PJM Demand Forecast Accuracy: Error, Bias and Worst Miss, 6 October to 5 November 2026
The day-ahead demand forecast for PJM was off by 3.0% on average (mean absolute percentage error) over 694 hours from 6 October to 5 November 2026, and 83% of hours landed within 5% of the reading. Its bias was -1.5%: it ran low on average, an under forecast. The largest miss was 7,621 MW (9.2%) too high at 19 Oct 2026, 05:00 EDT (UTC-04:00). Dates and times are local (America/New_York).
Key Facts
- The day-ahead demand forecast for PJM was off by 3.0% on average (mean absolute percentage error) over 694 hours from 6 October to 5 November 2026, and 83% of hours landed within 5% of the reading. Its bias was -1.5%: it ran low on average, an under forecast. The largest miss was 7,621 MW (9.2%) too high at 19 Oct 2026, 05:00 EDT (UTC-04:00).
- Across 53 US grids ranked by average error over their own latest 30 day windows, PJM came 17 (1 is the smallest error).
- On average the forecast differed from reported demand by 2,581 MW, against average demand of 86,367 MW.
- The forecast was above reported demand in 30% of compared hours.
Forecast Error at a Glance
694 hours from 6 October to 5 November 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (-1,256 MW per hour on average): the forecast ran low on average, an under forecast. The worst miss was 7,621 MW (9.2%) too high at 19 Oct 2026, 05:00 EDT (UTC-04:00): forecast 90,333 MW, reported 82,712 MW.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-05. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 5 Nov 2026, 08:00 EST (UTC-05:00)Show the data table (168 rows)
| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 29 Oct, 10:00 | 89,360 MW | 86,549 MW |
| 29 Oct, 11:00 | 89,890 MW | 86,637 MW |
| 29 Oct, 12:00 | 90,483 MW | 87,264 MW |
| 29 Oct, 13:00 | 90,892 MW | 87,999 MW |
| 29 Oct, 14:00 | 91,183 MW | 89,057 MW |
| 29 Oct, 15:00 | 91,542 MW | 90,872 MW |
| 29 Oct, 16:00 | 92,261 MW | 92,856 MW |
| 29 Oct, 17:00 | 93,471 MW | 93,767 MW |
| 29 Oct, 18:00 | 94,522 MW | 94,078 MW |
| 29 Oct, 19:00 | 94,711 MW | 92,567 MW |
| 29 Oct, 20:00 | 92,895 MW | 89,349 MW |
| 29 Oct, 21:00 | 90,025 MW | 84,899 MW |
| 29 Oct, 22:00 | 85,550 MW | 80,491 MW |
| 29 Oct, 23:00 | 81,892 MW | 76,868 MW |
| 30 Oct, 00:00 | 79,352 MW | 75,070 MW |
| 30 Oct, 01:00 | 78,169 MW | 73,763 MW |
| 30 Oct, 02:00 | 76,847 MW | 73,274 MW |
| 30 Oct, 03:00 | 76,278 MW | 74,258 MW |
| 30 Oct, 04:00 | 76,429 MW | 77,687 MW |
| 30 Oct, 05:00 | 78,388 MW | 83,637 MW |
| 30 Oct, 06:00 | 84,274 MW | 88,033 MW |
| 30 Oct, 07:00 | 88,725 MW | 88,758 MW |
| 30 Oct, 08:00 | 89,422 MW | 87,812 MW |
| 30 Oct, 09:00 | 88,301 MW | 86,919 MW |
| 30 Oct, 10:00 | 89,131 MW | 86,500 MW |
| 30 Oct, 11:00 | 89,769 MW | 86,622 MW |
| 30 Oct, 12:00 | 89,406 MW | 86,947 MW |
| 30 Oct, 13:00 | 89,474 MW | 87,400 MW |
| 30 Oct, 14:00 | 89,753 MW | 88,082 MW |
| 30 Oct, 15:00 | 90,241 MW | 89,482 MW |
| 30 Oct, 16:00 | 90,588 MW | 90,928 MW |
| 30 Oct, 17:00 | 90,915 MW | 90,928 MW |
| 30 Oct, 18:00 | 91,043 MW | 90,662 MW |
| 30 Oct, 19:00 | 90,463 MW | 88,998 MW |
