Slovenia Demand Forecast Accuracy: Error, Bias and Worst Miss, 8 October to 5 November 2026
The day-ahead demand forecast for Slovenia was off by 3.9% on average (mean absolute percentage error) over 687 hours from 8 October to 5 November 2026, and 76% of hours landed within 5% of the reading. Its bias was +0.2%: it ran close to balanced on average. The largest miss was 918 MW (100.3%) too high at 13 Oct 2026, 09:00 CEST (UTC+02:00). Dates and times are local (Europe/Ljubljana).
Key Facts
- The day-ahead demand forecast for Slovenia was off by 3.9% on average (mean absolute percentage error) over 687 hours from 8 October to 5 November 2026, and 76% of hours landed within 5% of the reading. Its bias was +0.2%: it ran close to balanced on average. The largest miss was 918 MW (100.3%) too high at 13 Oct 2026, 09:00 CEST (UTC+02:00).
- Across 47 European bidding zones ranked by average error over their own latest 30 day windows, Slovenia came 30 (1 is the smallest error).
- On average the forecast differed from reported demand by 59 MW, against average demand of 1,543 MW.
- The forecast was above reported demand in 48% of compared hours.
Forecast Error at a Glance
687 hours from 8 October to 5 November 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (-3 MW per hour on average): the forecast ran close to balanced on average. The worst miss was 918 MW (100.3%) too high at 13 Oct 2026, 09:00 CEST (UTC+02:00): forecast 1,834 MW, reported 915 MW.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-05. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 5 Nov 2026, 14:00 CET (UTC+01:00)Show the data table (168 rows)
| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 29 Oct, 15:00 | 1,652 MW | 1,667 MW |
| 29 Oct, 16:00 | 1,627 MW | 1,661 MW |
| 29 Oct, 17:00 | 1,619 MW | 1,744 MW |
| 29 Oct, 18:00 | 1,691 MW | 1,811 MW |
| 29 Oct, 19:00 | 1,705 MW | 1,785 MW |
| 29 Oct, 20:00 | 1,672 MW | 1,691 MW |
| 29 Oct, 21:00 | 1,570 MW | 1,592 MW |
| 29 Oct, 22:00 | 1,504 MW | 1,489 MW |
| 29 Oct, 23:00 | 1,405 MW | 1,411 MW |
| 30 Oct, 00:00 | 1,363 MW | 1,308 MW |
| 30 Oct, 01:00 | 1,318 MW | 1,311 MW |
| 30 Oct, 02:00 | 1,294 MW | 1,309 MW |
| 30 Oct, 03:00 | 1,359 MW | 1,311 MW |
| 30 Oct, 04:00 | 1,369 MW | 1,378 MW |
| 30 Oct, 05:00 | 1,416 MW | 1,542 MW |
| 30 Oct, 06:00 | 1,610 MW | 1,726 MW |
| 30 Oct, 07:00 | 1,731 MW | 1,832 MW |
| 30 Oct, 08:00 | 1,814 MW | 1,848 MW |
| 30 Oct, 09:00 | 1,824 MW | 1,808 MW |
| 30 Oct, 10:00 | 1,836 MW | 1,834 MW |
| 30 Oct, 11:00 | 1,903 MW | 1,814 MW |
| 30 Oct, 12:00 | 1,880 MW | 1,801 MW |
| 30 Oct, 13:00 | 1,765 MW | 1,785 MW |
| 30 Oct, 14:00 | 1,688 MW | 1,737 MW |
| 30 Oct, 15:00 | 1,594 MW | 1,649 MW |
| 30 Oct, 16:00 | 1,576 MW | 1,677 MW |
| 30 Oct, 17:00 | 1,595 MW | 1,779 MW |
| 30 Oct, 18:00 | 1,674 MW | 1,792 MW |
| 30 Oct, 19:00 | 1,686 MW | 1,759 MW |
| 30 Oct, 20:00 | 1,601 MW | 1,664 MW |
| 30 Oct, 21:00 | 1,494 MW | 1,572 MW |
| 30 Oct, 22:00 | 1,420 MW | 1,478 MW |
| 30 Oct, 23:00 | 1,359 MW | 1,390 MW |
| 31 Oct, 00:00 | 1,253 MW | 1,272 MW |
