SC Demand Forecast Accuracy: Error, Bias and Worst Miss, 6 October to 5 November 2026
The day-ahead demand forecast for SC was off by 4.5% on average (mean absolute percentage error) over 694 hours from 6 October to 5 November 2026, and 64% of hours landed within 5% of the reading. Its bias was +3.6%: it ran high on average, an over forecast. The largest miss was 1,530 MW (130.0%) too high at 12 Oct 2026, 01:00 EDT (UTC-04:00). Dates and times are local (America/New_York).
Key Facts
- The day-ahead demand forecast for SC was off by 4.5% on average (mean absolute percentage error) over 694 hours from 6 October to 5 November 2026, and 64% of hours landed within 5% of the reading. Its bias was +3.6%: it ran high on average, an over forecast. The largest miss was 1,530 MW (130.0%) too high at 12 Oct 2026, 01:00 EDT (UTC-04:00).
- Across 53 US grids ranked by average error over their own latest 30 day windows, SC came 30 (1 is the smallest error).
- On average the forecast differed from reported demand by 126 MW, against average demand of 2,905 MW.
- The forecast was above reported demand in 77% of compared hours.
Forecast Error at a Glance
694 hours from 6 October to 5 November 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (+99 MW per hour on average): the forecast ran high on average, an over forecast. The worst miss was 1,530 MW (130.0%) too high at 12 Oct 2026, 01:00 EDT (UTC-04:00): forecast 2,707 MW, reported 1,177 MW.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 5 Nov 2026, 08:00 EST (UTC-05:00)Show the data table (168 rows)
| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 29 Oct, 10:00 | 2,909 MW | 2,845 MW |
| 29 Oct, 11:00 | 2,920 MW | 2,876 MW |
| 29 Oct, 12:00 | 3,000 MW | 2,948 MW |
| 29 Oct, 13:00 | 3,145 MW | 3,003 MW |
| 29 Oct, 14:00 | 3,154 MW | 3,106 MW |
| 29 Oct, 15:00 | 3,214 MW | 3,178 MW |
| 29 Oct, 16:00 | 3,187 MW | 3,234 MW |
| 29 Oct, 17:00 | 3,235 MW | 3,265 MW |
| 29 Oct, 18:00 | 3,267 MW | 3,302 MW |
| 29 Oct, 19:00 | 3,280 MW | 3,309 MW |
| 29 Oct, 20:00 | 3,114 MW | 3,296 MW |
| 29 Oct, 21:00 | 2,995 MW | 3,191 MW |
| 29 Oct, 22:00 | 2,849 MW | 3,048 MW |
| 29 Oct, 23:00 | 2,588 MW | 2,872 MW |
| 30 Oct, 00:00 | 2,466 MW | 2,683 MW |
| 30 Oct, 01:00 | 2,438 MW | 2,579 MW |
| 30 Oct, 02:00 | 2,417 MW | 2,460 MW |
| 30 Oct, 03:00 | 2,309 MW | 2,419 MW |
| 30 Oct, 04:00 | 2,349 MW | 2,446 MW |
| 30 Oct, 05:00 | 2,568 MW | 2,494 MW |
| 30 Oct, 06:00 | 2,761 MW | 2,658 MW |
| 30 Oct, 07:00 | 2,855 MW | 2,775 MW |
| 30 Oct, 08:00 | 2,879 MW | 2,801 MW |
| 30 Oct, 09:00 | 2,911 MW | 2,861 MW |
| 30 Oct, 10:00 | 2,858 MW | 2,859 MW |
| 30 Oct, 11:00 | 2,964 MW | 2,862 MW |
| 30 Oct, 12:00 | 3,048 MW | 2,934 MW |
| 30 Oct, 13:00 | 3,092 MW | 2,985 MW |
| 30 Oct, 14:00 | 3,135 MW | 3,094 MW |
| 30 Oct, 15:00 | 3,228 MW | 3,201 MW |
| 30 Oct, 16:00 | 3,283 MW | 3,304 MW |
| 30 Oct, 17:00 | 3,226 MW | 3,322 MW |
| 30 Oct, 18:00 | 3,148 MW | 3,311 MW |
| 30 Oct, 19:00 | 3,153 MW | 3,280 MW |
| 30 Oct, 20:00 | 3,009 MW | 3,233 MW |
