EPE Demand Forecast Accuracy: Error, Bias and Worst Miss, 21 August to 20 September 2026
The day-ahead demand forecast for EPE was off by 3.2% on average (mean absolute percentage error) over 695 hours from 21 August to 20 September 2026, and 82% of hours landed within 5% of the reading. Its bias was -1.9%: it ran low on average, an under forecast. The largest miss was 272 MW (15.7%) too low at 17 Sept 2026, 21:00 MDT (UTC-06:00). Dates and times are local (America/Denver).
Key Facts
- The day-ahead demand forecast for EPE was off by 3.2% on average (mean absolute percentage error) over 695 hours from 21 August to 20 September 2026, and 82% of hours landed within 5% of the reading. Its bias was -1.9%: it ran low on average, an under forecast. The largest miss was 272 MW (15.7%) too low at 17 Sept 2026, 21:00 MDT (UTC-06:00).
- Across 53 US grids ranked by average error over their own latest 30 day windows, EPE came 19 (1 is the smallest error).
- On average the forecast differed from reported demand by 49 MW, against average demand of 1,505 MW.
- The forecast was above reported demand in 23% of compared hours.
Forecast Error at a Glance
695 hours from 21 August to 20 September 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (-30 MW per hour on average): the forecast ran low on average, an under forecast. The worst miss was 272 MW (15.7%) too low at 17 Sept 2026, 21:00 MDT (UTC-06:00): forecast 1,455 MW, reported 1,727 MW.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-09-20. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 20 Sept 2026, 19:00 MDT (UTC-06:00)| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 13 Sept, 20:00 | 1,787 MW | 1,742 MW |
| 13 Sept, 21:00 | 1,639 MW | 1,613 MW |
| 13 Sept, 22:00 | 1,485 MW | 1,472 MW |
| 13 Sept, 23:00 | 1,342 MW | 1,335 MW |
| 14 Sept, 00:00 | 1,215 MW | 1,231 MW |
| 14 Sept, 01:00 | 1,138 MW | 1,145 MW |
| 14 Sept, 02:00 | 1,088 MW | 1,071 MW |
| 14 Sept, 03:00 | 1,206 MW | 1,036 MW |
| 14 Sept, 04:00 | 1,193 MW | 1,027 MW |
| 14 Sept, 05:00 | 1,224 MW | 1,049 MW |
| 14 Sept, 06:00 | 1,277 MW | 1,098 MW |
| 14 Sept, 07:00 | 1,297 MW | 1,129 MW |
| 14 Sept, 08:00 | 1,322 MW | 1,206 MW |
| 14 Sept, 09:00 | 1,280 MW | 1,291 MW |
| 14 Sept, 10:00 | 1,371 MW | 1,407 MW |
| 14 Sept, 11:00 | 1,503 MW | 1,534 MW |
| 14 Sept, 12:00 | 1,620 MW | 1,671 MW |
| 14 Sept, 13:00 | 1,714 MW | 1,797 MW |
| 14 Sept, 14:00 | 1,865 MW | 1,894 MW |
| 14 Sept, 15:00 | 1,910 MW | 1,967 MW |
| 14 Sept, 16:00 | 2,010 MW | 2,006 MW |
| 14 Sept, 17:00 | 2,052 MW | 1,985 MW |
| 14 Sept, 18:00 | 1,956 MW | 1,918 MW |
| 14 Sept, 19:00 | 1,843 MW | 1,808 MW |
| 14 Sept, 20:00 | 1,750 MW | 1,706 MW |
| 14 Sept, 21:00 | 1,644 MW | 1,569 MW |
| 14 Sept, 22:00 | 1,506 MW | 1,422 MW |
| 14 Sept, 23:00 | 1,342 MW | 1,285 MW |
| 15 Sept, 00:00 | 1,200 MW | 1,185 MW |
| 15 Sept, 01:00 | 1,113 MW | 1,146 MW |
