618 GWh |
| 2026-08-23 | 592 GWh |
| 2026-08-24 | 688 GWh |
| 2026-08-25 | 691 GWh |
| 2026-08-26 | 705 GWh |
| 2026-08-27 | 702 GWh |
| 2026-08-28 | 663 GWh |
| 2026-08-29 | 591 GWh |
| 2026-08-30 | 565 GWh |
| 2026-08-31 | 686 GWh |
| 2026-09-01 | 734 GWh |
| 2026-09-02 | 757 GWh |
| 2026-09-03 | 784 GWh |
| 2026-09-04 | 792 GWh |
| 2026-09-05 | 704 GWh |
| 2026-09-06 | 656 GWh |
| 2026-09-07 | 776 GWh |
| 2026-09-08 | 780 GWh |
| 2026-09-09 | 733 GWh |
| 2026-09-10 | 698 GWh |
| 2026-09-11 | 668 GWh |
| 2026-09-12 | 608 GWh |
| 2026-09-13 | 584 GWh |
| 2026-09-14 | 707 GWh |
| 2026-09-15 | 728 GWh |
| 2026-09-16 | 703 GWh |
| 2026-09-17 | 683 GWh |
| 2026-09-18 | 674 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-18. Daily totals are summed by World Power Monitor from complete Europe/Madrid local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 176 TWh | 186 TWh | Solar 26.5% | 261 |
| 2025 (partial) | 237 TWh | 248 TWh | Wind 22.2% | 363 |
| 2024 | 232 TWh | 241 TWh | Wind 24.4% | 366 |
| 2023 (partial) | 229 TWh | 242 TWh | Wind 24.8% | 364 |
| 2022 (partial) | 235 TWh | 256 TWh | Gas 29.5% | 364 |
| 2021 | 244 TWh | 243 TWh | Gas 24.9% | 365 |
| 2020 | 238 TWh | 233 TWh | Gas 25.8% | 366 |
| 2019 | 250 TWh | 243 TWh | Gas 31.3% | 365 |
| 2018 (partial) | 253 TWh | 242 TWh | Nuclear 21.7% | 364 |
| 2017 | 252 TWh | 242 TWh | Gas 23.1% | 365 |
| 2016 | 250 TWh | 240 TWh | Nuclear 22.9% | 366 |
| 2015 (partial) | 241 TWh | 240 TWh | Nuclear 21.8% | 359 |
A year is partial when ENTSO-E has not published every day; 2024 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-18.
Power Flows With Neighbours
Net totals, 2026-08-20 (20 August 2026) to 2026-09-18 (18 September 2026)Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-18.
Share and Embed
Figures as of 2026-09-19 (19 September 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Spain, credited to ENTSO-E. The image is rebuilt with the page.