Italy Sicily Demand Forecast Accuracy: Error, Bias and Worst Miss, 23 August to 20 September 2026

The day-ahead demand forecast for Italy Sicily was off by 4.4% on average (mean absolute percentage error) over 686 hours from 23 August to 20 September 2026, and 65% of hours landed within 5% of the reading. Its bias was -0.1%: it ran close to balanced on average. The largest miss was 545 MW (15.2%) too low at 26 Aug 2026, 19:00 CEST (UTC+02:00). Dates and times are local (Europe/Rome).

Key Facts

  • The day-ahead demand forecast for Italy Sicily was off by 4.4% on average (mean absolute percentage error) over 686 hours from 23 August to 20 September 2026, and 65% of hours landed within 5% of the reading. Its bias was -0.1%: it ran close to balanced on average. The largest miss was 545 MW (15.2%) too low at 26 Aug 2026, 19:00 CEST (UTC+02:00).
  • Across 47 European bidding zones ranked by average error over their own latest 30 day windows, Italy Sicily came 29 (1 is the smallest error).
  • On average the forecast differed from reported demand by 116 MW, against average demand of 2,512 MW.
  • The forecast was above reported demand in 51% of compared hours.

Forecast Error at a Glance

686 hours from 23 August to 20 September 2026
Average error4.4%
Bias-0.1%
Hours within 5%65%
Worst miss545 MW

Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (-16 MW per hour on average): the forecast ran close to balanced on average. The worst miss was 545 MW (15.2%) too low at 26 Aug 2026, 19:00 CEST (UTC+02:00): forecast 3,048 MW, reported 3,592 MW.

Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-09-20. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.

