Italy South Demand Forecast Accuracy: Error, Bias and Worst Miss, 8 October to 5 November 2026
The day-ahead demand forecast for Italy South was off by 11.3% on average (mean absolute percentage error) over 686 hours from 8 October to 5 November 2026, and 27% of hours landed within 5% of the reading. Its bias was -0.6%: it ran low on average, an under forecast. The largest miss was 943 MW (36.6%) too low at 11 Oct 2026, 11:00 CEST (UTC+02:00). Dates and times are local (Europe/Rome).
Key Facts
- The day-ahead demand forecast for Italy South was off by 11.3% on average (mean absolute percentage error) over 686 hours from 8 October to 5 November 2026, and 27% of hours landed within 5% of the reading. Its bias was -0.6%: it ran low on average, an under forecast. The largest miss was 943 MW (36.6%) too low at 11 Oct 2026, 11:00 CEST (UTC+02:00).
- Across 47 European bidding zones ranked by average error over their own latest 30 day windows, Italy South came 42 (1 is the smallest error).
- On average the forecast differed from reported demand by 246 MW, against average demand of 2,231 MW.
- The forecast was above reported demand in 46% of compared hours.
Forecast Error at a Glance
686 hours from 8 October to 5 November 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (-47 MW per hour on average): the forecast ran low on average, an under forecast. The worst miss was 943 MW (36.6%) too low at 11 Oct 2026, 11:00 CEST (UTC+02:00): forecast 1,632 MW, reported 2,575 MW.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-05. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 5 Nov 2026, 13:00 CET (UTC+01:00)Show the data table (168 rows)
| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 29 Oct, 14:00 | 2,738 MW | 2,335 MW |
| 29 Oct, 15:00 | 3,022 MW | 2,397 MW |
| 29 Oct, 16:00 | 3,011 MW | 2,568 MW |
| 29 Oct, 17:00 | 3,108 MW | 2,722 MW |
| 29 Oct, 18:00 | 3,164 MW | 2,757 MW |
| 29 Oct, 19:00 | 3,125 MW | 2,725 MW |
| 29 Oct, 20:00 | 3,071 MW | 2,596 MW |
| 29 Oct, 21:00 | 2,954 MW | 2,452 MW |
| 29 Oct, 22:00 | 2,856 MW | 2,218 MW |
| 29 Oct, 23:00 | 2,665 MW | 2,065 MW |
| 30 Oct, 00:00 | 2,454 MW | 1,931 MW |
| 30 Oct, 01:00 | 2,195 MW | 1,719 MW |
| 30 Oct, 02:00 | 2,126 MW | 1,752 MW |
| 30 Oct, 03:00 | 2,136 MW | 1,740 MW |
| 30 Oct, 04:00 | 2,140 MW | 1,723 MW |
