Sweden South (SE4) Demand Forecast Accuracy and Bias, 8 October to 5 November 2026
The day-ahead demand forecast for Sweden South (SE4) was off by 7.7% on average (mean absolute percentage error) over 686 hours from 8 October to 5 November 2026, and 35% of hours landed within 5% of the reading. Its bias was +7.2%: it ran high on average, an over forecast. The largest miss was 583 MW (32.0%) too high at 20 Oct 2026, 05:00 CEST (UTC+02:00). Dates and times are local (Europe/Stockholm).
Key Facts
- The day-ahead demand forecast for Sweden South (SE4) was off by 7.7% on average (mean absolute percentage error) over 686 hours from 8 October to 5 November 2026, and 35% of hours landed within 5% of the reading. Its bias was +7.2%: it ran high on average, an over forecast. The largest miss was 583 MW (32.0%) too high at 20 Oct 2026, 05:00 CEST (UTC+02:00).
- Across 47 European bidding zones ranked by average error over their own latest 30 day windows, Sweden South (SE4) came 38 (1 is the smallest error).
- On average the forecast differed from reported demand by 171 MW, against average demand of 2,327 MW.
- The forecast was above reported demand in 91% of compared hours.
Forecast Error at a Glance
686 hours from 8 October to 5 November 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (+160 MW per hour on average): the forecast ran high on average, an over forecast. The worst miss was 583 MW (32.0%) too high at 20 Oct 2026, 05:00 CEST (UTC+02:00): forecast 2,405 MW, reported 1,822 MW.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-05. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 5 Nov 2026, 13:00 CET (UTC+01:00)Show the data table (168 rows)
| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 29 Oct, 14:00 | 2,305 MW | 2,710 MW |
| 29 Oct, 15:00 | 2,347 MW | 2,713 MW |
| 29 Oct, 16:00 | 2,447 MW | 2,749 MW |
| 29 Oct, 17:00 | 2,486 MW | 2,852 MW |
| 29 Oct, 18:00 | 2,401 MW | 2,854 MW |
| 29 Oct, 19:00 | 2,383 MW | 2,760 MW |
| 29 Oct, 20:00 | 2,412 MW | 2,648 MW |
| 29 Oct, 21:00 | 2,424 MW | 2,507 MW |
| 29 Oct, 22:00 | 2,312 MW | 2,380 MW |
| 29 Oct, 23:00 | 2,205 MW | 2,258 MW |
| 30 Oct, 00:00 | 2,028 MW | 2,201 MW |
| 30 Oct, 01:00 | 2,012 MW | 2,161 MW |
| 30 Oct, 02:00 | 1,938 MW | 2,124 MW |
| 30 Oct, 03:00 | 1,921 MW | 2,118 MW |
| 30 Oct, 04:00 | 1,763 MW | 2,152 MW |
