Hungary Demand Forecast Accuracy: Error, Bias and Worst Miss, 8 October to 5 November 2026
The day-ahead demand forecast for Hungary was off by 4.0% on average (mean absolute percentage error) over 686 hours from 8 October to 5 November 2026, and 70% of hours landed within 5% of the reading. Its bias was -2.7%: it ran low on average, an under forecast. The largest miss was 715 MW (20.5%) too high at 13 Oct 2026, 11:00 CEST (UTC+02:00). Dates and times are local (Europe/Budapest).
Key Facts
- The day-ahead demand forecast for Hungary was off by 4.0% on average (mean absolute percentage error) over 686 hours from 8 October to 5 November 2026, and 70% of hours landed within 5% of the reading. Its bias was -2.7%: it ran low on average, an under forecast. The largest miss was 715 MW (20.5%) too high at 13 Oct 2026, 11:00 CEST (UTC+02:00).
- Across 47 European bidding zones ranked by average error over their own latest 30 day windows, Hungary came 31 (1 is the smallest error).
- On average the forecast differed from reported demand by 195 MW, against average demand of 4,949 MW.
- The forecast was above reported demand in 17% of compared hours.
Forecast Error at a Glance
686 hours from 8 October to 5 November 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (-141 MW per hour on average): the forecast ran low on average, an under forecast. The worst miss was 715 MW (20.5%) too high at 13 Oct 2026, 11:00 CEST (UTC+02:00): forecast 4,203 MW, reported 3,488 MW.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-05. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 5 Nov 2026, 13:00 CET (UTC+01:00)Show the data table (168 rows)
| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 29 Oct, 14:00 | 5,572 MW | 5,362 MW |
| 29 Oct, 15:00 | 5,928 MW | 5,630 MW |
| 29 Oct, 16:00 | 6,136 MW | 5,844 MW |
| 29 Oct, 17:00 | 6,223 MW | 5,981 MW |
| 29 Oct, 18:00 | 6,163 MW | 5,961 MW |
| 29 Oct, 19:00 | 6,067 MW | 5,888 MW |
| 29 Oct, 20:00 | 5,870 MW | 5,641 MW |
| 29 Oct, 21:00 | 5,758 MW | 5,312 MW |
| 29 Oct, 22:00 | 5,484 MW | 5,085 MW |
| 29 Oct, 23:00 | 5,301 MW | 4,850 MW |
| 30 Oct, 00:00 | 4,860 MW | 4,545 MW |
| 30 Oct, 01:00 | 4,703 MW | 4,282 MW |
| 30 Oct, 02:00 | 4,660 MW | 4,147 MW |
| 30 Oct, 03:00 | 4,687 MW | 4,164 MW |
| 30 Oct, 04:00 | 4,655 MW | 4,326 MW |
| 30 Oct, 05:00 | 4,912 MW | 4,659 MW |
| 30 Oct, 06:00 | 5,408 MW | 5,287 MW |
| 30 Oct, 07:00 | 5,633 MW | 5,435 MW |
| 30 Oct, 08:00 | 5,520 MW | 5,370 MW |
| 30 Oct, 09:00 | 5,336 MW | 5,282 MW |
| 30 Oct, 10:00 | 5,200 MW | 5,224 MW |
| 30 Oct, 11:00 | 5,218 MW | 5,314 MW |
| 30 Oct, 12:00 | 5,226 MW | 5,355 MW |
| 30 Oct, 13:00 | 5,202 MW | 5,351 MW |
| 30 Oct, 14:00 | 5,470 MW | 5,404 MW |
| 30 Oct, 15:00 | 5,747 MW | 5,629 MW |
| 30 Oct, 16:00 | 6,045 MW | 5,843 MW |
| 30 Oct, 17:00 | 6,101 MW | 5,940 MW |
| 30 Oct, 18:00 | 6,031 MW | 5,909 MW |
| 30 Oct, 19:00 | 5,960 MW | 5,838 MW |
| 30 Oct, 20:00 | 5,780 MW | 5,592 MW |
| 30 Oct, 21:00 | 5,704 MW | 5,271 MW |
| 30 Oct, 22:00 | 5,421 MW | 5,047 MW |
| 30 Oct, 23:00 | 5,148 MW | 4,829 MW |
