Portugal Electricity Demand and Generation Mix
Portugal demand was 6,246 MW in the hour starting 5 Nov 2026, 13:00 WET (UTC+00:00). Solar was the largest source in the hour starting 5 Nov 2026, 13:00 WET (UTC+00:00), at 65% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Portugal is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 5 Nov 2026, 13:00 WET (UTC+00:00), demand in Portugal was 6,246 MW, against a day-ahead forecast of 6,352 MW.
- Solar supplied 65.2% of Portugal's generation in the hour starting 5 Nov 2026, 13:00 WET (UTC+00:00).
- The day-ahead price in Portugal averaged EUR 254.30/MWh for delivery on 2026-11-05 (5 November 2026).
- Installed generating capacity in Portugal was 22.1 GW in 2026, as reported to ENTSO-E.
- Demand in Portugal totalled 53.0 TWh in 2025.
- Wind supplied 30.8% of Portugal's generation in 2025.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 5 Nov 2026, 13:00 WET (UTC+00:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-05T13:00:00Z.
Generation by Source
Latest hour with generation by source: 5 Nov 2026, 13:00 WET (UTC+00:00)| Source | Output | Share |
|---|---|---|
| Solar | 2,755 MW | 65.2% |
| Gas | 906 MW | 21.4% |
| Bioenergy | 294 MW | 6.9% |
| Hydro | 146 MW | 3.4% |
| Wind | 124 MW | 2.9% |
| Other | 5 MW | 0.1% |
| Coal | 0 MW | 0.0% |
| Storage | -1,842 MW | charging |
| Total from these sources | 4,229 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
The sources reported in this hour add up to 38% of demand, so the generation report for Portugal looks incomplete and the shares above are shares of what was reported.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-05T13:00:00Z.
Day-Ahead Price
Delivery day 2026-11-05 (5 November 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Portugal and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-05.
Last 30 Days, Hourly
Times in UTCShow the data table (686 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-10-08T00:00Z | 5,172 MW |
| 2026-10-08T01:00Z | 5,035 MW |
| 2026-10-08T02:00Z | 4,922 MW |
| 2026-10-08T03:00Z | 4,865 MW |
| 2026-10-08T04:00Z | 4,955 MW |
| 2026-10-08T05:00Z | 5,426 MW |
| 2026-10-08T06:00Z | 6,113 MW |
| 2026-10-08T07:00Z | 6,708 MW |
| 2026-10-08T08:00Z | 6,697 MW |
| 2026-10-08T09:00Z | 6,401 MW |
| 2026-10-08T10:00Z | 6,281 MW |
| 2026-10-08T11:00Z | 6,067 MW |
| 2026-10-08T12:00Z | 5,940 MW |
| 2026-10-08T13:00Z | 6,151 MW |
| 2026-10-08T14:00Z | 6,256 MW |
| 2026-10-08T15:00Z | 6,450 MW |
| 2026-10-08T16:00Z | 6,544 MW |
| 2026-10-08T17:00Z | 6,833 MW |
| 2026-10-08T18:00Z | 7,495 MW |
| 2026-10-08T19:00Z | 7,414 MW |
| 2026-10-08T20:00Z | 6,939 MW |
| 2026-10-08T21:00Z | 6,402 MW |
| 2026-10-08T22:00Z | 5,907 MW |
| 2026-10-08T23:00Z | 5,514 MW |
| 2026-10-09T00:00Z | 5,227 MW |
| 2026-10-09T01:00Z | 5,074 MW |
| 2026-10-09T02:00Z | 4,986 MW |
| 2026-10-09T03:00Z | 4,943 MW |
| 2026-10-09T04:00Z | 5,013 MW |
| 2026-10-09T05:00Z | 5,500 MW |
| 2026-10-09T06:00Z | 6,166 MW |
| 2026-10-09T07:00Z | 6,810 MW |
| 2026-10-09T08:00Z | 6,824 MW |
| 2026-10-09T09:00Z | 6,514 MW |
| 2026-10-09T10:00Z | 6,343 MW |
| 2026-10-09T11:00Z | 6,097 MW |
| 2026-10-09T12:00Z | 5,952 MW |
| 2026-10-09T13:00Z | 6,106 MW |
| 2026-10-09T14:00Z | 6,137 MW |
| 2026-10-09T15:00Z | 6,071 MW |
| 2026-10-09T16:00Z | 6,635 MW |
| 2026-10-09T17:00Z | 7,410 MW |
| 2026-10-09T18:00Z | 7,746 MW |
| 2026-10-09T19:00Z | 7,512 MW |
| 2026-10-09T20:00Z | 7,208 MW |
| 2026-10-09T21:00Z | 6,450 MW |
| 2026-10-09T22:00Z | 5,768 MW |
| 2026-10-09T23:00Z | 5,248 MW |
| 2026-10-10T00:00Z | 4,950 MW |
| 2026-10-10T01:00Z | 4,736 MW |
| 2026-10-10T02:00Z | 4,576 MW |
| 2026-10-10T03:00Z | 4,500 MW |
| 2026-10-10T04:00Z | 4,526 MW |
| 2026-10-10T05:00Z | 4,672 MW |
| 2026-10-10T06:00Z | 4,932 MW |
| 2026-10-10T07:00Z | 5,195 MW |
| 2026-10-10T08:00Z | 5,392 MW |
| 2026-10-10T09:00Z | 5,387 MW |
| 2026-10-10T10:00Z | 5,324 MW |
| 2026-10-10T11:00Z | 5,371 MW |
| 2026-10-10T12:00Z | 5,240 MW |
| 2026-10-10T13:00Z | 5,152 MW |
| 2026-10-10T14:00Z | 5,160 MW |
| 2026-10-10T15:00Z | 5,257 MW |
| 2026-10-10T16:00Z | 5,530 MW |
| 2026-10-10T17:00Z | 5,864 MW |
| 2026-10-10T18:00Z | 6,354 MW |
| 2026-10-10T19:00Z | 6,357 MW |
| 2026-10-10T20:00Z | 5,957 MW |
| 2026-10-10T21:00Z | 5,640 MW |
| 2026-10-10T22:00Z | 5,233 MW |
| 2026-10-10T23:00Z | 4,896 MW |
| 2026-10-11T00:00Z | 4,636 MW |
| 2026-10-11T01:00Z | 4,455 MW |
| 2026-10-11T02:00Z | 4,317 MW |
| 2026-10-11T03:00Z | 4,246 MW |
| 2026-10-11T04:00Z | 4,231 MW |
| 2026-10-11T05:00Z | 4,374 MW |
| 2026-10-11T06:00Z | 4,455 MW |
| 2026-10-11T07:00Z | 4,698 MW |
| 2026-10-11T08:00Z | 5,079 MW |
| 2026-10-11T09:00Z | 5,302 MW |
| 2026-10-11T10:00Z | 5,418 MW |
| 2026-10-11T11:00Z | 5,526 MW |
| 2026-10-11T12:00Z | 5,320 MW |
| 2026-10-11T13:00Z | 5,184 MW |
| 2026-10-11T14:00Z | 5,129 MW |
| 2026-10-11T15:00Z | 5,202 MW |
| 2026-10-11T16:00Z | 5,347 MW |
| 2026-10-11T17:00Z | 5,648 MW |
| 2026-10-11T18:00Z | 6,267 MW |
| 2026-10-11T19:00Z | 6,305 MW |
| 2026-10-11T20:00Z | 5,965 MW |
| 2026-10-11T21:00Z | 5,583 MW |
| 2026-10-11T22:00Z | 5,156 MW |
| 2026-10-11T23:00Z | 4,791 MW |
| 2026-10-12T00:00Z | 4,557 MW |
| 2026-10-12T01:00Z | 4,390 MW |
| 2026-10-12T02:00Z | 4,285 MW |
| 2026-10-12T03:00Z | 4,267 MW |
| 2026-10-12T04:00Z | 4,412 MW |
| 2026-10-12T05:00Z | 4,960 MW |
| 2026-10-12T06:00Z | 5,713 MW |
| 2026-10-12T07:00Z | 6,531 MW |
| 2026-10-12T08:00Z | 6,758 MW |
| 2026-10-12T09:00Z | 6,524 MW |
| 2026-10-12T10:00Z | 6,366 MW |
| 2026-10-12T11:00Z | 6,122 MW |
| 2026-10-12T12:00Z | 6,026 MW |
| 2026-10-12T13:00Z | 6,144 MW |
| 2026-10-12T14:00Z | 6,255 MW |
| 2026-10-12T15:00Z | 6,357 MW |
| 2026-10-12T16:00Z | 6,514 MW |
| 2026-10-12T17:00Z | 6,843 MW |
| 2026-10-12T18:00Z | 7,500 MW |
| 2026-10-12T19:00Z | 7,369 MW |
| 2026-10-12T20:00Z | 6,843 MW |
| 2026-10-12T21:00Z | 6,294 MW |
| 2026-10-12T22:00Z | 5,690 MW |
| 2026-10-12T23:00Z | 5,339 MW |
| 2026-10-13T00:00Z | 5,058 MW |
| 2026-10-13T01:00Z | 4,866 MW |
| 2026-10-13T02:00Z | 4,747 MW |
| 2026-10-13T03:00Z | 4,658 MW |
| 2026-10-13T04:00Z | 4,681 MW |
| 2026-10-13T05:00Z | 5,168 MW |
| 2026-10-13T06:00Z | 5,907 MW |
| 2026-10-13T07:00Z | 6,706 MW |
| 2026-10-13T08:00Z | 6,941 MW |
| 2026-10-13T09:00Z | 6,677 MW |
| 2026-10-13T10:00Z | 6,470 MW |
| 2026-10-13T11:00Z | 6,158 MW |
| 2026-10-13T12:00Z | 6,072 MW |
| 2026-10-13T13:00Z | 6,197 MW |
| 2026-10-13T14:00Z | 6,345 MW |
| 2026-10-13T15:00Z | 6,524 MW |
| 2026-10-13T16:00Z | 6,730 MW |
| 2026-10-13T17:00Z | 6,996 MW |
| 2026-10-13T18:00Z | 7,598 MW |
| 2026-10-13T19:00Z | 7,429 MW |
| 2026-10-13T20:00Z | 6,918 MW |
| 2026-10-13T21:00Z | 6,374 MW |
| 2026-10-13T22:00Z | 5,785 MW |
| 2026-10-13T23:00Z | 5,314 MW |
| 2026-10-14T00:00Z | 5,014 MW |
| 2026-10-14T01:00Z | 4,810 MW |
| 2026-10-14T02:00Z | 4,684 MW |
| 2026-10-14T03:00Z | 4,620 MW |
| 2026-10-14T04:00Z | 4,697 MW |
| 2026-10-14T05:00Z | 5,132 MW |
| 2026-10-14T06:00Z | 5,828 MW |
| 2026-10-14T07:00Z | 6,632 MW |
| 2026-10-14T08:00Z | 6,720 MW |
| 2026-10-14T09:00Z | 6,478 MW |
| 2026-10-14T10:00Z | 6,401 MW |
| 2026-10-14T11:00Z | 6,223 MW |
| 2026-10-14T12:00Z | 6,164 MW |
| 2026-10-14T13:00Z | 6,357 MW |
| 2026-10-14T14:00Z | 6,483 MW |
| 2026-10-14T15:00Z | 6,627 MW |
| 2026-10-14T16:00Z | 6,751 MW |
| 2026-10-14T17:00Z | 7,040 MW |
| 2026-10-14T18:00Z | 7,628 MW |
| 2026-10-14T19:00Z | 7,445 MW |
| 2026-10-14T20:00Z | 6,909 MW |
| 2026-10-14T21:00Z | 6,348 MW |
| 2026-10-14T22:00Z | 5,782 MW |
| 2026-10-14T23:00Z | 5,361 MW |
| 2026-10-15T00:00Z | 5,068 MW |
| 2026-10-15T01:00Z | 4,856 MW |
| 2026-10-15T02:00Z | 4,758 MW |
| 2026-10-15T03:00Z | 4,682 MW |
| 2026-10-15T04:00Z | 4,763 MW |
| 2026-10-15T05:00Z | 5,211 MW |
| 2026-10-15T06:00Z | 5,923 MW |
| 2026-10-15T07:00Z | 6,703 MW |
| 2026-10-15T08:00Z | 6,840 MW |
| 2026-10-15T09:00Z | 6,649 MW |
| 2026-10-15T10:00Z | 6,541 MW |
| 2026-10-15T11:00Z | 6,301 MW |
| 2026-10-15T12:00Z | 6,163 MW |
| 2026-10-15T13:00Z | 6,348 MW |
| 2026-10-15T14:00Z | 6,385 MW |
| 2026-10-15T15:00Z | 6,577 MW |
| 2026-10-15T16:00Z | 6,722 MW |
| 2026-10-15T17:00Z | 7,025 MW |
| 2026-10-15T18:00Z | 7,601 MW |
| 2026-10-15T19:00Z | 7,420 MW |
| 2026-10-15T20:00Z | 6,892 MW |
| 2026-10-15T21:00Z | 6,384 MW |
| 2026-10-15T22:00Z | 5,821 MW |
| 2026-10-15T23:00Z | 5,443 MW |
| 2026-10-16T00:00Z | 5,149 MW |
| 2026-10-16T01:00Z | 4,915 MW |
| 2026-10-16T02:00Z | 4,788 MW |
| 2026-10-16T03:00Z | 4,725 MW |
| 2026-10-16T04:00Z | 4,804 MW |
| 2026-10-16T05:00Z | 5,241 MW |
| 2026-10-16T06:00Z | 5,954 MW |
| 2026-10-16T07:00Z | 6,675 MW |
| 2026-10-16T08:00Z | 6,767 MW |
| 2026-10-16T09:00Z | 6,683 MW |
| 2026-10-16T10:00Z | 6,585 MW |
| 2026-10-16T11:00Z | 6,347 MW |
| 2026-10-16T12:00Z | 6,240 MW |
| 2026-10-16T13:00Z | 6,394 MW |
| 2026-10-16T14:00Z | 6,436 MW |
| 2026-10-16T15:00Z | 6,500 MW |
| 2026-10-16T16:00Z | 6,656 MW |
| 2026-10-16T17:00Z | 6,918 MW |
| 2026-10-16T18:00Z | 7,452 MW |
| 2026-10-16T19:00Z | 7,260 MW |
| 2026-10-16T20:00Z | 6,760 MW |
| 2026-10-16T21:00Z | 6,270 MW |
| 2026-10-16T22:00Z | 5,793 MW |
| 2026-10-16T23:00Z | 5,481 MW |
| 2026-10-17T00:00Z | 5,198 MW |
| 2026-10-17T01:00Z | 5,001 MW |
| 2026-10-17T02:00Z | 4,823 MW |
| 2026-10-17T03:00Z | 4,712 MW |
| 2026-10-17T04:00Z | 4,696 MW |
| 2026-10-17T05:00Z | 4,874 MW |
| 2026-10-17T06:00Z | 5,101 MW |
| 2026-10-17T07:00Z | 5,454 MW |
| 2026-10-17T08:00Z | 5,632 MW |
| 2026-10-17T09:00Z | 5,605 MW |
| 2026-10-17T10:00Z | 5,576 MW |
| 2026-10-17T11:00Z | 5,586 MW |
| 2026-10-17T12:00Z | 5,418 MW |
| 2026-10-17T13:00Z | 5,309 MW |
| 2026-10-17T14:00Z | 5,333 MW |
| 2026-10-17T15:00Z | 5,348 MW |
| 2026-10-17T16:00Z | 5,669 MW |
| 2026-10-17T17:00Z | 6,101 MW |
| 2026-10-17T18:00Z | 6,617 MW |
| 2026-10-17T19:00Z | 6,441 MW |
| 2026-10-17T20:00Z | 6,024 MW |
| 2026-10-17T21:00Z | 5,724 MW |
| 2026-10-17T22:00Z | 5,339 MW |
| 2026-10-17T23:00Z | 5,018 MW |
| 2026-10-18T00:00Z | 4,762 MW |
| 2026-10-18T01:00Z | 4,571 MW |
| 2026-10-18T02:00Z | 4,438 MW |
| 2026-10-18T03:00Z | 4,350 MW |
| 2026-10-18T04:00Z | 4,355 MW |
| 2026-10-18T05:00Z | 4,458 MW |
| 2026-10-18T06:00Z | 4,584 MW |
| 2026-10-18T07:00Z | 4,790 MW |
| 2026-10-18T08:00Z | 4,937 MW |
| 2026-10-18T09:00Z | 4,929 MW |
| 2026-10-18T10:00Z | 5,013 MW |
| 2026-10-18T11:00Z | 5,106 MW |
| 2026-10-18T12:00Z | 4,859 MW |