| 30 Oct, 05:00 | 2,289 MW | 1,827 MW |
| 30 Oct, 06:00 | 2,561 MW | 2,040 MW |
| 30 Oct, 07:00 | 2,830 MW | 2,306 MW |
| 30 Oct, 08:00 | 2,920 MW | 2,395 MW |
| 30 Oct, 09:00 | 2,994 MW | 2,561 MW |
| 30 Oct, 10:00 | 2,973 MW | 2,584 MW |
| 30 Oct, 11:00 | 2,911 MW | 2,595 MW |
| 30 Oct, 12:00 | 2,914 MW | 2,586 MW |
| 30 Oct, 13:00 | 2,835 MW | 2,418 MW |
| 30 Oct, 14:00 | 2,850 MW | 2,331 MW |
| 30 Oct, 15:00 | 2,956 MW | 2,463 MW |
| 30 Oct, 16:00 | 2,992 MW | 2,809 MW |
| 30 Oct, 17:00 | 3,157 MW | 3,017 MW |
| 30 Oct, 18:00 | 2,844 MW | 2,988 MW |
| 30 Oct, 19:00 | 2,723 MW | 2,937 MW |
| 30 Oct, 20:00 | 2,661 MW | 2,884 MW |
| 30 Oct, 21:00 | 2,530 MW | 2,807 MW |
| 30 Oct, 22:00 | 2,404 MW | 2,603 MW |
| 30 Oct, 23:00 | 2,372 MW | 2,428 MW |
| 31 Oct, 00:00 | 2,233 MW | 2,190 MW |
| 31 Oct, 01:00 | 2,076 MW | 2,082 MW |
| 31 Oct, 02:00 | 1,966 MW | 2,068 MW |
| 31 Oct, 03:00 | 1,930 MW | 2,032 MW |
| 31 Oct, 04:00 | 1,961 MW | 2,017 MW |
| 31 Oct, 05:00 | 2,015 MW | 2,062 MW |
| 31 Oct, 06:00 | 2,133 MW | 2,194 MW |
| 31 Oct, 07:00 | 2,197 MW | 2,288 MW |
| 31 Oct, 08:00 | 2,319 MW | 2,392 MW |
| 31 Oct, 09:00 | 2,239 MW | 2,346 MW |
| 31 Oct, 10:00 | 2,192 MW | 2,353 MW |
| 31 Oct, 11:00 | 2,238 MW | 2,308 MW |
| 31 Oct, 12:00 | 2,505 MW | 2,165 MW |
| 31 Oct, 13:00 | 2,550 MW | 2,065 MW |
| 31 Oct, 14:00 | 2,355 MW | 2,243 MW |
| 31 Oct, 15:00 | 2,259 MW | 2,422 MW |
| 31 Oct, 16:00 | 2,377 MW | 2,538 MW |
| 31 Oct, 17:00 | 2,732 MW | 2,655 MW |
| 31 Oct, 18:00 | 2,719 MW | 2,787 MW |
| 31 Oct, 19:00 | 2,729 MW | 2,713 MW |
| 31 Oct, 20:00 | 2,754 MW | 2,526 MW |
| 31 Oct, 21:00 | 2,581 MW | 2,437 MW |
| 31 Oct, 22:00 | 2,413 MW | 2,351 MW |
| 31 Oct, 23:00 | 2,280 MW | 2,282 MW |
| 1 Nov, 00:00 | 2,116 MW | 1,877 MW |
| 1 Nov, 01:00 | 1,535 MW | 1,745 MW |
| 1 Nov, 02:00 | 1,342 MW | 1,709 MW |
| 1 Nov, 03:00 | 1,309 MW | 1,700 MW |
| 1 Nov, 04:00 | 1,315 MW | 1,645 MW |
| 1 Nov, 05:00 | 1,281 MW | 1,687 MW |
| 1 Nov, 06:00 | 1,358 MW | 1,747 MW |
| 1 Nov, 07:00 | 1,424 MW | 1,730 MW |
| 1 Nov, 08:00 | 1,511 MW | 1,894 MW |
| 1 Nov, 09:00 | 1,555 MW | 1,892 MW |
| 1 Nov, 10:00 | 2,044 MW | 1,933 MW |
| 1 Nov, 11:00 | 1,980 MW | 2,027 MW |
| 1 Nov, 12:00 | 2,070 MW | 2,032 MW |
| 1 Nov, 13:00 | 2,041 MW | 1,877 MW |
| 1 Nov, 14:00 | 1,888 MW | 1,900 MW |
| 1 Nov, 15:00 | 1,896 MW | 2,125 MW |