| 31 Oct, 00:00 | 4,760 MW | 4,502 MW |
| 31 Oct, 01:00 | 4,487 MW | 4,248 MW |
| 31 Oct, 02:00 | 4,375 MW | 4,110 MW |
| 31 Oct, 03:00 | 4,346 MW | 4,080 MW |
| 31 Oct, 04:00 | 4,373 MW | 4,121 MW |
| 31 Oct, 05:00 | 4,480 MW | 4,250 MW |
| 31 Oct, 06:00 | 4,647 MW | 4,491 MW |
| 31 Oct, 07:00 | 4,894 MW | 4,604 MW |
| 31 Oct, 08:00 | 4,919 MW | 4,661 MW |
| 31 Oct, 09:00 | 4,984 MW | 4,613 MW |
| 31 Oct, 10:00 | 5,038 MW | 4,577 MW |
| 31 Oct, 11:00 | 4,949 MW | 4,736 MW |
| 31 Oct, 12:00 | 4,806 MW | 4,789 MW |
| 31 Oct, 13:00 | 4,859 MW | 4,776 MW |
| 31 Oct, 14:00 | 4,968 MW | 4,829 MW |
| 31 Oct, 15:00 | 5,190 MW | 5,050 MW |
| 31 Oct, 16:00 | 5,502 MW | 5,283 MW |
| 31 Oct, 17:00 | 5,571 MW | 5,413 MW |
| 31 Oct, 18:00 | 5,484 MW | 5,421 MW |
| 31 Oct, 19:00 | 5,477 MW | 5,378 MW |
| 31 Oct, 20:00 | 5,292 MW | 5,179 MW |
| 31 Oct, 21:00 | 5,154 MW | 4,899 MW |
| 31 Oct, 22:00 | 4,938 MW | 4,717 MW |
| 31 Oct, 23:00 | 4,662 MW | 4,496 MW |
| 1 Nov, 00:00 | 4,330 MW | 4,094 MW |
| 1 Nov, 01:00 | 4,159 MW | 3,869 MW |
| 1 Nov, 02:00 | 4,059 MW | 3,750 MW |
| 1 Nov, 03:00 | 4,001 MW | 3,731 MW |
| 1 Nov, 04:00 | 4,097 MW | 3,757 MW |
| 1 Nov, 05:00 | 4,095 MW | 3,821 MW |
| 1 Nov, 06:00 | 4,180 MW | 3,930 MW |
| 1 Nov, 07:00 | 4,183 MW | 3,947 MW |
| 1 Nov, 08:00 | 4,163 MW | 4,025 MW |
| 1 Nov, 09:00 | 4,152 MW | 4,081 MW |
| 1 Nov, 10:00 | 4,207 MW | 4,120 MW |
| 1 Nov, 11:00 | 4,320 MW | 4,194 MW |
| 1 Nov, 12:00 | 4,422 MW | 4,244 MW |
| 1 Nov, 13:00 | 4,463 MW | 4,252 MW |
| 1 Nov, 14:00 | 4,690 MW | 4,379 MW |
| 1 Nov, 15:00 | 4,967 MW | 4,557 MW |
| 1 Nov, 16:00 | 5,142 MW | 4,781 MW |
| 1 Nov, 17:00 | 5,223 MW | 4,974 MW |
| 1 Nov, 18:00 | 5,202 MW | 5,002 MW |
| 1 Nov, 19:00 | 5,283 MW | 4,970 MW |
| 1 Nov, 20:00 | 5,169 MW | 4,815 MW |
| 1 Nov, 21:00 | 5,049 MW | 4,598 MW |
| 1 Nov, 22:00 | 4,843 MW | 4,428 MW |
| 1 Nov, 23:00 | 4,555 MW | 4,193 MW |
| 2 Nov, 00:00 | 4,274 MW | 4,041 MW |
| 2 Nov, 01:00 | 4,134 MW | 3,804 MW |
| 2 Nov, 02:00 | 4,095 MW | 3,723 MW |
| 2 Nov, 03:00 | 4,171 MW | 3,773 MW |
| 2 Nov, 04:00 | 4,205 MW | 3,964 MW |
| 2 Nov, 05:00 | 4,543 MW | 4,379 MW |
| 2 Nov, 06:00 | 5,337 MW | 5,118 MW |
| 2 Nov, 07:00 | 5,744 MW | 5,347 MW |
| 2 Nov, 08:00 | 5,876 MW | 5,387 MW |
| 2 Nov, 09:00 | 5,901 MW | 5,406 MW |
| 2 Nov, 10:00 | 5,921 MW | 5,436 MW |
| 2 Nov, 11:00 | 5,895 MW | 5,549 MW |
| 2 Nov, 12:00 | 5,930 MW | 5,591 MW |
| 2 Nov, 13:00 | 5,929 MW | 5,575 MW |
| 2 Nov, 14:00 | 6,040 MW | 5,619 MW |
| 2 Nov, 15:00 | 6,170 MW | 5,788 MW |
| 2 Nov, 16:00 | 6,304 MW | 5,958 MW |
| 2 Nov, 17:00 | 6,344 MW | 6,029 MW |
| 2 Nov, 18:00 | 6,342 MW | 5,997 MW |
| 2 Nov, 19:00 | 6,350 MW | 5,930 MW |
| 2 Nov, 20:00 | 6,124 MW | 5,699 MW |
| 2 Nov, 21:00 | 5,918 MW | 5,392 MW |
| 2 Nov, 22:00 | 5,593 MW | 5,138 MW |
| 2 Nov, 23:00 | 5,302 MW | 4,862 MW |
| 3 Nov, 00:00 | 4,955 MW | 4,613 MW |
| 3 Nov, 01:00 | 4,758 MW | 4,380 MW |
| 3 Nov, 02:00 | 4,809 MW | 4,249 MW |
| 3 Nov, 03:00 | 4,841 MW | 4,266 MW |
| 3 Nov, 04:00 | 4,859 MW | 4,418 MW |
| 3 Nov, 05:00 | 5,091 MW | 4,783 MW |