| 2026-10-18T13:00Z | 4,692 MW |
| 2026-10-18T14:00Z | 4,652 MW |
| 2026-10-18T15:00Z | 4,827 MW |
| 2026-10-18T16:00Z | 5,212 MW |
| 2026-10-18T17:00Z | 5,816 MW |
| 2026-10-18T18:00Z | 6,472 MW |
| 2026-10-18T19:00Z | 6,404 MW |
| 2026-10-18T20:00Z | 5,980 MW |
| 2026-10-18T21:00Z | 5,616 MW |
| 2026-10-18T22:00Z | 5,244 MW |
| 2026-10-18T23:00Z | 5,007 MW |
| 2026-10-19T00:00Z | 4,764 MW |
| 2026-10-19T01:00Z | 4,597 MW |
| 2026-10-19T02:00Z | 4,464 MW |
| 2026-10-19T03:00Z | 4,374 MW |
| 2026-10-19T04:00Z | 4,504 MW |
| 2026-10-19T05:00Z | 4,999 MW |
| 2026-10-19T06:00Z | 5,671 MW |
| 2026-10-19T07:00Z | 6,352 MW |
| 2026-10-19T08:00Z | 6,444 MW |
| 2026-10-19T09:00Z | 6,211 MW |
| 2026-10-19T10:00Z | 6,119 MW |
| 2026-10-19T11:00Z | 5,841 MW |
| 2026-10-19T12:00Z | 5,667 MW |
| 2026-10-19T13:00Z | 5,811 MW |
| 2026-10-19T14:00Z | 5,911 MW |
| 2026-10-19T15:00Z | 6,167 MW |
| 2026-10-19T16:00Z | 6,414 MW |
| 2026-10-19T17:00Z | 6,814 MW |
| 2026-10-19T18:00Z | 7,524 MW |
| 2026-10-19T19:00Z | 7,298 MW |
| 2026-10-19T20:00Z | 6,792 MW |
| 2026-10-19T21:00Z | 6,240 MW |
| 2026-10-19T22:00Z | 5,670 MW |
| 2026-10-19T23:00Z | 5,228 MW |
| 2026-10-20T00:00Z | 4,934 MW |
| 2026-10-20T01:00Z | 4,738 MW |
| 2026-10-20T02:00Z | 4,620 MW |
| 2026-10-20T03:00Z | 4,565 MW |
| 2026-10-20T04:00Z | 4,673 MW |
| 2026-10-20T05:00Z | 5,122 MW |
| 2026-10-20T06:00Z | 5,856 MW |
| 2026-10-20T07:00Z | 6,622 MW |
| 2026-10-20T08:00Z | 6,882 MW |
| 2026-10-20T09:00Z | 6,735 MW |
| 2026-10-20T10:00Z | 6,733 MW |
| 2026-10-20T11:00Z | 6,318 MW |
| 2026-10-20T12:00Z | 6,119 MW |
| 2026-10-20T13:00Z | 6,256 MW |
| 2026-10-20T14:00Z | 6,258 MW |
| 2026-10-20T15:00Z | 6,523 MW |
| 2026-10-20T16:00Z | 6,577 MW |
| 2026-10-20T17:00Z | 6,915 MW |
| 2026-10-20T18:00Z | 7,563 MW |
| 2026-10-20T19:00Z | 7,383 MW |
| 2026-10-20T20:00Z | 6,906 MW |
| 2026-10-20T21:00Z | 6,356 MW |
| 2026-10-20T22:00Z | 5,790 MW |
| 2026-10-20T23:00Z | 5,491 MW |
| 2026-10-21T00:00Z | 5,208 MW |
| 2026-10-21T01:00Z | 5,036 MW |
| 2026-10-21T02:00Z | 4,914 MW |
| 2026-10-21T03:00Z | 4,843 MW |
| 2026-10-21T04:00Z | 4,907 MW |
| 2026-10-21T05:00Z | 5,370 MW |
| 2026-10-21T06:00Z | 6,158 MW |
| 2026-10-21T07:00Z | 6,874 MW |
| 2026-10-21T08:00Z | 7,015 MW |
| 2026-10-21T09:00Z | 6,654 MW |
| 2026-10-21T10:00Z | 6,457 MW |
| 2026-10-21T11:00Z | 6,175 MW |
| 2026-10-21T12:00Z | 6,012 MW |
| 2026-10-21T13:00Z | 6,144 MW |
| 2026-10-21T14:00Z | 6,216 MW |
| 2026-10-21T15:00Z | 6,420 MW |
| 2026-10-21T16:00Z | 6,575 MW |
| 2026-10-21T17:00Z | 6,941 MW |
| 2026-10-21T18:00Z | 7,631 MW |
| 2026-10-21T19:00Z | 7,471 MW |
| 2026-10-21T20:00Z | 6,989 MW |
| 2026-10-21T21:00Z | 6,436 MW |
| 2026-10-21T22:00Z | 5,836 MW |
| 2026-10-21T23:00Z | 5,473 MW |
| 2026-10-22T00:00Z | 5,170 MW |
| 2026-10-22T01:00Z | 4,951 MW |
| 2026-10-22T02:00Z | 4,841 MW |
| 2026-10-22T03:00Z | 4,788 MW |
| 2026-10-22T04:00Z | 4,935 MW |
| 2026-10-22T05:00Z | 5,455 MW |
| 2026-10-22T06:00Z | 6,212 MW |
| 2026-10-22T07:00Z | 6,870 MW |
| 2026-10-22T08:00Z | 6,970 MW |
| 2026-10-22T09:00Z | 6,656 MW |
| 2026-10-22T10:00Z | 6,470 MW |
| 2026-10-22T11:00Z | 6,189 MW |
| 2026-10-22T12:00Z | 6,082 MW |
| 2026-10-22T13:00Z | 6,244 MW |
| 2026-10-22T14:00Z | 6,396 MW |
| 2026-10-22T15:00Z | 6,671 MW |
| 2026-10-22T16:00Z | 6,778 MW |
| 2026-10-22T17:00Z | 7,130 MW |
| 2026-10-22T18:00Z | 7,828 MW |
| 2026-10-22T19:00Z | 7,643 MW |
| 2026-10-22T20:00Z | 7,172 MW |
| 2026-10-22T21:00Z | 6,602 MW |
| 2026-10-22T22:00Z | 6,042 MW |
| 2026-10-22T23:00Z | 5,687 MW |
| 2026-10-23T00:00Z | 5,372 MW |
| 2026-10-23T01:00Z | 5,169 MW |
| 2026-10-23T02:00Z | 5,053 MW |
| 2026-10-23T03:00Z | 4,968 MW |
| 2026-10-23T04:00Z | 5,037 MW |
| 2026-10-23T05:00Z | 5,472 MW |
| 2026-10-23T06:00Z | 6,233 MW |
| 2026-10-23T07:00Z | 7,005 MW |
| 2026-10-23T08:00Z | 7,074 MW |
| 2026-10-23T09:00Z | 6,757 MW |
| 2026-10-23T10:00Z | 6,612 MW |
| 2026-10-23T11:00Z | 6,322 MW |
| 2026-10-23T12:00Z | 6,108 MW |
| 2026-10-23T13:00Z | 6,258 MW |
| 2026-10-23T14:00Z | 6,289 MW |
| 2026-10-23T15:00Z | 6,490 MW |
| 2026-10-23T16:00Z | 6,618 MW |
| 2026-10-23T17:00Z | 6,995 MW |
| 2026-10-23T18:00Z | 7,602 MW |
| 2026-10-23T19:00Z | 7,427 MW |
| 2026-10-23T20:00Z | 6,994 MW |
| 2026-10-23T21:00Z | 6,490 MW |
| 2026-10-23T22:00Z | 5,906 MW |
| 2026-10-23T23:00Z | 5,520 MW |
| 2026-10-24T00:00Z | 5,154 MW |
| 2026-10-24T01:00Z | 4,879 MW |
| 2026-10-24T02:00Z | 4,718 MW |
| 2026-10-24T03:00Z | 4,674 MW |
| 2026-10-24T04:00Z | 4,721 MW |
| 2026-10-24T05:00Z | 4,865 MW |
| 2026-10-24T06:00Z | 5,147 MW |
| 2026-10-24T07:00Z | 5,514 MW |
| 2026-10-24T08:00Z | 5,729 MW |
| 2026-10-24T09:00Z | 5,644 MW |
| 2026-10-24T10:00Z | 5,552 MW |
| 2026-10-24T11:00Z | 5,528 MW |
| 2026-10-24T12:00Z | 5,295 MW |
| 2026-10-24T13:00Z | 5,147 MW |
| 2026-10-24T14:00Z | 5,137 MW |
| 2026-10-24T15:00Z | 5,299 MW |
| 2026-10-24T16:00Z | 5,611 MW |
| 2026-10-24T17:00Z | 6,089 MW |
| 2026-10-24T18:00Z | 6,767 MW |
| 2026-10-24T19:00Z | 6,616 MW |
| 2026-10-24T20:00Z | 6,183 MW |
| 2026-10-24T21:00Z | 5,778 MW |
| 2026-10-24T22:00Z | 5,430 MW |
| 2026-10-24T23:00Z | 5,060 MW |
| 2026-10-25T00:00Z | 4,776 MW |
| 2026-10-25T01:00Z | 4,555 MW |
| 2026-10-25T02:00Z | 4,420 MW |
| 2026-10-25T03:00Z | 4,317 MW |
| 2026-10-25T04:00Z | 4,295 MW |
| 2026-10-25T05:00Z | 4,308 MW |
| 2026-10-25T06:00Z | 4,426 MW |
| 2026-10-25T07:00Z | 4,571 MW |
| 2026-10-25T08:00Z | 4,976 MW |
| 2026-10-25T09:00Z | 5,214 MW |
| 2026-10-25T10:00Z | 5,366 MW |
| 2026-10-25T11:00Z | 5,500 MW |
| 2026-10-25T12:00Z | 5,504 MW |
| 2026-10-25T13:00Z | 5,208 MW |
| 2026-10-25T14:00Z | 5,064 MW |
| 2026-10-25T15:00Z | 5,148 MW |
| 2026-10-25T16:00Z | 5,381 MW |
| 2026-10-25T17:00Z | 5,797 MW |
| 2026-10-25T18:00Z | 6,459 MW |
| 2026-10-25T19:00Z | 6,693 MW |
| 2026-10-25T20:00Z | 6,451 MW |
| 2026-10-25T21:00Z | 6,018 MW |
| 2026-10-25T22:00Z | 5,633 MW |
| 2026-10-25T23:00Z | 5,201 MW |
| 2026-10-26T00:00Z | 4,899 MW |
| 2026-10-26T01:00Z | 4,666 MW |
| 2026-10-26T02:00Z | 4,503 MW |
| 2026-10-26T03:00Z | 4,358 MW |
| 2026-10-26T04:00Z | 4,353 MW |
| 2026-10-26T05:00Z | 4,499 MW |
| 2026-10-26T06:00Z | 5,021 MW |
| 2026-10-26T07:00Z | 5,795 MW |
| 2026-10-26T08:00Z | 6,515 MW |
| 2026-10-26T09:00Z | 6,609 MW |
| 2026-10-26T10:00Z | 6,431 MW |
| 2026-10-26T11:00Z | 6,402 MW |
| 2026-10-26T12:00Z | 6,278 MW |
| 2026-10-26T13:00Z | 6,248 MW |
| 2026-10-26T14:00Z | 6,492 MW |
| 2026-10-26T15:00Z | 6,609 MW |
| 2026-10-26T16:00Z | 6,743 MW |
| 2026-10-26T17:00Z | 6,974 MW |
| 2026-10-26T18:00Z | 7,475 MW |
| 2026-10-26T19:00Z | 7,616 MW |
| 2026-10-26T20:00Z | 7,368 MW |
| 2026-10-26T21:00Z | 6,929 MW |
| 2026-10-26T22:00Z | 6,339 MW |
| 2026-10-26T23:00Z | 5,741 MW |
| 2026-10-27T00:00Z | 5,358 MW |
| 2026-10-27T01:00Z | 5,065 MW |
| 2026-10-27T02:00Z | 4,868 MW |
| 2026-10-27T03:00Z | 4,768 MW |
| 2026-10-27T04:00Z | 4,804 MW |
| 2026-10-27T05:00Z | 4,926 MW |
| 2026-10-27T06:00Z | 5,412 MW |
| 2026-10-27T07:00Z | 6,120 MW |
| 2026-10-27T08:00Z | 6,847 MW |
| 2026-10-27T09:00Z | 7,001 MW |
| 2026-10-27T10:00Z | 6,955 MW |
| 2026-10-27T11:00Z | 7,110 MW |
| 2026-10-27T12:00Z | 6,935 MW |
| 2026-10-27T13:00Z | 6,891 MW |
| 2026-10-27T14:00Z | 7,130 MW |
| 2026-10-27T15:00Z | 7,181 MW |
| 2026-10-27T16:00Z | 7,187 MW |
| 2026-10-27T17:00Z | 7,343 MW |
| 2026-10-27T18:00Z | 7,813 MW |
| 2026-10-27T19:00Z | 8,007 MW |
| 2026-10-27T20:00Z | 7,709 MW |
| 2026-10-27T21:00Z | 7,186 MW |
| 2026-10-27T22:00Z | 6,584 MW |
| 2026-10-27T23:00Z | 5,989 MW |
| 2026-10-28T00:00Z | 5,479 MW |
| 2026-10-28T01:00Z | 5,167 MW |
| 2026-10-28T02:00Z | 4,968 MW |
| 2026-10-28T03:00Z | 4,857 MW |
| 2026-10-28T04:00Z | 4,778 MW |
| 2026-10-28T05:00Z | 4,918 MW |
| 2026-10-28T06:00Z | 5,416 MW |
| 2026-10-28T07:00Z | 6,195 MW |
| 2026-10-28T08:00Z | 6,973 MW |
| 2026-10-28T09:00Z | 7,175 MW |
| 2026-10-28T10:00Z | 7,000 MW |
| 2026-10-28T11:00Z | 6,843 MW |
| 2026-10-28T12:00Z | 6,635 MW |
| 2026-10-28T13:00Z | 6,558 MW |
| 2026-10-28T14:00Z | 6,731 MW |
| 2026-10-28T15:00Z | 6,904 MW |
| 2026-10-28T16:00Z | 7,145 MW |
| 2026-10-28T17:00Z | 7,289 MW |
| 2026-10-28T18:00Z | 7,745 MW |
| 2026-10-28T19:00Z | 7,888 MW |
| 2026-10-28T20:00Z | 7,608 MW |
| 2026-10-28T21:00Z | 7,121 MW |
| 2026-10-28T22:00Z | 6,549 MW |
| 2026-10-28T23:00Z | 5,941 MW |
| 2026-10-29T00:00Z | 5,552 MW |
| 2026-10-29T01:00Z | 5,246 MW |
| 2026-10-29T02:00Z | 5,044 MW |
| 2026-10-29T03:00Z | 4,945 MW |
| 2026-10-29T04:00Z | 4,862 MW |
| 2026-10-29T05:00Z | 4,915 MW |
| 2026-10-29T06:00Z | 5,394 MW |
| 2026-10-29T07:00Z | 6,084 MW |
| 2026-10-29T08:00Z | 6,756 MW |
| 2026-10-29T09:00Z | 6,778 MW |
| 2026-10-29T10:00Z | 6,585 MW |
| 2026-10-29T11:00Z | 6,582 MW |
| 2026-10-29T12:00Z | 6,423 MW |
| 2026-10-29T13:00Z | 6,409 MW |
| 2026-10-29T14:00Z | 6,664 MW |
| 2026-10-29T15:00Z | 6,757 MW |
| 2026-10-29T16:00Z | 6,984 MW |
| 2026-10-29T17:00Z | 7,232 MW |
| 2026-10-29T18:00Z | 7,639 MW |
| 2026-10-29T19:00Z | 7,782 MW |
| 2026-10-29T20:00Z | 7,544 MW |
| 2026-10-29T21:00Z | 7,065 MW |
| 2026-10-29T22:00Z | 6,526 MW |
| 2026-10-29T23:00Z | 5,955 MW |
| 2026-10-30T00:00Z | 5,477 MW |
| 2026-10-30T01:00Z | 5,165 MW |
| 2026-10-30T02:00Z | 4,957 MW |
| 2026-10-30T03:00Z | 4,823 MW |
| 2026-10-30T04:00Z | 4,789 MW |
| 2026-10-30T05:00Z | 4,891 MW |
| 2026-10-30T06:00Z | 5,360 MW |
| 2026-10-30T07:00Z | 5,996 MW |
| 2026-10-30T08:00Z | 6,672 MW |
| 2026-10-30T09:00Z | 6,813 MW |
| 2026-10-30T10:00Z | 6,776 MW |
| 2026-10-30T11:00Z | 6,877 MW |
| 2026-10-30T12:00Z | 6,773 MW |
| 2026-10-30T13:00Z | 6,846 MW |
| 2026-10-30T14:00Z | 6,990 MW |
| 2026-10-30T15:00Z | 6,998 MW |
| 2026-10-30T16:00Z | 7,172 MW |
| 2026-10-30T17:00Z | 7,352 MW |
| 2026-10-30T18:00Z | 7,593 MW |
| 2026-10-30T19:00Z | 7,586 MW |
| 2026-10-30T20:00Z | 7,337 MW |
| 2026-10-30T21:00Z | 6,864 MW |
| 2026-10-30T22:00Z | 6,364 MW |
| 2026-10-30T23:00Z | 5,852 MW |
| 2026-10-31T00:00Z | 5,485 MW |
| 2026-10-31T01:00Z | 5,190 MW |
| 2026-10-31T02:00Z | 5,005 MW |
| 2026-10-31T03:00Z | 4,878 MW |
| 2026-10-31T04:00Z | 4,775 MW |
| 2026-10-31T05:00Z | 4,787 MW |
| 2026-10-31T06:00Z | 4,924 MW |
| 2026-10-31T07:00Z | 5,104 MW |
| 2026-10-31T08:00Z | 5,359 MW |
| 2026-10-31T09:00Z | 5,386 MW |
| 2026-10-31T10:00Z | 5,352 MW |
| 2026-10-31T11:00Z | 5,399 MW |
| 2026-10-31T12:00Z | 5,520 MW |
| 2026-10-31T13:00Z | 5,440 MW |
