Italy Sardinia Demand Forecast Accuracy: Error, Bias and Worst Miss, 8 October to 5 November 2026
The day-ahead demand forecast for Italy Sardinia was off by 3.9% on average (mean absolute percentage error) over 686 hours from 8 October to 5 November 2026, and 76% of hours landed within 5% of the reading. Its bias was +1.0%: it ran high on average, an over forecast. The largest miss was 213 MW (39.7%) too high at 25 Oct 2026, 02:00 CET (UTC+01:00). Dates and times are local (Europe/Rome).
Key Facts
- The day-ahead demand forecast for Italy Sardinia was off by 3.9% on average (mean absolute percentage error) over 686 hours from 8 October to 5 November 2026, and 76% of hours landed within 5% of the reading. Its bias was +1.0%: it ran high on average, an over forecast. The largest miss was 213 MW (39.7%) too high at 25 Oct 2026, 02:00 CET (UTC+01:00).
- Across 47 European bidding zones ranked by average error over their own latest 30 day windows, Italy Sardinia came 28 (1 is the smallest error).
- On average the forecast differed from reported demand by 29 MW, against average demand of 783 MW.
- The forecast was above reported demand in 56% of compared hours.
Forecast Error at a Glance
686 hours from 8 October to 5 November 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (+6 MW per hour on average): the forecast ran high on average, an over forecast. The worst miss was 213 MW (39.7%) too high at 25 Oct 2026, 02:00 CET (UTC+01:00): forecast 750 MW, reported 537 MW.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-05. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 5 Nov 2026, 13:00 CET (UTC+01:00)Show the data table (168 rows)
| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 29 Oct, 14:00 | 708 MW | 723 MW |
| 29 Oct, 15:00 | 781 MW | 768 MW |
| 29 Oct, 16:00 | 839 MW | 830 MW |
| 29 Oct, 17:00 | 928 MW | 913 MW |
| 29 Oct, 18:00 | 988 MW | 980 MW |
| 29 Oct, 19:00 | 1,002 MW | 975 MW |
| 29 Oct, 20:00 | 979 MW | 930 MW |
| 29 Oct, 21:00 | 917 MW | 885 MW |
| 29 Oct, 22:00 | 856 MW | 803 MW |
| 29 Oct, 23:00 | 773 MW | 738 MW |
| 30 Oct, 00:00 | 724 MW | 705 MW |
| 30 Oct, 01:00 | 690 MW | 680 MW |
| 30 Oct, 02:00 | 677 MW | 668 MW |
| 30 Oct, 03:00 | 670 MW | 660 MW |
| 30 Oct, 04:00 | 679 MW | 670 MW |
| 30 Oct, 05:00 | 705 MW | 708 MW |
| 30 Oct, 06:00 | 788 MW | 790 MW |
| 30 Oct, 07:00 | 857 MW | 865 MW |
| 30 Oct, 08:00 | 861 MW | 840 MW |
| 30 Oct, 09:00 | 790 MW | 785 MW |
| 30 Oct, 10:00 | 745 MW | 775 MW |
| 30 Oct, 11:00 | 729 MW | 758 MW |
| 30 Oct, 12:00 | 694 MW | 745 MW |
| 30 Oct, 13:00 | 680 MW | 730 MW |
| 30 Oct, 14:00 | 679 MW | 755 MW |
| 30 Oct, 15:00 | 712 MW | 788 MW |
| 30 Oct, 16:00 | 819 MW | 823 MW |
| 30 Oct, 17:00 | 920 MW | 913 MW |
| 30 Oct, 18:00 | 979 MW | 993 MW |
| 30 Oct, 19:00 | 1,001 MW | 1,008 MW |
| 30 Oct, 20:00 | 982 MW | 958 MW |
| 30 Oct, 21:00 | 929 MW | 888 MW |