| 1 Nov, 16:00 | 1,995 MW | 2,162 MW |
| 1 Nov, 17:00 | 2,212 MW | 2,127 MW |
| 1 Nov, 18:00 | 2,289 MW | 2,160 MW |
| 1 Nov, 19:00 | 2,306 MW | 2,147 MW |
| 1 Nov, 20:00 | 2,336 MW | 2,208 MW |
| 1 Nov, 21:00 | 2,223 MW | 2,227 MW |
| 1 Nov, 22:00 | 2,101 MW | 2,102 MW |
| 1 Nov, 23:00 | 1,869 MW | 1,992 MW |
| 2 Nov, 00:00 | 1,695 MW | 1,932 MW |
| 2 Nov, 01:00 | 1,573 MW | 1,961 MW |
| 2 Nov, 02:00 | 1,493 MW | 1,905 MW |
| 2 Nov, 03:00 | 1,473 MW | 1,896 MW |
| 2 Nov, 04:00 | 1,457 MW | 1,888 MW |
| 2 Nov, 05:00 | 1,508 MW | 1,960 MW |
| 2 Nov, 06:00 | 1,655 MW | 1,988 MW |
| 2 Nov, 07:00 | 1,918 MW | 2,290 MW |
| 2 Nov, 08:00 | 2,095 MW | 2,452 MW |
| 2 Nov, 09:00 | 2,307 MW | 2,645 MW |
| 2 Nov, 10:00 | 2,463 MW | 2,925 MW |
| 2 Nov, 11:00 | 2,508 MW | 2,795 MW |
| 2 Nov, 12:00 | 2,675 MW | 2,830 MW |
| 2 Nov, 13:00 | 2,810 MW | 2,808 MW |
| 2 Nov, 14:00 | 2,699 MW | 2,747 MW |
| 2 Nov, 15:00 | 2,628 MW | 2,815 MW |
| 2 Nov, 16:00 | 2,586 MW | 2,825 MW |
| 2 Nov, 17:00 | 2,590 MW | 2,998 MW |
| 2 Nov, 18:00 | 2,597 MW | 2,771 MW |
| 2 Nov, 19:00 | 2,742 MW | 2,650 MW |
| 2 Nov, 20:00 | 2,755 MW | 2,623 MW |
| 2 Nov, 21:00 | 2,602 MW | 2,512 MW |
| 2 Nov, 22:00 | 2,370 MW | 2,330 MW |
| 2 Nov, 23:00 | 2,153 MW | 2,232 MW |
| 3 Nov, 00:00 | 1,898 MW | 2,108 MW |
| 3 Nov, 01:00 | 1,784 MW | 1,925 MW |
| 3 Nov, 02:00 | 1,830 MW | 1,776 MW |
| 3 Nov, 03:00 | 1,708 MW | 1,721 MW |
| 3 Nov, 04:00 | 1,698 MW | 1,725 MW |
| 3 Nov, 05:00 | 1,651 MW | 1,860 MW |
| 3 Nov, 06:00 | 1,811 MW | 2,068 MW |
| 3 Nov, 07:00 | 2,102 MW | 2,360 MW |
| 3 Nov, 08:00 | 2,315 MW | 2,523 MW |
| 3 Nov, 09:00 | 2,269 MW | 2,457 MW |
| 3 Nov, 10:00 | 2,187 MW | 2,391 MW |
| 3 Nov, 11:00 | 2,286 MW | 2,368 MW |
| 3 Nov, 12:00 | 2,387 MW | 2,488 MW |
| 3 Nov, 13:00 | 2,359 MW | 2,476 MW |
| 3 Nov, 14:00 | 2,136 MW | 2,380 MW |
| 3 Nov, 15:00 | 2,066 MW | 2,442 MW |
| 3 Nov, 16:00 | 2,097 MW | 2,582 MW |
| 3 Nov, 17:00 | 2,431 MW | 2,805 MW |
| 3 Nov, 18:00 | 2,480 MW | 2,825 MW |
| 3 Nov, 19:00 | 2,505 MW | 2,810 MW |
| 3 Nov, 20:00 | 2,515 MW | 2,768 MW |
| 3 Nov, 21:00 | 2,229 MW | 2,623 MW |
| 3 Nov, 22:00 | 2,039 MW | 2,388 MW |
| 3 Nov, 23:00 | 1,877 MW | 2,173 MW |
| 4 Nov, 00:00 | 1,815 MW | 1,943 MW |
| 4 Nov, 01:00 | 1,781 MW | 1,663 MW |
| 4 Nov, 02:00 | 1,682 MW | 1,578 MW |