| 2026-10-31T14:00Z | 5,380 MW |
| 2026-10-31T15:00Z | 5,575 MW |
| 2026-10-31T16:00Z | 5,747 MW |
| 2026-10-31T17:00Z | 6,057 MW |
| 2026-10-31T18:00Z | 6,556 MW |
| 2026-10-31T19:00Z | 6,603 MW |
| 2026-10-31T20:00Z | 6,329 MW |
| 2026-10-31T21:00Z | 5,923 MW |
| 2026-10-31T22:00Z | 5,545 MW |
| 2026-10-31T23:00Z | 5,260 MW |
| 2026-11-01T00:00Z | 4,948 MW |
| 2026-11-01T01:00Z | 4,712 MW |
| 2026-11-01T02:00Z | 4,546 MW |
| 2026-11-01T03:00Z | 4,422 MW |
| 2026-11-01T04:00Z | 4,377 MW |
| 2026-11-01T05:00Z | 4,352 MW |
| 2026-11-01T06:00Z | 4,451 MW |
| 2026-11-01T07:00Z | 4,472 MW |
| 2026-11-01T08:00Z | 4,685 MW |
| 2026-11-01T09:00Z | 4,830 MW |
| 2026-11-01T10:00Z | 4,902 MW |
| 2026-11-01T11:00Z | 5,040 MW |
| 2026-11-01T12:00Z | 5,177 MW |
| 2026-11-01T13:00Z | 5,051 MW |
| 2026-11-01T14:00Z | 4,987 MW |
| 2026-11-01T15:00Z | 5,129 MW |
| 2026-11-01T16:00Z | 5,361 MW |
| 2026-11-01T17:00Z | 5,786 MW |
| 2026-11-01T18:00Z | 6,311 MW |
| 2026-11-01T19:00Z | 6,512 MW |
| 2026-11-01T20:00Z | 6,330 MW |
| 2026-11-01T21:00Z | 6,009 MW |
| 2026-11-01T22:00Z | 5,651 MW |
| 2026-11-01T23:00Z | 5,233 MW |
| 2026-11-02T00:00Z | 4,917 MW |
| 2026-11-02T01:00Z | 4,708 MW |
| 2026-11-02T02:00Z | 4,600 MW |
| 2026-11-02T03:00Z | 4,518 MW |
| 2026-11-02T04:00Z | 4,514 MW |
| 2026-11-02T05:00Z | 4,650 MW |
| 2026-11-02T06:00Z | 5,189 MW |
| 2026-11-02T07:00Z | 5,845 MW |
| 2026-11-02T08:00Z | 6,495 MW |
| 2026-11-02T09:00Z | 6,569 MW |
| 2026-11-02T10:00Z | 6,393 MW |
| 2026-11-02T11:00Z | 6,387 MW |
| 2026-11-02T12:00Z | 6,281 MW |
| 2026-11-02T13:00Z | 6,308 MW |
| 2026-11-02T14:00Z | 6,619 MW |
| 2026-11-02T15:00Z | 6,903 MW |
| 2026-11-02T16:00Z | 6,992 MW |
| 2026-11-02T17:00Z | 7,189 MW |
| 2026-11-02T18:00Z | 7,574 MW |
| 2026-11-02T19:00Z | 7,751 MW |
| 2026-11-02T20:00Z | 7,498 MW |
| 2026-11-02T21:00Z | 7,031 MW |
| 2026-11-02T22:00Z | 6,464 MW |
| 2026-11-02T23:00Z | 5,904 MW |
| 2026-11-03T00:00Z | 5,511 MW |
| 2026-11-03T01:00Z | 5,185 MW |
| 2026-11-03T02:00Z | 4,937 MW |
| 2026-11-03T03:00Z | 4,838 MW |
| 2026-11-03T04:00Z | 4,830 MW |
| 2026-11-03T05:00Z | 4,935 MW |
| 2026-11-03T06:00Z | 5,448 MW |
| 2026-11-03T07:00Z | 6,133 MW |
| 2026-11-03T08:00Z | 6,587 MW |
| 2026-11-03T09:00Z | 6,594 MW |
| 2026-11-03T10:00Z | 6,397 MW |
| 2026-11-03T11:00Z | 6,353 MW |
| 2026-11-03T12:00Z | 6,231 MW |
| 2026-11-03T13:00Z | 6,193 MW |
| 2026-11-03T14:00Z | 6,468 MW |
| 2026-11-03T15:00Z | 6,703 MW |
| 2026-11-03T16:00Z | 7,013 MW |
| 2026-11-03T17:00Z | 7,207 MW |
| 2026-11-03T18:00Z | 7,683 MW |
| 2026-11-03T19:00Z | 7,889 MW |
| 2026-11-03T20:00Z | 7,674 MW |
| 2026-11-03T21:00Z | 7,223 MW |
| 2026-11-03T22:00Z | 6,598 MW |
| 2026-11-03T23:00Z | 5,944 MW |
| 2026-11-04T00:00Z | 5,425 MW |
| 2026-11-04T01:00Z | 5,096 MW |
| 2026-11-04T02:00Z | 4,860 MW |
| 2026-11-04T03:00Z | 4,763 MW |
| 2026-11-04T04:00Z | 4,737 MW |
| 2026-11-04T05:00Z | 4,838 MW |
| 2026-11-04T06:00Z | 5,318 MW |
| 2026-11-04T07:00Z | 5,968 MW |
| 2026-11-04T08:00Z | 6,450 MW |
| 2026-11-04T09:00Z | 6,441 MW |
| 2026-11-04T10:00Z | 6,343 MW |
| 2026-11-04T11:00Z | 6,336 MW |
| 2026-11-04T12:00Z | 6,203 MW |
| 2026-11-04T13:00Z | 6,190 MW |
| 2026-11-04T14:00Z | 6,486 MW |
| 2026-11-04T15:00Z | 6,629 MW |
| 2026-11-04T16:00Z | 6,975 MW |
| 2026-11-04T17:00Z | 7,331 MW |
| 2026-11-04T18:00Z | 7,810 MW |
| 2026-11-04T19:00Z | 8,040 MW |
| 2026-11-04T20:00Z | 7,823 MW |
| 2026-11-04T21:00Z | 7,336 MW |
| 2026-11-04T22:00Z | 6,718 MW |
| 2026-11-04T23:00Z | 6,100 MW |
| 2026-11-05T00:00Z | 5,599 MW |
| 2026-11-05T01:00Z | 5,246 MW |
| 2026-11-05T02:00Z | 5,022 MW |
| 2026-11-05T03:00Z | 4,912 MW |
| 2026-11-05T04:00Z | 4,838 MW |
| 2026-11-05T05:00Z | 4,942 MW |
| 2026-11-05T06:00Z | 5,439 MW |
| 2026-11-05T07:00Z | 6,169 MW |
| 2026-11-05T08:00Z | 6,658 MW |
| 2026-11-05T09:00Z | 6,574 MW |
| 2026-11-05T10:00Z | 6,513 MW |
| 2026-11-05T11:00Z | 6,479 MW |
| 2026-11-05T12:00Z | 6,252 MW |
| 2026-11-05T13:00Z | 6,246 MW |
Show the data table (686 rows)
| Hour starting (UTC) | Wind | Solar | Gas | Storage | Hydro |
|---|---|---|---|---|---|
| 2026-10-08T00:00Z | 2,162 MW | 0 MW | 691 MW | 223 MW | 310 MW |
| 2026-10-08T01:00Z | 2,079 MW | 0 MW | 688 MW | 138 MW | 302 MW |
| 2026-10-08T02:00Z | 2,083 MW | 0 MW | 679 MW | 112 MW | 316 MW |
| 2026-10-08T03:00Z | 2,094 MW | 0 MW | 684 MW | 113 MW | 321 MW |
| 2026-10-08T04:00Z | 2,149 MW | 0 MW | 709 MW | 179 MW | 350 MW |
| 2026-10-08T05:00Z | 2,326 MW | 0 MW | 706 MW | 743 MW | 864 MW |
| 2026-10-08T06:00Z | 2,461 MW | 21 MW | 746 MW | 1,168 MW | 1,411 MW |
| 2026-10-08T07:00Z | 2,516 MW | 595 MW | 655 MW | -226 MW | 534 MW |
| 2026-10-08T08:00Z | 2,363 MW | 1,620 MW | 600 MW | -1,972 MW | 272 MW |
| 2026-10-08T09:00Z | 2,059 MW | 2,057 MW | 605 MW | -2,112 MW | 237 MW |
| 2026-10-08T10:00Z | 1,775 MW | 2,289 MW | 623 MW | -2,349 MW | 235 MW |
| 2026-10-08T11:00Z | 1,361 MW | 2,534 MW | 650 MW | -2,324 MW | 202 MW |
| 2026-10-08T12:00Z | 1,096 MW | 2,450 MW | 683 MW | -2,325 MW | 230 MW |
| 2026-10-08T13:00Z | 1,003 MW | 2,412 MW | 667 MW | -2,399 MW | 215 MW |
| 2026-10-08T14:00Z | 1,179 MW | 2,248 MW | 641 MW | -2,423 MW | 208 MW |
| 2026-10-08T15:00Z | 1,368 MW | 1,831 MW | 662 MW | -2,141 MW | 224 MW |
| 2026-10-08T16:00Z | 1,574 MW | 1,346 MW | 631 MW | -789 MW | 155 MW |
| 2026-10-08T17:00Z | 1,877 MW | 328 MW | 776 MW | 1,422 MW | 443 MW |
| 2026-10-08T18:00Z | 2,418 MW | 33 MW | 740 MW | 2,141 MW | 1,263 MW |
| 2026-10-08T19:00Z | 2,998 MW | 27 MW | 750 MW | 1,422 MW | 888 MW |
| 2026-10-08T20:00Z | 3,326 MW | 0 MW | 712 MW | 1,271 MW | 585 MW |
| 2026-10-08T21:00Z | 3,466 MW | 0 MW | 787 MW | 944 MW | 73 MW |
| 2026-10-08T22:00Z | 3,519 MW | 0 MW | 693 MW | 965 MW | 34 MW |
| 2026-10-08T23:00Z | 3,663 MW | 0 MW | 675 MW | 668 MW | 24 MW |
| 2026-10-09T00:00Z | 3,850 MW | 0 MW | 661 MW | 467 MW | 24 MW |
| 2026-10-09T01:00Z | 3,897 MW | 0 MW | 664 MW | 212 MW | 25 MW |
| 2026-10-09T02:00Z | 3,867 MW | 0 MW | 675 MW | 42 MW | 24 MW |
| 2026-10-09T03:00Z | 3,802 MW | 0 MW | 643 MW | 156 MW | 72 MW |
| 2026-10-09T04:00Z | 3,696 MW | 0 MW | 642 MW | 544 MW | 105 MW |
| 2026-10-09T05:00Z | 3,420 MW | 0 MW | 685 MW | 1,309 MW | 563 MW |
| 2026-10-09T06:00Z | 3,185 MW | 19 MW | 708 MW | 1,589 MW | 553 MW |
| 2026-10-09T07:00Z | 2,912 MW | 704 MW | 611 MW | -218 MW | 188 MW |
| 2026-10-09T08:00Z | 2,438 MW | 1,530 MW | 624 MW | -2,191 MW | 217 MW |
| 2026-10-09T09:00Z | 1,891 MW | 1,595 MW | 682 MW | -2,480 MW | 238 MW |
| 2026-10-09T10:00Z | 1,173 MW | 1,859 MW | 694 MW | -2,354 MW | 237 MW |
| 2026-10-09T11:00Z | 659 MW | 2,202 MW | 682 MW | -2,310 MW | 140 MW |
| 2026-10-09T12:00Z | 431 MW | 2,268 MW | 680 MW | -2,287 MW | 128 MW |
| 2026-10-09T13:00Z | 397 MW | 2,381 MW | 638 MW | -2,236 MW | 131 MW |
| 2026-10-09T14:00Z | 463 MW | 2,352 MW | 658 MW | -2,107 MW | 117 MW |
| 2026-10-09T15:00Z | 501 MW | 2,137 MW | 715 MW | -2,095 MW | 119 MW |
| 2026-10-09T16:00Z | 542 MW | 1,512 MW | 917 MW | -499 MW | 206 MW |
| 2026-10-09T17:00Z | 577 MW | 347 MW | 997 MW | 2,339 MW | 978 MW |
| 2026-10-09T18:00Z | 845 MW | 15 MW | 979 MW | 2,717 MW | 1,533 MW |
| 2026-10-09T19:00Z | 1,141 MW | 11 MW | 887 MW | 2,477 MW | 1,038 MW |
| 2026-10-09T20:00Z | 1,331 MW | 0 MW | 905 MW | 1,800 MW | 479 MW |
| 2026-10-09T21:00Z | 1,334 MW | 0 MW | 793 MW | 1,558 MW | 138 MW |
| 2026-10-09T22:00Z | 1,200 MW | 6 MW | 681 MW | 950 MW | 53 MW |
| 2026-10-09T23:00Z | 992 MW | 0 MW | 646 MW | 696 MW | 20 MW |
| 2026-10-10T00:00Z | 883 MW | 0 MW | 639 MW | 606 MW | 17 MW |
| 2026-10-10T01:00Z | 914 MW | 0 MW | 639 MW | 604 MW | 16 MW |
| 2026-10-10T02:00Z | 900 MW | 0 MW | 656 MW | 720 MW | 15 MW |
| 2026-10-10T03:00Z | 718 MW | 0 MW | 678 MW | 905 MW | 9 MW |
| 2026-10-10T04:00Z | 584 MW | 0 MW | 687 MW | 948 MW | 36 MW |
| 2026-10-10T05:00Z | 513 MW | 0 MW | 720 MW | 1,074 MW | 166 MW |
| 2026-10-10T06:00Z | 519 MW | 14 MW | 696 MW | 1,291 MW | 188 MW |
| 2026-10-10T07:00Z | 511 MW | 502 MW | 674 MW | -492 MW | 160 MW |
| 2026-10-10T08:00Z | 331 MW | 1,622 MW | 619 MW | -1,704 MW | 157 MW |
| 2026-10-10T09:00Z | 146 MW | 2,202 MW | 624 MW | -2,380 MW | 30 MW |
| 2026-10-10T10:00Z | 68 MW | 2,669 MW | 648 MW | -2,520 MW | 50 MW |
| 2026-10-10T11:00Z | 43 MW | 2,550 MW | 608 MW | -2,380 MW | 40 MW |
| 2026-10-10T12:00Z | 45 MW | 2,458 MW | 577 MW | -2,430 MW | 13 MW |
| 2026-10-10T13:00Z | 102 MW | 2,358 MW | 660 MW | -2,437 MW | 63 MW |
| 2026-10-10T14:00Z | 174 MW | 2,372 MW | 629 MW | -2,405 MW | 79 MW |
| 2026-10-10T15:00Z | 219 MW | 2,407 MW | 667 MW | -1,852 MW | 118 MW |
| 2026-10-10T16:00Z | 287 MW | 1,479 MW | 704 MW | -186 MW | 220 MW |
| 2026-10-10T17:00Z | 331 MW | 313 MW | 748 MW | 1,793 MW | 425 MW |
| 2026-10-10T18:00Z | 428 MW | 15 MW | 742 MW | 2,426 MW | 783 MW |
| 2026-10-10T19:00Z | 514 MW | 15 MW | 712 MW | 2,193 MW | 717 MW |
| 2026-10-10T20:00Z | 538 MW | 5 MW | 723 MW | 1,807 MW | 541 MW |
| 2026-10-10T21:00Z | 587 MW | 0 MW | 703 MW | 1,745 MW | 442 MW |
| 2026-10-10T22:00Z | 492 MW | 0 MW | 701 MW | 1,211 MW | 260 MW |
| 2026-10-10T23:00Z | 465 MW | 0 MW | 698 MW | 995 MW | 206 MW |
| 2026-10-11T00:00Z | 395 MW | 0 MW | 720 MW | 953 MW | 157 MW |
| 2026-10-11T01:00Z | 407 MW | 0 MW | 711 MW | 879 MW | 126 MW |
| 2026-10-11T02:00Z | 361 MW | 0 MW | 707 MW | 840 MW | 162 MW |
| 2026-10-11T03:00Z | 329 MW | 0 MW | 709 MW | 836 MW | 183 MW |
| 2026-10-11T04:00Z | 341 MW | 0 MW | 690 MW | 797 MW | 353 MW |
| 2026-10-11T05:00Z | 291 MW | 0 MW | 708 MW | 1,036 MW | 348 MW |
| 2026-10-11T06:00Z | 293 MW | 13 MW | 699 MW | 873 MW | 325 MW |
| 2026-10-11T07:00Z | 306 MW | 324 MW | 678 MW | -22 MW | 180 MW |
| 2026-10-11T08:00Z | 268 MW | 980 MW | 703 MW | -890 MW | 188 MW |
| 2026-10-11T09:00Z | 313 MW | 1,415 MW | 680 MW | -1,908 MW | 165 MW |
| 2026-10-11T10:00Z | 245 MW | 1,817 MW | 646 MW | -2,650 MW | 470 MW |
| 2026-10-11T11:00Z | 257 MW | 2,135 MW | 694 MW | -2,667 MW | 369 MW |
| 2026-10-11T12:00Z | 358 MW | 2,183 MW | 665 MW | -2,599 MW | 260 MW |
| 2026-10-11T13:00Z | 529 MW | 2,025 MW | 673 MW | -2,741 MW | 151 MW |
| 2026-10-11T14:00Z | 621 MW | 2,065 MW | 685 MW | -2,666 MW | 151 MW |
| 2026-10-11T15:00Z | 699 MW | 1,761 MW | 696 MW | -1,566 MW | 168 MW |
| 2026-10-11T16:00Z | 846 MW | 928 MW | 665 MW | 214 MW | 168 MW |
| 2026-10-11T17:00Z | 978 MW | 197 MW | 735 MW | 1,802 MW | 832 MW |