| 30 Oct, 21:00 | 2,929 MW | 3,106 MW |
| 30 Oct, 22:00 | 2,816 MW | 2,980 MW |
| 30 Oct, 23:00 | 2,695 MW | 2,842 MW |
| 31 Oct, 00:00 | 2,502 MW | 2,668 MW |
| 31 Oct, 01:00 | 2,514 MW | 2,492 MW |
| 31 Oct, 02:00 | 2,448 MW | 2,355 MW |
| 31 Oct, 03:00 | 2,436 MW | 2,373 MW |
| 31 Oct, 04:00 | 2,453 MW | 2,364 MW |
| 31 Oct, 05:00 | 2,344 MW | 2,394 MW |
| 31 Oct, 06:00 | 2,444 MW | 2,404 MW |
| 31 Oct, 07:00 | 2,499 MW | 2,538 MW |
| 31 Oct, 08:00 | 2,639 MW | 2,652 MW |
| 31 Oct, 09:00 | 2,710 MW | 2,741 MW |
| 31 Oct, 10:00 | 2,846 MW | 2,739 MW |
| 31 Oct, 11:00 | 2,866 MW | 2,781 MW |
| 31 Oct, 12:00 | 2,909 MW | 2,825 MW |
| 31 Oct, 13:00 | 2,934 MW | 2,818 MW |
| 31 Oct, 14:00 | 2,877 MW | 2,818 MW |
| 31 Oct, 15:00 | 2,928 MW | 2,815 MW |
| 31 Oct, 16:00 | 2,905 MW | 2,798 MW |
| 31 Oct, 17:00 | 2,874 MW | 2,781 MW |
| 31 Oct, 18:00 | 2,888 MW | 2,818 MW |
| 31 Oct, 19:00 | 2,828 MW | 2,891 MW |
| 31 Oct, 20:00 | 2,846 MW | 2,900 MW |
| 31 Oct, 21:00 | 2,780 MW | 2,836 MW |
| 31 Oct, 22:00 | 2,729 MW | 2,774 MW |
| 31 Oct, 23:00 | 2,627 MW | 2,642 MW |
| 1 Nov, 00:00 | 2,627 MW | n/a |
| 1 Nov, 01:00 | 2,528 MW | n/a |
| 1 Nov, 01:00 | 2,311 MW | n/a |
| 1 Nov, 02:00 | 2,349 MW | n/a |
| 1 Nov, 03:00 | 2,367 MW | n/a |
| 1 Nov, 04:00 | 2,438 MW | n/a |
| 1 Nov, 05:00 | 2,548 MW | n/a |
| 1 Nov, 06:00 | 2,677 MW | n/a |
| 1 Nov, 07:00 | 2,767 MW | n/a |
| 1 Nov, 08:00 | 2,755 MW | n/a |
| 1 Nov, 09:00 | 2,811 MW | n/a |
| 1 Nov, 10:00 | 2,822 MW | n/a |
| 1 Nov, 11:00 | 2,845 MW | n/a |
| 1 Nov, 12:00 | 2,869 MW | n/a |
| 1 Nov, 13:00 | 2,896 MW | n/a |
| 1 Nov, 14:00 | 2,866 MW | n/a |
| 1 Nov, 15:00 | 2,887 MW | n/a |
| 1 Nov, 16:00 | 2,977 MW | n/a |
| 1 Nov, 17:00 | 2,993 MW | n/a |
| 1 Nov, 18:00 | 2,977 MW | n/a |
| 1 Nov, 19:00 | 2,921 MW | n/a |
| 1 Nov, 20:00 | 2,795 MW | n/a |
| 1 Nov, 21:00 | 2,684 MW | n/a |
| 1 Nov, 22:00 | 2,545 MW | n/a |
| 1 Nov, 23:00 | 2,545 MW | n/a |
| 2 Nov, 00:00 | 2,497 MW | 2,570 MW |
| 2 Nov, 01:00 | 2,367 MW | 2,483 MW |
| 2 Nov, 02:00 | 2,438 MW | 2,416 MW |
| 2 Nov, 03:00 | 2,412 MW | 2,386 MW |
| 2 Nov, 04:00 | 2,469 MW | 2,438 MW |
| 2 Nov, 05:00 | 2,389 MW | 2,505 MW |
| 2 Nov, 06:00 | 2,571 MW | 2,715 MW |
| 2 Nov, 07:00 | 2,722 MW | 2,796 MW |
| 2 Nov, 08:00 | 2,772 MW | 2,830 MW |
| 2 Nov, 09:00 | 2,843 MW | 2,893 MW |
| 2 Nov, 10:00 | 2,916 MW | 2,910 MW |
| 2 Nov, 11:00 | 2,926 MW | 2,949 MW |
| 2 Nov, 12:00 | 2,968 MW | 2,986 MW |
| 2 Nov, 13:00 | 3,019 MW | 2,997 MW |
| 2 Nov, 14:00 | 3,033 MW | 2,994 MW |
| 2 Nov, 15:00 | 3,054 MW | 2,983 MW |
| 2 Nov, 16:00 | 3,092 MW | 3,005 MW |
| 2 Nov, 17:00 | 3,110 MW | 3,109 MW |
| 2 Nov, 18:00 | 3,142 MW | 3,225 MW |
| 2 Nov, 19:00 | 3,094 MW | 3,223 MW |
| 2 Nov, 20:00 | 3,039 MW | 3,159 MW |
| 2 Nov, 21:00 | 2,817 MW | 3,079 MW |
| 2 Nov, 22:00 | 2,742 MW | 2,953 MW |
| 2 Nov, 23:00 | 2,643 MW | 2,782 MW |
| 3 Nov, 00:00 | 2,519 MW | 2,641 MW |
| 3 Nov, 01:00 | 2,480 MW | 2,519 MW |
| 3 Nov, 02:00 | 2,443 MW | 2,428 MW |
| 3 Nov, 03:00 | 2,465 MW | 2,390 MW |
| 3 Nov, 04:00 | 2,487 MW | 2,440 MW |