Forecast and Reported Demand, Last 7 Days

Local time, to 20 Sept 2026, 13:00 CEST (UTC+02:00)
Italy Sicily day-ahead demand forecast and reported demand by hour Hourly reported demand and the day-ahead forecast for Italy Sicily over the last 7 days of the window, to 20 Sept 2026, 13:00 CEST (UTC+02:00). Gaps are hours with a missing, zero or implausible report. 0 750 1,500 2,250 3,000 13 Sept, 14:0014 Sept, 14:0015 Sept, 14:0016 Sept, 14:0017 Sept, 14:0018 Sept, 14:0019 Sept, 14:00
Hourly reported demand and the day-ahead forecast for Italy Sicily over the last 7 days of the window, to 20 Sept 2026, 13:00 CEST (UTC+02:00). Gaps are hours with a missing, zero or implausible report.
Data to 2026-09-20
Italy Sicily day-ahead demand forecast and reported demand by hour
Local hourReported demandDay-ahead forecast
13 Sept, 14:002,055 MW2,043 MW
13 Sept, 15:001,985 MW1,998 MW
13 Sept, 16:002,016 MW2,008 MW
13 Sept, 17:002,049 MW2,088 MW
13 Sept, 18:002,122 MW2,158 MW
13 Sept, 19:002,296 MW2,223 MW
13 Sept, 20:002,370 MW2,268 MW
13 Sept, 21:002,258 MW2,213 MW
13 Sept, 22:002,133 MW2,143 MW
13 Sept, 23:001,996 MW2,020 MW
14 Sept, 00:001,838 MW1,925 MW
14 Sept, 01:001,725 MW1,795 MW
14 Sept, 02:001,664 MW1,718 MW
14 Sept, 03:001,630 MW1,703 MW
14 Sept, 04:001,611 MW1,675 MW
14 Sept, 05:001,661 MW1,705 MW
14 Sept, 06:001,782 MW1,770 MW
14 Sept, 07:001,960 MW1,973 MW
14 Sept, 08:002,175 MW2,213 MW
14 Sept, 09:002,276 MW2,250 MW
14 Sept, 10:002,271 MW2,280 MW
14 Sept, 11:002,264 MW2,285 MW
14 Sept, 12:002,257 MW2,253 MW
14 Sept, 13:002,260 MW2,210 MW
14 Sept, 14:002,294 MW2,173 MW
14 Sept, 15:002,338 MW2,220 MW
14 Sept, 16:002,377 MW2,315 MW
14 Sept, 17:002,362 MW2,388 MW
14 Sept, 18:002,365 MW2,405 MW
14 Sept, 19:002,518 MW2,495 MW
14 Sept, 20:002,536 MW2,468 MW
14 Sept, 21:002,385 MW2,345 MW
14 Sept, 22:002,221 MW2,218 MW
14 Sept, 23:002,030 MW2,070 MW
15 Sept, 00:001,847 MW1,935 MW
15 Sept, 01:001,742 MW1,828 MW
15 Sept, 02:001,692 MW1,750 MW
15 Sept, 03:001,665 MW1,713 MW
15 Sept, 04:001,664 MW1,703 MW
15 Sept, 05:001,711 MW1,728 MW
15 Sept, 06:001,833 MW1,833 MW
15 Sept, 07:002,018 MW2,010 MW
15 Sept, 08:002,114 MW2,190 MW
15 Sept, 09:002,264 MW2,303 MW
15 Sept, 10:002,251 MW2,258 MW
15 Sept, 11:002,215 MW2,238 MW
15 Sept, 12:002,293 MW2,253 MW
15 Sept, 13:002,230 MW2,285 MW
15 Sept, 14:002,171 MW2,323 MW
15 Sept, 15:002,173 MW2,383 MW
15 Sept, 16:002,325 MW2,415 MW
15 Sept, 17:002,290 MW2,490 MW
15 Sept, 18:002,323 MW2,513 MW
15 Sept, 19:002,478 MW2,633 MW
15 Sept, 20:002,455 MW2,623 MW
15 Sept, 21:002,281 MW2,480 MW
15 Sept, 22:002,112 MW2,320 MW
15 Sept, 23:001,932 MW2,140 MW
16 Sept, 00:001,772 MW1,948 MW
16 Sept, 01:001,672 MW1,838 MW
16 Sept, 02:001,610 MW1,763 MW
16 Sept, 03:001,580 MW1,723 MW
16 Sept, 04:001,586 MW1,713 MW
16 Sept, 05:001,638 MW1,755 MW
16 Sept, 06:001,782 MW1,843 MW
16 Sept, 07:001,978 MW2,043 MW
16 Sept, 08:002,144 MW2,243 MW
16 Sept, 09:002,254 MW2,330 MW
16 Sept, 10:002,228 MW2,285 MW
16 Sept, 11:002,230 MW2,270 MW
16 Sept, 12:002,260 MW2,288 MW
16 Sept, 13:002,172 MW2,293 MW
16 Sept, 14:002,157 MW2,330 MW
16 Sept, 15:002,180 MW2,390 MW
16 Sept, 16:002,315 MW2,440 MW
16 Sept, 17:002,343 MW2,510 MW
16 Sept, 18:002,346 MW2,553 MW