| 2026-10-11T18:00Z | 925 MW | 15 MW | 739 MW | 1,934 MW | 926 MW |
| 2026-10-11T19:00Z | 876 MW | 15 MW | 719 MW | 2,103 MW | 587 MW |
| 2026-10-11T20:00Z | 745 MW | 5 MW | 715 MW | 1,550 MW | 290 MW |
| 2026-10-11T21:00Z | 639 MW | 0 MW | 680 MW | 706 MW | 227 MW |
| 2026-10-11T22:00Z | 559 MW | 0 MW | 702 MW | 181 MW | 257 MW |
| 2026-10-11T23:00Z | 477 MW | 0 MW | 683 MW | 216 MW | 227 MW |
| 2026-10-12T00:00Z | 407 MW | 0 MW | 689 MW | -115 MW | 114 MW |
| 2026-10-12T01:00Z | 394 MW | 0 MW | 690 MW | -171 MW | 99 MW |
| 2026-10-12T02:00Z | 374 MW | 0 MW | 670 MW | -206 MW | 141 MW |
| 2026-10-12T03:00Z | 362 MW | 0 MW | 701 MW | -335 MW | 188 MW |
| 2026-10-12T04:00Z | 322 MW | 0 MW | 746 MW | 22 MW | 316 MW |
| 2026-10-12T05:00Z | 323 MW | 0 MW | 760 MW | 607 MW | 819 MW |
| 2026-10-12T06:00Z | 337 MW | 11 MW | 773 MW | 1,058 MW | 947 MW |
| 2026-10-12T07:00Z | 326 MW | 401 MW | 733 MW | 592 MW | 564 MW |
| 2026-10-12T08:00Z | 248 MW | 1,295 MW | 694 MW | 48 MW | 288 MW |
| 2026-10-12T09:00Z | 179 MW | 2,134 MW | 628 MW | -776 MW | 199 MW |
| 2026-10-12T10:00Z | 136 MW | 2,865 MW | 581 MW | -1,551 MW | 170 MW |
| 2026-10-12T11:00Z | 106 MW | 3,264 MW | 575 MW | -2,093 MW | 151 MW |
| 2026-10-12T12:00Z | 112 MW | 3,239 MW | 542 MW | -2,040 MW | 89 MW |
| 2026-10-12T13:00Z | 128 MW | 2,754 MW | 635 MW | -1,621 MW | 87 MW |
| 2026-10-12T14:00Z | 184 MW | 2,375 MW | 652 MW | -1,310 MW | 196 MW |
| 2026-10-12T15:00Z | 251 MW | 2,164 MW | 627 MW | -1,030 MW | 179 MW |
| 2026-10-12T16:00Z | 277 MW | 1,397 MW | 697 MW | -42 MW | 256 MW |
| 2026-10-12T17:00Z | 335 MW | 276 MW | 742 MW | 1,396 MW | 1,430 MW |
| 2026-10-12T18:00Z | 393 MW | 15 MW | 766 MW | 1,869 MW | 1,754 MW |
| 2026-10-12T19:00Z | 402 MW | 15 MW | 782 MW | 1,896 MW | 1,192 MW |
| 2026-10-12T20:00Z | 407 MW | 1 MW | 771 MW | 1,488 MW | 725 MW |
| 2026-10-12T21:00Z | 388 MW | 0 MW | 729 MW | 939 MW | 590 MW |
| 2026-10-12T22:00Z | 331 MW | 0 MW | 761 MW | 1,090 MW | 517 MW |
| 2026-10-12T23:00Z | 309 MW | 0 MW | 660 MW | 557 MW | 514 MW |
| 2026-10-13T00:00Z | 308 MW | 0 MW | 628 MW | 345 MW | 457 MW |
| 2026-10-13T01:00Z | 308 MW | 0 MW | 747 MW | 295 MW | 245 MW |
| 2026-10-13T02:00Z | 317 MW | 0 MW | 762 MW | 327 MW | 220 MW |
| 2026-10-13T03:00Z | 349 MW | 0 MW | 885 MW | 255 MW | 249 MW |
| 2026-10-13T04:00Z | 389 MW | 0 MW | 1,004 MW | 673 MW | 653 MW |
| 2026-10-13T05:00Z | 437 MW | 0 MW | 1,039 MW | 1,523 MW | 1,706 MW |
| 2026-10-13T06:00Z | 424 MW | 10 MW | 1,035 MW | 1,935 MW | 1,830 MW |
| 2026-10-13T07:00Z | 358 MW | 524 MW | 981 MW | 757 MW | 685 MW |
| 2026-10-13T08:00Z | 327 MW | 1,695 MW | 589 MW | -366 MW | 338 MW |
| 2026-10-13T09:00Z | 221 MW | 2,577 MW | 598 MW | -1,619 MW | 265 MW |
| 2026-10-13T10:00Z | 145 MW | 3,001 MW | 578 MW | -1,978 MW | 196 MW |
| 2026-10-13T11:00Z | 132 MW | 3,187 MW | 584 MW | -1,944 MW | 142 MW |
| 2026-10-13T12:00Z | 119 MW | 3,208 MW | 785 MW | -1,979 MW | 146 MW |
| 2026-10-13T13:00Z | 117 MW | 3,125 MW | 822 MW | -1,410 MW | 173 MW |
| 2026-10-13T14:00Z | 145 MW | 2,880 MW | 822 MW | -1,087 MW | 183 MW |
| 2026-10-13T15:00Z | 179 MW | 2,358 MW | 800 MW | -486 MW | 276 MW |
| 2026-10-13T16:00Z | 207 MW | 1,308 MW | 951 MW | 626 MW | 414 MW |
| 2026-10-13T17:00Z | 267 MW | 227 MW | 1,088 MW | 1,755 MW | 1,509 MW |
| 2026-10-13T18:00Z | 288 MW | 15 MW | 1,089 MW | 1,880 MW | 1,827 MW |
| 2026-10-13T19:00Z | 234 MW | 9 MW | 1,062 MW | 1,541 MW | 1,480 MW |
| 2026-10-13T20:00Z | 180 MW | 0 MW | 1,079 MW | 1,192 MW | 1,051 MW |
| 2026-10-13T21:00Z | 175 MW | 0 MW | 768 MW | 1,294 MW | 727 MW |
| 2026-10-13T22:00Z | 193 MW | 0 MW | 645 MW | 991 MW | 366 MW |
| 2026-10-13T23:00Z | 178 MW | 0 MW | 694 MW | 957 MW | 319 MW |
| 2026-10-14T00:00Z | 203 MW | 0 MW | 687 MW | 900 MW | 345 MW |
| 2026-10-14T01:00Z | 258 MW | 0 MW | 694 MW | 923 MW | 373 MW |
| 2026-10-14T02:00Z | 259 MW | 0 MW | 694 MW | 930 MW | 379 MW |
| 2026-10-14T03:00Z | 263 MW | 0 MW | 677 MW | 914 MW | 338 MW |
| 2026-10-14T04:00Z | 310 MW | 0 MW | 716 MW | 1,099 MW | 377 MW |
| 2026-10-14T05:00Z | 390 MW | 0 MW | 783 MW | 673 MW | 1,089 MW |
| 2026-10-14T06:00Z | 390 MW | 8 MW | 784 MW | 712 MW | 1,575 MW |
| 2026-10-14T07:00Z | 373 MW | 536 MW | 814 MW | 573 MW | 922 MW |
| 2026-10-14T08:00Z | 289 MW | 1,765 MW | 657 MW | 116 MW | 577 MW |
| 2026-10-14T09:00Z | 217 MW | 2,639 MW | 656 MW | -736 MW | 409 MW |
| 2026-10-14T10:00Z | 214 MW | 3,038 MW | 682 MW | -1,005 MW | 174 MW |
| 2026-10-14T11:00Z | 214 MW | 3,225 MW | 670 MW | -1,301 MW | 127 MW |
| 2026-10-14T12:00Z | 189 MW | 3,256 MW | 704 MW | -1,383 MW | 97 MW |
| 2026-10-14T13:00Z | 191 MW | 3,165 MW | 696 MW | -1,178 MW | 160 MW |
| 2026-10-14T14:00Z | 156 MW | 2,888 MW | 707 MW | -816 MW | 217 MW |
| 2026-10-14T15:00Z | 148 MW | 2,360 MW | 702 MW | 177 MW | 217 MW |
| 2026-10-14T16:00Z | 158 MW | 1,274 MW | 1,064 MW | 1,076 MW | 424 MW |
| 2026-10-14T17:00Z | 227 MW | 213 MW | 1,379 MW | 1,788 MW | 1,762 MW |
| 2026-10-14T18:00Z | 287 MW | 15 MW | 1,463 MW | 1,859 MW | 1,721 MW |
| 2026-10-14T19:00Z | 321 MW | 12 MW | 1,382 MW | 1,414 MW | 1,600 MW |
| 2026-10-14T20:00Z | 332 MW | 0 MW | 1,093 MW | 1,044 MW | 1,036 MW |
| 2026-10-14T21:00Z | 334 MW | 0 MW | 927 MW | 975 MW | 717 MW |
| 2026-10-14T22:00Z | 333 MW | 0 MW | 1,097 MW | 1,091 MW | 373 MW |
| 2026-10-14T23:00Z | 356 MW | 0 MW | 1,034 MW | 494 MW | 67 MW |
| 2026-10-15T00:00Z | 374 MW | 0 MW | 998 MW | 198 MW | 76 MW |
| 2026-10-15T01:00Z | 449 MW | 0 MW | 962 MW | 272 MW | 76 MW |
| 2026-10-15T02:00Z | 499 MW | 0 MW | 970 MW | 273 MW | 76 MW |
| 2026-10-15T03:00Z | 550 MW | 0 MW | 965 MW | 158 MW | 78 MW |
| 2026-10-15T04:00Z | 676 MW | 0 MW | 1,089 MW | 689 MW | 294 MW |
| 2026-10-15T05:00Z | 765 MW | 0 MW | 1,093 MW | 1,324 MW | 1,188 MW |
| 2026-10-15T06:00Z | 796 MW | 7 MW | 1,109 MW | 1,343 MW | 1,489 MW |
| 2026-10-15T07:00Z | 788 MW | 485 MW | 1,046 MW | 1,037 MW | 455 MW |
| 2026-10-15T08:00Z | 658 MW | 1,621 MW | 863 MW | -153 MW | 296 MW |
| 2026-10-15T09:00Z | 506 MW | 2,470 MW | 585 MW | -1,641 MW | 216 MW |
| 2026-10-15T10:00Z | 398 MW | 2,866 MW | 646 MW | -2,003 MW | 186 MW |
| 2026-10-15T11:00Z | 351 MW | 3,039 MW | 632 MW | -2,251 MW | 83 MW |
| 2026-10-15T12:00Z | 334 MW | 3,267 MW | 681 MW | -2,213 MW | 74 MW |
| 2026-10-15T13:00Z | 272 MW | 3,152 MW | 716 MW | -2,156 MW | 93 MW |
| 2026-10-15T14:00Z | 236 MW | 2,854 MW | 703 MW | -1,884 MW | 141 MW |
| 2026-10-15T15:00Z | 270 MW | 2,290 MW | 876 MW | -436 MW | 213 MW |
| 2026-10-15T16:00Z | 332 MW | 1,245 MW | 1,223 MW | 1,069 MW | 287 MW |
| 2026-10-15T17:00Z | 416 MW | 202 MW | 1,404 MW | 1,933 MW | 1,162 MW |
| 2026-10-15T18:00Z | 495 MW | 15 MW | 1,447 MW | 2,005 MW | 1,316 MW |
| 2026-10-15T19:00Z | 528 MW | 11 MW | 1,420 MW | 1,774 MW | 1,270 MW |
| 2026-10-15T20:00Z | 526 MW | 0 MW | 1,143 MW | 1,135 MW | 732 MW |
| 2026-10-15T21:00Z | 509 MW | 0 MW | 832 MW | 1,010 MW | 558 MW |
| 2026-10-15T22:00Z | 469 MW | 0 MW | 741 MW | 313 MW | 504 MW |
| 2026-10-15T23:00Z | 389 MW | 0 MW | 734 MW | 284 MW | 446 MW |
| 2026-10-16T00:00Z | 374 MW | 0 MW | 687 MW | 214 MW | 398 MW |
| 2026-10-16T01:00Z | 376 MW | 0 MW | 694 MW | -1 MW | 365 MW |
| 2026-10-16T02:00Z | 356 MW | 0 MW | 685 MW | -3 MW | 527 MW |
| 2026-10-16T03:00Z | 344 MW | 0 MW | 677 MW | -2 MW | 540 MW |
| 2026-10-16T04:00Z | 335 MW | 0 MW | 706 MW | 607 MW | 810 MW |
| 2026-10-16T05:00Z | 305 MW | 0 MW | 780 MW | 1,107 MW | 1,404 MW |
| 2026-10-16T06:00Z | 285 MW | 5 MW | 782 MW | 1,180 MW | 1,630 MW |
| 2026-10-16T07:00Z | 283 MW | 492 MW | 769 MW | 1,163 MW | 1,029 MW |
| 2026-10-16T08:00Z | 215 MW | 1,689 MW | 659 MW | 651 MW | 555 MW |
| 2026-10-16T09:00Z | 150 MW | 2,531 MW | 592 MW | -712 MW | 415 MW |
| 2026-10-16T10:00Z | 118 MW | 3,004 MW | 667 MW | -1,214 MW | 304 MW |
| 2026-10-16T11:00Z | 152 MW | 3,197 MW | 677 MW | -1,623 MW | 278 MW |
| 2026-10-16T12:00Z | 191 MW | 3,101 MW | 670 MW | -1,662 MW | 202 MW |
| 2026-10-16T13:00Z | 311 MW | 2,983 MW | 672 MW | -1,503 MW | 199 MW |
| 2026-10-16T14:00Z | 535 MW | 2,668 MW | 676 MW | -1,350 MW | 223 MW |
| 2026-10-16T15:00Z | 590 MW | 2,028 MW | 686 MW | -486 MW | 268 MW |
| 2026-10-16T16:00Z | 649 MW | 1,052 MW | 732 MW | 757 MW | 482 MW |
| 2026-10-16T17:00Z | 820 MW | 166 MW | 723 MW | 1,618 MW | 890 MW |
| 2026-10-16T18:00Z | 1,006 MW | 15 MW | 767 MW | 1,374 MW | 803 MW |
| 2026-10-16T19:00Z | 1,039 MW | 5 MW | 740 MW | 987 MW | 692 MW |
| 2026-10-16T20:00Z | 939 MW | 0 MW | 704 MW | 279 MW | 720 MW |
| 2026-10-16T21:00Z | 841 MW | 0 MW | 683 MW | 236 MW | 692 MW |
| 2026-10-16T22:00Z | 794 MW | 0 MW | 703 MW | 836 MW | 864 MW |
| 2026-10-16T23:00Z | 780 MW | 0 MW | 656 MW | 483 MW | 645 MW |
| 2026-10-17T00:00Z | 762 MW | 0 MW | 599 MW | 226 MW | 604 MW |
| 2026-10-17T01:00Z | 769 MW | 0 MW | 615 MW | 262 MW | 556 MW |
| 2026-10-17T02:00Z | 941 MW | 0 MW | 624 MW | 231 MW | 452 MW |
| 2026-10-17T03:00Z | 1,177 MW | 0 MW | 605 MW | 302 MW | 420 MW |
| 2026-10-17T04:00Z | 1,408 MW | 0 MW | 601 MW | 405 MW | 409 MW |
| 2026-10-17T05:00Z | 1,627 MW | 0 MW | 620 MW | 870 MW | 549 MW |
| 2026-10-17T06:00Z | 1,830 MW | 4 MW | 626 MW | 747 MW | 635 MW |
| 2026-10-17T07:00Z | 2,025 MW | 232 MW | 596 MW | 75 MW | 296 MW |
| 2026-10-17T08:00Z | 2,013 MW | 1,102 MW | 548 MW | -1,769 MW | 152 MW |
| 2026-10-17T09:00Z | 1,926 MW | 1,800 MW | 527 MW | -2,357 MW | 124 MW |
| 2026-10-17T10:00Z | 1,862 MW | 2,144 MW | 640 MW | -2,423 MW | 165 MW |
| 2026-10-17T11:00Z | 1,876 MW | 2,364 MW | 616 MW | -2,425 MW | 154 MW |
| 2026-10-17T12:00Z | 1,913 MW | 2,219 MW | 624 MW | -2,423 MW | 153 MW |
| 2026-10-17T13:00Z | 2,005 MW | 1,883 MW | 627 MW | -2,424 MW | 154 MW |
| 2026-10-17T14:00Z | 2,005 MW | 1,656 MW | 624 MW | -2,342 MW | 154 MW |
| 2026-10-17T15:00Z | 2,031 MW | 1,513 MW | 616 MW | -2,039 MW | 141 MW |
| 2026-10-17T16:00Z | 1,975 MW | 861 MW | 663 MW | -588 MW | 121 MW |
| 2026-10-17T17:00Z | 2,270 MW | 183 MW | 649 MW | 941 MW | 229 MW |
| 2026-10-17T18:00Z | 2,666 MW | 15 MW | 605 MW | 1,546 MW | 370 MW |
| 2026-10-17T19:00Z | 2,879 MW | 6 MW | 681 MW | 1,357 MW | 266 MW |
| 2026-10-17T20:00Z | 2,971 MW | 0 MW | 731 MW | 994 MW | 68 MW |
| 2026-10-17T21:00Z | 3,178 MW | 0 MW | 721 MW | 611 MW | 57 MW |
| 2026-10-17T22:00Z | 3,346 MW | 0 MW | 732 MW | -267 MW | 38 MW |
| 2026-10-17T23:00Z | 3,385 MW | 0 MW | 727 MW | -568 MW | 43 MW |
