NWMT Demand Forecast Accuracy: Error, Bias and Worst Miss, 6 October to 5 November 2026
The day-ahead demand forecast for NWMT was off by 1.9% on average (mean absolute percentage error) over 719 hours from 6 October to 5 November 2026, and 92% of hours landed within 5% of the reading. Its bias was -0.9%: it ran low on average, an under forecast. The largest miss was 255 MW (23.6%) too high at 14 Oct 2026, 10:00 MDT (UTC-06:00). Dates and times are local (America/Denver).
Key Facts
- The day-ahead demand forecast for NWMT was off by 1.9% on average (mean absolute percentage error) over 719 hours from 6 October to 5 November 2026, and 92% of hours landed within 5% of the reading. Its bias was -0.9%: it ran low on average, an under forecast. The largest miss was 255 MW (23.6%) too high at 14 Oct 2026, 10:00 MDT (UTC-06:00).
- Across 53 US grids ranked by average error over their own latest 30 day windows, NWMT came 6 (1 is the smallest error).
- On average the forecast differed from reported demand by 25 MW, against average demand of 1,275 MW.
- The forecast was above reported demand in 38% of compared hours.
Forecast Error at a Glance
719 hours from 6 October to 5 November 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (-12 MW per hour on average): the forecast ran low on average, an under forecast. The worst miss was 255 MW (23.6%) too high at 14 Oct 2026, 10:00 MDT (UTC-06:00): forecast 1,336 MW, reported 1,081 MW.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 5 Nov 2026, 06:00 MST (UTC-07:00)Show the data table (168 rows)
| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 29 Oct, 08:00 | 1,481 MW | 1,449 MW |
| 29 Oct, 09:00 | 1,463 MW | 1,418 MW |
| 29 Oct, 10:00 | 1,423 MW | 1,383 MW |
| 29 Oct, 11:00 | 1,369 MW | 1,349 MW |
| 29 Oct, 12:00 | 1,331 MW | 1,323 MW |
| 29 Oct, 13:00 | 1,317 MW | 1,301 MW |
| 29 Oct, 14:00 | 1,290 MW | 1,289 MW |
| 29 Oct, 15:00 | 1,275 MW | 1,276 MW |
| 29 Oct, 16:00 | 1,291 MW | 1,296 MW |
| 29 Oct, 17:00 | 1,347 MW | 1,329 MW |
| 29 Oct, 18:00 | 1,398 MW | 1,390 MW |
| 29 Oct, 19:00 | 1,417 MW | 1,404 MW |
| 29 Oct, 20:00 | 1,390 MW | 1,381 MW |
| 29 Oct, 21:00 | 1,356 MW | 1,334 MW |
| 29 Oct, 22:00 | 1,292 MW | 1,269 MW |
| 29 Oct, 23:00 | 1,226 MW | 1,208 MW |
| 30 Oct, 00:00 | 1,201 MW | 1,202 MW |