| 30 Oct, 05:00 | 1,901 MW | 2,302 MW |
| 30 Oct, 06:00 | 2,136 MW | 2,583 MW |
| 30 Oct, 07:00 | 2,313 MW | 2,770 MW |
| 30 Oct, 08:00 | 2,439 MW | 2,783 MW |
| 30 Oct, 09:00 | 2,472 MW | 2,751 MW |
| 30 Oct, 10:00 | 2,541 MW | 2,724 MW |
| 30 Oct, 11:00 | 2,530 MW | 2,663 MW |
| 30 Oct, 12:00 | 2,474 MW | 2,629 MW |
| 30 Oct, 13:00 | 2,380 MW | 2,582 MW |
| 30 Oct, 14:00 | 2,290 MW | 2,571 MW |
| 30 Oct, 15:00 | 2,356 MW | 2,588 MW |
| 30 Oct, 16:00 | 2,488 MW | 2,655 MW |
| 30 Oct, 17:00 | 2,406 MW | 2,722 MW |
| 30 Oct, 18:00 | 2,349 MW | 2,678 MW |
| 30 Oct, 19:00 | 2,256 MW | 2,571 MW |
| 30 Oct, 20:00 | 2,172 MW | 2,477 MW |
| 30 Oct, 21:00 | 2,089 MW | 2,359 MW |
| 30 Oct, 22:00 | 2,118 MW | 2,241 MW |
| 30 Oct, 23:00 | 2,149 MW | 2,181 MW |
| 31 Oct, 00:00 | 2,127 MW | 2,158 MW |
| 31 Oct, 01:00 | 2,053 MW | 2,142 MW |
| 31 Oct, 02:00 | 2,031 MW | 2,120 MW |
| 31 Oct, 03:00 | 1,971 MW | 2,118 MW |
| 31 Oct, 04:00 | 2,004 MW | 2,156 MW |
| 31 Oct, 05:00 | 1,979 MW | 2,193 MW |
| 31 Oct, 06:00 | 2,024 MW | 2,239 MW |
| 31 Oct, 07:00 | 1,934 MW | 2,289 MW |
| 31 Oct, 08:00 | 2,050 MW | 2,347 MW |
| 31 Oct, 09:00 | 2,019 MW | 2,397 MW |
| 31 Oct, 10:00 | 2,047 MW | 2,396 MW |
| 31 Oct, 11:00 | 2,092 MW | 2,355 MW |
| 31 Oct, 12:00 | 2,101 MW | 2,302 MW |
| 31 Oct, 13:00 | 2,092 MW | 2,280 MW |
| 31 Oct, 14:00 | 2,109 MW | 2,267 MW |
| 31 Oct, 15:00 | 2,193 MW | 2,312 MW |
| 31 Oct, 16:00 | 2,275 MW | 2,477 MW |
| 31 Oct, 17:00 | 2,364 MW | 2,611 MW |
| 31 Oct, 18:00 | 2,285 MW | 2,571 MW |
| 31 Oct, 19:00 | 2,253 MW | 2,475 MW |
| 31 Oct, 20:00 | 2,165 MW | 2,409 MW |
| 31 Oct, 21:00 | 2,135 MW | 2,330 MW |
| 31 Oct, 22:00 | 2,113 MW | 2,274 MW |
| 31 Oct, 23:00 | 2,027 MW | 2,274 MW |
| 1 Nov, 00:00 | 1,958 MW | 2,167 MW |
| 1 Nov, 01:00 | 1,969 MW | 2,140 MW |
| 1 Nov, 02:00 | 1,967 MW | 2,115 MW |
| 1 Nov, 03:00 | 1,967 MW | 2,096 MW |
| 1 Nov, 04:00 | 1,993 MW | 2,121 MW |
| 1 Nov, 05:00 | 1,960 MW | 2,163 MW |
| 1 Nov, 06:00 | 1,993 MW | 2,200 MW |
| 1 Nov, 07:00 | 1,929 MW | 2,234 MW |
| 1 Nov, 08:00 | 1,936 MW | 2,333 MW |
| 1 Nov, 09:00 | 2,035 MW | 2,381 MW |
| 1 Nov, 10:00 | 2,114 MW | 2,413 MW |
| 1 Nov, 11:00 | 2,154 MW | 2,428 MW |
| 1 Nov, 12:00 | 2,230 MW | 2,429 MW |
| 1 Nov, 13:00 | 2,314 MW | 2,424 MW |
| 1 Nov, 14:00 | 2,350 MW | 2,443 MW |