| 2026-10-18T00:00Z | 3,574 MW | 0 MW | 734 MW | -923 MW | 53 MW |
| 2026-10-18T01:00Z | 3,707 MW | 0 MW | 715 MW | -1,364 MW | 34 MW |
| 2026-10-18T02:00Z | 3,782 MW | 0 MW | 656 MW | -1,398 MW | 51 MW |
| 2026-10-18T03:00Z | 3,628 MW | 0 MW | 732 MW | -1,482 MW | 52 MW |
| 2026-10-18T04:00Z | 3,608 MW | 0 MW | 651 MW | -1,118 MW | 39 MW |
| 2026-10-18T05:00Z | 3,553 MW | 0 MW | 632 MW | -1,087 MW | 68 MW |
| 2026-10-18T06:00Z | 3,531 MW | 2 MW | 656 MW | -551 MW | 127 MW |
| 2026-10-18T07:00Z | 3,481 MW | 281 MW | 654 MW | -1,152 MW | 171 MW |
| 2026-10-18T08:00Z | 3,503 MW | 1,085 MW | 640 MW | -2,107 MW | 135 MW |
| 2026-10-18T09:00Z | 3,546 MW | 1,707 MW | 598 MW | -2,415 MW | 124 MW |
| 2026-10-18T10:00Z | 3,455 MW | 1,956 MW | 648 MW | -2,453 MW | 165 MW |
| 2026-10-18T11:00Z | 3,311 MW | 2,086 MW | 654 MW | -2,405 MW | 168 MW |
| 2026-10-18T12:00Z | 3,100 MW | 2,205 MW | 633 MW | -2,410 MW | 152 MW |
| 2026-10-18T13:00Z | 2,830 MW | 1,854 MW | 656 MW | -2,320 MW | 172 MW |
| 2026-10-18T14:00Z | 2,664 MW | 1,870 MW | 657 MW | -2,289 MW | 168 MW |
| 2026-10-18T15:00Z | 2,608 MW | 1,629 MW | 689 MW | -2,184 MW | 180 MW |
| 2026-10-18T16:00Z | 2,696 MW | 964 MW | 705 MW | -897 MW | 194 MW |
| 2026-10-18T17:00Z | 2,825 MW | 147 MW | 688 MW | 810 MW | 319 MW |
| 2026-10-18T18:00Z | 3,086 MW | 15 MW | 618 MW | 1,812 MW | 455 MW |
| 2026-10-18T19:00Z | 3,300 MW | 12 MW | 612 MW | 1,660 MW | 518 MW |
| 2026-10-18T20:00Z | 3,549 MW | 0 MW | 628 MW | 1,301 MW | 141 MW |
| 2026-10-18T21:00Z | 3,530 MW | 0 MW | 646 MW | 541 MW | 95 MW |
| 2026-10-18T22:00Z | 3,450 MW | 0 MW | 641 MW | 617 MW | 128 MW |
| 2026-10-18T23:00Z | 3,335 MW | 0 MW | 682 MW | 100 MW | 174 MW |
| 2026-10-19T00:00Z | 3,151 MW | 0 MW | 688 MW | -199 MW | 77 MW |
| 2026-10-19T01:00Z | 3,021 MW | 0 MW | 675 MW | 85 MW | 81 MW |
| 2026-10-19T02:00Z | 2,960 MW | 0 MW | 658 MW | 302 MW | 199 MW |
| 2026-10-19T03:00Z | 2,841 MW | 0 MW | 648 MW | 629 MW | 238 MW |
| 2026-10-19T04:00Z | 2,657 MW | 0 MW | 730 MW | 499 MW | 182 MW |
| 2026-10-19T05:00Z | 2,520 MW | 0 MW | 778 MW | 1,179 MW | 561 MW |
| 2026-10-19T06:00Z | 2,357 MW | 3 MW | 823 MW | 2,066 MW | 1,121 MW |
| 2026-10-19T07:00Z | 2,079 MW | 427 MW | 770 MW | 1,137 MW | 799 MW |
| 2026-10-19T08:00Z | 1,567 MW | 1,580 MW | 701 MW | -287 MW | 477 MW |
| 2026-10-19T09:00Z | 1,235 MW | 2,386 MW | 700 MW | -369 MW | 346 MW |
| 2026-10-19T10:00Z | 938 MW | 2,765 MW | 702 MW | -620 MW | 308 MW |
| 2026-10-19T11:00Z | 661 MW | 3,012 MW | 761 MW | -254 MW | 249 MW |
| 2026-10-19T12:00Z | 486 MW | 3,140 MW | 711 MW | -169 MW | 216 MW |
| 2026-10-19T13:00Z | 331 MW | 2,983 MW | 711 MW | -65 MW | 200 MW |
| 2026-10-19T14:00Z | 209 MW | 2,654 MW | 763 MW | -69 MW | 337 MW |
| 2026-10-19T15:00Z | 273 MW | 2,141 MW | 917 MW | 603 MW | 409 MW |
| 2026-10-19T16:00Z | 430 MW | 1,146 MW | 1,079 MW | 1,690 MW | 828 MW |
| 2026-10-19T17:00Z | 516 MW | 167 MW | 1,269 MW | 2,122 MW | 1,111 MW |
| 2026-10-19T18:00Z | 527 MW | 16 MW | 1,418 MW | 2,366 MW | 1,692 MW |
| 2026-10-19T19:00Z | 482 MW | 8 MW | 1,437 MW | 2,298 MW | 1,577 MW |
| 2026-10-19T20:00Z | 431 MW | 1 MW | 1,437 MW | 1,687 MW | 812 MW |
| 2026-10-19T21:00Z | 345 MW | 1 MW | 1,271 MW | 999 MW | 727 MW |
| 2026-10-19T22:00Z | 307 MW | 0 MW | 1,103 MW | 1,079 MW | 658 MW |
| 2026-10-19T23:00Z | 283 MW | 0 MW | 1,089 MW | 1,102 MW | 604 MW |
| 2026-10-20T00:00Z | 297 MW | 0 MW | 1,145 MW | 862 MW | 546 MW |
| 2026-10-20T01:00Z | 333 MW | 0 MW | 1,171 MW | 662 MW | 492 MW |
| 2026-10-20T02:00Z | 434 MW | 0 MW | 842 MW | 519 MW | 456 MW |
| 2026-10-20T03:00Z | 534 MW | 0 MW | 744 MW | 530 MW | 509 MW |
| 2026-10-20T04:00Z | 518 MW | 0 MW | 767 MW | 630 MW | 621 MW |
| 2026-10-20T05:00Z | 518 MW | 0 MW | 769 MW | 1,447 MW | 723 MW |
| 2026-10-20T06:00Z | 488 MW | 3 MW | 848 MW | 1,940 MW | 789 MW |
| 2026-10-20T07:00Z | 418 MW | 211 MW | 807 MW | 1,389 MW | 606 MW |
| 2026-10-20T08:00Z | 406 MW | 865 MW | 694 MW | 800 MW | 514 MW |
| 2026-10-20T09:00Z | 409 MW | 1,600 MW | 703 MW | -784 MW | 345 MW |
| 2026-10-20T10:00Z | 368 MW | 2,194 MW | 678 MW | -1,772 MW | 350 MW |
| 2026-10-20T11:00Z | 292 MW | 2,574 MW | 639 MW | -2,228 MW | 277 MW |
| 2026-10-20T12:00Z | 293 MW | 2,844 MW | 635 MW | -2,459 MW | 200 MW |
| 2026-10-20T13:00Z | 530 MW | 2,914 MW | 607 MW | -2,453 MW | 187 MW |
| 2026-10-20T14:00Z | 829 MW | 2,793 MW | 663 MW | -2,451 MW | 142 MW |
| 2026-10-20T15:00Z | 1,118 MW | 2,252 MW | 660 MW | -1,763 MW | 284 MW |
| 2026-10-20T16:00Z | 1,648 MW | 1,059 MW | 717 MW | 493 MW | 418 MW |
| 2026-10-20T17:00Z | 1,758 MW | 148 MW | 737 MW | 1,955 MW | 958 MW |
| 2026-10-20T18:00Z | 1,725 MW | 15 MW | 752 MW | 2,063 MW | 1,179 MW |
| 2026-10-20T19:00Z | 2,144 MW | 13 MW | 699 MW | 1,136 MW | 682 MW |
| 2026-10-20T20:00Z | 2,578 MW | 0 MW | 688 MW | 135 MW | 223 MW |
| 2026-10-20T21:00Z | 2,668 MW | 0 MW | 649 MW | -83 MW | 218 MW |
| 2026-10-20T22:00Z | 2,545 MW | 0 MW | 634 MW | 81 MW | 233 MW |
| 2026-10-20T23:00Z | 2,490 MW | 0 MW | 699 MW | -280 MW | 225 MW |
| 2026-10-21T00:00Z | 2,397 MW | 0 MW | 631 MW | -47 MW | 216 MW |
| 2026-10-21T01:00Z | 2,101 MW | 0 MW | 655 MW | 261 MW | 239 MW |
| 2026-10-21T02:00Z | 2,039 MW | 0 MW | 624 MW | 230 MW | 127 MW |
| 2026-10-21T03:00Z | 1,729 MW | 0 MW | 679 MW | 639 MW | 81 MW |
| 2026-10-21T04:00Z | 1,491 MW | 0 MW | 669 MW | 790 MW | 310 MW |
| 2026-10-21T05:00Z | 1,440 MW | 0 MW | 739 MW | 1,080 MW | 406 MW |
| 2026-10-21T06:00Z | 1,508 MW | 3 MW | 809 MW | 1,782 MW | 582 MW |
| 2026-10-21T07:00Z | 1,353 MW | 353 MW | 765 MW | 774 MW | 465 MW |
| 2026-10-21T08:00Z | 1,082 MW | 1,280 MW | 606 MW | -1,070 MW | 265 MW |
| 2026-10-21T09:00Z | 899 MW | 2,004 MW | 575 MW | -2,278 MW | 227 MW |
| 2026-10-21T10:00Z | 662 MW | 2,318 MW | 619 MW | -2,302 MW | 221 MW |
| 2026-10-21T11:00Z | 621 MW | 2,453 MW | 598 MW | -2,302 MW | 167 MW |
| 2026-10-21T12:00Z | 542 MW | 2,358 MW | 674 MW | -2,239 MW | 152 MW |
| 2026-10-21T13:00Z | 562 MW | 2,356 MW | 544 MW | -2,185 MW | 103 MW |
| 2026-10-21T14:00Z | 610 MW | 2,161 MW | 636 MW | -2,054 MW | 154 MW |
| 2026-10-21T15:00Z | 633 MW | 2,102 MW | 688 MW | -1,721 MW | 201 MW |
| 2026-10-21T16:00Z | 688 MW | 1,180 MW | 901 MW | 679 MW | 268 MW |
| 2026-10-21T17:00Z | 797 MW | 153 MW | 1,174 MW | 1,783 MW | 622 MW |
| 2026-10-21T18:00Z | 787 MW | 15 MW | 1,292 MW | 2,272 MW | 1,291 MW |
| 2026-10-21T19:00Z | 682 MW | 13 MW | 1,189 MW | 2,297 MW | 1,204 MW |
| 2026-10-21T20:00Z | 607 MW | 0 MW | 1,109 MW | 1,729 MW | 456 MW |
| 2026-10-21T21:00Z | 650 MW | 0 MW | 954 MW | 1,228 MW | 302 MW |
| 2026-10-21T22:00Z | 637 MW | 0 MW | 920 MW | 990 MW | 373 MW |
| 2026-10-21T23:00Z | 566 MW | 0 MW | 932 MW | 1,065 MW | 404 MW |
| 2026-10-22T00:00Z | 570 MW | 0 MW | 853 MW | 1,099 MW | 347 MW |
| 2026-10-22T01:00Z | 565 MW | 0 MW | 775 MW | 1,098 MW | 179 MW |
| 2026-10-22T02:00Z | 418 MW | 0 MW | 749 MW | 1,201 MW | 176 MW |
| 2026-10-22T03:00Z | 321 MW | 0 MW | 719 MW | 1,041 MW | 180 MW |
| 2026-10-22T04:00Z | 327 MW | 0 MW | 778 MW | 1,153 MW | 344 MW |
| 2026-10-22T05:00Z | 310 MW | 0 MW | 789 MW | 1,637 MW | 1,083 MW |
| 2026-10-22T06:00Z | 272 MW | 3 MW | 796 MW | 1,957 MW | 1,930 MW |
| 2026-10-22T07:00Z | 253 MW | 447 MW | 759 MW | 1,352 MW | 986 MW |
| 2026-10-22T08:00Z | 186 MW | 1,744 MW | 606 MW | -643 MW | 239 MW |
| 2026-10-22T09:00Z | 166 MW | 2,637 MW | 608 MW | -1,791 MW | 193 MW |
| 2026-10-22T10:00Z | 245 MW | 2,916 MW | 593 MW | -2,138 MW | 174 MW |
| 2026-10-22T11:00Z | 387 MW | 2,887 MW | 563 MW | -2,333 MW | 144 MW |
| 2026-10-22T12:00Z | 716 MW | 2,674 MW | 611 MW | -2,334 MW | 143 MW |
| 2026-10-22T13:00Z | 1,179 MW | 2,530 MW | 568 MW | -2,268 MW | 133 MW |
| 2026-10-22T14:00Z | 1,814 MW | 2,314 MW | 637 MW | -2,302 MW | 162 MW |
| 2026-10-22T15:00Z | 2,251 MW | 2,026 MW | 644 MW | -1,946 MW | 175 MW |
| 2026-10-22T16:00Z | 2,332 MW | 1,094 MW | 677 MW | 30 MW | 235 MW |
| 2026-10-22T17:00Z | 2,344 MW | 120 MW | 760 MW | 1,984 MW | 851 MW |
| 2026-10-22T18:00Z | 2,310 MW | 15 MW | 758 MW | 2,025 MW | 983 MW |
| 2026-10-22T19:00Z | 2,403 MW | 8 MW | 715 MW | 1,290 MW | 244 MW |
| 2026-10-22T20:00Z | 2,699 MW | 0 MW | 672 MW | 651 MW | 90 MW |
| 2026-10-22T21:00Z | 2,909 MW | 0 MW | 665 MW | 422 MW | 70 MW |
| 2026-10-22T22:00Z | 3,030 MW | 0 MW | 671 MW | -232 MW | 79 MW |
| 2026-10-22T23:00Z | 2,868 MW | 0 MW | 746 MW | -402 MW | 119 MW |
| 2026-10-23T00:00Z | 2,752 MW | 0 MW | 668 MW | -913 MW | 183 MW |
| 2026-10-23T01:00Z | 2,604 MW | 0 MW | 688 MW | -1,133 MW | 149 MW |
| 2026-10-23T02:00Z | 2,545 MW | 0 MW | 667 MW | -1,304 MW | 141 MW |
| 2026-10-23T03:00Z | 2,365 MW | 0 MW | 672 MW | -993 MW | 136 MW |
| 2026-10-23T04:00Z | 2,232 MW | 0 MW | 668 MW | -412 MW | 90 MW |
| 2026-10-23T05:00Z | 2,124 MW | 0 MW | 704 MW | 435 MW | 217 MW |
| 2026-10-23T06:00Z | 2,114 MW | 1 MW | 627 MW | 1,148 MW | 372 MW |
| 2026-10-23T07:00Z | 2,075 MW | 218 MW | 675 MW | 534 MW | 134 MW |
| 2026-10-23T08:00Z | 1,823 MW | 1,060 MW | 654 MW | -1,095 MW | 201 MW |
| 2026-10-23T09:00Z | 1,569 MW | 1,388 MW | 618 MW | -2,133 MW | 229 MW |
| 2026-10-23T10:00Z | 1,189 MW | 1,681 MW | 682 MW | -2,362 MW | 299 MW |
| 2026-10-23T11:00Z | 795 MW | 2,001 MW | 681 MW | -2,294 MW | 210 MW |
| 2026-10-23T12:00Z | 676 MW | 2,088 MW | 694 MW | -2,243 MW | 222 MW |
| 2026-10-23T13:00Z | 916 MW | 1,862 MW | 638 MW | -2,212 MW | 239 MW |
| 2026-10-23T14:00Z | 1,098 MW | 1,755 MW | 605 MW | -2,392 MW | 232 MW |
| 2026-10-23T15:00Z | 1,126 MW | 1,723 MW | 658 MW | -1,852 MW | 210 MW |
| 2026-10-23T16:00Z | 1,356 MW | 1,016 MW | 666 MW | 93 MW | 99 MW |
| 2026-10-23T17:00Z | 1,563 MW | 130 MW | 748 MW | 1,575 MW | 449 MW |
| 2026-10-23T18:00Z | 1,669 MW | 15 MW | 736 MW | 2,149 MW | 765 MW |
| 2026-10-23T19:00Z | 1,704 MW | 15 MW | 723 MW | 1,871 MW | 568 MW |
| 2026-10-23T20:00Z | 1,863 MW | 1 MW | 643 MW | 1,291 MW | 238 MW |
| 2026-10-23T21:00Z | 1,826 MW | 0 MW | 686 MW | 931 MW | 125 MW |
| 2026-10-23T22:00Z | 1,290 MW | 0 MW | 705 MW | 1,133 MW | 16 MW |
| 2026-10-23T23:00Z | 1,183 MW | 0 MW | 711 MW | 1,120 MW | 16 MW |
| 2026-10-24T00:00Z | 1,124 MW | 0 MW | 668 MW | 945 MW | 70 MW |
| 2026-10-24T01:00Z | 950 MW | 0 MW | 640 MW | 805 MW | 85 MW |
| 2026-10-24T02:00Z | 897 MW | 0 MW | 634 MW | 693 MW | 150 MW |
| 2026-10-24T03:00Z | 664 MW | 0 MW | 684 MW | 664 MW | 216 MW |
| 2026-10-24T04:00Z | 331 MW | 0 MW | 696 MW | 791 MW | 288 MW |