16 Sept, 19:002,494 MW2,718 MW
16 Sept, 20:002,487 MW2,695 MW
16 Sept, 21:002,306 MW2,535 MW
16 Sept, 22:002,135 MW2,388 MW
16 Sept, 23:001,956 MW2,193 MW
17 Sept, 00:001,795 MW1,908 MW
17 Sept, 01:001,718 MW1,775 MW
17 Sept, 02:001,640 MW1,718 MW
17 Sept, 03:001,592 MW1,685 MW
17 Sept, 04:001,594 MW1,668 MW
17 Sept, 05:001,637 MW1,705 MW
17 Sept, 06:001,774 MW1,785 MW
17 Sept, 07:001,941 MW1,983 MW
17 Sept, 08:002,113 MW2,223 MW
17 Sept, 09:002,248 MW2,298 MW
17 Sept, 10:002,178 MW2,243 MW
17 Sept, 11:002,186 MW2,233 MW
17 Sept, 12:002,164 MW2,200 MW
17 Sept, 13:002,126 MW2,183 MW
17 Sept, 14:002,183 MW2,213 MW
17 Sept, 15:002,199 MW2,263 MW
17 Sept, 16:002,271 MW2,310 MW
17 Sept, 17:002,422 MW2,303 MW
17 Sept, 18:002,469 MW2,323 MW
17 Sept, 19:002,606 MW2,520 MW
17 Sept, 20:002,579 MW2,510 MW
17 Sept, 21:002,406 MW2,360 MW
17 Sept, 22:002,261 MW2,225 MW
17 Sept, 23:002,085 MW2,025 MW
18 Sept, 00:001,848 MW1,835 MW
18 Sept, 01:001,741 MW1,750 MW
18 Sept, 02:001,675 MW1,693 MW
18 Sept, 03:001,632 MW1,655 MW
18 Sept, 04:001,610 MW1,655 MW
18 Sept, 05:001,673 MW1,713 MW
18 Sept, 06:001,808 MW1,803 MW
18 Sept, 07:002,005 MW2,015 MW
18 Sept, 08:002,205 MW2,280 MW
18 Sept, 09:002,308 MW2,373 MW
18 Sept, 10:002,294 MW2,363 MW
18 Sept, 11:002,262 MW2,335 MW
18 Sept, 12:002,266 MW2,325 MW
18 Sept, 13:002,224 MW2,275 MW
18 Sept, 14:002,114 MW2,255 MW
18 Sept, 15:002,090 MW2,250 MW
18 Sept, 16:002,238 MW2,335 MW
18 Sept, 17:002,434 MW2,378 MW
18 Sept, 18:002,493 MW2,403 MW
18 Sept, 19:002,622 MW2,540 MW
18 Sept, 20:002,549 MW2,510 MW
18 Sept, 21:002,384 MW2,348 MW
18 Sept, 22:002,206 MW2,195 MW
18 Sept, 23:002,051 MW2,015 MW
19 Sept, 00:001,808 MW1,905 MW
19 Sept, 01:001,710 MW1,810 MW
19 Sept, 02:001,664 MW1,715 MW
19 Sept, 03:001,606 MW1,668 MW
19 Sept, 04:001,594 MW1,678 MW
19 Sept, 05:001,619 MW1,713 MW
19 Sept, 06:001,702 MW1,768 MW
19 Sept, 07:001,802 MW1,920 MW
19 Sept, 08:002,020 MW2,115 MW
19 Sept, 09:002,165 MW2,220 MW
19 Sept, 10:002,256 MW2,150 MW
19 Sept, 11:002,268 MW2,173 MW
19 Sept, 12:002,272 MW2,175 MW
19 Sept, 13:002,186 MW2,135 MW
19 Sept, 14:002,100 MW2,123 MW
19 Sept, 15:002,043 MW2,133 MW
19 Sept, 16:002,046 MW2,190 MW
19 Sept, 17:002,095 MW2,298 MW
19 Sept, 18:002,114 MW2,330 MW
19 Sept, 19:002,333 MW2,448 MW
19 Sept, 20:002,281 MW2,425 MW
19 Sept, 21:002,100 MW2,255 MW
19 Sept, 22:001,971 MW2,090 MW
19 Sept, 23:001,833 MW1,955 MW
20 Sept, 00:001,808 MW1,855 MW
20 Sept, 01:001,696 MW1,778 MW
20 Sept, 02:001,622 MW1,675 MW
20 Sept, 03:001,566 MW1,638 MW
20 Sept, 04:001,524 MW1,638 MW
20 Sept, 05:001,549 MW1,635 MW
20 Sept, 06:001,597 MW1,650 MW
20 Sept, 07:001,628 MW1,678 MW
20 Sept, 08:001,798 MW1,838 MW
20 Sept, 09:001,978 MW1,985 MW
20 Sept, 10:001,934 MW1,975 MW
20 Sept, 11:002,005 MW1,993 MW
20 Sept, 12:002,076 MW1,958 MW
20 Sept, 13:001,917 MW1,938 MW

Assumptions

  • Only hours with both a forecast and a positive demand reading count (686 of 686 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
  • Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
  • Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
  • European figures are for the ENTSO-E bidding zone named on this page. US and European grids are ranked separately.