| 3 Nov, 05:00 | 2,554 MW | 2,498 MW |
| 3 Nov, 06:00 | 2,657 MW | 2,636 MW |
| 3 Nov, 07:00 | 2,659 MW | 2,755 MW |
| 3 Nov, 08:00 | 2,715 MW | 2,817 MW |
| 3 Nov, 09:00 | 2,806 MW | 2,889 MW |
| 3 Nov, 10:00 | 2,929 MW | 2,956 MW |
| 3 Nov, 11:00 | 3,059 MW | 3,016 MW |
| 3 Nov, 12:00 | 3,104 MW | 3,072 MW |
| 3 Nov, 13:00 | 3,139 MW | 3,142 MW |
| 3 Nov, 14:00 | 3,215 MW | 3,156 MW |
| 3 Nov, 15:00 | 3,172 MW | 3,160 MW |
| 3 Nov, 16:00 | 3,181 MW | 3,166 MW |
| 3 Nov, 17:00 | 3,219 MW | 3,229 MW |
| 3 Nov, 18:00 | 3,222 MW | 3,302 MW |
| 3 Nov, 19:00 | 3,190 MW | 3,286 MW |
| 3 Nov, 20:00 | 3,089 MW | 3,175 MW |
| 3 Nov, 21:00 | 2,927 MW | 3,096 MW |
| 3 Nov, 22:00 | 2,780 MW | 2,968 MW |
| 3 Nov, 23:00 | 2,558 MW | 2,813 MW |
| 4 Nov, 00:00 | 2,526 MW | 2,602 MW |
| 4 Nov, 01:00 | 2,498 MW | 2,484 MW |
| 4 Nov, 02:00 | 2,471 MW | 2,434 MW |
| 4 Nov, 03:00 | 2,470 MW | 2,400 MW |
| 4 Nov, 04:00 | 2,450 MW | 2,289 MW |
| 4 Nov, 05:00 | 2,483 MW | 2,437 MW |
| 4 Nov, 06:00 | 2,654 MW | 2,599 MW |
| 4 Nov, 07:00 | 2,626 MW | 2,706 MW |
| 4 Nov, 08:00 | 2,639 MW | 2,740 MW |
| 4 Nov, 09:00 | 2,753 MW | 2,818 MW |
| 4 Nov, 10:00 | 2,814 MW | 2,890 MW |
| 4 Nov, 11:00 | 2,919 MW | 2,956 MW |
| 4 Nov, 12:00 | 3,037 MW | 3,043 MW |
| 4 Nov, 13:00 | 3,127 MW | 3,119 MW |
| 4 Nov, 14:00 | 3,210 MW | 3,219 MW |
| 4 Nov, 15:00 | 3,223 MW | 3,230 MW |
| 4 Nov, 16:00 | 3,264 MW | 3,234 MW |
| 4 Nov, 17:00 | 3,261 MW | 3,294 MW |
| 4 Nov, 18:00 | 3,340 MW | 3,348 MW |
| 4 Nov, 19:00 | 3,199 MW | 3,326 MW |
| 4 Nov, 20:00 | 3,152 MW | 3,218 MW |
| 4 Nov, 21:00 | 2,951 MW | 3,132 MW |
| 4 Nov, 22:00 | 2,866 MW | 2,993 MW |
| 4 Nov, 23:00 | 2,743 MW | 2,837 MW |
| 5 Nov, 00:00 | 2,676 MW | 2,649 MW |
| 5 Nov, 01:00 | 2,588 MW | 2,559 MW |
| 5 Nov, 02:00 | 2,552 MW | 2,467 MW |
| 5 Nov, 03:00 | 2,527 MW | 2,460 MW |
| 5 Nov, 04:00 | 2,562 MW | 2,481 MW |
| 5 Nov, 05:00 | 2,622 MW | 2,544 MW |
| 5 Nov, 06:00 | 2,804 MW | 2,691 MW |
| 5 Nov, 07:00 | 2,826 MW | 2,786 MW |
| 5 Nov, 08:00 | 2,943 MW | 2,814 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (694 of 720 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- US figures are for the EIA balancing authority or region named on this page. US and European grids are ranked separately.
Related
Cite this page
World Power Monitor. (2026). SC Demand Forecast Accuracy: Error, Bias and Worst Miss. https://worldpowermonitor.com/forecast-accuracy/sc/
World Power Monitor. SC Demand Forecast Accuracy: Error, Bias and Worst Miss. Data as of 2026-11-05. Data from U.S. Energy Information Administration. https://worldpowermonitor.com/forecast-accuracy/sc/
@misc{wpm_forecast_accuracy_sc_2026,
title = {{SC Demand Forecast Accuracy: Error, Bias and Worst Miss}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-05. Data from U.S. Energy Information Administration.},
url = {https://worldpowermonitor.com/forecast-accuracy/sc/}
} Permalink: https://worldpowermonitor.com/forecast-accuracy/sc/
The Copy buttons add today's date as the access date.