| 2026-10-24T05:00Z | 225 MW | 0 MW | 644 MW | 1,260 MW | 391 MW |
| 2026-10-24T06:00Z | 280 MW | 2 MW | 698 MW | 1,464 MW | 498 MW |
| 2026-10-24T07:00Z | 318 MW | 374 MW | 711 MW | 727 MW | 351 MW |
| 2026-10-24T08:00Z | 188 MW | 1,632 MW | 678 MW | -1,408 MW | 259 MW |
| 2026-10-24T09:00Z | 97 MW | 2,505 MW | 654 MW | -2,282 MW | 228 MW |
| 2026-10-24T10:00Z | 88 MW | 2,535 MW | 654 MW | -2,377 MW | 237 MW |
| 2026-10-24T11:00Z | 122 MW | 2,476 MW | 659 MW | -2,337 MW | 206 MW |
| 2026-10-24T12:00Z | 161 MW | 2,523 MW | 667 MW | -2,286 MW | 171 MW |
| 2026-10-24T13:00Z | 284 MW | 2,225 MW | 638 MW | -2,219 MW | 142 MW |
| 2026-10-24T14:00Z | 508 MW | 2,184 MW | 592 MW | -2,253 MW | 148 MW |
| 2026-10-24T15:00Z | 743 MW | 1,988 MW | 663 MW | -1,992 MW | 241 MW |
| 2026-10-24T16:00Z | 968 MW | 1,099 MW | 677 MW | -147 MW | 190 MW |
| 2026-10-24T17:00Z | 1,215 MW | 128 MW | 706 MW | 1,595 MW | 403 MW |
| 2026-10-24T18:00Z | 1,417 MW | 15 MW | 793 MW | 2,019 MW | 663 MW |
| 2026-10-24T19:00Z | 1,603 MW | 15 MW | 779 MW | 1,693 MW | 699 MW |
| 2026-10-24T20:00Z | 1,596 MW | 1 MW | 708 MW | 1,173 MW | 420 MW |
| 2026-10-24T21:00Z | 1,554 MW | 0 MW | 696 MW | 550 MW | 59 MW |
| 2026-10-24T22:00Z | 1,520 MW | 0 MW | 698 MW | 312 MW | 33 MW |
| 2026-10-24T23:00Z | 1,497 MW | 0 MW | 685 MW | -27 MW | 140 MW |
| 2026-10-25T00:00Z | 1,507 MW | 0 MW | 662 MW | -284 MW | 144 MW |
| 2026-10-25T01:00Z | 1,674 MW | 0 MW | 590 MW | -515 MW | 134 MW |
| 2026-10-25T02:00Z | 1,952 MW | 0 MW | 663 MW | -735 MW | 21 MW |
| 2026-10-25T03:00Z | 2,295 MW | 0 MW | 644 MW | -1,218 MW | 20 MW |
| 2026-10-25T04:00Z | 2,630 MW | 0 MW | 651 MW | -1,426 MW | 7 MW |
| 2026-10-25T05:00Z | 2,655 MW | 0 MW | 693 MW | -1,173 MW | 7 MW |
| 2026-10-25T06:00Z | 2,544 MW | 1 MW | 727 MW | -524 MW | 10 MW |
| 2026-10-25T07:00Z | 2,071 MW | 211 MW | 612 MW | -2,066 MW | 299 MW |
| 2026-10-25T08:00Z | 1,486 MW | 746 MW | 676 MW | -2,387 MW | 419 MW |
| 2026-10-25T09:00Z | 1,194 MW | 1,152 MW | 639 MW | -2,017 MW | 292 MW |
| 2026-10-25T10:00Z | 848 MW | 1,404 MW | 683 MW | -2,218 MW | 391 MW |
| 2026-10-25T11:00Z | 682 MW | 1,572 MW | 674 MW | -1,917 MW | 183 MW |
| 2026-10-25T12:00Z | 592 MW | 1,634 MW | 651 MW | -1,949 MW | 167 MW |
| 2026-10-25T13:00Z | 543 MW | 1,641 MW | 632 MW | -1,842 MW | 153 MW |
| 2026-10-25T14:00Z | 618 MW | 1,584 MW | 630 MW | -1,837 MW | 162 MW |
| 2026-10-25T15:00Z | 670 MW | 1,378 MW | 659 MW | -1,823 MW | 224 MW |
| 2026-10-25T16:00Z | 820 MW | 774 MW | 682 MW | -506 MW | 211 MW |
| 2026-10-25T17:00Z | 1,112 MW | 91 MW | 691 MW | 1,474 MW | 413 MW |
| 2026-10-25T18:00Z | 1,338 MW | 15 MW | 690 MW | 1,565 MW | 419 MW |
| 2026-10-25T19:00Z | 1,253 MW | 15 MW | 732 MW | 1,708 MW | 953 MW |
| 2026-10-25T20:00Z | 1,084 MW | 15 MW | 642 MW | 1,886 MW | 902 MW |
| 2026-10-25T21:00Z | 915 MW | 9 MW | 660 MW | 1,722 MW | 332 MW |
| 2026-10-25T22:00Z | 732 MW | 0 MW | 592 MW | 1,572 MW | 75 MW |
| 2026-10-25T23:00Z | 634 MW | 0 MW | 646 MW | 649 MW | 91 MW |
| 2026-10-26T00:00Z | 554 MW | 0 MW | 642 MW | 654 MW | 190 MW |
| 2026-10-26T01:00Z | 402 MW | 0 MW | 648 MW | 527 MW | 361 MW |
| 2026-10-26T02:00Z | 266 MW | 0 MW | 665 MW | 655 MW | 164 MW |
| 2026-10-26T03:00Z | 257 MW | 0 MW | 650 MW | 607 MW | 205 MW |
| 2026-10-26T04:00Z | 351 MW | 0 MW | 661 MW | 666 MW | 324 MW |
| 2026-10-26T05:00Z | 467 MW | 0 MW | 755 MW | 1,213 MW | 734 MW |
| 2026-10-26T06:00Z | 547 MW | 1 MW | 743 MW | 1,752 MW | 1,323 MW |
| 2026-10-26T07:00Z | 628 MW | 349 MW | 729 MW | 1,120 MW | 949 MW |
| 2026-10-26T08:00Z | 527 MW | 1,533 MW | 634 MW | -156 MW | 440 MW |
| 2026-10-26T09:00Z | 497 MW | 2,461 MW | 621 MW | -1,411 MW | 179 MW |
| 2026-10-26T10:00Z | 463 MW | 2,578 MW | 633 MW | -1,937 MW | 194 MW |
| 2026-10-26T11:00Z | 518 MW | 2,786 MW | 624 MW | -2,011 MW | 211 MW |
| 2026-10-26T12:00Z | 604 MW | 3,110 MW | 714 MW | -2,108 MW | 200 MW |
| 2026-10-26T13:00Z | 636 MW | 3,054 MW | 805 MW | -2,273 MW | 231 MW |
| 2026-10-26T14:00Z | 590 MW | 2,786 MW | 766 MW | -2,119 MW | 227 MW |
| 2026-10-26T15:00Z | 456 MW | 2,200 MW | 799 MW | -781 MW | 214 MW |
| 2026-10-26T16:00Z | 527 MW | 1,018 MW | 962 MW | 1,198 MW | 681 MW |
| 2026-10-26T17:00Z | 636 MW | 101 MW | 973 MW | 2,263 MW | 1,287 MW |
| 2026-10-26T18:00Z | 788 MW | 15 MW | 969 MW | 2,308 MW | 1,550 MW |
| 2026-10-26T19:00Z | 796 MW | 15 MW | 988 MW | 2,469 MW | 1,640 MW |
| 2026-10-26T20:00Z | 968 MW | 12 MW | 991 MW | 2,103 MW | 1,501 MW |
| 2026-10-26T21:00Z | 1,158 MW | 0 MW | 916 MW | 1,254 MW | 973 MW |
| 2026-10-26T22:00Z | 1,021 MW | 0 MW | 801 MW | 724 MW | 717 MW |
| 2026-10-26T23:00Z | 1,035 MW | 0 MW | 730 MW | 688 MW | 289 MW |
| 2026-10-27T00:00Z | 918 MW | 0 MW | 751 MW | 598 MW | 292 MW |
| 2026-10-27T01:00Z | 814 MW | 0 MW | 684 MW | 265 MW | 415 MW |
| 2026-10-27T02:00Z | 834 MW | 0 MW | 684 MW | 248 MW | 422 MW |
| 2026-10-27T03:00Z | 718 MW | 0 MW | 681 MW | 306 MW | 402 MW |
| 2026-10-27T04:00Z | 557 MW | 0 MW | 712 MW | 438 MW | 393 MW |
| 2026-10-27T05:00Z | 464 MW | 0 MW | 795 MW | 837 MW | 828 MW |
| 2026-10-27T06:00Z | 574 MW | 0 MW | 734 MW | 1,585 MW | 1,115 MW |
| 2026-10-27T07:00Z | 674 MW | 161 MW | 735 MW | 1,095 MW | 1,016 MW |
| 2026-10-27T08:00Z | 711 MW | 991 MW | 647 MW | 219 MW | 616 MW |
| 2026-10-27T09:00Z | 689 MW | 1,734 MW | 663 MW | -925 MW | 274 MW |
| 2026-10-27T10:00Z | 639 MW | 2,276 MW | 684 MW | -1,653 MW | 241 MW |
| 2026-10-27T11:00Z | 531 MW | 2,469 MW | 762 MW | -1,705 MW | 238 MW |
| 2026-10-27T12:00Z | 317 MW | 2,576 MW | 711 MW | -1,583 MW | 213 MW |
| 2026-10-27T13:00Z | 404 MW | 2,712 MW | 711 MW | -1,306 MW | 211 MW |
| 2026-10-27T14:00Z | 578 MW | 2,621 MW | 676 MW | -437 MW | 205 MW |
| 2026-10-27T15:00Z | 677 MW | 2,004 MW | 724 MW | 542 MW | 152 MW |
| 2026-10-27T16:00Z | 777 MW | 882 MW | 815 MW | 1,862 MW | 970 MW |
| 2026-10-27T17:00Z | 757 MW | 71 MW | 799 MW | 2,295 MW | 1,863 MW |
| 2026-10-27T18:00Z | 638 MW | 0 MW | 759 MW | 2,186 MW | 1,800 MW |
| 2026-10-27T19:00Z | 559 MW | 0 MW | 761 MW | 1,823 MW | 1,692 MW |
| 2026-10-27T20:00Z | 444 MW | 0 MW | 781 MW | 1,397 MW | 1,061 MW |
| 2026-10-27T21:00Z | 385 MW | 0 MW | 755 MW | 1,170 MW | 763 MW |
| 2026-10-27T22:00Z | 353 MW | 0 MW | 713 MW | 723 MW | 629 MW |
| 2026-10-27T23:00Z | 334 MW | 0 MW | 712 MW | 631 MW | 570 MW |
| 2026-10-28T00:00Z | 310 MW | 0 MW | 709 MW | 254 MW | 445 MW |
| 2026-10-28T01:00Z | 306 MW | 0 MW | 716 MW | 213 MW | 474 MW |
| 2026-10-28T02:00Z | 312 MW | 0 MW | 708 MW | 377 MW | 483 MW |
| 2026-10-28T03:00Z | 403 MW | 0 MW | 676 MW | 206 MW | 489 MW |
| 2026-10-28T04:00Z | 558 MW | 0 MW | 711 MW | 268 MW | 598 MW |
| 2026-10-28T05:00Z | 738 MW | 0 MW | 774 MW | 1,001 MW | 979 MW |
| 2026-10-28T06:00Z | 797 MW | 0 MW | 860 MW | 1,779 MW | 1,779 MW |
| 2026-10-28T07:00Z | 704 MW | 226 MW | 788 MW | 1,071 MW | 957 MW |
| 2026-10-28T08:00Z | 526 MW | 1,021 MW | 673 MW | -715 MW | 469 MW |
| 2026-10-28T09:00Z | 405 MW | 1,841 MW | 746 MW | -1,524 MW | 354 MW |
| 2026-10-28T10:00Z | 360 MW | 2,558 MW | 682 MW | -1,677 MW | 281 MW |
| 2026-10-28T11:00Z | 290 MW | 2,933 MW | 760 MW | -2,172 MW | 252 MW |
| 2026-10-28T12:00Z | 240 MW | 3,052 MW | 850 MW | -2,265 MW | 128 MW |
| 2026-10-28T13:00Z | 211 MW | 3,046 MW | 909 MW | -2,194 MW | 133 MW |
| 2026-10-28T14:00Z | 194 MW | 2,790 MW | 987 MW | -1,614 MW | 126 MW |
| 2026-10-28T15:00Z | 236 MW | 2,178 MW | 1,393 MW | -578 MW | 309 MW |
| 2026-10-28T16:00Z | 288 MW | 961 MW | 1,601 MW | 1,203 MW | 1,148 MW |
| 2026-10-28T17:00Z | 360 MW | 93 MW | 1,640 MW | 2,623 MW | 2,000 MW |
| 2026-10-28T18:00Z | 450 MW | 23 MW | 1,656 MW | 2,621 MW | 2,321 MW |
| 2026-10-28T19:00Z | 512 MW | 1 MW | 1,697 MW | 2,540 MW | 2,077 MW |
| 2026-10-28T20:00Z | 578 MW | 0 MW | 1,700 MW | 2,051 MW | 1,657 MW |
| 2026-10-28T21:00Z | 705 MW | 0 MW | 1,161 MW | 1,679 MW | 1,299 MW |
| 2026-10-28T22:00Z | 799 MW | 0 MW | 787 MW | 1,707 MW | 1,008 MW |
| 2026-10-28T23:00Z | 852 MW | 0 MW | 729 MW | 424 MW | 759 MW |
| 2026-10-29T00:00Z | 834 MW | 0 MW | 745 MW | 291 MW | 659 MW |
| 2026-10-29T01:00Z | 804 MW | 0 MW | 735 MW | 74 MW | 478 MW |
| 2026-10-29T02:00Z | 804 MW | 0 MW | 745 MW | -54 MW | 519 MW |
| 2026-10-29T03:00Z | 829 MW | 0 MW | 717 MW | -114 MW | 464 MW |
| 2026-10-29T04:00Z | 808 MW | 0 MW | 746 MW | 185 MW | 547 MW |
| 2026-10-29T05:00Z | 778 MW | 0 MW | 785 MW | 1,032 MW | 951 MW |
| 2026-10-29T06:00Z | 690 MW | 1 MW | 875 MW | 1,969 MW | 1,708 MW |
| 2026-10-29T07:00Z | 641 MW | 317 MW | 773 MW | 1,454 MW | 1,640 MW |
| 2026-10-29T08:00Z | 497 MW | 1,517 MW | 707 MW | 260 MW | 613 MW |
| 2026-10-29T09:00Z | 365 MW | 2,506 MW | 629 MW | -1,258 MW | 507 MW |
| 2026-10-29T10:00Z | 332 MW | 2,836 MW | 630 MW | -2,249 MW | 360 MW |
| 2026-10-29T11:00Z | 315 MW | 3,064 MW | 651 MW | -2,472 MW | 360 MW |
| 2026-10-29T12:00Z | 261 MW | 3,157 MW | 677 MW | -2,573 MW | 365 MW |
| 2026-10-29T13:00Z | 190 MW | 3,049 MW | 662 MW | -2,336 MW | 355 MW |
| 2026-10-29T14:00Z | 134 MW | 2,787 MW | 719 MW | -1,596 MW | 324 MW |
| 2026-10-29T15:00Z | 109 MW | 2,107 MW | 836 MW | -40 MW | 444 MW |
| 2026-10-29T16:00Z | 91 MW | 909 MW | 1,429 MW | 1,645 MW | 892 MW |
| 2026-10-29T17:00Z | 94 MW | 74 MW | 2,006 MW | 2,195 MW | 1,610 MW |
| 2026-10-29T18:00Z | 101 MW | 15 MW | 2,230 MW | 2,432 MW | 2,076 MW |
| 2026-10-29T19:00Z | 140 MW | 13 MW | 2,246 MW | 2,493 MW | 2,380 MW |
| 2026-10-29T20:00Z | 159 MW | 0 MW | 2,125 MW | 2,182 MW | 2,188 MW |
| 2026-10-29T21:00Z | 152 MW | 0 MW | 1,916 MW | 1,431 MW | 1,635 MW |
| 2026-10-29T22:00Z | 141 MW | 0 MW | 1,405 MW | 1,492 MW | 1,497 MW |
| 2026-10-29T23:00Z | 146 MW | 0 MW | 1,441 MW | 530 MW | 594 MW |
| 2026-10-30T00:00Z | 115 MW | 0 MW | 1,269 MW | 181 MW | 721 MW |
| 2026-10-30T01:00Z | 79 MW | 0 MW | 1,133 MW | -53 MW | 778 MW |
| 2026-10-30T02:00Z | 61 MW | 0 MW | 1,152 MW | -114 MW | 786 MW |
| 2026-10-30T03:00Z | 70 MW | 0 MW | 1,139 MW | -264 MW | 751 MW |
| 2026-10-30T04:00Z | 87 MW | 0 MW | 1,149 MW | 75 MW | 684 MW |
| 2026-10-30T05:00Z | 76 MW | 0 MW | 1,190 MW | 726 MW | 823 MW |
| 2026-10-30T06:00Z | 51 MW | 0 MW | 1,354 MW | 1,560 MW | 1,623 MW |
| 2026-10-30T07:00Z | 43 MW | 209 MW | 1,315 MW | 1,414 MW | 1,560 MW |
| 2026-10-30T08:00Z | 33 MW | 1,027 MW | 1,119 MW | 306 MW | 769 MW |
| 2026-10-30T09:00Z | 27 MW | 1,846 MW | 668 MW | -817 MW | 636 MW |
