DOPD Daily Electricity Demand by Hour of Day, 22 August to 19 September 2026
In the 29 complete local days from 22 August to 19 September 2026, electricity demand in DOPD averaged 263 MW and typically peaked at 17:00 local time (295 MW) and bottomed out at 03:00 (229 MW). Hours are local clock time (America/Los_Angeles).
Key Facts
- Over 29 complete local days from 22 August to 19 September 2026, average demand in DOPD was 263 MW. The hour of the day with the highest average demand was 17:00 local time (295 MW) and the lowest was 03:00 (229 MW).
- The largest three hour rise in average demand was 10 MW, between 14:00 to 17:00 local time.
- The single highest hour of demand in the 30 day window was 368 MW, in the hour starting 25 Aug 2026, 17:00 PDT (UTC-07:00).
Average Day by Local Hour
29 days to 2026-09-19, America/Los_Angeles time| Local hour (America/Los_Angeles) | Demand | Net generation |
|---|---|---|
| 00:00 | 237 MW | 218 MW |
| 01:00 | 232 MW | 216 MW |
| 02:00 | 229 MW | 210 MW |
| 03:00 | 229 MW | 208 MW |
| 04:00 | 231 MW | 220 MW |
| 05:00 | 240 MW | 230 MW |
| 06:00 | 253 MW | 278 MW |
| 07:00 | 259 MW | 266 MW |
| 08:00 | 263 MW | 234 MW |
| 09:00 | 267 MW | 232 MW |
| 10:00 | 271 MW | 230 MW |
| 11:00 | 273 MW | 249 MW |
| 12:00 | 277 MW | 261 MW |
| 13:00 | 280 MW | 278 MW |
| 14:00 | 284 MW | 281 MW |
| 15:00 | 288 MW | 307 MW |
| 16:00 | 291 MW | 444 MW |
| 17:00 | 295 MW | 486 MW |
| 18:00 | 291 MW | 497 MW |
| 19:00 | 285 MW | 482 MW |
| 20:00 | 278 MW | 449 MW |
| 21:00 | 266 MW | 340 MW |
| 22:00 | 254 MW | 257 MW |
| 23:00 | 244 MW | 239 MW |
| Local hour | Demand | Net generation |
|---|---|---|
| 00:00 | 237 MW | 218 MW |
| 01:00 | 232 MW | 216 MW |
| 02:00 | 229 MW | 210 MW |
| 03:00 | 229 MW | 208 MW |
| 04:00 | 231 MW | 220 MW |
| 05:00 | 240 MW | 230 MW |
| 06:00 | 253 MW | 278 MW |
| 07:00 | 259 MW | 266 MW |
| 08:00 | 263 MW | 234 MW |
| 09:00 | 267 MW | 232 MW |
| 10:00 | 271 MW | 230 MW |
| 11:00 | 273 MW | 249 MW |
| 12:00 | 277 MW | 261 MW |
| 13:00 | 280 MW | 278 MW |
| 14:00 | 284 MW | 281 MW |
| 15:00 | 288 MW | 307 MW |
| 16:00 | 291 MW | 444 MW |
| 17:00 | 295 MW | 486 MW |
| 18:00 | 291 MW | 497 MW |
| 19:00 | 285 MW | 482 MW |
| 20:00 | 278 MW | 449 MW |
| 21:00 | 266 MW | 340 MW |
| 22:00 | 254 MW | 257 MW |
| 23:00 | 244 MW | 239 MW |
Each value is the mean over 29 complete local days from 22 August to 19 September 2026, weekdays and weekends together, for the hour starting at that local clock time. The single highest hour of demand in the whole 30 day window was 368 MW; it is a published reading, not an average, and is not part of the profile above.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-19. Profiles are computed by World Power Monitor from the operator's hourly series.
Assumptions
- Hours are local clock time in America/Los_Angeles. A local day is used only if it is whole inside the 30 day window and at least 22 of its hours are complete; the profile uses the 29 most recent such days. Daylight saving follows the local clock: on a clock change day the missing hour is absent and the repeated hour is averaged over both readings.
- The average mixes weekdays and weekends and covers only 29 days, so it describes recent conditions, not a seasonal norm.
- The evening ramp is the largest rise over three hours in the average profile, starting between 14:00 and 20:00 local time.