| 30 Oct, 01:00 | 1,169 MW | 1,176 MW |
| 30 Oct, 02:00 | 1,169 MW | 1,176 MW |
| 30 Oct, 03:00 | 1,176 MW | 1,175 MW |
| 30 Oct, 04:00 | 1,176 MW | 1,196 MW |
| 30 Oct, 05:00 | 1,206 MW | 1,249 MW |
| 30 Oct, 06:00 | 1,329 MW | 1,306 MW |
| 30 Oct, 07:00 | 1,397 MW | 1,387 MW |
| 30 Oct, 08:00 | 1,434 MW | 1,402 MW |
| 30 Oct, 09:00 | 1,437 MW | 1,391 MW |
| 30 Oct, 10:00 | 1,430 MW | 1,369 MW |
| 30 Oct, 11:00 | 1,421 MW | 1,344 MW |
| 30 Oct, 12:00 | 1,392 MW | 1,330 MW |
| 30 Oct, 13:00 | 1,356 MW | 1,313 MW |
| 30 Oct, 14:00 | 1,325 MW | 1,301 MW |
| 30 Oct, 15:00 | 1,308 MW | 1,291 MW |
| 30 Oct, 16:00 | 1,337 MW | 1,295 MW |
| 30 Oct, 17:00 | 1,365 MW | 1,327 MW |
| 30 Oct, 18:00 | 1,391 MW | 1,376 MW |
| 30 Oct, 19:00 | 1,363 MW | 1,379 MW |
| 30 Oct, 20:00 | 1,348 MW | 1,348 MW |
| 30 Oct, 21:00 | 1,317 MW | 1,310 MW |
| 30 Oct, 22:00 | 1,280 MW | 1,259 MW |
| 30 Oct, 23:00 | 1,221 MW | 1,207 MW |
| 31 Oct, 00:00 | 1,196 MW | 1,193 MW |
| 31 Oct, 01:00 | 1,164 MW | 1,171 MW |
| 31 Oct, 02:00 | 1,148 MW | 1,165 MW |
| 31 Oct, 03:00 | 1,156 MW | 1,158 MW |
| 31 Oct, 04:00 | 1,157 MW | 1,171 MW |
| 31 Oct, 05:00 | 1,177 MW | 1,195 MW |
| 31 Oct, 06:00 | 1,224 MW | 1,235 MW |
| 31 Oct, 07:00 | 1,280 MW | 1,287 MW |
| 31 Oct, 08:00 | 1,329 MW | 1,325 MW |
| 31 Oct, 09:00 | 1,366 MW | 1,330 MW |
| 31 Oct, 10:00 | 1,394 MW | 1,317 MW |
| 31 Oct, 11:00 | 1,378 MW | 1,293 MW |
| 31 Oct, 12:00 | 1,381 MW | 1,269 MW |
| 31 Oct, 13:00 | 1,343 MW | 1,242 MW |
| 31 Oct, 14:00 | 1,304 MW | 1,226 MW |
| 31 Oct, 15:00 | 1,319 MW | 1,229 MW |
| 31 Oct, 16:00 | 1,321 MW | 1,240 MW |
| 31 Oct, 17:00 | 1,320 MW | 1,284 MW |
| 31 Oct, 18:00 | 1,351 MW | 1,342 MW |
| 31 Oct, 19:00 | 1,314 MW | 1,345 MW |
| 31 Oct, 20:00 | 1,287 MW | 1,320 MW |
| 31 Oct, 21:00 | 1,274 MW | 1,284 MW |
| 31 Oct, 22:00 | 1,218 MW | 1,236 MW |
| 31 Oct, 23:00 | 1,194 MW | 1,186 MW |
| 1 Nov, 00:00 | 1,158 MW | 1,158 MW |
| 1 Nov, 01:00 | 1,145 MW | 1,131 MW |
| 1 Nov, 01:00 | 1,133 MW | 1,116 MW |
| 1 Nov, 02:00 | 1,136 MW | 1,121 MW |
| 1 Nov, 03:00 | 1,141 MW | 1,123 MW |
| 1 Nov, 04:00 | 1,155 MW | 1,136 MW |
| 1 Nov, 05:00 | 1,192 MW | 1,170 MW |
| 1 Nov, 06:00 | 1,216 MW | 1,216 MW |
| 1 Nov, 07:00 | 1,283 MW | 1,254 MW |
| 1 Nov, 08:00 | 1,331 MW | 1,289 MW |
| 1 Nov, 09:00 | 1,368 MW | 1,306 MW |