| 2026-10-30T10:00Z | 17 MW | 2,121 MW | 742 MW | -1,932 MW | 714 MW |
| 2026-10-30T11:00Z | 9 MW | 2,351 MW | 775 MW | -1,861 MW | 752 MW |
| 2026-10-30T12:00Z | 19 MW | 2,471 MW | 716 MW | -1,908 MW | 653 MW |
| 2026-10-30T13:00Z | 28 MW | 2,364 MW | 784 MW | -1,660 MW | 626 MW |
| 2026-10-30T14:00Z | 38 MW | 1,838 MW | 805 MW | -1,093 MW | 559 MW |
| 2026-10-30T15:00Z | 73 MW | 1,347 MW | 1,047 MW | 174 MW | 533 MW |
| 2026-10-30T16:00Z | 113 MW | 689 MW | 1,331 MW | 1,480 MW | 1,064 MW |
| 2026-10-30T17:00Z | 158 MW | 241 MW | 1,489 MW | 2,396 MW | 1,961 MW |
| 2026-10-30T18:00Z | 235 MW | 93 MW | 1,489 MW | 2,159 MW | 1,915 MW |
| 2026-10-30T19:00Z | 280 MW | 15 MW | 1,505 MW | 2,274 MW | 1,877 MW |
| 2026-10-30T20:00Z | 296 MW | 5 MW | 1,483 MW | 2,064 MW | 1,283 MW |
| 2026-10-30T21:00Z | 300 MW | 0 MW | 1,213 MW | 1,357 MW | 1,030 MW |
| 2026-10-30T22:00Z | 326 MW | 0 MW | 1,112 MW | 408 MW | 807 MW |
| 2026-10-30T23:00Z | 325 MW | 0 MW | 887 MW | 589 MW | 879 MW |
| 2026-10-31T00:00Z | 306 MW | 0 MW | 791 MW | 827 MW | 930 MW |
| 2026-10-31T01:00Z | 279 MW | 0 MW | 833 MW | 782 MW | 1,003 MW |
| 2026-10-31T02:00Z | 283 MW | 0 MW | 764 MW | 510 MW | 883 MW |
| 2026-10-31T03:00Z | 274 MW | 0 MW | 802 MW | 497 MW | 736 MW |
| 2026-10-31T04:00Z | 347 MW | 0 MW | 775 MW | 454 MW | 514 MW |
| 2026-10-31T05:00Z | 395 MW | 0 MW | 808 MW | 526 MW | 602 MW |
| 2026-10-31T06:00Z | 395 MW | 0 MW | 791 MW | 477 MW | 521 MW |
| 2026-10-31T07:00Z | 519 MW | 285 MW | 736 MW | 462 MW | 455 MW |
| 2026-10-31T08:00Z | 523 MW | 1,471 MW | 607 MW | -698 MW | 271 MW |
| 2026-10-31T09:00Z | 348 MW | 2,487 MW | 594 MW | -1,804 MW | 209 MW |
| 2026-10-31T10:00Z | 187 MW | 2,900 MW | 634 MW | -2,448 MW | 194 MW |
| 2026-10-31T11:00Z | 130 MW | 3,080 MW | 645 MW | -2,625 MW | 184 MW |
| 2026-10-31T12:00Z | 102 MW | 3,151 MW | 652 MW | -2,564 MW | 129 MW |
| 2026-10-31T13:00Z | 152 MW | 3,047 MW | 632 MW | -2,642 MW | 105 MW |
| 2026-10-31T14:00Z | 138 MW | 2,760 MW | 644 MW | -2,520 MW | 108 MW |
| 2026-10-31T15:00Z | 101 MW | 2,102 MW | 748 MW | -892 MW | 132 MW |
| 2026-10-31T16:00Z | 127 MW | 873 MW | 799 MW | 1,536 MW | 378 MW |
| 2026-10-31T17:00Z | 231 MW | 72 MW | 794 MW | 2,509 MW | 995 MW |
| 2026-10-31T18:00Z | 304 MW | 35 MW | 795 MW | 2,538 MW | 1,184 MW |
| 2026-10-31T19:00Z | 336 MW | 21 MW | 800 MW | 1,732 MW | 749 MW |
| 2026-10-31T20:00Z | 414 MW | 15 MW | 775 MW | 1,058 MW | 512 MW |
| 2026-10-31T21:00Z | 525 MW | 0 MW | 756 MW | 862 MW | 330 MW |
| 2026-10-31T22:00Z | 742 MW | 0 MW | 709 MW | 408 MW | 234 MW |
| 2026-10-31T23:00Z | 876 MW | 19 MW | 761 MW | 622 MW | 27 MW |
| 2026-11-01T00:00Z | 1,037 MW | 0 MW | 776 MW | 440 MW | 17 MW |
| 2026-11-01T01:00Z | 1,174 MW | 0 MW | 788 MW | 450 MW | 110 MW |
| 2026-11-01T02:00Z | 1,223 MW | 0 MW | 697 MW | 170 MW | 135 MW |
| 2026-11-01T03:00Z | 1,253 MW | 0 MW | 655 MW | 98 MW | 133 MW |
| 2026-11-01T04:00Z | 1,286 MW | 0 MW | 636 MW | 169 MW | 140 MW |
| 2026-11-01T05:00Z | 1,359 MW | 0 MW | 728 MW | 338 MW | 153 MW |
| 2026-11-01T06:00Z | 1,276 MW | 0 MW | 754 MW | 520 MW | 101 MW |
| 2026-11-01T07:00Z | 1,278 MW | 266 MW | 639 MW | -462 MW | 156 MW |
| 2026-11-01T08:00Z | 1,121 MW | 896 MW | 629 MW | -2,547 MW | 238 MW |
| 2026-11-01T09:00Z | 794 MW | 1,298 MW | 610 MW | -2,743 MW | 152 MW |
| 2026-11-01T10:00Z | 478 MW | 1,555 MW | 612 MW | -2,785 MW | 92 MW |
| 2026-11-01T11:00Z | 279 MW | 1,654 MW | 573 MW | -2,800 MW | 135 MW |
| 2026-11-01T12:00Z | 186 MW | 1,650 MW | 556 MW | -2,801 MW | 109 MW |
| 2026-11-01T13:00Z | 124 MW | 1,623 MW | 546 MW | -2,725 MW | 104 MW |
| 2026-11-01T14:00Z | 83 MW | 1,433 MW | 554 MW | -2,708 MW | 143 MW |
| 2026-11-01T15:00Z | 65 MW | 1,361 MW | 597 MW | -2,649 MW | 160 MW |
| 2026-11-01T16:00Z | 82 MW | 635 MW | 745 MW | -646 MW | 144 MW |
| 2026-11-01T17:00Z | 189 MW | 48 MW | 707 MW | 1,503 MW | 371 MW |
| 2026-11-01T18:00Z | 374 MW | 15 MW | 711 MW | 1,427 MW | 498 MW |
| 2026-11-01T19:00Z | 501 MW | 36 MW | 733 MW | 1,740 MW | 440 MW |
| 2026-11-01T20:00Z | 552 MW | 20 MW | 744 MW | 1,357 MW | 274 MW |
| 2026-11-01T21:00Z | 644 MW | 6 MW | 728 MW | 911 MW | 148 MW |
| 2026-11-01T22:00Z | 844 MW | 0 MW | 682 MW | 534 MW | 139 MW |
| 2026-11-01T23:00Z | 1,058 MW | 0 MW | 632 MW | 255 MW | 136 MW |
| 2026-11-02T00:00Z | 1,376 MW | 0 MW | 582 MW | 64 MW | 71 MW |
| 2026-11-02T01:00Z | 1,728 MW | 0 MW | 564 MW | -36 MW | 86 MW |
| 2026-11-02T02:00Z | 1,750 MW | 0 MW | 645 MW | -52 MW | 16 MW |
| 2026-11-02T03:00Z | 1,757 MW | 0 MW | 595 MW | -32 MW | 14 MW |
| 2026-11-02T04:00Z | 1,970 MW | 0 MW | 563 MW | -2 MW | 40 MW |
| 2026-11-02T05:00Z | 2,014 MW | 0 MW | 671 MW | 246 MW | 57 MW |
| 2026-11-02T06:00Z | 2,044 MW | 19 MW | 705 MW | 847 MW | 95 MW |
| 2026-11-02T07:00Z | 1,996 MW | 270 MW | 614 MW | 250 MW | 108 MW |
| 2026-11-02T08:00Z | 2,035 MW | 1,361 MW | 568 MW | -2,156 MW | 117 MW |
| 2026-11-02T09:00Z | 1,897 MW | 1,884 MW | 528 MW | -2,860 MW | 188 MW |
| 2026-11-02T10:00Z | 1,654 MW | 2,100 MW | 576 MW | -2,785 MW | 92 MW |
| 2026-11-02T11:00Z | 1,352 MW | 2,247 MW | 608 MW | -2,826 MW | 100 MW |
| 2026-11-02T12:00Z | 1,060 MW | 2,298 MW | 574 MW | -2,778 MW | 75 MW |
| 2026-11-02T13:00Z | 813 MW | 2,282 MW | 594 MW | -2,658 MW | 70 MW |
| 2026-11-02T14:00Z | 559 MW | 2,084 MW | 599 MW | -2,603 MW | 97 MW |
| 2026-11-02T15:00Z | 435 MW | 1,876 MW | 634 MW | -2,067 MW | 154 MW |
| 2026-11-02T16:00Z | 404 MW | 790 MW | 719 MW | 1,394 MW | 255 MW |
| 2026-11-02T17:00Z | 606 MW | 64 MW | 690 MW | 2,634 MW | 962 MW |
| 2026-11-02T18:00Z | 836 MW | 15 MW | 703 MW | 2,554 MW | 963 MW |
| 2026-11-02T19:00Z | 994 MW | 15 MW | 720 MW | 2,318 MW | 1,264 MW |
| 2026-11-02T20:00Z | 1,147 MW | 11 MW | 670 MW | 1,522 MW | 726 MW |
| 2026-11-02T21:00Z | 1,553 MW | 0 MW | 650 MW | 985 MW | 344 MW |
| 2026-11-02T22:00Z | 2,047 MW | 0 MW | 597 MW | 315 MW | 47 MW |
| 2026-11-02T23:00Z | 2,069 MW | 0 MW | 650 MW | -147 MW | 13 MW |
| 2026-11-03T00:00Z | 1,863 MW | 0 MW | 649 MW | -201 MW | 43 MW |
| 2026-11-03T01:00Z | 1,750 MW | 0 MW | 611 MW | -357 MW | 46 MW |
| 2026-11-03T02:00Z | 1,751 MW | 0 MW | 584 MW | -409 MW | 46 MW |
| 2026-11-03T03:00Z | 2,038 MW | 0 MW | 580 MW | -510 MW | 43 MW |
| 2026-11-03T04:00Z | 2,347 MW | 0 MW | 580 MW | -546 MW | 18 MW |
| 2026-11-03T05:00Z | 2,554 MW | 0 MW | 648 MW | 388 MW | 37 MW |
| 2026-11-03T06:00Z | 2,795 MW | 0 MW | 739 MW | 1,659 MW | 481 MW |
| 2026-11-03T07:00Z | 2,903 MW | 214 MW | 671 MW | 1,125 MW | 594 MW |
| 2026-11-03T08:00Z | 2,835 MW | 1,211 MW | 529 MW | -1,178 MW | 207 MW |
| 2026-11-03T09:00Z | 2,801 MW | 2,027 MW | 542 MW | -2,745 MW | 131 MW |
| 2026-11-03T10:00Z | 2,769 MW | 2,217 MW | 557 MW | -2,679 MW | 125 MW |
| 2026-11-03T11:00Z | 2,445 MW | 2,450 MW | 618 MW | -2,721 MW | 120 MW |
| 2026-11-03T12:00Z | 2,122 MW | 2,770 MW | 571 MW | -2,747 MW | 120 MW |
| 2026-11-03T13:00Z | 1,908 MW | 2,776 MW | 596 MW | -2,665 MW | 189 MW |
| 2026-11-03T14:00Z | 1,716 MW | 2,520 MW | 653 MW | -2,023 MW | 231 MW |
| 2026-11-03T15:00Z | 1,576 MW | 1,927 MW | 726 MW | -254 MW | 97 MW |
| 2026-11-03T16:00Z | 1,494 MW | 764 MW | 767 MW | 2,026 MW | 272 MW |
| 2026-11-03T17:00Z | 1,781 MW | 40 MW | 679 MW | 2,474 MW | 1,030 MW |
| 2026-11-03T18:00Z | 2,293 MW | 0 MW | 672 MW | 2,435 MW | 1,576 MW |
| 2026-11-03T19:00Z | 2,655 MW | 10 MW | 713 MW | 2,560 MW | 1,376 MW |
| 2026-11-03T20:00Z | 2,951 MW | 12 MW | 691 MW | 2,126 MW | 976 MW |
| 2026-11-03T21:00Z | 3,203 MW | 0 MW | 753 MW | 1,455 MW | 295 MW |
| 2026-11-03T22:00Z | 3,296 MW | 0 MW | 828 MW | 780 MW | 209 MW |
| 2026-11-03T23:00Z | 3,297 MW | 0 MW | 704 MW | 107 MW | 181 MW |
| 2026-11-04T00:00Z | 3,105 MW | 0 MW | 726 MW | -292 MW | 199 MW |
| 2026-11-04T01:00Z | 2,922 MW | 0 MW | 649 MW | -258 MW | 231 MW |
| 2026-11-04T02:00Z | 2,820 MW | 0 MW | 642 MW | -516 MW | 262 MW |
| 2026-11-04T03:00Z | 2,851 MW | 0 MW | 616 MW | -512 MW | 289 MW |
| 2026-11-04T04:00Z | 2,810 MW | 0 MW | 689 MW | -3 MW | 340 MW |
| 2026-11-04T05:00Z | 2,763 MW | 0 MW | 729 MW | 289 MW | 474 MW |
| 2026-11-04T06:00Z | 2,718 MW | 0 MW | 752 MW | 1,476 MW | 715 MW |
| 2026-11-04T07:00Z | 2,544 MW | 214 MW | 744 MW | 1,762 MW | 754 MW |
| 2026-11-04T08:00Z | 2,061 MW | 1,388 MW | 669 MW | 246 MW | 602 MW |
| 2026-11-04T09:00Z | 1,564 MW | 2,466 MW | 601 MW | -1,069 MW | 426 MW |
| 2026-11-04T10:00Z | 1,051 MW | 2,918 MW | 695 MW | -1,819 MW | 399 MW |
| 2026-11-04T11:00Z | 552 MW | 3,084 MW | 932 MW | -1,639 MW | 366 MW |
| 2026-11-04T12:00Z | 214 MW | 3,123 MW | 957 MW | -1,314 MW | 311 MW |
| 2026-11-04T13:00Z | 106 MW | 3,009 MW | 1,130 MW | -1,334 MW | 325 MW |
| 2026-11-04T14:00Z | 102 MW | 2,732 MW | 1,188 MW | -954 MW | 319 MW |
| 2026-11-04T15:00Z | 144 MW | 2,006 MW | 1,533 MW | -332 MW | 509 MW |
| 2026-11-04T16:00Z | 176 MW | 769 MW | 1,722 MW | 1,291 MW | 986 MW |
| 2026-11-04T17:00Z | 206 MW | 34 MW | 1,766 MW | 2,118 MW | 1,781 MW |
| 2026-11-04T18:00Z | 231 MW | 0 MW | 1,768 MW | 2,406 MW | 2,504 MW |
| 2026-11-04T19:00Z | 238 MW | 0 MW | 1,795 MW | 2,485 MW | 2,732 MW |
| 2026-11-04T20:00Z | 254 MW | 0 MW | 1,757 MW | 2,294 MW | 2,239 MW |
| 2026-11-04T21:00Z | 282 MW | 0 MW | 1,769 MW | 1,979 MW | 1,656 MW |
| 2026-11-04T22:00Z | 247 MW | 0 MW | 1,690 MW | 1,009 MW | 743 MW |
| 2026-11-04T23:00Z | 220 MW | 0 MW | 1,560 MW | 103 MW | 682 MW |
| 2026-11-05T00:00Z | 191 MW | 0 MW | 1,429 MW | 108 MW | 560 MW |
| 2026-11-05T01:00Z | 165 MW | 0 MW | 1,428 MW | -209 MW | 480 MW |
| 2026-11-05T02:00Z | 143 MW | 0 MW | 1,398 MW | -94 MW | 391 MW |
| 2026-11-05T03:00Z | 129 MW | 0 MW | 1,382 MW | -94 MW | 395 MW |
| 2026-11-05T04:00Z | 125 MW | 0 MW | 1,389 MW | -2 MW | 323 MW |
| 2026-11-05T05:00Z | 121 MW | 0 MW | 1,464 MW | 584 MW | 448 MW |
| 2026-11-05T06:00Z | 105 MW | 0 MW | 1,464 MW | 1,650 MW | 850 MW |
| 2026-11-05T07:00Z | 91 MW | 236 MW | 1,198 MW | 1,658 MW | 978 MW |
| 2026-11-05T08:00Z | 65 MW | 1,273 MW | 921 MW | 208 MW | 497 MW |
| 2026-11-05T09:00Z | 58 MW | 2,277 MW | 867 MW | -586 MW | 463 MW |
| 2026-11-05T10:00Z | 67 MW | 2,728 MW | 844 MW | -1,893 MW | 298 MW |
| 2026-11-05T11:00Z | 75 MW | 2,917 MW | 866 MW | -2,066 MW | 200 MW |
| 2026-11-05T12:00Z | 110 MW | 2,909 MW | 839 MW | -2,221 MW | 133 MW |
| 2026-11-05T13:00Z | 124 MW | 2,755 MW | 906 MW | -1,842 MW | 146 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-05T13:00Z.