| 1 Nov, 15:00 | 2,420 MW | 2,465 MW |
| 1 Nov, 16:00 | 2,487 MW | 2,612 MW |
| 1 Nov, 17:00 | 2,591 MW | 2,686 MW |
| 1 Nov, 18:00 | 2,596 MW | 2,673 MW |
| 1 Nov, 19:00 | 2,461 MW | 2,590 MW |
| 1 Nov, 20:00 | 2,334 MW | 2,506 MW |
| 1 Nov, 21:00 | 2,202 MW | 2,374 MW |
| 1 Nov, 22:00 | 2,121 MW | 2,273 MW |
| 1 Nov, 23:00 | 2,190 MW | 2,216 MW |
| 2 Nov, 00:00 | 2,092 MW | 2,174 MW |
| 2 Nov, 01:00 | 2,029 MW | 2,138 MW |
| 2 Nov, 02:00 | 2,015 MW | 2,114 MW |
| 2 Nov, 03:00 | 2,024 MW | 2,132 MW |
| 2 Nov, 04:00 | 2,051 MW | 2,150 MW |
| 2 Nov, 05:00 | 2,160 MW | 2,279 MW |
| 2 Nov, 06:00 | 2,352 MW | 2,561 MW |
| 2 Nov, 07:00 | 2,628 MW | 2,790 MW |
| 2 Nov, 08:00 | 2,707 MW | 2,836 MW |
| 2 Nov, 09:00 | 2,729 MW | 2,864 MW |
| 2 Nov, 10:00 | 2,761 MW | 2,873 MW |
| 2 Nov, 11:00 | 2,848 MW | 2,868 MW |
| 2 Nov, 12:00 | 2,829 MW | 2,877 MW |
| 2 Nov, 13:00 | 2,856 MW | 2,877 MW |
| 2 Nov, 14:00 | 2,912 MW | 2,874 MW |
| 2 Nov, 15:00 | 2,936 MW | 2,912 MW |
| 2 Nov, 16:00 | 2,998 MW | 2,977 MW |
| 2 Nov, 17:00 | 2,983 MW | 3,010 MW |
| 2 Nov, 18:00 | 2,910 MW | 2,957 MW |
| 2 Nov, 19:00 | 2,726 MW | 2,857 MW |
| 2 Nov, 20:00 | 2,628 MW | 2,746 MW |
| 2 Nov, 21:00 | 2,473 MW | 2,621 MW |
| 2 Nov, 22:00 | 2,452 MW | 2,480 MW |
| 2 Nov, 23:00 | 2,369 MW | 2,379 MW |
| 3 Nov, 00:00 | 2,133 MW | 2,269 MW |
| 3 Nov, 01:00 | 2,202 MW | 2,255 MW |
| 3 Nov, 02:00 | 2,174 MW | 2,247 MW |
| 3 Nov, 03:00 | 2,079 MW | 2,278 MW |
| 3 Nov, 04:00 | 2,135 MW | 2,338 MW |
| 3 Nov, 05:00 | 2,363 MW | 2,491 MW |
| 3 Nov, 06:00 | 2,898 MW | 2,811 MW |
| 3 Nov, 07:00 | 3,249 MW | 3,065 MW |
| 3 Nov, 08:00 | 3,032 MW | 3,086 MW |
| 3 Nov, 09:00 | 2,885 MW | 3,070 MW |
| 3 Nov, 10:00 | 2,868 MW | 3,008 MW |
| 3 Nov, 11:00 | 2,674 MW | 2,945 MW |
| 3 Nov, 12:00 | 2,535 MW | 2,871 MW |
| 3 Nov, 13:00 | 2,570 MW | 2,839 MW |
| 3 Nov, 14:00 | 2,654 MW | 2,839 MW |
| 3 Nov, 15:00 | 2,769 MW | 2,879 MW |
| 3 Nov, 16:00 | 2,840 MW | 2,983 MW |
| 3 Nov, 17:00 | 2,835 MW | 3,113 MW |
| 3 Nov, 18:00 | 2,776 MW | 3,068 MW |
| 3 Nov, 19:00 | 2,685 MW | 3,023 MW |
| 3 Nov, 20:00 | 2,550 MW | 2,898 MW |
| 3 Nov, 21:00 | 2,526 MW | 2,776 MW |
| 3 Nov, 22:00 | 2,512 MW | 2,672 MW |
| 3 Nov, 23:00 | 2,495 MW | 2,586 MW |
| 4 Nov, 00:00 | 2,459 MW | 2,509 MW |
| 4 Nov, 01:00 | 2,463 MW | 2,446 MW |