| 30 Oct, 20:00 | 88,404 MW | 86,367 MW |
| 30 Oct, 21:00 | 86,123 MW | 82,990 MW |
| 30 Oct, 22:00 | 82,946 MW | 79,125 MW |
| 30 Oct, 23:00 | 79,397 MW | 76,461 MW |
| 31 Oct, 00:00 | 77,459 MW | 74,586 MW |
| 31 Oct, 01:00 | 76,623 MW | 73,358 MW |
| 31 Oct, 02:00 | 76,511 MW | 72,753 MW |
| 31 Oct, 03:00 | 76,403 MW | 73,071 MW |
| 31 Oct, 04:00 | 76,416 MW | 74,620 MW |
| 31 Oct, 05:00 | 76,616 MW | 77,374 MW |
| 31 Oct, 06:00 | 77,355 MW | 80,151 MW |
| 31 Oct, 07:00 | 80,724 MW | 81,631 MW |
| 31 Oct, 08:00 | 82,732 MW | 81,508 MW |
| 31 Oct, 09:00 | 83,535 MW | 80,711 MW |
| 31 Oct, 10:00 | 84,233 MW | 79,880 MW |
| 31 Oct, 11:00 | 83,895 MW | 79,147 MW |
| 31 Oct, 12:00 | 83,097 MW | 78,553 MW |
| 31 Oct, 13:00 | 82,961 MW | 78,478 MW |
| 31 Oct, 14:00 | 83,078 MW | 79,134 MW |
| 31 Oct, 15:00 | 81,978 MW | 81,014 MW |
| 31 Oct, 16:00 | 82,656 MW | 83,496 MW |
| 31 Oct, 17:00 | 83,068 MW | 85,153 MW |
| 31 Oct, 18:00 | 83,937 MW | 86,327 MW |
| 31 Oct, 19:00 | 83,778 MW | 85,575 MW |
| 31 Oct, 20:00 | 83,334 MW | 83,807 MW |
| 31 Oct, 21:00 | 82,402 MW | 81,244 MW |
| 31 Oct, 22:00 | 80,341 MW | 78,290 MW |
| 31 Oct, 23:00 | 77,978 MW | 76,125 MW |
| 1 Nov, 00:00 | 76,696 MW | n/a |
| 1 Nov, 01:00 | 75,403 MW | n/a |
| 1 Nov, 01:00 | 75,940 MW | n/a |
| 1 Nov, 02:00 | 76,127 MW | n/a |
| 1 Nov, 03:00 | 75,776 MW | n/a |
| 1 Nov, 04:00 | 76,266 MW | n/a |
| 1 Nov, 05:00 | 77,348 MW | n/a |
| 1 Nov, 06:00 | 78,748 MW | n/a |
| 1 Nov, 07:00 | 79,853 MW | n/a |
| 1 Nov, 08:00 | 81,033 MW | n/a |
| 1 Nov, 09:00 | 81,790 MW | n/a |
| 1 Nov, 10:00 | 81,893 MW | n/a |
| 1 Nov, 11:00 | 81,705 MW | n/a |
| 1 Nov, 12:00 | 81,649 MW | n/a |
| 1 Nov, 13:00 | 81,718 MW | n/a |
| 1 Nov, 14:00 | 82,633 MW | n/a |
| 1 Nov, 15:00 | 84,759 MW | n/a |
| 1 Nov, 16:00 | 88,741 MW | n/a |
| 1 Nov, 17:00 | 89,689 MW | n/a |
| 1 Nov, 18:00 | 88,384 MW | n/a |
| 1 Nov, 19:00 | 86,634 MW | n/a |
| 1 Nov, 20:00 | 83,881 MW | n/a |
| 1 Nov, 21:00 | 82,047 MW | n/a |
| 1 Nov, 22:00 | 80,176 MW | n/a |
| 1 Nov, 23:00 | 80,176 MW | n/a |
| 2 Nov, 00:00 | 78,412 MW | 75,717 MW |
| 2 Nov, 01:00 | 77,116 MW | 74,843 MW |
| 2 Nov, 02:00 | 77,252 MW | 74,651 MW |
| 2 Nov, 03:00 | 77,447 MW | 76,223 MW |
| 2 Nov, 04:00 | 78,632 MW | 80,105 MW |
| 2 Nov, 05:00 | 80,815 MW | 86,572 MW |
| 2 Nov, 06:00 | 86,752 MW | 90,999 MW |
| 2 Nov, 07:00 | 90,090 MW | 91,544 MW |
| 2 Nov, 08:00 | 90,207 MW | 90,406 MW |
| 2 Nov, 09:00 | 89,507 MW | 89,771 MW |
| 2 Nov, 10:00 | 89,642 MW | 89,531 MW |
| 2 Nov, 11:00 | 89,687 MW | 89,650 MW |
| 2 Nov, 12:00 | 89,905 MW | 89,973 MW |
| 2 Nov, 13:00 | 90,213 MW | 90,189 MW |
| 2 Nov, 14:00 | 91,070 MW | 90,876 MW |
| 2 Nov, 15:00 | 90,951 MW | 92,409 MW |
| 2 Nov, 16:00 | 92,497 MW | 94,945 MW |
| 2 Nov, 17:00 | 95,516 MW | 95,560 MW |
| 2 Nov, 18:00 | 95,673 MW | 95,409 MW |
| 2 Nov, 19:00 | 94,194 MW | 93,610 MW |
| 2 Nov, 20:00 | 91,850 MW | 90,553 MW |
| 2 Nov, 21:00 | 89,603 MW | 86,335 MW |
| 2 Nov, 22:00 | 86,661 MW | 82,332 MW |
| 2 Nov, 23:00 | 83,331 MW | 79,436 MW |
| 3 Nov, 00:00 | 81,153 MW | 76,945 MW |