| 4 Nov, 03:00 | 1,651 MW | 1,597 MW |
| 4 Nov, 04:00 | 1,631 MW | 1,602 MW |
| 4 Nov, 05:00 | 1,575 MW | 1,722 MW |
| 4 Nov, 06:00 | 1,732 MW | 1,908 MW |
| 4 Nov, 07:00 | 2,005 MW | 2,168 MW |
| 4 Nov, 08:00 | 2,049 MW | 2,247 MW |
| 4 Nov, 09:00 | 2,078 MW | 2,340 MW |
| 4 Nov, 10:00 | 2,064 MW | 2,475 MW |
| 4 Nov, 11:00 | 1,999 MW | 2,418 MW |
| 4 Nov, 12:00 | 2,190 MW | 2,440 MW |
| 4 Nov, 13:00 | 2,141 MW | 2,410 MW |
| 4 Nov, 14:00 | 2,088 MW | 2,265 MW |
| 4 Nov, 15:00 | 2,140 MW | 2,383 MW |
| 4 Nov, 16:00 | 2,225 MW | 2,586 MW |
| 4 Nov, 17:00 | 2,469 MW | 2,787 MW |
| 4 Nov, 18:00 | 2,577 MW | 2,890 MW |
| 4 Nov, 19:00 | 2,609 MW | 2,893 MW |
| 4 Nov, 20:00 | 2,524 MW | 2,813 MW |
| 4 Nov, 21:00 | 2,272 MW | 2,659 MW |
| 4 Nov, 22:00 | 2,135 MW | 2,472 MW |
| 4 Nov, 23:00 | 1,933 MW | 2,190 MW |
| 5 Nov, 00:00 | 1,674 MW | 2,021 MW |
| 5 Nov, 01:00 | 1,533 MW | 1,896 MW |
| 5 Nov, 02:00 | 1,559 MW | 1,951 MW |
| 5 Nov, 03:00 | 1,568 MW | 1,910 MW |
| 5 Nov, 04:00 | 1,584 MW | 1,925 MW |
| 5 Nov, 05:00 | 1,610 MW | 1,911 MW |
| 5 Nov, 06:00 | 1,943 MW | 2,119 MW |
| 5 Nov, 07:00 | 2,108 MW | 2,420 MW |
| 5 Nov, 08:00 | 2,083 MW | 2,659 MW |
| 5 Nov, 09:00 | 2,017 MW | 2,535 MW |
| 5 Nov, 10:00 | 2,051 MW | 2,375 MW |
| 5 Nov, 11:00 | 2,112 MW | 2,432 MW |
| 5 Nov, 12:00 | 2,076 MW | 2,445 MW |
| 5 Nov, 13:00 | 2,017 MW | 2,413 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (686 of 686 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- European figures are for the ENTSO-E bidding zone named on this page. US and European grids are ranked separately.
Related
Cite this page
World Power Monitor. (2026). Italy South Demand Forecast Accuracy: Error, Bias and Worst Miss. https://worldpowermonitor.com/forecast-accuracy/it-sud/
World Power Monitor. Italy South Demand Forecast Accuracy: Error, Bias and Worst Miss. Data as of 2026-11-05. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/forecast-accuracy/it-sud/
@misc{wpm_forecast_accuracy_it_sud_2026,
title = {{Italy South Demand Forecast Accuracy: Error, Bias and Worst Miss}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-05. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/forecast-accuracy/it-sud/}
} Permalink: https://worldpowermonitor.com/forecast-accuracy/it-sud/
The Copy buttons add today's date as the access date.