| 30 Oct, 22:00 | 860 MW | 828 MW |
| 30 Oct, 23:00 | 786 MW | 758 MW |
| 31 Oct, 00:00 | 739 MW | 743 MW |
| 31 Oct, 01:00 | 702 MW | 718 MW |
| 31 Oct, 02:00 | 691 MW | 700 MW |
| 31 Oct, 03:00 | 686 MW | 695 MW |
| 31 Oct, 04:00 | 689 MW | 700 MW |
| 31 Oct, 05:00 | 710 MW | 728 MW |
| 31 Oct, 06:00 | 757 MW | 793 MW |
| 31 Oct, 07:00 | 797 MW | 830 MW |
| 31 Oct, 08:00 | 790 MW | 825 MW |
| 31 Oct, 09:00 | 750 MW | 795 MW |
| 31 Oct, 10:00 | 713 MW | 740 MW |
| 31 Oct, 11:00 | 681 MW | 715 MW |
| 31 Oct, 12:00 | 717 MW | 720 MW |
| 31 Oct, 13:00 | 694 MW | 715 MW |
| 31 Oct, 14:00 | 717 MW | 723 MW |
| 31 Oct, 15:00 | 758 MW | 768 MW |
| 31 Oct, 16:00 | 819 MW | 815 MW |
| 31 Oct, 17:00 | 902 MW | 903 MW |
| 31 Oct, 18:00 | 959 MW | 963 MW |
| 31 Oct, 19:00 | 970 MW | 975 MW |
| 31 Oct, 20:00 | 950 MW | 938 MW |
| 31 Oct, 21:00 | 880 MW | 875 MW |
| 31 Oct, 22:00 | 826 MW | 833 MW |
| 31 Oct, 23:00 | 769 MW | 778 MW |
| 1 Nov, 00:00 | 718 MW | 725 MW |
| 1 Nov, 01:00 | 687 MW | 708 MW |
| 1 Nov, 02:00 | 667 MW | 680 MW |
| 1 Nov, 03:00 | 659 MW | 673 MW |
| 1 Nov, 04:00 | 655 MW | 673 MW |
| 1 Nov, 05:00 | 672 MW | 688 MW |
| 1 Nov, 06:00 | 696 MW | 728 MW |
| 1 Nov, 07:00 | 719 MW | 735 MW |
| 1 Nov, 08:00 | 728 MW | 733 MW |
| 1 Nov, 09:00 | 738 MW | 750 MW |
| 1 Nov, 10:00 | 750 MW | 760 MW |
| 1 Nov, 11:00 | 771 MW | 753 MW |
| 1 Nov, 12:00 | 808 MW | 758 MW |
| 1 Nov, 13:00 | 786 MW | 768 MW |
| 1 Nov, 14:00 | 762 MW | 760 MW |
| 1 Nov, 15:00 | 781 MW | 773 MW |
| 1 Nov, 16:00 | 814 MW | 795 MW |
| 1 Nov, 17:00 | 892 MW | 858 MW |
| 1 Nov, 18:00 | 945 MW | 925 MW |
| 1 Nov, 19:00 | 977 MW | 923 MW |
| 1 Nov, 20:00 | 954 MW | 925 MW |
| 1 Nov, 21:00 | 891 MW | 883 MW |
| 1 Nov, 22:00 | 833 MW | 825 MW |
| 1 Nov, 23:00 | 770 MW | 753 MW |
| 2 Nov, 00:00 | 724 MW | 698 MW |
| 2 Nov, 01:00 | 707 MW | 658 MW |
| 2 Nov, 02:00 | 691 MW | 643 MW |
| 2 Nov, 03:00 | 691 MW | 640 MW |
| 2 Nov, 04:00 | 699 MW | 653 MW |
| 2 Nov, 05:00 | 728 MW | 685 MW |
| 2 Nov, 06:00 | 811 MW | 783 MW |
| 2 Nov, 07:00 | 891 MW | 868 MW |
| 2 Nov, 08:00 | 910 MW | 888 MW |
| 2 Nov, 09:00 | 874 MW | 840 MW |
| 2 Nov, 10:00 | 806 MW | 800 MW |
| 2 Nov, 11:00 | 813 MW | 770 MW |
| 2 Nov, 12:00 | 834 MW | 758 MW |
| 2 Nov, 13:00 | 834 MW | 758 MW |
| 2 Nov, 14:00 | 847 MW | 770 MW |
| 2 Nov, 15:00 | 887 MW | 813 MW |
| 2 Nov, 16:00 | 937 MW | 878 MW |
| 2 Nov, 17:00 | 1,001 MW | 938 MW |
| 2 Nov, 18:00 | 1,054 MW | 990 MW |
| 2 Nov, 19:00 | 1,076 MW | 1,015 MW |
| 2 Nov, 20:00 | 1,063 MW | 990 MW |
| 2 Nov, 21:00 | 974 MW | 950 MW |
| 2 Nov, 22:00 | 877 MW | 870 MW |
| 2 Nov, 23:00 | 805 MW | 788 MW |
| 3 Nov, 00:00 | 754 MW | 733 MW |
| 3 Nov, 01:00 | 718 MW | 695 MW |
| 3 Nov, 02:00 | 703 MW | 675 MW |
| 3 Nov, 03:00 | 697 MW | 670 MW |
| 3 Nov, 04:00 | 699 MW | 683 MW |
| 3 Nov, 05:00 | 733 MW | 720 MW |
| 3 Nov, 06:00 | 835 MW | 815 MW |
| 3 Nov, 07:00 | 934 MW | 908 MW |
