LDWP Demand Forecast Accuracy: Error, Bias and Worst Miss, 6 October to 5 November 2026
The day-ahead demand forecast for LDWP was off by 9.2% on average (mean absolute percentage error) over 524 hours from 6 October to 5 November 2026, and 27% of hours landed within 5% of the reading. Its bias was -8.3%: it ran low on average, an under forecast. The largest miss was 1,134 MW (128.9%) too high at 5 Nov 2026, 04:00 PST (UTC-08:00). Dates and times are local (America/Los_Angeles).
This grid has 524 compared hours out of the 720 in its 30 day window, because the forecast or the demand reading is missing for the rest. Treat the figures as a shorter sample.
Key Facts
- The day-ahead demand forecast for LDWP was off by 9.2% on average (mean absolute percentage error) over 524 hours from 6 October to 5 November 2026, and 27% of hours landed within 5% of the reading. Its bias was -8.3%: it ran low on average, an under forecast. The largest miss was 1,134 MW (128.9%) too high at 5 Nov 2026, 04:00 PST (UTC-08:00).
- Across 53 US grids ranked by average error over their own latest 30 day windows, LDWP came 41 (1 is the smallest error).
- On average the forecast differed from reported demand by 274 MW, against average demand of 3,097 MW.
- The forecast was above reported demand in 6% of compared hours.
Forecast Error at a Glance
524 hours from 6 October to 5 November 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (-259 MW per hour on average): the forecast ran low on average, an under forecast. The worst miss was 1,134 MW (128.9%) too high at 5 Nov 2026, 04:00 PST (UTC-08:00): forecast 2,014 MW, reported 880 MW.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 5 Nov 2026, 04:00 PST (UTC-08:00)Show the data table (168 rows)
| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 29 Oct, 06:00 | 2,533 MW | n/a |
| 29 Oct, 07:00 | 2,652 MW | n/a |
| 29 Oct, 08:00 | 2,704 MW | n/a |
| 29 Oct, 09:00 | 3,006 MW | n/a |
| 29 Oct, 10:00 | 3,092 MW | n/a |
| 29 Oct, 11:00 | 3,177 MW | n/a |
| 29 Oct, 12:00 | 3,225 MW | n/a |
| 29 Oct, 13:00 | 3,285 MW | n/a |
| 29 Oct, 14:00 | 3,312 MW | n/a |
| 29 Oct, 15:00 | 3,336 MW | n/a |
| 29 Oct, 16:00 | 3,401 MW | n/a |
| 29 Oct, 17:00 | 3,153 MW | n/a |
| 29 Oct, 18:00 | 3,176 MW | n/a |
| 29 Oct, 19:00 | 3,152 MW | n/a |
| 29 Oct, 20:00 | 3,190 MW | n/a |
| 29 Oct, 21:00 | 3,103 MW | n/a |
| 29 Oct, 22:00 | 2,953 MW | n/a |
| 29 Oct, 23:00 | 2,745 MW | n/a |
| 30 Oct, 00:00 | 2,555 MW | n/a |
| 30 Oct, 01:00 | 2,377 MW | n/a |
| 30 Oct, 02:00 | 2,276 MW | n/a |
| 30 Oct, 03:00 | 2,240 MW | n/a |
| 30 Oct, 04:00 | 2,230 MW | n/a |
| 30 Oct, 05:00 | 2,316 MW | n/a |
| 30 Oct, 06:00 | 2,548 MW | n/a |
| 30 Oct, 07:00 | 2,671 MW | n/a |
| 30 Oct, 08:00 | 2,740 MW | n/a |
| 30 Oct, 09:00 | 2,899 MW | n/a |
| 30 Oct, 10:00 | 3,239 MW | n/a |
| 30 Oct, 11:00 | 3,268 MW | n/a |
| 30 Oct, 12:00 | 3,215 MW | n/a |
| 30 Oct, 13:00 | 3,132 MW | n/a |
| 30 Oct, 14:00 | 3,088 MW | n/a |