| 4 Nov, 02:00 | 2,494 MW | 2,427 MW |
| 4 Nov, 03:00 | 2,457 MW | 2,434 MW |
| 4 Nov, 04:00 | 2,410 MW | 2,500 MW |
| 4 Nov, 05:00 | 2,481 MW | 2,624 MW |
| 4 Nov, 06:00 | 2,781 MW | 2,927 MW |
| 4 Nov, 07:00 | 3,055 MW | 3,136 MW |
| 4 Nov, 08:00 | 3,063 MW | 3,157 MW |
| 4 Nov, 09:00 | 2,870 MW | 3,080 MW |
| 4 Nov, 10:00 | 2,718 MW | 3,006 MW |
| 4 Nov, 11:00 | 2,647 MW | 2,927 MW |
| 4 Nov, 12:00 | 2,570 MW | 2,847 MW |
| 4 Nov, 13:00 | 2,538 MW | 2,793 MW |
| 4 Nov, 14:00 | 2,542 MW | 2,781 MW |
| 4 Nov, 15:00 | 2,660 MW | 2,808 MW |
| 4 Nov, 16:00 | 2,820 MW | 2,920 MW |
| 4 Nov, 17:00 | 2,876 MW | 3,066 MW |
| 4 Nov, 18:00 | 2,691 MW | 3,051 MW |
| 4 Nov, 19:00 | 2,675 MW | 2,977 MW |
| 4 Nov, 20:00 | 2,635 MW | 2,889 MW |
| 4 Nov, 21:00 | 2,560 MW | 2,789 MW |
| 4 Nov, 22:00 | 2,277 MW | 2,637 MW |
| 4 Nov, 23:00 | 2,231 MW | 2,548 MW |
| 5 Nov, 00:00 | 2,308 MW | 2,467 MW |
| 5 Nov, 01:00 | 2,322 MW | 2,428 MW |
| 5 Nov, 02:00 | 2,204 MW | 2,409 MW |
| 5 Nov, 03:00 | 2,274 MW | 2,385 MW |
| 5 Nov, 04:00 | 2,221 MW | 2,436 MW |
| 5 Nov, 05:00 | 2,378 MW | 2,551 MW |
| 5 Nov, 06:00 | 2,631 MW | 2,840 MW |
| 5 Nov, 07:00 | 2,914 MW | 3,048 MW |
| 5 Nov, 08:00 | 3,039 MW | 3,070 MW |
| 5 Nov, 09:00 | 2,988 MW | 3,040 MW |
| 5 Nov, 10:00 | 2,918 MW | 3,000 MW |
| 5 Nov, 11:00 | 2,790 MW | 2,984 MW |
| 5 Nov, 12:00 | 2,691 MW | 2,958 MW |
| 5 Nov, 13:00 | 2,756 MW | 2,899 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (686 of 686 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- European figures are for the ENTSO-E bidding zone named on this page. US and European grids are ranked separately.
Related
Cite this page
World Power Monitor. (2026). Sweden South (SE4) Demand Forecast Accuracy and Bias. https://worldpowermonitor.com/forecast-accuracy/se4/
World Power Monitor. Sweden South (SE4) Demand Forecast Accuracy and Bias. Data as of 2026-11-05. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/forecast-accuracy/se4/
@misc{wpm_forecast_accuracy_se4_2026,
title = {{Sweden South (SE4) Demand Forecast Accuracy and Bias}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-05. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/forecast-accuracy/se4/}
} Permalink: https://worldpowermonitor.com/forecast-accuracy/se4/
The Copy buttons add today's date as the access date.