| 15 Sept, 02:00 | 1,079 MW | 1,068 MW |
| 15 Sept, 03:00 | 1,041 MW | 1,031 MW |
| 15 Sept, 04:00 | 1,038 MW | 1,021 MW |
| 15 Sept, 05:00 | 1,076 MW | 1,046 MW |
| 15 Sept, 06:00 | 1,123 MW | 1,098 MW |
| 15 Sept, 07:00 | 1,137 MW | 1,132 MW |
| 15 Sept, 08:00 | 1,171 MW | 1,191 MW |
| 15 Sept, 09:00 | 1,230 MW | 1,276 MW |
| 15 Sept, 10:00 | 1,278 MW | 1,384 MW |
| 15 Sept, 11:00 | 1,395 MW | 1,508 MW |
| 15 Sept, 12:00 | 1,579 MW | 1,625 MW |
| 15 Sept, 13:00 | 1,653 MW | 1,759 MW |
| 15 Sept, 14:00 | 1,717 MW | 1,868 MW |
| 15 Sept, 15:00 | 1,860 MW | 1,946 MW |
| 15 Sept, 16:00 | 2,096 MW | 1,986 MW |
| 15 Sept, 17:00 | 1,928 MW | 1,969 MW |
| 15 Sept, 18:00 | 1,855 MW | 1,899 MW |
| 15 Sept, 19:00 | 1,751 MW | 1,799 MW |
| 15 Sept, 20:00 | 1,663 MW | 1,701 MW |
| 15 Sept, 21:00 | 1,552 MW | 1,567 MW |
| 15 Sept, 22:00 | 1,503 MW | 1,418 MW |
| 15 Sept, 23:00 | 1,301 MW | 1,285 MW |
| 16 Sept, 00:00 | 1,151 MW | 1,185 MW |
| 16 Sept, 01:00 | 1,095 MW | 1,088 MW |
| 16 Sept, 02:00 | 1,062 MW | 1,032 MW |
| 16 Sept, 03:00 | 1,021 MW | 997 MW |
| 16 Sept, 04:00 | 1,003 MW | 988 MW |
| 16 Sept, 05:00 | 1,020 MW | 1,007 MW |
| 16 Sept, 06:00 | 1,085 MW | 1,053 MW |
| 16 Sept, 07:00 | 1,087 MW | 1,076 MW |
| 16 Sept, 08:00 | 1,133 MW | 1,126 MW |
| 16 Sept, 09:00 | 1,168 MW | 1,192 MW |
| 16 Sept, 10:00 | 1,222 MW | 1,290 MW |
| 16 Sept, 11:00 | 1,300 MW | 1,400 MW |
| 16 Sept, 12:00 | 1,407 MW | 1,515 MW |
| 16 Sept, 13:00 | 1,513 MW | 1,642 MW |
| 16 Sept, 14:00 | 1,637 MW | 1,741 MW |
| 16 Sept, 15:00 | 1,815 MW | 1,811 MW |
| 16 Sept, 16:00 | 1,812 MW | 1,839 MW |
| 16 Sept, 17:00 | 1,773 MW | 1,815 MW |
| 16 Sept, 18:00 | 1,776 MW | 1,730 MW |
| 16 Sept, 19:00 | 1,625 MW | 1,643 MW |
| 16 Sept, 20:00 | 1,507 MW | 1,556 MW |
| 16 Sept, 21:00 | 1,372 MW | 1,447 MW |
| 16 Sept, 22:00 | 1,289 MW | 1,318 MW |
| 16 Sept, 23:00 | 1,188 MW | 1,199 MW |
| 17 Sept, 00:00 | 1,122 MW | 1,109 MW |
| 17 Sept, 01:00 | 1,065 MW | 1,037 MW |
| 17 Sept, 02:00 | 1,028 MW | 1,004 MW |
| 17 Sept, 03:00 | 1,010 MW | 974 MW |
| 17 Sept, 04:00 | 998 MW | 969 MW |
| 17 Sept, 05:00 | 1,025 MW | 991 MW |
| 17 Sept, 06:00 | 1,073 MW | 1,040 MW |
| 17 Sept, 07:00 | 1,069 MW | 1,056 MW |
| 17 Sept, 08:00 | 1,096 MW | 1,110 MW |
| 17 Sept, 09:00 | 1,159 MW | 1,175 MW |
| 17 Sept, 10:00 | 1,315 MW | 1,273 MW |
| 17 Sept, 11:00 | 1,359 MW | 1,386 MW |
| 17 Sept, 12:00 | 1,480 MW | 1,509 MW |
| 17 Sept, 13:00 | 1,768 MW | 1,634 MW |
| 17 Sept, 14:00 | 1,793 MW | 1,740 MW |
| 17 Sept, 15:00 | 1,841 MW | 1,821 MW |
| 17 Sept, 16:00 | 1,894 MW | 1,874 MW |
| 17 Sept, 17:00 | 1,852 MW | 1,857 MW |
| 17 Sept, 18:00 | 1,807 MW | 1,759 MW |
| 17 Sept, 19:00 | 1,672 MW | 1,671 MW |
| 17 Sept, 20:00 | 1,557 MW | 1,573 MW |
| 17 Sept, 21:00 | 1,727 MW | 1,455 MW |
| 17 Sept, 22:00 | 1,328 MW | 1,322 MW |
| 17 Sept, 23:00 | 1,165 MW | 1,199 MW |
| 18 Sept, 00:00 | 1,076 MW | 1,103 MW |