| 30 Oct, 15:00 | 3,135 MW | n/a |
| 30 Oct, 16:00 | 3,169 MW | n/a |
| 30 Oct, 17:00 | 2,976 MW | n/a |
| 30 Oct, 18:00 | 3,005 MW | n/a |
| 30 Oct, 19:00 | 2,967 MW | n/a |
| 30 Oct, 20:00 | 2,895 MW | n/a |
| 30 Oct, 21:00 | 2,826 MW | n/a |
| 30 Oct, 22:00 | 2,680 MW | n/a |
| 30 Oct, 23:00 | 2,545 MW | n/a |
| 31 Oct, 00:00 | 2,405 MW | n/a |
| 31 Oct, 01:00 | 2,304 MW | n/a |
| 31 Oct, 02:00 | 2,252 MW | n/a |
| 31 Oct, 03:00 | 2,202 MW | n/a |
| 31 Oct, 04:00 | 2,169 MW | n/a |
| 31 Oct, 05:00 | 2,209 MW | n/a |
| 31 Oct, 06:00 | 2,323 MW | n/a |
| 31 Oct, 07:00 | 2,378 MW | n/a |
| 31 Oct, 08:00 | 2,460 MW | n/a |
| 31 Oct, 09:00 | 2,796 MW | n/a |
| 31 Oct, 10:00 | 2,842 MW | n/a |
| 31 Oct, 11:00 | 2,923 MW | n/a |
| 31 Oct, 12:00 | 2,903 MW | n/a |
| 31 Oct, 13:00 | 2,906 MW | n/a |
| 31 Oct, 14:00 | 2,916 MW | n/a |
| 31 Oct, 15:00 | 2,926 MW | n/a |
| 31 Oct, 16:00 | 2,713 MW | n/a |
| 31 Oct, 17:00 | 2,733 MW | n/a |
| 31 Oct, 18:00 | 2,769 MW | n/a |
| 31 Oct, 19:00 | 2,745 MW | n/a |
| 31 Oct, 20:00 | 2,716 MW | n/a |
| 31 Oct, 21:00 | 2,657 MW | n/a |
| 31 Oct, 22:00 | 2,501 MW | n/a |
| 31 Oct, 23:00 | 2,379 MW | n/a |
| 1 Nov, 00:00 | 2,363 MW | n/a |
| 1 Nov, 01:00 | 2,286 MW | n/a |
| 1 Nov, 01:00 | 2,227 MW | n/a |
| 1 Nov, 02:00 | 2,175 MW | n/a |
| 1 Nov, 03:00 | 2,144 MW | n/a |
| 1 Nov, 04:00 | 2,141 MW | n/a |
| 1 Nov, 05:00 | 2,184 MW | n/a |
| 1 Nov, 06:00 | 2,187 MW | n/a |
| 1 Nov, 07:00 | 2,242 MW | n/a |
| 1 Nov, 08:00 | 2,554 MW | n/a |
| 1 Nov, 09:00 | 2,673 MW | n/a |
| 1 Nov, 10:00 | 2,676 MW | n/a |
| 1 Nov, 11:00 | 2,655 MW | n/a |
| 1 Nov, 12:00 | 2,590 MW | n/a |
| 1 Nov, 13:00 | 2,654 MW | n/a |
| 1 Nov, 14:00 | 2,747 MW | n/a |
| 1 Nov, 15:00 | 2,890 MW | n/a |
| 1 Nov, 16:00 | 2,833 MW | n/a |
| 1 Nov, 17:00 | 3,022 MW | n/a |
| 1 Nov, 18:00 | 3,054 MW | n/a |
| 1 Nov, 19:00 | 3,027 MW | n/a |
| 1 Nov, 20:00 | 2,930 MW | n/a |
| 1 Nov, 21:00 | 2,829 MW | n/a |
| 1 Nov, 22:00 | 2,682 MW | n/a |
| 1 Nov, 23:00 | 2,554 MW | n/a |
| 2 Nov, 00:00 | 2,497 MW | n/a |
| 2 Nov, 01:00 | 2,370 MW | n/a |
| 2 Nov, 02:00 | 2,338 MW | n/a |
| 2 Nov, 03:00 | 2,336 MW | n/a |
| 2 Nov, 04:00 | 2,383 MW | n/a |
| 2 Nov, 05:00 | 2,514 MW | n/a |
| 2 Nov, 06:00 | 2,691 MW | n/a |
| 2 Nov, 07:00 | 2,791 MW | n/a |
| 2 Nov, 08:00 | 2,843 MW | n/a |
| 2 Nov, 09:00 | 3,100 MW | n/a |
| 2 Nov, 10:00 | 3,131 MW | n/a |
| 2 Nov, 11:00 | 3,178 MW | n/a |
| 2 Nov, 12:00 | 3,228 MW | n/a |
| 2 Nov, 13:00 | 3,342 MW | n/a |
| 2 Nov, 14:00 | 3,457 MW | n/a |
| 2 Nov, 15:00 | 3,282 MW | n/a |
| 2 Nov, 16:00 | 3,310 MW | n/a |
| 2 Nov, 17:00 | 3,384 MW | n/a |
| 2 Nov, 18:00 | 3,337 MW | n/a |
| 2 Nov, 19:00 | 3,268 MW | n/a |
| 2 Nov, 20:00 | 3,173 MW | n/a |
| 2 Nov, 21:00 | 3,052 MW | n/a |
| 2 Nov, 22:00 | 2,881 MW | n/a |
| 2 Nov, 23:00 | 2,714 MW | n/a |
| 3 Nov, 00:00 | 2,566 MW | 2,175 MW |
| 3 Nov, 01:00 | 2,464 MW | 2,089 MW |
| 3 Nov, 02:00 | 2,388 MW | 2,017 MW |