| 1 Nov, 10:00 | 1,383 MW | 1,301 MW |
| 1 Nov, 11:00 | 1,397 MW | 1,296 MW |
| 1 Nov, 12:00 | 1,409 MW | 1,299 MW |
| 1 Nov, 13:00 | 1,397 MW | 1,299 MW |
| 1 Nov, 14:00 | 1,411 MW | 1,309 MW |
| 1 Nov, 15:00 | 1,424 MW | 1,324 MW |
| 1 Nov, 16:00 | 1,466 MW | 1,381 MW |
| 1 Nov, 17:00 | 1,518 MW | 1,456 MW |
| 1 Nov, 18:00 | 1,505 MW | 1,467 MW |
| 1 Nov, 19:00 | 1,459 MW | 1,440 MW |
| 1 Nov, 20:00 | 1,422 MW | 1,409 MW |
| 1 Nov, 21:00 | 1,358 MW | 1,359 MW |
| 1 Nov, 22:00 | 1,286 MW | 1,277 MW |
| 1 Nov, 23:00 | 1,213 MW | 1,223 MW |
| 2 Nov, 00:00 | 1,183 MW | 1,175 MW |
| 2 Nov, 01:00 | 1,169 MW | 1,149 MW |
| 2 Nov, 02:00 | 1,166 MW | 1,144 MW |
| 2 Nov, 03:00 | 1,161 MW | 1,153 MW |
| 2 Nov, 04:00 | 1,188 MW | 1,173 MW |
| 2 Nov, 05:00 | 1,230 MW | 1,234 MW |
| 2 Nov, 06:00 | 1,347 MW | 1,340 MW |
| 2 Nov, 07:00 | 1,439 MW | 1,410 MW |
| 2 Nov, 08:00 | 1,452 MW | 1,411 MW |
| 2 Nov, 09:00 | 1,431 MW | 1,400 MW |
| 2 Nov, 10:00 | 1,413 MW | 1,385 MW |
| 2 Nov, 11:00 | 1,385 MW | 1,374 MW |
| 2 Nov, 12:00 | 1,393 MW | 1,372 MW |
| 2 Nov, 13:00 | 1,367 MW | 1,366 MW |
| 2 Nov, 14:00 | 1,360 MW | 1,367 MW |
| 2 Nov, 15:00 | 1,367 MW | 1,369 MW |
| 2 Nov, 16:00 | 1,406 MW | 1,423 MW |
| 2 Nov, 17:00 | 1,475 MW | 1,495 MW |
| 2 Nov, 18:00 | 1,494 MW | 1,502 MW |
| 2 Nov, 19:00 | 1,457 MW | 1,471 MW |
| 2 Nov, 20:00 | 1,428 MW | 1,439 MW |
| 2 Nov, 21:00 | 1,370 MW | 1,385 MW |
| 2 Nov, 22:00 | 1,292 MW | 1,308 MW |
| 2 Nov, 23:00 | 1,232 MW | 1,249 MW |
| 3 Nov, 00:00 | 1,212 MW | 1,213 MW |
| 3 Nov, 01:00 | 1,203 MW | 1,180 MW |
| 3 Nov, 02:00 | 1,178 MW | 1,190 MW |
| 3 Nov, 03:00 | 1,200 MW | 1,195 MW |
| 3 Nov, 04:00 | 1,217 MW | 1,220 MW |
| 3 Nov, 05:00 | 1,289 MW | 1,287 MW |
| 3 Nov, 06:00 | 1,397 MW | 1,400 MW |
| 3 Nov, 07:00 | 1,470 MW | 1,464 MW |
| 3 Nov, 08:00 | 1,460 MW | 1,453 MW |
| 3 Nov, 09:00 | 1,419 MW | 1,414 MW |
| 3 Nov, 10:00 | 1,372 MW | 1,375 MW |
| 3 Nov, 11:00 | 1,337 MW | 1,341 MW |
| 3 Nov, 12:00 | 1,323 MW | 1,318 MW |
| 3 Nov, 13:00 | 1,304 MW | 1,306 MW |
| 3 Nov, 14:00 | 1,291 MW | 1,303 MW |
| 3 Nov, 15:00 | 1,295 MW | 1,305 MW |
| 3 Nov, 16:00 | 1,340 MW | 1,363 MW |
| 3 Nov, 17:00 | 1,422 MW | 1,436 MW |
| 3 Nov, 18:00 | 1,444 MW | 1,447 MW |
| 3 Nov, 19:00 | 1,428 MW | 1,424 MW |
| 3 Nov, 20:00 | 1,405 MW | 1,400 MW |
| 3 Nov, 21:00 | 1,349 MW | 1,353 MW |