| 3 Nov, 01:00 | 79,998 MW | 75,728 MW |
| 3 Nov, 02:00 | 79,062 MW | 75,320 MW |
| 3 Nov, 03:00 | 78,959 MW | 76,502 MW |
| 3 Nov, 04:00 | 79,721 MW | 80,101 MW |
| 3 Nov, 05:00 | 81,762 MW | 86,196 MW |
| 3 Nov, 06:00 | 86,761 MW | 90,343 MW |
| 3 Nov, 07:00 | 89,542 MW | 90,745 MW |
| 3 Nov, 08:00 | 88,961 MW | 89,451 MW |
| 3 Nov, 09:00 | 89,131 MW | 88,771 MW |
| 3 Nov, 10:00 | 90,288 MW | 88,741 MW |
| 3 Nov, 11:00 | 90,859 MW | 89,314 MW |
| 3 Nov, 12:00 | 91,729 MW | 90,270 MW |
| 3 Nov, 13:00 | 92,108 MW | 91,159 MW |
| 3 Nov, 14:00 | 92,491 MW | 92,324 MW |
| 3 Nov, 15:00 | 93,367 MW | 94,248 MW |
| 3 Nov, 16:00 | 94,577 MW | 96,141 MW |
| 3 Nov, 17:00 | 96,923 MW | 96,501 MW |
| 3 Nov, 18:00 | 97,425 MW | 96,122 MW |
| 3 Nov, 19:00 | 95,683 MW | 94,038 MW |
| 3 Nov, 20:00 | 93,077 MW | 90,594 MW |
| 3 Nov, 21:00 | 89,679 MW | 86,077 MW |
| 3 Nov, 22:00 | 85,982 MW | 81,602 MW |
| 3 Nov, 23:00 | 83,854 MW | 78,255 MW |
| 4 Nov, 00:00 | 81,006 MW | 75,889 MW |
| 4 Nov, 01:00 | 79,501 MW | 74,358 MW |
| 4 Nov, 02:00 | 78,473 MW | 73,694 MW |
| 4 Nov, 03:00 | 77,844 MW | 74,560 MW |
| 4 Nov, 04:00 | 78,780 MW | 77,743 MW |
| 4 Nov, 05:00 | 81,160 MW | 83,493 MW |
| 4 Nov, 06:00 | 85,155 MW | 87,720 MW |
| 4 Nov, 07:00 | 88,210 MW | 88,719 MW |
| 4 Nov, 08:00 | 88,128 MW | 88,267 MW |
| 4 Nov, 09:00 | 88,520 MW | 88,231 MW |
| 4 Nov, 10:00 | 89,332 MW | 88,438 MW |
| 4 Nov, 11:00 | 90,406 MW | 89,299 MW |
| 4 Nov, 12:00 | 90,873 MW | 90,410 MW |
| 4 Nov, 13:00 | 92,139 MW | 91,444 MW |
| 4 Nov, 14:00 | 92,505 MW | 92,796 MW |
| 4 Nov, 15:00 | 93,062 MW | 94,753 MW |
| 4 Nov, 16:00 | 94,334 MW | 96,656 MW |
| 4 Nov, 17:00 | 96,657 MW | 96,644 MW |
| 4 Nov, 18:00 | 96,673 MW | 95,729 MW |
| 4 Nov, 19:00 | 95,041 MW | 93,186 MW |
| 4 Nov, 20:00 | 92,719 MW | 89,919 MW |
| 4 Nov, 21:00 | 89,658 MW | 85,429 MW |
| 4 Nov, 22:00 | 86,504 MW | 80,948 MW |
| 4 Nov, 23:00 | 83,002 MW | 77,625 MW |
| 5 Nov, 00:00 | 80,136 MW | 75,480 MW |
| 5 Nov, 01:00 | 78,153 MW | 73,955 MW |
| 5 Nov, 02:00 | 77,081 MW | 73,305 MW |
| 5 Nov, 03:00 | 76,795 MW | 74,259 MW |
| 5 Nov, 04:00 | 77,274 MW | 77,527 MW |
| 5 Nov, 05:00 | 79,231 MW | 83,448 MW |
| 5 Nov, 06:00 | 84,680 MW | 87,916 MW |
| 5 Nov, 07:00 | 88,643 MW | 89,490 MW |
| 5 Nov, 08:00 | 90,540 MW | 89,567 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (694 of 720 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- US figures are for the EIA balancing authority or region named on this page. US and European grids are ranked separately.
Related
Cite this page
World Power Monitor. (2026). PJM Demand Forecast Accuracy: Error, Bias and Worst Miss. https://worldpowermonitor.com/forecast-accuracy/pjm/
World Power Monitor. PJM Demand Forecast Accuracy: Error, Bias and Worst Miss. Data as of 2026-11-05. Data from U.S. Energy Information Administration. https://worldpowermonitor.com/forecast-accuracy/pjm/
@misc{wpm_forecast_accuracy_pjm_2026,
title = {{PJM Demand Forecast Accuracy: Error, Bias and Worst Miss}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-05. Data from U.S. Energy Information Administration.},