| 3 Nov, 08:00 | 924 MW | 908 MW |
| 3 Nov, 09:00 | 884 MW | 835 MW |
| 3 Nov, 10:00 | 835 MW | 800 MW |
| 3 Nov, 11:00 | 821 MW | 758 MW |
| 3 Nov, 12:00 | 801 MW | 778 MW |
| 3 Nov, 13:00 | 805 MW | 763 MW |
| 3 Nov, 14:00 | 815 MW | 795 MW |
| 3 Nov, 15:00 | 845 MW | 843 MW |
| 3 Nov, 16:00 | 884 MW | 900 MW |
| 3 Nov, 17:00 | 975 MW | 958 MW |
| 3 Nov, 18:00 | 1,051 MW | 1,003 MW |
| 3 Nov, 19:00 | 1,088 MW | 1,018 MW |
| 3 Nov, 20:00 | 1,063 MW | 1,005 MW |
| 3 Nov, 21:00 | 986 MW | 940 MW |
| 3 Nov, 22:00 | 899 MW | 863 MW |
| 3 Nov, 23:00 | 803 MW | 783 MW |
| 4 Nov, 00:00 | 735 MW | 733 MW |
| 4 Nov, 01:00 | 700 MW | 688 MW |
| 4 Nov, 02:00 | 686 MW | 673 MW |
| 4 Nov, 03:00 | 677 MW | 665 MW |
| 4 Nov, 04:00 | 679 MW | 660 MW |
| 4 Nov, 05:00 | 716 MW | 705 MW |
| 4 Nov, 06:00 | 814 MW | 795 MW |
| 4 Nov, 07:00 | 918 MW | 888 MW |
| 4 Nov, 08:00 | 925 MW | 885 MW |
| 4 Nov, 09:00 | 885 MW | 853 MW |
| 4 Nov, 10:00 | 830 MW | 823 MW |
| 4 Nov, 11:00 | 809 MW | 805 MW |
| 4 Nov, 12:00 | 823 MW | 815 MW |
| 4 Nov, 13:00 | 821 MW | 810 MW |
| 4 Nov, 14:00 | 868 MW | 838 MW |
| 4 Nov, 15:00 | 870 MW | 868 MW |
| 4 Nov, 16:00 | 882 MW | 893 MW |
| 4 Nov, 17:00 | 950 MW | 965 MW |
| 4 Nov, 18:00 | 989 MW | 1,010 MW |
| 4 Nov, 19:00 | 1,017 MW | 1,035 MW |
| 4 Nov, 20:00 | 997 MW | 1,005 MW |
| 4 Nov, 21:00 | 924 MW | 943 MW |
| 4 Nov, 22:00 | 844 MW | 870 MW |
| 4 Nov, 23:00 | 765 MW | 788 MW |
| 5 Nov, 00:00 | 700 MW | 768 MW |
| 5 Nov, 01:00 | 663 MW | 735 MW |
| 5 Nov, 02:00 | 648 MW | 720 MW |
| 5 Nov, 03:00 | 651 MW | 710 MW |
| 5 Nov, 04:00 | 659 MW | 708 MW |
| 5 Nov, 05:00 | 692 MW | 740 MW |
| 5 Nov, 06:00 | 787 MW | 845 MW |
| 5 Nov, 07:00 | 882 MW | 948 MW |
| 5 Nov, 08:00 | 911 MW | 948 MW |
| 5 Nov, 09:00 | 937 MW | 948 MW |
| 5 Nov, 10:00 | 951 MW | 913 MW |
| 5 Nov, 11:00 | 946 MW | 908 MW |
| 5 Nov, 12:00 | 959 MW | 885 MW |
| 5 Nov, 13:00 | 968 MW | 885 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (686 of 686 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- European figures are for the ENTSO-E bidding zone named on this page. US and European grids are ranked separately.
Related
Cite this page
World Power Monitor. (2026). Italy Sardinia Demand Forecast Accuracy: Error, Bias and Worst Miss. https://worldpowermonitor.com/forecast-accuracy/it-sard/
World Power Monitor. Italy Sardinia Demand Forecast Accuracy: Error, Bias and Worst Miss. Data as of 2026-11-05. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/forecast-accuracy/it-sard/
@misc{wpm_forecast_accuracy_it_sard_2026,
title = {{Italy Sardinia Demand Forecast Accuracy: Error, Bias and Worst Miss}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-05. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/forecast-accuracy/it-sard/}
} Permalink: https://worldpowermonitor.com/forecast-accuracy/it-sard/
The Copy buttons add today's date as the access date.