| 3 Nov, 06:00 | 5,689 MW | 5,438 MW |
| 3 Nov, 07:00 | 6,011 MW | 5,631 MW |
| 3 Nov, 08:00 | 6,025 MW | 5,657 MW |
| 3 Nov, 09:00 | 6,055 MW | 5,630 MW |
| 3 Nov, 10:00 | 6,051 MW | 5,575 MW |
| 3 Nov, 11:00 | 5,951 MW | 5,598 MW |
| 3 Nov, 12:00 | 5,858 MW | 5,575 MW |
| 3 Nov, 13:00 | 5,888 MW | 5,521 MW |
| 3 Nov, 14:00 | 5,991 MW | 5,608 MW |
| 3 Nov, 15:00 | 6,213 MW | 5,821 MW |
| 3 Nov, 16:00 | 6,394 MW | 6,023 MW |
| 3 Nov, 17:00 | 6,478 MW | 6,118 MW |
| 3 Nov, 18:00 | 6,440 MW | 6,095 MW |
| 3 Nov, 19:00 | 6,418 MW | 6,038 MW |
| 3 Nov, 20:00 | 6,208 MW | 5,807 MW |
| 3 Nov, 21:00 | 5,980 MW | 5,498 MW |
| 3 Nov, 22:00 | 5,700 MW | 5,270 MW |
| 3 Nov, 23:00 | 5,409 MW | 5,022 MW |
| 4 Nov, 00:00 | 5,035 MW | 4,751 MW |
| 4 Nov, 01:00 | 4,796 MW | 4,499 MW |
| 4 Nov, 02:00 | 4,807 MW | 4,410 MW |
| 4 Nov, 03:00 | 4,792 MW | 4,444 MW |
| 4 Nov, 04:00 | 4,790 MW | 4,599 MW |
| 4 Nov, 05:00 | 5,060 MW | 4,982 MW |
| 4 Nov, 06:00 | 5,735 MW | 5,599 MW |
| 4 Nov, 07:00 | 5,889 MW | 5,657 MW |
| 4 Nov, 08:00 | 5,632 MW | 5,385 MW |
| 4 Nov, 09:00 | 5,341 MW | 5,084 MW |
| 4 Nov, 10:00 | 5,116 MW | 4,934 MW |
| 4 Nov, 11:00 | 4,979 MW | 4,929 MW |
| 4 Nov, 12:00 | 4,990 MW | 4,965 MW |
| 4 Nov, 13:00 | 5,148 MW | 5,030 MW |
| 4 Nov, 14:00 | 5,546 MW | 5,259 MW |
| 4 Nov, 15:00 | 5,956 MW | 5,673 MW |
| 4 Nov, 16:00 | 6,263 MW | 6,044 MW |
| 4 Nov, 17:00 | 6,415 MW | 6,217 MW |
| 4 Nov, 18:00 | 6,447 MW | 6,224 MW |
| 4 Nov, 19:00 | 6,435 MW | 6,177 MW |
| 4 Nov, 20:00 | 6,227 MW | 5,957 MW |
| 4 Nov, 21:00 | 6,097 MW | 5,666 MW |
| 4 Nov, 22:00 | 5,775 MW | 5,477 MW |
| 4 Nov, 23:00 | 5,488 MW | 5,245 MW |
| 5 Nov, 00:00 | 5,161 MW | 4,855 MW |
| 5 Nov, 01:00 | 5,059 MW | 4,589 MW |
| 5 Nov, 02:00 | 4,994 MW | 4,500 MW |
| 5 Nov, 03:00 | 5,035 MW | 4,534 MW |
| 5 Nov, 04:00 | 4,973 MW | 4,690 MW |
| 5 Nov, 05:00 | 5,318 MW | 5,071 MW |
| 5 Nov, 06:00 | 5,964 MW | 5,699 MW |
| 5 Nov, 07:00 | 5,925 MW | 5,742 MW |
| 5 Nov, 08:00 | 5,412 MW | 5,420 MW |
| 5 Nov, 09:00 | 5,009 MW | 5,104 MW |
| 5 Nov, 10:00 | 4,858 MW | 4,888 MW |
| 5 Nov, 11:00 | 4,844 MW | 4,865 MW |
| 5 Nov, 12:00 | 4,845 MW | 4,885 MW |
| 5 Nov, 13:00 | 4,857 MW | 4,973 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (686 of 687 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- European figures are for the ENTSO-E bidding zone named on this page. US and European grids are ranked separately.
Related
Cite this page
World Power Monitor. (2026). Hungary Demand Forecast Accuracy: Error, Bias and Worst Miss. https://worldpowermonitor.com/forecast-accuracy/hu/
World Power Monitor. Hungary Demand Forecast Accuracy: Error, Bias and Worst Miss. Data as of 2026-11-05. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/forecast-accuracy/hu/
@misc{wpm_forecast_accuracy_hu_2026,
title = {{Hungary Demand Forecast Accuracy: Error, Bias and Worst Miss}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-05. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/forecast-accuracy/hu/}
} Permalink: https://worldpowermonitor.com/forecast-accuracy/hu/