| 3 Nov, 03:00 | 2,341 MW | 1,991 MW |
| 3 Nov, 04:00 | 2,369 MW | 2,014 MW |
| 3 Nov, 05:00 | 2,479 MW | 2,121 MW |
| 3 Nov, 06:00 | 2,617 MW | 2,280 MW |
| 3 Nov, 07:00 | 2,650 MW | 2,378 MW |
| 3 Nov, 08:00 | 2,693 MW | 2,436 MW |
| 3 Nov, 09:00 | 2,931 MW | 2,475 MW |
| 3 Nov, 10:00 | 2,940 MW | 2,486 MW |
| 3 Nov, 11:00 | 2,990 MW | 2,520 MW |
| 3 Nov, 12:00 | 3,030 MW | 2,580 MW |
| 3 Nov, 13:00 | 3,131 MW | 2,653 MW |
| 3 Nov, 14:00 | 2,997 MW | 2,737 MW |
| 3 Nov, 15:00 | 3,085 MW | 2,803 MW |
| 3 Nov, 16:00 | 3,125 MW | 2,839 MW |
| 3 Nov, 17:00 | 3,210 MW | 2,923 MW |
| 3 Nov, 18:00 | 3,150 MW | 2,886 MW |
| 3 Nov, 19:00 | 3,084 MW | 2,833 MW |
| 3 Nov, 20:00 | 2,975 MW | 2,761 MW |
| 3 Nov, 21:00 | 2,854 MW | 2,648 MW |
| 3 Nov, 22:00 | 2,697 MW | 2,495 MW |
| 3 Nov, 23:00 | 2,546 MW | 2,351 MW |
| 4 Nov, 00:00 | 2,089 MW | 2,200 MW |
| 4 Nov, 01:00 | 2,015 MW | 2,090 MW |
| 4 Nov, 02:00 | 2,087 MW | 2,016 MW |
| 4 Nov, 03:00 | 2,150 MW | 1,989 MW |
| 4 Nov, 04:00 | 2,160 MW | 2,003 MW |
| 4 Nov, 05:00 | 2,284 MW | 2,110 MW |
| 4 Nov, 06:00 | 2,460 MW | 2,260 MW |
| 4 Nov, 07:00 | 2,564 MW | 2,349 MW |
| 4 Nov, 08:00 | 2,624 MW | 2,386 MW |
| 4 Nov, 09:00 | 2,641 MW | 2,427 MW |
| 4 Nov, 10:00 | 2,684 MW | 2,450 MW |
| 4 Nov, 11:00 | 2,706 MW | 2,459 MW |
| 4 Nov, 12:00 | 2,732 MW | 2,507 MW |
| 4 Nov, 13:00 | 2,857 MW | 2,568 MW |
| 4 Nov, 14:00 | 2,958 MW | 2,675 MW |
| 4 Nov, 15:00 | 2,800 MW | 2,777 MW |
| 4 Nov, 16:00 | 2,843 MW | 2,818 MW |
| 4 Nov, 17:00 | 2,875 MW | 2,900 MW |
| 4 Nov, 18:00 | 2,823 MW | 2,854 MW |
| 4 Nov, 19:00 | 2,758 MW | 2,797 MW |
| 4 Nov, 20:00 | 2,673 MW | 2,745 MW |
| 4 Nov, 21:00 | 2,576 MW | 2,651 MW |
| 4 Nov, 22:00 | 2,358 MW | 2,497 MW |
| 4 Nov, 23:00 | 2,196 MW | 2,348 MW |
| 5 Nov, 00:00 | 2,075 MW | 2,215 MW |
| 5 Nov, 01:00 | 1,958 MW | 2,104 MW |
| 5 Nov, 02:00 | 1,882 MW | 2,029 MW |
| 5 Nov, 03:00 | n/a | 2,003 MW |
| 5 Nov, 04:00 | 880 MW | 2,014 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (524 of 720 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- US figures are for the EIA balancing authority or region named on this page. US and European grids are ranked separately.
Related
Cite this page
World Power Monitor. (2026). LDWP Demand Forecast Accuracy: Error, Bias and Worst Miss. https://worldpowermonitor.com/forecast-accuracy/ldwp/
World Power Monitor. LDWP Demand Forecast Accuracy: Error, Bias and Worst Miss. Data as of 2026-11-05. Data from U.S. Energy Information Administration. https://worldpowermonitor.com/forecast-accuracy/ldwp/
@misc{wpm_forecast_accuracy_ldwp_2026,
title = {{LDWP Demand Forecast Accuracy: Error, Bias and Worst Miss}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-05. Data from U.S. Energy Information Administration.},
url = {https://worldpowermonitor.com/forecast-accuracy/ldwp/}
} Permalink: https://worldpowermonitor.com/forecast-accuracy/ldwp/
The Copy buttons add today's date as the access date.