Installed Capacity
Annual figure for 2026| Wind | |
|---|---|
| Hydro | |
| Gas | |
| Storage | |
| Solar | |
| Bioenergy | |
| Other |
Total installed capacity in Portugal: 22.1 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Lisbon time dates, through 2026-11-04Show the data table (400 rows)
| Date (Europe/Lisbon time) | Demand |
|---|---|
| 2025-10-01 | 144 GWh |
| 2025-10-02 | 145 GWh |
| 2025-10-03 | 145 GWh |
| 2025-10-04 | 128 GWh |
| 2025-10-05 | 117 GWh |
| 2025-10-06 | 140 GWh |
| 2025-10-07 | 147 GWh |
| 2025-10-08 | 146 GWh |
| 2025-10-09 | 145 GWh |
| 2025-10-10 | 144 GWh |
| 2025-10-11 | 125 GWh |
| 2025-10-12 | 119 GWh |
| 2025-10-13 | 141 GWh |
| 2025-10-14 | 145 GWh |
| 2025-10-15 | 146 GWh |
| 2025-10-16 | 147 GWh |
| 2025-10-17 | 146 GWh |
| 2025-10-18 | 128 GWh |
| 2025-10-19 | 124 GWh |
| 2025-10-20 | 145 GWh |
| 2025-10-21 | 154 GWh |
| 2025-10-22 | 154 GWh |
| 2025-10-23 | 152 GWh |
| 2025-10-24 | 151 GWh |
| 2025-10-25 | 134 GWh |
| 2025-10-26 | 123 GWh |
| 2025-10-27 | 140 GWh |
| 2025-10-28 | 151 GWh |
| 2025-10-29 | 148 GWh |
| 2025-10-30 | 150 GWh |
| 2025-10-31 | 156 GWh |
| 2025-11-01 | 127 GWh |
| 2025-11-02 | 119 GWh |
| 2025-11-03 | 142 GWh |
| 2025-11-04 | 153 GWh |
| 2025-11-05 | 153 GWh |
| 2025-11-06 | 151 GWh |
| 2025-11-07 | 154 GWh |
| 2025-11-08 | 131 GWh |
| 2025-11-09 | 124 GWh |
| 2025-11-10 | 151 GWh |
| 2025-11-11 | 154 GWh |
| 2025-11-12 | 158 GWh |
| 2025-11-13 | 159 GWh |
| 2025-11-14 | 160 GWh |
| 2025-11-15 | 140 GWh |
| 2025-11-16 | 131 GWh |
| 2025-11-17 | 152 GWh |
| 2025-11-18 | 155 GWh |
| 2025-11-19 | 159 GWh |
| 2025-11-20 | 161 GWh |
| 2025-11-21 | 165 GWh |
| 2025-11-22 | 150 GWh |
| 2025-11-23 | 145 GWh |
| 2025-11-24 | 168 GWh |
| 2025-11-25 | 167 GWh |
| 2025-11-26 | 169 GWh |
| 2025-11-27 | 170 GWh |
| 2025-11-28 | 170 GWh |
| 2025-11-29 | 153 GWh |
| 2025-11-30 | 138 GWh |
| 2025-12-01 | 146 GWh |
| 2025-12-02 | 172 GWh |
| 2025-12-03 | 179 GWh |
| 2025-12-04 | 177 GWh |
| 2025-12-05 | 175 GWh |
| 2025-12-06 | 152 GWh |
| 2025-12-07 | 139 GWh |
| 2025-12-08 | 142 GWh |
| 2025-12-09 | 169 GWh |
| 2025-12-10 | 162 GWh |
| 2025-12-11 | 168 GWh |
| 2025-12-12 | 175 GWh |
| 2025-12-13 | 146 GWh |
| 2025-12-14 | 138 GWh |
| 2025-12-15 | 175 GWh |
| 2025-12-16 | 178 GWh |
| 2025-12-17 | 176 GWh |
| 2025-12-18 | 175 GWh |
| 2025-12-19 | 170 GWh |
| 2025-12-20 | 156 GWh |
| 2025-12-21 | 153 GWh |
| 2025-12-22 | 172 GWh |
| 2025-12-23 | 167 GWh |
| 2025-12-24 | 147 GWh |
| 2025-12-25 | 134 GWh |
| 2025-12-26 | 154 GWh |
| 2025-12-27 | 158 GWh |
| 2025-12-28 | 147 GWh |
| 2025-12-29 | 159 GWh |
| 2025-12-30 | 163 GWh |
| 2025-12-31 | 155 GWh |
| 2026-01-01 | 143 GWh |
| 2026-01-02 | 156 GWh |
| 2026-01-03 | 148 GWh |
| 2026-01-04 | 141 GWh |
| 2026-01-05 | 172 GWh |
| 2026-01-06 | 186 GWh |
| 2026-01-07 | 188 GWh |
| 2026-01-08 | 193 GWh |
| 2026-01-09 | 183 GWh |
| 2026-01-10 | 162 GWh |
| 2026-01-11 | 157 GWh |
| 2026-01-12 | 181 GWh |
| 2026-01-13 | 183 GWh |
| 2026-01-14 | 179 GWh |
| 2026-01-15 | 188 GWh |
| 2026-01-16 | 186 GWh |
| 2026-01-17 | 166 GWh |
| 2026-01-18 | 157 GWh |
| 2026-01-19 | 185 GWh |
| 2026-01-20 | 194 GWh |
| 2026-01-21 | 193 GWh |
| 2026-01-22 | 196 GWh |
| 2026-01-23 | 197 GWh |
| 2026-01-24 | 174 GWh |
| 2026-01-25 | 160 GWh |
| 2026-01-26 | 187 GWh |
| 2026-01-27 | 187 GWh |
| 2026-01-28 | 169 GWh |
| 2026-01-29 | 170 GWh |
| 2026-01-30 | 170 GWh |
| 2026-01-31 | 150 GWh |
| 2026-02-01 | 149 GWh |
| 2026-02-02 | 174 GWh |
| 2026-02-03 | 183 GWh |
| 2026-02-04 | 184 GWh |
| 2026-02-05 | 175 GWh |
| 2026-02-06 | 176 GWh |
| 2026-02-07 | 162 GWh |
| 2026-02-08 | 151 GWh |
| 2026-02-09 | 177 GWh |
| 2026-02-10 | 181 GWh |
| 2026-02-11 | 181 GWh |
| 2026-02-12 | 171 GWh |
| 2026-02-13 | 175 GWh |
| 2026-02-14 | 153 GWh |
| 2026-02-15 | 149 GWh |
| 2026-02-16 | 165 GWh |
| 2026-02-17 | 150 GWh |
| 2026-02-18 | 174 GWh |
| 2026-02-19 | 170 GWh |
| 2026-02-20 | 168 GWh |
| 2026-02-21 | 145 GWh |
| 2026-02-22 | 132 GWh |
| 2026-02-23 | 153 GWh |
| 2026-02-24 | 159 GWh |
| 2026-02-25 | 163 GWh |
| 2026-02-26 | 155 GWh |
| 2026-02-27 | 165 GWh |
| 2026-02-28 | 141 GWh |
| 2026-03-01 | 131 GWh |
| 2026-03-02 | 164 GWh |
| 2026-03-03 | 159 GWh |
| 2026-03-04 | 157 GWh |
| 2026-03-05 | 169 GWh |
| 2026-03-06 | 171 GWh |
| 2026-03-07 | 143 GWh |
| 2026-03-08 | 135 GWh |
| 2026-03-09 | 167 GWh |
| 2026-03-10 | 167 GWh |
| 2026-03-11 | 162 GWh |
| 2026-03-12 | 162 GWh |
| 2026-03-13 | 166 GWh |
| 2026-03-14 | 153 GWh |
| 2026-03-15 | 131 GWh |
| 2026-03-16 | 149 GWh |
| 2026-03-17 | 152 GWh |
| 2026-03-18 | 158 GWh |
| 2026-03-19 | 160 GWh |
| 2026-03-20 | 162 GWh |
| 2026-03-21 | 138 GWh |
| 2026-03-22 | 125 GWh |
| 2026-03-23 | 145 GWh |
| 2026-03-24 | 146 GWh |
| 2026-03-25 | 147 GWh |
| 2026-03-26 | 146 GWh |
| 2026-03-27 | 144 GWh |
| 2026-03-28 | 127 GWh |
| 2026-03-29 | 113 GWh |
| 2026-03-30 | 142 GWh |
| 2026-03-31 | 143 GWh |
| 2026-04-01 | 141 GWh |
| 2026-04-02 | 139 GWh |
| 2026-04-03 | 123 GWh |
| 2026-04-04 | 116 GWh |
| 2026-04-05 | 104 GWh |
| 2026-04-06 | 127 GWh |
| 2026-04-07 | 150 GWh |
| 2026-04-08 | 150 GWh |
| 2026-04-09 | 145 GWh |
| 2026-04-10 | 144 GWh |
| 2026-04-11 | 127 GWh |
| 2026-04-12 | 120 GWh |
| 2026-04-13 | 149 GWh |
| 2026-04-14 | 152 GWh |
| 2026-04-15 | 149 GWh |
| 2026-04-16 | 144 GWh |
| 2026-04-17 | 142 GWh |
| 2026-04-18 | 124 GWh |
| 2026-04-19 | 116 GWh |
| 2026-04-20 | 138 GWh |
| 2026-04-21 | 147 GWh |
| 2026-04-22 | 141 GWh |
| 2026-04-23 | 142 GWh |
| 2026-04-24 | 141 GWh |
| 2026-04-25 | 121 GWh |
| 2026-04-26 | 115 GWh |
| 2026-04-27 | 139 GWh |
| 2026-04-28 | 145 GWh |
| 2026-04-29 | 149 GWh |
| 2026-04-30 | 146 GWh |
| 2026-05-01 | 121 GWh |
| 2026-05-02 | 120 GWh |
| 2026-05-03 | 116 GWh |
| 2026-05-04 | 136 GWh |
| 2026-05-05 | 144 GWh |
| 2026-05-06 | 142 GWh |
| 2026-05-07 | 142 GWh |
| 2026-05-08 | 145 GWh |
| 2026-05-09 | 130 GWh |
| 2026-05-10 | 120 GWh |
| 2026-05-11 | 143 GWh |
| 2026-05-12 | 145 GWh |
| 2026-05-13 | 143 GWh |
| 2026-05-14 | 139 GWh |
| 2026-05-15 | 141 GWh |
| 2026-05-16 | 122 GWh |
| 2026-05-17 | 116 GWh |
| 2026-05-18 | 137 GWh |
| 2026-05-19 | 147 GWh |
| 2026-05-20 | 143 GWh |
| 2026-05-21 | 145 GWh |
| 2026-05-22 | 147 GWh |
| 2026-05-23 | 132 GWh |
| 2026-05-24 | 120 GWh |
| 2026-05-25 | 143 GWh |
| 2026-05-26 | 149 GWh |
| 2026-05-27 | 152 GWh |
| 2026-05-28 | 149 GWh |
| 2026-05-29 | 149 GWh |
| 2026-05-30 | 132 GWh |
| 2026-05-31 | 121 GWh |
| 2026-06-01 | 143 GWh |
| 2026-06-02 | 146 GWh |
| 2026-06-03 | 143 GWh |
| 2026-06-04 | 125 GWh |
| 2026-06-05 | 132 GWh |
| 2026-06-06 | 124 GWh |
| 2026-06-07 | 116 GWh |
| 2026-06-08 | 138 GWh |
| 2026-06-09 | 141 GWh |
| 2026-06-10 | 125 GWh |
| 2026-06-11 | 147 GWh |
| 2026-06-12 | 154 GWh |
| 2026-06-13 | 137 GWh |
| 2026-06-14 | 126 GWh |
| 2026-06-15 | 150 GWh |
| 2026-06-16 | 148 GWh |
| 2026-06-17 | 152 GWh |
| 2026-06-18 | 152 GWh |
| 2026-06-19 | 152 GWh |
| 2026-06-20 | 135 GWh |
| 2026-06-21 | 129 GWh |
| 2026-06-22 | 156 GWh |
| 2026-06-23 | 159 GWh |
| 2026-06-24 | 149 GWh |
| 2026-06-25 | 153 GWh |
| 2026-06-26 | 152 GWh |
| 2026-06-27 | 130 GWh |
| 2026-06-28 | 122 GWh |
| 2026-06-29 | 147 GWh |
| 2026-06-30 | 155 GWh |
| 2026-07-01 | 160 GWh |
| 2026-07-02 | 166 GWh |
| 2026-07-03 | 171 GWh |
| 2026-07-04 | 152 GWh |
| 2026-07-05 | 144 GWh |
| 2026-07-06 | 164 GWh |
| 2026-07-07 | 160 GWh |
| 2026-07-08 | 158 GWh |
| 2026-07-09 | 155 GWh |
| 2026-07-10 | 150 GWh |
| 2026-07-11 | 130 GWh |
| 2026-07-12 | 121 GWh |
| 2026-07-13 | 146 GWh |
| 2026-07-14 | 148 GWh |
| 2026-07-15 | 149 GWh |
| 2026-07-16 | 151 GWh |
| 2026-07-17 | 149 GWh |
| 2026-07-18 | 133 GWh |
| 2026-07-19 | 124 GWh |
| 2026-07-20 | 149 GWh |
| 2026-07-21 | 152 GWh |
| 2026-07-22 | 153 GWh |
| 2026-07-23 | 153 GWh |
| 2026-07-24 | 152 GWh |
| 2026-07-25 | 132 GWh |
| 2026-07-26 | 122 GWh |
| 2026-07-27 | 153 GWh |
| 2026-07-28 | 158 GWh |
| 2026-07-29 | 156 GWh |
| 2026-07-30 | 153 GWh |
| 2026-07-31 | 152 GWh |
| 2026-08-01 | 136 GWh |
| 2026-08-02 | 128 GWh |
| 2026-08-03 | 147 GWh |
| 2026-08-04 | 151 GWh |
| 2026-08-05 | 149 GWh |
| 2026-08-06 | 150 GWh |
| 2026-08-07 | 150 GWh |
| 2026-08-08 | 136 GWh |
| 2026-08-09 | 127 GWh |
| 2026-08-10 | 142 GWh |
| 2026-08-11 | 146 GWh |
| 2026-08-12 | 147 GWh |
| 2026-08-13 | 149 GWh |
| 2026-08-14 | 148 GWh |
| 2026-08-15 | 131 GWh |
| 2026-08-16 | 127 GWh |
| 2026-08-17 | 146 GWh |
| 2026-08-18 | 150 GWh |
| 2026-08-19 | 148 GWh |
| 2026-08-20 | 145 GWh |
| 2026-08-21 | 136 GWh |
| 2026-08-22 | 123 GWh |
| 2026-08-23 | 122 GWh |
| 2026-08-24 | 138 GWh |
| 2026-08-25 | 139 GWh |
| 2026-08-26 | 140 GWh |
| 2026-08-27 | 135 GWh |
| 2026-08-28 | 136 GWh |
| 2026-08-29 | 122 GWh |
| 2026-08-30 | 118 GWh |
| 2026-08-31 | 136 GWh |
| 2026-09-01 | 141 GWh |
| 2026-09-02 | 145 GWh |
| 2026-09-03 | 153 GWh |
| 2026-09-04 | 160 GWh |
| 2026-09-05 | 138 GWh |
| 2026-09-06 | 128 GWh |
| 2026-09-07 | 150 GWh |
| 2026-09-08 | 156 GWh |
| 2026-09-09 | 152 GWh |
| 2026-09-10 | 150 GWh |
| 2026-09-11 | 151 GWh |
| 2026-09-12 | 137 GWh |
| 2026-09-13 | 131 GWh |
| 2026-09-14 | 156 GWh |
| 2026-09-15 | 157 GWh |
| 2026-09-16 | 154 GWh |
| 2026-09-17 | 153 GWh |
| 2026-09-18 | 152 GWh |
| 2026-09-19 | 136 GWh |
| 2026-09-20 | 130 GWh |
| 2026-09-21 | 156 GWh |
| 2026-09-22 | 160 GWh |
| 2026-09-23 | 159 GWh |
| 2026-09-24 | 157 GWh |
| 2026-09-25 | 154 GWh |
| 2026-09-26 | 138 GWh |
| 2026-09-27 | 130 GWh |
| 2026-09-28 | 150 GWh |
| 2026-09-29 | 161 GWh |
| 2026-09-30 | 154 GWh |
| 2026-10-01 | 147 GWh |
| 2026-10-02 | 148 GWh |
| 2026-10-03 | 130 GWh |
| 2026-10-04 | 120 GWh |
| 2026-10-05 | 122 GWh |
| 2026-10-06 | 145 GWh |
| 2026-10-07 | 148 GWh |
| 2026-10-08 | 146 GWh |
| 2026-10-09 | 148 GWh |
| 2026-10-10 | 127 GWh |
| 2026-10-11 | 123 GWh |
| 2026-10-12 | 142 GWh |
| 2026-10-13 | 146 GWh |
| 2026-10-14 | 146 GWh |
| 2026-10-15 | 147 GWh |
| 2026-10-16 | 147 GWh |
| 2026-10-17 | 131 GWh |
| 2026-10-18 | 121 GWh |
| 2026-10-19 | 140 GWh |
| 2026-10-20 | 146 GWh |
| 2026-10-21 | 148 GWh |
| 2026-10-22 | 150 GWh |
| 2026-10-23 | 150 GWh |
| 2026-10-24 | 131 GWh |
| 2026-10-25 | 130 GWh |
| 2026-10-26 | 145 GWh |
| 2026-10-27 | 155 GWh |
| 2026-10-28 | 154 GWh |
| 2026-10-29 | 152 GWh |
| 2026-10-30 | 152 GWh |
| 2026-10-31 | 132 GWh |
| 2026-11-01 | 123 GWh |
| 2026-11-02 | 147 GWh |
| 2026-11-03 | 151 GWh |
| 2026-11-04 | 150 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-04. Daily totals are summed by World Power Monitor from complete Europe/Lisbon local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 45.5 TWh | 34.4 TWh | Wind 29.8% | 308 |
| 2025 | 53.0 TWh | 43.7 TWh | Wind 30.8% | 365 |
| 2024 | 51.4 TWh | 40.9 TWh | Wind 34.6% | 366 |
| 2023 | 50.7 TWh | 40.5 TWh | Wind 32.0% | 365 |
| 2022 | 50.3 TWh | 41.0 TWh | Gas 40.0% | 365 |
| 2021 | 49.5 TWh | 44.7 TWh | Gas 32.4% | 365 |
| 2020 | 48.8 TWh | 46.7 TWh | Gas 35.5% | 366 |
| 2019 | 50.3 TWh | 46.9 TWh | Gas 34.3% | 365 |
| 2018 | 50.9 TWh | 53.5 TWh | Gas 27.0% | 365 |
| 2017 | 49.6 TWh | 52.3 TWh | Gas 33.7% | 365 |
| 2016 | 49.3 TWh | 54.3 TWh | Hydro 24.4% | 366 |
| 2015 | 49.0 TWh | 46.7 TWh | Coal 29.3% | 365 |
A year is partial when ENTSO-E has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-04.
Power Flows With Neighbours
Net totals, 2026-10-06 (6 October 2026) to 2026-11-04 (4 November 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Spain | Portugal imports | 1.70 TWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-04.
Latest Grid Alerts
Newest alert 1 November 2026- Net imports Portugal imported a net 74.1 GWh on 1 November 2026, the highest daily net imports in 396 days of loaded history and 60% of its demand that day. All alerts that day
- Net imports Net imports into Portugal reached 67.5 GWh on 23 October 2026 (45% of demand), the 3rd highest daily net imports in 387 days of loaded history. All alerts that day
- Net imports Net imports into Portugal reached 70.9 GWh on 16 October 2026 (48% of demand), the 2nd highest daily net imports in 380 days of loaded history. All alerts that day
Follow this grid: RSS feed of Portugal alerts. Source: ENTSO-E operator data, provisional. Alerts by zone.
Share and Embed
Figures as of 2026-11-05 (5 November 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Portugal, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). Portugal Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/pt/
World Power Monitor. Portugal Electricity Demand and Generation Mix. Data as of 2026-11-05 13:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/pt/
@misc{wpm_zones_pt_2026,
title = {{Portugal Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-05 13:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/pt/}
} Permalink: https://worldpowermonitor.com/zones/pt/