| 31 Oct, 01:00 | 1,210 MW | 1,213 MW |
| 31 Oct, 02:00 | 1,172 MW | 1,174 MW |
| 31 Oct, 03:00 | 1,196 MW | 1,184 MW |
| 31 Oct, 04:00 | 1,194 MW | 1,206 MW |
| 31 Oct, 05:00 | 1,188 MW | 1,297 MW |
| 31 Oct, 06:00 | 1,237 MW | 1,388 MW |
| 31 Oct, 07:00 | 1,297 MW | 1,509 MW |
| 31 Oct, 08:00 | 1,363 MW | 1,591 MW |
| 31 Oct, 09:00 | 1,447 MW | 1,612 MW |
| 31 Oct, 10:00 | 1,474 MW | 1,611 MW |
| 31 Oct, 11:00 | 1,480 MW | 1,553 MW |
| 31 Oct, 12:00 | 1,470 MW | 1,553 MW |
| 31 Oct, 13:00 | 1,393 MW | 1,501 MW |
| 31 Oct, 14:00 | 1,367 MW | 1,442 MW |
| 31 Oct, 15:00 | 1,311 MW | 1,406 MW |
| 31 Oct, 16:00 | 1,301 MW | 1,426 MW |
| 31 Oct, 17:00 | 1,350 MW | 1,533 MW |
| 31 Oct, 18:00 | 1,435 MW | 1,545 MW |
| 31 Oct, 19:00 | 1,426 MW | 1,550 MW |
| 31 Oct, 20:00 | 1,408 MW | 1,507 MW |
| 31 Oct, 21:00 | 1,322 MW | 1,437 MW |
| 31 Oct, 22:00 | 1,272 MW | 1,353 MW |
| 31 Oct, 23:00 | 1,190 MW | 1,256 MW |
| 1 Nov, 00:00 | 1,110 MW | 1,245 MW |
| 1 Nov, 01:00 | 1,080 MW | 1,186 MW |
| 1 Nov, 02:00 | 1,080 MW | 1,140 MW |
| 1 Nov, 03:00 | 1,085 MW | 1,133 MW |
| 1 Nov, 04:00 | 1,093 MW | 1,142 MW |
| 1 Nov, 05:00 | 1,104 MW | 1,186 MW |
| 1 Nov, 06:00 | 1,153 MW | 1,272 MW |
| 1 Nov, 07:00 | 1,259 MW | 1,375 MW |
| 1 Nov, 08:00 | 1,351 MW | 1,456 MW |
| 1 Nov, 09:00 | 1,421 MW | 1,525 MW |
| 1 Nov, 10:00 | 1,536 MW | 1,597 MW |
| 1 Nov, 11:00 | 1,502 MW | 1,646 MW |
| 1 Nov, 12:00 | 1,493 MW | 1,605 MW |
| 1 Nov, 13:00 | 1,436 MW | 1,544 MW |
| 1 Nov, 14:00 | 1,342 MW | 1,502 MW |
| 1 Nov, 15:00 | 1,338 MW | 1,496 MW |
| 1 Nov, 16:00 | 1,340 MW | 1,512 MW |
| 1 Nov, 17:00 | 1,422 MW | 1,571 MW |
| 1 Nov, 18:00 | 1,436 MW | 1,595 MW |
| 1 Nov, 19:00 | 1,473 MW | 1,592 MW |
| 1 Nov, 20:00 | 1,464 MW | 1,539 MW |
| 1 Nov, 21:00 | 1,377 MW | 1,471 MW |
| 1 Nov, 22:00 | 1,342 MW | 1,379 MW |
| 1 Nov, 23:00 | 1,240 MW | 1,297 MW |
| 2 Nov, 00:00 | 1,179 MW | 1,193 MW |
| 2 Nov, 01:00 | 1,153 MW | 1,176 MW |
| 2 Nov, 02:00 | 1,173 MW | 1,174 MW |
| 2 Nov, 03:00 | 1,194 MW | 1,178 MW |
| 2 Nov, 04:00 | 1,205 MW | 1,260 MW |
| 2 Nov, 05:00 | 1,331 MW | 1,418 MW |
| 2 Nov, 06:00 | 1,652 MW | 1,638 MW |
| 2 Nov, 07:00 | 1,773 MW | 1,807 MW |
| 2 Nov, 08:00 | 1,888 MW | 1,917 MW |
| 2 Nov, 09:00 | 1,924 MW | 1,965 MW |
| 2 Nov, 10:00 | 1,923 MW | 1,981 MW |
| 2 Nov, 11:00 | 1,909 MW | 1,944 MW |
| 2 Nov, 12:00 | 1,936 MW | 1,925 MW |
| 2 Nov, 13:00 | 1,867 MW | 1,889 MW |
| 2 Nov, 14:00 | 1,772 MW | 1,822 MW |
| 2 Nov, 15:00 | 1,719 MW | 1,772 MW |
| 2 Nov, 16:00 | 1,783 MW | 1,753 MW |
| 2 Nov, 17:00 | 1,792 MW | 1,821 MW |
| 2 Nov, 18:00 | 1,822 MW | 1,833 MW |
| 2 Nov, 19:00 | 1,814 MW | 1,837 MW |
| 2 Nov, 20:00 | 1,782 MW | 1,777 MW |
| 2 Nov, 21:00 | 1,649 MW | 1,648 MW |
| 2 Nov, 22:00 | 1,559 MW | 1,554 MW |
| 2 Nov, 23:00 | 1,477 MW | 1,459 MW |
| 3 Nov, 00:00 | 1,422 MW | 1,275 MW |
| 3 Nov, 01:00 | 1,326 MW | 1,320 MW |
| 3 Nov, 02:00 | 1,311 MW | 1,320 MW |
| 3 Nov, 03:00 | 1,331 MW | 1,333 MW |
| 3 Nov, 04:00 | 1,330 MW | 1,359 MW |
| 3 Nov, 05:00 | 1,480 MW | 1,487 MW |
| 3 Nov, 06:00 | 1,737 MW | 1,704 MW |