| 18 Sept, 01:00 | 1,010 MW | 1,023 MW |
| 18 Sept, 02:00 | 977 MW | 958 MW |
| 18 Sept, 03:00 | 961 MW | 930 MW |
| 18 Sept, 04:00 | 954 MW | 926 MW |
| 18 Sept, 05:00 | 974 MW | 948 MW |
| 18 Sept, 06:00 | 1,031 MW | 995 MW |
| 18 Sept, 07:00 | 1,044 MW | 1,017 MW |
| 18 Sept, 08:00 | 1,094 MW | 1,067 MW |
| 18 Sept, 09:00 | 1,120 MW | 1,133 MW |
| 18 Sept, 10:00 | 1,258 MW | 1,231 MW |
| 18 Sept, 11:00 | 1,320 MW | 1,345 MW |
| 18 Sept, 12:00 | 1,421 MW | 1,464 MW |
| 18 Sept, 13:00 | 1,544 MW | 1,584 MW |
| 18 Sept, 14:00 | 1,683 MW | 1,703 MW |
| 18 Sept, 15:00 | 1,800 MW | 1,782 MW |
| 18 Sept, 16:00 | 1,826 MW | 1,815 MW |
| 18 Sept, 17:00 | 1,807 MW | 1,785 MW |
| 18 Sept, 18:00 | 1,732 MW | 1,672 MW |
| 18 Sept, 19:00 | 1,687 MW | 1,575 MW |
| 18 Sept, 20:00 | 1,577 MW | 1,477 MW |
| 18 Sept, 21:00 | 1,408 MW | 1,372 MW |
| 18 Sept, 22:00 | 1,316 MW | 1,265 MW |
| 18 Sept, 23:00 | 1,199 MW | 1,167 MW |
| 19 Sept, 00:00 | 1,098 MW | 1,079 MW |
| 19 Sept, 01:00 | 1,020 MW | 1,048 MW |
| 19 Sept, 02:00 | 977 MW | 985 MW |
| 19 Sept, 03:00 | 955 MW | 945 MW |
| 19 Sept, 04:00 | 931 MW | 923 MW |
| 19 Sept, 05:00 | 926 MW | 913 MW |
| 19 Sept, 06:00 | 930 MW | 918 MW |
| 19 Sept, 07:00 | 933 MW | 916 MW |
| 19 Sept, 08:00 | 973 MW | 973 MW |
| 19 Sept, 09:00 | 1,043 MW | 1,048 MW |
| 19 Sept, 10:00 | 1,146 MW | 1,155 MW |
| 19 Sept, 11:00 | 1,252 MW | 1,273 MW |
| 19 Sept, 12:00 | 1,350 MW | 1,394 MW |
| 19 Sept, 13:00 | 1,483 MW | 1,504 MW |
| 19 Sept, 14:00 | 1,570 MW | 1,603 MW |
| 19 Sept, 15:00 | 1,680 MW | 1,692 MW |
| 19 Sept, 16:00 | 1,834 MW | 1,728 MW |
| 19 Sept, 17:00 | 1,740 MW | 1,715 MW |
| 19 Sept, 18:00 | 1,720 MW | 1,621 MW |
| 19 Sept, 19:00 | 1,587 MW | 1,554 MW |
| 19 Sept, 20:00 | 1,475 MW | 1,452 MW |
| 19 Sept, 21:00 | 1,366 MW | 1,347 MW |
| 19 Sept, 22:00 | 1,268 MW | 1,244 MW |
| 19 Sept, 23:00 | 1,170 MW | 1,149 MW |
| 20 Sept, 00:00 | 1,071 MW | 1,067 MW |
| 20 Sept, 01:00 | 968 MW | 1,014 MW |
| 20 Sept, 02:00 | 915 MW | 942 MW |
| 20 Sept, 03:00 | 886 MW | 901 MW |
| 20 Sept, 04:00 | 857 MW | 875 MW |
| 20 Sept, 05:00 | 841 MW | 861 MW |
| 20 Sept, 06:00 | 833 MW | 858 MW |
| 20 Sept, 07:00 | 826 MW | 844 MW |
| 20 Sept, 08:00 | 875 MW | 894 MW |
| 20 Sept, 09:00 | 952 MW | 965 MW |
| 20 Sept, 10:00 | 1,051 MW | 1,068 MW |
| 20 Sept, 11:00 | 1,175 MW | 1,188 MW |
| 20 Sept, 12:00 | 1,302 MW | 1,316 MW |
| 20 Sept, 13:00 | 1,432 MW | 1,432 MW |
| 20 Sept, 14:00 | 1,557 MW | 1,541 MW |
| 20 Sept, 15:00 | 1,641 MW | 1,618 MW |
| 20 Sept, 16:00 | 1,688 MW | 1,669 MW |
| 20 Sept, 17:00 | 1,706 MW | 1,666 MW |
| 20 Sept, 18:00 | 1,638 MW | 1,610 MW |
| 20 Sept, 19:00 | 1,537 MW | 1,530 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (695 of 720 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- US figures are for the EIA balancing authority or region named on this page. US and European grids are ranked separately.