| 3 Nov, 22:00 | 1,289 MW | 1,278 MW |
| 3 Nov, 23:00 | 1,229 MW | 1,220 MW |
| 4 Nov, 00:00 | 1,196 MW | 1,206 MW |
| 4 Nov, 01:00 | 1,186 MW | 1,178 MW |
| 4 Nov, 02:00 | 1,177 MW | 1,182 MW |
| 4 Nov, 03:00 | 1,185 MW | 1,189 MW |
| 4 Nov, 04:00 | 1,209 MW | 1,216 MW |
| 4 Nov, 05:00 | 1,282 MW | 1,276 MW |
| 4 Nov, 06:00 | 1,396 MW | 1,385 MW |
| 4 Nov, 07:00 | 1,440 MW | 1,450 MW |
| 4 Nov, 08:00 | 1,416 MW | 1,439 MW |
| 4 Nov, 09:00 | 1,382 MW | 1,401 MW |
| 4 Nov, 10:00 | 1,361 MW | 1,363 MW |
| 4 Nov, 11:00 | 1,339 MW | 1,331 MW |
| 4 Nov, 12:00 | 1,305 MW | 1,309 MW |
| 4 Nov, 13:00 | 1,296 MW | 1,300 MW |
| 4 Nov, 14:00 | 1,291 MW | 1,297 MW |
| 4 Nov, 15:00 | 1,310 MW | 1,301 MW |
| 4 Nov, 16:00 | 1,354 MW | 1,355 MW |
| 4 Nov, 17:00 | 1,417 MW | 1,433 MW |
| 4 Nov, 18:00 | 1,432 MW | 1,442 MW |
| 4 Nov, 19:00 | 1,412 MW | 1,417 MW |
| 4 Nov, 20:00 | 1,383 MW | 1,394 MW |
| 4 Nov, 21:00 | 1,329 MW | 1,348 MW |
| 4 Nov, 22:00 | 1,269 MW | 1,272 MW |
| 4 Nov, 23:00 | 1,213 MW | 1,215 MW |
| 5 Nov, 00:00 | 1,193 MW | 1,184 MW |
| 5 Nov, 01:00 | 1,181 MW | 1,172 MW |
| 5 Nov, 02:00 | 1,183 MW | 1,175 MW |
| 5 Nov, 03:00 | 1,200 MW | 1,189 MW |
| 5 Nov, 04:00 | 1,226 MW | 1,217 MW |
| 5 Nov, 05:00 | 1,286 MW | 1,285 MW |
| 5 Nov, 06:00 | 1,416 MW | 1,394 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (719 of 720 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- US figures are for the EIA balancing authority or region named on this page. US and European grids are ranked separately.
Related
Cite this page
World Power Monitor. (2026). NWMT Demand Forecast Accuracy: Error, Bias and Worst Miss. https://worldpowermonitor.com/forecast-accuracy/nwmt/
World Power Monitor. NWMT Demand Forecast Accuracy: Error, Bias and Worst Miss. Data as of 2026-11-05. Data from U.S. Energy Information Administration. https://worldpowermonitor.com/forecast-accuracy/nwmt/
@misc{wpm_forecast_accuracy_nwmt_2026,
title = {{NWMT Demand Forecast Accuracy: Error, Bias and Worst Miss}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-05. Data from U.S. Energy Information Administration.},
url = {https://worldpowermonitor.com/forecast-accuracy/nwmt/}
} Permalink: https://worldpowermonitor.com/forecast-accuracy/nwmt/
The Copy buttons add today's date as the access date.