| 3 Nov, 07:00 | 1,827 MW | 1,853 MW |
| 3 Nov, 08:00 | 1,877 MW | 1,939 MW |
| 3 Nov, 09:00 | 1,866 MW | 1,934 MW |
| 3 Nov, 10:00 | 1,941 MW | 1,896 MW |
| 3 Nov, 11:00 | 1,973 MW | 1,908 MW |
| 3 Nov, 12:00 | 1,973 MW | 1,908 MW |
| 3 Nov, 13:00 | 1,953 MW | 1,875 MW |
| 3 Nov, 14:00 | 1,878 MW | 1,817 MW |
| 3 Nov, 15:00 | 1,832 MW | 1,790 MW |
| 3 Nov, 16:00 | 1,839 MW | 1,790 MW |
| 3 Nov, 17:00 | 1,850 MW | 1,846 MW |
| 3 Nov, 18:00 | 1,861 MW | 1,877 MW |
| 3 Nov, 19:00 | 1,873 MW | 1,878 MW |
| 3 Nov, 20:00 | 1,827 MW | 1,814 MW |
| 3 Nov, 21:00 | 1,695 MW | 1,672 MW |
| 3 Nov, 22:00 | 1,611 MW | 1,580 MW |
| 3 Nov, 23:00 | 1,511 MW | 1,505 MW |
| 4 Nov, 00:00 | 1,472 MW | 1,367 MW |
| 4 Nov, 01:00 | 1,415 MW | 1,368 MW |
| 4 Nov, 02:00 | 1,424 MW | 1,349 MW |
| 4 Nov, 03:00 | 1,422 MW | 1,359 MW |
| 4 Nov, 04:00 | 1,392 MW | 1,377 MW |
| 4 Nov, 05:00 | 1,521 MW | 1,526 MW |
| 4 Nov, 06:00 | 1,883 MW | 1,746 MW |
| 4 Nov, 07:00 | 2,150 MW | 1,855 MW |
| 4 Nov, 08:00 | 2,162 MW | 1,927 MW |
| 4 Nov, 09:00 | 2,002 MW | 1,962 MW |
| 4 Nov, 10:00 | 2,006 MW | 1,951 MW |
| 4 Nov, 11:00 | 2,004 MW | 1,941 MW |
| 4 Nov, 12:00 | 2,069 MW | 1,926 MW |
| 4 Nov, 13:00 | 1,950 MW | 1,905 MW |
| 4 Nov, 14:00 | 1,912 MW | 1,856 MW |
| 4 Nov, 15:00 | 1,954 MW | 1,807 MW |
| 4 Nov, 16:00 | 1,915 MW | 1,820 MW |
| 4 Nov, 17:00 | 2,057 MW | 1,852 MW |
| 4 Nov, 18:00 | 1,878 MW | 1,871 MW |
| 4 Nov, 19:00 | 1,885 MW | 1,882 MW |
| 4 Nov, 20:00 | 1,864 MW | 1,800 MW |
| 4 Nov, 21:00 | 1,733 MW | 1,666 MW |
| 4 Nov, 22:00 | 1,635 MW | 1,563 MW |
| 4 Nov, 23:00 | 1,512 MW | 1,495 MW |
| 5 Nov, 00:00 | 1,446 MW | 1,371 MW |
| 5 Nov, 01:00 | 1,410 MW | 1,355 MW |
| 5 Nov, 02:00 | 1,373 MW | 1,349 MW |
| 5 Nov, 03:00 | 1,405 MW | 1,344 MW |
| 5 Nov, 04:00 | 1,411 MW | 1,378 MW |
| 5 Nov, 05:00 | 1,499 MW | 1,512 MW |
| 5 Nov, 06:00 | 1,982 MW | 1,710 MW |
| 5 Nov, 07:00 | 2,225 MW | 1,842 MW |
| 5 Nov, 08:00 | 2,231 MW | 1,910 MW |
| 5 Nov, 09:00 | 2,031 MW | 1,910 MW |
| 5 Nov, 10:00 | 2,009 MW | 1,920 MW |
| 5 Nov, 11:00 | 2,076 MW | 1,902 MW |
| 5 Nov, 12:00 | 2,038 MW | 1,865 MW |
| 5 Nov, 13:00 | 1,991 MW | 1,847 MW |
| 5 Nov, 14:00 | 902 MW | 1,805 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (687 of 687 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- European figures are for the ENTSO-E bidding zone named on this page. US and European grids are ranked separately.
Related
Cite this page
World Power Monitor. (2026). Slovenia Demand Forecast Accuracy: Error, Bias and Worst Miss. https://worldpowermonitor.com/forecast-accuracy/si/
World Power Monitor. Slovenia Demand Forecast Accuracy: Error, Bias and Worst Miss. Data as of 2026-11-05. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/forecast-accuracy/si/
@misc{wpm_forecast_accuracy_si_2026,
title = {{Slovenia Demand Forecast Accuracy: Error, Bias and Worst Miss}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-05. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/forecast-accuracy/si/}
} Permalink: https://worldpowermonitor.com/forecast-accuracy/si/